Information Request for a NRC Post-Approval Site Inspection for License Renewal 05000373/2022010
ML21292A178
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 10/19/2021
From: John Bozga
NRC/RGN-III/DRS/EB1
To: Rhoades D
Exelon Generation Co, Exelon Nuclear
References
IR 2022010
Download: ML21292A178 (5)


See also: IR 05000373/2022010

Text

Mr. David Rhoades

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

LASALLE COUNTY STATION, UNIT 1 - INFORMATION REQUEST FOR

A NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

05000373/2022010

Dear Mr. Rhoades:

On January 10, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a

Post-Approval Site Inspection for License Renewal at Lasalle County Station, Unit 1. This

inspection will be performed in accordance with NRC Inspection Procedure (IP) 71003. This

inspection will focus on verifying that license conditions added as part of your renewed license

and a sample of license renewal commitments have been implemented.

In order to minimize the inspection impact on the site and to ensure a productive inspection for

both parties, we have enclosed a request for information needed for the inspection. It is

important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into two groups:

The first group lists information necessary for our initial inspection scoping and in-office

preparation activities. During the in-office preparation activities, the team will identify as

much as possible the information and activities to be reviewed during the inspection. This

information should be provided to the lead inspector by December 27, 2021.

The second group includes the additional information required for the team to review

selected activities. This information should be available to the team onsite

January 10, 2022. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the lead inspector as the documents are

generated.

The lead inspector for this inspection is Mr. J. Bozga. We understand that our licensing

contact for this inspection is Mr. J. Greenblott of your organization. If there are any questions

about the inspection or the material requested in the enclosure, please contact the lead

inspector at 630-829-9613.

October 19, 2021

D. Rhoades

-2-

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's

"Rules of Practice," a copy of this letter and its enclosure will be available electronically for

public inspection in the NRC Public Document Room or from the Publicly Available Records

System (PARS) component of NRC's Agencywide Documents Access and Management

System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

John V. Bozga, Senior Reactor Inspector

Engineering Branch 1

Division of Reactor Safety

Docket No. 50-373

License No. NPF-11

Enclosure:

Post-Approval Site Inspection License

Renewal Request for Information

cc: Distribution via LISTSERV

Signed by Bozga, John

on 10/19/21

D. Rhoades

-3-

Letter to David Rhoades from John V. Bozga dated October 19, 2021.

SUBJECT:

LASALLE COUNTY STATION, UNIT 1 - INFORMATION REQUEST FOR

A NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

05000373/2022010

DISTRIBUTION:

Jessie Quichocho

Robert Williams

RidsNrrDorlLpl3

RidsNrrPMLaSalle Resource

RidsNrrDroIrib Resource

John Giessner

Mohammed Shuaibi

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML21292A178

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

JBozga:mb

DATE

10/19/2021

OFFICIAL RECORD COPY

Enclosure

POST-APPROVAL SITE INSPECTION LICENSE RENEWAL

REQUEST INFORMATION

Inspection Report: 05000373/2022010

Inspection Dates:

January 10, 2022 - January 28, 2022

Inspection Procedure:

Inspection Procedure 71003 Post-Approval Site Inspection for

License Renewal

Lead Inspector:

John V. Bozga, Lead Inspector

630-829-9613

I.

Information Requested Prior to the On-site Inspection Week on December 27, 2021

The following information is requested by December 27, 2021, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please

call the team leader as soon as possible. (Please provide the information electronically

in pdf files, Excel, or other searchable formats, preferably on station/corporate online

portal for document sharing. The electronic information should be identified by unit,

contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.

Information in lists should contain enough information to be easily understood by

someone who has knowledge of light water reactor technology.)

1.

Provide a list of your license renewal commitments with an approximate

completion status of each.

2.

Provide a list of your Aging Management Programs (AMPs), copies of the

program basis documents for each, and a listing of the action tracking items for

each.

3.

For AMPs that are one-time inspection programs, provide a list of completed work

order numbers for inspections that have been completed. This may be

incorporated with the previous item and should include identification of the

inspected component.

4.

Provide current management and license renewal organizational charts.

5.

Provide electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

6.

Provide copies of any internal/external self-assessments and associated

corrective action documents generated in preparation for the inspection.

2

II.

Information Requested to Be Available When the Inspectors Arrive On-Site on

January 10, 2022

1.

Documentation demonstrating completion of license renewal commitments

completed as of the inspection date. For example, this may be in the form of a

binder for each commitment which includes the implementing documentation and

references.

III.

Information Requested to Be Provided Throughout the Inspection

1.

Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2.

Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

If you have questions regarding the information requested, please contact the lead inspector.