UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 1, 2010 Mr. Michael Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

LASALLE COUNTY STATION UNITS 1 AND 2

Dear Mr. Pacilio:

On August 5, 2010, the NRC staff completed its performance review of the LaSalle County Station Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information.

A separate letter designated and marked as "Official Use Only--Security Information" will include the Security Cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at LaSalle County Station Units 1 and 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

M. Pacilio If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Kenneth Riemer at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18

Enclosure:

LaSalle County Station Units 1 and 2 Inspection/Activity Plan cc w/encl: Distribution via ListServe

M. Pacilio If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Kenneth Riemer at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18

Enclosure:

LaSalle County Station Units 1 and 2 Inspection/Activity Plan cc w/encl: Distribution via ListServe DISTRIBUTION:

See next page DOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2010 to 2011\midcycle letters\LaSalle MOC Letter 2010.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N RIII N NAME NShah:cs KRiemer DATE 08/26/10 08/26/10 OFFICIAL RECORD COPY

Letter to M. Pacilio from K. Riemer dated September 1, 2010

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

LASALLE COUNTY STATION UNITS 1 AND 2 DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-2 RidsNrrPMLaSalle RidsNrrDirsIpab Resource Steven Reynolds Steven Orth Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource

LaSalle Inspection / Activity Plan 09/01/2010 - 12/31/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site ISFSI - ISFSI INSPECT. - SCHEDULE DEPENDENT 2 07/01/2010 09/30/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 09/13/2010 09/17/2010 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation OL EXAM - LASALLE INIT EXAM - SEPT. 2010 3 09/13/2010 09/24/2010 W90220 OL - INITIAL EXAM - SEPT 2010 - LASA BI ENG - COMPONENT DESIGN BASES INSPECTION 6 10/18/2010 11/19/2010 IP 7111121 Component Design Bases Inspection BI ENG - HEAD DROP ANALYSIS 1 10/18/2010 11/05/2010 IP 7111120 Refueling and Other Outage Activities BI ENG - INSERVICE INSPECTION - UNIT 2 1 02/21/2011 03/16/2011 IP 7111108G Inservice Inspection Activities - BWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 03/07/2011 03/11/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 03/07/2011 03/11/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 03/07/2011 03/11/2011 IP 71124.02 Occupational ALARA Planning and Controls BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 04/25/2011 04/29/2011 IP 71124.05 Radiation Monitoring Instrumentation BI EP - EP ROUTINE INSPECTION / PI VERIFICATION 2 06/27/2011 07/01/2011 IP 7111402 Alert and Notification System Testing 06/27/2011 07/01/2011 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 06/27/2011 07/01/2011 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 06/27/2011 07/01/2011 IP 71151-EP01 Drill/Exercise Performance 06/27/2011 07/01/2011 IP 71151-EP02 ERO Drill Participation 06/27/2011 07/01/2011 IP 71151-EP03 Alert & Notification System BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 07/18/2011 07/22/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 07/18/2011 07/22/2011 IP 71124.07 Radiological Environmental Monitoring Program BI PI&R - BIENNIAL PI&R INSPECTION 2 09/12/2011 09/30/2011 IP 71152B Identification and Resolution of Problems BI ENG - TRIENNIAL FIRE PROTECTION INSPECTION 3 10/17/2011 11/18/2011 IP 7111105T Fire Protection [Triennial]

BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 10/31/2011 11/04/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls

LaSalle Inspection / Activity Plan 09/01/2010 - 12/31/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 10/31/2011 11/04/2011 IP 71151 Performance Indicator Verification BI OL - BIENNIAL REQUAL PROGRAM INSPECTION 2 11/07/2011 11/10/2011 IP 7111111B Licensed Operator Requalification Program