ML17223A875: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 20: Line 20:
DISTRIBUTION
DISTRIBUTION
DEMONSTRATION
DEMONSTRATION
SYSTEMI~~'REGULATORY
SYSTEM I~~'REGULATORY
INFORMATION
INFORMATION
DISTRIBUTION
DISTRIBUTION
SYSTEM(R1DS)ACCESSION
SYSTEM (R1DS)ACCESSION NBR:9008140504
NBR:9008140504
DOC.DATE: 90/08/09 NOTARIZED:
DOC.DATE:
NO FACIL:50-335
90/08/09NOTARIZED:
St.Lucie Plant, Unit 1, Florida Power 6 Light Co.AUTH.NAME AUTHOR AFFILIATION
NOFACIL:50-335
St.LuciePlant,Unit1,FloridaPower6LightCo.AUTH.NAMEAUTHORAFFILIATION
GOLDBERG,J.H.
GOLDBERG,J.H.
FloridaPower&Light,Co.RECIP.NAME
Florida Power&Light, Co.RECIP.NAME
RECIPIENT
RECIPIENT AFFIL1ATION
AFFIL1ATION
Document Control Branch (Document Control Desk)SUBJECT: Responds to violations
DocumentControlBranch(Document
noted in Insp Rept 50-335/90-14.
ControlDesk)SUBJECT:Respondstoviolations
notedinInspRept50-335/90-14.
DISTRIBUTION
DISTRIBUTION
CODE:IEOIDCOPIESRECEIVED:LTR
CODE: IEOID COPIES RECEIVED:LTR
iENCLjSIZE:TITLE:General(50Dkt)-Insp
i ENCL j SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
Rept/Notice
of VioTation Response NOTES: DOCKET ,05000335 D RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS AEOD/DEIIB
ofVioTation
DEDRO NRR SHANKMAN,S
ResponseNOTES:DOCKET,05000335
NRR/DOEA DIR 11 NRR/DRIS/DIR
DRECIPIENT
IDCODE/NAME
PD2-2PDINTERNAL:
ACRSAEOD/DEIIB
DEDRONRRSHANKMAN,S
NRR/DOEADIR11NRR/DRIS/DIR
.NRR/PMAS/ILRB12
.NRR/PMAS/ILRB12
OE.DEXTERNAL:
OE.D EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1.1 1 1'1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD AEOD/TPAD NRR MORISSEAU,D
LPDRNSICCOPIESLTTRENCL11221111111.111'111111111RECIPIENT
IDCODE/NAME
NORRIS,JAEODAEOD/TPAD
NRRMORISSEAU,D
NRR/DLPQ/LPEB10
NRR/DLPQ/LPEB10
NRR/DREP/PEPB9DNRR/DST/DIR
NRR/DRE P/PE PB9 D NRR/DST/DIR
8E2NUDOCS-ABSTRACT
8E2 NUDOCS-ABSTRACT
OGC/HDS2RGN2FILE01NRCPDRCOPIESLTTRENCL11111111111111111111ADDSDNOTETOALL"RIDS"RECIPIENTS:
OGC/HDS2 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 A D D S D NOTE TO ALL"RIDS" RECIPIENTS:
DDPLEASEHELPUSTOREDUCEO'ASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOiiIPl-37(EXT.20079)TOELIMINATE
D D PLEASE HELP US TO REDUCE O'ASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOiiI Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROiv!DISTRIBUTIOiV
YOURNAMEFROiv!DISTRIBUTIOiV
LISTS FOR DOCUi>IENTS
LISTSFORDOCUi>IENTS
YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24
YOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:
PO.Box 14000,Juno
LTTR24ENCL24
Beach,FL 33408 0420 AUGUST.9 1990 L-90-291 10 CFR 2.201 U.S.Nuclear Regulatory
PO.Box14000,Juno
Beach,FL334080420AUGUST.91990L-90-29110CFR2.201U.S.NuclearRegulatory
Commission
Commission
Attn:DocumentControlDeskWashington,
Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
D.C.20555Gentlemen:
Re: St.Lucie Unit 1 Docket Nos.50-335 Response to Notice of Violation Ins ection Re ort 90-14 Florida Power and Light Company has reviewed the subject inspection
Re:St.LucieUnit1DocketNos.50-335ResponsetoNoticeofViolation
report and pursuant to 10 CFR 2.201 the response is attached.Very truly yours,":.b WX~~:~J;H.Goldberg President-Nuclear Division JHG/GRM Attachment
InsectionReort90-14FloridaPowerandLightCompanyhasreviewedthesubjectinspection
A cc: Stewart D.Ebneter, Regional Administrator, USNRC Region II Senior Resident Inspector, USNRC, St.Lucie Plant900-:;,40.".;Ot'C>r>80a>
reportandpursuantto10CFR2.201theresponseisattached.
F'1:<AZ>GCc,'-C~i>j>.".:;:
Verytrulyyours,":.bWX~~:~J;H.GoldbergPresident
>-D>".an FPL Grov>>compacv+/  
-NuclearDivisionJHG/GRMAttachment
Re: St.Lucie Units 1 Docket Nos.50-335 Response to Notice of Violation Ins ection Re ort 90-14 FINDING:.Unit 1 Technical Specification (TS)6.8.1.a requires that written procedures
Acc:StewartD.Ebneter,RegionalAdministrator,
shall be established, implemented
USNRCRegionIISeniorResidentInspector,
and maintained
USNRC,St.LuciePlant900-:;,40.".;Ot'C>r>80a>
covering the activities
F'1:<AZ>GCc,'-
C~i>j>.".:;:
>-D>".anFPLGrov>>compacv+/  
Re:St.LucieUnits1DocketNos.50-335ResponsetoNoticeofViolation
InsectionReort90-14FINDING:.Unit1Technical
Specification
(TS)6.8.1.arequiresthatwrittenprocedures
shallbeestablished,
implemented
andmaintained
coveringtheactivities
recommended
recommended
inAppendixAofRegulatory
in Appendix A of Regulatory
Guide1.33,Revision2,February1978.AppendixA,paragraph
Guide 1.33, Revision 2, February 1978.Appendix A, paragraph 1.d, includes procedures
1.d,includesprocedures
addressing
addressing
procedure
procedure adherence and temporary change method.Procedure QI 5-PR/PSL-l, Rev 37, Preparation, Revision, Review/Approval
adherence
of Procedures, section 5.5, implemented
andtemporary
TS 6.8.1 and required that procedures
changemethod.Procedure
be strictly adhered to.It also provided the method to obtain approved temporary procedure changes and, if appropriate, subsequent
QI5-PR/PSL-l,
permanent changes.Procedure OP-1-0120051, Rev 10, RCS Flow Determination
Rev37,Preparation,
by Calorimetric
Revision,
Procedure, steps 8.3 through 8.6, directed certain action sequences involving coordination
Review/Approval
with the Reactor Control Operator at the control board, control board loop temperature
ofProcedures,
meter function selection using switches, and confirmation
section5.5,implemented
that measurements
TS6.8.1andrequiredthatprocedures
were being made=only on channels that had the meter switched out and isolated.Cont'rary to the above, on May 14, 1990, During the performance
bestrictlyadheredto.Italsoprovidedthemethodtoobtainapprovedtemporary
of procedure OP 1-0120051, the licensee's
procedure
staff did not follow instruction
changesand,ifappropriate,
steps 8.3 through 8.6 The test persons instead utilized an unapproved
subsequent
method to isolate all the meters to simultaneously
permanent
isolate the involved loop temperature
changes.Procedure
meters and complete the data collection
OP-1-0120051,
without.the described coordination.
Rev10,RCSFlowDetermination
RESPONSE: 2~3~Florida Power and Light Company concurs with the violation.
byCalorimetric
The reason for the violation was failure to follow QI 5-PR/PSL-1.Test personnel failed to process a Procedure Change Request (PCR)prior to,implementing
Procedure,
an improved method of collecting
steps8.3through8.6,directedcertainactionsequences
the temperature
involving
data.The Reactor Coolant System flow determination
coordination
by calorimetric
withtheReactorControlOperatoratthecontrolboard,controlboardlooptemperature
.procedure was repeated with the individual's
meterfunctionselection
usingswitches,
andconfirmation
thatmeasurements
werebeingmade=onlyonchannelsthathadthemeterswitchedoutandisolated.
Cont'rary
totheabove,onMay14,1990,Duringtheperformance
ofprocedure
OP1-0120051,
thelicensee's
staffdidnotfollowinstruction
steps8.3through8.6Thetestpersonsinsteadutilizedanunapproved
methodtoisolateallthemeterstosimultaneously
isolatetheinvolvedlooptemperature
metersandcompletethedatacollection
without.thedescribed
coordination.
RESPONSE:
2~3~FloridaPowerandLightCompanyconcurswiththeviolation.
Thereasonfortheviolation
wasfailuretofollowQI5-PR/PSL-1.
Testpersonnel
failedtoprocessaProcedure
ChangeRequest(PCR)priorto,implementing
animprovedmethodofcollecting
thetemperature
data.TheReactorCoolantSystemflowdetermination
bycalorimetric
.procedure
wasrepeatedwiththeindividual's
supervisor
supervisor
observing.
observing.
4,Thefollowing
4, The following actions have been implemented
actionshavebeenimplemented
to avoid further violations:
toavoidfurtherviolations:
a.The individual
a.Theindividual
was counselled
wascounselled
by his supervisor.'.
byhissupervisor.'.
A PCR was submitted to clarify and authorize the'improved method of data collection.  
APCRwassubmitted
toclarifyandauthorize
the'improved
methodofdatacollection.  
   
   
Re:St.LucieUnits1DocketNos.50-335ResponsetoNoticeofViolation
Re: St.Lucie Units 1 Docket Nos.50-335 Response to Notice of Violation Ins ection Re ort 90-14 c.All individuals
InsectionReort90-14c.Allindividuals
in the Test Group were reminded of the importance
intheTestGroupwereremindedoftheimportance
of following procedures
offollowing
and the need for processing
procedures
a PCR and/or a Temporary Change (TC)followed by a PCR prior to implementation
andtheneedforprocessing
of the change.5.All the corrective
aPCRand/oraTemporary
actions were completed by August 1, 1990.
Change(TC)followedbyaPCRpriortoimplementation
ofthechange.5.Allthecorrective
actionswerecompleted
byAugust1,1990.
}}
}}

Revision as of 17:34, 7 July 2018

Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor
ML17223A875
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/09/1990
From: GOLDBERG J H
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-291, NUDOCS 9008140504
Download: ML17223A875 (5)


See also: IR 05000335/1990014

Text

(ACCELERATED

DISTRIBUTION

DEMONSTRATION

SYSTEM I~~'REGULATORY

INFORMATION

DISTRIBUTION

SYSTEM (R1DS)ACCESSION NBR:9008140504

DOC.DATE: 90/08/09 NOTARIZED:

NO FACIL:50-335

St.Lucie Plant, Unit 1, Florida Power 6 Light Co.AUTH.NAME AUTHOR AFFILIATION

GOLDBERG,J.H.

Florida Power&Light, Co.RECIP.NAME

RECIPIENT AFFIL1ATION

Document Control Branch (Document Control Desk)SUBJECT: Responds to violations

noted in Insp Rept 50-335/90-14.

DISTRIBUTION

CODE: IEOID COPIES RECEIVED:LTR

i ENCL j SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice

of VioTation Response NOTES: DOCKET ,05000335 D RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS AEOD/DEIIB

DEDRO NRR SHANKMAN,S

NRR/DOEA DIR 11 NRR/DRIS/DIR

.NRR/PMAS/ILRB12

OE.D EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1.1 1 1'1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD AEOD/TPAD NRR MORISSEAU,D

NRR/DLPQ/LPEB10

NRR/DRE P/PE PB9 D NRR/DST/DIR

8E2 NUDOCS-ABSTRACT

OGC/HDS2 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 A D D S D NOTE TO ALL"RIDS" RECIPIENTS:

D D PLEASE HELP US TO REDUCE O'ASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOiiI Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROiv!DISTRIBUTIOiV

LISTS FOR DOCUi>IENTS

YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

PO.Box 14000,Juno

Beach,FL 33408 0420 AUGUST.9 1990 L-90-291 10 CFR 2.201 U.S.Nuclear Regulatory

Commission

Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: St.Lucie Unit 1 Docket Nos.50-335 Response to Notice of Violation Ins ection Re ort 90-14 Florida Power and Light Company has reviewed the subject inspection

report and pursuant to 10 CFR 2.201 the response is attached.Very truly yours,":.b WX~~:~J;H.Goldberg President-Nuclear Division JHG/GRM Attachment

A cc: Stewart D.Ebneter, Regional Administrator, USNRC Region II Senior Resident Inspector, USNRC, St.Lucie Plant900-:;,40.".;Ot'C>r>80a>

F'1:<AZ>GCc,'-C~i>j>.".:;:

>-D>".an FPL Grov>>compacv+/

Re: St.Lucie Units 1 Docket Nos.50-335 Response to Notice of Violation Ins ection Re ort 90-14 FINDING:.Unit 1 Technical Specification (TS)6.8.1.a requires that written procedures

shall be established, implemented

and maintained

covering the activities

recommended

in Appendix A of Regulatory

Guide 1.33, Revision 2, February 1978.Appendix A, paragraph 1.d, includes procedures

addressing

procedure adherence and temporary change method.Procedure QI 5-PR/PSL-l, Rev 37, Preparation, Revision, Review/Approval

of Procedures, section 5.5, implemented

TS 6.8.1 and required that procedures

be strictly adhered to.It also provided the method to obtain approved temporary procedure changes and, if appropriate, subsequent

permanent changes.Procedure OP-1-0120051, Rev 10, RCS Flow Determination

by Calorimetric

Procedure, steps 8.3 through 8.6, directed certain action sequences involving coordination

with the Reactor Control Operator at the control board, control board loop temperature

meter function selection using switches, and confirmation

that measurements

were being made=only on channels that had the meter switched out and isolated.Cont'rary to the above, on May 14, 1990, During the performance

of procedure OP 1-0120051, the licensee's

staff did not follow instruction

steps 8.3 through 8.6 The test persons instead utilized an unapproved

method to isolate all the meters to simultaneously

isolate the involved loop temperature

meters and complete the data collection

without.the described coordination.

RESPONSE: 2~3~Florida Power and Light Company concurs with the violation.

The reason for the violation was failure to follow QI 5-PR/PSL-1.Test personnel failed to process a Procedure Change Request (PCR)prior to,implementing

an improved method of collecting

the temperature

data.The Reactor Coolant System flow determination

by calorimetric

.procedure was repeated with the individual's

supervisor

observing.

4, The following actions have been implemented

to avoid further violations:

a.The individual

was counselled

by his supervisor.'.

A PCR was submitted to clarify and authorize the'improved method of data collection.

Re: St.Lucie Units 1 Docket Nos.50-335 Response to Notice of Violation Ins ection Re ort 90-14 c.All individuals

in the Test Group were reminded of the importance

of following procedures

and the need for processing

a PCR and/or a Temporary Change (TC)followed by a PCR prior to implementation

of the change.5.All the corrective

actions were completed by August 1, 1990.