{{#Wiki_filter:Pair'~(ROCHESTER GAS%%3ELECTRICCORPORATION GINNASTATIONCONTROLLED COPYNUiSERGlNNASTAT1GNUNlTffCQI)PLET-DOATE::-TlhtE':--
{{#Wiki_filter:Pair'~(ROCHESTER GAS%%3 ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUiSER GlNNA STAT1GN UNlT ff CQI)PLET-D OATE::-TlhtE':--PROCEDURE NO.-37 5 REV.NO.CONTAINMEÃZ RECIRCULATION FANS~iIASS AIR FLOW CHEK TECHNICAL REVIEW (PORC 3-24-80 QC REVIEW APPROVED FOR USE PLAil UPERINTENDENT qA X NON-QA CATEGORY 1.0 REVIEWED BY:/THIS PROCEDUPZ CQiNTAINS 1O PAGES
PROCEDURE NO.-375REV.NO.CONTAINMEÃZ RECIRCULATION FANS~iIASSAIRFLOWCHEKTECHNICAL REVIEW(PORC3-24-80QCREVIEWAPPROVEDFORUSEPLAilUPERINTENDENT qAXNON-QACATEGORY1.0REVIEWEDBY:/THISPROCEDUPZ CQiNTAINS 1OPAGES


(PT-37.5CONTAIRKNT RECIRCULATION FANSHASSAIRPLO'rlCHiCKPT-37.5:1 1.0PURPOSE:Todetermine totalairflowthroughContainment Recirculation Pans.2.0TESTREQUIRE>lENTS:
(PT-37.5 CONTAIRKNT RECIRCULATION FANS HASS AIR PLO'rl CHiCK PT-37.5:1 1.0 PURPOSE: To determine total air flow through Containment Recirculation Pans.2.0 TEST REQUIRE>lENTS:
2.1Determine massairflowofeachcontainment recirculation fanduringnornaloperation and"A"g"C"fansduringaccidentoperation.
2.1 Determine mass air flow of each containment recirculation fan during nornal operation and"A" g"C" fans during accident operation.


==3.0REFERENCES==
==3.0 REFERENCES==
:
:
3.1Tech.Specs.Section4.5.2.3.4.0INITIALCONDITIONS:
3.1 Tech.Specs.Section 4.5.2.3.4.0 INITIAL CONDITIONS:
4.1Ensurethatallfansexceptthatfanundergoing theflowcheck,arenotoperating.
4.1 Ensure that all fans except that fan undergoing the flow check, are not operating.
Thisprocedure isdividedinto6sections.
This procedure is divided into 6 sections.Indicate which sections were used and mark remainder N/A.4.2.1"A" Containment Recirculation Fan Normal Conditions Hass Air Flow Check.4.2.2"A" Containment Recirculation Fan Accident Conditions Hass Air Flow Check.4.2.3"8" Containment Recirculation Fan Normal Conditions Hass Air Plow Check.'4.2.4"C" Containment Recirculation Fan Normal Conditions Hass Air Flow Check.4.2.5"C" Containment Recirculation Fan Accident Conditions Hass Air Flow Check.4.2.6"D" Containment Recirculation Fan Normal Conditions Hass Air Flow Check., 4.3 Test personnel are qualified in accordance with A-1102.5.0 , 5.1 PRECAUTIONS:
Indicatewhichsectionswereusedandmarkremainder N/A.4.2.1"A"Containment Recirculation FanNormalConditions HassAirFlowCheck.4.2.2"A"Containment Recirculation FanAccidentConditions HassAirFlowCheck.4.2.3"8"Containment Recirculation FanNormalConditions HassAirPlowCheck.'4.2.4"C"Containment Recirculation FanNormalConditions HassAirFlowCheck.4.2.5"C"Containment Recirculation FanAccidentConditions HassAirFlowCheck.4.2.6"D"Containment Recirculation FanNormalConditions HassAirFlowCheck.,4.3Testpersonnel arequalified inaccordance withA-1102.5.0,5.1PRECAUTIONS:
Normal company safety precautions will be observed./  
Normalcompanysafetyprecautions willbeobserved.
/  


PT-37.5:2 (4lINSTRUCTIONS:
PT-37.5:2 (4l INSTRUCTIONS: "A" Containment Recirculation Fan Normal Conditions Mass Air Flow Check: 6.1.1 Ensure that only the"A" Containment Recirculation Fan is running, 6.1.2 Ensure that normal loop entry damper 1 F-LED (5873)is open.6.1.3 Insert Pitot Tube and position end into air flow.6.1.4 Record air flow measurements at points indicated on data sheet.6'.5 Perform calculations for total air flow.6.2"A" Containment Recirculation-Fan Accident Conditions Mass Air Flow Check: 6.2.1 Ensure that only the"A" Containment Recirculation Fan is running.6.2;2 Press in armature button of CF1A/L relay in Relay Racks (latch in type relay), verify the following:
"A"Containment Recirculation FanNormalConditions MassAirFlowCheck:6.1.1Ensurethatonlythe"A"Containment Recirculation Fanisrunning,6.1.2Ensurethatnormalloopentrydamper1F-LED(5873)isopen.6.1.3InsertPitotTubeandpositionendintoairflow.6.1.4Recordairflowmeasurements atpointsindicated ondatasheet.6'.5Performcalculations fortotalairflow.6.2"A"Containment Recirculation-FanAccidentConditions MassAirFlowCheck:6.2.1Ensurethatonlythe"A"Containment Recirculation Fanisrunning.6.2;2PressinarmaturebuttonofCF1A/LrelayinRelayRacks(latchintyperelay),verifythefollowing:
6.2.2.1 1F-LED damper (58?3)assumes its fully closed position.(6.2.2.2 lI-CID damper (5871)assumes its fully open position.6.2.2.3 lK-COD damper (5872)assumes its fully open position.6.2.2.4 Green indicating light (at M.C.B.)for charcoal dampers is extinguished.'.2.3 Insert Pitot Tube and position end into air flow.6.2.4 6.2.5 6.2.6 Record air flow measurements at points indicated on data sheet.Perform calculations for total air flow.Return"A" Containment Recirculation Fan Dampers to their normal position by pressing in.reset push button and verify the following:
6.2.2.11F-LEDdamper(58?3)assumesitsfullyclosedposition.
6.2.6.1 1F-LED damper (5873)assumes its fully open position.6.2.6.2 1I-CID damper (5871)assumes its fully closed position.6.2.6.3 1K-COD damper (5872)assumes its fully closed position.6.2.6.4 6.3 Green indicating light (at M.C.B.)for charcoal dampers is illuminated."B" Containment Recirculation Fan Normal Conditions Mass Air Flow Check:
(6.2.2.2lI-CIDdamper(5871)assumesitsfullyopenposition.
PT-37.5:3 6.3.1 Ensure that only the"B" Containment Recirculation Pan is running.6.3.2 6.3.3 6.3.4 6.3.5 Ensure that normal loop entry damper 1G-LED is open.Insert Pitot Tube and position end.into air flow.Record air flow measureme'ats at points indicated on data sheet.Perform calculations for total air flow.6.4"C" Containment Recirculation Pan Normal Conditions Mass Air Plov Check:6.4.1 6.4.2 6.4.3 6.4.4 6.4.5 6.s 6.5.1 6.5.2 Ensure that only the"C" Containment Recirculation Fan is zunning.Ensure that normal loop entry damper 1H-LED (5875)is open.Insert Pitot Tube and position end into air flow.Record air flow measurements at points indicated on data sheet.Perform calculations for total air flow."C" Containment Recirculation Pan Accident Conditions Mass Air Plow Check: Ensure that only the"C" Containment Recirculation Pan is running.Press in armature button of CF1C/L relay in Relay Racks (latch in type relay), verify the fo3;lowing:
6.2.2.3lK-CODdamper(5872)assumesitsfullyopenposition.
6.5.2.1 1H-LED damper (5875)assumes its fully closed position.6.5.2.2 1J-CID damper (5876)assumes its fully open position.6'.2.3 6.5.2.4 6.5.3 6.5.4 6.s.s 6.5.6 1L-COD damper (5874)assumes its fully open position.Green indicating light (at M.C.B.)for charcoal dampers is extinguished.
6.2.2.4Greenindicating light(atM.C.B.)forcharcoaldampersisextinguished.'.2.3 InsertPitotTubeandpositionendintoairflow.6.2.46.2.56.2.6Recordairflowmeasurements atpointsindicated ondatasheet.Performcalculations fortotalairflow.Return"A"Containment Recirculation FanDamperstotheirnormalpositionbypressingin.resetpushbuttonandverifythefollowing:
Insert pitot tube and position end into air flov.Record air flov measurements at points indicated on data sheet.Perform calculations for total air flow.Return"C" Containment Recirculation Fan Dampers to their normal position by pressing in reset push buttong and verify the folloving:
6.2.6.11F-LEDdamper(5873)assumesitsfullyopenposition.
6.5.6.1 1H-LED damper (5875)assumes its fully open position.6.5.6.2 1J-CID damper (5876)assumes its fully closed position.  
6.2.6.21I-CIDdamper(5871)assumesitsfullyclosedposition.
6.2.6.31K-CODdamper(5872)assumesitsfullyclosedposition.
6.2.6.46.3Greenindicating light(atM.C.B.)forcharcoaldampersisilluminated.
"B"Containment Recirculation FanNormalConditions MassAirFlowCheck:
PT-37.5:3 6.3.1Ensurethatonlythe"B"Containment Recirculation Panisrunning.6.3.26.3.36.3.46.3.5Ensurethatnormalloopentrydamper1G-LEDisopen.InsertPitotTubeandpositionend.intoairflow.Recordairflowmeasureme'ats atpointsindicated ondatasheet.Performcalculations fortotalairflow.6.4"C"Containment Recirculation PanNormalConditions MassAirPlovCheck:6.4.16.4.26.4.36.4.46.4.56.s6.5.16.5.2Ensurethatonlythe"C"Containment Recirculation Faniszunning.Ensurethatnormalloopentrydamper1H-LED(5875)isopen.InsertPitotTubeandpositionendintoairflow.Recordairflowmeasurements atpointsindicated ondatasheet.Performcalculations fortotalairflow."C"Containment Recirculation PanAccidentConditions MassAirPlowCheck:Ensurethatonlythe"C"Containment Recirculation Panisrunning.PressinarmaturebuttonofCF1C/LrelayinRelayRacks(latchintyperelay),verifythefo3;lowing:
6.5.2.11H-LEDdamper(5875)assumesitsfullyclosedposition.
6.5.2.21J-CIDdamper(5876)assumesitsfullyopenposition.
6'.2.36.5.2.46.5.36.5.46.s.s6.5.61L-CODdamper(5874)assumesitsfullyopenposition.
Greenindicating light(atM.C.B.)forcharcoaldampersisextinguished.
Insertpitottubeandpositionendintoairflov.Recordairflovmeasurements atpointsindicated ondatasheet.Performcalculations fortotalairflow.Return"C"Containment Recirculation FanDamperstotheirnormalpositionbypressinginresetpushbuttongandverifythefolloving:
6.5.6.11H-LEDdamper(5875)assumesitsfullyopenposition.
6.5.6.21J-CIDdamper(5876)assumesitsfullyclosedposition.  


PT-37.5:4 (6.5.6.31L-CODdamper(5874)assumesitsfullyclosedposition.
PT-37.5:4 (6.5.6.3 1L-COD damper (5874)assumes its fully closed position.6.5.6.4 Green indicating light (at M.C.B.)for charcoal dampers is illuminated.
6.5.6.4Greenindicating light(atM.C.B.)forcharcoaldampersisilluminated.
6.6"D" Containment Recirculation Fan Normal Conditions Mass Air Plow Check: 6.6.1 6.6.2 6.6.3 6.6.4 6.6.5 Ensure that only the"D" Containment Recirculation Pan is running.Ensure that normal loop entry damper 1E-LED is open.Insert Pitot Tube and position end into air flow.r Record air flow measurements at points indicated on data skeet.Perform calculations for total air flow.J'OMPLETED BY: DATE COMPLETED:
6.6"D"Containment Recirculation FanNormalConditions MassAirPlowCheck:6.6.16.6.26.6.36.6.46.6.5Ensurethatonlythe"D"Containment Recirculation Panisrunning.Ensurethatnormalloopentrydamper1E-LEDisopen.InsertPitotTubeandpositionendintoairflow.rRecordairflowmeasurements atpointsindicated ondataskeet.Performcalculations fortotalairflow.J'OMPLETED BY:DATECOMPLETED:
SHIFT SUPERVISOR:
SHIFTSUPERVISOR:
RESULTS AND TEST REVIEW: DATE:  
RESULTSANDTESTREVIEW:DATE:  
"PT-37.5:5"A" CONTAIRKNT RECIRCULATION FAN NORMAL CONDITIONS MASS AIR FLOP CHECK DATA SHEET INCHES 1 1/16 3 7/16 6 1/8 9 1/2 14 3/8 TRA RSE j 1 N2 r Tot.Traverse jul Tot.Traverse jf2 Total 10 10 ave traverse jul=ave.traverse g2"H20 27 5/8 32 1/2 35 7/8 38 9/16 40 15/16 TOTAL ("H 0)144 in/ft 12 in ft 2.31 ft H20 j in V=2g (dP)=(64.4 ft/sec)(e,.075 g/ft ft/sec 2 2 Area of 42" Duct=9.6218 ft 2 jj'/f t ft/sec Q=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min 3 COIRKNTS: PERFORMED BY:=DATE:  
"PT-37.5:5"A"CONTAIRKNT RECIRCULATION FANNORMALCONDITIONS MASSAIRFLOPCHECKDATASHEETINCHES11/1637/1661/891/2143/8TRARSEj1N2rTot.TraversejulTot.Traversejf2Total1010avetraversejul=ave.traverseg2"H20275/8321/2357/8389/164015/16TOTAL("H0)144in/ft12inft2.31ftH20jinV=2g(dP)=(64.4ft/sec)(e,.075g/ftft/sec22Areaof42"Duct=9.6218ft2jj'/ftft/secQ=AV=(9.6218ft)(ft/sec)(60sec/min)=ft/min3COIRKNTS:
"A" CONTAI%1ENT RECRCULATION FAN ACCIDENT CONDITIONS HASS AIR FLOW CHECK DATA SHEET INCHES 1 1/16 3 7/16 6 1/8 9 1/2 14 3/8 TRAVERSE Tot.Traverse/Pl 10 Tot.Traverse/j2 10 Total ave.traverse/jl=ave.traverse jj2"H20 27 5/8 32 1/2 35 7/8 38 9/16 40 15/16 TOTAL ("H 0)144 in/ft 12 in ft 2.31 ft H20 in 2g (dZ)=(64.4 ft/sec)(e.075 g/ft ft/sec 2 2 Area of 42" Duct=9.6218 ft.2 ff/ft 7P/f t ft/sec Q=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min 3 COMHENTS: PERFORtKD BY: DATE:
PERFORMED BY:=DATE:  
PT-37.5:7"B" CONTAHRlENT RECIRCULATION FAN NODAL CONDITIONS MASS AIR FLOW CHECK DATA SHEET INCHES 1 1/16 TRAVERSE i2 Tot.Traverse jjl 10 ave.traverse ijl 3 7/16 6 1/8 9 1/2 Tot.Traverse ij2 10 Total=ave.traverse/j2"H20 14 3/8 27 5/8 32 1/2 35 7/8 38 9/16 40 15/16 TOTAL ("H 0)144 in/ft.2 2 12 in/ft Z.31 ft H20 f in 28 (~)=(64.4 ft/sec)(e.075/P/ft ft/sec 2 2 Area of 42" Duct-" 9,6218 ft 2 jj/f t fP/f t ft/sec 0=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min COlQKNTS: PERFORMED BY: DATE:
"A"CONTAI%1ENT RECRCULATION FANACCIDENTCONDITIONS HASSAIRFLOWCHECKDATASHEETINCHES11/1637/1661/891/2143/8TRAVERSETot.Traverse/Pl10Tot.Traverse/j210Totalave.traverse/jl=ave.traversejj2"H20275/8321/2357/8389/164015/16TOTAL("H0)144in/ft12inft2.31ftH20in2g(dZ)=(64.4ft/sec)(e.075g/ftft/sec22Areaof42"Duct=9.6218ft.2ff/ft7P/ftft/secQ=AV=(9.6218ft)(ft/sec)(60sec/min)=ft/min3COMHENTS:
PT-37.5:8"C" CONTAM1ENT RECIRCULATION FAN NORM CONDITIONS MASS AIR FLOP CHECK DATA SHEET INCHES 1 1/16 3 7/16 6 1/8 TRAVERSE Tot.Traverse gl Tot.Traverse/j2 Total 10 10 ave.traverse tj1=ave.traverse jj2"H 0 9 1/2 14 3/8 27 5/8 32 1/2 35 7/8 38 9/16 4O 1S/16 TOTAL ("H 0)144 in/ft 2 2 12 in ft Z.31 ft/H20 i in" 2g (dP)=64.4 ft/sec)(e..o7s/E/ft ft/sec 2 2 Area of 42" Duct=9.6218 ft 8/ft 8/f t.ft/sec Q=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min 3 COMMENTS: PERFORMED BY: DATE:
PERFORtKD BY:DATE:
PT-37.5:9"C" CONTAIRlENT RECIRCULATION FAN ACCIDENT CONDITIONS MASS AIR FLOW CHECK DATA SHEET INCHES 1 1/16 3 7/16 6 1/8 9 1/2 14 3/8 TRAVERSE 1 2 Tot.Traverse-j/1 Tot.Traverse g2 Total 2 10 10 ave.traverse ill=ave.traverse 82 H,O 27 5/8 32 1/2 35 7/8 38 9/16 40 15/16 TOTAL ("H 0)144 in/ft 12 in ft 2.31 ft H20 in V=g (&)=(64.4 ft/sec)(e.075///ft ft/sec 2 2 Area of 42" Duct=9.6218 ft g/ft 0/ft ft/sec g=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min COtHNTS: a PERFORMED BY: DATE:
PT-37.5:7 "B"CONTAHRlENT RECIRCULATION FANNODALCONDITIONS MASSAIRFLOWCHECKDATASHEETINCHES11/16TRAVERSEi2Tot.Traversejjl10ave.traverseijl37/1661/891/2Tot.Traverseij210Total=ave.traverse/j2"H20143/8275/8321/2357/8389/164015/16TOTAL("H0)144in/ft.2212in/ftZ.31ftH20fin28(~)=(64.4ft/sec)(e.075/P/ftft/sec22Areaof42"Duct-"9,6218ft2jj/ftfP/ftft/sec0=AV=(9.6218ft)(ft/sec)(60sec/min)=ft/minCOlQKNTS:
pT-37.5:10"D" CONTAIQKNT RECIRCULATION FAif NOEfAL CONDlTIONS MASS AIR FLOW CHECK DATA SHEET INCHES 1 1/16 3 7/16 6 i/8 9 1/2 14 3/8 TRAVERSE 82 Tot.Traverse jjl Tot.Traverse jj2 Total 10 10 ave.traverse/tl=ave.traverse/j2"H20 27 5/8 32 1/2 35 7/8 38 9/16 40 i5/16 TOTAL ("H 0)144 in/ft 12 in ft 2.31 ft H20 2g QZ)=(64.4 ft/sec)(e.075///ft ft/sec 2 2 Area of 42" Duct=9'218 ft 2/E/f t ft/sec Q=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min COE'ANTS E e PERF016KD BY: DATE:
PERFORMED BY:DATE:
PT-37.5:8"C"CONTAM1ENT RECIRCULATION FANNORMCONDITIONS MASSAIRFLOPCHECKDATASHEETINCHES11/1637/1661/8TRAVERSETot.TraverseglTot.Traverse/j2Total1010ave.traversetj1=ave.traversejj2"H091/2143/8275/8321/2357/8389/164O1S/16TOTAL("H0)144in/ft2212inftZ.31ft/H20iin"2g(dP)=64.4ft/sec)(e..o7s/E/ftft/sec22Areaof42"Duct=9.6218ft8/ft8/ft.ft/secQ=AV=(9.6218ft)(ft/sec)(60sec/min)=ft/min3COMMENTS:
PERFORMED BY:DATE:
PT-37.5:9 "C"CONTAIRlENT RECIRCULATION FANACCIDENTCONDITIONS MASSAIRFLOWCHECKDATASHEETINCHES11/1637/1661/891/2143/8TRAVERSE12Tot.Traverse-j/1Tot.Traverseg2Total21010ave.traverseill=ave.traverse82H,O275/8321/2357/8389/164015/16TOTAL("H0)144in/ft12inft2.31ftH20inV=g(&)=(64.4ft/sec)(e.075///ftft/sec22Areaof42"Duct=9.6218ftg/ft0/ftft/secg=AV=(9.6218ft)(ft/sec)(60sec/min)=ft/minCOtHNTS:aPERFORMED BY:DATE:
pT-37.5:10 "D"CONTAIQKNT RECIRCULATION FAifNOEfALCONDlTIONS MASSAIRFLOWCHECKDATASHEETINCHES11/1637/166i/891/2143/8TRAVERSE82Tot.TraversejjlTot.Traversejj2Total1010ave.traverse/tl=ave.traverse/j2"H20275/8321/2357/8389/1640i5/16TOTAL("H0)144in/ft12inft2.31ftH202gQZ)=(64.4ft/sec)(e.075///ftft/sec22Areaof42"Duct=9'218ft2/E/ftft/secQ=AV=(9.6218ft)(ft/sec)(60sec/min)=ft/minCOE'ANTSEePERF016KD BY:DATE:
0>i~'i,}}
0>i~'i,}}

Revision as of 15:57, 7 July 2018

Containment Recirculation Fans Mass Air Flow Check.
ML17250A583
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/31/1980
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17250A560 List:
References
PT-37.5, NUDOCS 8009160582
Download: ML17250A583 (15)


Text

Pair'~(ROCHESTER GAS%%3 ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUiSER GlNNA STAT1GN UNlT ff CQI)PLET-D OATE::-TlhtE':--PROCEDURE NO.-37 5 REV.NO.CONTAINMEÃZ RECIRCULATION FANS~iIASS AIR FLOW CHEK TECHNICAL REVIEW (PORC 3-24-80 QC REVIEW APPROVED FOR USE PLAil UPERINTENDENT qA X NON-QA CATEGORY 1.0 REVIEWED BY:/THIS PROCEDUPZ CQiNTAINS 1O PAGES

(PT-37.5 CONTAIRKNT RECIRCULATION FANS HASS AIR PLO'rl CHiCK PT-37.5:1 1.0 PURPOSE: To determine total air flow through Containment Recirculation Pans.2.0 TEST REQUIRE>lENTS:

2.1 Determine mass air flow of each containment recirculation fan during nornal operation and"A" g"C" fans during accident operation.

3.0 REFERENCES

3.1 Tech.Specs.Section 4.5.2.3.4.0 INITIAL CONDITIONS:

4.1 Ensure that all fans except that fan undergoing the flow check, are not operating.

This procedure is divided into 6 sections.Indicate which sections were used and mark remainder N/A.4.2.1"A" Containment Recirculation Fan Normal Conditions Hass Air Flow Check.4.2.2"A" Containment Recirculation Fan Accident Conditions Hass Air Flow Check.4.2.3"8" Containment Recirculation Fan Normal Conditions Hass Air Plow Check.'4.2.4"C" Containment Recirculation Fan Normal Conditions Hass Air Flow Check.4.2.5"C" Containment Recirculation Fan Accident Conditions Hass Air Flow Check.4.2.6"D" Containment Recirculation Fan Normal Conditions Hass Air Flow Check., 4.3 Test personnel are qualified in accordance with A-1102.5.0 , 5.1 PRECAUTIONS:

Normal company safety precautions will be observed./

PT-37.5:2 (4l INSTRUCTIONS: "A" Containment Recirculation Fan Normal Conditions Mass Air Flow Check: 6.1.1 Ensure that only the"A" Containment Recirculation Fan is running, 6.1.2 Ensure that normal loop entry damper 1 F-LED (5873)is open.6.1.3 Insert Pitot Tube and position end into air flow.6.1.4 Record air flow measurements at points indicated on data sheet.6'.5 Perform calculations for total air flow.6.2"A" Containment Recirculation-Fan Accident Conditions Mass Air Flow Check: 6.2.1 Ensure that only the"A" Containment Recirculation Fan is running.6.2;2 Press in armature button of CF1A/L relay in Relay Racks (latch in type relay), verify the following:

6.2.2.1 1F-LED damper (58?3)assumes its fully closed position.(6.2.2.2 lI-CID damper (5871)assumes its fully open position.6.2.2.3 lK-COD damper (5872)assumes its fully open position.6.2.2.4 Green indicating light (at M.C.B.)for charcoal dampers is extinguished.'.2.3 Insert Pitot Tube and position end into air flow.6.2.4 6.2.5 6.2.6 Record air flow measurements at points indicated on data sheet.Perform calculations for total air flow.Return"A" Containment Recirculation Fan Dampers to their normal position by pressing in.reset push button and verify the following:

6.2.6.1 1F-LED damper (5873)assumes its fully open position.6.2.6.2 1I-CID damper (5871)assumes its fully closed position.6.2.6.3 1K-COD damper (5872)assumes its fully closed position.6.2.6.4 6.3 Green indicating light (at M.C.B.)for charcoal dampers is illuminated."B" Containment Recirculation Fan Normal Conditions Mass Air Flow Check:

PT-37.5:3 6.3.1 Ensure that only the"B" Containment Recirculation Pan is running.6.3.2 6.3.3 6.3.4 6.3.5 Ensure that normal loop entry damper 1G-LED is open.Insert Pitot Tube and position end.into air flow.Record air flow measureme'ats at points indicated on data sheet.Perform calculations for total air flow.6.4"C" Containment Recirculation Pan Normal Conditions Mass Air Plov Check:6.4.1 6.4.2 6.4.3 6.4.4 6.4.5 6.s 6.5.1 6.5.2 Ensure that only the"C" Containment Recirculation Fan is zunning.Ensure that normal loop entry damper 1H-LED (5875)is open.Insert Pitot Tube and position end into air flow.Record air flow measurements at points indicated on data sheet.Perform calculations for total air flow."C" Containment Recirculation Pan Accident Conditions Mass Air Plow Check: Ensure that only the"C" Containment Recirculation Pan is running.Press in armature button of CF1C/L relay in Relay Racks (latch in type relay), verify the fo3;lowing:

6.5.2.1 1H-LED damper (5875)assumes its fully closed position.6.5.2.2 1J-CID damper (5876)assumes its fully open position.6'.2.3 6.5.2.4 6.5.3 6.5.4 6.s.s 6.5.6 1L-COD damper (5874)assumes its fully open position.Green indicating light (at M.C.B.)for charcoal dampers is extinguished.

Insert pitot tube and position end into air flov.Record air flov measurements at points indicated on data sheet.Perform calculations for total air flow.Return"C" Containment Recirculation Fan Dampers to their normal position by pressing in reset push buttong and verify the folloving:

6.5.6.1 1H-LED damper (5875)assumes its fully open position.6.5.6.2 1J-CID damper (5876)assumes its fully closed position.

PT-37.5:4 (6.5.6.3 1L-COD damper (5874)assumes its fully closed position.6.5.6.4 Green indicating light (at M.C.B.)for charcoal dampers is illuminated.

6.6"D" Containment Recirculation Fan Normal Conditions Mass Air Plow Check: 6.6.1 6.6.2 6.6.3 6.6.4 6.6.5 Ensure that only the"D" Containment Recirculation Pan is running.Ensure that normal loop entry damper 1E-LED is open.Insert Pitot Tube and position end into air flow.r Record air flow measurements at points indicated on data skeet.Perform calculations for total air flow.J'OMPLETED BY: DATE COMPLETED:

SHIFT SUPERVISOR:

RESULTS AND TEST REVIEW: DATE:

"PT-37.5:5"A" CONTAIRKNT RECIRCULATION FAN NORMAL CONDITIONS MASS AIR FLOP CHECK DATA SHEET INCHES 1 1/16 3 7/16 6 1/8 9 1/2 14 3/8 TRA RSE j 1 N2 r Tot.Traverse jul Tot.Traverse jf2 Total 10 10 ave traverse jul=ave.traverse g2"H20 27 5/8 32 1/2 35 7/8 38 9/16 40 15/16 TOTAL ("H 0)144 in/ft 12 in ft 2.31 ft H20 j in V=2g (dP)=(64.4 ft/sec)(e,.075 g/ft ft/sec 2 2 Area of 42" Duct=9.6218 ft 2 jj'/f t ft/sec Q=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min 3 COIRKNTS: PERFORMED BY:=DATE:

"A" CONTAI%1ENT RECRCULATION FAN ACCIDENT CONDITIONS HASS AIR FLOW CHECK DATA SHEET INCHES 1 1/16 3 7/16 6 1/8 9 1/2 14 3/8 TRAVERSE Tot.Traverse/Pl 10 Tot.Traverse/j2 10 Total ave.traverse/jl=ave.traverse jj2"H20 27 5/8 32 1/2 35 7/8 38 9/16 40 15/16 TOTAL ("H 0)144 in/ft 12 in ft 2.31 ft H20 in 2g (dZ)=(64.4 ft/sec)(e.075 g/ft ft/sec 2 2 Area of 42" Duct=9.6218 ft.2 ff/ft 7P/f t ft/sec Q=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min 3 COMHENTS: PERFORtKD BY: DATE:

PT-37.5:7"B" CONTAHRlENT RECIRCULATION FAN NODAL CONDITIONS MASS AIR FLOW CHECK DATA SHEET INCHES 1 1/16 TRAVERSE i2 Tot.Traverse jjl 10 ave.traverse ijl 3 7/16 6 1/8 9 1/2 Tot.Traverse ij2 10 Total=ave.traverse/j2"H20 14 3/8 27 5/8 32 1/2 35 7/8 38 9/16 40 15/16 TOTAL ("H 0)144 in/ft.2 2 12 in/ft Z.31 ft H20 f in 28 (~)=(64.4 ft/sec)(e.075/P/ft ft/sec 2 2 Area of 42" Duct-" 9,6218 ft 2 jj/f t fP/f t ft/sec 0=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min COlQKNTS: PERFORMED BY: DATE:

PT-37.5:8"C" CONTAM1ENT RECIRCULATION FAN NORM CONDITIONS MASS AIR FLOP CHECK DATA SHEET INCHES 1 1/16 3 7/16 6 1/8 TRAVERSE Tot.Traverse gl Tot.Traverse/j2 Total 10 10 ave.traverse tj1=ave.traverse jj2"H 0 9 1/2 14 3/8 27 5/8 32 1/2 35 7/8 38 9/16 4O 1S/16 TOTAL ("H 0)144 in/ft 2 2 12 in ft Z.31 ft/H20 i in" 2g (dP)=64.4 ft/sec)(e..o7s/E/ft ft/sec 2 2 Area of 42" Duct=9.6218 ft 8/ft 8/f t.ft/sec Q=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min 3 COMMENTS: PERFORMED BY: DATE:

PT-37.5:9"C" CONTAIRlENT RECIRCULATION FAN ACCIDENT CONDITIONS MASS AIR FLOW CHECK DATA SHEET INCHES 1 1/16 3 7/16 6 1/8 9 1/2 14 3/8 TRAVERSE 1 2 Tot.Traverse-j/1 Tot.Traverse g2 Total 2 10 10 ave.traverse ill=ave.traverse 82 H,O 27 5/8 32 1/2 35 7/8 38 9/16 40 15/16 TOTAL ("H 0)144 in/ft 12 in ft 2.31 ft H20 in V=g (&)=(64.4 ft/sec)(e.075///ft ft/sec 2 2 Area of 42" Duct=9.6218 ft g/ft 0/ft ft/sec g=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min COtHNTS: a PERFORMED BY: DATE:

pT-37.5:10"D" CONTAIQKNT RECIRCULATION FAif NOEfAL CONDlTIONS MASS AIR FLOW CHECK DATA SHEET INCHES 1 1/16 3 7/16 6 i/8 9 1/2 14 3/8 TRAVERSE 82 Tot.Traverse jjl Tot.Traverse jj2 Total 10 10 ave.traverse/tl=ave.traverse/j2"H20 27 5/8 32 1/2 35 7/8 38 9/16 40 i5/16 TOTAL ("H 0)144 in/ft 12 in ft 2.31 ft H20 2g QZ)=(64.4 ft/sec)(e.075///ft ft/sec 2 2 Area of 42" Duct=9'218 ft 2/E/f t ft/sec Q=AV=(9.6218 ft)(ft/sec)(60 sec/min)=ft/min COE'ANTS E e PERF016KD BY: DATE:

0>i~'i,