ML17292A933: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:fyCATEGORY1REGULRTINFORMATION DISTRIBUTIONSTEM (RIDE)ACCESSION NBR:9707220092 DOC.DATE:
{{#Wiki_filter:fy CATEGORY 1 REGULRT INFORMATION DISTRIBUTIONSTEM (RIDE)ACCESSION NBR:9707220092 DOC.DATE: 97/06/30 NOTARIZED:
97/06/30NOTARIZED:
NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAPE AUTHOR AFFILIATION KASKO,B.Washington Public Power Supply System SMITH,G.O.
NODOCKETFACIL:50-397 WPPSSNuclearProject,Unit2,Washington PublicPowe05000397AUTH.NAPE AUTHORAFFILIATION KASKO,B.Washington PublicPowerSupplySystemSMITH,G.O.
Washington Public Power Supply System RECIP.NAME RECIPIENT.
Washington PublicPowerSupplySystemRECIP.NAME RECIPIENT.
AFFILIATION
AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthlyoperating reptforJune1997forWNP-2.W/970715 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR iENCL~SIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:RECIPIENT IDCODE/NAME PD4-2PDINTERNAL:~ACRS~
Monthly operating rept for June 1997 for WNP-2.W/970715 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL~SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL:~ACRS~
(+FILECENTER,O1~OC/DBA'/PAD'XTERNAL:
(+FILE CENTER,O 1~OC/DBA'/PAD'XTERNAL:
LITCOBRYCE,JHNRCPDRCOPIESLTTRENCL111111111111RECIPIENT IDCODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4NOACCOPIESLTTRENCL1111111111NOTETOALL"RIDS"RECIPIENTS:
LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFNSD-'5(EXT.
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-'5(EXT.
415-2083)
415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 f C'
TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO.Box 968~Richiand, Washington 99352-0968 July 15, 1997 G02-97-142 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
LTTR11ENCL11f C'
WASHINGTON PUBLICPOWERSUPPLYSYSTEMPO.Box968~Richiand, Washington 99352-0968 July15,1997G02-97-142 DocketNo.50-397U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Gentlemen:


==Subject:==
==Subject:==
WNP-2OPERATING LICENSENPF-21MONTHLYOPERATING REPORTJUNE1997Transmitted herewithistheMonthlyOperating ReportforthemonthofJune1997asrequiredbyTechnical Specification 5.6.4.Inaccordance withtheguidancecontained inGenericLetter97-02,theformatofthisreporthasbeenamended.Respectfully, G.0,SmithPlantGeneralManagerMailDrop9270CC:EWMerschoff
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT JUNE 1997 Transmitted herewith is the Monthly Operating Report for the month of June 1997 as required by Technical Specification 5.6.4.In accordance with the guidance contained in Generic Letter 97-02, the format of this report has been amended.Respectfully, G.0, Smith Plant General Manager Mail Drop 9270 CC: EW Merschoff-NRC RIV TG Colburn-NRR KE Perkins, Jr.-NRC RIV, WCFO NRC Sr.Resident Inspector-927N PD Robinson-Winston&Strawn INPO ANI Library Utility Data Institute DL Williams-BPA/399:~An c~-4,9707220092 970630 PDR ADQCK 0500039'7 R PDR J lllilllllllllllllllll'Illllllllllll!
-NRCRIVTGColburn-NRRKEPerkins,Jr.-NRCRIV,WCFONRCSr.ResidentInspector
OPERATING STATUS REPORT for WNP-2 Date: July 1, 1997 1.Docket: 50-397 2.Reporting Period: JUNE 1997 3, Utility Contact: Bernice Kasko (509)377-4473 4.Design Electrical Rating (Net MW,): 5..Maximum Dependable Capacity-summer (Gross MW,): 1153 1153 6.7.8.9.Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)MONTH 0.0 0.0 696.0-8,485 YEAR 2,049.2 2,049.2 1,248.0 1,699,500 CUMULATIVE 77,921.8 75,299.3 3,204.2 72,007,775 10.Challenges to safety/relief valves;See Attached Table UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: July 1, 1997 COMPLETED BY: B Kasko TELEPHONE:
-927NPDRobinson-Winston&StrawnINPOANILibraryUtilityDataInstitute DLWilliams-BPA/399:~Anc~-4,9707220092 970630PDRADQCK0500039'7 RPDRJlllilllllllllllllllll'Illllllllllll!
(509)377M73 REPORT PERIOD: JUNE 1997 No.Date Type F: Forced S: Scheduled Duration (Hours)Reason (1)Method (2)Cause and Corrective Action To Prevent Recurrence 97-012 970419 720.0 Plant entered annual refueling and maintenance outage (R-12)on April 19, 1997.
OPERATING STATUSREPORTforWNP-2Date:July1,19971.Docket:50-3972.Reporting Period:JUNE19973,UtilityContact:BerniceKasko(509)377-44734.DesignElectrical Rating(NetMW,):5..MaximumDependable Capacity-summer(GrossMW,):115311536.7.8.9.HoursReactorCriticalHoursGenerator On-LineUnitReserveShutdownHoursNetElectrical Energy(MWH)MONTH0.00.0696.0-8,485YEAR2,049.22,049.21,248.01,699,500 CUMULATIVE 77,921.875,299.33,204.272,007,775 10.Challenges tosafety/relief valves;SeeAttachedTable UNITSHUTDOWNS DOCKETNO.:50-397UNITNAME:WNP-2DATE:July1,1997COMPLETED BY:BKaskoTELEPHONE:
 
(509)377M73REPORTPERIOD:JUNE1997No.DateTypeF:ForcedS:Scheduled Duration(Hours)Reason(1)Method(2)CauseandCorrective ActionToPreventRecurrence 97-012970419720.0Plantenteredannualrefueling andmaintenance outage(R-12)onApril19,1997.SUMMARY:Theplantcontinued themonthintheannualplannedrefueling/maintenance outagewhichbeganonApril19,1997.~lREASONA-Equipment FailureB-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administration G-Operational ErrorH-Other~2METHOD1-Manual2-ManualScram3-AutoScram4-Continued 5-ReducedLoad9-Other SRVCHALLENGES DATETYPEREASOMS-RV-1BMS-RV-1DMS-RV-2AMS-RV-2BMS-RV-2D'S-RV-3AMS-RV-4AMS-RV-4CMS-RV-4DMS-RV-5C6/17/976/17/976/17/976/17/976/17/976/17/976/17/976/17/976/17/976/17/97BBBBBBBBBBCCCCCCCCCCeofActuation ReasonA=Automatic B=RemoteManualC=SpringA=Overpressure B=ADSorothersafetyC=TestD=Inadvertent (Accidental/Spurious)
==SUMMARY==
E=ManualReliefAlloftheMSRVsfunctioned normally.
: The plant continued the month in the annual planned refueling/maintenance outage which began on April 19, 1997.~lREAS ON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other~2METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SRV CHALLENGES DATE TYPE REASO MS-RV-1B MS-RV-1D MS-RV-2A MS-RV-2B MS-RV-2D'S-RV-3A MS-RV-4A MS-RV-4C MS-RV-4D MS-RV-5C 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 B B B B B B B B B B C C C C C C C C C C e of Actuation Reason A=Automatic B=Remote Manual C=Spring A=Overpressure B=ADS or other safety C=Test D=Inadvertent (Accidental/Spurious)
TherewerenootherMSRVchallenges duringtheperiod.  
E=Manual Relief All of the MSRVs functioned normally.There were no other MSRV challenges during the period.  
~g4ptJ.tji~1VI,/J}}
~g 4 p t J.tj i~1 V I ,/J}}

Revision as of 12:05, 6 July 2018

Monthly Operating Rept for June 1997 for WNP-2.W/970715 Ltr
ML17292A933
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/30/1997
From: KASKO B, SMITH G O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, GO2-97-142, NUDOCS 9707220092
Download: ML17292A933 (7)


Text

fy CATEGORY 1 REGULRT INFORMATION DISTRIBUTIONSTEM (RIDE)ACCESSION NBR:9707220092 DOC.DATE: 97/06/30 NOTARIZED:

NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAPE AUTHOR AFFILIATION KASKO,B.Washington Public Power Supply System SMITH,G.O.

Washington Public Power Supply System RECIP.NAME RECIPIENT.

AFFILIATION

SUBJECT:

Monthly operating rept for June 1997 for WNP-2.W/970715 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL~SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL:~ACRS~

(+FILE CENTER,O 1~OC/DBA'/PAD'XTERNAL:

LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-'5(EXT.

415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 f C'

WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO.Box 968~Richiand, Washington 99352-0968 July 15, 1997 G02-97-142 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT JUNE 1997 Transmitted herewith is the Monthly Operating Report for the month of June 1997 as required by Technical Specification 5.6.4.In accordance with the guidance contained in Generic Letter 97-02, the format of this report has been amended.Respectfully, G.0, Smith Plant General Manager Mail Drop 9270 CC: EW Merschoff-NRC RIV TG Colburn-NRR KE Perkins, Jr.-NRC RIV, WCFO NRC Sr.Resident Inspector-927N PD Robinson-Winston&Strawn INPO ANI Library Utility Data Institute DL Williams-BPA/399:~An c~-4,9707220092 970630 PDR ADQCK 0500039'7 R PDR J lllilllllllllllllllll'Illllllllllll!

OPERATING STATUS REPORT for WNP-2 Date: July 1, 1997 1.Docket: 50-397 2.Reporting Period: JUNE 1997 3, Utility Contact: Bernice Kasko (509)377-4473 4.Design Electrical Rating (Net MW,): 5..Maximum Dependable Capacity-summer (Gross MW,): 1153 1153 6.7.8.9.Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)MONTH 0.0 0.0 696.0-8,485 YEAR 2,049.2 2,049.2 1,248.0 1,699,500 CUMULATIVE 77,921.8 75,299.3 3,204.2 72,007,775 10.Challenges to safety/relief valves;See Attached Table UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: July 1, 1997 COMPLETED BY: B Kasko TELEPHONE:

(509)377M73 REPORT PERIOD: JUNE 1997 No.Date Type F: Forced S: Scheduled Duration (Hours)Reason (1)Method (2)Cause and Corrective Action To Prevent Recurrence 97-012 970419 720.0 Plant entered annual refueling and maintenance outage (R-12)on April 19, 1997.

SUMMARY

The plant continued the month in the annual planned refueling/maintenance outage which began on April 19, 1997.~lREAS ON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other~2METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SRV CHALLENGES DATE TYPE REASO MS-RV-1B MS-RV-1D MS-RV-2A MS-RV-2B MS-RV-2D'S-RV-3A MS-RV-4A MS-RV-4C MS-RV-4D MS-RV-5C 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 6/17/97 B B B B B B B B B B C C C C C C C C C C e of Actuation Reason A=Automatic B=Remote Manual C=Spring A=Overpressure B=ADS or other safety C=Test D=Inadvertent (Accidental/Spurious)

E=Manual Relief All of the MSRVs functioned normally.There were no other MSRV challenges during the period.

~g 4 p t J.tj i~1 V I ,/J