ML17292B110: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY1REGULAYINFORMATION DISTRIBUTI SYSTEM(RIDS)ACCESSION NBR:9711180204 DOC.DATE:
{{#Wiki_filter:CATEGORY 1 REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)ACCESSION NBR:9711180204 DOC.DATE: 97/10/31 NOTARIZED:
97/10/31NOTARIZED:
NO DOCKET FACIL:50~397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.MME AUTHOR AFFILIATION KASKO,B.Washington Public Power Supply System SMITH,G.O.
NODOCKETFACIL:50~397 WPPSSNuclearProject,Unit2,Washington PublicPowe05000397AUTH.MMEAUTHORAFFILIATION KASKO,B.Washington PublicPowerSupplySystemSMITH,G.O.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
Washington PublicPowerSupplySystemRECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthlyoperating reptforOct1997forWNP-2.W/971111 ltr.DISTRIBUTION CODE:XE24DCOPIESRECEIVED:LTR ENCL"SIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:RECXPIENT IDCODE/NAME PD4-2PDINTERNAL:
Monthly operating rept for Oct 1997 for WNP-2.W/971111 ltr.DISTRIBUTION CODE: XE24D COPIES RECEIVED:LTR ENCL" SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECXPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS ENTE 01 BA'COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT XD CODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 E 0 EZTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D 0 C E N NOTE TO ALL"RIDS" RECIPIENTS:
ACRSENTE01BA'COPIESLTTRENCL11111111RECIPIENT XDCODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4COPIESLTTRENCL11111111E0EZTERNAL:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR'YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENS1ON 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 t gl Cy'P 4 I WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~Richland, Washington 99352-0968 November 11, 1997 r G02-97-205 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
LITCOBRYCE,JHNRCPDR1111NOAC11D0CENNOTETOALL"RIDS"RECIPIENTS:
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUOR'YOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENS1ON 415-2083TOTALNUMBEROFCOPIESREQUIRED:
LTTR11ENCL11 tglCy'P4I WASHINGTON PUBLICPOWERSUPPLYSYSTEMP.O.Box968~Richland, Washington 99352-0968 November11,1997rG02-97-205 DocketNo.50-397U.S.NuclearRegulatory Commission DocumentControlDeskWashington, D.C.20555Gentlemen:


==Subject:==
==Subject:==
WNP-2OPERATING LICENSENPF-21MONTHLYOPERATING REPORTOCTOBER1997Transmitted herewithistheMonthlyOperating ReportforthemonthofOctober1997asrequired.
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT OCTOBER 1997 Transmitted herewith is the Monthly Operating Report for the month of October 1997 as required.by'.Technical Specification 5.6.4.~, Respectfully, G.O.Smith Plant General Manager Mail Drop 927M cc: EW Merschoff-NRC RIV TG Colburn-NRR KE Perkins, Jr.-NRC RIV, WCFO NRC Sr.Resident Inspector-927N PD Robinson-Winston&Strawn INPO ANI Library Utility Data Institute,""-"'DL"Williams
by'.Technical Specification 5.6.4.~,Respectfully, G.O.SmithPlantGeneralManagerMailDrop927Mcc:EWMerschoff
-'BPA/;3999'7iii80204 97iQSi PDR.'ADQCK 05000397 I'PDR IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I A k v~ll OPERATING STATUS REPORT for WNP-2 Date: November 1, 1997 2.3.4.5.Docket: 50-397 Reporting Period: OCTOBER 1997, Utility Contact: Bernice Kasko (509)377-4473 Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Net MW,): 1153 1107 6.7.8.9 Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)MONTH 744,0 744.0 0.0 699,834 YEAR 4,907.7 4,783.9 1,081.3 4,443,046 CUMULATIVE 80,780.3 78,034.0 3,037.5 74,751,321 10.Challenges to safety/relief valves: None E<<I 4 UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: November 1, 1997 COMPLETED BY: B Kasko TELEPHONE:
-NRCRIVTGColburn-NRRKEPerkins,Jr.-NRCRIV,WCFONRCSr.ResidentInspector
(509)377M73 REPORT PERIOD: OCTOBER 1997 No.Date Type F: Forced S: Scheduled Duration (Hours)Reason (I)Method (2)Cause and Corrective Action To Prevent Recurrence None SMBrIARY: At the end of the month WNP-2 was operating at 100%power.~lREASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other 2 METHOD 1-Manua 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other o I)a=4}}
-927NPDRobinson-Winston&StrawnINPOANILibraryUtilityDataInstitute,
""-"'DL"Williams
-'BPA/;3999'7iii80204 97iQSiPDR.'ADQCK05000397I'PDRIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IAkv~ll OPERATING STATUSREPORTforWNP-2Date:November1,19972.3.4.5.Docket:50-397Reporting Period:OCTOBER1997,UtilityContact:BerniceKasko(509)377-4473DesignElectrical Rating(NetMW,):MaximumDependable Capacity-summer(NetMW,):115311076.7.8.9HoursReactorCriticalHoursGenerator On-LineUnitReserveShutdownHoursNetElectrical Energy(MWH)MONTH744,0744.00.0699,834YEAR4,907.74,783.91,081.34,443,046 CUMULATIVE 80,780.378,034.03,037.574,751,321 10.Challenges tosafety/relief valves:None E<<I4 UNITSHUTDOWNS DOCKETNO.:50-397UNITNAME:WNP-2DATE:November1,1997COMPLETED BY:BKaskoTELEPHONE:
(509)377M73REPORTPERIOD:OCTOBER1997No.DateTypeF:ForcedS:Scheduled Duration(Hours)Reason(I)Method(2)CauseandCorrective ActionToPreventRecurrence NoneSMBrIARY:
AttheendofthemonthWNP-2wasoperating at100%power.~lREASONA-Equipment FailureB-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administration G-Operational ErrorH-Other2METHOD1-Manua2-ManualScram3-AutoScram4-Continued 5-ReducedLoad9-Other oI)a=4}}

Revision as of 12:02, 6 July 2018

Monthly Operating Rept for Oct 1997 for WNP-2.W/971111 Ltr
ML17292B110
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/31/1997
From: KASKO B, SMITH G O
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-97-205, NUDOCS 9711180204
Download: ML17292B110 (8)


Text

CATEGORY 1 REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)ACCESSION NBR:9711180204 DOC.DATE: 97/10/31 NOTARIZED:

NO DOCKET FACIL:50~397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.MME AUTHOR AFFILIATION KASKO,B.Washington Public Power Supply System SMITH,G.O.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Oct 1997 for WNP-2.W/971111 ltr.DISTRIBUTION CODE: XE24D COPIES RECEIVED:LTR ENCL" SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECXPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS ENTE 01 BA'COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT XD CODE/NAME COLBURN,T AEOD/SPD/RRAB NRR/DRPM/PECB RGN4 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 E 0 EZTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D 0 C E N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR'YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENS1ON 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 t gl Cy'P 4 I WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~Richland, Washington 99352-0968 November 11, 1997 r G02-97-205 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT OCTOBER 1997 Transmitted herewith is the Monthly Operating Report for the month of October 1997 as required.by'.Technical Specification 5.6.4.~, Respectfully, G.O.Smith Plant General Manager Mail Drop 927M cc: EW Merschoff-NRC RIV TG Colburn-NRR KE Perkins, Jr.-NRC RIV, WCFO NRC Sr.Resident Inspector-927N PD Robinson-Winston&Strawn INPO ANI Library Utility Data Institute,""-"'DL"Williams

-'BPA/;3999'7iii80204 97iQSi PDR.'ADQCK 05000397 I'PDR IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I A k v~ll OPERATING STATUS REPORT for WNP-2 Date: November 1, 1997 2.3.4.5.Docket: 50-397 Reporting Period: OCTOBER 1997, Utility Contact: Bernice Kasko (509)377-4473 Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Net MW,): 1153 1107 6.7.8.9 Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH)MONTH 744,0 744.0 0.0 699,834 YEAR 4,907.7 4,783.9 1,081.3 4,443,046 CUMULATIVE 80,780.3 78,034.0 3,037.5 74,751,321 10.Challenges to safety/relief valves: None E<<I 4 UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: November 1, 1997 COMPLETED BY: B Kasko TELEPHONE:

(509)377M73 REPORT PERIOD: OCTOBER 1997 No.Date Type F: Forced S: Scheduled Duration (Hours)Reason (I)Method (2)Cause and Corrective Action To Prevent Recurrence None SMBrIARY: At the end of the month WNP-2 was operating at 100%power.~lREASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other 2 METHOD 1-Manua 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other o I)a=4