ML14225A671: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 1 of 11 Exelon Nuclear Job Performance Measure   Provide Alternate Ventilation to the Control Room and the Aux Electric Room  JPM Number:  2014 ILT NRC JPM k Revision Number: 00 Date: 10/21/2013   Developed By:     Instructor Date Validated By:     SME or Instructor Date Reviewed By:     Operations Representative Date Approved By:     Training Department Date 2014 ILT NRC JPM k - Rev 00   SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 9 and 13 below. ________ 1. Task description and number, JPM description and number are identified. ________ 2. Knowledge and Abilities (K/A) references are included. ________ 3. Performance location specified. (in-plant, control room, simulator, or other) ________ 4. Initial setup conditions are identified. ________ 5. Initiating cue (and terminating cue if required) are properly identified. ________ 6. Task standards identified and verified by SME review. ________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*). ________ 8. If an alternate path is used, the task standard contains criteria for successful completion. ________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision: Procedure QOA 5750-15 Rev: 11 Procedure   Rev:  Procedure   Rev:  ________ 10. Verify cues both verbal and visual are free of conflict. ________ 11. Verify performance time is accurate
{{#Wiki_filter:SRRS: 3D.105 (when utilized for operator initial or continuing training)
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:       SME / Instructor Date  
Page 1 of 11 Exelon Nuclear Job Performance Measure Provide Alternate Ventilation to the Control Room and the Aux Electric Room  JPM Number:  2014 ILT NRC JPM k Revision Number: 00 Date: 10/21/2013 Developed By:
Instructor Date Validated By:
SME or Instructor Date Reviewed By:
Operations Representative Date  
 
Approved By:
Training Department Date  
 
2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initia l validation.
Prior to JPM usage, revalidate JPM using steps 9 and 13 below.
________ 1. Task description and number, JPM description and number are identified. ________ 2. Knowledge and Abilities (K/A) references are included. ________ 3. Performance location specified. (in-plant, control room, simulator, or other) ________ 4. Initial setup conditions are identified. ________ 5. Initiating cue (and terminating cue if required) are properly identified. ________ 6. Task standards identifi ed and verified by SME review. ________ 7. Critical steps meet the criteria for critical st eps and are identified with an asterisk (*). ________ 8. If an alternate path is used, the task standard contai ns criteria for successful completion. ________ 9. Verify the procedure(
s) referenced by this JPM re flects the current revision:
Procedure QOA 5750-15 Rev: 11 Procedure Rev:  Procedure Rev:  ________ 10. Verify cues both verbal and visual are free of conflict. ________ 11. Verify performance time is accurate
________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date
 
SME / Instructor Date  


SME / Instructor Date  
SME / Instructor Date  


SME / Instructor Date 2014 ILT NRC JPM k - Rev 00   SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 11 Revision Record (Summary) Revision 00, Renamed to 2014 ILT NRC JPM k. Restarted numbering accordingly Previous revisions were: Revision 10, This JPM is developed IAW guidelines established in NUREG 1021 Rev 8 ES-301 and Appendix C. This JPM meets the criteria of Category B.1 "Control Room Systems," for RO/SRO candidates. JPM revised to match procedure changes.
2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision 11, JPM revised to reflect procedure changes. Revision 12, JPM revised to reflect updated completion time. Revision 13, JPM revised to reflect format and completion time change. Revision 14, JPM revised to reflect procedure changes. Revision 15, JPM revised to reflect procedure changes. Specified that normal power was available at wall receptacles in the initial conditions. Updated K/A ratings. Revision 16, Revised JPM to reflect procedure changes.
Page 3 of 11 Revision Record (Summary)
2014 ILT NRC JPM k - Rev 00   SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 11 INITIAL CONDITIONS - Both Units are operating at near rated conditions with normal electrical line-up. - The "B" Control Room HVAC fan was taken out-of-service yesterday to replace the fan motor bearings. - Approximately 1 hour ago the CONTROL ROOM SPLY/RETURN FAN TRIP (912-5 E-2) alarm came up. - The Shift Manager was notified of the loss of ventilation and the maintenance department is investigating but, as yet, has not resolved the problem. - Both the Control Room and the Aux Electric Room temperatures are being monitored by other operators and are approaching 98°F. - Normal power is available at wall receptacles.  
Revision 00, Renamed to 2014 ILT NRC JPM k. Restarted numbering accordingly Previous revisions were:
- You have obtained all necessary keys to perform this task. - This JPM is not time critical. INITIATING CUE The US has directed you to set-up and provide an alternate means of ventilating both the Control Room and the Aux. Electric Room IAW QOA 5750-15. Provide examinee with: Copy of QOA 5750-15. Fill in the JPM Start Time when the student acknowledges the Initiating Cue. Information For Evaluator's Use: UNSAT requires written comments on respective step.
Revision 10, This JPM is developed IAW guidelines established in NUREG 1021 Rev 8 ES-301 and Appendix C. This JPM meets the criteria of Category B.1 "Control Room Systems," for RO/SRO candidates. JPM revised to match procedure changes.  
 
Revision 11, JPM revised to reflect procedure changes.
Revision 12, JPM revised to reflec t updated completion time.
Revision 13, JPM revised to reflect forma t and completion time change.
Revision 14, JPM revised to reflect procedure changes.
Revision 15, JPM revised to reflect procedure c hanges. Specified that normal power was available at wall receptacles in the initial conditions. Updated K/A ratings.
Revision 16, Revised JPM to reflect procedure changes.
2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 11 INITIAL CONDITIONS - Both Units are operating at near rated conditions with normal electrical line-up. - The "B" Control Room HVAC fan was taken out-of-service yesterday to replace the fan motor bearings. - Approximately 1 hour ago the CONTROL ROOM SPLY/RETURN FAN TRIP (912-5 E-2) alarm came up. - The Shift Manager was notified of the loss of ventilation and the maintenance department is investigating but, as yet, has not resolved the problem. - Both the Control Room and t he Aux Electric Room temperat ures are being monitored by other operators and are approaching 98
°F. - Normal power is available at wall receptacles.  
- You have obtained all necessary keys to perform this task. - This JPM is not time critical.
INITIATING CUE The US has directed you to set-up and provi de an alternate means of ventilating both the Control Room and the Aux. Electric Room IAW QOA 5750-15.
Provide examinee with:
Copy of QOA 5750-15.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluator's Use:
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
* Denotes critical elements of a critical step. Number any comments in the "Comment Number" column on the following pages. Then annotate that comment in the "Comments" section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
* Denotes critical elemen ts of a critical step.
2014 ILT NRC JPM k - Rev 00   SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 11 The timeclock starts when the candidate acknowledges the initiating cue. JPM K QOA 5750-15, Rev 011, COMPLETE 2014 ILT NRC JPM k - Rev 00   SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 11  JPM Start Time:   STEP ELEMENT STANDARD SAT UNSAT Comment Number EVALUATOR:  The candidate may perform the steps in any logical order. It is most likely that the candidate will perform all the tasks for one floor level and then repeat at the other floor level. EVALUATOR:  The initial conditions state that electrical power is available at the outlets. If the candidate chooses to obtain the generators to provide electrical power, this is acceptable provided the suction for the smoke ejector is NOT near the exhaust [breathing hazard to control room personnel]. *D.3.b. *Obtain temporary ventilation equipment for Control Room from Service Building 3rd Floor Hallway to CAS.  
Number any comments in the "Comment Nu mber" column on the following pages. Then annotate that comment in the "Comments" sect ion at the bottom of the page. The comment section should be used to document the reason t hat a step is marked as unsatisfactory and to document unsatisfactory performance re lating to management expectations.
(1) Extension Cords (2) Collapsible Ductwork (3) Smoke Ejectors.* Unlocks (if necessary) temporary ventilation equipment located in the Service Building 3rd Floor Hallway to CAS and obtains the following: 1.) Extension Cords 2.) Collapsible Ductwork 3.) Smoke Ejectors _________CUE: State, "You have obtained the temporary ventilation equipment."  (Should be smoke ejector, flexible duct, and extension cord.) NOTE:  In the following step, the candidate may refer to step D.2.c for a clarification that the "1st floor west of Weld Shop" is the Electrical Distribution Room on the first floor of the Service Building, south of the EMD Truck Bay. *D.3.c. *Obtain temporary ventilation equipment for Auxiliary Electric Room (located 1st floor west of Weld Shop)  
Some operations that are perform ed from outside of the contro l room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to per form groups of procedure steps instead of calling for each individual item to be performed.
(1) Extension Cord (2) Collapsible Ductwork (3) Smoke Ejectors.* Unlocks (if necessary) temporary ventilation equipment from the Service Building Electric Equipment Room (located 1st floor west of Weld shop) and obtains the following: 1) Extension Cords  
2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 11 The timeclock starts when the candidate acknowledges the initiating cue. JPM K QOA 5750-15, Rev 011, COMPLETE 2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 11  JPM Start Time:
STEP ELEMENT STANDARD SAT UNSAT Comment Number EVALUATOR:  The candidate may perform the steps in any logical order. It is most likely that the candidate will perform all the tasks for one floor level and then repeat at the other floor level. EVALUATOR:  The initial conditions state that electrical power is available at the outlets. If the candidate chooses to obtain the generators to provide electrical power, this is acceptable provided the suction for the smoke ejector is NOT near the exhaust [breathing hazard to control room personnel].  
*D.3.b. *Obtain temporary ventilation equipment for Control Room  
 
from Service Building 3rd Floor Hallway to CAS.  
 
(1) Extension Cords (2) Collapsible Ductwork (3) Smoke Ejectors.
* Unlocks (if necessary) temporary ventilation equipment  
 
located in the Service Building  
 
3rd Floor Hallway to CAS and obtains the following: 1.) Extension Cords 2.) Collapsible Ductwork 3.) Smoke Ejectors _________CUE: State, "You have obtained the temporary ventilation equipment."  (Should be smoke ejector, flexible duc t, and extension cord.) NOTE:  In the following step, the candidate may refer to step D.2.c fo r a clarification that the "1st floor west of Weld Shop" is the Electrical Distribution Room on th e first floor of the Service Building, south of the EMD Truck Bay.  
*D.3.c. *Obtain temporary ventilation equipment for Auxiliary Electric  
 
Room (located 1st floor west  
 
of Weld Shop)  
 
(1) Extension Cord (2) Collapsible Ductwork (3) Smoke Ejectors.
* Unlocks (if necessary) temporary ventilation equipment  
 
from the Service Building  
 
Electric Equipment Room  
 
(located 1 st floor west of Weld shop) and obtains the following: 1) Extension Cords  
: 2) Collapsible Ductwork  
: 2) Collapsible Ductwork  
: 3) Smoke Ejectors _________
: 3) Smoke Ejectors _________
2014 ILT NRC JPM k - Rev 00   SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 11 STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE:  State, "You have obtained the temporary ventilation equipment."  (Should be smoke ejectors, flexible duct, and extension cord.) D.3.d. Direct Security to establish Control Room AND Aux Electric Room access control. Contacts Security and requests access control established to the Control Room and Aux Electric Room. _________CUE:  As security, acknowledge the request and state security personnel are standing by to control access to the Control Room and Aux Electric Room. *D.3.e.  *Open Control Room double doors and maintain open for cooling.* Opens south CR double doors and props them open. _________CUE:  State the Control Room doors are open. EVALUATOR:  The single Control Room door enters the RCA. Simulate opening the door. *D.3.f.  *Open single Control Room door and maintain open for cooling.* Opens west CR single door and props it open. _________CUE:  State the Control Room door is open. *D.3.g. & D.3.h & D.3.i  *Place smoke ejector AND duct such that air is blown into the Control Room through the double doors*, routing extension cord(s) between smoke ejector and power source. 
2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 11 STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE:  State, "You have obtained the temporary ventilation equipment."  (Should be smoke ejectors, flexible duc t, and extension cord.)
D.3.d. Direct Security to establish Control Room AND Aux Electric  
 
Room access control.
Contacts Security and requests access control established to  


Locate convenient wall outlet  *Plug in smoke ejector* (Simulates) placing the smoke ejector and ductwork such that the exhaust enters the control room south (double) doors. Plugs the smoke ejector into an available electrical outlet. _________CUE:  State the smoke ejector/ductwork is placed as the candidate indicates. State the smoke ejector is plugged into the outlet the candidate indicates.
the Control Room and Aux Electric Room. _________
2014 ILT NRC JPM k - Rev 00   SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 11 STEP ELEMENT STANDARD SAT UNSAT Comment Number *D.3.j. *Verify smoke ejector is running* Turns on smoke ejector Observes fan rotation and checks duct for air flow. _________CUE:  State, "Air is flowing into the Control Room." *D.3.k. *Open panel doors in Control Room to ensure a more even temperature distribution.* Opens all Control Room panel doors. _________CUE:  State the Control Room panel doors are open. EVALUATOR:  The following step is unnecessary and may not be performed by the candidate. It is applicable if electrical power via the outlets were unavailable. D.3.l. Place portable generator in machine shop area. Obtains and places a generator in the machine shop area. CUE:  State a portable generator has been placed in the machine shop area. D.3.m. Inform RP that plant conditions require smoke ejector for Aux Electric Room and that this will involve routing ejector from clean area through radiologically controlled area to clean area. Contacts Radiation Protection and informs them that temporary ventilation equipment will be routed from the maintenance shop area through the west doors of the Aux Electric Room. CUE:  As Radiation Protection, acknowledge the information. EVALUATOR:  The following step is on the RCA side. The student may choose to perform this step in conjunction with routing the smoke ejector ductwork. *D.3.n. *Open Aux Electric Room double doors and maintain open for cooling.* Opens west Aux Electric Room double doors and props them open. _________CUE:  State the Aux Electric Room double doors are open. *D.3.o. *Open single Aux Electric Room door and maintain open for cooling.* Opens South Aux Electric Room door and props it open. _________
CUE:  As security, acknowledge the request and state security personnel are standing by to control access to the Control Room and Aux Electric Room.
2014 ILT NRC JPM k - Rev 00   SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 11 STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE:  State the Aux Electric Room door is open. *D.3.p & D.3.q & D.3.r *Place smoke ejector AND duct such that air is blown into Aux Electric Room through the double doors*, routing extension cord(s) between smoke ejector and power source.   
*D.3.e.  *Open Control Room double doors and maintain open for cooling.* Opens south CR double doors and props them open.
_________
CUE:  State the Control Room doors are open. EVALUATOR:  The single Control Room door en ters the RCA. Simulate opening the door.
*D.3.f.  *Open single Control Room door and maintain open for cooling.
* Opens west CR single door and props it open.
_________
CUE:  State the Control Room door is open.
*D.3.g. &
D.3.h & D.3.i  *Place smoke ejector AND duct such that air is blown into the
 
Control Room through the double doors
*, routing extension cord(s) between smoke
 
ejector and power source. 
 
Locate convenient wall outlet  
  *Plug in smoke ejector
* (Simulates) placing the smoke ejector and ductwork such that the exhaust enters the control  
 
room south (double) doors.
Plugs the smoke ejector into an available electrical outlet.
_________
CUE:  State the smoke ejector/ductwork is pl aced as the candidate indicates. State the smoke ejector is plugged into th e outlet the candidate indicates.
2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 11 STEP ELEMENT STANDARD SAT UNSAT Comment Number *D.3.j. *Verify smoke ejector is running* Turns on smoke ejector Observes fan rotation and checks duct for air flow. _________
CUE:  State, "Air is flowing into the Control Room."  
*D.3.k. *Open panel doors in Control Room to ensure a more even temperature distribution.
* Opens all Control Room panel doors. _________
CUE:  State the Control Room panel doors are open. EVALUATOR:  The following step is unnecessary and may not be performed by the candidate. It is applicable if electrical power via the outlets were unavailable. D.3.l. Place portable generator in machine shop area.
Obtains and places a generator in the machine shop area.
CUE:  State a portable generator has been placed in the machine shop area.
D.3.m. Inform RP that plant conditions require smoke  
 
ejector for Aux Electric Room  
 
and that this will involve routing ejector from  
 
clean area through radiologically  
 
controlled area to clean area.
Contacts Radiation Protection and informs them that  
 
temporary ventilation equipment  
 
will be routed from the  
 
maintenance shop area through  
 
the west doors of the Aux Electric Room.
CUE:  As Radiation Protection, acknowledge the information. EVALUATOR:  The following step is on the RCA side. The student may choose to perform this step in conjunction with routing the smoke ejector ductwork.  
*D.3.n. *Open Aux Electric Room double doors and maintain open for cooling.
* Opens west Aux Electric Room double doors and props them open. _________
CUE:  State the Aux Electric R oom double doors are open.  
*D.3.o. *Open single Aux Electric Room door and maintain open for cooling.* Opens South Aux Electric Room door and props it open. _________
2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 9 of 11 STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE:  State the Aux Electric Room door is open.  
*D.3.p &
D.3.q & D.3.r *Place smoke ejector AND duct such that air is blown into Aux  
 
Electric Room through the double doors
*, routing extension cord(s) between smoke ejector and power source.   
 
Locate convenient wall
 
receptacle.


Locate convenient wall receptacle.
  *Plug in smoke ejector.
  *Plug in smoke ejector.
* Places the smoke ejector and ductwork such that the exhaust enters the Aux Electric Room West (double) doors. Plugs the smoke ejector into an available electrical outlet. _________*D.3.s. *Verify smoke ejector is running* Turns on smoke ejector Observes fan rotation and checks duct for air flow. _________CUE:  State, "Air is blowing into the Aux Electric Room." *D.3.t.
* Places the smoke ejector and ductwork such that the exhaust  
* Open panel doors in Aux Electric Room to ensure a more even temperature distribution.* Unlocks and opens all Aux Electric Room panel doors. _________CUE:  State all Aux Electric Rm panel doors are open. EVALUATOR:  The candidate should inform you that the task is complete. JPM Stop Time:
 
2014 ILT NRC JPM k - Rev 00   SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 11 JPM SUMMARY Operator's Name:  Job Title:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title: Provide Alternate Ventilation to the Control Room and the Aux Electric Room JPM Number: 2014 ILT NRC JPM k  Revision Number: 00 Task Number and Title: SRN-5750-P18 (Freq: LIC=B  NF=B)  Given an operating reactor plant with a complete loss of control HVAC, locally establish temporary ventilation for the control room and the aux electric room in accordance with QOA 5750-15. K/A Number and Importance: K/A: 290003 2.1.23 Rating: 4.3/4.4 Control Room Heating, Ventilation and Air Conditioning Ability to perform specific system and integrated plant procedures during all modes of plant operation. Suggested Testing Environment: Plant Alternate Path:  Yes  No SRO Only:  Yes  No Time Critical:  Yes  No Reference(s): QOA 5750-15, Rev. 11,Complete Loss of Control Room HVAC Actual Testing Environment: Simulator Control Room In-Plant  Other Testing Method:  Simulate  Perform Estimated Time to Complete: 15 minutes Actual Time Used:   minutes EVALUATION SUMMARY: Were all the Critical Elements performed satisfactorily?  Yes  No The operator's performance was evaluated against standards contained within this JPM and has been determined to be:  Satisfactory  Unsatisfactory Comments:
enters the Aux El ectric Room West (double) doors.
Evaluator's Name:  (Print) Evaluator's Signature:  Date:    [If this page is an odd numbered page, a blank page is automatically generated after this page to keep the student cue sheet separate from this page]
Plugs the smoke ejector into an available electrical outlet. _________
INITIAL CONDITIONS - Both Units are operating at near rated conditions with normal electrical line-up. - The "B" Control Room HVAC fan was taken out-of-service yesterday to replace the fan motor bearings. - Approximately 1 hour ago the CONTROL ROOM SPLY/RETURN FAN TRIP (912-5 E-2) alarm came up. - The Shift Manager was notified of the loss of ventilation and the maintenance department is investigating but, as yet, has not resolved the problem. - Both the Control Room and the Aux Electric Room temperatures are being monitored by other operators and are approaching 98°F. - Normal power is available at wall receptacles.  
*D.3.s. *Verify smoke ejector is running* Turns on smoke ejector Observes fan rotation and checks duct for air flow. _________
- You have obtained all necessary keys to perform this task. - This JPM is not time critical.
CUE:  State, "Air is blowing in to the Aux Electric Room."
INITIATING CUE The US has directed you to set-up and provide an alternate means of ventilating both the Control Room and the Aux. Electric Room IAW QOA 5750-15.}}
*D.3.t.
* Open panel doors in Aux Electric Room to ensure a more even temperature distribution.
* Unlocks and opens all Aux Electric Room panel doors. _________
CUE:  State all Aux Electric Rm panel doors are open. EVALUATOR:  The candidate should inform you that the task is complete.
JPM Stop Time:
 
2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 10 of 11 JPM SUMMARY Operator's Name
:  Job Title
:  EO  RO SRO  FS  STA/IA  SRO Cert JPM Title: Provide Alternate Ventilation to the Control Room and the Aux Electric Room JPM Number: 2014 ILT NRC JPM k  Revision Number: 00 Task Number and Title:
SRN-5750-P18 (Freq: LIC=B  NF=B)  Given an operating reactor plant with a complete loss of control HVAC, loca lly establish temporary ventilation for the control room and the aux electric room in accordance with QOA 5750-15.
K/A Number and Importance:
K/A: 290003 2.1.23 Rating: 4.3/4.4 Control Room Heating, Vent ilation and Air Conditioning Ability to perform specific system and integrat ed plant procedures during all modes of plant operation. Suggested Testing Environment: Plant Alternate Path:  Yes  No SRO Only:  Yes  No Time Critical:  Yes  No Reference(s): QOA 5750-15, Rev. 11,Comp lete Loss of Control Room HVAC Actual Testing Environment:
Simulator Control Room In-Plant  Other Testing Method:  Simulate  Perform Estimated Time to Complete: 15 minutes Actual Time Used:
minutes EVALUATION SUMMARY:
Were all the Critical Elements performed satisfactorily?  Yes  No The operator's performance wa s evaluated against standards contained within this JPM and has been determined to be:  Satisfactory  Unsatisfactory Comments:
Evaluator's Name
:  (Print)
Evaluator's Signature
:  Date:    [If this page is an odd numbered page, a blank page is automatically generated after this page to keep the student cue sheet separate from this page]
INITIAL CONDITIONS - Both Units are operating at near rated conditions with normal electrical line-up. - The "B" Control Room HVAC fan was taken out-of-service yesterday to replace the fan motor bearings. - Approximately 1 hour ago the CONTROL ROOM SPLY/RETURN FAN TRIP (912-5 E-2) alarm came up. - The Shift Manager was notified of the loss of ventilation and the maintenance department is investigating but, as yet, has not resolved the problem. - Both the Control Room and t he Aux Electric Room temperat ures are being monitored by other operators and are approaching 98
°F. - Normal power is available at wall receptacles.  
- You have obtained all necessary keys to perform this task. - This JPM is not time critical.  
 
INITIATING CUE The US has directed you to set-up and provi de an alternate means of ventilating both the Control Room and the Aux. Electric Room IAW QOA 5750-15.}}

Revision as of 11:07, 1 July 2018

Quad Cities, Systems JPM K
ML14225A671
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/27/2013
From:
NRC/RGN-III
To:
Exelon Generation Co
Bruce Palagi
Shared Package
ML13093A388 List:
References
Download: ML14225A671 (11)


Text

SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 11 Exelon Nuclear Job Performance Measure Provide Alternate Ventilation to the Control Room and the Aux Electric Room JPM Number: 2014 ILT NRC JPM k Revision Number: 00 Date: 10/21/2013 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date

Approved By:

Training Department Date

2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initia l validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified. ________ 2. Knowledge and Abilities (K/A) references are included. ________ 3. Performance location specified. (in-plant, control room, simulator, or other) ________ 4. Initial setup conditions are identified. ________ 5. Initiating cue (and terminating cue if required) are properly identified. ________ 6. Task standards identifi ed and verified by SME review. ________ 7. Critical steps meet the criteria for critical st eps and are identified with an asterisk (*). ________ 8. If an alternate path is used, the task standard contai ns criteria for successful completion. ________ 9. Verify the procedure(

s) referenced by this JPM re flects the current revision:

Procedure QOA 5750-15 Rev: 11 Procedure Rev: Procedure Rev: ________ 10. Verify cues both verbal and visual are free of conflict. ________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM. ________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date

SME / Instructor Date

SME / Instructor Date

2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 11 Revision Record (Summary)

Revision 00, Renamed to 2014 ILT NRC JPM k. Restarted numbering accordingly Previous revisions were:

Revision 10, This JPM is developed IAW guidelines established in NUREG 1021 Rev 8 ES-301 and Appendix C. This JPM meets the criteria of Category B.1 "Control Room Systems," for RO/SRO candidates. JPM revised to match procedure changes.

Revision 11, JPM revised to reflect procedure changes.

Revision 12, JPM revised to reflec t updated completion time.

Revision 13, JPM revised to reflect forma t and completion time change.

Revision 14, JPM revised to reflect procedure changes.

Revision 15, JPM revised to reflect procedure c hanges. Specified that normal power was available at wall receptacles in the initial conditions. Updated K/A ratings.

Revision 16, Revised JPM to reflect procedure changes.

2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 11 INITIAL CONDITIONS - Both Units are operating at near rated conditions with normal electrical line-up. - The "B" Control Room HVAC fan was taken out-of-service yesterday to replace the fan motor bearings. - Approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago the CONTROL ROOM SPLY/RETURN FAN TRIP (912-5 E-2) alarm came up. - The Shift Manager was notified of the loss of ventilation and the maintenance department is investigating but, as yet, has not resolved the problem. - Both the Control Room and t he Aux Electric Room temperat ures are being monitored by other operators and are approaching 98

°F. - Normal power is available at wall receptacles.

- You have obtained all necessary keys to perform this task. - This JPM is not time critical.

INITIATING CUE The US has directed you to set-up and provi de an alternate means of ventilating both the Control Room and the Aux. Electric Room IAW QOA 5750-15.

Provide examinee with:

Copy of QOA 5750-15.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluator's Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elemen ts of a critical step.

Number any comments in the "Comment Nu mber" column on the following pages. Then annotate that comment in the "Comments" sect ion at the bottom of the page. The comment section should be used to document the reason t hat a step is marked as unsatisfactory and to document unsatisfactory performance re lating to management expectations.

Some operations that are perform ed from outside of the contro l room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to per form groups of procedure steps instead of calling for each individual item to be performed.

2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 11 The timeclock starts when the candidate acknowledges the initiating cue. JPM K QOA 5750-15, Rev 011, COMPLETE 2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 11 JPM Start Time:

STEP ELEMENT STANDARD SAT UNSAT Comment Number EVALUATOR: The candidate may perform the steps in any logical order. It is most likely that the candidate will perform all the tasks for one floor level and then repeat at the other floor level. EVALUATOR: The initial conditions state that electrical power is available at the outlets. If the candidate chooses to obtain the generators to provide electrical power, this is acceptable provided the suction for the smoke ejector is NOT near the exhaust [breathing hazard to control room personnel].

  • D.3.b. *Obtain temporary ventilation equipment for Control Room

from Service Building 3rd Floor Hallway to CAS.

(1) Extension Cords (2) Collapsible Ductwork (3) Smoke Ejectors.

  • Unlocks (if necessary) temporary ventilation equipment

located in the Service Building

3rd Floor Hallway to CAS and obtains the following: 1.) Extension Cords 2.) Collapsible Ductwork 3.) Smoke Ejectors _________CUE: State, "You have obtained the temporary ventilation equipment." (Should be smoke ejector, flexible duc t, and extension cord.) NOTE: In the following step, the candidate may refer to step D.2.c fo r a clarification that the "1st floor west of Weld Shop" is the Electrical Distribution Room on th e first floor of the Service Building, south of the EMD Truck Bay.

  • D.3.c. *Obtain temporary ventilation equipment for Auxiliary Electric

Room (located 1st floor west

of Weld Shop)

(1) Extension Cord (2) Collapsible Ductwork (3) Smoke Ejectors.

  • Unlocks (if necessary) temporary ventilation equipment

from the Service Building

Electric Equipment Room

(located 1 st floor west of Weld shop) and obtains the following: 1) Extension Cords

2) Collapsible Ductwork
3) Smoke Ejectors _________

2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 11 STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE: State, "You have obtained the temporary ventilation equipment." (Should be smoke ejectors, flexible duc t, and extension cord.)

D.3.d. Direct Security to establish Control Room AND Aux Electric

Room access control.

Contacts Security and requests access control established to

the Control Room and Aux Electric Room. _________

CUE: As security, acknowledge the request and state security personnel are standing by to control access to the Control Room and Aux Electric Room.

  • D.3.e. *Open Control Room double doors and maintain open for cooling.* Opens south CR double doors and props them open.

_________

CUE: State the Control Room doors are open. EVALUATOR: The single Control Room door en ters the RCA. Simulate opening the door.

  • D.3.f. *Open single Control Room door and maintain open for cooling.
  • Opens west CR single door and props it open.

_________

CUE: State the Control Room door is open.

  • D.3.g. &

D.3.h & D.3.i *Place smoke ejector AND duct such that air is blown into the

Control Room through the double doors

  • , routing extension cord(s) between smoke

ejector and power source.

Locate convenient wall outlet

  • Plug in smoke ejector
  • (Simulates) placing the smoke ejector and ductwork such that the exhaust enters the control

room south (double) doors.

Plugs the smoke ejector into an available electrical outlet.

_________

CUE: State the smoke ejector/ductwork is pl aced as the candidate indicates. State the smoke ejector is plugged into th e outlet the candidate indicates.

2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 11 STEP ELEMENT STANDARD SAT UNSAT Comment Number *D.3.j. *Verify smoke ejector is running* Turns on smoke ejector Observes fan rotation and checks duct for air flow. _________

CUE: State, "Air is flowing into the Control Room."

  • D.3.k. *Open panel doors in Control Room to ensure a more even temperature distribution.
  • Opens all Control Room panel doors. _________

CUE: State the Control Room panel doors are open. EVALUATOR: The following step is unnecessary and may not be performed by the candidate. It is applicable if electrical power via the outlets were unavailable. D.3.l. Place portable generator in machine shop area.

Obtains and places a generator in the machine shop area.

CUE: State a portable generator has been placed in the machine shop area.

D.3.m. Inform RP that plant conditions require smoke

ejector for Aux Electric Room

and that this will involve routing ejector from

clean area through radiologically

controlled area to clean area.

Contacts Radiation Protection and informs them that

temporary ventilation equipment

will be routed from the

maintenance shop area through

the west doors of the Aux Electric Room.

CUE: As Radiation Protection, acknowledge the information. EVALUATOR: The following step is on the RCA side. The student may choose to perform this step in conjunction with routing the smoke ejector ductwork.

  • D.3.n. *Open Aux Electric Room double doors and maintain open for cooling.
  • Opens west Aux Electric Room double doors and props them open. _________

CUE: State the Aux Electric R oom double doors are open.

  • D.3.o. *Open single Aux Electric Room door and maintain open for cooling.* Opens South Aux Electric Room door and props it open. _________

2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 11 STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE: State the Aux Electric Room door is open.

  • D.3.p &

D.3.q & D.3.r *Place smoke ejector AND duct such that air is blown into Aux

Electric Room through the double doors

  • , routing extension cord(s) between smoke ejector and power source.

Locate convenient wall

receptacle.

  • Plug in smoke ejector.
  • Places the smoke ejector and ductwork such that the exhaust

enters the Aux El ectric Room West (double) doors.

Plugs the smoke ejector into an available electrical outlet. _________

  • D.3.s. *Verify smoke ejector is running* Turns on smoke ejector Observes fan rotation and checks duct for air flow. _________

CUE: State, "Air is blowing in to the Aux Electric Room."

  • D.3.t.
  • Open panel doors in Aux Electric Room to ensure a more even temperature distribution.
  • Unlocks and opens all Aux Electric Room panel doors. _________

CUE: State all Aux Electric Rm panel doors are open. EVALUATOR: The candidate should inform you that the task is complete.

JPM Stop Time:

2014 ILT NRC JPM k - Rev 00 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 10 of 11 JPM SUMMARY Operator's Name

Job Title
EO RO SRO FS STA/IA SRO Cert JPM Title: Provide Alternate Ventilation to the Control Room and the Aux Electric Room JPM Number: 2014 ILT NRC JPM k Revision Number: 00 Task Number and Title:

SRN-5750-P18 (Freq: LIC=B NF=B) Given an operating reactor plant with a complete loss of control HVAC, loca lly establish temporary ventilation for the control room and the aux electric room in accordance with QOA 5750-15.

K/A Number and Importance:

K/A: 290003 2.1.23 Rating: 4.3/4.4 Control Room Heating, Vent ilation and Air Conditioning Ability to perform specific system and integrat ed plant procedures during all modes of plant operation. Suggested Testing Environment: Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): QOA 5750-15, Rev. 11,Comp lete Loss of Control Room HVAC Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used:

minutes EVALUATION SUMMARY:

Were all the Critical Elements performed satisfactorily? Yes No The operator's performance wa s evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluator's Name

(Print)

Evaluator's Signature

Date: [If this page is an odd numbered page, a blank page is automatically generated after this page to keep the student cue sheet separate from this page]

INITIAL CONDITIONS - Both Units are operating at near rated conditions with normal electrical line-up. - The "B" Control Room HVAC fan was taken out-of-service yesterday to replace the fan motor bearings. - Approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago the CONTROL ROOM SPLY/RETURN FAN TRIP (912-5 E-2) alarm came up. - The Shift Manager was notified of the loss of ventilation and the maintenance department is investigating but, as yet, has not resolved the problem. - Both the Control Room and t he Aux Electric Room temperat ures are being monitored by other operators and are approaching 98

°F. - Normal power is available at wall receptacles.

- You have obtained all necessary keys to perform this task. - This JPM is not time critical.

INITIATING CUE The US has directed you to set-up and provi de an alternate means of ventilating both the Control Room and the Aux. Electric Room IAW QOA 5750-15.