ML16203A368: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:WOLF CREEK TABLE OF CONTENTS  CHAPTER
{{#Wiki_filter:WOLF CREEK  


==1.0 INTRODUCTION==
TABLE OF CONTENTS CHAPTER
AND GENERAL DESCRIPTION OF THE PLANT Section  Page
 
==1.0 INTRODUCTION==
AND GENERAL DESCRIPTION OF THE PLANT  
 
Section  Page  


==1.1 INTRODUCTION==
==1.1 INTRODUCTION==
1.1-1 1.1.1 LICENSES REQUESTED 1.1-1  
1.1-1  
 
1.1.1 LICENSES REQUESTED 1.1-1  


1.1.2 PLANT UNITS 1.1-1  
1.1.2 PLANT UNITS 1.1-1  
Line 37: Line 43:
1.1.7 DESIGN BASES 1.1-3  
1.1.7 DESIGN BASES 1.1-3  


1.2 GENERAL PLANT DESCRIPTION 1.2-1 1.2.1 PLANT SITE DESCRIPTION 1.2-1 1.2.1.1 Site Location 1.2-1 1.2.1.2 Site Ownership 1.2-1 1.2.1.3 Access to the Site 1.2-1 1.2.1.4 Environs 1.2-1 1.2.1.5 Geology 1.2-2 1.2.1.6 Seismology 1.2-3 1.2.1.7 Hydrology 1.2-3 1.2.1.8 Meteorology 1.2-5  
1.2 GENERAL PLANT DESCRIPTION 1.2-1  
 
1.2.1 PLANT SITE DESCRIPTION 1.2-1 1.2.1.1 Site Location 1.2-1 1.2.1.2 Site Ownership 1.2-1 1.2.1.3 Access to the Site 1.2-1 1.2.1.4 Environs 1.2-1 1.2.1.5 Geology 1.2-2 1.2.1.6 Seismology 1.2-3 1.2.1.7 Hydrology 1.2-3 1.2.1.8 Meteorology 1.2-5  


1.2.2 GENERAL ARRANGEMENTS OF STRUCTURES 1.2-5   
1.2.2 GENERAL ARRANGEMENTS OF STRUCTURES 1.2-5   
Line 47: Line 55:
1.2.5 ENGINEERED SAFETY FEATURES AND EMERGENCY SYSTEMS 1.2-10 1.2.5.1 Containment 1.2-10 1.2.5.2 Emergency Core Cooling System 1.2-12 1.2.5.3 Auxiliary Feedwater System 1.2-12  
1.2.5 ENGINEERED SAFETY FEATURES AND EMERGENCY SYSTEMS 1.2-10 1.2.5.1 Containment 1.2-10 1.2.5.2 Emergency Core Cooling System 1.2-12 1.2.5.3 Auxiliary Feedwater System 1.2-12  


1.0-i Rev. 29 WOLF CREEK TABLE OF CONTENTS (CONTINUED)
1.0-i Rev. 29 WOLF CREEK  
Section Page 1.2.6 PLANT INSTRUMENTATION AND CONTROL SYSTEMS 1.2-13 1.2.6.1 Protection System 1.2-14 1.2.6.2 Reactor Instrumentation and Control System 1.2-14 1.2.6.3 Radiation Monitoring System 1.2-15 1.2.6.4 Balance-of-Plant Instrumentation and Control Systems 1.2-15   
 
TABLE OF CONTENTS (CONTINUED)  
 
Section Page  
 
1.2.6 PLANT INSTRUMENTATION AND CONTROL SYSTEMS 1.2-13 1.2.6.1 Protection System 1.2-14 1.2.6.2 Reactor Instrumentation and Control System 1.2-14 1.2.6.3 Radiation Monitoring System 1.2-15 1.2.6.4 Balance-of-Plant Instrumentation and Control Systems 1.2-15   


1.2.7 PLANT ELECTRIC POWER SYSTEM 1.2-15 1.2.7.1 Transmission and Generation Systems 1.2-15 1.2.7.2 Electric Power Distribution System 1.2-16   
1.2.7 PLANT ELECTRIC POWER SYSTEM 1.2-15 1.2.7.1 Transmission and Generation Systems 1.2-15 1.2.7.2 Electric Power Distribution System 1.2-16   
Line 62: Line 75:
1.2.12 REFERENCES 1.2-27  
1.2.12 REFERENCES 1.2-27  


1.0-ii Rev. 29 WOLF CREEK TABLE OF CONTENTS (CONTINUED)
1.0-ii Rev. 29 WOLF CREEK  
Section Page 1.3 COMPARISON TABLES 1.3-1 1.3.1 COMPARISON WITH SIMILAR FACILITY DESIGNS 1.3-1   
 
TABLE OF CONTENTS (CONTINUED)  
 
Section Page  
 
1.3 COMPARISON TABLES 1.3-1  
 
1.3.1 COMPARISON WITH SIMILAR FACILITY DESIGNS 1.3-1   


1.3.2 COMPARISON OF FINAL AND PRELIMINARY INFORMATION 1.3-1  
1.3.2 COMPARISON OF FINAL AND PRELIMINARY INFORMATION 1.3-1  
Line 69: Line 89:
1.3.3 COMPLIANCE WITH NRC REGULATIONS 1.3-1   
1.3.3 COMPLIANCE WITH NRC REGULATIONS 1.3-1   


1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS 1.4-1 1.4.1 APPLICANTS 1.4-1  
1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS 1.4-1  
 
1.4.1 APPLICANTS 1.4-1  


1.4.2 SNUPPS 1.4-1  
1.4.2 SNUPPS 1.4-1  
Line 87: Line 109:
1.4.9 DIVISION OF RESPONSIBILITIES 1.4-11 1.4.9.1 Utility Company 1.4-11 1.4.9.2 Standard Plant Architect/Engineer 1.4-11 1.4.9.3 SNUPPS Staff 1.4-12 1.4.9.4 Site Architect/Engineer 1.4-12 1.4.9.5 Security Consultant 1.4-12  
1.4.9 DIVISION OF RESPONSIBILITIES 1.4-11 1.4.9.1 Utility Company 1.4-11 1.4.9.2 Standard Plant Architect/Engineer 1.4-11 1.4.9.3 SNUPPS Staff 1.4-12 1.4.9.4 Site Architect/Engineer 1.4-12 1.4.9.5 Security Consultant 1.4-12  


1.5 REQUIREMENTS FOR FURTHER TECHNICAL   INFORMATION 1.5-1 1.5.1 17 x 17 FUEL ASSEMBLY 1.5-1 1.5.1.1 Rod Cluster Control Spider Tests 1.5-1 1.5.1.2 Grid Tests 1.5-1 1.5.1.3 Fuel Assembly Structural Tests 1.5-1 1.5.1.4 Guide Tube Tests 1.5-1 1.5.1.5 Prototype Assembly Tests 1.5-2 1.5.1.6 Departure from Nucleate Boiling Tests 1.5-2 1.5.1.7 Incore Flow Mixing 1.5-2  
1.5 REQUIREMENTS FOR FURTHER TECHNICAL INFORMATION 1.5-1 1.5.1 17 x 17 FUEL ASSEMBLY 1.5-1 1.5.1.1 Rod Cluster Control Spider Tests 1.5-1 1.5.1.2 Grid Tests 1.5-1 1.5.1.3 Fuel Assembly Structural Tests 1.5-1 1.5.1.4 Guide Tube Tests 1.5-1 1.5.1.5 Prototype Assembly Tests 1.5-2 1.5.1.6 Departure from Nucleate Boiling Tests 1.5-2 1.5.1.7 Incore Flow Mixing 1.5-2  
 
1.0-iii Rev. 29 WOLF CREEK
 
TABLE OF CONTENTS (CONTINUED)


1.0-iii Rev. 29 WOLF CREEK TABLE OF CONTENTS (CONTINUED)
Section Page 1.5.2 FIRE STOPS 1.5-2  
Section Page 1.5.2 FIRE STOPS 1.5-2  


Line 99: Line 124:
1.5-3  
1.5-3  


1.6 MATERIAL INCORPORATED BY REFERENCE 1.6-1 1.7 DRAWINGS AND OTHER DETAILED INFORMATION 1.7-1 1.7.1 ELECTRICAL, INSTRUMENTATION AND CONTROL DRAWINGS 1.7-1  
1.6 MATERIAL INCORPORATED BY REFERENCE 1.6-1
 
1.7 DRAWINGS AND OTHER DETAILED INFORMATION 1.7-1  
 
1.7.1 ELECTRICAL, INSTRUMENTATION AND CONTROL DRAWINGS 1.7-1  


1.7.2 PIPING AND INSTRUMENTATION DIAGRAMS 1.7-1  
1.7.2 PIPING AND INSTRUMENTATION DIAGRAMS 1.7-1  
Line 107: Line 136:
1.7.4 LONG-TERM TEMPORARY MODIFICATIONS 1.7-1   
1.7.4 LONG-TERM TEMPORARY MODIFICATIONS 1.7-1   


1.8 CONFORMANCE TO NRC REGULATORY GUIDES 1.8-1 1.9 NRC REGULATORY REQUIREMENTS REVIEW COMMITTEE CATEGORY 2, 3, AND 4 MATTERS 1.9-1   
1.8 CONFORMANCE TO NRC REGULATORY GUIDES 1.8-1  
 
1.9 NRC REGULATORY REQUIREMENTS REVIEW COMMITTEE CATEGORY 2, 3, AND 4 MATTERS 1.9-1   


1.0-iv Rev. 29 WOLF CREEK TABLE OF CONTENTS (CONTINUED)   LIST OF TABLES Table no. Title 1.1-1 Acronyms Used in the USAR  
1.0-iv Rev. 29 WOLF CREEK  
 
TABLE OF CONTENTS (CONTINUED)
LIST OF TABLES  
 
Table no. Title  
 
1.1-1 Acronyms Used in the USAR  


1.2-1 Design Envelope  
1.2-1 Design Envelope  
Line 131: Line 169:
1.6-3 USAR Figure/Controlled Drawing Cross-Reference   
1.6-3 USAR Figure/Controlled Drawing Cross-Reference   


1.6-4 Incorporated by Reference USAR Section.Controlled Document Cross- Reference 1.7-1 Electrical, Instrumentation, and Control Drawings   
1.6-4 Incorporated by Reference USAR Section.Controlled Document Cross-Reference
 
1.7-1 Electrical, Instrumentation, and Control Drawings   


1.7-2 Piping and Instrumentation Diagrams   
1.7-2 Piping and Instrumentation Diagrams   


1.7-3 Additional Controlled Drawings Used in the USAR 1.7-4 Erected Scaffold Expected to be in Place Throughout Next Required USAR Update Cycle 1.9-1 Category 2, 3 and 4 Regulatory Guides  
1.7-3 Additional Controlled Drawings Used in the USAR  
 
1.7-4 Erected Scaffold Expected to be in Place Throughout Next Required USAR Update Cycle
 
1.9-1 Category 2, 3 and 4 Regulatory Guides  


1.9-2 Category 2, 3, and 4 Branch Technical Positions  
1.9-2 Category 2, 3, and 4 Branch Technical Positions  
Line 143: Line 187:
1.9-4 Other Category 4 Positions  
1.9-4 Other Category 4 Positions  


1.0-v    Rev. 29 WOLF CREEK CHAPTER 1 - LIST OF FIGURES *Refer to Section 1.6 and Table 1.6-3. Controlled drawings were removed from the USAR at Revision 17 and are considered incorporated by reference. Figure # Sheet TitleDrawing #*1.1-1 1 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-120101 1.1-1 2 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-120102 1.1-1 3 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-020103 1.1-1 4 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-020104 1.2-1 0 Peninsular Plant Arrangement Standard Power Systems & Structure Interface M-1G001 1.2-2 0 Equipment Location Radwaste Building Plan El. 1976'-0" M-1G010 1.2-3 0 Equipment Location Radwaste Building Plan El. 2000'-0" M-1G011 1.2-4 0 Equipment Location Radwaste Building Plan El. 2022'-0" M-0G012 1.2-5 0 Equipment Location Radwaste Building El. 2031'-6" & Roof Plan M-1G013 1.2-6 0 Equipment Location Radwaste Building Sections A & B M-1G014 1.2-7 0 Equipment Location Radwaste Building Sections C & E M-1G015 1.2-8 0 Equipment Location Radwaste Building Sections D & F M-1G016 1.2-9 0 Equipment Location Reactor and Auxiliary Bldgs Plan - Basement El. 1974'-0" M-1G020 1.2-10 0 Equipment Location Auxiliary Building Partial Plan El. 1988'-0" & El. 2013'-6" M-1G021 1.2-11 0 Equipment Location Reactor and Auxiliary Building Plan Ground Floor Elevation 2000'-0" M-1G022 1.2-12 0 Equipment Location Reactor and Auxiliary Building Plan El. 2026'-0" M-1G023 1.2-13 0 Equipment Location Reactor and Auxiliary Buildings Plan Operating Floor El. 2047'-6" M-1G024 1.2-14 0 Equipment Locations Reactor and Auxiliary Buildings Plan El. 2068'-8" M-1G025 1.2-15 0 Equipment Location Reactor and Auxiliary Building Section A M-1G026 1.2-16 0 Equipment Locations Reactor and Auxiliary Buildings Section B M-1G027 1.2-17 0 Equipment Location Reactor and Auxiliary Building Section C M-1G028 1.2-18 0 Equipment Location Reactor and Auxiliary Building Section D M-1G029    1.0-vi Rev. 17 WOLF CREEK CHAPTER 1 - LIST OF FIGURES *Refer to Section 1.6 and Table 1.6-3. Controlled drawings were removed from the USAR at Revision 17 and are considered incorporated by reference. Figure # Sheet TitleDrawing #* 1.2-19 0 Equipment Location Auxiliary Building Sections E, F, & G M-1G030 1.2-20 0 Equipment Location Fuel Building Plan Elevation 2000'- 0", 2026'-0" and 2047'-6" M-1G040 1.2-21 0 Equipment Location Fuel Building Sections A, B, & C M-1G041 1.2-22 0 Equipment Location Fuel Building Sections D, E, & F M-1G042 1.2-23 0 Equipment Location Control Building & Communication Corridor Plan Elevation 1974'- 0" & 1984'-0" M-1G050 1.2-24 0 Equipment Location Control & Diesel Generator Buildings & Communication Corridor Plan Elevation 2000'-0" & 2016'-0" M-1G051 1.2-25 0 Equipment Location Control & Diesel Generator Buildings & Communication Corridor Plan Elevation 2032'-0" & 2047'-6" M-1G052 1.2-26 0 Equipment Location Control & Diesel Generator Buildings & Corridor Plan Elevation 2061'- 6",
1.0-v    Rev. 29 WOLF CREEK CHAPTER 1 - LIST OF FIGURES
2066'-0" & 2073'-6" & Section D. M-1G053 1.2-27 0 Equipment Location Control & Diesel Generator Buildings & Communication Corridor Section A M-1G054 1.2-28 0 Equipment Location Control & Diesel Generator Buildings Sections B & C M-1G055 1.2-29 0 Equipment Location Turbine Building Condenser Pit Plan Elevation 1983'-0" M-1G060 1.2-30 0 Equipment Location Turbine Building Ground Floor Plan Elevation 2000'-0" M-1G061 1.2-31 0 Equipment Location Turbine Building Partial Plan Elevation 2015'-4" M-1G062 1.2-32 0 Equipment Location Turbine Building Mezzanine Floor Plan Elevation 2033'-0" M-1G063 1.2-33 0 Equipment Location Turbine Building Operating Floor Plan Elevation 2065'-0" M-1G064 1.2-34 0 Equipment Location Turbine Building Section A M-1G065 1.2-35 0 Equipment Location Turbine Building Section B M-1G066 1.2-36 0 Equipment Location Turbine Building Section C M-1G067 1.2-37 0 Equipment Location Turbine Building Section D M-0G068 1.2-38 0 Equipment Location Turbine Building Section E M-1G069 1.2-39 0 Equipment Location Turbine Building Section F M-1G070 1.2-40 0 Equipment Location Turbine Building Section G M-0G071 1.2-41 0 Equipment Location Turbine Building Section H M-1G072 1.2-42 0 Turbine Component Laydown Area, Elevation 2065'-0" M-1G073 1.2-43 0 Site Area Layout  1.2-44 0 Site Plan 8025-C-KG1202 
*Refer to Section 1.6 and Table 1.6-3. Controlled drawings were removed from the USAR at Revision 17 and are considered incorporated by reference.
Figure #
Sheet TitleDrawing #*1.1-1 1 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-120101 1.1-1 2 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-120102 1.1-1 3 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-020103 1.1-1 4 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-020104 1.2-1 0 Peninsular Plant Arrangement Standard Power Systems & Structure Interface M-1G001 1.2-2 0 Equipment Location Radwaste Building Plan El.
1976'-0" M-1G010 1.2-3 0 Equipment Location Radwaste Building Plan El.
2000'-0" M-1G011 1.2-4 0 Equipment Location Radwaste Building Plan El.
2022'-0" M-0G012 1.2-5 0 Equipment Location Radwaste Building El. 2031'-
6" & Roof Plan M-1G013 1.2-6 0 Equipment Location Radwaste Building Sections A  
& B M-1G014 1.2-7 0 Equipment Location Radwaste Building Sections C  
& E M-1G015 1.2-8 0 Equipment Location Radwaste Building Sections D  
& F M-1G016 1.2-9 0 Equipment Location Reactor and Auxiliary Bldgs Plan - Basement El. 1974'-0" M-1G020 1.2-10 0 Equipment Location Auxiliary Building Partial Plan El. 1988'-0" & El. 2013'-6" M-1G021 1.2-11 0 Equipment Location Reactor and Auxiliary Building Plan Ground Floor Elevation 2000'-0" M-1G022 1.2-12 0 Equipment Location Reactor and Auxiliary Building Plan El. 2026'-0" M-1G023 1.2-13 0 Equipment Location Reactor and Auxiliary Buildings Plan Operating Floor El. 2047'-6" M-1G024 1.2-14 0 Equipment Locations Reactor and Auxiliary Buildings Plan El. 2068'-8" M-1G025 1.2-15 0 Equipment Location Reactor and Auxiliary Building Section A M-1G026 1.2-16 0 Equipment Locations Reactor and Auxiliary Buildings Section B M-1G027 1.2-17 0 Equipment Location Reactor and Auxiliary Building Section C M-1G028 1.2-18 0 Equipment Location Reactor and Auxiliary Building Section D M-1G029    1.0-vi Rev.
17 WOLF CREEK CHAPTER 1 - LIST OF FIGURES
*Refer to Section 1.6 and Table 1.6-3. Controlled drawings were removed from the USAR at Revision 17 and are considered incorporated by reference.
Figure # Sheet TitleDrawing #* 1.2-19 0 Equipment Location Auxiliary Building Sections E, F, & G M-1G030 1.2-20 0 Equipment Location Fuel Building Plan Elevation 2000'- 0", 2026'-0" and 2047'-6" M-1G040 1.2-21 0 Equipment Location Fuel Building Sections A, B, &
C M-1G041 1.2-22 0 Equipment Location Fuel Building Sections D, E, &
F M-1G042 1.2-23 0 Equipment Location Control Building &
Communication Corridor Plan Elevation 1974'- 0" &
1984'-0" M-1G050 1.2-24 0 Equipment Location Control & Diesel Generator Buildings & Communication Corridor Plan Elevation 2000'-0" & 2016'-0" M-1G051 1.2-25 0 Equipment Location Control & Diesel Generator Buildings & Communication Corridor Plan Elevation  
 
2032'-0" & 2047'-6" M-1G052 1.2-26 0 Equipment Location Control & Diesel Generator Buildings & Corridor Plan Elevation 2061'- 6",  


1.0-vii Rev. 29 WOLF CREEK CHAPTER
2066'-0" & 2073'-6" & Section D.
M-1G053 1.2-27 0 Equipment Location Control & Diesel Generator Buildings & Communication Corridor Section A M-1G054 1.2-28 0 Equipment Location Control & Diesel Generator Buildings Sections B & C M-1G055 1.2-29 0 Equipment Location Turbine Building Condenser Pit Plan Elevation 1983'-0" M-1G060 1.2-30 0 Equipment Location Turbine Building Ground Floor Plan Elevation 2000'-0" M-1G061 1.2-31 0 Equipment Location Turbine Building Partial Plan Elevation 2015'-4" M-1G062 1.2-32 0 Equipment Location Turbine Building Mezzanine Floor Plan Elevation 2033'-0" M-1G063 1.2-33 0 Equipment Location Turbine Building Operating Floor Plan Elevation 2065'-0" M-1G064 1.2-34 0 Equipment Location Turbine Building Section A M-1G065 1.2-35 0 Equipment Location Turbine Building Section B M-1G066 1.2-36 0 Equipment Location Turbine Building Section C M-1G067 1.2-37 0 Equipment Location Turbine Building Section D M-0G068 1.2-38 0 Equipment Location Turbine Building Section E M-1G069 1.2-39 0 Equipment Location Turbine Building Section F M-1G070 1.2-40 0 Equipment Location Turbine Building Section G M-0G071 1.2-41 0 Equipment Location Turbine Building Section H M-1G072 1.2-42 0 Turbine Component Laydown Area, Elevation 2065'-
0" M-1G073 1.2-43 0 Site Area Layout 1.2-44 0 Site Plan 8025-C-KG1202 


==1.0INTRODUCTION==
1.0-vii Rev. 29
 
WOLF CREEK CHAPTER
 
==1.0 INTRODUCTION==
AND GENERAL DESCRIPTION OF THE PLANT
AND GENERAL DESCRIPTION OF THE PLANT


==1.1 INTRODUCTION==
==1.1 INTRODUCTION==
Kansas City Power & Light Company, Kansas Gas and Electric Company (KG&E) and Union Electric Company joined together to design, purchase, and license a nuclear block for a generating station acceptable at any of several sites, under the acronym of SNUPPS, Standardized Nuclear Unit Power Plant System. The terminology "the Operating Agent" is used throughout this report to identify the managing corporation for WCGS. At this time the Operating Agent is Wolf Creek Nuclear Operating Corporation (WCNOC) 1.1.1 LICENSE REQUESTED The Safety Analysis Report was submitted to the Nuclear Regulatory Commission (NRC) in support of the application by the Operating Agent for a Class 103 license to operate a nuclear power facility. The participants in the Wolf Creek project and their portions of ownership are:Kansas City Power & Light Company (47 percent), Kansas Electric Power Cooperative, Incorporated (6 percent), and Kansas Gas and Electric Company (47 percent). See Section 1.4.1 for additional discussion of plant ownership. This report was originally submitted in two parts, the SNUPPS FSAR and the Wolf Creek Site Addendum. It was combined into one report, the Wolf Creek Updated Safety Analysis Report, in the first update after receipt of the Operating License. This report follows the format recommended by Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants. Sufficiently detailed design information is provided in this report to make a definitive evaluation that the Wolf Creek Generating Station (WCGS) can be operated without undue risk to the health and safety of the public. The Licensees received a low power (less than five percent) license to operate the Wolf Creek Generating Station on March 11, 1985. The full power license was issued on June 4, 1985. 1.1.2 PLANT UNITS The application was for a single pressurized water reactor nuclear unit. The power  block was built to the  SNUPPS  duplicate plant 1.1-1  Rev. 2 WOLF CREEK  design. The ESWS vertical loop chase design is not included in the SNUPPS duplicate plant design. Evaluations of the site characteristics and the design of the cooling system and other site-related systems and facilities have considered the installation of a second nuclear unit at a later date.


The WCGS power block, consists of these structures, including enclosed systems and components:  
Kansas City Power & Light Company, Kansas Gas and Electric Company (KG&E) and Union Electric Company joined together to design, purchase, and license a nuclear block for a generating station acceptable at any of several sites, under the acronym of SNUPPS, Standardized Nuclear Unit Power Plant System. The terminology "the Operating Agent" is used throughout this report to identify the managing corporation for WCGS. At this time the Operating Agent is Wolf Creek Nuclear Operating Corporation (WCNOC) 1.1.1 LICENSE REQUESTED
: a. Reactor building (containment)  
 
The Safety Analysis Report was submitted to the Nuclear Regulatory Commission (NRC) in support of the application by the Operating Agent for a Class 103 license to operate a nuclear power facility.
The participants in the Wolf Creek project and their portions of ownership are:
Kansas City Power & Light Company (47 percent), Kansas Electric Power Cooperative, Incorporated (6 percent), and Kansas Gas and Electric Company (47
 
percent). See Section 1.4.1 for additional discussion of plant ownership.
This report was originally submitted in two parts, the SNUPPS FSAR and the Wolf Creek Site Addendum. It was combined into one report, the Wolf Creek Updated
 
Safety Analysis Report, in the first update after receipt of the Operating
 
License. This report follows the format recommended by Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants. Sufficiently detailed design information is provided in this report to make a definitive evaluation that the Wolf Creek Generating Station (WCGS) can
 
be operated without undue risk to the health and safety of the public.
The Licensees received a low power (less than five percent) license to operate the Wolf Creek Generating Station on March 11, 1985. The full power license was issued on June 4, 1985. 1.1.2 PLANT UNITS
 
The application was for a single pressurized water reactor nuclear unit. The power  block was built to the  SNUPPS  duplicate plant 1.1-1  Rev. 2 WOLF CREEK design. The ESWS vertical loop chase design is not included in the SNUPPS duplicate plant design. Evaluations of the site characteristics and the design of the cooling system and other site-related systems and facilities have
 
considered the installation of a second nuclear unit at a later date.
 
The WCGS power block, consists of these structures, including enclosed systems  
 
and components:  
: a. Reactor building (containment)  
: b. Turbine building  
: b. Turbine building  
: c. Control building  
: c. Control building  
Line 164: Line 253:
: h. Storage tanks (refueling water, condensate, demineralized water, reactor makeup water, and emergency fuel oil)  
: h. Storage tanks (refueling water, condensate, demineralized water, reactor makeup water, and emergency fuel oil)  
: i. Transformers (main, unit auxiliary, ESF, and station service) and vaults  
: i. Transformers (main, unit auxiliary, ESF, and station service) and vaults  
: j. ESWS Vertical Loop Chase Due to the use of the SNUPPS standard design for these items, design envelopes were developed by use of the most restrictive site conditions imposed by any one of the four original sites or by generic design criteria which were conservative for each of the sites. With the cancellation of the Tyrone plant, however, the four-site enveloping approach was modified in the seismic design area (e.g. development of spectra) for work not yet completed to include only the three remaining sites. Refer to Sections 2.5 and 3.7(B) for details. The design envelopes were not revised to reflect the cancellation of Sterling.
: j. ESWS Vertical Loop Chase  
The ESWS vertical loop chase design was analyzed using the design envelopes applied to the original SNUPPS standard plant design. 1.1.3 PLANT LOCATION The site for the Wolf Creek Generating Station, Unit No. 1, is located approximately 3.5 miles northeast of the town of Burlington, in Coffey County, Kansas. The site is situated approximately 3.5 miles east of the Neosho River and the John Redmond Reservoir. The nearest population center is Emporia, Kansas, located 28 miles west-northwest of the site. It is approximately 75 miles southwest of Kansas City, Kansas.


1.1-2 Rev. 29 WOLF CREEK  1.1.4 CONTAINMENT STRUCTURE The containment, which was designed by the Bechtel Power Corporation, is a carbon steel-lined, concrete structure. The walls and dome are post-tensioned, prestressed concrete, and the base slab is reinforced concrete.
Due to the use of the SNUPPS standard design for these items, design envelopes
1.1.5 NUCLEAR STEAM SUPPLY SYSTEM AND TURBINE-GENERATOR The nuclear steam supply system (NSSS) for Wolf Creek is a pressurized water reactor (PWR) which was designed and supplied by the Westinghouse Electric Corporation.


The reactor core was designed for an output of 3,411 MWt. When the reactor coolant pump input of 14 MWt was added to the core output, the warranted nuclear steam supply system output was 3,425 MWt, which was defined as the rated power in the license application. The engineered safety features were designed for a core power of 3,565 MWt. An additional 2 percent conservatism was added for some analyses to give a maximum accident analysis power of 3,636 MWt. Analyses were performed in 1992 to uprate the reactor core power to 3565 MWt.
were developed by use of the most restrictive site conditions imposed by any


The turbine generator is rated for operation at the NSSS output of 3,425 MWt.
one of the four original sites or by generic design criteria which were
The corresponding turbine generator electrical output is 1,186 MWe. The turbine generator has a valve wide open capability of 1,234 MWe, assuming an NSSS output of approximately 105 percent of the rated steam flow. The turbine generator was designed and supplied by the General Electric Company.


The Wolf Creek Power Rerate Program increases the licensed reactor core power level from 3411 MW(th) to 3565 MW(th). The estimated turbine-generator output is 1228 MW(e) at the Power Rerate condition, which is based on an NSSS output of 3579 MW(th) and a Reactor Coolant System hot leg (Thot) temperature of 618.2 F. The turbine has been upgraded with new monoblock rotors on both the high pressure (HP) and low pressure (LP) turbines. The new HP turbine is a dense pack design (increase in stages from 7 to 9). The last stage buckets in the LP turbines have been increased from 38" to 43". These efficiency enhancements resulted in an expected turbine-generator output of 1268 MWe. 1.1.6 SCHEDULE FOR FUEL LOADING AND OPERATION A low power operating license was issued for WCGS on March 11, 1985. WCGS first entered commercial operation on September 3, 1985. 1.1.7 DESIGN BASES As used within this USAR, the design bases are a list of requirements that the system must meet in order to:
conservative for each of the sites. With the cancellation of the Tyrone plant,  
: a. Perform directly a specified safety or power generation function including support of another function (e.g.,
provide cooling water flow for other components, maintain  a given compartment temperature). 
: b. Comply with a regulatory or statutory requirement or guideline (e.g., a jurisdictional building code).


1.1-3 Rev. 25 WOLF CREEK  c. Meet a specific operator interface, startup, or specific  testing requirement. d. Meet a design classification or code requirement (e.g.,  be designed to withstand the safe shutdown earthquake). Items implicit in contemporary design practices (e.g., use of the English system of weights and measures or the exercise of good engineering practice) are not specified as design bases. Safety design bases are engineering objectives which must be met by safety-related structures, systems, or components. Safety-related items are defined as those plant features necessary to ensure the following:  a. The integrity of the reactor coolant pressure boundary. b. The capability to shut down the reactor after a design basis accident and maintain it in a post-accident safe shutdown condition. c. The capability to prevent or mitigate the consequences of  accidents that could potentially result in offsite exposures approaching the guideline exposures of 10 CFR 100. Items which are associated with safety-related equipment, but which in themselves are not absolutely essential to the safety function of the equipment, are not considered safety-related. Power generation design bases support, either directly or indirectly,the major electrical power generation function of the station. Examples of power generation design bases are the requirements to provide adequate radiation shielding and domestic water for plant personnel. Sections describing Westinghouse-supplied systems and components do not provide safety design bases or power generation design bases as such. These sections do give functional descriptions and are in compliance with Regulatory Guide 1.70. 1.1-4 Rev. 14 WOLF CREEK TABLE 1.1-1  ACRONYMS USED IN THE USAR  AC    Alternating Current ACI  American Concrete Institute ACRS  Advisory Committee on Reactor Safeguards A/E  Architect/Engineer AFAS  Auxiliary Feedwater Actuation System AFS  Auxiliary Feedwater System AISC  American Institute of Steel Construction ALARA As Low as Reasonably Achievable AMSAC (ATWS) Mitigation System Activation Circuitry  ANSI  American National Standards Institute  APRM  Average Power Range Monitor ARM  Area Radiation Monitor ARW  Chemical Waste ASCE  American Society of Civil Engineers ASME  American Society of Mechanical Engineers ASTM  American Society for Testing and Materials ATWS  Anticipated Transients Without Scram AVT  All Volatile Treatment AWS  American Welding Society BOP  Balance of Plant B&PVC Boiler and Pressure Vessel Codes BRS  Boron Recycle System BTP  Branch Technical Position CAS  Compressed Air System CCS  Condensate Cleanup System CCWS  Component Cooling Water System CDS  Condensate Demineralizer System CeCWS Central Chilled Water System CFR  Code of Federal Regulations CFS  Condensate and Feedwater System CGCS  Combustible Gas Control System CHF  Critical Heat Flux CIS  Containment Isolation Signal ClCWS Closed Cooling Water System CM    Center of Mass CMAA  Crane Manufacturing Association of America CP    Construction Permit CPR  Critical Power Ratio CPIS  Containment Purge Isolation System/Signal  CR    Center of Rigidity CRD  Control Rod Drive CRDA  Control Rod Drop Accident CRDM  Control Rod Drive Mechanism CREA  Control Rod Ejection Accident CRVIS Control Room Ventilation Isolation System/Signal CRW  Tritiated Waste
however, the four-site enveloping approach was modified in the seismic design  


Rev. 4 WOLF CREEK TABLE 1.1-1  (Sheet 2) CSD  Cold Shutdown CST  Condensate Storage Tank CSTS  Condensate Storage and Transfer System CtCS  Containment Cooling System CVCS  Chemical and Volume Control System CWS  Circulating Water System DAC Derived Air Concentration DBA  Design Basis Accident DBE  Design Basis Event DC    Direct Current DEPSG Double Ended Pump Suction Guillotine DG    Diesel Generator DGB  Diesel Generator Building DoWS  Domestic Water System DNB  Departure From Nucleate Boiling DNBR  Departure From Nucleate Boiling Ratio DRW  Potentially Radioactive Nontritiated Waste DWMS  Demineralized Water Makeup System DWST  Demineralized Water Storage Tank DWSTS Demineralized Water Storage and Transfer System DWT  Dead Weight Test ECCS  Emergency Core Cooling System EHC  Electrohydraulic Control EOL  End of Life EDECAIES Emergency Diesel Engine Combustion Air Intake and Exhaust System EDECWS Emergency Diesel Engine Cooling Water System EDEFSTS Emergency Diesel Engine Fuel Oil Storage and Transfer System EDELS Emergency Diesel Engine Lubrication System EDESS Emergency Diesel Engine Start System EFOST Emergency Fuel Oil Storage Tank ER    Environmental Report ESFS  Engineered Safety Feature System ESFAS Engineered Safety Feature Actuation System ESWS  Essential Service Water System ESWVLC Essential Service Water Vertical Loop Chase FBIS  Fuel Building Isolation Signal FED  Floor and Equipment Drainage FDDR  Field Deviation Disposition Request  FHA  Fuel Handling Accident FHS  Fuel Handling System FMEA  Failure Modes and Effects Analysis  FPCC  Fuel Pool Cooling and Cleanup FPRCS Fission Product Removal and Control System  FPS  Fire Protection System FRS  Floor Response Spectra FSAR  Final Safety Analysis Report FSF Fuel Storage Facility GDC  General Design Criteria 
area (e.g. development of spectra) for work not yet completed to include only


Rev. 29 WOLF CREEK TABLE 1.1-1 (Sheet 3)  GRWS  Gaseous Radwaste System HELB  High Energy Line Break HEPA  High Efficiency Particulate Air (filter) HEX  Heat Exchanger Hga  Inches of Mercury Absolute HSST  Heavy Section Steel Technology HVAC  Heating, Ventilation and Air Conditioning IAC  Interim Acceptance Criteria IEEE  Institute of Electrical and Electronics Engineers ILRT  Integrated Leakage Rate Test ISI  Inservice Inspection LCO  Limiting Condition of Operation LEFM  Linear Elastic Fracture Mechanics  LOCA  Loss-of-Coolant Accident LPRM  Local Power Range Monitor LPZ  Low Population Zone LRWS  Liquid Radwaste System LRW  Potentially Radioactive Secondary Liquid Waste LSP  Low Suction Pressure MCARS Main Condenser Air Removal System MCC  Motor Control Center MCES  Main Condenser Evacuation System MCPR  Minimum Critical Power Ratio MFIV  Main Feedwater Isolation Valve MG    Motor Generator Set MOV  Motor-Operated Valve MPC  Maximum Permissible Concentration  MS    Manufacturer's Standard MSIV  Main Steam Isolation Valve MSL  Mean Sea Level MSLB  Main Steam Line Break MSSS  Main Steam Supply System NDT  Nondestructive Testing NDTT  Nil-Ductility Transition Temperature NFSF  New Fuel Storage Facility NPSH  Net Positive Suction Head NRC  Nuclear Regulatory Commission NSSS  Nuclear Steam Supply System OBE  Operating Basis Earthquake OL    Operating License OPS  Offsite Power Systems ORE  Occupational Radiation Exposures PA    Public Address PAMS  Post-Accident Monitoring System PCT  Peak Cladding Temperature PHS  Plant Heating System
the three remaining sites. Refer to Sections 2.5 and 3.7(B) for details. The


Rev. 0 WOLF CREEK TABLE 1.1-1 (Sheet 4)  P&ID  Piping and Instrumentation Diagram PLS  Precautions, Limitations, and Setpoints PMF  Probable Maximum Flood PRA  Peak Recording Accelograph PRM  Process Radiation Monitoring PSAR  Preliminary Safety Analysis Report PSS  Process Sampling System PWR  Pressurized Water Reactor RCP  Reactor Coolant Pumps RCPB  Reactor Coolant Pressure Boundary RCS  Reactor Coolant System RHR  Residual Heat Removal RMWCS Reactor Makeup Water Control System  RMWS  Reactor Makeup Water System RMWST Reactor Makeup Water Storage Tank RO    Reactor Operator RPV  Reactor Pressure Vessel RRS  Required Response Spectrum RWB  Radwaste Building RWST  Refueling Water Storage Tank SACF  Single Active Component Failure SAR  Safety Analysis Report SAS  Secondary Alarm Station SGB  Steam Generator Blowdown SGBIS Steam Generator Blowdown Isolation System/Signal SGBS    Steam Generator Blowdown System SIS    Safety Injection Signal SIT    Structural Integrity Test SJAE    Steam Jet Air Ejectors SLWS    Secondary Liquid Waste System SMA    Strong Motion Accelerometer SNUPPS  Standard Nuclear Unit Power Plant System SRO    Senior Reactor Operator SRP    Standard Review Plan SRS    Solid Radwaste System SRSS    Square Root of the Sum of the Squares SRW    Detergent Waste SSE    Safe Shutdown Earthquake SWS    Service Water System TBS    Turbine Bypass System TG      Turbine Generator TGSS    Turbine Gland Sealing System TRS    Test Response Spectrum UHS    Ultimate Heat Sink USAR    Updated Safety Analysis Report USGS    U.S. Geological Survey
design envelopes were not revised to reflect the cancellation of Sterling.  


Rev. 14 WOLF CREEK TABLE 1.1-1 (Sheet 5)  UT      Ultrasonic Testing VWO    Valves Wide Open W      Westinghouse WCGS    Wolf Creek Generating Station WCNOC  Wolf Creek Nuclear Operating Corporation 
The ESWS vertical loop chase design was analyzed using the design envelopes applied to the original SNUPPS standard plant design.
1.1.3 PLANT LOCATION


Rev. 2 WOLF CREEK 1.2 GENERAL PLANT DESCRIPTION  This section describes the plant site, general arrangement of plant structures, design criteria and general design of major systems. Comparisons between the WCGS design and to the design at other plants were made at the time of application for the Operating License. These comparisons are considered historic references and will not be updated to reflect changes in other utilities designs.
The site for the Wolf Creek Generating Station, Unit No. 1, is located  
1.2.1 PLANT SITE DESCRIPTION 1.2.1.1 Site Location  The WCGS site is located approximately 3.5 miles northeast of the town of Burlington in Coffey County, Kansas. The site is situated approximately 3.5 miles east of the Neosho River and the John Redmond Reservoir. It is approximately 75 miles southwest of Kansas City, Kansas. Site location is discussed in more detail in Section 2.1.1.


1.2.1.2 Site Ownership  The Licensees have either purchased or have obtained easements on the necessary land within the site boundary. Full ownership control of the exclusion area is presently exercised by the Operating Agent and will continue including all mineral rights with full authority to determine all activities within the exclusion area including exclusion or removal of personnel and property from the area. This is in accordance with the exclusion area requirements of 10 CFR 100.3(a).
approximately 3.5 miles northeast of the town of Burlington, in Coffey County,


1.2.1.3 Access to the Site  There are no public highways, county and/or township roads, public waterways, or public railroads that traverse the exclusion area. There are no persons living in the exclusion area. There is to be no one working in the exclusion area except employees of the Applicants and their authorized agents. The exclusion area is patrolled periodically by plant guards to ensure awareness of access to the area by individuals. See Section 2.1.2 for further details on access to the exclusion area and details concerning lake use. Controlled access to the protected area is monitored by guards on a 24 hour per day basis.
Kansas. The site is situated approximately 3.5 miles east of the Neosho River


1.2.1.4 Environs  The area within 10 miles of the site is rural and of low population; in 1980 the population within the 10-mile radius was 6,652. The only incorporated
and the John Redmond Reservoir. The nearest population center is Emporia,  


1.2-1 Rev. 0 WOLF CREEK  places,as defined by the U.S. Bureau of Census, within 10 miles  of the site are Burlington and New Strawn. In 1980, Burlington recorded a population of 2,901 and New Strawn, which was incorporated in 1971, had a 1980 population of 457. Topeka, located 53 miles north of the site, recorded a metropolitan population of 115,266 in 1980 and Emporia, 28 miles west-northwest of the site, in 1980 recorded a population of 25,287. Most of the land surrounding the site is used for agricultural purposes with the exception of such rural service centers as Burlington. All recreational facilities are city-owned parks with the exception of the John Redmond Reservoir area, the main recreational facility in the area which is federally operated. Use of the Wolf Creek lake for recreation is discussed in Section 2.1.2. The region is expected to retain its distinctly rural character.
Kansas, located 28 miles west-northwest of the site. It is approximately 75


The Low Population Zone is chosen as the area within a 2.5-mile radius of the plant site.
miles southwest of Kansas City, Kansas.  
1.2.1.5 Geology  The WCGS site is located within the Central Stable Region of the North American Continent. This region was subjected to gentle structural uparching and down-warping during Mesozoic and Paleozoic time. These structural movements resulted in the formation of broad-scale basins and arches which have been modified locally by folding and faulting. Geotechnical investigations at the site during construction excavation have identified the presence of localized zones of penecontemporaneous deformation in the bedrock. However, the investigations have established the last age of deformation as Pennsylvanian, and there is no known macroseismic activity associated with these zones and no structural association with capable faults (Reference 1). The faulting, shearing and deformation, therefore, are noncapable as defined by Appendix A to 10 CFR 100.
The surface bedrock in the site area consists of alternating layers of Pennsylvanian age shales, limestones, sandstones, and a few thin coal seams.
These bedrock units dip gently to the west and northwest and have been folded locally into small-scale plunging anticlines and synclines. At the site, the Precambrian basement is present at a depth of approximately 2,500 feet. The Precambrian rocks consist of approximately 1,000 feet of sedimentary deposits which rest on a granitic basement complex.  


The site area has been submaturely to maturely dissected by the Neosho River and its tributaries to form flat to gently rolling uplands with a maximum topographic relief of 100 feet or less from the uplands to the valley floors.
1.1-2 Rev. 29 WOLF CREEK 1.1.4 CONTAINMENT STRUCTURE
Residual soils ranging in thickness from 0 to 16 feet are developed


1.2-2 Rev. 10 WOLF CREEK on the Pennsylvanian strata. Quaternary alluvium reaches a thickness of approximately 25 feet in the Wolf Creek valley. Scattered Tertiary age deposits of clayey gravel cap some of the higher hills in the site area.
The containment, which was designed by the Bechtel Power Corporation, is a carbon steel-lined, concrete structure. The walls and dome are post-tensioned, prestressed concrete, and the base slab is reinforced concrete.  
Glacial deposits are not present at the site. The alternating Pennsylvanian strata forming the bedrock surface consist of competent rock units with a low amount of structural discontinuities in the rock mass. No major geologic features have been identified which could adversely affect the stability of subsurface materials at seismic Category I facilities. Minor geologic features, such as jointing, the zones of penecontemporaneous deformation, and the weathering profile in the rock, were considered during design and construction of facilities. Comprehensive geotechnical investigations of the site have determined the subsurface conditions in adequate detail to provide design criteria for foundation support of safety-related facilities. Major seismic Category I structures are supported on competent rock. Only minor, localized modifications to foundation materials were required in design and construction to provide uniform support of safety-related facilities.
1.2.1.6 Seismology  The plant site is located in a relatively seismic stable region of the central United States. No earthquake epicenter has been reported closer than 40 miles to the site, and the nearest shocks have had epicentral intensities no greater than Intensity III. At distances of 85 and 105 miles from the site, earthquakes of Intensity VII to VII-VIII have been recorded. Since 1800, only seven earthquakes of Intensity V or greater have occurred within 100 miles of the site, and 16 events of Intensity VI or greater have been recorded within 200 miles. Previously recorded earthquakes probably have not generated intensities greater than VI at the site, and none of the buildings in the vicinity of the site have sustained any known structural damage due to earthquakes.  


An Operating Basis Earthquake corresponding to a horizontal acceleration of six percent of gravity and a Safe Shutdown Earthquake corresponding to a horizontal acceleration of 12 percent of gravity was selected for the site. However, a seismic evaluation of these structures, systems, and components using the Lawrence Livermore Laboratories spectrum anchored at 0.15g for structures supported on bedrock is contained in Appendix 3C. 1.2.1.7 Hydrology 1.2.1.7.1 Surface Water Hydrology
1.1.5 NUCLEAR STEAM SUPPLY SYSTEM AND TURBINE-GENERATOR


The plant site is located within the Wolf Creek watershed northeast of Burlington, Kansas. The topography within the watershed varies from
The nuclear steam supply system (NSSS) for Wolf Creek is a pressurized water


1.2-3 Rev. 14 WOLF CREEK  undulating hills upstream of the plant site to a floodplain area shared with the Neosho River with a drainage area within Kansas of 6,300 sq. miles near the mouth of Wolf Creek with a drainage area of 35 sq. miles. The cooling lake alters the draining pattern of the watershed, but safety-related facilities are protected from severe hydrological events.
reactor (PWR) which was designed and supplied by the Westinghouse Electric


The cooling lake is designed to supply adequate cooling water to the plant during a one in fifty year drought. Makeup water is supplied to the cooling lake from the Wolf Creek watershed runoff and from makeup water pumped from John Redmond Reservoir. The region surrounding the site is not characterized by events such as tsunamis, surge activity, or severe ice flooding. Major dam failures on the Neosho River above Wolf Creek watershed will not affect safety-related facilities.
Corporation.  
The flow of the Neosho River is controlled by three reservoirs above the site. The Maximum flood design elevation of 1097.5 ft. msl., resulting from the probable maximum flood routed through the cooling lake with coincident wave activity, is below the plant site grade of 1099.5 ft. msl.  


1.2.1.7.2 Groundwater Hydrology  Only small quantities of groundwater are available within a 50-mile radius of the plant site. The groundwater is produced from three types of aquifers:  the alluvial deposits in the river valleys, the weathered bedrock including the shallow soil, and the unweathered bedrock.
The reactor core was designed for an output of 3,411 MWt. When the reactor coolant pump input of 14 MWt was added to the core output, the warranted nuclear steam supply system output was 3,425 MWt, which was defined as the  


The alluvial aquifers are composed of silts, sands, and gravel. Yields from wells in the alluvial aquifers are up to 100 gallons per minute. Recharge to such aquifers occurs from precipitation and from rivers during periods of high flow. Regionally, discharge from the alluvial aquifers normally flows into the rivers.  
rated power in the license application. The engineered safety features were


The weathered bedrock aquifer consists of weathered shales, siltstones, sandstones, and limestones. Pressure tests indicate that this aquifer is sufficiently permeable to yield up to 10 gallons per minute for livestock and domestic wells. Recharge occurs from precipitation and locally from downward percolation through the overlying alluvium. Discharge occurs into both alluvium and streams.  
designed for a core power of 3,565 MWt. An additional 2 percent conservatism


The consolidated bedrock aquifers are composed of sandstones and limestones which are limited to yields ranging from about l to 10 gallons per minute. Recharge to such aquifers occurs by precipitation and infiltration of  
was added for some analyses to give a maximum accident analysis power of 3,636


1.2-4 Rev. 1 WOLF CREEK  surface water at the outcrops. Where overlain by shales and siltstones, which act as aquitards and aquicludes, vertical recharge to the limestones and sandstones is minimal.
MWt. Analyses were performed in 1992 to uprate the reactor core power to 3565


There is no anticipated use of groundwater at the plant site. The operation of the plant will not have any detrimental effect on the groundwater environment, nor will local groundwater use affect the operation of the plant.  
MWt.  


1.2.1.8 Meteorology The continental location of the site ensures a wide seasonal range of temperature and frequent day to day temperature changes due to frequent passage of cyclonic systems through the vicinity. The maximum temperature was 117 degrees Fahrenheit recorded at Burlington, Kansas. The lowest extreme temperature was -26 degrees Fahrenheit. The prevailing winds are from the south to southeast except during the winter when north to northwest winds prevail. There are no meteorologically significant terrain features or bodies of water within 50 miles of the site.  
The turbine generator is rated for operation at the NSSS output of 3,425 MWt.


The site vicinity is subject to occasional severe thunderstorms and the possibility of a tornado from early spring until autumn. The world record 42 minute rainfall of 12 inches occurred at Holt, Missouri, approximately 120 miles from the Wolf Creek Site. However, precipitation is generally moderate throughout the year and snowfall ranges from very little during some winters to substantial during others.
The corresponding turbine generator electrical output is 1,186 MWe. The  


The fastest wind, excluding tornadoes was 86 mph.
turbine generator has a valve wide open capability of 1,234 MWe, assuming an


The diffusion climatology is generally favorable due to the frequent passage of cyclonic storm systems. The poorest diffusion conditions occur during (1) nighttime inversions which become most developed during winters and (2) dominance of the site area by stagnant anticyclonic systems which may persist for several consecutive days, especially during late summer and autumn.
NSSS output of approximately 105 percent of the rated steam flow. The turbine
1.2.2 GENERAL ARRANGEMENT OF STRUCTURES The principal structures located on the Wolf Creek Generating Station site are listed below.
: a. Reactor Building - houses the reactor, reactor coolant  piping, steam generators, pressurizer, reactor coolant pumps, accumulators, and the containment air coolers;


1.2-5 Rev. 27 WOLF CREEK  b. Auxiliary Building - houses the engineered safety features and nuclear auxiliary systems equipment;
generator was designed and supplied by the General Electric Company.  
: c. Turbine Building - houses the turbine generator, condensers, main feed pumps, and other power-conversion equipment;
: d. Fuel Building - houses the new fuel storage vault, the fuel storage pool, the fuel handling system, and a portion of the spent fuel pool cooling and cleanup system;
: e. Radwaste Building - houses the radioactive waste treatment facilities and boron recycle system components;
: f. Control Building - houses the main control room, the computer,the Class IE switchgear, the Class IE battery rooms, the access control area, cable spreading rooms, and portions of the main control room emergency ventilation systems;
: g. Storage Tanks - include the condensate storage tank, the refueling water storage tank, the reactor makeup water storage tank, the demineralized water tank, and the emergency fuel oil storage tanks;
: h. Diesel Generator Building - houses the diesel generators and associated equipment;
: i. Transformer Vaults - house oil retaining pits for the main transformers, startup transformer, station service transformer, unit auxiliary transformer, and ESF transformers;
: j. Communication Corridor;
: k. Deleted
: l. Cooling lake and ultimate heat Sink;
: m. Circulating Water Screenhouse - houses traveling screens, service water pumps and strainers, circulating water pumps, fire protection pumps, and chemical injection systems for raw water treatment;
: n. Essential Service Water Pumphouse - houses pumps and strainers for the essential service water system;
: o. Deleted  p. Hot Machine Shop;  q. Administration Building; 


1.2-6 Rev. 28 WOLF CREEK  r. Shop building;
The Wolf Creek Power Rerate Program increases the licensed reactor core power level from 3411 MW (th) to 3565 MW (th). The estimated turbine-generator output is 1228 MW (e) at the Power Rerate condition, which is based on an NSSS output of 3579 MW (th) and a Reactor Coolant System hot leg (T hot) temperature of 618.2 F. The turbine has been upgraded with new monoblock rotors on both the high pressure (HP) and low pressure (LP) turbines. The new HP turbine is a dense pack design (increase in stages from 7 to 9). The last stage buckets in the LP turbines have been increased from 38" to 43". These efficiency enhancements resulted in an expected turbine-generator output of 1268 MWe.
: s. Materials Center (Warehouse)
1.1.6 SCHEDULE FOR FUEL LOADING AND OPERATION
: t. Technical Support Center;
: u. Prescreening and Main Security Buildings;
: v. Covered Walkway;
: w. Education Center (emergency operations facility -
simulator/training complex);
: x. Non Discharging Sewage Lagoon;
: y. Switchyard;
: z. Make-up Water Screenhouse (located below John Redmond Dam);


aa. Make-up Discharge Structure;
A low power operating license was issued for WCGS on March 11, 1985. WCGS first entered commercial operation on September 3, 1985.
1.1.7 DESIGN BASES


bb. Outage Processing Center; 
As used within this USAR, the design bases are a list of requirements that the


cc. Support Building West;
system must meet in order to:
: a. Perform directly a specified safety or power generation function including support of another function (e.g.,
provide cooling water flow for other components, maintain  a given compartment temperature).
: b. Comply with a regulatory or statutory requirement or guideline (e.g., a jurisdictional building code).  


dd. General Office Building
1.1-3 Rev. 25 WOLF CREEK  c. Meet a specific operator interface, startup, or specific  testing requirement. d. Meet a design classification or code requirement (e.g.,  be designed to withstand the safe shutdown earthquake).
Items implicit in contemporary design practices (e.g., use of the English system of weights and measures or the exercise of good engineering practice) are not specified as design bases.
Safety design bases are engineering objectives which must be met by safety-related structures, systems, or components.
Safety-related items are defined as those plant features necessary to ensure the following:  a. The integrity of the reactor coolant pressure boundary. b. The capability to shut down the reactor after a design basis accident and maintain it in a post-accident safe shutdown condition. c. The capability to prevent or mitigate the consequences of  accidents that could potentially result in offsite exposures approaching the guideline exposures of 10 CFR 100. Items which are associated with safety-related equipment, but which in themselves are not absolutely essential to the safety function of the


ee. Waste Water Treatment Facility;  
equipment, are not considered safety-related.
Power generation design bases support, either directly or indirectly,the major electrical power generation function of the station. Examples of power generation design bases are the requirements to provide adequate radiation shielding and domestic water for plant personnel.
Sections describing Westinghouse-supplied systems and components do not provide safety design bases or power generation design bases as such. These sections do give functional descriptions and are in compliance with Regulatory Guide 1.70. 1.1-4 Rev. 14 WOLF CREEK TABLE 1.1-1 ACRONYMS USED IN THE USAR AC    Alternating Current ACI  American Concrete Institute ACRS  Advisory Committee on Reactor Safeguards A/E  Architect/Engineer AFAS  Auxiliary Feedwater Actuation System AFS  Auxiliary Feedwater System AISC American Institute of Steel Construction ALARA As Low as Reasonably Achievable


ff. Waste Water Treatment Facility -- houses the recirculation pumps, chemical reagent storage tanks and feedpumps for the wastewater treatment system;
AMSAC (ATWS) Mitigation System Activation Circuitry  ANSI  American National Standards Institute  APRM  Average Power Range Monitor ARM  Area Radiation Monitor ARW  Chemical Waste ASCE  American Society of Civil Engineers ASME  American Society of Mechanical Engineers ASTM  American Society for Testing and Materials ATWS  Anticipated Transients Without Scram AVT  All Volatile Treatment AWS  American Welding Society BOP  Balance of Plant B&PVC Boiler and Pressure Vessel Codes BRS  Boron Recycle System BTP  Branch Technical Position CAS  Compressed Air System CCS  Condensate Cleanup System CCWS  Component Cooling Water System CDS  Condensate Demineralizer System CeCWS Central Chilled Water System CFR  Code of Federal Regulations CFS  Condensate and Feedwater System CGCS  Combustible Gas Control System CHF  Critical Heat Flux CIS  Containment Isolation Signal ClCWS Closed Cooling Water System CM    Center of Mass CMAA  Crane Manufacturing Association of America CP    Construction Permit CPR  Critical Power Ratio CPIS  Containment Purge Isolation System/Signal  CR    Center of Rigidity CRD  Control Rod Drive CRDA  Control Rod Drop Accident CRDM  Control Rod Drive Mechanism CREA  Control Rod Ejection Accident CRVIS Control Room Ventilation Isolation System/Signal CRW  Tritiated Waste


gg. Waste Water Retention Basins -- two 300,000 gallon open top concrete basins used for retaining and neutralizing secondary regenerative wastewaters prior to discharging to the WCGS cooling lake.
Rev. 4 WOLF CREEK TABLE 1.1-1  (Sheet 2)
hh. Owens Corning Building ii. Cathodic Protection Building (Rectifier Shelter #1)
CSD  Cold Shutdown CST  Condensate Storage Tank CSTS  Condensate Storage and Transfer System CtCS  Containment Cooling System CVCS  Chemical and Volume Control System CWS  Circulating Water System DAC Derived Air Concentration DBA  Design Basis Accident DBE  Design Basis Event DC    Direct Current DEPSG Double Ended Pump Suction Guillotine DG    Diesel Generator DGB  Diesel Generator Building DoWS  Domestic Water System DNB  Departure From Nucleate Boiling DNBR  Departure From Nucleate Boiling Ratio DRW  Potentially Radioactive Nontritiated Waste DWMS  Demineralized Water Makeup System DWST  Demineralized Water Storage Tank DWSTS Demineralized Water Storage and Transfer System DWT  Dead Weight Test ECCS  Emergency Core Cooling System EHC  Electrohydraulic Control EOL  End of Life EDECAIES Emergency Diesel Engine Combustion Air Intake and Exhaust System EDECWS Emergency Diesel Engine Cooling Water System EDEFSTS Emergency Diesel Engine Fuel Oil Storage and Transfer System EDELS Emergency Diesel Engine Lubrication System EDESS Emergency Diesel Engine Start System EFOST Emergency Fuel Oil Storage Tank ER    Environmental Report ESFS  Engineered Safety Feature System ESFAS Engineered Safety Feature Actuation System ESWS  Essential Service Water System


jj. Cable Reel Yard Building  
ESWVLC Essential Service Water Vertical Loop Chase FBIS  Fuel Building Isolation Signal FED  Floor and Equipment Drainage FDDR  Field Deviation Disposition Request FHA  Fuel Handling Accident FHS  Fuel Handling System FMEA  Failure Modes and Effects Analysis FPCC  Fuel Pool Cooling and Cleanup FPRCS Fission Product Removal and Control System FPS  Fire Protection System FRS  Floor Response Spectra FSAR  Final Safety Analysis Report FSF Fuel Storage Facility GDC  General Design Criteria


kk. X-Ray Building
Rev. 29 WOLF CREEK TABLE 1.1-1 (Sheet 3)
GRWS  Gaseous Radwaste System HELB  High Energy Line Break HEPA  High Efficiency Particulate Air (filter)  HEX  Heat Exchanger Hga  Inches of Mercury Absolute HSST  Heavy Section Steel Technology HVAC  Heating, Ventilation and Air Conditioning IAC  Interim Acceptance Criteria IEEE  Institute of Electrical and Electronics Engineers ILRT  Integrated Leakage Rate Test ISI  Inservice Inspection LCO  Limiting Condition of Operation LEFM  Linear Elastic Fracture Mechanics  LOCA  Loss-of-Coolant Accident LPRM  Local Power Range Monitor LPZ  Low Population Zone LRWS  Liquid Radwaste System LRW  Potentially Radioactive Secondary Liquid Waste LSP  Low Suction Pressure MCARS Main Condenser Air Removal System MCC  Motor Control Center MCES  Main Condenser Evacuation System MCPR  Minimum Critical Power Ratio MFIV  Main Feedwater Isolation Valve MG    Motor Generator Set MOV  Motor-Operated Valve MPC  Maximum Permissible Concentration  MS    Manufacturer's Standard MSIV  Main Steam Isolation Valve MSL  Mean Sea Level MSLB  Main Steam Line Break MSSS  Main Steam Supply System NDT  Nondestructive Testing NDTT  Nil-Ductility Transition Temperature NFSF  New Fuel Storage Facility NPSH  Net Positive Suction Head NRC  Nuclear Regulatory Commission NSSS  Nuclear Steam Supply System OBE  Operating Basis Earthquake OL    Operating License OPS  Offsite Power Systems ORE  Occupational Radiation Exposures PA    Public Address PAMS  Post-Accident Monitoring System PCT  Peak Cladding Temperature PHS  Plant Heating System


ll. Water Treatment Building North
Rev. 0 WOLF CREEK TABLE 1.1-1 (Sheet 4)
P&ID  Piping and Instrumentation Diagram PLS  Precautions, Limitations, and Setpoints PMF  Probable Maximum Flood PRA  Peak Recording Accelograph PRM  Process Radiation Monitoring PSAR  Preliminary Safety Analysis Report PSS  Process Sampling System PWR  Pressurized Water Reactor RCP  Reactor Coolant Pumps RCPB  Reactor Coolant Pressure Boundary RCS  Reactor Coolant System RHR  Residual Heat Removal RMWCS Reactor Makeup Water Control System  RMWS  Reactor Makeup Water System RMWST Reactor Makeup Water Storage Tank RO    Reactor Operator RPV  Reactor Pressure Vessel RRS  Required Response Spectrum RWB  Radwaste Building RWST  Refueling Water Storage Tank SACF  Single Active Component Failure SAR  Safety Analysis Report SAS  Secondary Alarm Station


mm. Chemical Addition Building
SGB  Steam Generator Blowdown SGBIS Steam Generator Blowdown Isolation System/Signal SGBS    Steam Generator Blowdown System SIS    Safety Injection Signal SIT    Structural Integrity Test SJAE    Steam Jet Air Ejectors SLWS    Secondary Liquid Waste System SMA    Strong Motion Accelerometer SNUPPS  Standard Nuclear Unit Power Plant System SRO    Senior Reactor Operator SRP    Standard Review Plan SRS    Solid Radwaste System SRSS    Square Root of the Sum of the Squares SRW    Detergent Waste SSE    Safe Shutdown Earthquake SWS    Service Water System TBS    Turbine Bypass System TG      Turbine Generator TGSS    Turbine Gland Sealing System TRS    Test Response Spectrum UHS    Ultimate Heat Sink USAR    Updated Safety Analysis Report USGS    U.S. Geological Survey


nn. Station Blackout Diesel Generator Missile Barrier  oo. Cathodic Protection Building (Rectifier Shelter #2, near Firing Range)  pp. ESWS Vertical Loop Chase - houses both trains of the ESWS vertical loops. NOTE:  The above list gives a general use description of the principal structures. The actual name of the structure may differ. The general arrangement of these and other structures and equipment is shown in Figures 1.2-1 through 1.2-43. The site area layout is shown in Figure 1.2-44. 1.2-7 Rev. 29 WOLF CREEK 1.2.3 PRINCIPAL DESIGN CRITERIA The plant was designed so that it could be constructed and operated to produce electric power in a safe and reliable manner. Plant design conforms to applicable codes, standards, and regulations identified in appropriate sections of the USAR.
Rev. 14 WOLF CREEK TABLE 1.1-1 (Sheet 5)
UT      Ultrasonic Testing VWO    Valves Wide Open W      Westinghouse WCGS    Wolf Creek Generating Station WCNOC  Wolf Creek Nuclear Operating Corporation  


The plant was designed, fabricated, constructed, and is operated in such a way that the release of radioactive materials to the environment is limited to values less than the limits and guideline values of applicable federal regulations pertaining to the release of radioactive materials for normal operations, abnormal events, and design basis accidents.
Rev. 2 WOLF CREEK 1.2 GENERAL PLANT DESCRIPTION This section describes the plant site, general arrangement of plant structures,  


The plant was designed in accordance with 10 CFR 50, Appendix A, General Design Criteria for Nuclear Power Plants, as described in Section 3.1.
design criteria and general design of major systems. Comparisons between the  
1.2.3.1 SNUPPS Design Envelope  The Wolf Creek power block was designed and evaluated to the SNUPPS design envelope which was established by:
: a. A design criterion which is conservative for all of the sites, or
: b. The limiting site condition existing at any site for the condition of interest.


A tabulation of the SNUPPS design envelope is presented in Table 1.2-1.
WCGS design and to the design at other plants were made at the time of application for the Operating License. These comparisons are considered
1.2.4 NUCLEAR STEAM SUPPLY SYSTEM  The nuclear steam supply system (NSSS) consists of a reactor and four closed reactor coolant loops connected in parallel to the reactor vessel, each loop containing a reactor coolant pump and a steam generator. The NSSS also contains an electrically heated pressurizer and various other auxiliary systems.  


High pressure water circulates through the reactor core to remove the heat generated by the nuclear chain reaction. The heated water exits from the reactor vessel and passes via the coolant loop piping to the steam generators.
historic references and will not be updated to reflect changes in other
Here it gives up its thermal energy to the feedwater to generate steam for the turbine generator. The cycle is completed when the water is pumped back to the reactor vessel. The entire reactor coolant system is composed of leaktight components to ensure that all fluids are confined to the system.


The core is of the multiregion type. All fuel assemblies are mechanically compatible, although the fuel enrichment is not the same in all the assemblies.
utilities designs.  
The initial reactor core design for WCGS is essentially identical to the design for the Comanche Peak units (Docket Nos. 50-445 and 50-446). 


1.2-8 Rev. 18 WOLF CREEK  In the initial core loading, three fuel enrichments are used. Fuel assemblies with the highest enrichments are placed in the core periphery, or outer region, and the two groups of lower enrichment fuel assemblies are arranged in a selected pattern in the central region. In subsequent refuelings, some of the fuel assemblies (e.g., one-third) are discharged. The remaining fuel assemblies are, in general, moved to other positions in the core, and fresh fuel assemblies are added to fill out the core.  
1.2.1 PLANT SITE DESCRIPTION


Rod cluster control assemblies, which consist of clusters of cylindrical absorber rods, are used for controlling core reactivity. The absorber rods move within guide tubes in certain fuel assemblies. Each absorber rod is attached to a spider connector above the core. The spider connector is attached to a drive shaft, which may be raised and lowered by a drive mechanism mounted on the reactor vessel head. The rod cluster control assemblies drop into the core under the effect of gravity when a reactor trip (SCRAM) occurs. Supplementary reactivity control is provided by boric acid dissolved in the reactor coolant water.
1.2.1.1 Site Location The WCGS site is located approximately 3.5 miles northeast of the town of  


The reactor coolant pumps are Westinghouse Model 93Al vertical, single stage, centrifugal pumps of the shaft-seal type. WCGS was one of the first domestic operating units to utilize Model 93Al reactor coolant pumps. However, Westinghouse Model 93Al pumps were previously reviewed by the NRC in conjunction with the RESAR-3S application (Docket No. STN-50-545). A Safety Evaluation Report (NUREG-0104) and Preliminary Design Approval (PDA-7) were issued on RESAR-3S in December 1976. In addition, the Model 93Al reactor coolant pumps are similar to the Model 93A pumps used in the Comanche Peak units (the major difference is the flow capacity as indicated in Table 1.3-1).
Burlington in Coffey County, Kansas. The site is situated approximately 3.5  
The pumps utilized at WCGS are identical to those used at Callaway.
The steam generators are Westinghouse Model F vertical U-tube units, which contain thermally treated Inconel tubes. The Model F steam generator includes features (discussed in detail in Section 5.4.2) such as improved tube support plate design and high circulation ratio, which are designed to minimize most forms of corrosion, sludge buildup, and chemical attack. Integral moisture separation equipment reduces the moisture content of the existing steam to one-quarter percent or less. WCGS was the second domestic operating unit to utilize Model F steam generators, (Callaway was the first domestic operating unit to utilize the Westinghouse Model F steam Generator). Westinghouse Model F steam generators were previously reviewed by the NRC in conjunction with the Sundesert PSAR application (Docket Nos. 50-582 and 50-583). An interim Safety Evaluation Report (NUREG-0469) was issued on the Sundesert PSAR application in October 1978.


1.2-9 Rev. 5 WOLF CREEK  Essentially all of the metal surfaces in contact with the reactor water are stainless steel, except the steam generator tubes (Inconel), fuel assembly skeleton (stainless steel, Inconel and zirconium ally) and fuel rod cladding (zirconium ally).
miles east of the Neosho River and the John Redmond Reservoir. It is approximately 75 miles southwest of Kansas City, Kansas. Site location is
An electrically heated pressurizer connected to one reactor coolant loop maintains reactor coolant system pressure during normal operation and limits pressure variations during plant load transients. The pressurizer utilized at WCGS is essentially identical to those utilized in the Comanche Peak units, Callaway and many other facilities that are currently in operation.  


Auxiliary system components are provided to charge makeup water into the reactor coolant system, purify reactor coolant water, provide chemicals for corrosion inhibition and reactivity control, cool system components, remove decay heat when the reactor is shut down, and provide for emergency safety injection.
discussed in more detail in Section 2.1.1.  
1.2.5 ENGINEERED SAFETY FEATURES AND EMERGENCY SYSTEMS  1.2.5.1 Containment  1.2.5.1.1 Containment Structure


The containment structure is a prestressed, post-tensioned concrete structure with a cylindrical wall, a hemispherical dome, and a flat foundation slab. The wall and dome form a prestressed, post-tensioned system consisting of horizontal tendons in the wall and inverted U-shaped vertical tendons in the wall and dome. The foundation slab is reinforced with carbon steel. The inside surface of the structure is lined with a carbon steel liner to ensure a high degree of leaktightness. The containment structure completely encloses the reactor and reactor coolant system, i.e, the reactor pressure vessel, the steam generators, the reactor coolant loops and portions of the associated auxiliary systems, the pressurizer, accumulator tanks, and associated piping, described in Section 1.2.4. The design ensures that the containment structure is protected against postulated missiles from both equipment failures and external sources. The containment design provides means for the integrated leak rate testing of the containment structure and for local leak rate testing of individual piping, electrical, and access penetrations of the containment.
1.2.1.2 Site Ownership The Licensees have either purchased or have obtained easements on the necessary
For details, refer to Chapters 3.0 and 6.0.


The containment structure design is the same standard state-of-the-art design that has been applied to several other Bechtel-designed plants. The basic structure is similar to the containment structures at Farley, Palo Verde, and Turkey Point and identical to the structure at Callaway.
land within the site boundary. Full ownership control of the exclusion area is  


1.2-10 Rev. 18 WOLF CREEK 1.2.5.1.2 Containment Spray System The containment spray system is one of the two independent pressure-reducing systems and is operated in conjunction with the containment fan coolers to provide adequate cooling of the containment atmosphere following a LOCA. Two of the four fan coolers and one of the two containment spray pumps operating are sufficient to cool the containment atmosphere. This reduces the pressure inside the containment, thus minimizing the release of radioactivity from the structure.
presently exercised by the Operating Agent and will continue including all mineral rights with full authority to determine all activities within the  


The containment spray system supplies borated water to cool the containment atmosphere. The pumps take suction from the refueling water storage tank.
exclusion area including exclusion or removal of personnel and property from  
When the storage tank supply is depleted, suction of the pumps is aligned to pump water from the containment sump directly into the containment during the recirculation mode of operation. Sodium hydroxide is added to the spray to remove iodine from the containment atmosphere in the post-LOCA condition.
The containment spray system is similar in design and function to the reactor building spray system at the Midland Plant, Units 1 and 2. Although the WCGS containment spray system utilizes two containment sumps, versus one for Midland, both systems function under equivalent conditions. The WCGS containment spray system is identical to the system used at Callaway. 1.2.5.1.3 Containment Cooling System


The containment fan cooler system is the second of the two independent pressure-reducing systems. The system consists of four fan cooling units. The operation of two of these units and one of the containment spray pumps is sufficient to meet the design requirements for containment depressurization after a postulated LOCA. Containment atmosphere is drawn through the fan cooler units to cool the air and condense steam from the containment atmosphere after a LOCA. During normal plant operation, three fan cooler units are required to remove sensible heat generated from equipment inside the containment and maintain the containment atmosphere below 120 F.
the area. This is in accordance with the exclusion area requirements of 10 CFR


The containment cooling system design is a state-of-the-art design used throughout the nuclear industry. Components of the containment cooling system are similar in design and function to individual components that are used in the containment cooling systems at Farley, Palo Verde, and Midland and are identical to components used in the system at Callaway.  
100.3(a).  


1.2-11 Rev. 1 WOLF CREEK  1.2.5.1.4 Combustible Gas Control Systems
1.2.1.3 Access to the Site There are no public highways, county and/or township roads, public waterways,


Control of combustible gases in the containment following a LOCA is provided by two 100-percent-capacity electric (thermal) hydrogen recombiners located within the containment, which maintain the post-LOCA hydrogen concentration in the containment atmosphere below the lower flammability limit.  
or public railroads that traverse the exclusion area. There are no persons


A hydrogen purge subsystem is also provided for combustible gas control as a backup system.  
living in the exclusion area. There is to be no one working in the exclusion area except employees of the Applicants and their authorized agents. The


The combustible gas control system including the hydrogen recombiner system, hydrogen monitoring system, and the hydrogen purge system has components that are similar in design and function to the combustible gas control system used at Midland Plant, Units 1 and and 2. The hydrogen recombiners utilized at WCGS are essentially identical to those utilized in the Comanche Peak units, Callaway, and many other facilities that are currently in operation.
exclusion area is patrolled periodically by plant guards to ensure awareness of


1.2.5.1.5 Containment Isolation System
access to the area by individuals. See Section 2.1.2 for further details on


The containment isolation system preserves the ability of the containment boundary to minimize the release of fission products to the environment while at the same time allowing the normal and emergency passage of fluids through the containment boundary. System components include isolation valves that satisfy the containment isolation criteria. The containment isolation system is similar in design and function to the standard design that has been applied to several other Bechtel-designed plants. The containment isolation system used at WCGS is essentially identical to that utilized at Callaway. 1.2.5.2 Emergency Core Cooling System  The emergency core cooling system (ECCS) injects borated water into the reactor coolant system following a LOCA. This limits damage to the fuel assemblies and limits metal-water reactions and fission product release. The ECCS also provides continuous long-term post-LOCA cooling of the core by recirculating borated water between the containment sumps and the reactor core. The ECCS design at WCGS is functionally identical to the ECCS design for the Comanche Peak units and Callaway.  
access to the exclusion area and details concerning lake use. Controlled


1.2.5.3 Auxiliary Feedwater System  When the main feedwater system is not in operation and the reactor coolant temperature is greater than 350° degrees F, the auxiliary 
access to the protected area is monitored by guards on a 24 hour per day basis.


1.2-12 Rev. 1 WOLF CREEK feedwater system is used to supply water to the secondary side of the steam generators.
1.2.1.4 Environs The area within 10 miles of the site is rural and of low population; in 1980


The system consists of two motor-driven pumps which are powered by the emergency diesel generators if there is loss of offsite power and one steam-turbine-driven pump. During normal plant cooldown, the auxiliary feedwater system can, if necessary, be used to supply feedwater to the steam generators for removal of decay and sensible heat from the reactor coolant system. See section 7.3.6.1.1 for a description of this operation.  
the population within the 10-mile radius was 6,652. The only incorporated


The auxiliary feedwater system has a design that is similar to the auxiliary feedwater system design on the Midland Plant, Units 1 and 2. Both designs utilize steam-driven and ac-powered motor-driven auxiliary feedwater pumps.
1.2-1 Rev. 0 WOLF CREEK places,as defined by the U.S. Bureau of Census, within 10 miles  of the site
However, the WCGS design utilizes an additional motor-driven pump for reliability. The auxiliary feedwater system utilized at WCGS is identical to that used at Callaway. 1.2.6 PLANT INSTRUMENTATION AND CONTROL SYSTEMS The plant instrumentation and control systems ensure safe and orderly operation of all systems and processes over the full operating range of the plant. The control room is designed to enable operators to start up, operate, and shutdown the plant. Supervision of both the nuclear and turbine generator systems is accomplished from the control room. Additional controls at appropriate locations outside the control room (in particular, an auxiliary shutdown panel in the auxiliary building) ensure the capability of reaching and maintaining a post-accident or post-fire shutdown condition in the unlikely event that the control room becomes uninhabitable.  (Note that the control room is protected from fire, breach of security, and missiles, and contains a redundant ventilation system filtered to remove iodine.)


The WCGS instrumentation and control systems summarized below and discussed in detail in Chapter 7.0 are functionally similar to those systems utilized in the Comanche Peak units and are essentially identical to those systems utilized at Callaway.  
are Burlington and New Strawn. In 1980, Burlington recorded a population of


1.2-13 Rev. 14 WOLF CREEK  1.2.6.1 Protection System The plant protection system monitors selected plant parameters in order to initiate reactor trip and/or engineered safety features actuation. Multiple independent channels monitor each of the selected plant parameters. The plant protection system logic was designed to initiate automatically protective action whenever the monitored parameters reach a limiting safety system setting. Redundancy was provided to assure that no single failure would prevent protective action when it was required. The plant protection system was designed in conformance to IEEE Standard 279 "Criteria for Protection Systems for Nuclear Power Generating Stations."
2,901 and New Strawn, which was incorporated in 1971, had a 1980 population of


1.2.6.1.1 Reactor Trip System
457. Topeka, located 53 miles north of the site, recorded a metropolitan population of 115,266 in 1980 and Emporia, 28 miles west-northwest of the site,


The reactor trip system shuts down the reactor whenever the limits of safe operation are approached. The safe operating region was defined by such considerations as mechanical/hydraulic limitations on equipment and heat transfer phenomena. Therefore, the reactor trip system keeps surveillance on process or calculated variables which are directly related to those equipment limitations. Whenever a direct process or calculated variable exceeds a setpoint, the reactor would automatically be shut down.
in 1980 recorded a population of 25,287. Most of the land surrounding the site


1.2.6.1.2 Engineered Safety Features Actuation System
is used for agricultural purposes with the exception of such rural service


The engineered safety features actuation system was designed to detect symptoms of a loss-of-coolant accident, a steam-line break, a feedwater-line break, loss of offsite power, or a fuel handling accident and to actuate the appropriate engineered safety features systems as certain threshold levels of each indicator symptom are passed.
centers as Burlington. All recreational facilities are city-owned parks with
1.2.6.2 Reactor Instrumentation and Control System  The reactor is controlled (1) by taking advantage of inherent neutronic characteristics, e.g., temperature coefficients of reactivity; (2) by control rod cluster motion, which is used for load transients and for startup and shutdown; (3) and by a soluble neutron absorber, boron, in the form of boric acid inserted during cold shutdown, partially removed at startup, and adjusted in concentration during core lifetime to compensate for fuel consumption and accumulation of fission products. The control system allows the plant to accept step load increases of up to 10 percent and ramp load increases of up to 5 percent per minute over the load range of 15 to 100 percent of full power.
Equal step and ramp load reductions are possible, over the range of 100 to 15 percent of full power.


1.2-14 Rev. 0 WOLF CREEK  1.2.6.3 Radiation Monitoring System The liquid and gaseous effluents from the plant are continuously monitored for radioactivity. Release rates are monitored and recorded. The process radiation monitoring system detects radioactivity in fluid systems which is indicative of fuel clad defects and/or fluid leakage between process systems.
the exception of the John Redmond Reservoir area, the main recreational


Area monitoring stations are provided to measure gamma radiation at selected locations in the plant. Radiation levels, as detected by these monitors, are indicated in the control room, and above normal values are annunciated.  
facility in the area which is federally operated. Use of the Wolf Creek lake for recreation is discussed in Section 2.1.2. The region is expected to retain its distinctly rural character.  


1.2.6.4 Balance-of-Plant Instrumentation and Control Systems The turbine and generator control systems are designed to regulate generator load. The turbine-generator protection system is designed to ensure safe operation of the unit. The analog Electro-Hydraulic Control (EHC) system has been replaced with a new digital Turbine Control System (TCS). The new system utilizes an Ovation-Based Distributed Control System (DCS). Two redundant sets of controllers are used in the turbine control system. The TCS architecture is based on combined functional and hardware redundancy to create a robust and reliable system.
The Low Population Zone is chosen as the area within a 2.5-mile radius of the  
Additional instrumentation and controls allow manual or automatic control of various temperatures, pressures, flows, and liquid levels throughout the plant.
Indicators, recorders, annunciators, and the plant computer inform the operating personnel at the equipment location and/or the control room of plant conditions and performance.


1.2.7 PLANT ELECTRIC POWER SYSTEM 1.2.7.1 Transmission and Generation Systems The generating units are connected to the respective utility transmission systems. The transmission system voltage is 345 kV for Kansas Gas and Electric Company (KG&E) and Kansas City Power & Light Company (KCP&L). The utilities have integrated transmission networks and interconnections with neighboring systems. A description of system network and interconnection for each utility is given in Chapter 8.0.  
plant site.  


The main generator is a General Electric 1,800 rpm, three-phase, 60-cycle synchronous unit. The generator is connected directly to the turbine shaft and is equipped with an excitation system coupled directly to the generator shaft.
1.2.1.5 Geology The WCGS site is located within the Central Stable Region of the North American


Power from the generators is stepped up from 25 kV by the unit main transformers and supplied by overhead lines to the switchyard. A unit auxiliary transformer is connected to the main generator through an isolated phase bus duct to supply the auxiliary loads of the unit during power generation.
Continent. This region was subjected to gentle structural uparching and down-


1.2-15 Rev. 27 WOLF CREEK  1.2.7.2 Electric Power Distribution System Electric power is supplied from the switchyard to the onsite power system for the electrical auxiliaries of each unit through two independent circuits. One circuit supplies power through a startup transformer and the other through an engineered safety features (ESF) transformer. The startup transformer feeds two 13.8-kV buses and a second ESF transformer. Power is supplied to auxiliaries at 13.8 kV, 4.16 kV, 480 V, 480/277 V, and 208/120 V ac. Refer to Figure 8.3-1.
warping during Mesozoic and Paleozoic time. These structural movements resulted in the formation of broad-scale basins and arches which have been


The power distribution system includes the Class IE and non-Class IE ac and dc power systems. The Class IE power system supplies equipment used to shut down the reactor and limit the release of radioactive material following a design basis event.
modified locally by folding and faulting. Geotechnical investigations at the  
The Class IE ac system for each unit consists of two independent and redundant load groups and four independent 120-V vital ac instrumentation and control power supply systems. The load groups include 4.16-kV switchgear, 480-V load centers, and motor control centers.


Two diesel generators are provided as a standby power source for each unit, one for each of the two Class IE load groups. Each generator has sufficient capacity to operate all the equipment of one load group, which is necessary to prevent undue risk to public health and safety in the event of a design basis accident.
site during construction excavation have identified the presence of localized


The non-Class IE ac system includes 13.8-kV switchgear, 4.16-kV switchgear, 480-V load centers, and motor control centers.
zones of penecontemporaneous deformation in the bedrock. However, the


The vital ac instrumentation and control power supply systems include battery systems, static inverters, and distribution panels. All voltages listed are nominal values, and all electrical Class IE equipment is designed to accept the expected range in voltage.
investigations have established the last age of deformation as Pennsylvanian,  


The Class IE electrical systems are similar to Class IE systems utilized on many other Bechtel-designed plants since designs that meet the requirements and standards of the nuclear industry develop in a similar manner. For instance, Class IE system and components have a similar design and function to the ac systems and components at the Midland Plant, Units 1 and 2. In addition, the Class IE dc systems and components are similar to the dc systems and components at Palo Verde. The Class IE system used at WCGS is similar to the system used at Callaway.
and there is no known macroseismic activity associated with these zones and no


Direct current power for the Class IE dc loads of each unit is supplied by four independent Class IE 125-V dc batteries and 
structural association with capable faults (Reference 1). The faulting,


1.2-16 Rev. 0 WOLF CREEK  associated battery chargers. One 250-V and four 125-V non-Class 1E batteries and associated battery chargers are also provided to supply 250-V and 125-V dc power for the non-Class 1E dc system loads.
shearing and deformation, therefore, are noncapable as defined by Appendix A to  
The Station Blackout Diesel Generator power system consists of three (3) non-safety related diesel generators that are capable of supplying essential loads on bus NB001 or bus NB002 required to reliably and safely shut down the unit following a station blackout event. Station blackout means the complete loss of alternating current (ac) electric power to the essential and nonessential switchgear buses in a nuclear power plant (i.e., loss of offsite electric power system concurrent with turbine trip and unavailability of the onsite emergency ac power system). This equipment is not credited for coping with a station blackout per NRC Regulatory Guide 1.155 and NUMARC 87-00, but is instead installed to provide plant MSPI/PRA margin. The equipment is located within a missile barrier designed to limit the average wind speed downstream of the barrier entrance to less than or equal to 150 mph during a 230 mph tornado event in accordance with NRC Regulatory Guide 1.76, Rev. 1. 1.2.8 POWER CONVERSION SYSTEM


Thermal energy that is generated by the NSSS is converted into electrical energy through the steam cycle process by the turbine generator.  
10 CFR 100.  


The turbine is a tandem-compound, six-flow, four-element, 1,800-rpm unit, having one high-pressure and three low-pressure elements. Combination moisture separator-reheaters are employed to dry and reheat the steam between the high-and low-pressure turbines. The auxiliaries include deaerating surface condensers, condenser evacuation system, turbine-driven main feedwater pumps, motor-driven condensate pumps, and seven stages of feedwater heating. The steam and turbine systems were designed to receive the heat energy produced in the reactor during normal operation as well as a 50-percent load reduction of the turbine-generator. Heat dissipation under the latter condition is accomplished by steam dump to the condenser (40-percent full load). The steam dump enables the plant to accept a loss of 50-percent external load without reactor or turbine trip. The condensers are cooled by the circulating water system.  
The surface bedrock in the site area consists of alternating layers of Pennsylvanian age shales, limestones, sandstones, and a few thin coal seams.


1.2.8.1 Main Steam Supply System The main steam supply system consists of the piping and valves that are necessary to deliver saturated steam from the steam generators to the turbine generator. Four 28-inch main steam lines carry steam from the top of the steam generators, through four main steam isolation valves, one in each line, to the turbine stop valves at the inlet to the turbine generator. Each main steam line is also equipped with five code safety valves and one atmospheric relief valve. The main steam supply system is similar to the main steam supply system at Palo Verde and identical to the main steam supply system at Callaway.
These bedrock units dip gently to the west and northwest and have been folded


1.2.8.2 Main Condenser Evacuation System The main condenser evacuation system provides a means for removing air and noncondensible gases from the main condenser. The main condenser evacuation system uses three vacuum pumps to perform this function; two for normal operation and the third that is started to help draw a vacuum during the startup mode.
locally into small-scale plunging anticlines and synclines. At the site, the  


1.2-17 Rev. 27 WOLF CREEK  This system is similar to the main condenser evacuation system that is utilized on Palo Verde with the exception that the Palo Verde design includes a fourth vacuum pump. The system used at WCGS is identical to the system used at Callaway.
Precambrian basement is present at a depth of approximately 2,500 feet. The  
1.2.8.3 Turbine Gland Sealing System  The turbine gland sealing system seals the turbine shaft penetrations and the turbine valve stems to prevent the escape of steam or the introduction of air at these places in the steam areas of the turbine. This system utilizes standard industry components and is similar in design and function to the system utilized at San Onofre and identical to the system used at Callaway.


1.2.8.4 Turbine Bypass System  The turbine bypass system, more commonly known as the steam dump system, is provided to reduce the transient effects of plant startup, hot shutdown, cooldown, and step reductions in generator loadings on the reactor coolant system. The steam dump system has the capability to bypass up to 40 percent of full steam flow from the steam generators to the main condenser. This system uses air-operated globe valves to perform its function and is similar in design and function to the steam dump system at Palo Verde and identical to the system at Callaway.
Precambrian rocks consist of approximately 1,000 feet of sedimentary deposits


1.2.8.5 Circulating Water System  The circulating water system supplies cooling water from the plant's cooling water source to the main condenser to condense the steam that discharges from the exhaust of the turbine or the turbine bypass system. The Wolf Creek site utilizes a large cooling lake for its source of circulating water and cooling mechanism as does Comanche Peak.  
which rest on a granitic basement complex.  


1.2.8.6 Condensate Cleanup System  The condensate cleanup system, more commonly known as the condensate demineralizer system, contains demineralizers that are utilized to maintain the required purity of the feedwater which supplies the steam generators. The condensate demineralizer system is similar in design and function to the cleanup system utilized at Midland Plant, Units 1 and 2. The WCGS design includes additional components, such as a waste collection tank and sluice water pumps. The system used at WCGS is identical to the system used at Callaway.
The site area has been submaturely to maturely dissected by the Neosho River


1.2-18 Rev.1 WOLF CREEK 1.2.8.7 Condensate and Feedwater System  The condensate and feedwater system receives condensate from the condenser hotwells and delivers feedwater to the steam generators at a temperature that provides maximum steam plant efficiency.
and its tributaries to form flat to gently rolling uplands with a maximum  
The condensate and feedwater system includes seven stages of feedwater heaters, six demineralizer vessels, and various pumps, valves, and piping to perform its intended function. This system is similar in design and function to the condensate and feedwater system at Trojan and identical to the system used at Callaway.


During normal plant cooldown and startup, the feedwater system is used to supply feedwater to the steam generators for removal of decay and sensible heat from the reactor coolant system. 1.2.8.8 Steam Generator Blowdown System  The steam generator blowdown system functions to maintain the secondary side water within the NSSS supplier's water chemistry specifications. This system includes a flash tank, filters, demineralizers, containment isolation valves, and various piping, all of which are common to most plant designs. This system, however, employs an improved design which provides much larger flow rates, four to five times larger, which enhances the blow-down function.  
topographic relief of 100 feet or less from the uplands to the valley floors.


1.2.8.9 Secondary Liquid Waste System  The secondary liquid waste system processes condensate demineralizer regeneration wastes and either directs these wastes for processing and re-use or discharge. This system also processes potentially radioactive liquid wastes. Secondary liquid waste systems are usually plant specific and depend upon the design of the systems they serve. The secondary liquid waste system is similar in design and function to most other Bechtel-designed projects.  
Residual soils ranging in thickness from 0 to 16 feet are developed
 
1.2-2 Rev. 10 WOLF CREEK on the Pennsylvanian strata. Quaternary alluvium reaches a thickness of approximately 25 feet in the Wolf Creek valley. Scattered Tertiary age


1.2.8.10 Wastewater Treatment System  The wastewater treatment facility processes wastewater discharges from the makeup demineralized water system (WM), the condensate demineralized system (AK), the secondary liquid waste system (HF), water treatment plant acid and caustic skid drains, the water treatment plant chemical spill catch basin, and the wastewater treatment facility chemical spill catch basin prior to discharge to the WCGS cooling lake. This system is designed to ensure that the above mentioned wastewater are in compliance with the pH limitations set forth in the NPDES permit. This system shall also process wastewater as allowed by the Offsite Dose Calculation Manual.  
deposits of clayey gravel cap some of the higher hills in the site area.


1.2-19 Rev. 19 WOLF CREEK 1.2.9 AUXILIARY SYSTEMS 1.2.9.1 Chemical and Volume Control System The chemical and volume control system (CVCS) performs the following functions:
Glacial deposits are not present at the site. The alternating Pennsylvanian
: a. Reactivity control 
: b. Regulation of reactor coolant inventory
: c. Reactor coolant purification
: d. Chemical additions for corrosion control
: e. Seal water injection to reactor coolant pump seals


Reactor coolant system is continuously purified by removing a small fraction of the reactor coolant flow through the letdown system. Letdown water is cooled in the regenerative heat exchanger. From there, the coolant flows to a letdown heat exchanger and through a demineralizer where corrosion and fission products are removed. The coolant then passes through a filter and is sprayed into the volume control tank, from which it is returned to the reactor coolant system by the charging system.  
strata forming the bedrock surface consist of competent rock units with a low amount of structural discontinuities in the rock mass. No major geologic


The CVCS automatically adjusts the amount of reactor coolant to compensate for changes in specific volume due to coolant temperature changes and reactor coolant pump shaft seal leakage in order to maintain a programmed level in the pressurizer.
features have been identified which could adversely affect the stability of  


The CVCS design for WCGS is similar to the CVCS design for the Comanche Peak units. The major difference is that WCGS includes provisions in the CVCS and residual heat removal system (see Section 7.4) to improve the capability to achieve and maintain cold shutdown. The CVCS system at WCGS is identical to the system used by Callaway.  
subsurface materials at seismic Category I facilities. Minor geologic


1.2.9.2 Residual Heat Removal System The residual heat removal system (RHRS) is used to remove heat from the reactor coolant at a controlled rate when the reactor coolant pressure is less than approximately 425 psig and the temperature is from 350 degrees F to 140 degrees F, and to maintain the proper reactor coolant temperature during refueling.
features, such as jointing, the zones of penecontemporaneous deformation, and  


The design of the RHRS includes two motor-operated isolation valves that are closed during normal operations. They are provided with both a "prevent-open" interlock and "RHRS-Iso-Valve-Open" alarm which are designed to prevent possible exposure of the RHRS to normal RCS operating pressure.
the weathering profile in the rock, were considered during design and  


The isolation valves are opened for residual heat removal during a plant cooldown after the RCS temperature is reduced to approximately 350F and RCS pressure is less than approximately 360 psig. During a plant startup, the inlet isolation valves are shut after drawing a bubble in the pressurizer and prior to increasing RCS pressure above approximately 425 psig (alarm setpoint).
construction of facilities. Comprehensive geotechnical investigations of the  


1.2-20 Rev. 14 WOLF CREEK The residual heat removal pumps are used to circulate the reactor coolant through two residual heat removal heat exchangers, returning it to the reactor coolant system through the lowpressure injection header.
site have determined the subsurface conditions in adequate detail to provide


The RHRS design for WCGS is similar to the RHRS design for the Comanche Peak units. The major difference is that at Wolf Creek, provisions are included in the CVCS and RHRS (see Section 7.4) to improve the capability to achieve and maintain cold shutdown. The RHRS used at WCGS is identical to the system used by Callaway.  
design criteria for foundation support of safety-related facilities. Major


1.2.9.3 Fuel Handling and Storage System The reactor is refueled using equipment designed to handle and store spent fuel under water from the time it leaves the reactor vessel until it is placed in a cask for shipment from the site. Underwater transfer of spent fuel provides an optically transparent radiation shield, as well as a reliable source of coolant for removal of decay heat. This system also provides capability for receiving, handling, and storing new fuel.
seismic Category I structures are supported on competent rock. Only minor,  


The fuel handling system is divided into two areas: the reactor cavity, which is flooded for refueling, and the fuel storage pool, which is outside the reactor containment and is accessible to plant personnel. The fuel storage pool consists of the spent fuel pool and the cask loading pool (with fuel storage racks installed). The reactor cavity and the fuel storage pool are connected by a fuel transfer system which carries the fuel through an opening in the reactor containment. The fuel pool cooling and cleanup system removes decay heat from fuel stored in the spent fuel pool and maintains the purity of the fuel pool water.
localized modifications to foundation materials were required in design and construction to provide uniform support of safety-related facilities.  
Spent fuel is removed from the reactor vessel by a refueling machine and placed in the fuel transfer system. In the spent fuel pool, the fuel is removed from the transfer system and placed into storage racks. After a suitable decay period, the fuel is removed from storage and loaded into a shipping cask for transfer.  


The fuel handling system and new fuel storage racks utilized at WCGS are similar to those utilized in the Comanche Peak units and many other facilities that are currently in operation.
1.2.1.6 Seismology The plant site is located in a relatively seismic stable region of the central
1.2.9.4 Service Water Systems  1.2.9.4.1 Service Water System


During normal plant operation, the service water system (SWS) supplies cooling water to the turbine building closed cooling water heat exchangers, central chiller condensers, and pump out units, condenser vacuum pump seal water coolers, steam packing exhauster, generator stator coolers, generator hydrogen coolers, turbine-generator lube oil coolers, steam generator blowdown non-regenerative heat exchanger, CVCS chiller unit, waterbox venting pump seal water coolers, motor driven feed pump, and air compressors. The system also supplies cooling water to the essential service water system during normal operation.  
United States. No earthquake epicenter has been reported closer than 40 miles


The system draws water from the cooling lake, pumps the coolant through the heat exchangers, and discharges it into the circulating water discharge, where it is directed back to the cooling
to the site, and the nearest shocks have had epicentral intensities no greater than Intensity III. At distances of 85 and 105 miles from the site,  


1.2-21 Rev. 14 WOLF CREEK lake. Water returning from the essential service water system is returned to the Ultimate Heat Sink and/or the cooling lake. Makeup water for the cooling lake is provided by pumps in the makeup water screenhouse. The SWS is described in detail in Section 9.2.1.  
earthquakes of Intensity VII to VII-VIII have been recorded. Since 1800, only


The system is similar in design and function to the service water system utilized at Midland Plant, Units 1 and 2.
seven earthquakes of Intensity V or greater have occurred within 100 miles of
1.2.9.4.2 Essential Service Water System


The essential service water system (ESWS) provides cooling water from the ultimate heat sink (cooling lake) for plant components which require cooling for safe shutdown of the reactor following an accident and/or loss of offsite power. These components are the component cooling water heat exchangers, containment air coolers, diesel generator coolers, safety injection pump room coolers, RHR pump room coolers, containment spray pump room coolers, centrifugal charging pump room coolers, component cooling water pump room coolers, auxiliary feedwater pump room coolers, control room air-conditioning condensers, Class 1E switchgear air-conditioning condensers, penetration room coolers, fuel pool cooling pump room cooler, and air compressor and after cooler. The ESW cooling water is discharged to the ultimate heat sink. The essential service water pumps, prelube storage tanks, self-cleaning strainers, and traveling water screens are located in a seismic Category I pumphouse. Other parts of the system located outside the power block are either buried underground or located in seismic Category I structures. The ESWS is described in detail in Section 9.2.1.
the site, and 16 events of Intensity VI or greater have been recorded within


The essential service water system provides emergency makeup to the spent fuel pool and component cooling water systems. It is also the backup water supply to the auxiliary feedwater system.  
200 miles. Previously recorded earthquakes probably have not generated


The essential service water system is similar in design and function to the essential service water system utilized at the Midland Plant, Units 1 and 2.
intensities greater than VI at the site, and none of the buildings in the  
1.2.9.5 Component Cooling Water System  The component cooling water system is a closed loop circulating water system serving heat exchangers whose operation is required for the safe shutdown of the reactor. Heat is removed from the closed loop by the essential service water system. Radiation monitors are provided to detect any radioactive leakage into the component cooling system.


1.2-22 Rev. 14 WOLF CREEK  The component cooling water system is similar in design and function to the component cooling water system that is utilized at the Midland Plant, Units 1 and 2 and is identical to the system utilized at Callaway.
vicinity of the site have sustained any known structural damage due to  
1.2.9.6 Compressed Air Systems  Four nonlubricated air compressors, with separate aftercoolers, discharge compressed air to three air receivers that supply compressed air to a common header. This header furnishes compressed air for both the plant air system and the instrument air system. Instrument air is dried and filtered downstream of the common supply header.
The plant air system provides compressed air for normal maintenance service at various stations throughout the plant. The instrument air system provides compressed air for the operation of all air-operated instruments and valves.


The compressed air system is similar in design and function to the compressed air systems that are utilized at the Trojan and Midland Plant, Units 1 and 2 and is identical to the system utilized at Callaway.  
earthquakes.  


1.2.9.7 Fire Protection Systems  The fire protection system was designed to provide water to the plant fire protection system and site fire protection facilities. An outside underground yard loop surrounds the power block and provides water to all buildings and hydrants spaced around the plant site. Water for the fire protection system is provided from the circulating water screenhouse intake bay. The system is described in detail in Section 9.5.1.  
An Operating Basis Earthquake corresponding to a horizontal acceleration of six percent of gravity and a Safe Shutdown Earthquake corresponding to a horizontal acceleration of 12 percent of gravity was selected for the site. However, a seismic evaluation of these structures, systems, and components using the Lawrence Livermore Laboratories spectrum anchored at 0.15g for structures supported on bedrock is contained in Appendix 3C.
1.2.1.7 Hydrology


The plant fire protection system consists of the following materials, structures, detection devices, alarms, and suppression and extinguishing facilities, selected and designed to minimize fire hazards and fire damage:
1.2.1.7.1 Surface Water Hydrology
: a. Automatic wet-pipe sprinklers;
: b. Automatic pre-action systems; 
: c. Water spray systems;
: d. Halon 1301 systems;
: e. Standpipe and hoserack assemblies;


1.2-23 Rev. 14 WOLF CREEK  f. Portable extinguishers;
The plant site is located within the Wolf Creek watershed northeast of Burlington, Kansas. The topography within the watershed varies from
: g. Fire and smoke detection and alarm systems;
: h. Fire walls and barriers;
: i. Fire resistant and noncombustible materials of construction; and
: j. Smoke and heat vents;


Portions of the fire protection system that protect or pass through areas containing equipment required for safe shutdown of the plant during and after an earthquake are seismically analyzed and supported to prevent damage to this equipment. The system is designed to preclude flooding of safety-related equipment under seismic conditions.
1.2-3 Rev. 14 WOLF CREEK undulating hills upstream of the plant site to a floodplain area shared with


The fire protection system provides an adequate supply of water to hydrants, hose stations, sprinklers, and deluge systems, based on the maximum automatic sprinkler or fixed water spray system demand with the simultaneous flow for hose streams outside the power block.
the Neosho River with a drainage area within Kansas of 6,300 sq. miles near the  


Noncombustible and heat-resistant materials are used throughout the plant.
mouth of Wolf Creek with a drainage area of 35 sq. miles. The cooling lake
Plant fire walls are provided and rated according to their particular location in the plant, and penetrations through fire barriers are fitted with fire stops having, as a minimum, the same rating as the barrier.  


Instrumentation and controls are provided for the proper operation of the fire-fighting systems and for fire detection and annunciation. The fire protection system was designed with components and systems that are common to many plants throughout the nuclear industry and, therefore, is comparable to most fire protection systems utilized at other plants. This system is most similar in design and function to the fire protection system utilized at San Onofre.  
alters the draining pattern of the watershed, but safety-related facilities are protected from severe hydrological events.  


1.2.9.8 Heating, Ventilating, and Air-Conditioning Systems  The heating, ventilating, and air-conditioning (HVAC) systems are designed to provide a suitable environment for equipment and to ensure the safety of personnel.
The cooling lake is designed to supply adequate cooling water to the plant
Redundant cooling and ventilating systems serving engineered safety features equipment rooms and the main control room meet 


1.2-24 Rev. 0 WOLF CREEK  seismic Category I requirements and are each supplied from separate Class IE electrical buses. These systems satisfy the single failure criterion.
during a one in fifty year drought. Makeup water is supplied to the cooling


The HVAC systems serving the control room areas are similar in design and function to the HVAC systems at the Midland Plant, Units 1 and 2 and Callaway.
lake from the Wolf Creek watershed runoff and from makeup water pumped from
The nonsafety-related HVAC systems are specifically tailored to suit the design of other portions of the plant but are similar in design and function to that of other Bechtel-designed projects.


1.2.9.9 Sampling Systems  The sampling systems collect representative samples of the various process fluids. The systems include a primary sampling system, secondary sampling system, radwaste sampling system, and local grab sample provisions. Samples are routed to centralized sampling stations or local sample stations, all of which are located outside the reactor containment. Both liquid and gaseous samples are taken. Automatic and "on-line" analyses are made for some samples.
John Redmond Reservoir. The region surrounding the site is not characterized
Chemical and radiochemical laboratory analyses are performed on other samples to determine chemical composition, boron concentration, fission and corrosion product activity levels, dissolved gas concentration, gross radioactivity, and specific isotopic analyses. The results are used to regulate boron control adjustments, monitor fuel rod integrity, evaluate demineralizer performance, control effluent releases, and maintain correct water chemistry.
The sampling system is specifically tailored to suit the design of other portions of the plant but is similar in design and function to sampling systems utilized throughout the nuclear industry.


1.2.9.10 Service Gas System  The service gas system provides for the handling and storage of commonly used service gases. The service gas system has provisions to protect against nitrogen and hydrogen gas ruptures and is comparable in design and function to the service gas system at Palo Verde. The service gas system also provides its function for several other gases, e.g. carbon dioxide and oxygen.  
by events such as tsunamis, surge activity, or severe ice flooding. Major dam


1.2.9.11 Communications System  The communications system provides components and distribution for the total communications network of the plant including intercom systems and remote communications devices. The communication system is similar in design and function to the communications system at Arkansas Nuclear One - Unit 2 and Callaway.
failures on the Neosho River above Wolf Creek watershed will not affect safety-


1.2-25 Rev. 0 WOLF CREEK  1.2.9.12 Diesel Generator Support Systems The emergency diesel engine fuel oil storage and transfer system provides onsite fuel oil storage and transfer of fuel oil to the diesel engines. The storage capacity of this system is somewhat larger than the storage capacity at other plants with a similar design.  
related facilities.  


The emergency diesel engine cooling water system is a closed cycle system that provides a source of cooling water to the diesel engines. The emergency diesel engine cooling water system is the intermediate system that transfers heat between the diesel engine and the essential service water system and is similar in design and function to the typical nuclear industry design.
The flow of the Neosho River is controlled by three reservoirs above the site.
The Maximum flood design elevation of 1097.5 ft. msl., resulting from the  


The emergency diesel engine starting system provides startup air to the diesel engines with two independent, redundant starting air trains per engine. The emergency diesel engine lubricating system consists of two major subsystems; 1) the main oil system, and 2) the rocker oil system. Each engine has its own independent redundant lubricating system. The emergency diesel engine combustion air intake and exhaust system provides filtered combustion air to the diesel engines and discharges the exhaust via silencers in the discharge stacks.
probable maximum flood routed through the cooling lake with coincident wave


The diesel generator support systems are tailored to the specific design of the diesel engines and are similar in design and function to the diesel generator support systems at San Onofre and Midland Plant, Units 1 and 2 and identical to the system at Callaway.
activity, is below the plant site grade of 1099.5 ft. msl.  
1.2.10 WASTE PROCESSING SYSTEMS The waste processing systems provide all the equipment necessary for controlled treatment and preparation for retention or disposal of all liquid, gaseous, and solid wastes produced as a result of reactor operation. The liquid waste processing system collects, processes, and removes or concentrates radioactive constituents, and processes them until suitable for processing in the solid radwaste system. The gaseous waste processing system removes fission product gases from the reactor coolant and contains these gases during normal plant operation. The solid radwaste system receives, processes, packages, and stores all radioactive wastes generated until shipment offsite.


1.2-26 Rev. 19 WOLF CREEK 1.2.11 SHARED FACILITIES AND COMPONENTS  WCGS utilized the SNUPPS standard plant or power block design which was developed to be acceptable for installation at any one of several sites. Wolf Creek is a single unit site and has no shared safety-related facilities and components. 1.2.12 REFERENCES SECTION 1.2 
1.2.1.7.2 Groundwater Hydrology Only small quantities of groundwater are available within a 50-mile radius of
: 1. Dames & Moore, 1977, Penecontemporaneous Deformation Zones Wolf Creek Generating Station; for Kansas Gas and Electric Co.
and Kansas City Power & Light Co., Dames & Moore, May 20, 1977.


1.2-27 Rev. 14 WOLF CREEK    TABLE 1.2-1  DESIGN ENVELOPE (Sheet 1) (1)  Parameter SNUPPS USAR Reference Hazards There are no hazards which have an Section 2.2 Explosions from acci- adverse effect on structures  dents involving ex-    plosives or gases were postulated in accordance with Regulatory Guide    1.91. The maximum overpressure and ground shock on the plant structures from such explosions are well below the design pressures for tornado protection and the   design OBE ground accelerations.  
the plant site. The groundwater is produced from three types of aquifers: the alluvial deposits in the river valleys, the weathered bedrock including the shallow soil, and the unweathered bedrock.  


Temperatures(2)  Sections 2.3, These temperatures    3.11(B).2.5, and 9.4 envelop the histori-  1. Design min. and -60 F to 120 F  cally recorded mini-  max. for exposed  mum and maximum re-outside structures  gional temperatures  or components  and are within a      range of 100-year
The alluvial aquifers are composed of silts, sands, and gravel. Yields from wells in the alluvial aquifers are up to 100 gallons per minute. Recharge to such aquifers occurs from precipitation and from rivers during periods of high flow. Regionally, discharge from the alluvial aquifers normally flows into the rivers.  
: 2. Design for ulti- Cooling pond  recurrence temperatures.
mate heat sink
: 3. Design winter -25 F and 15 mph wind air conditions for ventilation
: 4. Design for summer 97 F dry bulb, 79 F wet bulb ventilation


Flood level Flooding is precluded by the Section 2.4 and No special flood    elevation of the plant and by Table 3.4-2 protection measures the site drainage system.  (such as external flood doors) are incorporated.
The weathered bedrock aquifer consists of weathered shales, siltstones,


Maximum rainfall 7.4 in/hr, excess allowed to run Section 2.4 Site drainage designed off roofs  to preclude local flooding.  
sandstones, and limestones. Pressure tests indicate that this aquifer is


Rev. 6 WOLF CREEK    TABLE 1.2-1 (Sheet 2)  Parameter SNUPPS USAR Reference Remarks  Ice and snow loading  Section 2.4 Basic snow load (100-      year recurrence snow-
sufficiently permeable to yield up to 10 gallons per minute for livestock and domestic wells. Recharge occurs from precipitation and locally from downward
: 1. Basic snow load, 91 psf  pack) adjusted for normal and severe  geometry and drifting environmental  for roof design using Section 7.2 of ANSI
: 2. Basic snow load, 153 psf  A58.1-1972.  "Extreme  extreme environ- environmental" includes mental  the effects of PMWP.


Ground water elevation Maximum hydrostatic level is at Section 2.4 Conservative assumption Grade  for buoyancy calcula-tions and computation of uplift pressure on      foundation base mats.  
percolation through the overlying alluvium. Discharge occurs into both


Seismology (OBE and OBE - 0.12g, SSE - 0.20g Section 2.5 The standard plant SSE)
alluvium and streams.  
OBE and SSE were used with each site's soil properties to generate  seismic structural  loads. These loads were  enveloped for design. Floor response spectra  were generated in the  same manner. All items  were designed either to  the envelope or all of  the individual floor  response spectra so that  these items could be  interchangeable at all  sites, thus the Wolf  Creek site design was  limited by the other  SNUPPS plants floor  response spectra. Foundation character-istics
: 1. Settlement Design settlements are within the Section 2.5 following criteria:
: a. Total - 3 in.
: b. Post construction - 1 in.
: c. Post construction differen-tial (between buildings and/or columns) - 1/2 in.  


Rev. 0 WOLF CREEK    TABLE 1.2-1 (Sheet 3)  Parameter SNUPPS USAR Reference Remarks
The consolidated bedrock aquifers are composed of sandstones and limestones which are limited to yields ranging from about l to 10 gallons per minute.
: 2. Static and dy- The equations for the lateral earth Section 2.5 Used for design of   namic lateral pressures, shown in Figure 2.5-152,  subsurface Category  earth pressures are used in conjunction with the  I walls  soil parameters and the enveloping earthquake parameters (i.e., enveloping  SSE and OBE) to compute the lateral  pressures on the foundation walls.
Recharge to such aquifers occurs by precipitation and infiltration of  
The maximum earth pressure thus computed is taken as the envelope pressure and is used in design. 
: 3. Liquefaction Subsurface materials at all sites Section 2.5 not susceptible to liquefaction
: 4. Local subsidence No evidence of any actual or poten- Section 2.4 WCGS is free from tial subsidence  major surface or sub-surface subsidence or  collapse resulting from  tectonic depressions,  cavernous conditions,  solutioning, or  extraction of subsurface  fluids or mining  resulting from man-made  activities. Windspeed 100 mph. Tornado maximum wind speed Sections 3.3.1 and BC-TOP-3-A, ANSI-is 360 mph with 3 psi pressure drop 3.3.2 A58.1-1972, and Reg-in 1-1/2 secs  ulatory Guide 1.76.


Relative humidity(2) 97 F dry bulb Section 9.4 and  These are temperature  79 F wet bulb 45% (summer) Table 9.4-1 conditions based
1.2-4 Rev. 1 WOLF CREEK surface water at the outcrops. Where overlain by shales and siltstones, which
-25 F dry bulb (winter)  on 1972 ASHRAE Handbook  of Fundamentals and  are used for design of  the plant HVAC systems  for safety-related  structures. 
(1) The design envelope was conservatively developed using data from all SNUPPS sites.  


(2) The winter temperature conditions have been re-evaluated for Wolf Creek. The acceptable design minimum temperature for exposed outside structures or components is -30°F. The acceptable design winter temperature for HVAC design is 7°F.
act as aquitards and aquicludes, vertical recharge to the limestones and


Rev. 14 
sandstones is minimal.  


WOLF CREEK 1.3 COMPARISON TABLES  1.3.1 COMPARISON WITH SIMILAR FACILITY DESIGNS  Table 1.3-1 presents a design comparison of the major NSSS parameters or features of WCGS with Comanche Peak, Units 1 and 2 (Docket Nos. 50-445 and 50-446), W. B. McGuire, Units 1 and 2 (Docket Nos. 50-369 and 50-370), and Trojan (Docket No. 50-344). Wolf Creek and Callaway were both designed using the SNUPPS powerblock design. These comparisons were made at the time of application for the Operating License and are considered historic data. Table 1.3-1 will not be updated to reflect changes made at these facilities.
There is no anticipated use of groundwater at the plant site. The operation of  


For a general design comparison of the major BOP systems utilized by WCGS with similar systems on other Bechtel-designed plants, refer to the general system descriptions in Section 1.2. Refer to Table 1.3-2 for a listing of major analyses that have been used on WCGS but are not included in topical reports. Most of these analyses have been previously reviewed by the NRC on other dockets. Note that approved topical reports issued by Bechtel and Westinghouse are listed in Section 1.6.
the plant will not have any detrimental effect on the groundwater environment,  
1.3.2 COMPARISON OF FINAL AND PRELIMINARY INFORMATION Table 1.3-3 identifies all the significant changes that were made to the power block since submittal of the SNUPPS PSAR but prior to receipt of the operating license. Only items not reported in the PSAR and its subsequent amendments are listed in Table 1.3-3.
1.3.3 COMPLIANCE WITH NRC REGULATIONS Table 1.3-4 presents a list of NRC regulations and a corresponding description regarding the degree of compliance to each regulation. Compliance with 10 CFR Parts 20, 26, 50, 51, 55, 70, 71, 73, and 100 is considered. 


1.3-1 Rev. 23 WOLF CREEK  TABLE 1.3-1  DESIGN COMPARISON  USAR Parameter or Feature Chapter/Section WCGS(b) Comanche Peak W. B. McGuire Trojan  Reactor core heat 4.0, 5.0, 15.0 3,411 3,411 3,411 3,411 output, MWt  Minimum DNBR for 4.1, 4.4, 15.0 >1.30 >1.30 >1.30 >1.30 design transients  Total thermal flow 4.1, 4.4, 5.1 142.1 142.1 140.3 132.7 rate, 106 lb/hr  Reactor coolant tem- 4.1, 4.4 peratures, F  Core outlet  621.4 621.4 620.8 619.5  Vessel outlet  618.2 618.2 618.2 616.8 Core average  591.8 591.8 589.4 585.9  Vessel average  588.5 588.5 588.2 584.7  Core inlet  558.8 558.8 558.1 552.5  Vessel inlet  558.8 558.8 558.1 552.5  Average linear power, 4.1, 4.4 5.44 5.44 5.44 5.44 kW/ft  Peak linear power for 4.1, 4.4 12.6 12.6 12.6 13.6 normal operation, kW/ft  Heat flux hot channel 4.1, 4.4, 15.0 2.32 2.32 2.32 2.50 factor, FQ  Fuel assembly array 4.1, 4.3 17 x 17 17 x 17 17 x 17 17 x 17 
nor will local groundwater use affect the operation of the plant.  


Rev. 7 WOLF CREEK  TABLE 1.3-1 (Sheet 2)  DESIGN COMPARISON  USAR Parameter or Feature Chapter/Section WCGS(b) Comanche Peak W. B. McGuire Trojan  Number of fuel 4.1, 4.3 193 193 193 193 assemblies  Uranium dioxide rods 4.1, 4.3 264 264 264 264 per assembly Fuel weight as uranium 4.1, 4.3 222,739 222,739 222,739 222,739 dioxide, lb  Number of grids per 4.1, 4.3 8-Type R 8-Type R 8-Type R 8-Type R assembly  Rod cluster control 4.1, 4.3 assemblies  Number of full/part 53/- 53/- 53/8 53/8 length assemblies    Absorber material Ag-In-Cd Ag-In-Cd Ag-In-Cd Ag-In-Cd Hafnium  Clad material Stainless Stainless Stainless Stainless Steel Steel Steel Steel  Clad thickness 0.0185 0.0185 0.0185 0.0185  Equivalent core 4.1, 4.3 132.7 132.7 132.7 132.7 diameter, in. Active fuel length, in. 4.1, 4.3 143.7 143.7 143.7 143.7  Fuel enrichment (weight` 4.1, 4.3 Core A Unit 1 percent)  Region 1 2.10 1.60 2.10 2.10  Region 2 2.60 2.40 2.60 2.60  Region 3 3.10 3.10 3.10 3.10    Rev. 7 WOLF CREEK  TABLE 1.3-1 (Sheet 3)      DESIGN COMPARISON  USAR Parameter or Feature Chapter/Section WCGS(b) Comanche Peak W. B. McGuire Trojan  Number of coolant loops 5.0 4 4 4 4  Total steam flow, 5.1 15.14 15.14 15.14 5.07 106 lb/hr  Reactor vessel 5.3  Inside diameter, in. 173 173 173 173  Inlet nozzle inside  27-1/2 27-1/2 27-1/2 27-1/2 diameter, in. Outlet nozzle inside  29 29 29 29 diameter, in. Number of reactor  54 54 54 54 closure head studs  Reactor coolant pumps 5.4.1  Horsepower  7,000 7,000 7,000 6,000  Capacity, gpm  100,600 99,000 99,000 88,500  Steam generators 5.4.2  Model F D D D  Heat transfer areas, ft.2 55,000 48,000 48,000 51,500  Number of U-tubes 5,626 4,578 4,674 3,388  Residual heat removal 5.4.7  Initiation pressure, ~425 ~425 ~425 ~400 psig 
1.2.1.8 Meteorology


Rev. 12 WOLF CREEK  TABLE 1.3-1 (Sheet 4)  DESIGN COMPARISON  USAR Parameter or Feature Chapter/Section WCGS(b) Comanche Peak W. B. McGuire Trojan  Initiation/completion ~350/140 ~350/140 ~350/140 ~350/140 temperature, F  Component cooling water 105 105 95 95 design temperature, F  Cooldown time after ~16 ~16 ~16 ~16 initiation, hr  Heater exchanger removal 39.0 39.1 34.15 34.2 capacity, 106 Btu/hr  Pressurizer 5.4.10  Heatup rate using 55 55 55 55 heaters, F/hr Internal volume, ft3 1,800 1,800 1,800 1,800 Pressurizer safety 5.4.13 valves  Number 3 3 3 3 Maximum relieving  420,000(c) 420,000 420,000 420,000  capacity, lb/hr  Accumulators 6.3  Number 4 4 4 4 Operating pressure,  600 600 600 600 minimum, psig Minimum operating water  819 950 950 870 volume, each, ft3 
The continental location of the site ensures a wide seasonal range of


Rev. 16 WOLF CREEK  TABLE 1.3-1 (Sheet 5)  DESIGN COMPARISON  USAR Parameter or Feature Chapter/Section WCGS(b) Comanche Peak W. B. McGuire Trojan  Centrifugal charging 6.3 pumps  Number 2 2 2 2 Design flow, gpm 150 150 150 150 Design head, ft 5,800 5,800 5,800 5,800  Safety injection 6.3 pumps  Number 2 2 2 2 Design flow, gpm 440 425 425 425 Design head, ft 2,780 2,680 2,500 2,500  Residual heat removal 5.4.7, 6.3 pumps  Number 2 2 2 2 Design flow, gpm 3,800 3,800 3,000 3,000 Design head, ft 350 350 375 375  Instrumentation and 7.0 (a) (a) (a) (a) controls  New fuel storage racks 9.1.1 21 21 21 21 center-to-center spacing, in. Chemical and volume 9.3.4 control  Total seal water 32 32 32 32 supply flow rate, nominal, gpm 
temperature and frequent day to day temperature changes due to frequent passage


Rev. 7 WOLF CREEK  TABLE 1.3-1 (Sheet 6)  DESIGN COMPARISON  USAR Parameter or Feature Chapter/Section WCGS(b) Comanche Peak W. B. McGuire Trojan Total seal water 12 12 12 12 return flow rate, nominal, gpm Letdown flow, normal/maximum, 75/120 75/120 75/120 75/120 gpm Charging flow, 55/100 55/100 55/100 55/100 normal/maximum, gpm
of cyclonic systems through the vicinity. The maximum temperature was 117


NOTES:
degrees Fahrenheit recorded at Burlington, Kansas. The lowest extreme


(a) The instrumentation and control systems discussed in Chapter 7.0 are functionally similar to those systems implemented in Comanche Peak, W. B. McGuire, and Trojan.
temperature was -26 degrees Fahrenheit. The prevailing winds are from the


(b) The design conditions for WCGS listed in this Table have been changed by the Wolf Creek Power Rerate Program. However, since the comparisons were made at the time of application for the Operating License and are considered historic data, the Table will not be updated to reflect the new information.
south to southeast except during the winter when north to northwest winds


(c) The capacity is reduced to 415,764 lb/hr due to the setpoint change from 2485 psig to 2460 psig.
prevail. There are no meteorologically significant terrain features or bodies


Rev. 16 WOLF CREEK TABLE 1.3-2  MAJOR ANALYSES NOT INCLUDED IN TOPICAL REPORTS  Analysis Previously  Description and Applicable Reviewed on Other Name USAR Section Projects  Control Room Habitability  a. Control room air intake 2.3 Partial use in X/Q due to accidental Calvert Cliffs and releases of radiological Grand Gulf materials  b. All other accidents, e.g., 2.2 Grand Gulf explosions, toxic chemical spills, fire, etc. Reactor Building  a. Tendon Gallery 3.8 Grand Gulf (1)
of water within 50 miles of the site.  
[CE 901 (STRUDL)]
[CE 800 (BSAP)]  b. Base Slab Bending 3.8 Grand Gulf (1)
[CE 779 (SAP 1.9)]  c. Containment 3.8 San Onofre Units Wall-Flexure  2 and 3 (1)
[CE 779 (SAP 1.9)]  Reactor Building Internals  a. Secondary Shield Walls 3.8 San Onofre Units
[CE 779 (SAP 1.9)]  2 and 3  b. Refueling Pool 3.8 San Onofre Units (CE 779 (SAP 1.9)]  2 and 3  c. Compartment Analysis 3.8 Grand Gulf (1)
[CE 901 (STRUDL)]  Other Category I Structures  a. Structural Steel Framing 3.8 Grand Gulf Units
[CE 901 (STRUDL)]  1 and 2  b. Reinforced Concrete Analysis 3.8 Grand Gulf Units
[CE 901 (STRUDL)]  1 and 2
[CE 800 (BSAP)]
Rev.0 WOLF CREEK TABLE 1.3-2 (Sheet 2)  Analysis Previously Description and Applicable Reviewed on Other Name USAR Section Projects Seismic 
: a. Impedance Functions for 3.7(B) Palo Verde Layered Soils
[CE 970 (LUCON)]
: b. Floor Response Spectra 3.7(B) None (FLUSH). Although not specifically named, a description of this program is included in BC-TOP-4-A
: c. Seismic Displacement 3.7(B) None Analysis
[CE 933 (FASS)] (DISCOM)


Piping Analysis 
The site vicinity is subject to occasional severe thunderstorms and the
: a. ME-101 3.9(B) Grand Gulf, Farley ME-632


Used to calculate the stresses and loads in piping systems due to restrained thermal expansion; deadweight and seismic anchor movements, and earthquake
possibility of a tornado from early spring until autumn. The world record 42
: b. ANSYS 3.9(B) Grand Gulf, Farley


General static, thermal, and dynamic analysis for linear elastic and plastic analysis
minute rainfall of 12 inches occurred at Holt, Missouri, approximately 120
: c. ME-210 3.9(B) Grand Gulf, Farley


Computes local stresses in piping due to external loads 
miles from the Wolf Creek Site. However, precipitation is generally moderate


Rev. 0 WOLF CREEK TABLE 1.3-2 (Sheet 3)  Analysis Previously Description and Applicable Reviewed on Other Name USAR Section Projects 
throughout the year and snowfall ranges from very little during some winters to
: d. ICES/STRUDL  3.9(B) Grand Gulf, Farley  (CE 901)


Analysis of indeterminate frame structures, both spatial and plane.
substantial during others.  
Used to evaluate reactions, deflections, stresses, and code check


Essential Service Water Vertical Loop Chase  a. Foundation and Substructure 3.8 N/A Walls Analysis (020544.14.01-C-002)  b. Vertical Loop Chase 3.8 N/A  Structural Analysis  (020544.14.01-C-005)  c. ESW Waterhammer 9.2.1.2 N/A  Mitigation Analysis  (EF-M-076) 
The fastest wind, excluding tornadoes was 86 mph.  


(1) Although this program was not necessarily used for analysis of the same structure on another plant,  it was used for similar applications. 
The diffusion climatology is generally favorable due to the frequent passage of  


Rev. 29 WOLF CREEK  TABLE 1.3-4  COMPLIANCE WITH NRC REGULATIONS, 10 CFR  Regulation (10 CFR) Compliance 20.1001(a) This regulation states the general purpose for which  the Part 20 regulations are established and does not impose any independent obligations on licensees.
cyclonic storm systems. The poorest diffusion conditions occur during (1)  


20.1001(b) This regulation describes the overall purpose of the  Part 20 regulations to control the possession, use, and transfer of licensed material by any licensee, so that the total dose to an individual will not exceed the standards prescribed therein. It does not impose any independent obligations on licensees.
nighttime inversions which become most developed during winters and (2)  


20.1101(b) Conformance with the ALARA principle stated in this  regulation is ensured by the implementation of Company policies and appropriate Technical Specifications and health physics procedures.
dominance of the site area by stagnant anticyclonic systems which may persist
Chapters 11.0 and 12.0 of the USAR describe the specific equipment and design features utilized in this effort.


20.1002 This regulation states the general purpose for the  Part 20 regulations and imposes no independent obligations on those licensees to which they apply.  
for several consecutive days, especially during late summer and autumn.  


20.1003 The definitions contained in this regulation are  adhered to in appropriate Technical Specifications and procedures and in applicable sections of the USAR. 20.1004 The units of radiation dose specified in this  regulation are accepted and conformed to in all applicable station procedures. 20.1005 The units of radioactivity specified in this  regulation are accepted and conformed to in all applicable station procedures. 20.1006 This regulation governs the interpretation of  regulations by the NRC and does not impose independent obligations on licensees. 20.1007 This regulation gives the address of the NRC and  does not impose independent obligations on licensees. 
1.2.2 GENERAL ARRANGEMENT OF STRUCTURES


Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 2)  Regulation (10 CFR) Compliance 20.1201 The radiation dose limits specified in this  regulation are complied with through the implementation of and adherence to administrative policies and controls and appropriate health physics procedures developed for this purpose.
The principal structures located on the Wolf Creek Generating Station site are  
Conformance is documented by the use of appropriate personnel monitoring devices and the maintenance of all required records.


20.2104(d) When required by this regulation, the accumulated  dose for any individual permitted to exceed the exposure limits specified in 20.1201 is  determined by the use of Form NRC-4. Appropriate health physics procedures and administrative policies control this process.
listed below.  
: a. Reactor Building - houses the reactor, reactor coolant  piping, steam generators, pressurizer, reactor coolant pumps, accumulators, and the containment air coolers;


20.1204 Compliance with this regulation is ensured through  the implementation of appropriate health physics procedures relating to air sampling for radioactive materials and bioassay of individuals for internal contamination. Administrative policies and controls provide adequate margins of safety for the protection of individuals against intake of radioactive materials. The systems and equipment described in Chapters 11.0 and 12.0 of the USAR provide the capability to minimize these hazards.  
1.2-5 Rev. 27 WOLF CREEK
: b. Auxiliary Building - houses the engineered safety features and nuclear auxiliary systems equipment;
: c. Turbine Building - houses the turbine generator, condensers, main feed pumps, and other power-conversion equipment;
: d. Fuel Building - houses the new fuel storage vault, the fuel storage pool, the fuel handling system, and a portion of the spent fuel pool cooling and cleanup system;
: e. Radwaste Building - houses the radioactive waste treatment facilities and boron recycle system components;
: f. Control Building - houses the main control room, the computer,the Class IE switchgear, the Class IE battery rooms, the access control area, cable spreading rooms, and portions of the main control room emergency ventilation systems;
: g. Storage Tanks - include the condensate storage tank, the refueling water storage tank, the reactor makeup water storage tank, the demineralized water tank, and the emergency fuel oil storage tanks;
: h. Diesel Generator Building - houses the diesel generators and associated equipment;
: i. Transformer Vaults - house oil retaining pits for the main transformers, startup transformer, station service transformer, unit auxiliary transformer, and ESF transformers;
: j. Communication Corridor;
: k. Deleted
: l. Cooling lake and ultimate heat Sink;
: m. Circulating Water Screenhouse - houses traveling screens, service water pumps and strainers, circulating water pumps, fire protection pumps, and chemical injection systems for raw water treatment;
: n. Essential Service Water Pumphouse - houses pumps and strainers for the essential service water system;
: o. Deleted
: p. Hot Machine Shop;
: q. Administration Building;


20.1701 Appropriate process and engineering controls and equipment, as described in Chapters 11.0 and 12.0 of the USAR, are installed and operated to maintain levels of airborne radioactivity as low as reasonably achievable.  
1.2-6 Rev. 28 WOLF CREEK
: r. Shop building;
: s. Materials Center (Warehouse);  
: t. Technical Support Center;
: u. Prescreening and Main Security Buildings;
: v. Covered Walkway;
: w. Education Center (emergency operations facility -
simulator/training complex);
: x. Non Discharging Sewage Lagoon;
: y. Switchyard;
: z. Make-up Water Screenhouse (located below John Redmond Dam);


20.1703 This regulation allows credit in estimating  individual exposures for operators who are wearing respiratory protective equipment. Operating manuals contain procedures that ensure that approved respiratory protection equipment is being properly used and that plant practices are in compliance with Regulatory Guide 8.15, "Acceptable Programs for Respiratory Protection."
aa. Make-up Discharge Structure;


20.1703(c) This regulation prohibits the licensee from  assigning protection factors higher than those specified in Appendix A and allows the Commission to authorize higher protection factors under certain conditions.   
bb. Outage Processing Center;  


Rev. 9 WOLF CREEK  TABLE 1.3-4 (Sheet 3)  Regulation (10 CFR) Compliance  20.1703(a)(2) This regulation requires the licensee to obtain  specific authorization from the NRC in order to make allowance for certain respiratory protection equipment and provides the requirements for the application for such authorization. 20.1703(c) This regulation states the requirements for  respiratory equipment which can be used as emergency devices. 20.1703(d) The proper notification specified by this  regulation will be made to the appropriate authority within the appropriate time limit. 20.1207 Conformance with this regulation is ensured by  appropriate company policies regarding employment of individuals under the age of 18 and the station procedures restricting these individuals' access to the station restricted areas. 20.1301(c) Chapter 11.0 of the USAR provides the information  and related radiation dose assessments specified by this regulation. 20.1301(c) The radiation dose rate limits specified in this  regulation are complied with through the implementation of station procedures, Technical Specifications, and administrative policies which control the use and transfer of radioactive materials. Appropriate surveys and monitoring devices document this compliance. 20.1301(a) Conformance with the limits specified in this  regulation is ensured through the implementation of station procedures and applicable Technical Specifications which provide adequate sampling and analyses and monitoring of radioactive materials in effluents prior to and during their release. The level of radioactivity in station effluents is minimized to the extent practicable by the use of appropriate equipment designed for this purpose, as described in Chapter 11.0 of the USAR. 20.1301(c) The Operating Agent has not and does not currently 20.106(c)        intend to include in any license or amendment application proposed limits higher than those specified in 20.1301(a), as provided for in these  regulations.
cc. Support Building West;
Rev. 9 WOLF CREEK  TABLE 1.3-4 (Sheet 4)  Regulation (10 CFR) Compliance  20.1206 This regulation allows for Planned Special Exposures  that are authorized by the licensee. These exposures are  tracked separately with their own exposure limits. The  lifetime whole body limit for Planned Special Exposure is  25 rem. 20.1302(b)(2) Appropriate allowances for dilution and disper-  sion of radioactive effluents are made in conformance with this regulation, and are described in detail in Chapter 11.0 of the USAR and in appropriate reports required by the Technical Specifications. 20.1301 This regulation provides criteria by which the  Commission may impose further limitations on releases of radioactive materials made by a licensee. It imposes no independent obligations on licensees. 20.1301(a) This regulation states that the provisions of  20.2003 do not apply to disposal of radioactive  material into sanitary sewage systems. It imposes no independent obligations on licensees. 20.1301(d) This regulation pertains to licensees engaged in  Uranium fuel cycle operations and does not apply to WCGS. 20.1002 This regulation clarifies that the Part 20  regulations are not intended to apply to the intentional exposure of patients to radiation for the purpose of medical diagnosis or therapy. It does not impose any independent obligations on licensees. 20.1204 Necessary bioassay equipment and procedures,  including Whole Body Counting, are utilized at the station to determine exposure of individuals to concentrations of radioactive materials.
Appropriate health physics procedures and administrative policies implement this require-ment. 20.1501(a) The surveys required by this regulation are  performed at adequate frequencies and contain such detail as to be consistent with the radiation hazard being evaluated. Applicable health physics procedures require these surveys and provide for their documentation in such a manner as to ensure compliance with the regulations of 10 CFR 20. Rev. 9 WOLF CREEK  TABLE 1.3-4 (Sheet 5)  Regulation (10 CFR) Compliance 20.1502 Applicable health physics procedures set forth  policies and practices which ensure that all individuals are supplied with and required to use appropriate personnel monitoring equipment. Work procedures are established to provide additional control of personnel working in radiation areas and to ensure that the level of protection afforded to these individuals is consistent with the radiological hazards in the work place.  


20.1501 The terminology set forth in this regulation is accepted and conformed to in all applicable station procedures, Technical Specifications, and those portions of the station procedures in which its use is made.
dd. General Office Building
 
ee. Waste Water Treatment Facility;  


20.1501(c) This regulation pertains to personnel dosimeter  processing and evaluation and is conformed to through appropriate Health Physics procedures.
ff. Waste Water Treatment Facility -- houses the recirculation pumps, chemical reagent storage tanks and feedpumps for the wastewater treatment system;


20.1901(a) All materials used for labeling, posting, or  otherwise designating radiation hazards or radioactive materials, and using the radiation symbol, conform to the conventional design pre-scribed in this regulation.  
gg. Waste Water Retention Basins -- two 300,000 gallon open top concrete basins used for retaining and neutralizing secondary regenerative wastewaters prior to discharging to the WCGS cooling lake.  


20.1902(a) This regulation is conformed to through the  implementation of appropriate health physics procedures relating to posting of radiation areas, as defined in 10 CFR Part 20.1501.
hh. Owens Corning Building 
20.1902(b) The requirements of this regulation for "High  Radiation Areas" are conformed to by the imple-mentation of the Technical Specifications and appropriate health physics procedures. The controls and other protective measures set forth in the regulation are maintained under the surveillance of the station Health Physics group.  


20.1902(d) Each Airborne Radioactivity Area, as defined in  this regulation, is required to be posted in accordance with appropriate health physics procedures. These procedures also provide for the surveillance requirements necessary to determine airborne radioactivity levels. 
ii. Cathodic Protection Building (Rectifier Shelter #1)  


Rev. 9 WOLF CREEK  TABLE 1.3-4 (Sheet 6)  Regulation (10 CFR) Compliance 20.1902 The area and room posting requirements set forth in  this regulation pertaining to radioactive materials are complied with through the implementation of appropriate health physics procedures.  
jj. Cable Reel Yard Building


20.1902(e) The container labeling requirements set forth in  this regulation are complied with through the implementation of appropriate health physics procedures.  
kk. X-Ray Building


20.1904(a) The posting requirement exceptions described in  this regulation are used where appropriate and necessary at the station. Adequate controls are provided within the station health physics procedures to ensure safe and proper application of these exceptions.  
ll. Water Treatment Building North


20.1906 All of the requirements of this regulation per-  taining to procedures for picking up, receiving, and opening packages of radioactive materials are implemented by the station procedures and appropriate health physics procedures. These procedures also provide for the necessary documentation to ensure an auditable record of compliance.  
mm. Chemical Addition Building


20.1801 The storage and control requirements for licensed 20.1802 materials in unrestricted areas are conformed to and documented through the implementation of station health physics procedures.
nn. Station Blackout Diesel Generator Missile Barrier oo. Cathodic Protection Building (Rectifier Shelter #2, near Firing Range)  pp. ESWS Vertical Loop Chase - houses both trains of the ESWS vertical loops. NOTE: The above list gives a general use description of the principal


20.2001 The general requirements for waste disposal set  forth in this regulation are complied with through station health physics procedures, the Technical Specifications, and the provisions of the station license. Chapter 11.0 of the USAR describes the solid waste disposal system installed at the station.
structures. The actual name of the structure may differ.
The general arrangement of these and other structures and equipment is shown in


Rev. 9 WOLF CREEK  TABLE 1.3-4 (Sheet 7)  Regulation (10 CFR) Compliance  20.2002 No such application for proposed disposal  procedures as described in this regulation is contemplated. 20.2003 No such plans for disposal of licensed material by  release into sanitary sewage systems as provided for in this regulation are contemplated. 20.2004 No such incineration of licensed material as  provided for in this regulation is contemplated. 20.2005 This regulation pertains to disposal of specific  wastes and is not applicable to WCGS. 20.2006 This regulation provides requirements which are  designed to control transfers of radioactive waste intended for a land disposal facility and establishes a tracking system, in addition to supplementing existing requirements concerning transfer and record keeping. These requirements are met via implementation of appropriate health physics procedures. 20.2101 All of the requirements of this regulation are 20.2103 complied with through the implementation of  appropriate Technical Specifications and health physics procedures pertaining to records of-surveys, radiation monitoring, and waste dis-posal. The retention periods specified for such records are also provided for in these specifications and procedures. 20.2201 The station has established an appropriate  inventory and control program to ensure strict accountability for all licensed radioactive materials. Reports of theft or loss of licensed material are required by reference to the regulations of 10 CFR in the Technical Specifi-cations. 20.2202 Notifications of accidents, as described in this  regulation, are assured by the requirements of the Technical Specifications and appropriate health physics procedures, which also provide for the necessary assessments to determine the occurrence of such incidents.
Figures 1.2-1 through 1.2-43. The site area layout is shown in Figure 1.2-44.
1.2-7 Rev. 29 WOLF CREEK 1.2.3 PRINCIPAL DESIGN CRITERIA


Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 8)  Regulation (10 CFR) Compliance 20.2203 Reports of overexposures to radiation and the occurrence of excessive levels and concentra-tions, as required by this regulation, are provided  for by reference in the Technical Specifications and in appropriate health physics procedures.
The plant was designed so that it could be constructed and operated to produce electric power in a safe and reliable manner. Plant design conforms to applicable codes, standards, and regulations identified in appropriate sections


20.2206 The personnel monitoring required by this regulation is provided for by the Technical Specifications. Appropriate health physics procedures establish the data base from which this report is generated.  
of the USAR.  


20.2206 The report of radiation exposure required by this  regulation upon termination of an individual's  employment or work assignment is generated through the provisions of a station health physics procedure.
The plant was designed, fabricated, constructed, and is operated in such a way


20.2301 This regulation provides for the granting of exemptions from 10 CFR Part 20 regulations, provided that such exemptions are authorized by law and will not result in undue hazard to life or property. It does not impose independent obligations on licensees.
that the release of radioactive materials to the environment is limited to  


20.2302 This regulation describes the means by which the Commission may impose upon any licensee requirements which are in addition to the  regulations of Part 20. It does not impose  independent obligations on licensees.
values less than the limits and guideline values of applicable federal


20.2401 This regulation describes the remedies which the Commission may obtain in order to enforce its regulations, and sets forth those penalties or punishments which may be imposed for violations of its rules. It does not impose any independent obligations on licensees.
regulations pertaining to the release of radioactive materials for normal


26.1-26.11 Subpart A, This subpart prescibes requirements and standards for the establishment, implementation, and maintenance of fitness-for-duty (FFD) programs. 26.21-26.41 Subpart B, This subpart requires the establishment, implementation, and maintenance of FFD progrzms. 26.51-26.71 Subpart C, This subpart specifies the requirements to grant initial authorization, authorization update, authorization reinstatement, or authorization with potentially disqualifying FFD information. 26.73-26.77 Subpart D, This section defines the minimum sanctions that licensees and other entities shall impose when an individual has violated the drug and alcohol provisions of an FFD policy. Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 9)  Regulation (10 CFR) Compliance  26.81-26.119 Subpart E, This subpart contains requirements for collecting specimens for drug testing and conducting alcohol tests by or on behalf of the licensees and other entities. 26.151-26.169 Subpart G, This subpart contains requirements for the HHS-certified laboratories that licensees and other entities who are subject to this part use for testing urine specimens for validty and the presence of drugs and drug metabolites. 26.181-26.189 Subpart H, This subpart contains requirements for determining whether a donor has violated the FFD policy and for making a determination of fitness. 26.201-26.211 Subpart I, This subpart contains requirements for work hour controls and rest-break periods for select categories of workers. 26.709-26.719 Subpart N, This subpart contains the requirements for maintaining records and submitting certain reports to the NRC. 26.821-26.825 Subpart O, This subpart requires the allowance of duly authorized NRC inspectors.
operations, abnormal events, and design basis accidents.  
50.1 This regulation states the purpose of the Part 50 regulations and does not impose any independent obligations on licensees.
50.2 This regulation defines various terms and does not impose independent obligations on licensees.  


50.3 This regulation governs the interpretation of the regulations by the NRC and does not impose independent obligations on licensees.  
The plant was designed in accordance with 10 CFR 50, Appendix A, General Design Criteria for Nuclear Power Plants, as described in Section 3.1.  


50.4 This regulation gives the address of the NRC and does not impose independent obligations on licensees. 50.7 This regulation provides the requirements for employee protection and provides for remedy on the part of the employee who is discriminated against for engaging in certain protected activities as well as the penalty for violation.
1.2.3.1 SNUPPS Design Envelope The Wolf Creek power block was designed and evaluated to the SNUPPS design


Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 10)  Regulation (10 CFR)    Compliance 50.8 This regulation provides the NRC information  collection requirements and specifies associated  OMB approval. 50.9 This regulation provides the requirements for  completeness and accuracy of information provided  by the licensee to the NRC. 50.10 These regulations specify the types of activities 50.11  that may not be undertaken without a license from  the NRC. The Operating Agent does not propose to  conduct any such activities at Wolf Creek without  an NRC license. 50.12 This regulation provides for the granting of  exemptions from 10 CFR Part 50 regulations, provided that such exemptions are authorized by law  and will not endanger life or property or the  common defense and security and are otherwise in  the public interest. It does not impose  independent obligations on licensees. 50.13 This regulation says that a license applicant need  not design against acts of war. It imposes no  independent obligations on licensees. 50.20 These regulations described the types of licenses 50.21 that the NRC issues. They do not address the sub-50.22 stantive requirements that an applicant must sat-50.23 isfy to qualify for such licenses.
envelope which was established by:
50.30 This regulation sets forth procedural requirements for the filing of license applications concerning items such as place of filing, oath or affirmation, number of copies of application, application for operating license, filing fees, and an environmental report. The procedural requirements of this regulation have been met in the license application and will continue to be met for subsequent amendments to the license application.
: a. A design criterion which is conservative for all of the sites, or  
50.31 These regulations permit more efficient organiza  50.32 tion of the license application and impose no independent obligations on licensees.  
: b. The limiting site condition existing at any site for the condition of interest.  


50.33 This regulation requires the licensee's application  to contain certain general information, such as  identification of the applicant, information about the applicant's financial qualifications, and a list of regulatory agencies with jurisdiction over the applicant's rates and services. This information is provided in the operating license application.  
A tabulation of the SNUPPS design envelope is presented in Table 1.2-1.  


Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 11)  Regulation (10 CFR) Compliance  50.33a This regulation requires applicants for  construction permits to submit information required  for the antitrust review. The requirements set  forth by this regulation were satisfied at the time  the application for a construction permit was  submitted. 50.34(a) This regulation sets forth requirements which  govern the content of technical information in the  Preliminary Safety Analysis Report and is relevant  to the construction permit stage. The requirements  of this regulation were satisfied as part of the  construction permit application. 50.34(b) An Updated Safety Analysis Report (USAR) has been  prepared and submitted which addresses in the  chapters indicated the information required:  1. Site evaluation factors - Chapter 2.0  2. Structures, systems, and components - Chapters 3.0, 4.0, 5.0, 6.0, 7.0, 8.0, 9.0, 10.0, 11.0, 12.0, and 15.0
1.2.4 NUCLEAR STEAM SUPPLY SYSTEM The nuclear steam supply system (NSSS) consists of a reactor and four closed reactor coolant loops connected in parallel to the reactor vessel, each loop
: 3. Radioactive effluents and radiation protection  - Chapters 11.0 and 12.0
: 4. Design and performance evaluation - ECCS performance is discussed and shown to meet the requirements of 10 CFR 50.46 in Chapters 6.0 and 15.0
: 5. Results of research program - Section 1.5
: 6. i. Organizational structure - Chapter 13.0    ii. Managerial and administrative controls -
Chapters 13.0 and 17.0. Chapter 17.0 discusses compliance with the quality assurance requirements of Appendix B.


iii. Preoperational testing and initial operations - Chapter 14.0
containing a reactor coolant pump and a steam generator. The NSSS also


iv. Plans for conduct of normal operations -
contains an electrically heated pressurizer and various other auxiliary
Chapters 13.0 and 17.0. Surveillance and periodic testing is specified in the Technical Specifications.
: v. Plans for coping with emergencies -    Emergency Plan.
vi. Technical Specifications


vii. Potential hazards analysis (Appendix 3B)
systems.  
: 7. Technical qualifications - Chapter 13.0
: 8. Operator requalification program - Chapter 13.0 Rev. 23 WOLF CREEK  TABLE 1.3-4 (Sheet 12)  Regulation (10 CFR) Compliance 50.34(c) The  information  required  in  these  sections was 50.34(d) submitted for Wolf Creek pursuant to Paragraph 2.790(d) 10 CFR 2, "Rules of Practice."  This  information includes both the Physical Security Plan and the Safeguards Contingency Plan.  


50.34(e) This regulation requires that the licensee who  prepares a physical security plan, a safeguards  contingency plan, or a guard qualification and  training plan protect the plans and other  Safeguards Information against unauthorized  disclosure in accordance with 10 CFR 73.21. 50.34(f) This regulation provides additional TMI-related  requirements for applicants for a construction  permit whose application was pending as of  February 16, 1982. Wolf Creek is not impacted by  this regulation. 50.34a This regulation sets forth the requirements for including in the construction permit application a description of the design objectives and the preliminary design of equipment to control the  release of radioactive material in nuclear power reactor effluents. The requirements of this regulation were satisfied as part of the construction permit application.
High pressure water circulates through the reactor core to remove the heat


50.35 This regulation is relevant to the construction permit stage rather than the operating license stage.
generated by the nuclear chain reaction. The heated water exits from the  


50.36 Technical Specifications are prepared for implemen-  tation and include 1) safety limits and limiting  safety settings, 2) limiting conditions for operations, 3) surveillance requirements, 4) design features, and 5) administrative controls.
reactor vessel and passes via the coolant loop piping to the steam generators.
Technical Specifications will take the form prescribed by NUREG 0452, Revision 3, dated November 1980 which are the "Standard Technical Specifications for Westinghouse Pressurized Water Reactors."


50.36(a) Radiological Effluent Technical Specifications (RETS) were prepared for implementation as required by this regulation. The RETS have taken the form prescribed by NUREG 0472, Revision 2, dated July 1979. 
Here it gives up its thermal energy to the feedwater to generate steam for the  


Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 13)  Regulation (10 CFR) Compliance 50.36b This regulation allows the NRC to attach to and  incorporate in the license additional conditions to  protect the environment.
turbine generator. The cycle is completed when the water is pumped back to the  
50.37 This regulation requires the applicant to agree to limit access to restricted data. This requirement was satisfied at the time of application for the construction permit.
50.38 This regulation prohibits the NRC from issuing a license to any person who is a citizen, national, or agent of a foreign country or any corporation or other entity which is owned, controlled, or dominated by an alien, a foreign corporation, or a foreign government. The licensees were eligible to apply for and obtain a license as stated in their applications for operating licenses. Therefore, the requirements of this regulation are not  applicable.
50.39 This regulation provides that applications and related documents may be made available for public inspection. This imposes no direct obligations on applicants and licensees.


50.40 This regulation provides considerations to "guide" the Commission in granting licenses, as follows:
reactor vessel. The entire reactor coolant system is composed of leaktight


50.40(a) The design and operation of the facility is to provide reasonable assurance that the health and safety of the public will not be endangered. The basis for the assurance that the regulations will be met and the public protected is contained in  this document and in the license application and  the related correspondence over the years.
components to ensure that all fluids are confined to the system.  
Moreover, the lengthy process by which the plant was designed, constructed, and reviewed, including reviews by the architect-engineer, the NSSS vendor, the licensees individual staffs, and the NRC Staff, provides a great deal of assurance that the public health and safety will not be endangered.  


50.40(b) This regulation requires that the applicant be both technically and financially qualified to engage in the proposed activities as specified in the license application. Technical and financial adequacy of the applicants was determined to be satisfactory during the hearing process at the construction permit stage. Additional information was provided in the operating license application.
The core is of the multiregion type. All fuel assemblies are mechanically


Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 14)  Regulation (10 CFR) Compliance 50.40(c) The issuance of a license to the applicants was not inimical to the common defense and security or to the health and safety of the public. The  individual showings of compliance with particular regulations contained in this section as well as the contents of the USAR and related correspondence on the record, plus the lengthy process of design, construction, and review by the applicants, the architect-engineer, the NSSS vendor, and the government ensure that the license will not be inimical to the health and safety of the public.
compatible, although the fuel enrichment is not the same in all the assemblies.   
Compliance with the requirements in 10 CFR 50.40(a) demonstrated that a license was not inimical to the common defense and security.
50.40(d) The requirements set forth in this regulation were satisfied in that Environmental Reports were submitted in accordance with 10 CFR 51 as part of the operating license application.


50.41 This regulation applies to class 104 licensees, such as those for devices used in medical therapy.
The initial reactor core design for WCGS is essentially identical to the design
The Operating Agent has not applied for a class 104 license, and therefore 50.41 is not applicable.


50.42 This regulation requires the Commission to consider additional standards in determining whether or not a license should be issued, i.e., 1) that the  proposed activities will serve a useful purpose  proportionate to the quantities of special nuclear material or source material to be utilized and 2) that due account will be taken of the antitrust advice provided by the Attorney General.
for the Comanche Peak units (Docket Nos. 50-445 and 50-446).  
Information pertinent to these standards was made known to the Commission at the construction permit stage 1) by the licensing board verification of the need for power and 2) by the Attorney General's satisfactory review of the antitrust information.  


An update of this information was provided with the operating license application, in accordance with Regulatory Guide 9.3.  
1.2-8 Rev. 18 WOLF CREEK In the initial core loading, three fuel enrichments are used. Fuel assemblies


Rev. 0 WOLF CREEK TABLE 1.3-4 (Sheet 15)  Regulation (10 CFR) Compliance 50.43 This regulation imposes certain duties on the NRC and addresses the applicability of the Federal Power Act and the right of government agencies to obtain NRC licenses. It imposes no direct obligations on licensees.
with the highest enrichments are placed in the core periphery, or outer region,  
50.44 10 CFR 50.44 was revised in 2003. The revised 10 CFR 50.44 no longer defines a design-basis LOCA hydrogen release, and eliminates the requirements for hydrogen control systems to mitigate such a release. The installation of hydrogen recombiners and/or vent and purge systems required by 10 CFR 50.44(b)(3) was intended to address the limited quantity and rate of hydrogen generation that was postulated from a design-basis LOCA. The Commission has found that the hydrogen release is not risk-significant because the design-basis LOCA hydrogen release does not contribute to the conditional probability of a large relase up to approximately 24 hours after the onset of core damage. In addition, these systems were ineffective at mitigating hydrogen releases from risk-significant beyond design-basis accidents. License Amendment No. 157 was issued by the NRC on January 31, 2005 and deleted the Technical Specification requirements for the hydrogen recombiners and relocated the requirements for the hydrogen monitors. The WCGS power block combustible gas control system  is described in USAR Section 6.2.5.2. The system is  designed to maintain the hydrogen concentration in containment at a safe level following a LOCA, without purging the containment atmosphere, as specified in 10 CFR 50.44(c).
The system consists of a hydrogen monitoring subsystem, and hydrogen recombiners. Sections 6.2.5.2 and 6.2.5.3 of the USAR describe the hydrogen mixing provisions and indicate that adequate mixing occurs following a LOCA without reliance on the hydrogen mixing fans. Section 6.2.5.2 of the USAR indicates that the recombiners or the hydrogen purge subsystem can be utilized in sufficient time to limit hydrogen concentration following a LOCA to less than 4 volume percent. In accordance with 50.44(d), the hydrogen contribution of the core metal-water reaction is assumed to be that resulting from reaction of 5 percent of the fuel cladding.
50.45 This regulation provides standards for construction permits rather than operating licenses and is therefore not pertinent to this operating license proceeding.
50.46 USAR Section 6.3 describes the emergency core cooling system and the methods used to analyze ECCS performance following the course of an accident. The results of the loss-of-coolant accident analyses presented in USAR Section 15.6.5  demonstrate conformance with 50.46.


Rev. 19 WOLF CREEK TABLE 1.3-4 (Sheet 16)  Regulation (10 CFR) Compliance 50.47 This regulation states that the NRC will not issue an operating license until adequate emergency plans have been assured based upon their evaluation of FEMA's assessments of state and local emergency plans and the NRC's assessment of the onsite emergency plans.
and the two groups of lower enrichment fuel assemblies are arranged in a  
50.48 This regulation governs the fire protection plans required for operating nuclear power plants. USAR Section 9.5 describes the fire protection system designed to provide fire protection in accordance with 10 CFR 50 Appendix A, GDC3. USAR Appendix 9.5A provides a summary of the compliance with NRC Branch Technical Position APCSB 9.5-1, Appendix A. USAR Appendix 9.5B provides a summary of analyses performed to demonstrate that WCGS could meet the requirements of 10 CFR 50, Appendix R.
Table 9.5E-1 of USAR Appendix 9.5E provides a design comparison to 10 CFR 50 Appendix R.


50.49 This regulation provides the requirements for environmental qualification of electrical equipment important to safety for nuclear power plants.
selected pattern in the central region. In subsequent refuelings, some of the fuel assemblies (e.g., one-third) are discharged. The remaining fuel
50.50 This regulation provides that the NRC will issue a license upon determining that the application meets the standards and requirements of the Atomic Energy Act and the regulations and that the necessary notifications to other agencies or bodies have been duly made. It imposes no direct obligations on the  licensees.  


50.51 This regulation specifies the maximum duration of licenses. Compliance will be affected by the Commission's issuing the license in order to comply.
assemblies are, in general, moved to other positions in the core, and fresh
50.52 This regulation provides for the combining in a single license of a number of activities. It imposes no independent obligation on the licensee.
50.53 This regulation provides that licenses are not to be issued for activities that are not under or within the jurisdiction of the United States. The operation of WCGS will be within the United States and subject to the jurisdiction of the United States, as is evident from the description of the facility in Part A of the operating license application.
50.54 This regulation specifies certain conditions that are incorporated in every license issued. Compliance was effected by the inclusion of these conditions in the license when it was issued.
50.54(jj) The regulation changes published in the Federal Register Vol. 79, No. 214, pages 65776 through 65814 on Nov. 5, 2014, relocated previous regulation 50.55a(a)(1) to 50.54(jj). As originally stated with regard to 50.55a(a)(1) and now with regard to 50.54(jj), Section 3.2 of the USAR describes compliance with this regulation. Rev. 29 WOLF CREEK TABLE 1.3-4 (Sheet 17)  Regulation (10 CFR) Compliance 50.55 This regulation addresses conditions of con-struction permits, not operating licenses, and therefore it is not applicable to this applica-tion.


50.55a(a) The regulation changes published in the Federal Register Vol. 79, No. 214, pages 65776 through 65814 on Nov. 5, 2014, relocated standards and other documents incorporated by reference from 50.55a(b) to a new 50.55a(a). Therefore, 50.55a(a) provides guidance concerning the approved edition and addenda of ASME Codes and IEEE Standards that are incorporated by reference in the regulations. Note:  The previous 50.55a introductory text and 50.55a(a)(2), which specified the requirements for systems and components and protection systems for nuclear power reactors, were moved into 50.55a(b), 50.55a(c), 50.55a(d), 50.55a(e), 50.55a(f), 50.55a(g) and 50.55a(h).
fuel assemblies are added to fill out the core.  
50.55a(b)(1) This regulation provides conditions on use of ASME BPV Code Section III.
50.55a(b)(2) This regulation provides conditions on use of ASME BPV Code Section XI  50.55a(b)(3) This regulation provides conditions on use of ASME OM Code. 50.55a(b)(4) This regulation provides conditions on use of ASME BPV Code Section III Code Cases for design, fabrication and materials. 50.55a(b)(5) This regulation provides conditions on use of ASME BPV Code Section XI Code Cases for inservce inspection and repair/replacement activities. 50.55a(b)(6) This regulation provides conditions on use of ASME OM Code Code Cases.
50.55a(c) This regulation provides the code requirements for components which are part of the reactor coolant pressure boundary and for components which are connected to the reactor coolant system, including inservice inspection requirements.  


Rev. 29 WOLF CREEK TABLE 1.3-4 (Sheet 18)  Regulation (10 CFR) Compliance Design and fabrication of the reactor vessel, reactor coolant system piping, reactor coolant pumps, and reactor coolant system valves were carried out in accordance with ASME Section III as described in Section 5 of the USAR.
Rod cluster control assemblies, which consist of clusters of cylindrical
50.55a(d) These regulations apply to nuclear power plants 50.55a(e) whose application for a construction permit was docketed after May 14, 1984.


50.55a(f) Inservice testing (IST) requirements delineated in this part are specified in the Technical Specifications.  
absorber rods, are used for controlling core reactivity. The absorber rods


50.55a(g) Inservice inspection (ISI) requirements delineated in this part are specified in the Technical Requirements Manual and Inservice Inspection Program.
move within guide tubes in certain fuel assemblies. Each absorber rod is
50.55a(z) The regulation changes published in the Federal Register Vol. 79, No. 214, pages 65776 through 65814 on Nov. 5, 2014, relocated te allowance for proposed alternatives contained in the previous 50.55a(a)(3) to a new paragraph 50.55a(z). 50.55a(z) allows for proposed alternatives to 50.55a paragraphs (b), (c), (d), (e), (f), (g), and (h).
50.55(h) As discussed in Chapter 7.0, Section 7.1, the protection systems meet IEEE 279-1971.
50.55b This regulation has been revoked. 43 Fed. Reg. 49775.  


50.56 This regulation provides that the Commission will, in the absence of good cause shown to the contrary, issue an operating license upon completion of the construction of a facility in compliance with the terms and conditions of the construction permit.
attached to a spider connector above the core. The spider connector is
This imposes no independent obligations on the applicant.  


50.57(a) This regulation required the Commission to make certain findings prior to the issuance of the operating license.
attached to a drive shaft, which may be raised and lowered by a drive mechanism


50.57(b) The license, as issued, contains appropriate conditions to ensure that items of construction or modification were completed on a schedule acceptable to the Commission.
mounted on the reactor vessel head. The rod cluster control assemblies drop into the core under the effect of gravity when a reactor trip (SCRAM) occurs.
Supplementary reactivity control is provided by boric acid dissolved in the  


50.57(c) This regulation provided for a low-power testing license.  
reactor coolant water.  


50.58 This regulation provided for the review and report of the Advisory Committee on Reactor Safeguards.
The reactor coolant pumps are Westinghouse Model 93Al vertical, single stage,


50.59 This regulation provides for the licensing of certain changes, tests, and experiments at a licensed facility. Technical Specifications and procedures provide implementation of this regulation. Rev. 29 WOLF CREEK TABLE 1.3-4 (Sheet 19)  Regulation (10 CFR) Compliance  50.60 This regulation provides the acceptance criteria for fracture prevention measures for nuclear power reactors during normal operation. Section 5.3 of the USAR details vessel material parameters in terms of the fracture toughness requirements set forth in Appendices G and H of 10 CFR 50.
centrifugal pumps of the shaft-seal type. WCGS was one of the first domestic
50.61 This regulation provides the fracture toughness requirements for protection against pressurized thermal shock events. Fracture toughness for the reactor pressure vessel is addressed in Section 5.3 of the USAR.
Compliance with Regulatory Guide 1.99 is addressed in Appendix 3A of the USAR.
50.62 This regulation specifies the requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-water nuclear power plants.
50.63 This regulation pertains to the Station Blackout rule.


50.64 This regulation pertains to non-power reactors only and is not applicable to WCGS.  
operating units to utilize Model 93Al reactor coolant pumps. However,


50.65 This regulation requires the implementation of a program to  monitor the effectiveness of maintenance programs by monitoring  performance of plant SSCs. Plant procedures implement and  control this program.
Westinghouse Model 93Al pumps were previously reviewed by the NRC in


50.68 This regulation provides the licensee with eight requirements that may be complied with in lieu of compliance with 10CFR70.24 for criticality monitoring.
conjunction with the RESAR-3S application (Docket No. STN-50-545). A Safety
WCGS complies with this regulation.
50.70 The Commission has assigned resident inspectors to WCGS and space was provided in conformance with 50.70(b)(1) through (3).  


50.71 Records are and will be maintained and reports will be made in accordance with the requirements of sections (a) through (e) of this regulation and the license.
Evaluation Report (NUREG-0104) and Preliminary Design Approval (PDA-7) were


50.72 This regulation provides the immediate notification requirements for operating nuclear power reactors.
issued on RESAR-3S in December 1976. In addition, the Model 93Al reactor


50.73 This regulation requires the licensee to submit Licensee Event Reports for certain specific events.
coolant pumps are similar to the Model 93A pumps used in the Comanche Peak


50.74 This regulation requires the licensee to notify the NRC pertaining to a change in Reactor Operator or Senior Reactor Operator status.  
units (the major difference is the flow capacity as indicated in Table 1.3-1).


50.78 This regulation pertains to holders of construction permits and does not apply to WCGS.  
The pumps utilized at WCGS are identical to those used at Callaway.  


50.80 This regulation provides that licenses may not be transferred without NRC consent. No application for transfer has been made by the WCGS Licensees. Rev. 29 WOLF CREEK TABLE 1.3-4 (Sheet 20)  Regulation (10 CFR) Compliance 50.81 This regulation permits the creation of mort-gages, pledges, and liens on licensed facilities, subject to certain provisions. The regulation prohibits secured creditors from violating the Atomic Energy Act and the Commission's regulations.
The steam generators are Westinghouse Model F vertical U-tube units, which contain thermally treated Inconel tubes. The Model F steam generator includes


50.82 This regulation provides for the termination of licenses. It does not apply to WCGS because no termination of licenses has been requested.  
features (discussed in detail in Section 5.4.2) such as improved tube support


50.90 This regulation governs applications for amend-ments to licenses. Future request for license amendments will be made in accordance with these requirements.
plate design and high circulation ratio, which are designed to minimize most


50.91 This regulation provides guidance to the NRC regarding no significant hazards considerations, notices for public comment and state consultation.
forms of corrosion, sludge buildup, and chemical attack. Integral moisture


50.92 This regulation provides guidance to the NRC in issuing license amendments including no significant hazards consideration determinations.
separation equipment reduces the moisture content of the existing steam to one-


50.100 These regulations govern the revocation, suspen-50.101 sion, and modification of licenses by the Com-50.102 mission under unusual circumstances. No such 50.103 circumstances are present and these regulations are not applicable.
quarter percent or less. WCGS was the second domestic operating unit to


50.109 This regulation specifies the conditions under which the NRC may require the backfitting of a facility. This regulation imposes no independent obligations on a licensee unless the NRC proposes a backfitting requirement and, therefore, this regulation is not applicable.
utilize Model F steam generators, (Callaway was the first domestic operating


50.110 This regulation governs enforcement of the Atomic Energy Act, the Energy Reorganization Act of 1974, and the NRC's regulations and orders. No enforcement action is at issue and, therefore, this regulation is not applicable.  
unit to utilize the Westinghouse Model F steam Generator). Westinghouse Model


50.120 This regulation provides guidance for the training and qualifications of Nuclear Power Plant Personnel.
F steam generators were previously reviewed by the NRC in conjunction with the  
This regulation establishes the requirements for a training program. Appropriate procedures control this program.


Appendix A USAR Section 3.1 discusses the extent to which the design criteria for the WCGS's plant structures, systems, and components important to safety comply with Title 10, Code of Federal Regulations, Part 50 (10 CFR 50), Appendix A, "General Design Criteria for Nuclear Power Plants" (GDC). As presented in Section 3.1, each criterion is first quoted and then discussed in enough detail to demonstrate SNUPPS' compliance with each criterion. In some cases, detailed evaluations of compliance with the various general design criteria are incorporated in more appropriate USAR sections, and are located by reference. Rev. 29 WOLF CREEK TABLE 1.3-4 (Sheet 21) Regulation (10 CFR) Compliance Appendix B Chapter 17.0 describes in detail the provisions of the operating Quality program which have been implemented to meet all applicable requirements of Appendix B.  
Sundesert PSAR application (Docket Nos. 50-582 and 50-583). An interim Safety


Appendix C This appendix provides a guide for establishing an applicant's financial qualifications. Financial qualifications were established at the construction permit stage, and it was found that there is reasonable assurance that the funds needed to operate the facility in compliance with the Commission's regulations are available. 
Evaluation Report (NUREG-0469) was issued on the Sundesert PSAR application in  


Updated information addressing financial quali-fication was submitted with the operating license application.  
October 1978.  


Appendix D This appendix has been superseded by 10 CFR Part
1.2-9 Rev. 5 WOLF CREEK Essentially all of the metal surfaces in contact with the reactor water are stainless steel, except the steam generator tubes (Inconel), fuel assembly skeleton (stainless steel, Inconel and zirconium ally) and fuel rod cladding (zirconium ally).  
: 51. As noted in the discussion for 10 CFR 50.40(d), the requirements of Part 51 have been satisfied.  


Appendix E This appendix specifies requirements for emer-gency plans. Emergency plans were developed to provide reasonable assurance that appropriate measures can and will be taken in the event of an emergency to protect the public's health and safety and prevent damage to property. The new criteria for emergency planning developed subsequent to the event at Three Mile Island, Unit 2 were factored into the emergency plans for the WCGS utilities. The Emergency Plan and associated facilities (EOF and Alternate TSC) were updated in 2011 to comply with revised regulations pertaining to "Enhancements to Emergency Preparedness Regulations" (Reference Section 18).
An electrically heated pressurizer connected to one reactor coolant loop
Appendix F This appendix applies to fuel reprocessing plants and related waste management facilities, not to power reactors such as those found in WCGS plants and is, therefore, not applicable.


Appendix G Fracture toughness compliance can be found in USAR Section 5.3.1.5. Assurance of adequate fracture toughness of ferritic materials in the reactor coolant pressure boundary (ASME Code, Section III, Class 1 components) is provided by compliance with the requirements for fracture toughness testing included in NB-2300 to Section III of the ASME Code and Appendix G of 10 CFR 50.
maintains reactor coolant system pressure during normal operation and limits


Appendix H Reactor vessel material surveillance program requirements are delineated in this part. Technical Specifications and operating procedures have been established to implement their requirements.
pressure variations during plant load transients. The pressurizer utilized at
Further information is provided in USAR Chapter 5.0.  


Rev. 28 WOLF CREEK TABLE 1.3-4 (Sheet 22)  Regulation (10 CFR) Compliance Appendix I This appendix provides numerical guides for design objectives and limiting conditions for operation to meet the criteria "as low as is reasonably  achievable" for radioactive material in light water-cooled nuclear power reactor effluents. USAR Chapters 2.0, 11.0, and 12.0 discuss the extent to which the criteria for Appendix I are met.  
WCGS is essentially identical to those utilized in the Comanche Peak units, Callaway and many other facilities that are currently in operation.  


Appendix J Reactor containment leakage testing for water-cooled power reactors is delineated in this appendix. These requirements are given in the Technical Specifications. Additional information concerning compliance can be found in USAR Chapter  6.0, Sections 6.2.3 and 6.2.6.
Auxiliary system components are provided to charge makeup water into the  
Appendix K This appendix specifies features of acceptable ECCS evaluation models. As stated in USAR Section 6.3, the ECCS subsystem functional parameters are integrated so that the Appendix K requirements are met over the range of anticipated accidents and single failure assumptions.


In addition, the ECCS evaluation model used to demonstrate conformance with 10 CFR 50.46 (see USAR Section 15.6.5) is in conformance with Appendix K requirements.
reactor coolant system, purify reactor coolant water, provide chemicals for


Appendix L This appendix identifies the information required  to be submitted by the applicant to the Attorney  General to satisfy the requirements when applying for a facility license. The requirements of this appendix were satisfied prior to the time of application for the operating license.
corrosion inhibition and reactivity control, cool system components, remove


Appendix M This appendix lists guidelines for the licensing of plants whose site requirements are not considered in the design of the plant structures. Since all WCGS sites are considered in the plant design, this appendix is not applicable.
decay heat when the reactor is shut down, and provide for emergency safety


Appendix N This appendix dictates the requirements applicable to duplicate plant designs on multiple sites. As allowed in this regulation, WCGS used a common Safety Analysis Report prior to issuance of the first update after receipt of the Operating License; however, where site specific needs were addressed Addenda were included for reference. The two reports have been merged into one Wolf Creek Specific Safety Analysis Report.  
injection.  


Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 23)  Regulation (10 CFR) Compliance Appendix 0 Appendix 0 dictates guidelines for the Staff in reviewing standardization of design. No inde-pendent obligation on the licensee is required.
1.2.5 ENGINEERED SAFETY FEATURES AND EMERGENCY SYSTEMS 1.2.5.1 Containment 1.2.5.1.1 Containment Structure
Appendix P Reserved.  


Appendix Q Appendix Q dictates guidelines for the staff in early review of the site and does not deal with operating license review.  
The containment structure is a prestressed, post-tensioned concrete structure with a cylindrical wall, a hemispherical dome, and a flat foundation slab. The


Appendix R Appendix R delineates the fire protection program for nuclear power facilities operating prior to January 1, 1979. Appendix 9B of the USAR provides  a summary of analyses performed to demonstrate that  WCGS could meet the requirements of Appendix R.
wall and dome form a prestressed, post-tensioned system consisting of  
Table 9.5E-1 of the USAR appendix 9.5E provides a design comparison of WCGS to Appendix R.


51.1 This regulation states the general purpose and scope for which the Part 51 regulations are established and does not impose any independent obligations on licensees.
horizontal tendons in the wall and inverted U-shaped vertical tendons in the  


51.2 This regulation specifies that Subpart A of Part 51 implements section 102(2) of the NEPA act of 1969, as amended.  
wall and dome. The foundation slab is reinforced with carbon steel. The


51.3 This regulation states that in any conflict between  the general rule and Subpart A of Part 51 (or other  applicable part of this chapter) the special rule governs.
inside surface of the structure is lined with a carbon steel liner to ensure a


51.4 The definitions contained in this regulation are adhered to in all appropriate documents.
high degree of leaktightness. The containment structure completely encloses


51.5 This regulation governs the interpretation of regulations and does not impose independent obligations on licensees. This regulation specifies that interpretations of the regulations in Part 51 are not authorized other than a written interpretation by the General Counsel.
the reactor and reactor coolant system, i.e, the reactor pressure vessel, the  


51.6 This regulation specifies the authority of the NRC in granting exemptions and does not impose independent obligations on licensees.
steam generators, the reactor coolant loops and portions of the associated


Subpart A 51.10 This regulation provides the purpose and scope of Subpart A which is to implement Section 102(2) of the National Environmental Policy Act (NEPA) in a manner consistent with NRC's domestic licensing and regulatory authority.
auxiliary systems, the pressurizer, accumulator tanks, and associated piping,


Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 24)  Regulation (10 CFR) Compliance 51.11 [Reserved]  51.12 This regulation states that subpart A applies to  the NRC's ongoing environmental work and does not  require retroactive measures for environmental  reports or supplements filed prior to June 7,  1984. This regulation does not impose independent  obligations or licensees. 51.13 This regulation permits the NRC to take immediate  action in emergencies where the health and safety  of the public may be adversely affected without  observing the NEPA regulations. This regulation  does not impose independent obligations on  licensees. 51.14 This regulation provides a pertinent definitions  related to NEPA which are adhered to in all  appropriate documents. 51.15 This regulation provides the requirements for  establishing time schedules for NRC-NEPA processes. 51.16 This regulation provides the requirements for the submittal of proprietary information. 51.17 This regulation indicates that the NRC has  submitted the information requirements to OMB  related to this part of the Code of Federal  Regulations. 51.20 This regulation sets forth the requirements for an  applicant for filing an Environmental Impact  Report. These requirements were satisfied during  the review of the Environmental Reports that were  submitted with the application for a construction  permit and the application for an operating  license. 51.21 This regulation specifies that all licensing and  regulatory actions subject to Part 51 require an  environmental assessment except those identified in  51.20(b) as requiring an environmental impact  statement and those identified in 51.22(c) as  categorical exclusions. 51.22 This regulation sets forth the criterion for an  identification of licensing and regulatory actions  eligible for categorical exclusion. 
described in Section 1.2.4. The design ensures that the containment structure is protected against postulated missiles from both equipment failures and external sources. The containment design provides means for the integrated


Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 25)  Regulation (10 CFR) Compliance 51.23 This regulation indicates that the NRC will require no environmental reports, impact statements, assessments or other analyses in connection with  issuance of license amendment for storage of spent fuel up to 30 years beyond the expiration of
leak rate testing of the containment structure and for local leak rate testing


reactor operating license.51.25 This regulation states than an appropriate NRC staff director will determine when a categorical exclusion environmental impact statement or environment assessment should be prepared.  
of individual piping, electrical, and access penetrations of the containment.


51.26 This regulation states that when an NRC staff  director determines that an environmental impact  statement will be prepared a notice of intent will be published in the Federal Register and a scoping process will be conducted.  
For details, refer to Chapters 3.0 and 6.0.  


51.27 This regulation describes the requirements for the Notice of Intent as required by 10 CFR 51.26.
The containment structure design is the same standard state-of-the-art design


51.28 This regulation specifies who the NRC staff director shall invite to participate in the scoping process for an environmental impact statement.  
that has been applied to several other Bechtel-designed plants. The basic


51.29 This regulation provides the requirements for the scoping process for an environmental impact statement. 51.30 This regulation sets fourth the requirements for an environmental assessment by the NRC.
structure is similar to the containment structures at Farley, Palo Verde, and


51.31 This regulation states that the NRC staff director will make the determination (based upon environmental assessments) whether to prepare an environmental impact statement or a finding of no significant impact.  
Turkey Point and identical to the structure at Callaway.  


51.32-51.35 These regulations provide the requirements for a finding of no significant impact by the NRC.  
1.2-10 Rev. 18 WOLF CREEK 1.2.5.1.2 Containment Spray System


51.40 This regulation provides guidance to prospective applicants or petitioners for rulemaking for consultation with the NRC staff.5
The containment spray system is one of the two independent pressure-reducing


51.41 This regulation gives the NRC authority to require  permit or license applicants amendment applicants  or petitioners to submit information useful in aiding NRC compliance with Section 102(2) of NEPA. 
systems and is operated in conjunction with the containment fan coolers to  


Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 26)  Regulation (10 CFR) Compliance 51.45-51.69 These regulations set fourth the requirements for environmental reports.
provide adequate cooling of the containment atmosphere following a LOCA. Two of the four fan coolers and one of the two containment spray pumps operating
51.70-51.125 These regulations set fourth the requirements for environmental impact statements.


Appendix A to Subpart A This Appendix to Part 51 Subpart A provides the format for presentation of material in environmental impact statements.
are sufficient to cool the containment atmosphere. This reduces the pressure


55.1-55.71 These regulations set forth the requirements for  nuclear power plant operator's licenses.
inside the containment, thus minimizing the release of radioactivity from the  
70.1 This regulation states the general purpose for which Part 70 regulations are established and does not impose any independent obligations on  licensees.


70.2 This regulation states the general scope of Part 70 and does not impose any independent obligations on licensees.  
structure.  


70.3 This regulation gives the Commission the power to authorize licenses for the shipment and possession of special nuclear material.
The containment spray system supplies borated water to cool the containment
70.4 The definitions contained in this regulation are  adhered to in all appropriate documents.


70.5 This regulation sets forth the requirements for communications with the NRC regarding special nuclear materials and includes with addresses for the Director, Office of Nuclear material Safety and Safeguards.  
atmosphere. The pumps take suction from the refueling water storage tank.


70.6 This regulation governs the interpretation of regulations and does not impose any independent obligations on licensees.
When the storage tank supply is depleted, suction of the pumps is aligned to


70.7 This regulation prohibits discrimination against and otherwise protects employees of all licensee  engaged in certain protected activities. 
pump water from the containment sump directly into the containment during the


Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 27)  Regulation (10 CFR) Compliance 70.8 This regulation sets forth the information collection requirements and specifies OMB approval.
recirculation mode of operation. Sodium hydroxide is added to the spray to remove iodine from the containment atmosphere in the post-LOCA condition.  
70.9 This regulation addresses the completeness and accuracy of information provided to the NRC.  


70.11 - These regulations specify those persons exempted 70.14 from complying with Part 70. The licensees are not exempt from complying with the applicable requirements of Part 70.
The containment spray system is similar in design and function to the reactor


70.15 Reserved.
building spray system at the Midland Plant, Units 1 and 2. Although the WCGS  
70.18 - These regulations list types of licenses issued  70.20b for special nuclear material. WCGS adhered to all applicable requirements.


70.21 This regulation sets forth the requirements concerning the filing of special nuclear material license applications. The requirements of this regulation were satisfied.
containment spray system utilizes two containment sumps, versus one for


70.22 This regulation sets forth the requirements concerning the contents of special nuclear material license applications. The requirements of this regulation were satisfied.  
Midland, both systems function under equivalent conditions. The WCGS containment spray system is identical to the system used at Callaway.
1.2.5.1.3 Containment Cooling System


70.23 This regulation defines the requirements for the approval of an application for a license to possess  special nuclear material. It does not impose independent obligations on licensees.
The containment fan cooler system is the second of the two independent  


70.24 This regulation requires licensees to install monitors which have the capability of initiating audible alarms in the event of accidental criticality. On June 24, 1997, the NRC issued to  WCNOC an exemption from the requirements of 10CFR70.24. On November 12, 1998 the NRC issued 10CFR50.68, which  provides eight criteria that may be followed in lieu of criticality monitoring per 10CFR70.24 and revised  10CFR70.24 to make any exemption ineffective so long  as the licensee elects to comply to 10CFR50.68. 70.31 This regulation lists guidelines for the Com-mission to follow in issuing a license.
pressure-reducing systems. The system consists of four fan cooling units. The operation of two of these units and one of the containment spray pumps is


70.32 This regulation defines the conditions by which the  licensee must abide in order to keep the special nuclear materials license. The health physics program found in Chapter 12.0, Section 12.5 provides information relating to the compliance of this regulation.
sufficient to meet the design requirements for containment depressurization


Rev. 13 WOLF CREEK TABLE 1.3-4 (Sheet 28)  Regulation (10 CFR) Compliance 70.33 - These  regulations  dictate  procedural  require-70.35 ments for renewing or amending a license. The Operating Agent shall follow these guidelines when  the need to renew or amend arises.
after a postulated LOCA. Containment atmosphere is drawn through the fan


70.36 This regulation prohibits the transfer of the license. No such transfer is planned by WCGS.
cooler units to cool the air and condense steam from the containment atmosphere


70.37 This is a disclaimer of warranty and does not affect the Licensees.  
after a LOCA. During normal plant operation, three fan cooler units are


70.38 This regulation sets forth the requirements for  expiration and termination of licenses. 70.39 This regulation sets guidelines for the manu-facture of source material and does not apply to power units such as WCGS.
required to remove sensible heat generated from equipment inside the  
70.41 This regulation provides the requirements for  authorized use of special nuclear material. 70.42 This regulation provides guidance on the transfer  of special nuclear material. WCGS follows these  guidelines as appropriate. 70.44 This regulation sets forth the requirements in regard to creditors concerning special nuclear material. Information concerning creditors has been included, as applicable, in the information  submitted with the operating license applica-tions. The primary financial constituents have been identified and their relationships described.


70.51 This regulation sets forth the requirements in regard to licensees of special nuclear material that require them to maintain records and establish procedures for inventory of special nuclear material. At such a time when this regulation applies, records will be established and kept and  procedures established to satisfy this regulation.
containment and maintain the containment atmosphere below 120 F.  
70.52 This regulation sets forth the requirements concerning reporting procedures in the event of an accidental criticality, loss or theft or attempted theft of special nuclear material. When applicable, the requirements of this regulation will be satisfied.  


Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 29)  Regulation (10 CFR) Compliance 70.53 This regulation sets forth the requirements for submitting Material Status Reports. Where applicable, proper procedures were developed and  submitted to properly account for quantities of special nuclear material and to describe appropriate actions that should be taken in the event that material is unaccounted for.
The containment cooling system design is a state-of-the-art design used


70.54 This regulation sets forth the requirements for the reporting of special nuclear material transfers in the Nuclear Material Transaction Report. When applicable, the proper transfer documentation will be completed. 70.55 This regulation sets forth the requirements regarding the responsibilities of the licensees with respect to affording support and access to NRC inspection personnel. Provisions have been made to satisfy the requirements of this regulation in conjunction with granting approval on an application for license for special nuclear material.
throughout the nuclear industry. Components of the containment cooling system are similar in design and function to individual components that are used in the containment cooling systems at Farley, Palo Verde, and Midland and are


70.56 This regulation sets forth the requirements for testing the administration of the regulations in 10 CFR 71.  "The Operating Agent will support such testing to the extent practicable under the regulation."  70.57 This regulation sets forth the requirements for operations other than those involved in the operation of a nuclear reactor licensed to Part 50, waste disposal operations or sealed sources. No  such operations are contemplated; therefore, the requirements of this regulation are not applicable.  
identical to components used in the system at Callaway.  


70.58 This regulation sets forth the requirements concerning use of special nuclear material other than licensed by Part 50 and in a waste disposal operation and as sealed sources.  
1.2-11 Rev. 1 WOLF CREEK 1.2.5.1.4 Combustible Gas Control Systems


No such use is contemplated; therefore, the re-quirements of this regulation are not applicable. 70.59 This regulation sets forth the requirements for effluent monitoring reporting for special nuclear material. This regulation pertains to fuel pro-cessing and fabrication and is not applicable to a utilization facility.
Control of combustible gases in the containment following a LOCA is provided by


Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 30) Regulation (10 CFR) Compliance 70.61 These regulations allow the Commission to revoke 70.62 any license for special nuclear material. It does not impose independent obligations on licensees.
two 100-percent-capacity electric (thermal) hydrogen recombiners located within the containment, which maintain the post-LOCA hydrogen concentration in the  


70.71 This regulation governs enforcement of the Atomic Energy Act, the Energy Reorganization Act of 1974, and the NRC's regulations and orders. No enforcement action is at issue and, therefore, this regulation is not applicable.  
containment atmosphere below the lower flammability limit.  


Subpart A 71.0 This regulation establishes the purpose, scope and  applicability for the Part 71 regulations and does  not impose any independent obligations on  licensees . 71.1 This regulation provides the address for  communications with the NRC. 71.2 This regulation states that only written  interpretations of Part 71 by the NRC's General  Counsel are binding.
A hydrogen purge subsystem is also provided for combustible gas control as a
71.3 This regulation prohibits delivery or transport of licensed material, except as authorized by the Commission.


71.4 The definitions contained in this regulation are adhered to in all appropriate documents.  
backup system.  


71.5 This regulation specifies that transportation of licensed materials be done per the requirements of the Department of Transportation and Postal Service. This regulation shall be complied with per the revision of March 25, 1980.
The combustible gas control system including the hydrogen recombiner system,  


71.6 This regulation states the information collection  requirements submitted for OMB approval. 71.6a This regulation governs the completeness and accuracy of information provided to the NRC. Subpart B 71.7-71.10 These regulations delineate the exemptions from  Part 71. 
hydrogen monitoring system, and the hydrogen purge system has components that


Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 31)  Regulation (10 CFR) Compliance  Subpart C 71.12 This regulation issues a general license for  shipment in certain NRC approved containers and  packages provided the licensee has an approved QA program. QA programs for WCGS are filed with the NRC during the operations phase as part of the license application. 71.13-71.24 These regulations set forth the general license  requirements for shipments in specific packages or  contains under a general license. Subpart D 71.31-71.39 These regulations provide the requirements for an  application for a proposed packaging design  including the contents of the application, package  description, package evaluation, and quality  assurance requirements. Subpart E 71.41-71.65 These regulations provide the requirements for  packaging radioactive material for transport. Compliance with each of the individual parts and  paragraphs was demonstrated in the license  application proceedings. These requirements of  these regulations are referenced as the standards. Subpart F 71.71-71.77 These regulations address the testing requirements  for packages, containers and special form  radioactive materials. Subpart G 71.81-71.99 These regulations provide various operating  controls and procedures pertinent to the transport  and packaging of radioactive materials. Subpart H 71.101-71.137 These regulations set forth the quality assurance  requirements applying to design, purchases,  fabrication, handling, shipping, storing, cleaning,  assembly, inspection, testing, operation,  maintenance, repair and modification of components  of packaging (for radioactive materials) which are  important to safety. Appendix A  This regulation establishes the procedure for  obtaining activity values A and A2 to be used in  packaging and shipping processes. Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 32)  Regulation (10 CFR) Compliance  73.1 This regulation states the general purpose and scope of Part 73 and does not impose independent obligations on the licensee. 73.2 The definitions contained in this regulation are adhered to in all appropriate documents. 73.3 This regulation governs the interpretation of regulations by the NRC and does not impose independent obligations on licensees. 73.4 This regulation gives the address of the NRC and does not impose any independent obligations on licensees. 73.5 This regulation allows the Commission to grant exemptions as long as they will not endanger life or property or the common defense and security. It does not impose independent obligations on licensees. 73.6 This regulation enumerates specific exemptions, including an exemption for the following: U-235 contained in uranium enriched to less than 20 percent in the U-235 isotope. Since this is the  only special nuclear material for which WCGS is  currently licensed, it is exempt from the  requirements of 73.20, 73.25, 73.26, 73.27, 73.45,  73.46, 73.70, and 73.72. This regulation sets  forth the information requirements established by  the Commission and specifies OMB approval. 73.8 This regulation specifies the information  collection requirements and submitted for OMB  approval. 73.20 The licensee is exempt from the requirements of this regulation. See 73.6. 73.21 This regulation sets forth the requirements for the  protection of safeguards information. These  requirements are addressed by the WCGS Site  Security Plan. 73.24 This regulation sets forth the requirements concerning transport of special nuclear material in passenger aircraft and in quantities in excess of formula quantities. Shipments of special nuclear material use the requirements of this regulation for reference when such requirements are applicable. Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 33)  Regulation (10 CFR) Compliance  73.25 - The licensee is exempt from the requirements of 73.27 these regulations. See 73.6. 73.30 - These requirements have been deleted.
are similar in design and function to the combustible gas control system used  
73.36  73.37 This regulation sets forth the requirements  regarding physical protection during the transport  of irradiated reactor fuel. 73.40 This regulation sets forth the requirements regarding the establishment of and maintenance of physical security systems that provide physical protection against radiological sabotage and against theft of special nuclear material at fixed sites. Physical security systems are  provided and maintained to provide adequate physical protection against sabotage and theft of special nuclear material. In addition, a safeguards contingency plan was prepared in accordance with the criteria in Appendix C of this part, submitted for Commission approval and implemented. 73.45 The licensee is exempt from the requirements of 73.46 these regulations. See 73.6. 73.50 This regulation sets forth the requirements for physical protection of licensed activities at other than nuclear power reactors. 73.55 This regulation sets forth the requirements for physical protection of licensed activities in nuclear power reactors against radiological sabotage. Features were implemented to provide for physical barriers, access control, detection aids, and communications along with a physical security organization that ensures physical protection. The requirements, as prescribed by this regulation, has been satisfied to the extent practicable. 73.57 This regulation establishes the requirements for  Criminal History Checks of individuals granted  unescorted access to a nuclear power facility or  access to Safeguards Information by power reactor  licensees. These requirements are addressed in the  WCGS Site Security Plan. 73.60 This regulation applies to non-power reactors and thus does not apply to WCGS.
Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 34)  Regulation (10 CFR) Compliance 73.67 This regulation sets forth licensee fixed site and in-transient requirements for the physical protection of special nuclear material of moderate and low strategic significance. The requirements of this regulation will be met in a manner similar to that described in the response to Paragraph 73.55.


73.70 This regulation sets forth the requirement for records for licensees subject to various Para-graphs in part 73. At this time the licensee  is exempt from the requirements of this regulation  (See 73.6).
at Midland Plant, Units 1 and and 2.
73.71 This regulation sets forth requirements for reporting unaccounted for shipments, suspected theft, unlawful diversion, or radiological sabotage. The requirements of this regulation will be followed at such time as they become applicable. 73.72 This regulation sets forth the requirements for making advanced notice of shipment of special nuclear material. At this time the Licensee is  exempt from the requirements of this regulation  (See 73.6). 73.73 This regulation establishes the requirements for  advance notice and protection of export shipments  of special nuclear material of low strategy  significance and does not apply to WCNOC since it  is not licensed to export special nuclear material. 73.74 This regulation establishes the requirements for  advance notice and protection of import shipments  of nuclear materials from countries that are not  party to the Convention of Physical Protection of  Nuclear Material. It does not apply to WCNOC since  it is not licensed to import special nuclear  material. 73.80 This regulation governs enforcement of the Atomic Energy Act, the Energy Reorganization Act of 1974, and the NRC's regulations and orders. No enforcement action is at issue and so this regulation is not applicable. Appendix A This appendix groups each state into regions to be supervised by the USNRC Inspection and Enforcement and requires no obligations by the licensee.
The hydrogen recombiners utilized at WCGS are essentially identical to those
Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 35)  Regulation (10 CFR) Compliance Appendix B The general criteria for security personnel are outlined in this appendix. The principles in this regulation were factored into the WCGS security plans.


Appendix C This regulation sets forth the requirements for licensee safeguards contingency plans. This plan has been developed and implemented.
utilized in the Comanche Peak units, Callaway, and many other facilities that


Appendix D This appendix requires that licensees who transport or deliver to a carrier for transport irradiated reactor fuel assure that shipment escorts have completed a training program. These requirements were satisfied at the time of submittal of the operating license application.  
are currently in operation.  


Appendix E This regulation specifies the levels of physical  protection to be applied in international transport  of Nuclear material and does not apply to WCGS,  since WCNOC is not involved in such transport. Appendix F This regulation merely lists the nations that are  parties to the convention on the physical  protection of nuclear material. Appendix G This regulation sets forth the requirements for 3  reportable safeguards events and is addressed by  the WCGS Site Emergency Plan.
1.2.5.1.5 Containment Isolation System
100.1 This regulation is explanatory and does not impose independent obligations on licensees.  


100.2 This regulation is explanatory. WCGS is not novel in design and is not unproven as a prototype or pilot plant.
The containment isolation system preserves the ability of the containment


100.3 The definitions contained in this regulation are  adhered to in all appropriate documents. 100.8 This regulation sets forth the information  requirements established by the NRC and specifies  OMB approval. 
boundary to minimize the release of fission products to the environment while


Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 36)  Regulation (10 CFR) Compliance 100.10 The factors listed related to both the unit design and the site have been provided in the applica-tion. Site specifics, including seismology, meteorology, geology, and hydrology, are presented in Chapter 2.0 of the USAR. The exclusion area, low population zone, and population center dis-tance are provided and described. The USAR also describes the characteristics of reactor design and operation.
at the same time allowing the normal and emergency passage of fluids through


100.11 Exclusion areas have been established, as described in Section 2.1. The low population zone has been established in accordance with this requirement.  
the containment boundary. System components include isolation valves that


The USAR accident analyses, particularly those in Chapters 6.0 and 15.0, demonstrate that offsite doses resulting from postulated accidents would not exceed the criteria in this section of the regulation.  
satisfy the containment isolation criteria. The containment isolation system


Appendix A Appendix A to 10 CFR Part 100 provides seismic and geologic siting criteria for nuclear power plants.
is similar in design and function to the standard design that has been applied
Site suitability was determined at the construction permit stage.


Rev. 3 WOLF CREEK 1.4  IDENTIFICATION OF AGENTS AND CONTRACTORS1.4.1  APPLICANTS Kansas City Power & Light Company (KCPL), Kansas Electric Power Cooperative, Incorporated (KEPCo), and Kansas Gas and Electric Company (KG&E) are co-owners of WCGS, having 47, 6 and 47 percent participation, respectively. For the purposes of the operating license application KCPL and KG&E were considered co-applicants for Wolf Creek. KG&E was the lead applicant and was initially responsible for the design, construction and operation of WCGS.In Amendment No.
to several other Bechtel-designed plants. The containment isolation system  
4 to the Operating License, Wolf Creek Nuclear Operating Corporation (WCNOC) was authorized to act as agent for KCPL, KG&E, and KEPCo and has exclusive responsibility and control over the physical construction, operation, and maintenance of the facility. WCNOC will be referred to as the Operating Agent in matters where the corporation acts in the interests of all three licensees. KCPL is an independent investor-owned utility with headquarters in Kansas City, Missouri that provides electric service in a 5,700 square mile area of western Missouri and eastern Kansas. KCPL serves 331,000 customers and also provides electricity at wholesale to eight communities, three electric cooperatives and two utilities. KEPCo is a rural electric cooperative association of 25 member cooperatives which provide electric service to the rural areas of Kansas. KEPCo is headquartered in Topeka, Kansas and was incorporated in 1975. KEPCo serves approximately 90,000 meters to provide electricity to nearly 325,000 consumers located throughout Kansas. KG&E is an independent investor-owned utility that provides electric service in an 8,100 square mile area of south central and southeast Kansas. General offices of the company are in Wichita, Kansas. KG&E serves 212,000 retail customers and also provides, at wholesale, part or all of the electricity sold by 24 municipal electric systems and by 8 rural electric cooperatives. The owners have over 97 years of experience in the operation of electric generating plants. The owners do not maintain engineering and construction staffs for power plants but do engage reputable engineering and construction firms for these purposes. As of January 1, 1980, the owners had in operation 11 power stations in which they are full or partial owners with a total system generator nameplate capacity of 4420 MW. 1.4.2  SNUPPS KCPL, KEPCO, KG&E and Union Electric Company joined together to share costs and manage a project to design, purchase, and license two nuclear power plants of standardized design, the Standardized Nuclear Unit Power Plant System (SNUPPS) units (Wolf Creek and Callaway). 1.4-1 Rev. 2 WOLF CREEK The SNUPPS utilities were signatories of an agreement for standardization for nuclear generating facilities known as the SNUPPS Agreement. The agreement specified objectives of the undertaking, defined the responsibilities of the utility participants, and established a method of sharing the costs.
Participation in the agreement was open to any entity proposing to construct or participate with others in constructing nuclear generating facilities of approximately 1,100 electrical megawatts on a site without active earthquake potential. The SNUPPS Agreement provided for cost sharing of the duplicate portions of the plant, established an organizational structure for management of the project, and defined a mechanism for reaching decisions on joint actions on the basis of one share and one vote per unit. The basic shared activities were:  (1) design of the standardized portion of the plants, known as the power block; (2) procurement of the NSSS; (3) procurement of the turbine generators; (4) procurement of essentially all other equipment and materials for the power block; and (5) design and fabrication of the first fuel loading. Activities which were the responsibility of each individual applicant utility were:  (1) design and procurement of equipment and materials for nonstandardized facilities outside of the power block; (2) construction of both standardized and nonstandardized facilities; and (3) procurement of certain power block materials to standard specifications. The SNUPPS utilities controlled the project through a management committee composed of one officer of each company. The members elected a chairman annually and held regular meetings. This senior executive group had overall responsibility for administration of the project and for resolution of technical, contractual, and schedular problems during evolution of the project. The SNUPPS utilities entered into individual, basically identical contracts with four contractors to purchase the materials and services for the shared activities:  1) Bechtel Power Corporation to provide architect-engineering services for the power block; 2) Westinghouse to supply two identical NSSSs and, under a separate contract, and to supply the first fuel loading; 3) General Electric to supply two identical turbine generators and directly related auxiliaries; and 4) Nuclear Projects, Inc., for project management and for furnishing the technical and administrative staff to represent the utility owners and to engage consulting services and contractors, as required. These contracts were administered as one project. 1.4-2 Rev. 0 WOLF CREEK Nuclear Projects, Inc., established in May 1974, furnished services to the SNUPPS utilities for management of the SNUPPS project, as authorized and directed by the management committee. The SNUPPS Executive Director, appointed by the management committee, and the SNUPPS technical and administrative staff were employees of and consultants to Nuclear Projects, Inc. They had the responsibility to act for the management committee and the utilities in the day-to-day administration of work under the lead architect-engineer contract. The lead architect-engineer, in turn, was delegated responsibility for administration of the turbine generator and NSSS procurement. The lead architect-engineer had responsibility for the power block and authority to procure equipment and materials for the utilities. The Executive Director also had authority to administer the contracts for design and fabrication of the first core. Various utility committees augmented the SNUPPS staff and provided communication links between SNUPPS activities and each individual utility.
Committees included a technical committee, quality assurance committee, operations committee, legal committee, construction review group, licensing coordination group, and committees for records management, spare parts, finance and accounting, public relations, and numerous ad hoc groups and task forces for special problems. Outside of the shared activities, each utility managed site unique activities and construction. Each utility retained a site architect-engineer (Sargent & Lundy for WCGS) to design non-standardized facilities. Construction management at the Wolf Creek site was by Daniel International Corporation. Bechtel staff was located at each construction site to interpret plans and specifications and expedite procurements. A SNUPPS staff member was located at each active site to ensure that construction experience was made available to later plants. 1.4.3  NUCLEAR STEAM SUPPLY SYSTEM MANUFACTURER Westinghouse Electric Corporation (Westinghouse) was responsible for supplying the NSSS and first fuel load for WCGS. Westinghouse has designed, developed, and manufactured nuclear facilities since the 1950s, beginning with the world's first large central station nuclear power plant (Shippingport), which has produced power since 1957. Completed or presently contracted commercial nuclear capacity totals in excess of 97,000 MW.
Westinghouse pioneered new nuclear design concepts, such as chemical shim control of reactivity and the rod cluster control  1.4-3 Rev. 0 WOLF CREEK concept, throughout the last two decades. Among the company's own related manufacturing facilities are the Columbia Plant, Nuclear Fuel Division, the largest commercial nuclear fuel fabrication facility in the world, and the Tampa Division Plant, the world's most modern heat transfer equipment production facility. 1.4.4  STANDARD PLANT (LEAD) ARCHITECT/ENGINEER The Gaithersburg Power Division of Bechtel Power Corporation (Bechtel) was retained by the SNUPPS utilities to provide architect/engineer services, including procurement, for the standardized portions of the nuclear electric generating facilities. The Bechtel Corporation, the parent of Bechtel Power Corporation, has been continuously engaged in construction and engineering activities since 1898.
Since the close of World War II, Bechtel has placed strong emphasis on electrical power generation projects. During this period, Bechtel has been responsible for the design of over 204 thermal generating units, representing more than 126,860 MW of new generating capacity. Of this number, a nuclear capacity of more than 65,800 MW has been or is being engineered by the company itself.The ratings of thermal generating plants designed by Bechtel range up to 1,470 MW per unit and include most types of station designs and arrangements, such as reheat and nonreheat, indoor and outdoor stations, single and multiple units, and wide ranges of steam conditions up to 3,500 psig, 1,050/1,000 F. Also, some of the larger units are fully automated and computer controlled. The majority of contracts for these facilities provided Bechtel with complete responsibility for both engineering and construction, although several contracts have been engineering design assignments only. For over 25 years, Bechtel has been actively working on nuclear projects involving power plants, as well as such facilities as nuclear accelerators, research laboratories, hot cells, experimental reactors, and nuclear fuel processing plants. Its responsibilities have covered design, construction, site surveys, license applications, feasibility studies, and equipment procurement.1.4.5  TURBINE-GENERATOR MANUFACTURER The General Electric Company was responsible for the design, fabrication, and delivery of the turbine generators, and provided technical assistance for installation, startup, and operation of this equipment. 1.4-4 Rev. 1 WOLF CREEK General Electric has a long history in the application of turbine generators for nuclear power plants. 1.4.6  SITE ARCHITECT/ENGINEER For the site-related work covered by the application, except for certain environmental studies, Sargent & Lundy Engineers (S&L) was retained as the architect-engineer and design consultant. In general, the responsibilities included the site layout, the location of the power block, the design of yard and construction facilities, and the location and design of the circulating water systems. They were responsible for the design of site-related systems and facilities which are nonseismic Category I and for seismic Category I dams, canals, ponds and earthwork. Sargent & Lundy is an independent consulting engineering organization founded in Chicago in 1891. The firm has specialized in the design of generation, transmission and distribution systems for steam utilization, electric power, and related facilities. The firm has provided the complete engineering services for more than 600 turbine-generator units with a total installed capacity of 53,000 MW. Of this, some 9,800 MW is nuclear generating capacity.Table 1.4-1 lists the nuclear plants S&L itself has completed or is currently designing. Table 1.4-2 lists other nuclear plants Sargent & Lundy has had partial responsibility for. 1.4.7  CONSULTANT FIRMS 1.4.7.1  SNUPPS ConsultantsPrincipal consultants for the SNUPPS portions (powerblock) of the WCGS and their related responsibilities are:  a. Quadrex Corporation (formerly Nuclear Services Corporation This consultant assisted the SNUPPS staff to coordinate  the owners' preparation of power block operating  procedures and review and approval action by the owners of  Bechtel-prepared flush, hydrostatic, preoperation, and  special test procedures. The compilation of specific data  lists, useful for operating procedure preparation, power plant operation, and maintenance, is assigned to this consultant on an as-needed basis. This consultant also performed third-level design reviews of selected systems  for compliance with codes and regulations. 1.4-5 Rev. 0 WOLF CREEK  b. Southwest Research Institute  This consultant reviewed portions of the SNUPPS unit  design to assure that adequate provision was made for  preservice and inservice inspection, including access  engineering, and to verify the performance of mechanical  equipment. In the latter category, this consultant has  performed analog simulation of the reactor charging system  and recommended the design of pulsation suppressors  chosen for use in the SNUPPS plants. c. NUS Corporation The nuclear engineering, plant design, and nuclear power  plant licensing skills and experience of this consultant were drawn upon on an as-needed basis to perform a number of activities. Examples included drafting specifications  for a loose parts monitor, carrying out an independent  review of Bechtel's calculations for shielding the reactor  cavity, and reviewing the SNUPPS units' cold shutdown  capability. d. Nuclear Water & Waste Technology, Inc. This consultant, a specialist in water chemistry, re-  viewed the design and assisted in the selection of fluid  systems and equipment, particularly the condensate  polisher, liquid radwaste systems, and process control  instrumentation. e. Pickard, Lowe and Garrick, Inc. This consultant was utilized early in the SNUPPS project  to assist in bid evaluations and selection of the Stan-dard Plant A/E. This consultant remained available on an as-needed basis, and provided occasional assistance in  matters related to nuclear design and performance, such as reviewing the performance of nuclear fuel designs. f. Professional Loss Control, Inc. This consultant reviewed the WCGS fire protection system and assisted in making related design decisions. 1.4-6 Rev. 0 WOLF CREEK  g. Energy Research & Consultants Corporation This consultant reviewed design and operation of pumps  and other rotating equipment, including advising WCGS  during the bid evaluation for several pumps, and per-  forming tests necessary to evaluate the auxiliary feed-  water pumps. h. Dr. James Halitsky This consultant developed calculations of atmospheric  dispersion parameters for the control room fresh air intake for use in control room accident dose calcula-tions. i. Energy Incorporated This consultant was engaged to assist the SNUPPS  utilities to develop an independent plant transient and  analysis capability using the RETRAN computer code. j. Essex Corporation This consultant was engaged to perform an independent  design evaluation of the SNUPPS control room, emphasizing human factors considerations. 1.4.7.2 WCGS Specific Consultantsa. Dames & Moore The independent consulting firm of Dames & Moore was  retained to perform site investigations relating to demography, geography and land use,  meteorology, hydrology, geology and seismology. Having performed such safety-realted and environmental impact related investigations for over 75 nuclear power plant sites, Dames & Moore is an acknowledged leader in the field of site investigations related to nuclear plant  construction. 1.4-7 Rev. 0 WOLF CREEK Listed below are some of the nuclear power plants for which Dames & Moore has performed geotechnical and/or environmental investigations: U.S. NORTHEAST Atlantic James A. Fitzpatrick Salem  Burlington Limerick Seabrook  Calvert Cliffs Newbold Island Shoreham Douglas Point Nine-Mile Point Somerset  Forked River Oyster Creek Sterling Hope Creek Peach Bottom Summit  Indian Point Perryman Susquehanna  Jamesport Robert E. Ginna Yankee U.S. MIDWEST  Bailly N 1 Dresden Midland  Braidwood Duane Arnold Monticello Byron Fermi Palisades Carroll County Fort Calhoun Point Beach Central Iowa Greenwood Prairie Island Clinton Haven Quad-Cities Cooper Kewaunee Zimmer Davis-Besse LaSalle Zion Donald C. Cook Marble Hill  U.S. SOUTH Brunswick Joseph M. Farley Shearon Harris  Catawba McGuire South Dade  Cherokee North Anna St. Lucie  Crystal River Nuclear One Surry  DeSoto Oconee Turkey Point Edwin I. Hatch Perkins Virgil C. Summer Isolte Robinson U.S. SOUTHWEST Allens Creek Comanche Peak South Texas    Project U.S. WEST AND NORTHWEST Humboldt Bay Skagit Trojan  San Onofre Sundesert  1.4-8 Rev. 0 WOLF CREEK  b. Ecological Analysts, Inc. The private research and service organization of  Ecological Analysts, Inc. was retained to collect,  analyze and report environmental data related to the  environmental impact of the WCGS. These studies  included biological, chemical, and radiological  investigations. The organization was founded in 1978  and was formerly part of Industrial BIO-TEST Labora-  tories, Inc. (1968-75), NALCO Chemical Company (1975-78)  and Hazleton Environmental Sciences Corporation (1978-  80). The present full-time staff includes more than 160 scientists and technicians. Listed below are some of the nuclear power plants for which Ecological Analysts, Inc. has performed environmental studies and investigations:  Bailly Fort Calhoun  Catawba Kewaunee Clinton LaSalle Cooper Quad-Cities Dresden Wm. H. Zimmer Duane Arnold Zion  c. Hoad Engineers, Incorporated Hoad Engineers, Incorporated (HEI), a wholly-owned  subsidiary of Blount, Incorporated, was retained to  provide the design, plans and specifications along with  equipment procurement and construction management services for the WCGS security system. The Operating Agent took over responsibility for these activities in  late 1982. HEI prepared and provided documents for the Security Plan, Safeguard Contingency Plan and Security Training and Qualifications Plan. Since its inception  in 1953, HEI has primarily served the investor-owned utilities in all of the usual engineering and  architectural disciplines. HEI has been engaged in providing the design plans,  specifications and equipment procurement services for security systems at two nuclear power plants for the Consumers Power Company in Jackson, Michigan. 1.4-9 Rev. 0 WOLF CREEK  d. Phoenix Power Services, Incorporated Phoenix Power Services, Incorporated was retained to  assist in preparing the early drafts of the Emergency  Plan for WCGS. Phoenix has performed extensive work in  the area of Emergency Planning. e. Professional Loss Control, Inc. Professional Loss Control, Inc., (PLC), was retained to  review the Fire Plan and implementing procedures and advise The Operating Agent of their adequacy. Founded in 1976, PLC provides services in the fields of fire protection, safety and environmental engineering.
Listed below are some of the utilities for which PLC has performed loss control services  Carolina Power and Light Company  Florida Power Corporation Jersey Central Power and Light Company  Maine Yankee Atomic Power Company  Niagara Mohawk Power Corporation  Portland General Electric Company Power Authority of the State of New York  Rochester Gas and Electric Company  Tennessee Valley Authority  Washington Public Power Supply System Wisconsin Electric Power Company Yankee Atomic Electric Company 1.4.8  CONSTRUCTOR Daniel International Corporation, herein referred to as Daniel, was assigned construction and construction management responsibilities for WCGS. Daniel's scope of work consisted of receiving design information as prepared by Bechtel, Westinghouse and Sargent & Lundy; receiving manufactured items and materials as procured by Bechtel and Westinghouse; procuring additional bulk materials and consumable items; procuring the services of various subcontractors; planning and scheduling the activities of the construction forces and directly supervising the construction forces to assemble the power plant in accordance with the design. 1.4-10 Rev. 0 WOLF CREEK Daniel Construction Company was awarded the ASME Certificate of Authorization to perform nuclear code construction (N stamp) on September 11, 1973, following an ASME implementation and enforcement audit of Daniel's Quality Assurance Program.Daniel's experience, past and present, includes construction of nuclear and fossil fueled power plants. The first project of this nature was construction of the nuclear power Carolinas-Virginia Tube Reactor at Parr, South Carolina. This facility operated several years as a prototype plant. Other nuclear power plants under construction, in operation or on which Daniel is performing maintenance are specified below:  Callaway Oconee  H. B. Robinson Shearon Harris  Joseph M. Farley Virgil Summer 1.4.9  DIVISION OF RESPONSIBILITIES 1.4.9.1  Utility CompanyThe ultimate responsibility for the proper design, construction, and operation for the entire spectrum of safety of WCGS rests with The Operating Agent. 1.4.9.2  Standard Plant Architect/EngineerBechtel Power Corporation was responsible for the design, engineering, and procurement of the standard power block, which included the following:  a. Turbine building
: b. Reactor building
: c. Auxiliary building  d. Fuel building  e. Radwaste building
: f. Diesel generator building  g. Control building  1.4-11 Rev. 0 WOLF CREEK  Bechtel was also responsible for the design of the standard plant storage tanks and transformer vaults. However, the individual utilities arranged to procure this equipment.


The NSSS portion of the facility was procurred by individual contract between The Operating Agent and the NSSS supplier. Similarly, the turbine generator is obtained by direct contract between the turbine generator supplier and The Operating Agent. However, Bechtel Power Corporation (acting as agent) retained responsibility for monitoring the design and integrating the system into the power block to ensure that the NSSS and turbine generator components being supplied were consistent with the needs of the facility. Other equipment and material for areas within their scope were procured by Bechtel Power Corporation.
used at WCGS is essentially identical to that utilized at Callaway.
1.2.5.2 Emergency Core Cooling System The emergency core cooling system (ECCS) injects borated water into the reactor


Bechtel Power Corporation was also responsible for the design, engineering and procurement of the portions of the WCGS seismic Category I essential service water systems (ESWS) which lie outside the power block.
coolant system following a LOCA. This limits damage to the fuel assemblies and  
The design and engineering of all SSCs associated with the ESWS Vertical Loops and Chase were not part of the original SNUPPS standard plant design. Loops and Chase were added to both trains of the ESWS. Design and specification of these SSCs were obtained by direct contract between WCNOC and several contributing contractors. Interfaces were established and monitored by WCNOC to ensure compatibility in design between power block SSCs and the ESWS vertical Loops and Chase. WCNOC is ultimately responsible for the the design, engineering, and procurement of the SSCs associated with the ESWS Vertical Loops and Chase.
1.4.9.3  SNUPPS Staff The SNUPPS Staff functioned as an extension of the management, engineering, and operations organizations of the SNUPPS Utilities. During design and construction phases, the SNUPPS Staff performed day-to-day administration of all of the shared activities, primarily by interfacing with and providing written direction to the Standard Plant Architect/Engineer. This required a close relationship between the SNUPPS Staff and SNUPPS Utilities, which was achieved by frequent communications and regularly scheduled meetings of the various committees and groups.


1 4.9.4  Site Architect/Engineer All systems, equipment and structures outside the power block except for the ESWS components and station security-related systems were designed or specified by Sargent & Lundy. The ultimate heat sink was the only seismic Category I structure designed by Sargent & Lundy.
limits metal-water reactions and fission product release. The ECCS also provides continuous long-term post-LOCA cooling of the core by recirculating


Interfaces were established and monitored by Bechtel Power Corporation to ensure compatibility in design between power block and site-related systems and equipment.  
borated water between the containment sumps and the reactor core. The ECCS


1.4.9.5  Security Consultant The station security-related systems were initially designed and specified by Hoad Engineers, Incorporated, who was retained to design a security system for WCGS to meet the requirements of 10 CFR 73.55.
design at WCGS is functionally identical to the ECCS design for the Comanche


1.4-12 Rev. 29 WOLF CREEK    TABLE 1.4-1  NUCLEAR POWER PLANTS COMPLETED OR  CURRENTLY UNDER DESIGN BY SARGENT & LUNDY NOMINAL GROSS*
Peak units and Callaway.  
UNIT RATING (MWe) POWER OPERATION EBWR 5 1956 Elk River 22 1962 La Crosse 60 1969 SEFOR 20 (MWt) 1969 Dresden 2 850 1969 Dresden 3 850 1971 Quad-Cities 1 850 1971 Quad-Cities 2 850 1972 Zion 1 1085 1973 Zion 2 1085 1973 Fort St. Vrain, Unit 1 330 1973 La Salle County Station, Unit 1 1122 1982 La Salle County Station, Unit 2 1122 1983 Byron Station, Unit 1 1175 1984 Byron Station, Unit 2 1175 1985 Braidwood Station, Unit 1 1175 1985 Clinton Power Station, Unit 1 992 1985 Braidwood Station, Unit 2 1175 1986 Clinton Power Station, Unit 2 992 Cancelled Bailly Nuclear 1 685 Cancelled Marble Hill, Unit 1 1190 Cancelled Marble Hill, Unit 2 1190 Cancelled Wm. H  Zimmer, Unit 1 840 Cancelled Carroll County Station, Unit 1 1175 Future Carroll County Station, Unit 2  Future


___________________________________________
1.2.5.3 Auxiliary Feedwater System When the main feedwater system is not in operation and the reactor coolant temperature is greater than 350° degrees F, the auxiliary 
*Note that this is a gross rating, not a net rating.


Rev. 0 WOLF CREEK                                                      TABLE 1.4-2                                              OTHER NUCLEAR POWER PLANTS WITH PARTIAL SARGENT & LUNDY DESIGN RESPONSIBILITY                                          NOMINAL GROSS*                    SARGENT & LUNDY          UNIT                            RATING (MWe)                      RESPONSIBILITY          Bellefonte, Unit 1                  1235                      Consulting Services on Containment Bellefonte, Unit 2                 1235                      Design (Sructural Analysis of post-tension containment structures).          D. C. Cook, Unit 1                  1083                      Design of water intake structures, crib          D. C. Cook, Unit 2                  1118                      house, turbine room foundations and miscellaneous electrical consulting services.          Enrico Fermi, Unit 2                1223                      Design of Residual Heat Removal complex,                                                                        shielding design calculations and class 1 piping analysis.          Kaiseraugst                          992                      All design inside the containment including                                                                        the containment itself.          Point Beach, Unit 1                  519                      Consulting services on water intake          Point Beach, Unit 2                  519                      structures._____________________________________________*Note that this is a gross rating, not a net rating.                                                                                                              Rev. 0 WOLF CREEK 1.5  REQUIREMENTS FOR FURTHER TECHNICAL INFORMATIONOne of the design bases for WCGS has been to utilize well-developed and proven design concepts, systems, and equipment, in order to minimize the potential for cost and schedule overruns and to enhance the reliability of operation. As a consequence, there have been few requirements, as delineated by 10 CFR 50.34(a)(8), for research and development programs to confirm the adequacy of the design. Two such programs were identified at the construction permit stage. Those programs have been satisfactorily completed, as described in Sections 1.5.1 and 1.5.2. Other programs were identified at the construction permit stage as not required but as valuable to define margins of conservatism or possible design improvements. Relevant programs in this latter category are described in Section 1.5.3. 1.5.1  17 x 17 FUEL ASSEMBLY A comprehensive test program for the 17 x 17 assembly has been successfully completed by Westinghouse. Reference 1 contains a summary discussion of the program. The following sections present specific references documenting individual portions of the program. 1.5.1.1  Rod Cluster Control Spider TestsRod cluster control spider tests have been completed. For a further discussion of these tests, refer to Section 4.2.4.3. 1.5.1.2  Grid TestsVerification tests of the structural adequacy of the grid design have been completed. Refer to Section 4.2.3.4 and Reference 2 for a discussion of these tests.1.5.1.3  Fuel Assembly Structural TestsFuel assembly structural tests have been completed. Refer to References 2 and 3 for a discussion of these tests. 1.5.1.4  Guide Tube TestsVerification tests of the structural adequacy of the guide tubes have been completed. Refer to References 3 and 4 for a discussion of these tests. 1.5-1 Rev. 0 WOLF CREEK 1.5.1.5  Prototype Assembly TestsVerification tests of the integrated fuel assembly and rod cluster control performance have been completed. Refer to References 3 and 4 for a discussion of these tests. 1.5.1.6  Departure from Nucleate Boiling TestsThe test program for experimentally determining the effect of the fuel assembly geometry on the departure from nucleate boiling (DNB) heat flux has been completed. Refer to Reference 5 for a discussion of these tests. 1.5.1.7  Incore Flow MixingThe experimental test program to determine the effects of the fuel assembly geometry on mixing has been completed. Refer to Reference 6 for a discussion of these tests. 1.5.2  FIRE STOPS A test program to determine the adequacy of various fire stop designs has been completed. Penetration seals compatible with the WCGS design were successfully tested, using silicone foam sealant. Details of the tests are provided in Section 9.5.1. 1.5.3  OTHER PROGRAMS 1.5.3.1  Generic Programs of WestinghouseReference 7 summarizes ongoing safety-related research and development programs that are being carried out for, or by, or in conjunction with the Westinghouse Nuclear Energy System Division and that are applicable to Westinghouse pressurized water reactors. These programs are applicable to WCGS and may lead to changes in safety analyses or modes of operation. Further progress on these programs is not required for safe operation of WCGS. Experimental test programs to determine the thermal-hydraulic characteristics of 17 x 17 fuel assemblies and to obtain experimental reflooding heat transfer data under simulated LOCA conditions have been completed. Refer to Reference 8 for a discussion of these tests. A single rod burst test program to quantify the maximum assembly flow blockage which is assumed in the LOCA analyses has been completed. Refer to Reference 9 for a discussion of these tests. The results of these two test programs have been used in the ECCS analyses in Section 15.6.5. 1.5-2 Rev. 0 WOLF CREEK Two general types of model boiler tests were conducted by Westinghouse (1) to confirm the thermal-hydraulic analyses used for the Model-F steam generator and (2) to explore the potential for corrosion and other water-chemistry induced effects in the Model-F steam generator. The initial series of each of these tests were completed prior to startup of WCGS. Further information on the steam generator test programs of Westinghouse is given in Section 5.4.2. 1.5.3.2  Generic Programs of BechtelWolf Creek through SNUPPS has contributed, with other utilities, to tests of prototypical cable trays under seismically induced loads. A primary objective of the tests has been evaluation of damping coefficients under SSE conditions.
1.2-12 Rev. 1 WOLF CREEK feedwater system is used to supply water to the secondary side of the steam generators.  
Mechanical bracing of cable trays at WCGS is verified by the results of this test program. 1.5.3.3  Test of a Wolf Creek Steam GeneratorOne of the steam generators in the Wolf Creek plant was equipped with special pressure and temperature instrumentation that enabled thermal-hydraulic performance characteristics to be measured during the early stages of power operation. The objective of these tests was primarily to confirm Westinghouse's design analyses. The test results are proprietary but are available for NRC review. 1.


==5.4  REFERENCES==
The system consists of two motor-driven pumps which are powered by the  
: 1. Eggleston, F. T., "Safety-Related Research and Development  for Westinghouse Pressurized Water Reactors, Program  Summaries - Spring 1976," WCAP-8768, June, 1976. 2. Gesinski, L. and Chiang, D., "Safety Analysis of the 17 x 17  Fuel Assembly for Combined Seismic and Loss-of-Coolant Accident," WCAP-8236 (Proprietary) and WCAP-8288 (Non-Proprietary), December, 1973. 3. DeMario, E. E., "Hydraulic Flow Test of the 17 x 17 Fuel  Assembly," WCAP-8278 (Proprietary) and WCAP-8279 (Non-  Proprietary), February, 1974. 1.5-3 Rev. 0 WOLF CREEK 4. Cooper, F. W., Jr., "17 x 17 Driveline Component Tests -  Phase IB, II, III, D-Loop Drop and Deflection," WCAP-8446 (Proprietary) and WCAP-8449 (Non-Proprietary), December,  1974. 5. Hill, K. W., et al., "Effect of 17 x 17 Fuel Assembly  Geometry on DNB," WCAP-8296-P-A (Proprietary) and WCAP-8297-A  (Non-Proprietary), February, 1975. 6. Cadek, F. F., Motley, F. E. and Dominicis, D. P., "Effect of  Axial Spacing on Interchannel Thermal Mixing with the R Mixing Vane Grid," WCAP-7941-P-A (Proprietary) and WCAP-7959-  A (Non-Proprietary), January, 1975. 7. Eggleston, F. T., "Safety-Related Research and Development  for Westinghouse Pressurized Water Reactors, Program Summaries - Winter 1977 - Summer 1978," WCAP-8768, Revision 2, October, 1978. 8. "Westinghouse ECCS Evaluation Model - October 1975 Version,"  WCAP-8622 (Proprietary) and WCAP-8623 (Non-Proprietary),
November, 1975. 9. Kuchirka, P. J., "17 x 17 Design Fuel Rod Behavior During  Simulated Loss-of-Coolant Accident Conditions," WCAP-8289  (Proprietary) and WCAP-8290 (Non-Proprietary), November,  1974. 1.5-4 Rev. 0 WOLF CREEK 1.6  MATERIAL INCORPORATED BY REFERENCE  The Wolf Creek USAR incorporates, by reference, various topical reports as part of the application. Bechtel topical reports are listed in Table 1.6-1, and Westinghouse topical reports are listed in Table 1.6-2. The Bechtel and Westinghouse topical reports have been filed separately in support of this and similar applications.


Amendment No. 89 relocated various Technical Specifications to the USAR. The relocated Technical Specifications have subsequently been incorporated into the Technical Requirements Manual (TRM) with the same format and content they possessed in the Technical Specifications. The TRM is a physically separate document from the USAR, but by this specific reference, it is considered part of the USAR and is thereby incorporated by reference. Implementation of, and revision to, the TRM is controlled through administrative procedures.
emergency diesel generators if there is loss of offsite power and one steam-turbine-driven pump. During normal plant cooldown, the auxiliary feedwater


Controlled drawings were removed from the USAR at Revision 17. The drawings are considered incorporated by reference. Table 1.6-3 identifies the controlled drawings that are incorporated by reference and also provides a cross-reference of the controlled drawings to the respective USAR figure number. The contents of the drawings are controlled by WCGS procedures.
system can, if necessary, be used to supply feedwater to the steam generators


Appendix 9.5B, "Fire Hazard Analyses", was removed from the USAR at Revision 19, and is considered incorporated by reference. Table 1.6-4 identifies the section and provides a cross-reference of the controlled document, E-1F9905, "Fire Hazard Analysis", which supersedes the information originally provided in Appendix 9.5B of the USAR. The contents of the Fire Hazard Analysis is controlled by WCGS procedures.  
for removal of decay and sensible heat from the reactor coolant system. See


Chapter 17.2 Quality Assurance, was removed from the USAR at Revision 21.
section 7.3.6.1.1 for a description of this operation.  
Chapter 17.2 is considered incorporated by reference. The Quality Program Manual supercedes the information originally provided in Chapter 17.2 of the USAR. The contents of the Quality Program Manual are controlled by WCGS procedures.  


Table 3.11(B)-1, Plant Environmental Normal Conditions; Table 3.11(B)-2, Environmental Qualification Parameters for SNUPPS NUREG-0588 (LOCA, MSLB and HELB); Table 3.11(B)-3, Identification of Safety-Related Equipment and Components: Equipment Qualification; Table 3.11(B)-4, Containment Worst Case Radiation Levels (MRADs); Table3.11(B)-5, Containment Spray Requirements; Table 3.11(B)-8, Exemptions from NUREG-0588 Qualification; Table 3.11(B)-10, Equipment Added for NUREG-0737; Figures 3.11(B)-1 through 3.11(B)-49, were removed from the USAR at Revision 28. The listed Tables and Figures are considered incorporated by reference. EQSD-I, EQ Summary Document Section I Program Description, and EQSD-II, EQ Master List Section II, supercedes the information provided by listed Tables and Figures. The contents of EQSD-I and EQSD-II are controlled by WCGS procedures. 
The auxiliary feedwater system has a design that is similar to the auxiliary


1.6-1 Rev. 28 WOLF CREEK    TABLE 1.6-1  BECHTEL TOPICAL REPORTS INCORPORATED BY REFERENCE  Bechtel USAR Report  Topical Revision Section Submitted Review(1)
feedwater system design on the Midland Plant, Units 1 and 2. Both designs
Report No. Title Number Reference  to the NRC Status BC-TOP-1 Containment Building Rev. 1 3.7(B)-3 1/73 A Liner Plate Design 3.8 Report


BC-TOP-3-A Tornado and Extreme Rev. 3 3.3 8/74 A Wind Design Criteria 3.8 for Nuclear Power Plants
utilize steam-driven and ac-powered motor-driven auxiliary feedwater pumps.


BC-TOP-4-A Seismic Analyses of Rev. 3 3.7(B).2 11/74 A Structures and 3.7(B).3 Equipment for Nuclear 3.8 Power Plants
However, the WCGS design utilizes an additional motor-driven pump for  


BC-TOP-5-A Prestressed Concrete Rev. 3 3.8 2/75 A Nuclear Reactor 3A Containment Structures
reliability. The auxiliary feedwater system utilized at WCGS is identical to that used at Callaway.
1.2.6 PLANT INSTRUMENTATION AND CONTROL SYSTEMS


BC-TOP-7 Full Scale Buttress Rev. 0 3.8 9/72 A Test for Prestressed 3A Nuclear Containment Structures
The plant instrumentation and control systems ensure safe and orderly operation


BC-TOP-8 Tendon End Anchor Rev. 0 3.8 9/72 A Reinforcement Test 3A
of all systems and processes over the full operating range of the plant. The


BC-TOP-9-A Design of Structures Rev. 2 3.8 9/74 A for Missile Impact 3.5.3.2
control room is designed to enable operators to start up, operate, and shutdown


Rev. 0 WOLF CREEK    TABLE 1.6-1 (Sheet 2)  BECHTEL TOPICAL REPORTS INCORPORATED BY REFERENCE  Bechtel  USAR Report  Topical  Revision Section Submitted Review(1)
the plant. Supervision of both the nuclear and turbine generator systems is
Report No. Title Number Reference to the NRC Status BN-TOP-1 Test Criteria for Rev. 1 3.8 11/72 A Integrated Leak Rate 6.2 Testing of Primary Containment Structures for Nuclear Power Plants


BN-TOP-2 Design for Pipe Break Rev. 2 3.6 5/74 A Effects 3.8
accomplished from the control room. Additional controls at appropriate


BN-TOP-3 Performance and Siz- Rev. 3  8/75 P ing of Dry Pressure 6.2.1 Containments
locations outside the control room (in particular, an auxiliary shutdown panel


BN-TOP-4 Subcompartment Rev. 1 6.2.1 10/77 A Pressure and 3.6 Temperature Transient Analysis
in the auxiliary building) ensure the capability of reaching and maintaining a


BP-TOP-1 Seismic Analysis of Rev. 3 3.7.(B).2 1/76 A Piping Systems 3.7.(B).3 3.9.(B).7
post-accident or post-fire shutdown condition in the unlikely event that the control room becomes uninhabitable.  (Note that the control room is protected from fire, breach of security, and missiles, and contains a redundant


_____________________
ventilation system filtered to remove iodine.)  
(1) See Notes on Table 1.6-2


Rev. 0 WOLF CREEK TABLE 1.6-2  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse  USAR Report Topical  Revision Section Submitted Review(1)
The WCGS instrumentation and control systems summarized below and discussed in detail in Chapter 7.0 are functionally similar to those systems utilized in the  
Report No. Title Number Reference to the NRC Status WCAP-2048 "The Doppler Effect for a Rev. 0 4.3 7/62 0 Non-Uniform Temperature Distribution in Reactor Fuel Elements"


WCAP-2850-L(P) "Single Phase Local Boiling Rev. 0 4.4  5/66 0 WCAP-7916 And Bulk Boiling Pressure Drop Correlations"
Comanche Peak units and are essentially identical to those systems utilized at


WCAP-2923 "In-Pile Measurement of Rev. 0 4.4 3/66 0 UO2 Thermal Conductivity"
Callaway.  


WCAP-3269-8 "Hydraulic Tests of the Rev. 0 4.4 6/64 0 San Onofre Reactor Model"
1.2-13 Rev. 14 WOLF CREEK 1.2.6.1 Protection System


WCAP-3269-26 "LEOPARD - A Spectrum Rev. 0 4.3, 15.0, 9/63 0 Dependent Non-Spatial 15.4 Depletion Code for the IBM - 7094"
The plant protection system monitors selected plant parameters in order to


WCAP-3385-56 "Saxton Core II Fuel Rev. 0 4.3, 4.4 7/70 0 Performance Evaluation,"
initiate reactor trip and/or engineered safety features actuation. Multiple
WCAP-3385-56, Part II "Evaluation of Mass Spectrometric and Radiochemical Materials Analyses of Irradiated Saxton Plutonium Fuel"


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 2)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse  USAR Report Topical  Revision Section Submitted Review(1) Report No. Title Number Reference to the NRC Status WCAP-3680-20 "Xenon-Induced Spatial Rev. 0 4.3 3/68 0 Instabilities in Large Pressurized Water Reactors" (EURAEC-1974)
independent channels monitor each of the selected plant parameters. The plant protection system logic was designed to initiate automatically protective


WCAP-3680-21 "Control Procedures for Rev. 0 4.3 2/69 0 Xenon-Induced X-Y Instabilities in Large Pressurized Water Reactors" (EURAEC-2111)
action whenever the monitored parameters reach a limiting safety system


WCAP-3680-22 "Xenon-Induced Spatial Rev. 0 4.3 9/69 0 Instabilities in Three-Dimensions" (EURAEC-2116)
setting. Redundancy was provided to assure that no single failure would


WCAP-3696-8 "Pressurized Water Rev. 0 4.3 10/68 0 Reactor pH-Reactivity Effect Final Report" (EURAEC-2074)
prevent protective action when it was required. The plant protection system


WCAP-3726-1 "Pu02 -U02 Fueled Critical Rev. 0 4.3 7/67 0 Experiments"  
was designed in conformance to IEEE Standard 279 "Criteria for Protection


WCAP-6065 "Melting Point of Rev. 0 4.4 2/65 0 Irradiated U02"  
Systems for Nuclear Power Generating Stations."  


WCAP-6069 "Burnup Physics of Rev. 0 4.4 6/65 0 Heterogeneous Reactor Lattices"
1.2.6.1.1 Reactor Trip System


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 3)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse  USAR Report Topical  Revision Section Submitted Review(1)
The reactor trip system shuts down the reactor whenever the limits of safe operation are approached. The safe operating region was defined by such considerations as mechanical/hydraulic limitations on equipment and heat
Report No. Title Number Reference to the NRC Status  WCAP-6073 "LASER - A Depletion Rev. 0 4.3 4/66 0 Program for Lattice Calculations Based on MUFT and THERMOS"  WCAP 6086 "Supplementary Report Rev. 0 4.3 8/69 0 on Evaluation of Mass Spectrometric and Radiochemical Analyses of Yankee Core I Spent Fuel, Including Isotopes of Elements Thorium Through Curium"  WCAP-7015 "Subchannel Thermal Rev. 1 4.4 2/14/69 0 Analysis of Rod Bundle Cores  WCAP-7048 "The PANDA Code" Rev. 0 4.3 1/9/75 A P-A(P)
WCAP-7757-A  WCAP-7198-L(P) "Evaluation of Protective Rev. 0 6.1 4/23/69 0  WCAP-7825 Coatings for use in  12/16/71 Reactor Containment"  WCAP-7213- "The TURTLE 24.0 Diffusion Rev. 0 4.3, 15.0, 1/9/75 A P-A(P) Depletion Code" 15.4  WCAP-7758-A  WCAP-7240(P) "An Experimental Investi- Rev. 0 7/7/72 B gation of the Effect of Open Channel Flow on Thermal-Hydrodynamic Flow Stability" Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 4)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse  USAR Report Topical  Revision Section Submitted Review(1) Report No. Title Number Reference to the NRC Status WCAP-7308-L(P) "Evaluation of Nuclear Rev. 0 4.3 7/9/70 U WCAP-7810 Hot Channel Factor 12/16/71 Uncertainties"


WCAP-7359-L(P) "Application of the THINC Rev. 0 4.4 9/8/69 0 WCAP-7838 Program to PWR Design" 1/17/72
transfer phenomena. Therefore, the reactor trip system keeps surveillance on


WCAP-7397-L(P) "Seismic Testing of Rev. 0 3.10(N) 2/6/70 U WCAP-7817 Electrical and Control 12/16/71 Equipment"
process or calculated variables which are directly related to those equipment


WCAP-7397-L(P) "Seismic Testing of Supple- 3.10(N) 1/27/71 U WCAP-7817 Electrical and Control ment 1 12/16/71 Equipment (WCID Process Control Equipment)"
limitations. Whenever a direct process or calculated variable exceeds a


WCAP-7477-L(P) "Sensitized Stainless Rev. 0 5.2 3/26/70 A WCAP-7735 Steel in Westinghouse 8/12/71 PWR Nuclear Steam Supply Systems"
setpoint, the reactor would automatically be shut down.  


WCAP-7488-L(P) "Solid State Logic Rev. 0 7.2, 7.3 3/24/71 B WCAP-7672 Protection System 5/27/71 Description"
1.2.6.1.2 Engineered Safety Features Actuation System  


WCAP-7558 "Seismic Vibration Testing Rev. 0 3.10(N) 9/25/72 U with Sine Beats"
The engineered safety features actuation system was designed to detect symptoms


WCAP-7588 "An Evaluation of the Rev. 1A 15.4 1/7/75 A Rod Ejection Accident in Westinghouse Pressurized Water Reactors Using Spatial Kinetics Methods" Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 5)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse  USAR Report Topical  Revision Section Submitted Review(1) Report No. Title Number Reference to the NRC Status WCAP-7595-A (See WCAP-7941-P-A(P))
of a loss-of-coolant accident, a steam-line break, a feedwater-line break, loss


WCAP-7667-P- "Interchannel Thermal Mixing Rev. 0 4.4 1/27/75 A A(P) with Mixing Vane Grids" WCAP-7755-A
of offsite power, or a fuel handling accident and to actuate the appropriate


WCAP-7695- "DNB Tests Results for  Rev. 0 4.4 1/21/75 A P-A(P) New Mixing Vane Grids (R)"
engineered safety features systems as certain threshold levels of each
WCAP-7958-A


WCAP-7695, "DNB Test Results for R Rev. 0 4.4 1/21/75 A Addendum Grid Thimble Cold Wall 1-P-A(P) Cells" WCAP-7985, Addendum 1-A
indicator symptom are passed.  


WCAP-7672 (See WCAP 7488-L(P))  
1.2.6.2 Reactor Instrumentation and Control System The reactor is controlled (1) by taking advantage of inherent neutronic


WCAP-7705 "Testing of Engineered Rev. 2 5/5/76 B Safety Features Actuation System"
characteristics, e.g., temperature coefficients of reactivity; (2) by control


WCAP-7706-L(P) "An Evaluation of Solid Rev. 0 4.6, 7.1 9/2/71 U WCAP-7706 State Logic Reactor 7.2, 7.3 Protection in Anticipated Transients"
rod cluster motion, which is used for load transients and for startup and shutdown; (3) and by a soluble neutron absorber, boron, in the form of boric


WCAP-7709-L(P) "Electrical Hydrogen Rev. 0 7/14/71 A WCAP-7820 Recombiner for Water 6.2.5 12/16/71 Reactor Containments"
acid inserted during cold shutdown, partially removed at startup, and adjusted


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 6)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse  USAR Report Topical Revision Section Submitted Review(1) Report No. Title Number Reference to the NRC Status WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 5/23/72 A WCAP-7820 for PWR Containments - Final ment 1 6.2.5 5/31/72 Development Report"
in concentration during core lifetime to compensate for fuel consumption and


WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 9/24/73 A WCAP-7820 for PWR Containments - Equip- ment 2 6.2.5 11/2/73 ment Qualification Report"
accumulation of fission products. The control system allows the plant to


WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 1/23/74 A WCAP-7820 for PWR Containments - Long- ment 3 6.2.5 3/22/74 Term Tests"
accept step load increases of up to 10 percent and ramp load increases of up to


WCAP-7709-L(P "Electric Hydrogen Recombiner Supple- 4/21/74 A WCAP-7820 for PWR Containments" ment 4 6.2.5
5 percent per minute over the load range of 15 to 100 percent of full power.


WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 1/7/76 A WCAP-7820 Special Tests" ment 5 6.2.5
Equal step and ramp load reductions are possible, over the range of 100 to 15


WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 11/5/76 A WCAP-7820 IEEE 323-1974 Qualification" ment 6 6.2.5
percent of full power.  


WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 9/21/77 A WCAP-7820 LWR Containments - Supple- ment 7 6.2.5 mental Test Number 2"
1.2-14 Rev. 0 WOLF CREEK 1.2.6.3 Radiation Monitoring System


WCAP-7735 (See WCAP-7477-L(P))
The liquid and gaseous effluents from the plant are continuously monitored for


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 7)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse USAR Report Topical  Revision Section Submitted Review(1)
radioactivity. Release rates are monitored and recorded. The process
Report No. Title Number Reference to the NRC Status WCAP-7750 "A Comprehensive Space Time Rev. 0 3.6.3 8/31/71 0 Dependent Analysis of Loss-of-Coolant (SATAN-IV Digital (Code)"


WCAP-7755-A (See WCAP-7667-P-A(P))
radiation monitoring system detects radioactivity in fluid systems which is


WCAP-7757-A (See WCAP-7048-P-A(P))
indicative of fuel clad defects and/or fluid leakage between process systems.


WCAP-7758-A (See WCAP-7213-P-A(P))
Area monitoring stations are provided to measure gamma radiation at selected


WCAP-7769 "Overpressure Protection for Rev. 1 5.2, 15.2 7/5/72 U Westinghouse Pressurized Water Reactors"
locations in the plant. Radiation levels, as detected by these monitors, are


WCAP-7798-L(P) "Behavior of Austenitic Rev. 0 6.1 12/6/71 0 WCAP-7803 Stainless Steel in Post 1/4/72 Hypothetical Loss-of-Coolant Environment"
indicated in the control room, and above normal values are annunciated.  


WCAP-7800 "Nuclear Fuel Division Rev. 4A 3A 4/28/75 A Quality Assurance Program 4.2 Plan"
1.2.6.4 Balance-of-Plant Instrumentation and Control Systems


WCAP-7803 (See WCAP-7798-L(P))
The turbine and generator control systems are designed to regulate generator


WCAP-7806 "Nuclear Design of Westing- Rev. 0 4.3 21/16/71 B house Pressurized Water Reactors with Burnable Poison Rods"
load. The turbine-generator protection system is designed to ensure safe


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 8) WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse USAR Report Topical Revision Section Submitted Review(1)
operation of the unit. The analog Electro-Hydraulic Control (EHC) system has been replaced with a new digital Turbine Control System (TCS). The new system utilizes an Ovation-Based Distributed Control System (DCS). Two redundant sets of controllers are used in the turbine control system. The TCS architecture is based on combined functional and hardware redundancy to create a robust and reliable system.
Report No. Title Number Reference to the NRC Status WCAP-7810 (See WCAP-7308-L(P))  


WCAP-7811 "Power Distribution Control Rev. 0 4.3 12/16/71 0 of Westinghouse Pressurized Water Reactors"
Additional instrumentation and controls allow manual or automatic control of  


WCAP-7817 (See WCAP-7397-L(P)) Rev. 0
various temperatures, pressures, flows, and liquid levels throughout the plant.


WCAP-7817 (See WCAP-7477-L(P)) Supple-ment 1
Indicators, recorders, annunciators, and the plant computer inform the


WCAP-7817 "Seismic Testing of Electrical Supple- 3.10(N) 1/17/72 U and Control Equipment (Low ment 2 Seismic Plants)"
operating personnel at the equipment location and/or the control room of plant


WCAP-7817 "Seismic Testing of Electrical Supple- 3.10(N) 1/17/72 U and Control Equipment (Westing ment 3 house Solid State Protection System) (Low Seismic Plants)"
conditions and performance.  


WCAP-7817 "Seismic Testing of Electrical Supple- 3.10(N) 12/14/72 U and Control Equipment (WCID ment 4 NUCANA 7300 Series) (Low Seismic Plants)"
1.2.7 PLANT ELECTRIC POWER SYSTEM


WCAP-7817 "Seismic Testing of Electrical Supple- 3.10(N) 12/14/72 U and Control Equipment (Instru- ment 5 ment Bus Distribution Panel)
1.2.7.1 Transmission and Generation Systems
(Low Seismic Plants)"


WCAP-7817 "Seismic Testing of Electrical Supple- 3.10(N) 8/00/74 U and control Equipment (Type DB ment 6 Reactor Trip Switchgear)
The generating units are connected to the respective utility transmission


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 9)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse USAR Report Topical Revision Section Submitted Review(1)
systems. The transmission system voltage is 345 kV for Kansas Gas and Electric
Report No. Title Number Reference to the NRC Status WCAP-7820 (See WCAP 7709-L[P])


WCAP-7825 (See WCAP 7198-L[P])  
Company (KG&E) and Kansas City Power & Light Company (KCP&L). The utilities


WCAP-7832 "Evaluation of Steam Generator Rev. 0 5.4 21/26/73 A Tube, Tube Sheet and Divider Plate Under Combined LOCA Plus SSE Conditions"
have integrated transmission networks and interconnections with neighboring


WCAP-7836 "Inlet Orificing of Open PWR Rev. 0 4.4 1/17/72 B Cores"
systems. A description of system network and interconnection for each utility


WCAP-7838 (See WCAP 7359-L[P])
is given in Chapter 8.0.


WCAP-7870 "Neutron Shielding Pads" Rev. 0 3.9 (N) 7/17/72 A
The main generator is a General Electric 1,800 rpm, three-phase, 60-cycle


WCAp-7907 "LOFTRAN Code Description" Rev. 0 5.2, 10/11/72 U 15.0, 15.1  15.2, 15.3,  15.4, 15.5  15.6 WCAP-7908 "FACTRAN - A FORTRAN-IV code Rev. 0 15.0, 9/20/72 U for Thermal Transients in a  15.3, U02 Fuel Rod"  15.4
synchronous unit. The generator is connected directly to the turbine shaft and


WCAP-7909 "MARVEL - A Digital Computer        Rev. 0  10/11/72 U Code for Transient Analysis of a Multiploop PWR System"
is equipped with an excitation system coupled directly to the generator shaft.  


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 10)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse USAR Report Topical Revision Section Submitted Review(1)
Power from the generators is stepped up from 25 kV by the unit main
Report No. Title Number Reference to the NRC Status WCAP-7912- "Power Peaking Factors" Rev. 0 4.3, 4.4 1/16/75 A P-A (P)
WCAP-7912-A


WCAP-7913 "Process Instrumentation Rev. 0 7.2, 7.3 3/9/73 B for Westinghouse Nuclear Steam Supply System (4-Loop Plant Using WCID-7300 Series Process Instrumentation)"
transformers and supplied by overhead lines to the switchyard. A unit


WCAP-7916 (See WCAP 2850-L[P])
auxiliary transformer is connected to the main generator through an isolated


WCAP-7921-AR "Damping Values of Nuclear Rev. 0 3.7(N), 3A 7/11/74 A Power Plant Components"
phase bus duct to supply the auxiliary loads of the unit during power


WCAP-7924-A "Basis for Heatup and Rev. 0 4/28/75 A Cooldown Limit Curves"
generation.  


WCAP-7941- "Effect of Axial Spacing on Rev. 0 1.5, 4.4 1/27/75 A P-A (P) Interchannel Thermal Mixing WCAP-7595-A with the R Mixing Van Grid"
1.2-15 Rev. 27 WOLF CREEK 1.2.7.2 Electric Power Distribution System


WCAP-7956 "THINC-IV - An Improved Program Rev. 0 4.4 10/22/73 A for Thermal-Hydraulic Analysis of Rod Bundle Cores"
Electric power is supplied from the switchyard to the onsite power system for  


WCAP-7958 (See WCAP-7695-P-A(P))
the electrical auxiliaries of each unit through two independent circuits. One


WCAP-7964 "Axial Zenon Transient Tests Rev. 0 4.3 6/15/71 O at the Rochester Gas and Electric Reactor"
circuit supplies power through a startup transformer and the other through an engineered safety features (ESF) transformer. The startup transformer feeds


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 11)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse USAR Report Topical Revision Section Submitted Review(1)
two 13.8-kV buses and a second ESF transformer. Power is supplied to  
Report No. Title Number Reference to the NRC Status WCAP-7979- "TWINKLE - A Multi-Dimensional Rev. 0 15.0, 1/7/75 A P-A (P) Neutron Kinetics Computer 15.4 WCAP-8028-A Code"


WCAP-7985 (See WCAP-7695, Addendum 1-P-A[P]) Addendum 1A
auxiliaries at 13.8 kV, 4.16 kV, 480 V, 480/277 V, and 208/120 V ac. Refer to


WCAP-8028-A (See WCAP-7979-P-A(P))
Figure 8.3-1.


WCAP-8054 (P) "Application of the THINC-IV Rev. 0 4.4 12/7/73 A WCAP-8195 Program to PWR Design" 1/11/74
The power distribution system includes the Class IE and non-Class IE ac and dc


WCAP-8082- "Pipe Breaks for the LOCA Rev. 0 3.6.3 1/16/75 A P-A (P) Analysis of the Westinghouse WCAP-8172-A Primary Coolant Loop"
power systems. The Class IE power system supplies equipment used to shut down


WCAP-8099 "A Summary Analysis of the Rev. 0 4/20/73 B April 30 Incident at the San Onofre Nuclear Generation Station, Unit 1"
the reactor and limit the release of radioactive material following a design


WCAP-8163 "Reactor Coolant Pump Rev. 0 3A, 5.4 9/20/73 U Integrity in LOCA"
basis event.  


WCAP-8170 (P) "Calculational Model for Core Rev. 0 15.16 7/3/74 AE WCAP-8171 Reflooding After a Loss-of-Coolant Accident (WREFLOOD Code)"
The Class IE ac system for each unit consists of two independent and redundant load groups and four independent 120-V vital ac instrumentation and control


WCAP-8172-A (See WCAP 8082-P-A[P])
power supply systems. The load groups include 4.16-kV switchgear, 480-V load


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 12)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse USAR Report Topical Revision Section Submitted Review(1)
centers, and motor control centers.  
Report No. Title Number Reference to the NRC Status WCAP-8183 "Operational Experience with Rev. 7 4.2 4/20/78 B Westinghouse Cores (up to December 31, 1977)"


WCAP-8195 (See WCAP-8054(P))
Two diesel generators are provided as a standby power source for each unit, one


WCAP-8200 (P) "WFLASH - A FORTRAN-IV Rev. 2 15.6 7/3/74 AE WCAP-8261 Computer Program for Simula- Rev. 1 tion of Transients in a Multi-Loop PWR"
for each of the two Class IE load groups. Each generator has sufficient
 
capacity to operate all the equipment of one load group, which is necessary to
 
prevent undue risk to public health and safety in the event of a design basis
 
accident.
 
The non-Class IE ac system includes 13.8-kV switchgear, 4.16-kV switchgear,
 
480-V load centers, and motor control centers.
 
The vital ac instrumentation and control power supply systems include battery systems, static inverters, and distribution panels. All voltages listed are nominal values, and all electrical Class IE equipment is designed to accept the
 
expected range in voltage.  
 
The Class IE electrical systems are similar to Class IE systems utilized on
 
many other Bechtel-designed plants since designs that meet the requirements and
 
standards of the nuclear industry develop in a similar manner. For instance,
 
Class IE system and components have a similar design and function to the ac
 
systems and components at the Midland Plant, Units 1 and 2. In addition, the
 
Class IE dc systems and components are similar to the dc systems and components


WCAP-8218 "Improved Fuel Performance Rev. 0 3A, 4.2, 4.4 June 1985 A  P-A (P) Models for Westinghouse Fuel WCAP-8219-A Rod Design and Safety Evaluations."
at Palo Verde. The Class IE system used at WCGS is similar to the system used
WCAP-8236 (P) "Safety Analysis of the 17 x 17 Rev. 0 1.5, 4.2 2/28/74 U WCAP-8288 Fuel Assembly for Combined 3/1/74 Seismic and Loss-of-Coolant Accident"


WCAP-8236 (P) "Safety Analysis of the 8-Grid Addendum 3.7(N) 4/15/74 A WCAP-8288 17 x 17 Fuel Assembly for 1 Combined Seismic and Loss-of-Coolant Accident"
at Callaway.  


Rev. 14 WOLF CREEK TABLE 1.6-2 (Sheet 13)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse USAR Report Topical Revision Section Submitted Review(1)
Direct current power for the Class IE dc loads of each unit is supplied by four
Report No. Title Number Reference to the NRC Status WCAP-8252 "Documentation of Selected Rev. 1 3.6.3, 3.9(N) 7/19/77 U Westinghouse Structural Analysis Computer Codes"


WCAP-8253 "Source Term Data for Westing- Amendment 2/13/76 B house Pressurized Water 1 Reactors"
independent Class IE 125-V dc batteries and 


WCAP-8255 "Nuclear Instrumentation Rev. 0 7.2, 7.7 4/9/74 B System"
1.2-16 Rev. 0 WOLF CREEK associated battery chargers. One 250-V and four 125-V non-Class 1E batteries


WCAP-8261 (See WCAP-8200(P))
and associated battery chargers are also provided to supply 250-V and 125-V dc


WCAP-8278 (P) "Hydraulic Flow Test of the Rev. 0 1.5, 4.2, 4.4 2/28/74 U WCAP-8279 17 x 17 Fuel Assembly" 3/1/74
power for the non-Class 1E dc system loads.  


WCAP-8288 (See WCAP-8236(P))  
The Station Blackout Diesel Generator power system consists of three (3) non-safety related diesel generators that are capable of supplying essential loads on bus NB001 or bus NB002 required to reliably and safely shut down the unit following a station blackout event. Station blackout means the complete loss of alternating current (ac) electric power to the essential and nonessential switchgear buses in a nuclear power plant (i.e., loss of offsite electric power system concurrent with turbine trip and unavailability of the onsite emergency ac power system).
This equipment is not credited for coping with a station blackout per NRC Regulatory Guide 1.155 and NUMARC 87-00, but is instead installed to provide plant MSPI/PRA margin.
The equipment is located within a missile barrier designed to limit the average wind speed downstream of the barrier entrance to less than or equal to 150 mph during a 230 mph tornado event in accordance with NRC Regulatory Guide 1.76, Rev. 1. 1.2.8 POWER CONVERSION SYSTEM


WCAP-8289 (P) "17 x 17 Design Fuel Rod Rev. 0 1.5 11/18/74 A WCAP-8290 Behavior During Simulated Loss-of-Coolant Accident Conditions"
Thermal energy that is generated by the NSSS is converted into electrical


WCAP-8296- "Effect of 17 x 17 Fuel Rev. 0 1.5 2/6/75 A P-A (P) Assembly Geometry on DNB" WCAP-8297-A
energy through the steam cycle process by the turbine generator.  


WCAP-8298- "The Effect of 17 x 17 Rev. 0 4.4 1/28/75 0A P-A (P) Fuel Assembly Geometry on WCAP-8299-A Interchannel Thermal Mixing"
The turbine is a tandem-compound, six-flow, four-element, 1,800-rpm unit,


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 14)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse USAR Report Topical Revision Section Submitted Review(1)
having one high-pressure and three low-pressure elements. Combination moisture
Report No. Title Number Reference to the NRC Status WCAP-8301 (P) "LOCTA-IV Program: Loss-of Rev. 0 15.0, 15.6 7/12/74 AE WCAP-8305 Coolant Transient Analysis"


WCAP-8302 (P) "SATAN-VI Program:  Compre- Rev. 0 15.0, 15.6 7/12/74 AE WCAP-8306 hensive Space-Time Dependent Analysis of Loss-of-Coolant"
separator-reheaters are employed to dry and reheat the steam between the high-


WCAP-8303- "Prediction of the Flow-Induced Rev. 0 3.9(N) 7/18/75 A P-A (P) Vibration of Reactor Internals WCAP-8317-A by Scale Model Test"
and low-pressure turbines. The auxiliaries include deaerating surface


WCAP-8305 (See WCAP-8301(P))
condensers, condenser evacuation system, turbine-driven main feedwater pumps,


WCAP-8306 (See WCAP-8302(P))
motor-driven condensate pumps, and seven stages of feedwater heating. The


WCAP-8317-A (See WCAP-8303-P-A(P))
steam and turbine systems were designed to receive the heat energy produced in


WCAP-8324-A "Control of Delta Ferrite in Rev. 0 5.2 6/23/75 A Austenitic Stainless Steel Weldments"
the reactor during normal operation as well as a 50-percent load reduction of  


WCAP-8327 (P) "Containment Pressure Analysis Rev. 0 15.6 7/3/74 AE WCAP-8326 Code (COCO)"
the turbine-generator. Heat dissipation under the latter condition is


WCAP-8330 "Westinghouse Anticipated Rev. 0 4.3, 4.6 9/25/74 U Transients Without Trip Analysis"
accomplished by steam dump to the condenser (40-percent full load). The steam


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 15)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse USAR Report  Topical  Revision Section Submitted Review(1)
dump enables the plant to accept a loss of 50-percent external load without
Report No. Title Number Reference to the NRC Status WCAP-8339 "Westinghouse Emergency Core Rev. 0 15.6 7/3/74 AE Cooling System Evaluation Model - Summary"


WCAP-8340 (P) "Westinghouse Emergency Core Rev. 0 15.6 8/1/74 AE WCAP-8356 Cooling System - Plant Sensitivity Studies"
reactor or turbine trip. The condensers are cooled by the circulating water


WCAP-8341 (P) "Westinghouse Emergency Core Rev. 0 15.6 7/3/74 AE WCAP-8342 Cooling System Evaluation Model-Sensitivity Studies"
system.  


WCAP-8359 "Effects of Fuel Densification Rev. 0 4.3 8/2/74 A Power Spikes on Clad Thermal Transients"
1.2.8.1 Main Steam Supply System


WCAP-8370 "Quality Assurance Plan Rev. 7A 3A 2/5/75 A Westinghouse Nuclear Energy Systems Divisions"
The main steam supply system consists of the piping and valves that are


WCAP-8370 "Westinghouse Water Reactor Rev. 8A 3A 11/14/77 A Divisions Quality Assurance Plan"  
necessary to deliver saturated steam from the steam generators to the turbine
 
generator. Four 28-inch main steam lines carry steam from the top of the steam
 
generators, through four main steam isolation valves, one in each line, to the
 
turbine stop valves at the inlet to the turbine generator. Each main steam
 
line is also equipped with five code safety valves and one atmospheric relief
 
valve. The main steam supply system is similar to the main steam supply system
 
at Palo Verde and identical to the main steam supply system at Callaway.
 
1.2.8.2 Main Condenser Evacuation System
 
The main condenser evacuation system provides a means for removing air and
 
noncondensible gases from the main condenser. The main condenser evacuation
 
system uses three vacuum pumps to perform this function; two for normal
 
operation and the third that is started to help draw a vacuum during the
 
startup mode.
 
1.2-17 Rev. 27 WOLF CREEK This system is similar to the main condenser evacuation system that is utilized
 
on Palo Verde with the exception that the Palo Verde design includes a fourth
 
vacuum pump. The system used at WCGS is identical to the system used at
 
Callaway.
 
1.2.8.3 Turbine Gland Sealing System The turbine gland sealing system seals the turbine shaft penetrations and the
 
turbine valve stems to prevent the escape of steam or the introduction of air
 
at these places in the steam areas of the turbine. This system utilizes standard industry components and is similar in design and function to the
 
system utilized at San Onofre and identical to the system used at Callaway.
 
1.2.8.4 Turbine Bypass System The turbine bypass system, more commonly known as the steam dump system, is
 
provided to reduce the transient effects of plant startup, hot shutdown,
 
cooldown, and step reductions in generator loadings on the reactor coolant system. The steam dump system has the capability to bypass up to 40 percent of
 
full steam flow from the steam generators to the main condenser. This system
 
uses air-operated globe valves to perform its function and is similar in design
 
and function to the steam dump system at Palo Verde and identical to the system
 
at Callaway.
 
1.2.8.5 Circulating Water System The circulating water system supplies cooling water from the plant's cooling
 
water source to the main condenser to condense the steam that discharges from
 
the exhaust of the turbine or the turbine bypass system. The Wolf Creek site utilizes a large cooling lake for its source of circulating water and cooling
 
mechanism as does Comanche Peak.
 
1.2.8.6 Condensate Cleanup System The condensate cleanup system, more commonly known as the condensate
 
demineralizer system, contains demineralizers that are utilized to maintain the
 
required purity of the feedwater which supplies the steam generators. The condensate demineralizer system is similar in design and function to the
 
cleanup system utilized at Midland Plant, Units 1 and 2. The WCGS design
 
includes additional components, such as a waste collection tank and sluice
 
water pumps. The system used at WCGS is identical to the system used at
 
Callaway.
 
1.2-18 Rev.1 WOLF CREEK 1.2.8.7 Condensate and Feedwater System The condensate and feedwater system receives condensate from the condenser
 
hotwells and delivers feedwater to the steam generators at a temperature that
 
provides maximum steam plant efficiency.
 
The condensate and feedwater system includes seven stages of feedwater heaters,
 
six demineralizer vessels, and various pumps, valves, and piping to perform its
 
intended function. This system is similar in design and function to the
 
condensate and feedwater system at Trojan and identical to the system used at
 
Callaway.
 
During normal plant cooldown and startup, the feedwater system is used to
 
supply feedwater to the steam generators for removal of decay and sensible heat
 
from the reactor coolant system.
1.2.8.8 Steam Generator Blowdown System The steam generator blowdown system functions to maintain the secondary side
 
water within the NSSS supplier's water chemistry specifications. This system
 
includes a flash tank, filters, demineralizers, containment isolation valves, and various piping, all of which are common to most plant designs. This
 
system, however, employs an improved design which provides much larger flow
 
rates, four to five times larger, which enhances the blow-down function.
 
1.2.8.9 Secondary Liquid Waste System The secondary liquid waste system processes condensate demineralizer
 
regeneration wastes and either directs these wastes for processing and re-use
 
or discharge. This system also processes potentially radioactive liquid wastes. Secondary liquid waste systems are usually plant specific and depend
 
upon the design of the systems they serve. The secondary liquid waste system
 
is similar in design and function to most other Bechtel-designed projects.
 
1.2.8.10 Wastewater Treatment System The wastewater treatment facility processes wastewater discharges from the makeup demineralized water system (WM), the condensate demineralized system
 
(AK), the secondary liquid waste system (HF), water treatment plant acid and
 
caustic skid drains, the water treatment plant chemical spill catch basin, and
 
the wastewater treatment facility chemical spill catch basin prior to discharge
 
to the WCGS cooling lake. This system is designed to ensure that the above mentioned wastewater are in compliance with the pH limitations set forth in the
 
NPDES permit. This system shall also process wastewater as allowed by the
 
Offsite Dose Calculation Manual.
 
1.2-19 Rev. 19 WOLF CREEK 1.2.9 AUXILIARY SYSTEMS
 
1.2.9.1 Chemical and Volume Control System
 
The chemical and volume control system (CVCS) performs the following functions:
: a. Reactivity control
: b. Regulation of reactor coolant inventory
: c. Reactor coolant purification
: d. Chemical additions for corrosion control
: e. Seal water injection to reactor coolant pump seals
 
Reactor coolant system is continuously purified by removing a small fraction of the reactor coolant flow through the letdown system. Letdown water is cooled in the regenerative heat exchanger. From there, the coolant flows to a letdown
 
heat exchanger and through a demineralizer where corrosion and fission products
 
are removed. The coolant then passes through a filter and is sprayed into the
 
volume control tank, from which it is returned to the reactor coolant system by
 
the charging system.
 
The CVCS automatically adjusts the amount of reactor coolant to compensate for
 
changes in specific volume due to coolant temperature changes and reactor
 
coolant pump shaft seal leakage in order to maintain a programmed level in the
 
pressurizer.
 
The CVCS design for WCGS is similar to the CVCS design for the Comanche Peak
 
units. The major difference is that WCGS includes provisions in the CVCS and
 
residual heat removal system (see Section 7.4) to improve the capability to achieve and maintain cold shutdown. The CVCS system at WCGS is identical to the system used by Callaway.
 
1.2.9.2 Residual Heat Removal System
 
The residual heat removal system (RHRS) is used to remove heat from the reactor
 
coolant at a controlled rate when the reactor coolant pressure is less than
 
approximately 425 psig and the temperature is from 350 degrees F to 140 degrees F, and to maintain the proper reactor coolant temperature during refueling.
 
The design of the RHRS includes two motor-operated isolation valves that are
 
closed during normal operations. They are provided with both a "prevent-open"
 
interlock and "RHRS-Iso-Valve-Open" alarm which are designed to prevent
 
possible exposure of the RHRS to normal RCS operating pressure.
 
The isolation valves are opened for residual heat removal during a plant cooldown after the RCS temperature is reduced to approximately 350F and RCS pressure is less than approximately 360 psig. During a plant startup, the inlet isolation valves are shut after drawing a bubble in the pressurizer and
 
prior to increasing RCS pressure above approximately 425 psig (alarm setpoint).
 
1.2-20 Rev. 14 WOLF CREEK The residual heat removal pumps are used to circulate the reactor coolant through two residual heat removal heat exchangers, returning it to the reactor
 
coolant system through the lowpressure injection header.
 
The RHRS design for WCGS is similar to the RHRS design for the Comanche Peak units. The major difference is that at Wolf Creek, provisions are included in
 
the CVCS and RHRS (see Section 7.4) to improve the capability to achieve and maintain cold shutdown. The RHRS used at WCGS is identical to the system used by Callaway.
 
1.2.9.3 Fuel Handling and Storage System
 
The reactor is refueled using equipment designed to handle and store spent fuel
 
under water from the time it leaves the reactor vessel until it is placed in a
 
cask for shipment from the site. Underwater transfer of spent fuel provides an optically transparent radiation shield, as well as a reliable source of coolant
 
for removal of decay heat. This system also provides capability for receiving,
 
handling, and storing new fuel.
 
The fuel handling system is divided into two areas: the reactor cavity, which
 
is flooded for refueling, and the fuel storage pool, which is outside the reactor containment and is accessible to plant personnel. The fuel storage pool consists of the spent fuel pool and the cask loading pool (with fuel storage racks installed). The reactor cavity and the fuel storage pool are connected by a fuel transfer system which carries the fuel through an opening in the reactor containment. The fuel pool cooling and cleanup system removes
 
decay heat from fuel stored in the spent fuel pool and maintains the purity of
 
the fuel pool water.
 
Spent fuel is removed from the reactor vessel by a refueling machine and placed
 
in the fuel transfer system. In the spent fuel pool, the fuel is removed from
 
the transfer system and placed into storage racks. After a suitable decay
 
period, the fuel is removed from storage and loaded into a shipping cask for
 
transfer.
 
The fuel handling system and new fuel storage racks utilized at WCGS are
 
similar to those utilized in the Comanche Peak units and many other facilities
 
that are currently in operation.
 
1.2.9.4 Service Water Systems 1.2.9.4.1 Service Water System
 
During normal plant operation, the service water system (SWS) supplies cooling water to the turbine building closed cooling water heat exchangers, central
 
chiller condensers, and pump out units, condenser vacuum pump seal water
 
coolers, steam packing exhauster, generator stator coolers, generator hydrogen
 
coolers, turbine-generator lube oil coolers, steam generator blowdown non-
 
regenerative heat exchanger, CVCS chiller unit, waterbox venting pump seal
 
water coolers, motor driven feed pump, and air compressors. The system also supplies cooling water to the essential service water system during normal operation.
 
The system draws water from the cooling lake, pumps the coolant through the
 
heat exchangers, and discharges it into the circulating water discharge, where it is directed back to the cooling
 
1.2-21 Rev. 14 WOLF CREEK lake. Water returning from the essential service water system is returned to the Ultimate Heat Sink and/or the cooling lake. Makeup water for the cooling lake is provided by pumps in the makeup water screenhouse. The SWS is
 
described in detail in Section 9.2.1.
 
The system is similar in design and function to the service water system
 
utilized at Midland Plant, Units 1 and 2.
 
1.2.9.4.2 Essential Service Water System
 
The essential service water system (ESWS) provides cooling water from the
 
ultimate heat sink (cooling lake) for plant components which require cooling
 
for safe shutdown of the reactor following an accident and/or loss of offsite
 
power. These components are the component cooling water heat exchangers,
 
containment air coolers, diesel generator coolers, safety injection pump room
 
coolers, RHR pump room coolers, containment spray pump room coolers,
 
centrifugal charging pump room coolers, component cooling water pump room coolers, auxiliary feedwater pump room coolers, control room air-conditioning condensers, Class 1E switchgear air-conditioning condensers, penetration room coolers, fuel pool cooling pump room cooler, and air compressor and after cooler. The ESW cooling water is discharged to the ultimate heat sink. The essential
 
service water pumps, prelube storage tanks, self-cleaning strainers, and
 
traveling water screens are located in a seismic Category I pumphouse. Other
 
parts of the system located outside the power block are either buried underground or located in seismic Category I structures. The ESWS is described
 
in detail in Section 9.2.1.
 
The essential service water system provides emergency makeup to the spent fuel pool and component cooling water systems. It is also the backup water supply to the auxiliary feedwater system.
 
The essential service water system is similar in design and function to the
 
essential service water system utilized at the Midland Plant, Units 1 and 2.
 
1.2.9.5 Component Cooling Water System The component cooling water system is a closed loop circulating water system
 
serving heat exchangers whose operation is required for the safe shutdown of
 
the reactor. Heat is removed from the closed loop by the essential service water system. Radiation monitors are provided to detect any radioactive
 
leakage into the component cooling system.
 
1.2-22 Rev. 14 WOLF CREEK The component cooling water system is similar in design and function to the
 
component cooling water system that is utilized at the Midland Plant, Units 1
 
and 2 and is identical to the system utilized at Callaway.
 
1.2.9.6 Compressed Air Systems Four nonlubricated air compressors, with separate aftercoolers, discharge compressed air to three air receivers that supply compressed air to a common
 
header. This header furnishes compressed air for both the plant air system and
 
the instrument air system. Instrument air is dried and filtered downstream of
 
the common supply header.
 
The plant air system provides compressed air for normal maintenance service at
 
various stations throughout the plant. The instrument air system provides
 
compressed air for the operation of all air-operated instruments and valves.
 
The compressed air system is similar in design and function to the compressed
 
air systems that are utilized at the Trojan and Midland Plant, Units 1 and 2
 
and is identical to the system utilized at Callaway.
 
1.2.9.7 Fire Protection Systems The fire protection system was designed to provide water to the plant fire
 
protection system and site fire protection facilities. An outside underground
 
yard loop surrounds the power block and provides water to all buildings and hydrants spaced around the plant site. Water for the fire protection system is
 
provided from the circulating water screenhouse intake bay. The system is
 
described in detail in Section 9.5.1.
 
The plant fire protection system consists of the following materials,
 
structures, detection devices, alarms, and suppression and extinguishing
 
facilities, selected and designed to minimize fire hazards and fire damage:
: a. Automatic wet-pipe sprinklers;
: b. Automatic pre-action systems;
: c. Water spray systems;
: d. Halon 1301 systems;
: e. Standpipe and hoserack assemblies;
 
1.2-23 Rev. 14 WOLF CREEK
: f. Portable extinguishers;
: g. Fire and smoke detection and alarm systems;
: h. Fire walls and barriers;
: i. Fire resistant and noncombustible materials of construction; and
: j. Smoke and heat vents;
 
Portions of the fire protection system that protect or pass through areas
 
containing equipment required for safe shutdown of the plant during and after
 
an earthquake are seismically analyzed and supported to prevent damage to this equipment. The system is designed to preclude flooding of safety-related equipment under seismic conditions.
 
The fire protection system provides an adequate supply of water to hydrants,
 
hose stations, sprinklers, and deluge systems, based on the maximum automatic
 
sprinkler or fixed water spray system demand with the simultaneous flow for
 
hose streams outside the power block.
 
Noncombustible and heat-resistant materials are used throughout the plant. 
 
Plant fire walls are provided and rated according to their particular location
 
in the plant, and penetrations through fire barriers are fitted with fire stops
 
having, as a minimum, the same rating as the barrier.
 
Instrumentation and controls are provided for the proper operation of the fire-
 
fighting systems and for fire detection and annunciation.
The fire protection system was designed with components and systems that are
 
common to many plants throughout the nuclear industry and, therefore, is
 
comparable to most fire protection systems utilized at other plants. This
 
system is most similar in design and function to the fire protection system
 
utilized at San Onofre.
 
1.2.9.8 Heating, Ventilating, and Air-Conditioning Systems The heating, ventilating, and air-conditioning (HVAC) systems are designed to
 
provide a suitable environment for equipment and to ensure the safety of
 
personnel.
 
Redundant cooling and ventilating systems serving engineered safety features
 
equipment rooms and the main control room meet 
 
1.2-24 Rev. 0 WOLF CREEK seismic Category I requirements and are each supplied from separate Class IE
 
electrical buses. These systems satisfy the single failure criterion.
 
The HVAC systems serving the control room areas are similar in design and function to the HVAC systems at the Midland Plant, Units 1 and 2 and Callaway. 
 
The nonsafety-related HVAC systems are specifically tailored to suit the design
 
of other portions of the plant but are similar in design and function to that
 
of other Bechtel-designed projects.
 
1.2.9.9 Sampling Systems The sampling systems collect representative samples of the various process
 
fluids. The systems include a primary sampling system, secondary sampling
 
system, radwaste sampling system, and local grab sample provisions. Samples are routed to centralized sampling stations or local sample stations, all of
 
which are located outside the reactor containment. Both liquid and gaseous
 
samples are taken. Automatic and "on-line" analyses are made for some samples. 
 
Chemical and radiochemical laboratory analyses are performed on other samples
 
to determine chemical composition, boron concentration, fission and corrosion
 
product activity levels, dissolved gas concentration, gross radioactivity, and
 
specific isotopic analyses. The results are used to regulate boron control
 
adjustments, monitor fuel rod integrity, evaluate demineralizer performance,
 
control effluent releases, and maintain correct water chemistry.
 
The sampling system is specifically tailored to suit the design of other portions of the plant but is similar in design and function to sampling systems
 
utilized throughout the nuclear industry.
 
1.2.9.10 Service Gas System The service gas system provides for the handling and storage of commonly used
 
service gases. The service gas system has provisions to protect against
 
nitrogen and hydrogen gas ruptures and is comparable in design and function to the service gas system at Palo Verde. The service gas system also provides its
 
function for several other gases, e.g. carbon dioxide and oxygen.
 
1.2.9.11 Communications System The communications system provides components and distribution for the total
 
communications network of the plant including intercom systems and remote
 
communications devices. The communication system is similar in design and function to the communications system at Arkansas Nuclear One - Unit 2 and
 
Callaway.
 
1.2-25 Rev. 0 WOLF CREEK 1.2.9.12 Diesel Generator Support Systems
 
The emergency diesel engine fuel oil storage and transfer system provides
 
onsite fuel oil storage and transfer of fuel oil to the diesel engines. The
 
storage capacity of this system is somewhat larger than the storage capacity at other plants with a similar design.
 
The emergency diesel engine cooling water system is a closed cycle system that
 
provides a source of cooling water to the diesel engines. The emergency diesel
 
engine cooling water system is the intermediate system that transfers heat
 
between the diesel engine and the essential service water system and is similar
 
in design and function to the typical nuclear industry design.
 
The emergency diesel engine starting system provides startup air to the diesel
 
engines with two independent, redundant starting air trains per engine. The emergency diesel engine lubricating system consists of two major subsystems; 1) the main oil system, and 2) the rocker oil system. Each engine has its own
 
independent redundant lubricating system. The emergency diesel engine
 
combustion air intake and exhaust system provides filtered combustion air to
 
the diesel engines and discharges the exhaust via silencers in the discharge
 
stacks.
 
The diesel generator support systems are tailored to the specific design of the
 
diesel engines and are similar in design and function to the diesel generator
 
support systems at San Onofre and Midland Plant, Units 1 and 2 and identical to
 
the system at Callaway.
 
1.2.10 WASTE PROCESSING SYSTEMS
 
The waste processing systems provide all the equipment necessary for controlled
 
treatment and preparation for retention or disposal of all liquid, gaseous, and
 
solid wastes produced as a result of reactor operation. The liquid waste
 
processing system collects, processes, and removes or concentrates radioactive
 
constituents, and processes them until suitable for processing in the solid
 
radwaste system. The gaseous waste processing system removes fission product
 
gases from the reactor coolant and contains these gases during normal plant
 
operation. The solid radwaste system receives, processes, packages, and stores all radioactive wastes generated until shipment offsite.
 
1.2-26 Rev. 19 WOLF CREEK 1.2.11 SHARED FACILITIES AND COMPONENTS WCGS utilized the SNUPPS standard plant or power block design which was
 
developed to be acceptable for installation at any one of several sites. Wolf
 
Creek is a single unit site and has no shared safety-related facilities and
 
components.
1.2.12 REFERENCES SECTION 1.2
: 1. Dames & Moore, 1977, Penecontemporaneous Deformation Zones Wolf Creek Generating Station; for Kansas Gas and Electric Co.
and Kansas City Power & Light Co., Dames & Moore, May 20,
 
1977.
 
1.2-27 Rev. 14 WOLF CREEK TABLE 1.2-1 DESIGN ENVELOPE (Sheet 1) (1)
Parameter SNUPPS USAR Reference
 
Hazards There are no hazards which have an Section 2.2 Explosions from acci-  adverse effect on structures  dents involving ex-    plosives or gases were postulated in accordance with Regulatory Guide    1.91. The maximum overpressure and ground shock on the plant structures from such explosions are well below the design pressures for tornado protection and the    design OBE ground accelerations.
 
Temperatures (2)  Sections 2.3, These temperatures    3.11(B).2.5, and 9.4 envelop the histori-  1. Design min. and -60 F to 120 F  cally recorded mini-  max. for exposed  mum and maximum re-outside structures  gional temperatures  or components  and are within a      range of 100-year
: 2. Design for ulti- Cooling pond  recurrence temperatures.
mate heat sink
: 3. Design winter -25 F and 15 mph wind air conditions for ventilation
: 4. Design for summer 97 F dry bulb, 79 F wet bulb ventilation
 
Flood level Flooding is precluded by the Section 2.4 and No special flood    elevation of the plant and by Table 3.4-2 protection measures the site drainage system.  (such as external flood doors) are incorporated.
 
Maximum rainfall 7.4 in/hr, excess allowed to run Section 2.4 Site drainage designed off roofs  to preclude local flooding.
 
Rev. 6 WOLF CREEK TABLE 1.2-1 (Sheet 2)
Parameter SNUPPS USAR Reference Remarks  Ice and snow loading  Section 2.4 Basic snow load (100-      year recurrence snow-
: 1. Basic snow load, 91 psf  pack) adjusted for normal and severe  geometry and drifting environmental  for roof design using Section 7.2 of ANSI
: 2. Basic snow load, 153 psf  A58.1-1972.  "Extreme  extreme environ- environmental" includes mental  the effects of PMWP.
 
Ground water elevation Maximum hydrostatic level is at Section 2.4 Conservative assumption Grade  for buoyancy calcula-tions and computation of uplift pressure on      foundation base mats.
 
Seismology (OBE and OBE - 0.12g, SSE - 0.20g Section 2.5 The standard plant SSE)
OBE and SSE were used with each site's soil
 
properties to generate seismic structural loads. These loads were enveloped for design.
Floor response spectra were generated in the same manner. All items were designed either to the envelope or all of the individual floor response spectra so that these items could be interchangeable at all sites, thus the Wolf Creek site design was limited by the other SNUPPS plants floor response spectra.
Foundation character-
 
istics
: 1. Settlement Design settlements are within the Section 2.5 following criteria:
: a. Total - 3 in.
: b. Post construction - 1 in.
: c. Post construction differen-tial (between buildings and/or columns) - 1/2 in.
 
Rev. 0 WOLF CREEK TABLE 1.2-1 (Sheet 3)
Parameter SNUPPS USAR Reference Remarks
: 2. Static and dy- The equations for the lateral earth Section 2.5 Used for design of  namic lateral pressures, shown in Figure 2.5-152,  subsurface Category  earth pressures are used in conjunction with the  I walls  soil parameters and the enveloping earthquake parameters (i.e., enveloping  SSE and OBE) to compute the lateral  pressures on the foundation walls.
The maximum earth pressure thus computed is taken as the envelope pressure and is used in design.
: 3. Liquefaction Subsurface materials at all sites Section 2.5 not susceptible to liquefaction
: 4. Local subsidence No evidence of any actual or poten- Section 2.4 WCGS is free from tial subsidence  major surface or sub-
 
surface subsidence or collapse resulting from tectonic depressions, cavernous conditions, solutioning, or extraction of subsurface fluids or mining resulting from man-made activities.
Windspeed 100 mph. Tornado maximum wind speed Sections 3.3.1 and BC-TOP-3-A, ANSI-is 360 mph with 3 psi pressure drop 3.3.2 A58.1-1972, and Reg-in 1-1/2 secs  ulatory Guide 1.76.
 
Relative humidity (2) 97 F dry bulb Section 9.4 and  These are temperature  79 F wet bulb 45% (summer) Table 9.4-1 conditions based
-25 F dry bulb (winter)  on 1972 ASHRAE Handbook of Fundamentals and are used for design of the plant HVAC systems for safety-related structures.
 
(1) The design envelope was conservatively developed using data from all SNUPPS sites.
 
(2) The winter temperature conditions have been re-evaluated for Wolf Creek. The acceptable design minimum temperature for exposed outside structures or components is -30°F. The acceptable design winter temperature for HVAC design is 7°F.
 
Rev. 14 
 
WOLF CREEK 1.3 COMPARISON TABLES 1.3.1 COMPARISON WITH SIMILAR FACILITY DESIGNS Table 1.3-1 presents a design comparison of the major NSSS parameters or features of WCGS with Comanche Peak, Units 1 and 2 (Docket Nos. 50-445 and 50-
 
446), W. B. McGuire, Units 1 and 2 (Docket Nos. 50-369 and 50-370), and Trojan
 
(Docket No. 50-344). Wolf Creek and Callaway were both designed using the
 
SNUPPS powerblock design. These comparisons were made at the time of
 
application for the Operating License and are considered historic data. Table
 
1.3-1 will not be updated to reflect changes made at these facilities.
 
For a general design comparison of the major BOP systems utilized by WCGS with
 
similar systems on other Bechtel-designed plants, refer to the general system
 
descriptions in Section 1.2.
Refer to Table 1.3-2 for a listing of major analyses that have been used on
 
WCGS but are not included in topical reports. Most of these analyses have been
 
previously reviewed by the NRC on other dockets. Note that approved topical
 
reports issued by Bechtel and Westinghouse are listed in Section 1.6.
 
1.3.2 COMPARISON OF FINAL AND PRELIMINARY INFORMATION
 
Table 1.3-3 identifies all the significant changes that were made to the power
 
block since submittal of the SNUPPS PSAR but prior to receipt of the operating
 
license. Only items not reported in the PSAR and its subsequent amendments are
 
listed in Table 1.3-3.
 
1.3.3 COMPLIANCE WITH NRC REGULATIONS
 
Table 1.3-4 presents a list of NRC regulations and a corresponding description
 
regarding the degree of compliance to each regulation. Compliance with 10 CFR
 
Parts 20, 26, 50, 51, 55, 70, 71, 73, and 100 is considered.
 
1.3-1 Rev. 23 WOLF CREEK TABLE 1.3-1 DESIGN COMPARISON USAR Parameter or Feature Chapter/Section WCGS(b) Comanche Peak W. B. McGuire Trojan  Reactor core heat 4.0, 5.0, 15.0 3,411 3,411 3,411 3,411
 
output, MWt Minimum DNBR for 4.1, 4.4, 15.0 >1.30 >1.30 >1.30 >1.30
 
design transients Total thermal flow 4.1, 4.4, 5.1 142.1 142.1 140.3 132.7
 
rate, 106 lb/hr Reactor coolant tem- 4.1, 4.4
 
peratures, F Core outlet  621.4 621.4 620.8 619.5 Vessel outlet  618.2 618.2 618.2 616.8 Core average  591.8 591.8 589.4 585.9 Vessel average  588.5 588.5 588.2 584.7 Core inlet  558.8 558.8 558.1 552.5 Vessel inlet  558.8 558.8 558.1 552.5 Average linear power, 4.1, 4.4 5.44 5.44 5.44 5.44
 
kW/ft  Peak linear power for 4.1, 4.4 12.6 12.6 12.6 13.6
 
normal operation, kW/ft Heat flux hot channel 4.1, 4.4, 15.0 2.32 2.32 2.32 2.50
 
factor, FQ Fuel assembly array 4.1, 4.3 17 x 17 17 x 17 17 x 17 17 x 17
 
Rev. 7 WOLF CREEK TABLE 1.3-1 (Sheet 2)
DESIGN COMPARISON USAR Parameter or Feature Chapter/Section WCGS (b) Comanche Peak W. B. McGuire Trojan Number of fuel 4.1, 4.3 193 193 193 193
 
assemblies Uranium dioxide rods 4.1, 4.3 264 264 264 264
 
per assembly Fuel weight as uranium 4.1, 4.3 222,739 222,739 222,739 222,739
 
dioxide, lb Number of grids per 4.1, 4.3 8-Type R 8-Type R 8-Type R 8-Type R
 
assembly Rod cluster control 4.1, 4.3
 
assemblies Number of full/part 53/- 53/- 53/8 53/8 length assemblies Absorber material Ag-In-Cd Ag-In-Cd Ag-In-Cd Ag-In-Cd Hafnium Clad material Stainless Stainless Stainless Stainless Steel Steel Steel Steel Clad thickness 0.0185 0.0185 0.0185 0.0185 Equivalent core 4.1, 4.3 132.7 132.7 132.7 132.7
 
diameter, in.
Active fuel length, in. 4.1, 4.3 143.7 143.7 143.7 143.7 Fuel enrichment (weight` 4.1, 4.3 Core A Unit 1 percent)
Region 1 2.10 1.60 2.10 2.10 Region 2 2.60 2.40 2.60 2.60 Region 3 3.10 3.10 3.10 3.10 Rev. 7 WOLF CREEK TABLE 1.3-1 (Sheet 3)
DESIGN COMPARISON USAR Parameter or Feature Chapter/Section WCGS(b) Comanche Peak W. B. McGuire Trojan  Number of coolant loops 5.0 4 4 4 4 Total steam flow, 5.1 15.14 15.14 15.14 5.07
 
106 lb/hr  Reactor vessel 5.3 Inside diameter, in. 173 173 173 173 Inlet nozzle inside  27-1/2 27-1/2 27-1/2 27-1/2 diameter, in.
Outlet nozzle inside  29 29 29 29 diameter, in.
Number of reactor  54 54 54 54 closure head studs Reactor coolant pumps 5.4.1 Horsepower  7,000 7,000 7,000 6,000 Capacity, gpm  100,600 99,000 99,000 88,500 Steam generators 5.4.2 Model F D D D Heat transfer areas, ft.2 55,000 48,000 48,000 51,500 Number of U-tubes 5,626 4,578 4,674 3,388 Residual heat removal 5.4.7 Initiation pressure, ~425 ~425 ~425 ~400 psig 
 
Rev. 12 WOLF CREEK TABLE 1.3-1 (Sheet 4)
DESIGN COMPARISON USAR Parameter or Feature Chapter/Section WCGS(b) Comanche Peak W. B. McGuire Trojan  Initiation/completion ~350/140 ~350/140 ~350/140 ~350/140 temperature, F Component cooling water 105 105 95 95 design temperature, F Cooldown time after ~16 ~16 ~16 ~16 initiation, hr Heater exchanger removal 39.0 39.1 34.15 34.2 capacity, 106 Btu/hr Pressurizer 5.4.10 Heatup rate using 55 55 55 55 heaters, F/hr Internal volume, ft3 1,800 1,800 1,800 1,800 Pressurizer safety 5.4.13
 
valves  Number 3 3 3 3 Maximum relieving  420,000(c) 420,000 420,000 420,000  capacity, lb/hr Accumulators 6.3 Number 4 4 4 4 Operating pressure,  600 600 600 600 minimum, psig Minimum operating water  819 950 950 870 volume, each, ft3
 
Rev. 16 WOLF CREEK TABLE 1.3-1 (Sheet 5)
DESIGN COMPARISON USAR Parameter or Feature Chapter/Section WCGS(b) Comanche Peak W. B. McGuire Trojan  Centrifugal charging 6.3
 
pumps  Number 2 2 2 2 Design flow, gpm 150 150 150 150 Design head, ft 5,800 5,800 5,800 5,800 Safety injection 6.3
 
pumps  Number 2 2 2 2 Design flow, gpm 440 425 425 425 Design head, ft 2,780 2,680 2,500 2,500 Residual heat removal 5.4.7, 6.3
 
pumps  Number 2 2 2 2 Design flow, gpm 3,800 3,800 3,000 3,000 Design head, ft 350 350 375 375 Instrumentation and 7.0 (a) (a) (a) (a)
 
controls New fuel storage racks 9.1.1 21 21 21 21
 
center-to-center
 
spacing, in.
Chemical and volume 9.3.4
 
control  Total seal water 32 32 32 32 supply flow rate, nominal, gpm
 
Rev. 7 WOLF CREEK TABLE 1.3-1 (Sheet 6)
DESIGN COMPARISON USAR Parameter or Feature Chapter/Section WCGS(b) Comanche Peak W. B. McGuire Trojan Total seal water 12 12 12 12 return flow rate, nominal, gpm Letdown flow, normal/maximum, 75/120 75/120 75/120 75/120 gpm Charging flow, 55/100 55/100 55/100 55/100 normal/maximum, gpm
 
NOTES:
 
(a) The instrumentation and control systems discussed in Chapter 7.0 are functionally similar to those systems implemented in Comanche Peak, W. B. McGuire, and Trojan.
 
(b) The design conditions for WCGS listed in this Table have been changed by the Wolf Creek Power Rerate Program. However, since the comparisons were made at the time of application for the Operating License and are considered historic data, the Table will not be updated to reflect the new 
 
information.
 
(c) The capacity is reduced to 415,764 lb/hr due to the setpoint change from 2485 psig to 2460 psig.
 
Rev. 16 WOLF CREEK TABLE 1.3-2 MAJOR ANALYSES NOT INCLUDED IN TOPICAL REPORTS Analysis Previously  Description and Applicable Reviewed on Other
 
Name USAR Section Projects Control Room Habitability
: a. Control room air intake 2.3 Partial use in X/Q due to accidental Calvert Cliffs and releases of radiological Grand Gulf
 
materials
: b. All other accidents, e.g., 2.2 Grand Gulf explosions, toxic chemical spills, fire, etc.
Reactor Building
: a. Tendon Gallery 3.8 Grand Gulf (1)
[CE 901 (STRUDL)]
[CE 800 (BSAP)]
: b. Base Slab Bending 3.8 Grand Gulf (1)
[CE 779 (SAP 1.9)]
: c. Containment 3.8 San Onofre Units Wall-Flexure  2 and 3 (1)
[CE 779 (SAP 1.9)]
Reactor Building Internals
: a. Secondary Shield Walls 3.8 San Onofre Units
[CE 779 (SAP 1.9)]  2 and 3
: b. Refueling Pool 3.8 San Onofre Units (CE 779 (SAP 1.9)]  2 and 3
: c. Compartment Analysis 3.8 Grand Gulf (1)
[CE 901 (STRUDL)]
Other Category I Structures
: a. Structural Steel Framing 3.8 Grand Gulf Units
[CE 901 (STRUDL)]  1 and 2
: b. Reinforced Concrete Analysis 3.8 Grand Gulf Units
[CE 901 (STRUDL)]  1 and 2
[CE 800 (BSAP)]
 
Rev.0 WOLF CREEK TABLE 1.3-2 (Sheet 2)
Analysis Previously Description and Applicable Reviewed on Other
 
Name USAR Section Projects
 
Seismic 
: a. Impedance Functions for 3.7(B) Palo Verde Layered Soils
[CE 970 (LUCON)]
: b. Floor Response Spectra 3.7(B) None (FLUSH). Although not specifically named, a description of this program is included in
 
BC-TOP-4-A
: c. Seismic Displacement 3.7(B) None
 
Analysis
[CE 933 (FASS)] (DISCOM)
 
Piping Analysis
: a. ME-101 3.9(B) Grand Gulf, Farley
 
ME-632
 
Used to calculate the stresses
 
and loads in piping systems due
 
to restrained thermal expansion;
 
deadweight and seismic anchor
 
movements, and earthquake
: b. ANSYS 3.9(B) Grand Gulf, Farley
 
General static, thermal, and
 
dynamic analysis for linear
 
elastic and plastic analysis
: c. ME-210 3.9(B) Grand Gulf, Farley
 
Computes local stresses in
 
piping due to external loads
 
Rev. 0 WOLF CREEK TABLE 1.3-2 (Sheet 3)
Analysis Previously Description and Applicable Reviewed on Other Name USAR Section Projects
: d. ICES/STRUDL  3.9(B) Grand Gulf, Farley  (CE 901)
 
Analysis of indeterminate frame
 
structures, both spatial and plane.
 
Used to evaluate reactions,
 
deflections, stresses, and code
 
check
 
Essential Service Water Vertical Loop Chase
: a. Foundation and Substructure 3.8 N/A Walls Analysis (020544.14.01-C-002)
: b. Vertical Loop Chase 3.8 N/A  Structural Analysis (020544.14.01-C-005)
: c. ESW Waterhammer 9.2.1.2 N/A  Mitigation Analysis (EF-M-076)
 
(1) Although this program was not necessarily used for analysis of the same structure on another plant,  it was used for
 
similar applications.
 
Rev. 29 WOLF CREEK TABLE 1.3-4 COMPLIANCE WITH NRC REGULATIONS, 10 CFR Regulation
 
(10 CFR) Compliance
 
20.1001(a) This regulation states the general purpose for which  the Part 20 regulations are established and does not impose any independent obligations on licensees.
 
20.1001(b) This regulation describes the overall purpose of the  Part 20 regulations to control the possession, use, and transfer of licensed material by any licensee, so that the total dose to an individual will not exceed the standards prescribed therein. It does not impose any independent obligations on licensees.
 
20.1101(b) Conformance with the ALARA principle stated in this  regulation is ensured by the implementation of Company policies and appropriate Technical Specifications and health physics procedures.
Chapters 11.0 and 12.0 of the USAR describe the specific equipment and design features utilized in this effort.
 
20.1002 This regulation states the general purpose for the  Part 20 regulations and imposes no independent obligations on those licensees to which they apply.
 
20.1003 The definitions contained in this regulation are  adhered to in appropriate Technical Specifications and procedures and in applicable sections of the
 
USAR. 20.1004 The units of radiation dose specified in this  regulation are accepted and conformed to in all applicable station procedures.
20.1005 The units of radioactivity specified in this  regulation are accepted and conformed to in all applicable station procedures.
20.1006 This regulation governs the interpretation of  regulations by the NRC and does not impose independent obligations on licensees.
20.1007 This regulation gives the address of the NRC and  does not impose independent obligations on
 
licensees.
 
Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 2)
Regulation (10 CFR) Compliance
 
20.1201 The radiation dose limits specified in this  regulation are complied with through the implementation of and adherence to administrative policies and controls and appropriate health physics procedures developed for this purpose.
Conformance is documented by the use of appropriate personnel monitoring devices and the maintenance of all required records.
 
20.2104(d) When required by this regulation, the accumulated  dose for any individual permitted to exceed the exposure limits specified in 20.1201 is  determined by the use of Form NRC-4. Appropriate health physics procedures and administrative policies control this process.
 
20.1204 Compliance with this regulation is ensured through  the implementation of appropriate health physics procedures relating to air sampling for radioactive materials and bioassay of individuals for internal contamination. Administrative policies and controls provide adequate margins of safety for the protection of individuals against intake of radioactive materials. The systems and equipment described in Chapters 11.0 and 12.0 of the USAR provide the capability to minimize these hazards.
 
20.1701 Appropriate process and engineering controls and  equipment, as described in Chapters 11.0 and 12.0 of the USAR, are installed and operated to maintain levels of airborne radioactivity as low as reasonably achievable.
 
20.1703 This regulation allows credit in estimating  individual exposures for operators who are wearing respiratory protective equipment. Operating manuals contain procedures that ensure that approved respiratory protection equipment is being properly used and that plant practices are in compliance with Regulatory Guide 8.15, "Acceptable Programs for Respiratory Protection."
 
20.1703(c) This regulation prohibits the licensee from  assigning protection factors higher than those specified in Appendix A and allows the Commission to authorize higher protection factors under certain conditions.
 
Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 3)
Regulation (10 CFR) Compliance 20.1703(a)(2) This regulation requires the licensee to obtain  specific authorization from the NRC in order to make allowance for certain respiratory protection equipment and provides the requirements for the application for such authorization.
20.1703(c) This regulation states the requirements for  respiratory equipment which can be used as emergency devices.
20.1703(d) The proper notification specified by this  regulation will be made to the appropriate authority within the appropriate time limit.
20.1207 Conformance with this regulation is ensured by  appropriate company policies regarding employment of individuals under the age of 18 and the station procedures restricting these individuals' access to the station restricted areas.
20.1301(c) Chapter 11.0 of the USAR provides the information  and related radiation dose assessments specified by this regulation.
20.1301(c) The radiation dose rate limits specified in this  regulation are complied with through the implementation of station procedures, Technical Specifications, and administrative policies which control the use and transfer of radioactive materials. Appropriate surveys and monitoring devices document this compliance.
20.1301(a) Conformance with the limits specified in this  regulation is ensured through the implementation of station procedures and applicable Technical Specifications which provide adequate sampling and analyses and monitoring of radioactive materials in effluents prior to and during their release. The level of radioactivity in station effluents is minimized to the extent practicable by the use of appropriate equipment designed for this purpose, as described in Chapter 11.0 of the USAR.
20.1301(c) The Operating Agent has not and does not currently 20.106(c)        intend to include in any license or amendment application proposed limits higher than those specified in 20.1301(a), as provided for in these regulations.
 
Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 4)
Regulation (10 CFR) Compliance 20.1206 This regulation allows for Planned Special Exposures  that are authorized by the licensee. These exposures are  tracked separately with their own exposure limits. The  lifetime whole body limit for Planned Special Exposure is  25 rem.
20.1302(b)(2) Appropriate allowances for dilution and disper-  sion of radioactive effluents are made in conformance with this regulation, and are described in detail in Chapter 11.0 of the USAR and in appropriate reports required by the Technical
 
Specifications.
20.1301 This regulation provides criteria by which the  Commission may impose further limitations on releases of radioactive materials made by a licensee. It imposes no independent obligations on
 
licensees.
20.1301(a) This regulation states that the provisions of  20.2003 do not apply to disposal of radioactive  material into sanitary sewage systems. It imposes no independent obligations on licensees.
20.1301(d) This regulation pertains to licensees engaged in  Uranium fuel cycle operations and does not apply to
 
WCGS. 20.1002 This regulation clarifies that the Part 20  regulations are not intended to apply to the intentional exposure of patients to radiation for the purpose of medical diagnosis or therapy. It does not impose any independent obligations on
 
licensees.
20.1204 Necessary bioassay equipment and procedures,  including Whole Body Counting, are utilized at the station to determine exposure of individuals to concentrations of radioactive materials.
Appropriate health physics procedures and administrative policies implement this require-
 
ment. 20.1501(a) The surveys required by this regulation are  performed at adequate frequencies and contain such detail as to be consistent with the radiation hazard being evaluated. Applicable health physics procedures require these surveys and provide for their documentation in such a manner as to ensure compliance with the regulations of 10 CFR 20.
Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 5)
Regulation
 
(10 CFR) Compliance
 
20.1502 Applicable health physics procedures set forth  policies and practices which ensure that all individuals are supplied with and required to use appropriate personnel monitoring equipment. Work procedures are established to provide additional control of personnel working in radiation areas and to ensure that the level of protection afforded to these individuals is consistent with the radiological hazards in the work place.
 
20.1501 The terminology set forth in this regulation is  accepted and conformed to in all applicable station procedures, Technical Specifications, and those portions of the station procedures in which its use is made.
 
20.1501(c) This regulation pertains to personnel dosimeter  processing and evaluation and is conformed to through appropriate Health Physics procedures.
 
20.1901(a) All materials used for labeling, posting, or  otherwise designating radiation hazards or radioactive materials, and using the radiation symbol, conform to the conventional design pre-scribed in this regulation.
 
20.1902(a) This regulation is conformed to through the  implementation of appropriate health physics procedures relating to posting of radiation areas, as defined in 10 CFR Part 20.1501.
 
20.1902(b) The requirements of this regulation for "High  Radiation Areas" are conformed to by the imple-mentation of the Technical Specifications and appropriate health physics procedures. The controls and other protective measures set forth in the regulation are maintained under the surveillance of the station Health Physics group.
 
20.1902(d) Each Airborne Radioactivity Area, as defined in  this regulation, is required to be posted in accordance with appropriate health physics procedures. These procedures also provide for the surveillance requirements necessary to determine airborne radioactivity levels.
 
Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 6)
Regulation
 
(10 CFR) Compliance
 
20.1902 The area and room posting requirements set forth in  this regulation pertaining to radioactive materials are complied with through the implementation of appropriate health physics procedures.
 
20.1902(e) The container labeling requirements set forth in  this regulation are complied with through the implementation of appropriate health physics
 
procedures.
 
20.1904(a) The posting requirement exceptions described in  this regulation are used where appropriate and necessary at the station. Adequate controls are provided within the station health physics procedures to ensure safe and proper application of these exceptions.
 
20.1906 All of the requirements of this regulation per-  taining to procedures for picking up, receiving, and opening packages of radioactive materials are implemented by the station procedures and appropriate health physics procedures. These procedures also provide for the necessary documentation to ensure an auditable record of
 
compliance.
 
20.1801 The storage and control requirements for licensed 20.1802 materials in unrestricted areas are conformed to  and documented through the implementation of station health physics procedures.
 
20.2001 The general requirements for waste disposal set  forth in this regulation are complied with through station health physics procedures, the Technical Specifications, and the provisions of the station license. Chapter 11.0 of the USAR describes the solid waste disposal system installed at the
 
station.
 
Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 7)
Regulation (10 CFR) Compliance 20.2002 No such application for proposed disposal  procedures as described in this regulation is
 
contemplated.
20.2003 No such plans for disposal of licensed material by  release into sanitary sewage systems as provided for in this regulation are contemplated.
20.2004 No such incineration of licensed material as  provided for in this regulation is contemplated.
20.2005 This regulation pertains to disposal of specific  wastes and is not applicable to WCGS.
20.2006 This regulation provides requirements which are  designed to control transfers of radioactive waste intended for a land disposal facility and establishes a tracking system, in addition to supplementing existing requirements concerning transfer and record keeping. These requirements are met via implementation of appropriate health physics procedures.
20.2101 All of the requirements of this regulation are 20.2103 complied with through the implementation of  appropriate Technical Specifications and health physics procedures pertaining to records of-surveys, radiation monitoring, and waste dis-posal. The retention periods specified for such records are also provided for in these specifications and procedures.
20.2201 The station has established an appropriate  inventory and control program to ensure strict accountability for all licensed radioactive materials. Reports of theft or loss of licensed material are required by reference to the regulations of 10 CFR in the Technical Specifi-
 
cations.
20.2202 Notifications of accidents, as described in this  regulation, are assured by the requirements of the Technical Specifications and appropriate health physics procedures, which also provide for the necessary assessments to determine the occurrence of such incidents.
 
Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 8)
Regulation
 
(10 CFR) Compliance
 
20.2203 Reports of overexposures to radiation and the occurrence of excessive levels and concentra-tions, as required by this regulation, are provided  for by reference in the Technical Specifications and in appropriate health physics procedures.
 
20.2206 The personnel monitoring required by this regulation is provided for by the Technical Specifications. Appropriate health physics procedures establish the data base from which this report is generated.
 
20.2206 The report of radiation exposure required by this  regulation upon termination of an individual's  employment or work assignment is generated through the provisions of a station health physics
 
procedure.
 
20.2301 This regulation provides for the granting of exemptions from 10 CFR Part 20 regulations, provided that such exemptions are authorized by law and will not result in undue hazard to life or property. It does not impose independent obligations on licensees.
 
20.2302 This regulation describes the means by which the Commission may impose upon any licensee requirements which are in addition to the  regulations of Part 20. It does not impose  independent obligations on licensees.
 
20.2401 This regulation describes the remedies which the Commission may obtain in order to enforce its regulations, and sets forth those penalties or punishments which may be imposed for violations of its rules. It does not impose any independent obligations on licensees.
 
26.1-26.11 Subpart A, This subpart prescibes requirements and standards for the establishment, implementation, and maintenance of fitness-for-duty (FFD) programs.
26.21-26.41 Subpart B, This subpart requires the establishment, implementation, and maintenance of FFD progrzms.
26.51-26.71 Subpart C, This subpart specifies the requirements to grant initial authorization, authorization update, authorization reinstatement, or authorization with potentially disqualifying FFD information.
26.73-26.77 Subpart D, This section defines the minimum sanctions that licensees and other entities shall impose when an individual has violated the drug and alcohol provisions of an FFD policy.
Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 9)
Regulation
 
(10 CFR) Compliance 26.81-26.119 Subpart E, This subpart contains requirements for collecting specimens for drug testing and conducting alcohol tests by or on behalf of the licensees and other entities.
26.151-26.169 Subpart G, This subpart contains requirements for the HHS-certified laboratories that licensees and other entities who are subject to this part use for testing urine specimens for validty and the presence of drugs and drug metabolites.
26.181-26.189 Subpart H, This subpart contains requirements for determining whether a donor has violated the FFD policy and for making a determination of fitness.
26.201-26.211 Subpart I, This subpart contains requirements for work hour controls and rest-break periods for select categories of workers.
26.709-26.719 Subpart N, This subpart contains the requirements for maintaining records and submitting certain reports to the NRC.
26.821-26.825 Subpart O, This subpart requires the allowance of duly authorized NRC inspectors.
 
50.1 This regulation states the purpose of the Part 50 regulations and does not impose any independent obligations on licensees.
 
50.2 This regulation defines various terms and does not impose independent obligations on licensees.
 
50.3 This regulation governs the interpretation of the regulations by the NRC and does not impose independent obligations on licensees.
 
50.4 This regulation gives the address of the NRC and does not impose independent obligations on
 
licensees.
50.7 This regulation provides the requirements for employee protection and provides for remedy on the part of the employee who is discriminated against for engaging in certain protected activities as well as the penalty for violation.
 
Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 10)
Regulation
 
(10 CFR)    Compliance
 
50.8 This regulation provides the NRC information  collection requirements and specifies associated  OMB approval.
50.9 This regulation provides the requirements for  completeness and accuracy of information provided  by the licensee to the NRC.
50.10 These regulations specify the types of activities 50.11  that may not be undertaken without a license from  the NRC. The Operating Agent does not propose to  conduct any such activities at Wolf Creek without  an NRC license.
50.12 This regulation provides for the granting of  exemptions from 10 CFR Part 50 regulations,  provided that such exemptions are authorized by law  and will not endanger life or property or the  common defense and security and are otherwise in  the public interest. It does not impose  independent obligations on licensees.
50.13 This regulation says that a license applicant need  not design against acts of war. It imposes no  independent obligations on licensees.
50.20 These regulations described the types of licenses 50.21 that the NRC issues. They do not address the sub-50.22 stantive requirements that an applicant must sat-50.23 isfy to qualify for such licenses.
 
50.30 This regulation sets forth procedural requirements for the filing of license applications concerning items such as place of filing, oath or affirmation, number of copies of application, application for operating license, filing fees, and an environmental report. The procedural requirements of this regulation have been met in the license application and will continue to be met for subsequent amendments to the license application.
 
50.31 These regulations permit more efficient organiza  50.32 tion of the license application and impose no independent obligations on licensees.
 
50.33 This regulation requires the licensee's application  to contain certain general information, such as  identification of the applicant, information about the applicant's financial qualifications, and a list of regulatory agencies with jurisdiction over the applicant's rates and services. This information is provided in the operating license
 
application.
 
Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 11)
Regulation (10 CFR) Compliance 50.33a This regulation requires applicants for  construction permits to submit information required  for the antitrust review. The requirements set  forth by this regulation were satisfied at the time  the application for a construction permit was submitted.
50.34(a) This regulation sets forth requirements which  govern the content of technical information in the  Preliminary Safety Analysis Report and is relevant  to the construction permit stage. The requirements  of this regulation were satisfied as part of the  construction permit application.
50.34(b) An Updated Safety Analysis Report (USAR) has been  prepared and submitted which addresses in the  chapters indicated the information required:
: 1. Site evaluation factors - Chapter 2.0
: 2. Structures, systems, and components - Chapters 3.0, 4.0, 5.0, 6.0, 7.0, 8.0, 9.0, 10.0, 11.0, 12.0, and 15.0
: 3. Radioactive effluents and radiation protection  - Chapters 11.0 and 12.0
: 4. Design and performance evaluation - ECCS performance is discussed and shown to meet the requirements of 10 CFR 50.46 in Chapters 6.0 and 15.0
: 5. Results of research program - Section 1.5
: 6. i. Organizational structure - Chapter 13.0 ii. Managerial and administrative controls -
Chapters 13.0 and 17.0. Chapter 17.0 discusses compliance with the quality assurance requirements of Appendix B.
 
iii. Preoperational testing and initial operations - Chapter 14.0
 
iv. Plans for conduct of normal operations -
Chapters 13.0 and 17.0. Surveillance and periodic testing is specified in the Technical Specifications.
: v. Plans for coping with emergencies -    Emergency Plan.
 
vi. Technical Specifications
 
vii. Potential hazards analysis (Appendix 3B)
: 7. Technical qualifications - Chapter 13.0
: 8. Operator requalification program - Chapter 13.0 
 
Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 12)
Regulation
 
(10 CFR) Compliance
 
50.34(c) The  information  required  in  these  sections was 50.34(d) submitted for Wolf Creek pursuant to Paragraph 2.790(d) 10 CFR 2, "Rules of Practice."  This  information includes both the Physical Security Plan and the Safeguards Contingency Plan.
 
50.34(e) This regulation requires that the licensee who  prepares a physical security plan, a safeguards  contingency plan, or a guard qualification and  training plan protect the plans and other  Safeguards Information against unauthorized  disclosure in accordance with 10 CFR 73.21.
50.34(f) This regulation provides additional TMI-related  requirements for applicants for a construction  permit whose application was pending as of  February 16, 1982. Wolf Creek is not impacted by  this regulation.
50.34a This regulation sets forth the requirements for including in the construction permit application a description of the design objectives and the preliminary design of equipment to control the  release of radioactive material in nuclear power reactor effluents. The requirements of this regulation were satisfied as part of the construction permit application.
 
50.35 This regulation is relevant to the construction permit stage rather than the operating license
 
stage.
 
50.36 Technical Specifications are prepared for implemen-  tation and include 1) safety limits and limiting  safety settings, 2) limiting conditions for operations, 3) surveillance requirements, 4) design features, and 5) administrative controls.
Technical Specifications will take the form prescribed by NUREG 0452, Revision 3, dated November 1980 which are the "Standard Technical Specifications for Westinghouse Pressurized Water
 
Reactors."
 
50.36(a) Radiological Effluent Technical Specifications (RETS) were prepared for implementation as required by this regulation. The RETS have taken the form prescribed by NUREG 0472, Revision 2, dated July
 
1979. 
 
Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 13)
Regulation
 
(10 CFR) Compliance
 
50.36b This regulation allows the NRC to attach to and  incorporate in the license additional conditions to  protect the environment.
 
50.37 This regulation requires the applicant to agree to limit access to restricted data. This requirement was satisfied at the time of application for the construction permit.
 
50.38 This regulation prohibits the NRC from issuing a license to any person who is a citizen, national, or agent of a foreign country or any corporation or other entity which is owned, controlled, or dominated by an alien, a foreign corporation, or a foreign government. The licensees were eligible to apply for and obtain a license as stated in their applications for operating licenses. Therefore, the requirements of this regulation are not applicable.
 
50.39 This regulation provides that applications and related documents may be made available for public inspection. This imposes no direct obligations on applicants and licensees.
 
50.40 This regulation provides considerations to "guide" the Commission in granting licenses, as follows:
 
50.40(a) The design and operation of the facility is to provide reasonable assurance that the health and safety of the public will not be endangered. The basis for the assurance that the regulations will be met and the public protected is contained in  this document and in the license application and  the related correspondence over the years.
Moreover, the lengthy process by which the plant was designed, constructed, and reviewed, including reviews by the architect-engineer, the NSSS vendor, the licensees individual staffs, and the NRC Staff, provides a great deal of assurance that the public health and safety will not be endangered.
 
50.40(b) This regulation requires that the applicant be both technically and financially qualified to engage in the proposed activities as specified in the license application. Technical and financial adequacy of the applicants was determined to be satisfactory during the hearing process at the construction permit stage. Additional information was provided in the operating license application. 
 
Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 14)
Regulation
 
(10 CFR) Compliance
 
50.40(c) The issuance of a license to the applicants was not inimical to the common defense and security or to the health and safety of the public. The  individual showings of compliance with particular regulations contained in this section as well as the contents of the USAR and related correspondence on the record, plus the lengthy process of design, construction, and review by the applicants, the architect-engineer, the NSSS vendor, and the government ensure that the license will not be inimical to the health and safety of the public.
Compliance with the requirements in 10 CFR 50.40(a) demonstrated that a license was not inimical to the  common defense and security.
 
50.40(d) The requirements set forth in this regulation were satisfied in that Environmental Reports were submitted in accordance with 10 CFR 51 as part of the operating license application.
 
50.41 This regulation applies to class 104 licensees, such as those for devices used in medical therapy.
The Operating Agent has not applied for a class 104 license, and therefore 50.41 is not applicable.
 
50.42 This regulation requires the Commission to consider additional standards in determining whether or not a license should be issued, i.e., 1) that the  proposed activities will serve a useful purpose  proportionate to the quantities of special nuclear material or source material to be utilized and 2) that due account will be taken of the antitrust advice provided by the Attorney General.
Information pertinent to these standards was made known to the Commission at the construction permit stage 1) by the licensing board verification of the need for power and 2) by the Attorney General's satisfactory review of the antitrust information.
 
An update of this information was provided with the operating license application, in accordance with Regulatory Guide 9.3.
 
Rev. 0 WOLF CREEK TABLE 1.3-4 (Sheet 15)
Regulation
 
(10 CFR) Compliance
 
50.43 This regulation imposes certain duties on the NRC and addresses the applicability of the Federal Power Act and the right of
 
government agencies to obtain NRC licenses. It imposes no direct obligations on licensees.
 
50.44 10 CFR 50.44 was revised in 2003. The revised 10 CFR 50.44 no longer defines a design-basis LOCA hydrogen release, and eliminates the requirements for hydrogen control systems to mitigate such a release. The installation of hydrogen recombiners and/or vent and purge systems required by 10 CFR 50.44(b)(3) was intended to address the limited quantity and rate of hydrogen generation that was postulated from a design-basis LOCA. The Commission has found that the hydrogen release is not risk-significant because the design-basis LOCA hydrogen release does not contribute to the conditional probability of a large relase up to approximately 24 hours after the onset of core damage. In addition, these systems were ineffective at mitigating hydrogen releases from risk-significant beyond design-basis accidents. License Amendment No. 157 was issued by the NRC on January 31, 2005 and deleted the Technical Specification requirements for the hydrogen recombiners and relocated the requirements for the hydrogen monitors.
The WCGS power block combustible gas control system  is described in USAR Section 6.2.5.2. The system is  designed to maintain the hydrogen concentration in containment at a safe level following a LOCA, without purging
 
the containment atmosphere, as specified in 10 CFR 50.44(c). 
 
The system consists of a hydrogen monitoring subsystem, and hydrogen recombiners.
Sections 6.2.5.2 and 6.2.5.3 of the USAR describe the hydrogen
 
mixing provisions and indicate that adequate mixing occurs
 
following a LOCA without reliance on the hydrogen mixing fans.
Section 6.2.5.2 of the USAR indicates that the recombiners or
 
the hydrogen purge subsystem can be utilized in sufficient time
 
to limit hydrogen concentration following a LOCA to less than 4
 
volume percent. In accordance with 50.44(d), the hydrogen contribution of the core metal-water reaction is assumed to be that resulting from reaction of 5 percent of the fuel cladding.
 
50.45 This regulation provides standards for construction permits rather than operating licenses and is therefore not pertinent to
 
this operating license proceeding.
 
50.46 USAR Section 6.3 describes the emergency core cooling system and the methods used to analyze ECCS performance following the
 
course of an accident. The results of the loss-of-coolant
 
accident analyses presented in USAR Section 15.6.5  demonstrate conformance with 50.46.
 
Rev. 19 WOLF CREEK TABLE 1.3-4 (Sheet 16)
Regulation (10 CFR) Compliance
 
50.47 This regulation states that the NRC will not issue an operating license until adequate emergency plans have
 
been assured based upon their evaluation of FEMA's
 
assessments of state and local emergency plans and the
 
NRC's assessment of the onsite emergency plans.
 
50.48 This regulation governs the fire protection plans required for operating nuclear power plants. USAR
 
Section 9.5 describes the fire protection system
 
designed to provide fire protection in accordance with
 
10 CFR 50 Appendix A, GDC3. USAR Appendix
 
9.5A provides a summary of the compliance with NRC
 
Branch Technical Position APCSB 9.5-1, Appendix A. USAR
 
Appendix 9.5B provides a summary of analyses performed
 
to demonstrate that WCGS could meet the requirements of
 
10 CFR 50, Appendix R.
 
Table 9.5E-1 of USAR Appendix 9.5E provides a design comparison to 10 CFR 50 Appendix R.
 
50.49 This regulation provides the requirements for environmental qualification of electrical equipment
 
important to safety for nuclear power plants.
 
50.50 This regulation provides that the NRC will issue a license upon determining that the application meets the
 
standards and requirements of the Atomic Energy Act and
 
the regulations and that the necessary notifications to
 
other agencies or bodies have been duly made. It imposes
 
no direct obligations on the licensees.
 
50.51 This regulation specifies the maximum duration of licenses. Compliance will be affected by the
 
Commission's issuing the license in order to comply.
 
50.52 This regulation provides for the combining in a single license of a number of activities. It imposes no
 
independent obligation on the licensee.
 
50.53 This regulation provides that licenses are not to be issued for activities that are not under or within the
 
jurisdiction of the United States. The operation of
 
WCGS will be within the United States and subject to the
 
jurisdiction of the United
 
States, as is evident from the description of the
 
facility in Part A of the operating license
 
application.
 
50.54 This regulation specifies certain conditions that are incorporated in every license issued. Compliance was
 
effected by the inclusion of these conditions in the
 
license when it was issued. 
 
50.54(jj) The regulation changes published in the Federal Register Vol. 79, No. 214, pages 65776 through 65814 on Nov. 5, 2014, relocated previous regulation 50.55a(a)(1) to 50.54(jj). As originally stated with regard to 50.55a(a)(1) and now with regard to 50.54(jj), Section 3.2 of the USAR describes compliance with this regulation.
Rev. 29 WOLF CREEK TABLE 1.3-4 (Sheet 17)
Regulation (10 CFR) Compliance
 
50.55 This regulation addresses conditions of con-struction permits, not operating licenses, and therefore it is not applicable to this applica-
 
tion.
 
50.55a(a) The regulation changes published in the Federal Register Vol. 79, No. 214, pages 65776 through 65814 on Nov. 5, 2014, relocated standards and other documents incorporated by reference from 50.55a(b) to a new 50.55a(a). Therefore, 50.55a(a) provides guidance concerning the approved edition and addenda of ASME Codes and IEEE Standards that are incorporated by reference in the regulations.
Note:  The previous 50.55a introductory text and 50.55a(a)(2), which specified the requirements for systems and components and protection systems for nuclear power reactors, were moved into 50.55a(b),
50.55a(c), 50.55a(d), 50.55a(e), 50.55a(f), 50.55a(g) and 50.55a(h).
 
50.55a(b)(1) This regulation provides conditions on use of ASME BPV Code Section III.
 
50.55a(b)(2) This regulation provides conditions on use of ASME BPV Code Section XI 50.55a(b)(3) This regulation provides conditions on use of ASME OM Code. 50.55a(b)(4) This regulation provides conditions on use of ASME BPV Code Section III Code Cases for design, fabrication and materials.
50.55a(b)(5) This regulation provides conditions on use of ASME BPV Code Section XI Code Cases for inservce inspection and repair/replacement activities.
50.55a(b)(6) This regulation provides conditions on use of ASME OM Code Code Cases.
 
50.55a(c) This regulation provides the code requirements for components which are part of the reactor coolant pressure boundary and for components which are connected to the reactor coolant system, including inservice inspection requirements.
 
Rev. 29 WOLF CREEK TABLE 1.3-4 (Sheet 18)
Regulation (10 CFR)
Compliance
 
Design and fabrication of the reactor vessel, reactor coolant system piping, reactor coolant pumps, and reactor coolant system valves were carried out in accordance with ASME Section III as described in Section 5 of the USAR.
 
50.55a(d) These regulations apply to nuclear power plants 50.55a(e) whose application for a construction permit was docketed after May 14, 1984.
 
50.55a(f) Inservice testing (IST) requirements delineated in this part are specified in the Technical Specifications.
 
50.55a(g) Inservice inspection (ISI) requirements delineated in this part are specified in the Technical Requirements Manual and Inservice Inspection Program.
 
50.55a(z) The regulation changes published in the Federal Register Vol. 79, No. 214, pages 65776 through 65814 on Nov. 5, 2014, relocated te allowance for proposed alternatives contained in the previous 50.55a(a)(3) to a new paragraph 50.55a(z). 50.55a(z) allows for proposed alternatives to 50.55a paragraphs (b), (c), (d), (e),
(f), (g), and (h).
 
50.55(h) As discussed in Chapter 7.0, Section 7.1, the protection systems meet IEEE 279-1971. 
 
50.55b This regulation has been revoked. 43 Fed. Reg.
49775.
 
50.56 This regulation provides that the Commission will, in the absence of good cause shown to the contrary, issue an operating license upon completion of the construction of a facility in compliance with the terms and conditions of the construction permit.
This imposes no independent obligations on the
 
applicant.
 
50.57(a) This regulation required the Commission to make certain findings prior to the issuance of the operating license.
 
50.57(b) The license, as issued, contains appropriate conditions to ensure that items of construction or modification were completed on a schedule acceptable to the Commission.
 
50.57(c) This regulation provided for a low-power testing
 
license.
 
50.58 This regulation provided for the review and report of the Advisory Committee on Reactor Safeguards.
 
50.59 This regulation provides for the licensing of certain changes, tests, and experiments at a licensed facility. Technical Specifications and procedures provide implementation of this
 
regulation.
Rev. 29 WOLF CREEK TABLE 1.3-4 (Sheet 19)
Regulation (10 CFR)
Compliance 50.60 This regulation provides the acceptance criteria for fracture prevention measures for nuclear power reactors
 
during normal operation. Section 5.3 of the USAR details
 
vessel material parameters in terms of the fracture
 
toughness requirements set forth in Appendices G and H of
 
10 CFR 50.
 
50.61 This regulation provides the fracture toughness requirements for protection against pressurized thermal
 
shock events. Fracture toughness for the reactor
 
pressure vessel is addressed in Section 5.3 of the USAR. 
 
Compliance with Regulatory Guide 1.99 is addressed in
 
Appendix 3A of the USAR.
 
50.62 This regulation specifies the requirements for reduction of risk from anticipated transients without scram (ATWS)
 
events for light-water nuclear power plants.
 
50.63 This regulation pertains to the Station Blackout rule.
 
50.64 This regulation pertains to non-power reactors only and is not applicable to WCGS.
 
50.65 This regulation requires the implementation of a program to  monitor the effectiveness of maintenance programs by monitoring  performance of plant SSCs. Plant procedures implement and  control this program.
 
50.68 This regulation provides the licensee with eight requirements that may be complied with in lieu of
 
compliance with 10CFR70.24 for criticality monitoring. 
 
WCGS complies with this regulation.
 
50.70 The Commission has assigned resident inspectors to WCGS and space was provided in conformance with 50.70(b)(1) through (3).
 
50.71 Records are and will be maintained and reports will be made in accordance with the requirements of sections (a) through (e) of this regulation and the
 
license.
 
50.72 This regulation provides the immediate notification requirements for operating nuclear power reactors.
 
50.73 This regulation requires the licensee to submit Licensee Event Reports for certain specific events.
 
50.74 This regulation requires the licensee to notify the NRC pertaining to a change in Reactor Operator or Senior Reactor Operator status.
 
50.78 This regulation pertains to holders of construction permits and does not apply to WCGS.
 
50.80 This regulation provides that licenses may not be transferred without NRC consent. No application for transfer has been made by the WCGS Licensees.
Rev. 29 WOLF CREEK TABLE 1.3-4 (Sheet 20)
Regulation (10 CFR) Compliance
 
50.81 This regulation permits the creation of mort-gages, pledges, and liens on licensed facilities, subject to certain provisions. The regulation prohibits secured creditors from violating the Atomic Energy Act and the Commission's regulations.
 
50.82 This regulation provides for the termination of licenses. It does not apply to WCGS because no termination of licenses has been requested.
 
50.90 This regulation governs applications for amend-ments to licenses. Future request for license amendments will be made in accordance with these
 
requirements.
 
50.91 This regulation provides guidance to the NRC regarding no significant hazards considerations, notices for public comment and state consultation. 
 
50.92 This regulation provides guidance to the NRC in issuing license amendments including no significant hazards consideration determinations.
 
50.100 These regulations govern the revocation, suspen-50.101 sion, and modification of licenses by the Com-50.102 mission under unusual circumstances. No such 50.103 circumstances are present and these regulations are not applicable.
 
50.109 This regulation specifies the conditions under which the NRC may require the backfitting of a facility. This regulation imposes no independent obligations on a licensee unless the NRC proposes a backfitting requirement and, therefore, this regulation is not applicable.
 
50.110 This regulation governs enforcement of the Atomic Energy Act, the Energy Reorganization Act of 1974, and the NRC's regulations and orders. No enforcement action is at issue and, therefore, this regulation is not applicable.
 
50.120 This regulation provides guidance for the training and qualifications of Nuclear Power Plant Personnel.
This regulation establishes the requirements for a training program. Appropriate procedures control this program.
 
Appendix A USAR Section 3.1 discusses the extent to which the design criteria for the WCGS's plant structures, systems, and components important to safety comply with Title 10, Code of Federal Regulations, Part 50 (10 CFR 50), Appendix A, "General Design Criteria for Nuclear Power Plants" (GDC). As presented in Section 3.1, each criterion is first quoted and then discussed in enough detail to demonstrate SNUPPS' compliance with each criterion. In some cases, detailed evaluations of compliance with the various general design criteria are incorporated in more appropriate USAR sections, and are located by
 
reference.
Rev. 29 WOLF CREEK TABLE 1.3-4 (Sheet 21)
Regulation (10 CFR) Compliance
 
Appendix B Chapter 17.0 describes in detail the provisions of the operating Quality program which have been implemented to meet all applicable requirements of Appendix B.
 
Appendix C This appendix provides a guide for establishing an applicant's financial qualifications. Financial qualifications were established at the construction permit stage, and it was found that there is reasonable assurance that the funds needed to operate the facility in compliance with the Commission's regulations are available. 
 
Updated information addressing financial quali-fication was submitted with the operating license
 
application.
 
Appendix D This appendix has been superseded by 10 CFR Part
: 51. As noted in the discussion for 10 CFR 50.40(d), the requirements of Part 51 have been
 
satisfied.
 
Appendix E This appendix specifies requirements for emer-gency plans. Emergency plans were developed to provide reasonable assurance that appropriate measures can and will be taken in the event of an emergency to protect the public's health and safety and prevent damage to property. The new criteria for emergency planning developed subsequent to the event at Three Mile Island, Unit 2 were factored into the emergency plans for the WCGS utilities. The Emergency Plan and associated facilities (EOF and Alternate TSC) were updated in 2011 to comply with revised regulations pertaining to "Enhancements to Emergency Preparedness Regulations" (Reference Section 18).
Appendix F This appendix applies to fuel reprocessing plants and related waste management facilities, not to power reactors such as those found in WCGS plants and is, therefore, not applicable.
 
Appendix G Fracture toughness compliance can be found in USAR Section 5.3.1.5. Assurance of adequate fracture toughness of ferritic materials in the reactor coolant pressure boundary (ASME Code, Section III, Class 1 components) is provided by compliance with the requirements for fracture toughness testing included in NB-2300 to Section III of the ASME Code and Appendix G of 10 CFR 50.
 
Appendix H Reactor vessel material surveillance program requirements are delineated in this part. Technical Specifications and operating procedures have been established to implement their requirements.
Further information is provided in USAR Chapter
 
5.0.
 
Rev. 28 WOLF CREEK TABLE 1.3-4 (Sheet 22)
Regulation
 
(10 CFR) Compliance
 
Appendix I This appendix provides numerical guides for design objectives and limiting conditions for operation to meet the criteria "as low as is reasonably  achievable" for radioactive material in light water-cooled nuclear power reactor effluents. USAR Chapters 2.0, 11.0, and 12.0 discuss the extent to which the criteria for Appendix I are met.
 
Appendix J Reactor containment leakage testing for water-cooled power reactors is delineated in this appendix. These requirements are given in the Technical Specifications. Additional information concerning compliance can be found in USAR Chapter  6.0, Sections 6.2.3 and 6.2.6.
 
Appendix K This appendix specifies features of acceptable ECCS evaluation models. As stated in USAR Section 6.3, the ECCS subsystem functional parameters are integrated so that the Appendix K requirements are met over the range of anticipated accidents and single failure assumptions.
 
In addition, the ECCS evaluation model used to demonstrate conformance with 10 CFR 50.46 (see USAR Section 15.6.5) is in conformance with Appendix K
 
requirements.
 
Appendix L This appendix identifies the information required  to be submitted by the applicant to the Attorney  General to satisfy the requirements when applying for a facility license. The requirements of this appendix were satisfied prior to the time of application for the operating license.
 
Appendix M This appendix lists guidelines for the licensing of plants whose site requirements are not considered in the design of the plant structures. Since all WCGS sites are considered in the plant design, this appendix is not applicable.
 
Appendix N This appendix dictates the requirements applicable to duplicate plant designs on multiple sites. As allowed in this regulation, WCGS used a common Safety Analysis Report prior to issuance of the first update after receipt of the Operating License; however, where site specific needs were addressed Addenda were included for reference. The two reports have been merged into one Wolf Creek Specific Safety Analysis Report.
 
Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 23)
Regulation
 
(10 CFR) Compliance
 
Appendix 0 Appendix 0 dictates guidelines for the Staff in reviewing standardization of design. No inde-pendent obligation on the licensee is required.
 
Appendix P Reserved.
 
Appendix Q Appendix Q dictates guidelines for the staff in early review of the site and does not deal with operating license review.
 
Appendix R Appendix R delineates the fire protection program for nuclear power facilities operating prior to January 1, 1979. Appendix 9B of the USAR provides  a summary of analyses performed to demonstrate that  WCGS could meet the requirements of Appendix R.
Table 9.5E-1 of the USAR appendix 9.5E provides a design comparison of WCGS to Appendix R.
 
51.1 This regulation states the general purpose and scope for which the Part 51 regulations are established and does not impose any independent obligations on licensees.
 
51.2 This regulation specifies that Subpart A of Part 51 implements section 102(2) of the NEPA act of 1969, as amended.
 
51.3 This regulation states that in any conflict between  the general rule and Subpart A of Part 51 (or other  applicable part of this chapter) the special rule
 
governs.
 
51.4 The definitions contained in this regulation are adhered to in all appropriate documents.
 
51.5 This regulation governs the interpretation of regulations and does not impose independent obligations on licensees. This regulation specifies that interpretations of the regulations in Part 51 are not authorized other than a written interpretation by the General Counsel.
 
51.6 This regulation specifies the authority of the NRC in granting exemptions and does not impose independent obligations on licensees.
 
Subpart A 51.10 This regulation provides the purpose and scope of Subpart A which is to implement Section 102(2) of the National Environmental Policy Act (NEPA) in a manner consistent with NRC's domestic licensing and regulatory authority.
 
Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 24)
Regulation
 
(10 CFR) Compliance
 
51.11 [Reserved]
51.12 This regulation states that subpart A applies to  the NRC's ongoing environmental work and does not  require retroactive measures for environmental  reports or supplements filed prior to June 7,  1984. This regulation does not impose independent  obligations or licensees.
51.13 This regulation permits the NRC to take immediate  action in emergencies where the health and safety  of the public may be adversely affected without  observing the NEPA regulations. This regulation  does not impose independent obligations on licensees.
51.14 This regulation provides a pertinent definitions  related to NEPA which are adhered to in all  appropriate documents.
51.15 This regulation provides the requirements for  establishing time schedules for NRC-NEPA processes.
51.16 This regulation provides the requirements for the  submittal of proprietary information.
51.17 This regulation indicates that the NRC has  submitted the information requirements to OMB  related to this part of the Code of Federal Regulations.
51.20 This regulation sets forth the requirements for an  applicant for filing an Environmental Impact  Report. These requirements were satisfied during  the review of the Environmental Reports that were  submitted with the application for a construction  permit and the application for an operating license.
51.21 This regulation specifies that all licensing and  regulatory actions subject to Part 51 require an  environmental assessment except those identified in  51.20(b) as requiring an environmental impact  statement and those identified in 51.22(c) as  categorical exclusions.
51.22 This regulation sets forth the criterion for an  identification of licensing and regulatory actions  eligible for categorical exclusion. 
 
Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 25)
Regulation
 
(10 CFR) Compliance
 
51.23 This regulation indicates that the NRC will require no environmental reports, impact statements, assessments or other analyses in connection with  issuance of license amendment for storage of spent fuel up to 30 years beyond the expiration of
 
reactor operating license.51.25 This regulation states than an appropriate NRC staff director will determine when a categorical exclusion environmental impact statement or environment assessment should be prepared.
 
51.26 This regulation states that when an NRC staff  director determines that an environmental impact  statement will be prepared a notice of intent will be published in the Federal Register and a scoping process will be conducted.
 
51.27 This regulation describes the requirements for the Notice of Intent as required by 10 CFR 51.26.
 
51.28 This regulation specifies who the NRC staff director shall invite to participate in the scoping process for an environmental impact statement.
 
51.29 This regulation provides the requirements for the scoping process for an environmental impact
 
statement.
51.30 This regulation sets fourth the requirements for an environmental assessment by the NRC.
 
51.31 This regulation states that the NRC staff director will make the determination (based upon environmental assessments) whether to prepare an environmental impact statement or a finding of no significant impact.
 
51.32-51.35 These regulations provide the requirements for a finding of no significant impact by the NRC.
 
51.40 This regulation provides guidance to prospective applicants or petitioners for rulemaking for consultation with the NRC staff.5
 
51.41 This regulation gives the NRC authority to require  permit or license applicants amendment applicants  or petitioners to submit information useful in aiding NRC compliance with Section 102(2) of NEPA. 
 
Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 26)
Regulation
 
(10 CFR) Compliance
 
51.45-51.69 These regulations set fourth the requirements for environmental reports.
 
51.70-51.125 These regulations set fourth the requirements for environmental impact statements.
 
Appendix A to Subpart A This Appendix to Part 51 Subpart A provides the format for presentation of material in environmental impact statements.
 
55.1-55.71 These regulations set forth the requirements for  nuclear power plant operator's licenses.
 
70.1 This regulation states the general purpose for which Part 70 regulations are established and does not impose any independent obligations on licensees.
 
70.2 This regulation states the general scope of Part 70 and does not impose any independent obligations on
 
licensees.
 
70.3 This regulation gives the Commission the power to authorize licenses for the shipment and possession of special nuclear material.
 
70.4 The definitions contained in this regulation are  adhered to in all appropriate documents.
 
70.5 This regulation sets forth the requirements for communications with the NRC regarding special nuclear materials and includes with addresses for the Director, Office of Nuclear material Safety and
 
Safeguards.
 
70.6 This regulation governs the interpretation of regulations and does not impose any independent obligations on licensees.
 
70.7 This regulation prohibits discrimination against and otherwise protects employees of all licensee  engaged in certain protected activities. 
 
Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 27)
Regulation
 
(10 CFR) Compliance
 
70.8 This regulation sets forth the information collection requirements and specifies OMB approval.
 
70.9 This regulation addresses the completeness and accuracy of information provided to the NRC.
 
70.11 - These regulations specify those persons exempted 70.14 from complying with Part 70. The licensees are not exempt from complying with the applicable requirements of Part 70.
 
70.15 Reserved.
 
70.18 - These regulations list types of licenses issued  70.20b for special nuclear material. WCGS adhered to all applicable requirements.
 
70.21 This regulation sets forth the requirements concerning the filing of special nuclear material license applications. The requirements of this regulation were satisfied.
 
70.22 This regulation sets forth the requirements concerning the contents of special nuclear material license applications. The requirements of this regulation were satisfied.
 
70.23 This regulation defines the requirements for the  approval of an application for a license to possess  special nuclear material. It does not impose independent obligations on licensees.
 
70.24 This regulation requires licensees to install monitors which have the capability of initiating audible alarms in the event of accidental criticality. On June 24, 1997, the NRC issued to  WCNOC an exemption from the requirements of 10CFR70.24. On November 12, 1998 the NRC issued 10CFR50.68, which  provides eight criteria that may be followed in lieu of criticality monitoring per 10CFR70.24 and revised  10CFR70.24 to make any exemption ineffective so long  as the licensee elects to comply to 10CFR50.68.
70.31 This regulation lists guidelines for the Com-mission to follow in issuing a license.
 
70.32 This regulation defines the conditions by which the  licensee must abide in order to keep the special nuclear materials license. The health physics program found in Chapter 12.0, Section 12.5 provides information relating to the compliance of this regulation.
 
Rev. 13 WOLF CREEK TABLE 1.3-4 (Sheet 28)
Regulation
 
(10 CFR) Compliance
 
70.33 - These  regulations  dictate  procedural  require-70.35 ments for renewing or amending a license. The Operating Agent shall follow these guidelines when  the need to renew or amend arises.
 
70.36 This regulation prohibits the transfer of the license. No such transfer is planned by WCGS.
 
70.37 This is a disclaimer of warranty and does not affect the Licensees.
 
70.38 This regulation sets forth the requirements for  expiration and termination of licenses.
70.39 This regulation sets guidelines for the manu-facture of source material and does not apply to power units such as WCGS.
 
70.41 This regulation provides the requirements for  authorized use of special nuclear material.
70.42 This regulation provides guidance on the transfer  of special nuclear material. WCGS follows these  guidelines as appropriate.
70.44 This regulation sets forth the requirements in regard to creditors concerning special nuclear material. Information concerning creditors has been included, as applicable, in the information  submitted with the operating license applica-tions. The primary financial constituents have been identified and their relationships described.
 
70.51 This regulation sets forth the requirements in regard to licensees of special nuclear material that require them to maintain records and establish procedures for inventory of special nuclear material. At such a time when this regulation applies, records will be established and kept and  procedures established to satisfy this regulation.
 
70.52 This regulation sets forth the requirements concerning reporting procedures in the event of an accidental criticality, loss or theft or attempted theft of special nuclear material. When applicable, the requirements of this regulation will be
 
satisfied.
 
Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 29)
Regulation
 
(10 CFR) Compliance
 
70.53 This regulation sets forth the requirements for submitting Material Status Reports. Where applicable, proper procedures were developed and  submitted to properly account for quantities of special nuclear material and to describe appropriate actions that should be taken in the event that material is unaccounted for.
 
70.54 This regulation sets forth the requirements for the reporting of special nuclear material transfers in the Nuclear Material Transaction Report. When applicable, the proper transfer documentation will be completed.
70.55 This regulation sets forth the requirements regarding the responsibilities of the licensees with respect to affording support and access to NRC inspection personnel. Provisions have been made to satisfy the requirements of this regulation in conjunction with granting approval on an application for license for special nuclear
 
material.
 
70.56 This regulation sets forth the requirements for testing the administration of the regulations in 10 CFR 71.  "The Operating Agent will support such testing to the extent practicable under the regulation."
70.57 This regulation sets forth the requirements for operations other than those involved in the operation of a nuclear reactor licensed to Part 50, waste disposal operations or sealed sources. No  such operations are contemplated; therefore, the requirements of this regulation are not applicable.
 
70.58 This regulation sets forth the requirements concerning use of special nuclear material other than licensed by Part 50 and in a waste disposal operation and as sealed sources.
 
No such use is contemplated; therefore, the re-quirements of this regulation are not applicable.
70.59 This regulation sets forth the requirements for effluent monitoring reporting for special nuclear material. This regulation pertains to fuel pro-cessing and fabrication and is not applicable to a utilization facility.
 
Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 30)
Regulation (10 CFR) Compliance
 
70.61 These regulations allow the Commission to revoke 70.62 any license for special nuclear material. It does not impose independent obligations on licensees.
 
70.71 This regulation governs enforcement of the Atomic Energy Act, the Energy Reorganization Act of 1974, and the NRC's regulations and orders. No enforcement action is at issue and, therefore, this regulation is not applicable.
 
Subpart A 71.0 This regulation establishes the purpose, scope and  applicability for the Part 71 regulations and does  not impose any independent obligations on  licensees .
71.1 This regulation provides the address for  communications with the NRC.
71.2 This regulation states that only written  interpretations of Part 71 by the NRC's General  Counsel are binding.
 
71.3 This regulation prohibits delivery or transport of licensed material, except as authorized by the
 
Commission.
 
71.4 The definitions contained in this regulation are adhered to in all appropriate documents.
 
71.5 This regulation specifies that transportation of licensed materials be done per the requirements of the Department of Transportation and Postal Service. This regulation shall be complied with per the revision of March 25, 1980.
 
71.6 This regulation states the information collection  requirements submitted for OMB approval.
71.6a This regulation governs the completeness and  accuracy of information provided to the NRC.
Subpart B 71.7-71.10 These regulations delineate the exemptions from  Part 71.
 
Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 31)
Regulation (10 CFR) Compliance Subpart C 71.12 This regulation issues a general license for  shipment in certain NRC approved containers and  packages provided the licensee has an approved QA program. QA programs for WCGS are filed with the NRC during the operations phase as part of the license application.
71.13-71.24 These regulations set forth the general license  requirements for shipments in specific packages or  contains under a general license.
Subpart D 71.31-71.39 These regulations provide the requirements for an  application for a proposed packaging design  including the contents of the application, package  description, package evaluation, and quality  assurance requirements.
Subpart E 71.41-71.65 These regulations provide the requirements for  packaging radioactive material for transport. Compliance with each of the individual parts and  paragraphs was demonstrated in the license  application proceedings. These requirements of  these regulations are referenced as the standards.
Subpart F 71.71-71.77 These regulations address the testing requirements  for packages, containers and special form  radioactive materials.
Subpart G 71.81-71.99 These regulations provide various operating  controls and procedures pertinent to the transport  and packaging of radioactive materials.
Subpart H 71.101-71.137 These regulations set forth the quality assurance  requirements applying to design, purchases,  fabrication, handling, shipping, storing, cleaning,  assembly, inspection, testing, operation,  maintenance, repair and modification of components  of packaging (for radioactive materials) which are  important to safety.
Appendix A  This regulation establishes the procedure for  obtaining activity values A and A2 to be used in  packaging and shipping processes.
Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 32)
Regulation (10 CFR) Compliance 73.1 This regulation states the general purpose and scope of Part 73 and does not impose independent obligations on the licensee.
73.2 The definitions contained in this regulation are adhered to in all appropriate documents.
73.3 This regulation governs the interpretation of regulations by the NRC and does not impose independent obligations on licensees.
73.4 This regulation gives the address of the NRC and does not impose any independent obligations on
 
licensees.
73.5 This regulation allows the Commission to grant exemptions as long as they will not endanger life or property or the common defense and security. It does not impose independent obligations on
 
licensees.
73.6 This regulation enumerates specific exemptions, including an exemption for the following: U-235 contained in uranium enriched to less than 20 percent in the U-235 isotope. Since this is the  only special nuclear material for which WCGS is  currently licensed, it is exempt from the  requirements of 73.20, 73.25, 73.26, 73.27, 73.45,  73.46, 73.70, and 73.72. This regulation sets  forth the information requirements established by  the Commission and specifies OMB approval.
73.8 This regulation specifies the information  collection requirements and submitted for OMB approval.
73.20 The licensee is exempt from the requirements of this regulation. See 73.6.
73.21 This regulation sets forth the requirements for the  protection of safeguards information. These  requirements are addressed by the WCGS Site  Security Plan.
73.24 This regulation sets forth the requirements concerning transport of special nuclear material in passenger aircraft and in quantities in excess of formula quantities. Shipments of special nuclear material use the requirements of this regulation for reference when such requirements are
 
applicable.
Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 33)
Regulation (10 CFR) Compliance 73.25 - The licensee is exempt from the requirements of 73.27 these regulations. See 73.6.
73.30 - These requirements have been deleted.
 
73.36  73.37 This regulation sets forth the requirements  regarding physical protection during the transport  of irradiated reactor fuel.
73.40 This regulation sets forth the requirements regarding the establishment of and maintenance of physical security systems that provide physical protection against radiological sabotage and against theft of special nuclear material at fixed sites. Physical security systems are  provided and maintained to provide adequate physical protection against sabotage and theft of special nuclear material. In addition, a safeguards contingency plan was prepared in accordance with the criteria in Appendix C of this part, submitted for Commission approval and
 
implemented.
73.45 The licensee is exempt from the requirements of 73.46 these regulations. See 73.6.
73.50 This regulation sets forth the requirements for physical protection of licensed activities at other than nuclear power reactors.
73.55 This regulation sets forth the requirements for physical protection of licensed activities in nuclear power reactors against radiological sabotage. Features were implemented to provide for physical barriers, access control, detection aids, and communications along with a physical security organization that ensures physical protection. The requirements, as prescribed by this regulation, has been satisfied to the extent practicable.
73.57 This regulation establishes the requirements for  Criminal History Checks of individuals granted  unescorted access to a nuclear power facility or  access to Safeguards Information by power reactor  licensees. These requirements are addressed in the  WCGS Site Security Plan.
73.60 This regulation applies to non-power reactors and thus does not apply to WCGS.
 
Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 34)
Regulation (10 CFR) Compliance
 
73.67 This regulation sets forth licensee fixed site and in-transient requirements for the physical protection of special nuclear material of moderate and low strategic significance. The requirements of this regulation will be met in a manner similar to that described in the response to Paragraph
 
73.55.
 
73.70 This regulation sets forth the requirement for records for licensees subject to various Para-graphs in part 73. At this time the licensee  is exempt from the requirements of this regulation  (See 73.6).
 
73.71 This regulation sets forth requirements for reporting unaccounted for shipments, suspected theft, unlawful diversion, or radiological sabotage. The requirements of this regulation will be followed at such time as they become applicable.
73.72 This regulation sets forth the requirements for making advanced notice of shipment of special nuclear material. At this time the Licensee is  exempt from the requirements of this regulation  (See 73.6).
73.73 This regulation establishes the requirements for  advance notice and protection of export shipments  of special nuclear material of low strategy  significance and does not apply to WCNOC since it  is not licensed to export special nuclear material.
73.74 This regulation establishes the requirements for  advance notice and protection of import shipments  of nuclear materials from countries that are not  party to the Convention of Physical Protection of  Nuclear Material. It does not apply to WCNOC since  it is not licensed to import special nuclear material.
73.80 This regulation governs enforcement of the Atomic Energy Act, the Energy Reorganization Act of 1974, and the NRC's regulations and orders. No enforcement action is at issue and so this regulation is not applicable.
Appendix A This appendix groups each state into regions to be supervised by the USNRC Inspection and Enforcement and requires no obligations by the licensee.
 
Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 35)
Regulation (10 CFR) Compliance
 
Appendix B The general criteria for security personnel are outlined in this appendix. The principles in this regulation were factored into the WCGS security
 
plans.
 
Appendix C This regulation sets forth the requirements for licensee safeguards contingency plans. This plan has been developed and implemented.
 
Appendix D This appendix requires that licensees who transport or deliver to a carrier for transport irradiated reactor fuel assure that shipment escorts have completed a training program. These requirements were satisfied at the time of submittal of the operating license application.
 
Appendix E This regulation specifies the levels of physical  protection to be applied in international transport  of Nuclear material and does not apply to WCGS,  since WCNOC is not involved in such transport.
Appendix F This regulation merely lists the nations that are  parties to the convention on the physical  protection of nuclear material.
Appendix G This regulation sets forth the requirements for 3  reportable safeguards events and is addressed by  the WCGS Site Emergency Plan.
 
100.1 This regulation is explanatory and does not impose independent obligations on licensees.
 
100.2 This regulation is explanatory. WCGS is not novel in design and is not unproven as a prototype or pilot plant.
 
100.3 The definitions contained in this regulation are  adhered to in all appropriate documents.
100.8 This regulation sets forth the information  requirements established by the NRC and specifies  OMB approval.
 
Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 36)
Regulation (10 CFR) Compliance
 
100.10 The factors listed related to both the unit design and the site have been provided in the applica-tion. Site specifics, including seismology, meteorology, geology, and hydrology, are presented in Chapter 2.0 of the USAR. The exclusion area, low population zone, and population center dis-tance are provided and described. The USAR also describes the characteristics of reactor design and
 
operation.
 
100.11 Exclusion areas have been established, as described in Section 2.1. The low population zone has been established in accordance with this requirement.
 
The USAR accident analyses, particularly those in Chapters 6.0 and 15.0, demonstrate that offsite doses resulting from postulated accidents would not exceed the criteria in this section of the
 
regulation.
 
Appendix A Appendix A to 10 CFR Part 100 provides seismic and geologic siting criteria for nuclear power plants.
Site suitability was determined at the construction permit stage.
 
Rev. 3 WOLF CREEK 1.4  IDENTIFICATION OF AGENTS AND CONTRACTORS 1.4.1  APPLICANTS Kansas City Power & Light Company (KCPL), Kansas Electric Power Cooperative, Incorporated (KEPCo), and Kansas Gas and Electric Company (KG&E) are co-owners
 
of WCGS, having 47, 6 and 47 percent participation, respectively. For the
 
purposes of the operating license application KCPL and KG&E were considered co-
 
applicants for Wolf Creek. KG&E was the lead applicant and was initially
 
responsible for the design, construction and operation of WCGS.In Amendment No.
 
4 to the Operating License, Wolf Creek Nuclear Operating Corporation (WCNOC) was authorized to act as agent for KCPL, KG&E, and KEPCo and has exclusive
 
responsibility and control over the physical construction, operation, and
 
maintenance of the facility. WCNOC will be referred to as the Operating Agent
 
in matters where the corporation acts in the interests of all three licensees.
KCPL is an independent investor-owned utility with headquarters in Kansas City, Missouri that provides electric service in a 5,700 square mile area of western Missouri and eastern Kansas. KCPL serves 331,000 customers and also provides
 
electricity at wholesale to eight communities, three electric cooperatives and
 
two utilities.
KEPCo is a rural electric cooperative association of 25 member cooperatives which provide electric service to the rural areas of Kansas. KEPCo is
 
headquartered in Topeka, Kansas and was incorporated in 1975. KEPCo serves
 
approximately 90,000 meters to provide electricity to nearly 325,000 consumers
 
located throughout Kansas.
KG&E is an independent investor-owned utility that provides electric service in an 8,100 square mile area of south central and southeast Kansas. General
 
offices of the company are in Wichita, Kansas. KG&E serves 212,000 retail
 
customers and also provides, at wholesale, part or all of the electricity sold
 
by 24 municipal electric systems and by 8 rural electric cooperatives.
The owners have over 97 years of experience in the operation of electric generating plants. The owners do not maintain engineering and construction
 
staffs for power plants but do engage reputable engineering and construction
 
firms for these purposes. As of January 1, 1980, the owners had in operation
 
11 power stations in which they are full or partial owners with a total system
 
generator nameplate capacity of 4420 MW.
1.4.2  SNUPPS KCPL, KEPCO, KG&E and Union Electric Company joined together to share costs and manage a project to design, purchase, and license two nuclear power plants of standardized design, the Standardized Nuclear Unit Power Plant System (SNUPPS) units (Wolf Creek and Callaway). 1.4-1 Rev. 2 WOLF CREEK The SNUPPS utilities were signatories of an agreement for standardization for nuclear generating facilities known as the SNUPPS Agreement. The agreement
 
specified objectives of the undertaking, defined the responsibilities of the
 
utility participants, and established a method of sharing the costs.
 
Participation in the agreement was open to any entity proposing to construct or
 
participate with others in constructing nuclear generating facilities of approximately 1,100 electrical megawatts on a site without active earthquake potential. The SNUPPS Agreement provided for cost sharing of the duplicate portions of the plant, established an organizational structure for management
 
of the project, and defined a mechanism for reaching decisions on joint actions
 
on the basis of one share and one vote per unit.
The basic shared activities were:  (1) design of the standardized portion of the plants, known as the power block; (2) procurement of the NSSS; (3) procurement of the turbine generators; (4) procurement of essentially all other
 
equipment and materials for the power block; and (5) design and fabrication of
 
the first fuel loading. Activities which were the responsibility of each
 
individual applicant utility were:  (1) design and procurement of equipment and
 
materials for nonstandardized facilities outside of the power block; (2)
 
construction of both standardized and nonstandardized facilities; and (3)
 
procurement of certain power block materials to standard specifications.
The SNUPPS utilities controlled the project through a management committee composed of one officer of each company. The members elected a chairman
 
annually and held regular meetings. This senior executive group had overall
 
responsibility for administration of the project and for resolution of technical, contractual, and schedular problems during evolution of the project.
The SNUPPS utilities entered into individual, basically identical contracts with four contractors to purchase the materials and services for the shared
 
activities:  1) Bechtel Power Corporation to provide architect-engineering services for the power block; 2) Westinghouse to supply two identical NSSSs and, under a separate contract, and to supply the first fuel loading; 3)
General Electric to supply two identical turbine generators and directly
 
related auxiliaries; and 4) Nuclear Projects, Inc., for project management and
 
for furnishing the technical and administrative staff to represent the utility
 
owners and to engage consulting services and contractors, as required. These
 
contracts were administered as one project. 1.4-2 Rev. 0 WOLF CREEK Nuclear Projects, Inc., established in May 1974, furnished services to the SNUPPS utilities for management of the SNUPPS project, as authorized and
 
directed by the management committee. The SNUPPS Executive Director, appointed
 
by the management committee, and the SNUPPS technical and administrative staff
 
were employees of and consultants to Nuclear Projects, Inc.
They had the responsibility to act for the management committee and the utilities in the day-to-day administration of work under the lead architect-engineer contract. The lead architect-engineer, in turn, was delegated
 
responsibility for administration of the turbine generator and NSSS
 
procurement. The lead architect-engineer had responsibility for the power
 
block and authority to procure equipment and materials for the utilities. The Executive Director also had authority to administer the contracts for design and fabrication of the first core.
Various utility committees augmented the SNUPPS staff and provided communication links between SNUPPS activities and each individual utility.
 
Committees included a technical committee, quality assurance committee,
 
operations committee, legal committee, construction review group, licensing
 
coordination group, and committees for records management, spare parts, finance
 
and accounting, public relations, and numerous ad hoc groups and task forces
 
for special problems.
Outside of the shared activities, each utility managed site unique activities and construction. Each utility retained a site architect-engineer (Sargent &
Lundy for WCGS) to design non-standardized facilities. Construction management at the Wolf Creek site was by Daniel International Corporation. Bechtel staff was located at each construction site to interpret plans and specifications and
 
expedite procurements. A SNUPPS staff member was located at each active site
 
to ensure that construction experience was made available to later plants.
1.4.3  NUCLEAR STEAM SUPPLY SYSTEM MANUFACTURER Westinghouse Electric Corporation (Westinghouse) was responsible for supplying the NSSS and first fuel load for WCGS.
Westinghouse has designed, developed, and manufactured nuclear facilities since the 1950s, beginning with the world's first large central station nuclear power plant (Shippingport), which has produced power since 1957. Completed or
 
presently contracted commercial nuclear capacity totals in excess of 97,000 MW.
 
Westinghouse pioneered new nuclear design concepts, such as chemical shim
 
control of reactivity and the rod cluster control  1.4-3 Rev. 0 WOLF CREEK concept, throughout the last two decades. Among the company's own related manufacturing facilities are the Columbia Plant, Nuclear Fuel Division, the
 
largest commercial nuclear fuel fabrication facility in the world, and the Tampa Division Plant, the world's most modern heat transfer equipment production facility.
1.4.4  STANDARD PLANT (LEAD) ARCHITECT/ENGINEER The Gaithersburg Power Division of Bechtel Power Corporation (Bechtel) was retained by the SNUPPS utilities to provide architect/engineer services, including procurement, for the standardized portions of the nuclear electric generating facilities.
The Bechtel Corporation, the parent of Bechtel Power Corporation, has been continuously engaged in construction and engineering activities since 1898.
 
Since the close of World War II, Bechtel has placed strong emphasis on
 
electrical power generation projects. During this period, Bechtel has been
 
responsible for the design of over 204 thermal generating units, representing
 
more than 126,860 MW of new generating capacity. Of this number, a nuclear capacity of more than 65,800 MW has been or is being engineered by the company
 
itself.The ratings of thermal generating plants designed by Bechtel range up to 1,470 MW per unit and include most types of station designs and arrangements, such as reheat and nonreheat, indoor and outdoor stations, single and multiple units, and wide ranges of steam conditions up to 3,500 psig, 1,050/1,000 F. Also, some of the larger units are fully automated and computer controlled. The majority of contracts for these facilities provided Bechtel with complete responsibility for both engineering and construction, although several contracts have been engineering design assignments only.
For over 25 years, Bechtel has been actively working on nuclear projects involving power plants, as well as such facilities as nuclear accelerators,
 
research laboratories, hot cells, experimental reactors, and nuclear fuel processing plants. Its responsibilities have covered design, construction,
 
site surveys, license applications, feasibility studies, and equipment
 
procurement.
1.4.5  TURBINE-GENERATOR MANUFACTURER The General Electric Company was responsible for the design, fabrication, and delivery of the turbine generators, and provided technical assistance for
 
installation, startup, and operation of this equipment. 1.4-4 Rev. 1 WOLF CREEK General Electric has a long history in the application of turbine generators for nuclear power plants.
1.4.6  SITE ARCHITECT/ENGINEER For the site-related work covered by the application, except for certain environmental studies, Sargent & Lundy Engineers (S&L) was retained as the architect-engineer and design consultant. In general, the responsibilities
 
included the site layout, the location of the power block, the design of yard and construction facilities, and the location and design of the circulating water systems. They were responsible for the design of site-related systems
 
and facilities which are nonseismic Category I and for seismic Category I dams,
 
canals, ponds and earthwork.
Sargent & Lundy is an independent consulting engineering organization founded in Chicago in 1891. The firm has specialized in the design of generation, transmission and distribution systems for steam utilization, electric power,
 
and related facilities. The firm has provided the complete engineering
 
services for more than 600 turbine-generator units with a total installed
 
capacity of 53,000 MW. Of this, some 9,800 MW is nuclear generating capacity.
Table 1.4-1 lists the nuclear plants S&L itself has completed or is currently designing. Table 1.4-2 lists other nuclear plants Sargent & Lundy has had
 
partial responsibility for.
1.4.7  CONSULTANT FIRMS 1.4.7.1  SNUPPS Consultants Principal consultants for the SNUPPS portions (powerblock) of the WCGS and their related responsibilities are:  a. Quadrex Corporation (formerly Nuclear Services Corporation This consultant assisted the SNUPPS staff to coordinate  the owners' preparation of power block operating  procedures and review and approval action by the owners of  Bechtel-prepared flush, hydrostatic, preoperation, and  special test procedures. The compilation of specific data  lists, useful for operating procedure preparation, power plant operation, and maintenance, is assigned to this consultant on an as-needed basis. This consultant also performed third-level design reviews of selected systems  for compliance with codes and regulations. 1.4-5 Rev. 0 WOLF CREEK  b. Southwest Research Institute  This consultant reviewed portions of the SNUPPS unit  design to assure that adequate provision was made for  preservice and inservice inspection, including access  engineering, and to verify the performance of mechanical  equipment. In the latter category, this consultant has  performed analog simulation of the reactor charging system  and recommended the design of pulsation suppressors  chosen for use in the SNUPPS plants. c. NUS Corporation The nuclear engineering, plant design, and nuclear power  plant licensing skills and experience of this consultant were drawn upon on an as-needed basis to perform a number of activities. Examples included drafting specifications  for a loose parts monitor, carrying out an independent  review of Bechtel's calculations for shielding the reactor  cavity, and reviewing the SNUPPS units' cold shutdown capability. d. Nuclear Water & Waste Technology, Inc. This consultant, a specialist in water chemistry, re-  viewed the design and assisted in the selection of fluid  systems and equipment, particularly the condensate  polisher, liquid radwaste systems, and process control instrumentation.
: e. Pickard, Lowe and Garrick, Inc. This consultant was utilized early in the SNUPPS project  to assist in bid evaluations and selection of the Stan-dard Plant A/E. This consultant remained available on an as-needed basis, and provided occasional assistance in  matters related to nuclear design and performance, such as reviewing the performance of nuclear fuel designs.
: f. Professional Loss Control, Inc. This consultant reviewed the WCGS fire protection system  and assisted in making related design decisions. 1.4-6 Rev. 0 WOLF CREEK  g. Energy Research & Consultants Corporation This consultant reviewed design and operation of pumps  and other rotating equipment, including advising WCGS  during the bid evaluation for several pumps, and per-  forming tests necessary to evaluate the auxiliary feed-  water pumps. h. Dr. James Halitsky This consultant developed calculations of atmospheric  dispersion parameters for the control room fresh air intake for use in control room accident dose calcula-
 
tions. i. Energy Incorporated This consultant was engaged to assist the SNUPPS  utilities to develop an independent plant transient and  analysis capability using the RETRAN computer code. j. Essex Corporation This consultant was engaged to perform an independent  design evaluation of the SNUPPS control room, emphasizing human factors considerations. 1.4.7.2 WCGS Specific Consultantsa. Dames & Moore The independent consulting firm of Dames & Moore was  retained to perform site investigations relating to demography, geography and land use,  meteorology, hydrology, geology and seismology. Having performed such safety-realted and environmental impact related investigations for over 75 nuclear power plant sites, Dames & Moore is an acknowledged leader in the field of site investigations related to nuclear plant construction. 1.4-7 Rev. 0 WOLF CREEK Listed below are some of the nuclear power plants for which Dames & Moore has performed geotechnical and/or environmental investigations:
U.S. NORTHEAST Atlantic James A. Fitzpatrick Salem  Burlington Limerick Seabrook  Calvert Cliffs Newbold Island Shoreham Douglas Point Nine-Mile Point Somerset  Forked River Oyster Creek Sterling Hope Creek Peach Bottom Summit  Indian Point Perryman Susquehanna  Jamesport Robert E. Ginna Yankee U.S. MIDWEST  Bailly N 1 Dresden Midland  Braidwood Duane Arnold Monticello Byron Fermi Palisades Carroll County Fort Calhoun Point Beach Central Iowa Greenwood Prairie Island Clinton Haven Quad-Cities Cooper Kewaunee Zimmer Davis-Besse LaSalle Zion Donald C. Cook Marble Hill  U.S. SOUTH Brunswick Joseph M. Farley Shearon Harris  Catawba McGuire South Dade  Cherokee North Anna St. Lucie  Crystal River Nuclear One Surry  DeSoto Oconee Turkey Point Edwin I. Hatch Perkins Virgil C. Summer Isolte Robinson U.S. SOUTHWEST Allens Creek Comanche Peak South Texas    Project U.S. WEST AND NORTHWEST Humboldt Bay Skagit Trojan  San Onofre Sundesert  1.4-8 Rev. 0 WOLF CREEK  b. Ecological Analysts, Inc. The private research and service organization of  Ecological Analysts, Inc. was retained to collect,  analyze and report environmental data related to the  environmental impact of the WCGS. These studies  included biological, chemical, and radiological  investigations. The organization was founded in 1978  and was formerly part of Industrial BIO-TEST Labora-  tories, Inc. (1968-75), NALCO Chemical Company (1975-78)  and Hazleton Environmental Sciences Corporation (1978-  80). The present full-time staff includes more than 160 scientists and technicians. Listed below are some of the nuclear power plants for which Ecological Analysts, Inc. has performed environmental studies and
 
investigations:  Bailly Fort Calhoun  Catawba Kewaunee Clinton LaSalle Cooper Quad-Cities Dresden Wm. H. Zimmer Duane Arnold Zion  c. Hoad Engineers, Incorporated Hoad Engineers, Incorporated (HEI), a wholly-owned  subsidiary of Blount, Incorporated, was retained to  provide the design, plans and specifications along with  equipment procurement and construction management services for the WCGS security system. The Operating Agent took over responsibility for these activities in  late 1982. HEI prepared and provided documents for the Security Plan, Safeguard Contingency Plan and Security Training and Qualifications Plan. Since its inception  in 1953, HEI has primarily served the investor-owned utilities in all of the usual engineering and  architectural disciplines. HEI has been engaged in providing the design plans,  specifications and equipment procurement services for security systems at two nuclear power plants for the Consumers Power Company in Jackson, Michigan. 1.4-9 Rev. 0 WOLF CREEK  d. Phoenix Power Services, Incorporated Phoenix Power Services, Incorporated was retained to  assist in preparing the early drafts of the Emergency  Plan for WCGS. Phoenix has performed extensive work in  the area of Emergency Planning. e. Professional Loss Control, Inc. Professional Loss Control, Inc., (PLC), was retained to  review the Fire Plan and implementing procedures and advise The Operating Agent of their adequacy. Founded in 1976, PLC provides services in the fields of fire protection, safety and environmental engineering.
Listed below are some of the utilities for which PLC has performed loss control services  Carolina Power and Light Company  Florida Power Corporation Jersey Central Power and Light Company  Maine Yankee Atomic Power Company  Niagara Mohawk Power Corporation  Portland General Electric Company Power Authority of the State of New York  Rochester Gas and Electric Company  Tennessee Valley Authority  Washington Public Power Supply System Wisconsin Electric Power Company Yankee Atomic Electric Company 1.4.8  CONSTRUCTOR Daniel International Corporation, herein referred to as Daniel, was assigned construction and construction management responsibilities for WCGS.
Daniel's scope of work consisted of receiving design information as prepared by Bechtel, Westinghouse and Sargent & Lundy; receiving manufactured items and
 
materials as procured by Bechtel and Westinghouse; procuring additional bulk
 
materials and consumable items; procuring the services of various
 
subcontractors; planning and scheduling the activities of the construction forces and directly supervising the construction forces to assemble the power
 
plant in accordance with the design. 1.4-10 Rev. 0 WOLF CREEK Daniel Construction Company was awarded the ASME Certificate of Authorization to perform nuclear code construction (N stamp) on September 11, 1973, following
 
an ASME implementation and enforcement audit of Daniel's Quality Assurance Program.Daniel's experience, past and present, includes construction of nuclear and fossil fueled power plants. The first project of this nature was construction of the nuclear power Carolinas-Virginia Tube Reactor at Parr, South Carolina.
This facility operated several years as a prototype plant. Other nuclear power plants under construction, in operation or on which Daniel is performing
 
maintenance are specified below:  Callaway Oconee  H. B. Robinson Shearon Harris  Joseph M. Farley Virgil Summer 1.4.9  DIVISION OF RESPONSIBILITIES 1.4.9.1  Utility Company The ultimate responsibility for the proper design, construction, and operation for the entire spectrum of safety of WCGS rests with The Operating Agent.
1.4.9.2  Standard Plant Architect/Engineer Bechtel Power Corporation was responsible for the design, engineering, and procurement of the standard power block, which included the following:  a. Turbine building
: b. Reactor building
: c. Auxiliary building  d. Fuel building  e. Radwaste building
: f. Diesel generator building  g. Control building  1.4-11 Rev. 0 WOLF CREEK Bechtel was also responsible for the design of the standard plant storage tanks
 
and transformer vaults. However, the individual utilities arranged to procure
 
this equipment.
 
The NSSS portion of the facility was procurred by individual contract between
 
The Operating Agent and the NSSS supplier. Similarly, the turbine generator is
 
obtained by direct contract between the turbine generator supplier and The
 
Operating Agent. However, Bechtel Power Corporation (acting as agent) retained
 
responsibility for monitoring the design and integrating the system into the
 
power block to ensure that the NSSS and turbine generator components being
 
supplied were consistent with the needs of the facility. Other equipment and
 
material for areas within their scope were procured by Bechtel Power
 
Corporation.
 
Bechtel Power Corporation was also responsible for the design, engineering and
 
procurement of the portions of the WCGS seismic Category I essential service
 
water systems (ESWS) which lie outside the power block.
 
The design and engineering of all SSCs associated with the ESWS Vertical Loops and Chase were not part of the original SNUPPS standard plant design. Loops and Chase were added to both trains of the ESWS. Design and specification of these SSCs were obtained by direct contract between WCNOC and several contributing contractors. Interfaces were established and monitored by WCNOC to ensure compatibility in design between power block SSCs and the ESWS vertical Loops and Chase. WCNOC is ultimately responsible for the the design, engineering, and procurement of the SSCs associated with the ESWS Vertical Loops and Chase.
 
1.4.9.3  SNUPPS Staff
 
The SNUPPS Staff functioned as an extension of the management, engineering, and
 
operations organizations of the SNUPPS Utilities. During design and
 
construction phases, the SNUPPS Staff performed day-to-day administration of
 
all of the shared activities, primarily by interfacing with and providing
 
written direction to the Standard Plant Architect/Engineer. This required a
 
close relationship between the SNUPPS Staff and SNUPPS Utilities, which was
 
achieved by frequent communications and regularly scheduled meetings of the
 
various committees and groups.
 
1 4.9.4  Site Architect/Engineer
 
All systems, equipment and structures outside the power block except for the
 
ESWS components and station security-related systems were designed or specified
 
by Sargent & Lundy. The ultimate heat sink was the only seismic Category I
 
structure designed by Sargent & Lundy.
 
Interfaces were established and monitored by Bechtel Power Corporation to
 
ensure compatibility in design between power block and site-related systems and
 
equipment.
 
1.4.9.5  Security Consultant
 
The station security-related systems were initially designed and specified by
 
Hoad Engineers, Incorporated, who was retained to design a security system for
 
WCGS to meet the requirements of 10 CFR 73.55.
 
1.4-12 Rev. 29 WOLF CREEK TABLE 1.4-1 NUCLEAR POWER PLANTS COMPLETED OR CURRENTLY UNDER DESIGN BY SARGENT & LUNDY
 
NOMINAL GROSS*
 
UNIT RATING (MWe) POWER OPERATION
 
EBWR 5 1956 Elk River 22 1962 La Crosse 60 1969 SEFOR 20 (MWt) 1969 Dresden 2 850 1969 Dresden 3 850 1971 Quad-Cities 1 850 1971 Quad-Cities 2 850 1972 Zion 1 1085 1973 Zion 2 1085 1973 Fort St. Vrain, Unit 1 330 1973 La Salle County Station, Unit 1 1122 1982 La Salle County Station, Unit 2 1122 1983 Byron Station, Unit 1 1175 1984 Byron Station, Unit 2 1175 1985 Braidwood Station, Unit 1 1175 1985 Clinton Power Station, Unit 1 992 1985 Braidwood Station, Unit 2 1175 1986 Clinton Power Station, Unit 2 992 Cancelled Bailly Nuclear 1 685 Cancelled Marble Hill, Unit 1 1190 Cancelled Marble Hill, Unit 2 1190 Cancelled Wm. H  Zimmer, Unit 1 840 Cancelled Carroll County Station, Unit 1 1175 Future Carroll County Station, Unit 2  Future
 
___________________________________________
 
*Note that this is a gross rating, not a net rating.
 
Rev. 0 WOLF CREEK TABLE 1.4-2 OTHER NUCLEAR POWER PLANTS
 
WITH PARTIAL SARGENT & LUNDY DESIGN RESPONSIBILITY NOMINAL GROSS*                    SARGENT & LUNDY UNIT                            RATING (MWe)
RESPONSIBILITY Bellefonte, Unit 1                  1235                      Consulting Services on Containment
 
Bellefonte, Unit 2                  1235                      Design (Sructural Analysis of post-
 
tension containment structures).
D. C. Cook, Unit 1                  1083                      Design of water intake structures, crib D. C. Cook, Unit 2                  1118                      house, turbine room foundations and
 
miscellaneous electrical consulting
 
services.
Enrico Fermi, Unit 2                1223                      Design of Residual Heat Removal complex, shielding design calculations and class
 
1 piping analysis.
Kaiseraugst                          992                      All design inside the containment including the containment itself.
Point Beach, Unit 1                  519                      Consulting services on water intake Point Beach, Unit 2                  519                      structures.
_____________________________________________
*Note that this is a gross rating, not a net rating.
Rev. 0 WOLF CREEK 1.5  REQUIREMENTS FOR FURTHER TECHNICAL INFORMATION One of the design bases for WCGS has been to utilize well-developed and proven design concepts, systems, and equipment, in order to minimize the potential for
 
cost and schedule overruns and to enhance the reliability of operation. As a
 
consequence, there have been few requirements, as delineated by 10 CFR
 
50.34(a)(8), for research and development programs to confirm the adequacy of
 
the design. Two such programs were identified at the construction permit stage. Those programs have been satisfactorily completed, as described in
 
Sections 1.5.1 and 1.5.2. Other programs were identified at the construction
 
permit stage as not required but as valuable to define margins of conservatism or possible design improvements. Relevant programs in this latter category are
 
described in Section 1.5.3.
1.5.1  17 x 17 FUEL ASSEMBLY A comprehensive test program for the 17 x 17 assembly has been successfully completed by Westinghouse. Reference 1 contains a summary discussion of the program. The following sections present specific references documenting
 
individual portions of the program.
1.5.1.1  Rod Cluster Control Spider Tests Rod cluster control spider tests have been completed. For a further discussion of these tests, refer to Section 4.2.4.3.
1.5.1.2  Grid Tests Verification tests of the structural adequacy of the grid design have been completed. Refer to Section 4.2.3.4 and Reference 2 for a discussion of these tests.1.5.1.3  Fuel Assembly Structural Tests Fuel assembly structural tests have been completed. Refer to References 2 and 3 for a discussion of these tests.
1.5.1.4  Guide Tube Tests Verification tests of the structural adequacy of the guide tubes have been completed. Refer to References 3 and 4 for a discussion of these tests. 1.5-1 Rev. 0 WOLF CREEK 1.5.1.5  Prototype Assembly Tests Verification tests of the integrated fuel assembly and rod cluster control performance have been completed. Refer to References 3 and 4 for a discussion of these tests.
1.5.1.6  Departure from Nucleate Boiling Tests The test program for experimentally determining the effect of the fuel assembly geometry on the departure from nucleate boiling (DNB) heat flux has been
 
completed. Refer to Reference 5 for a discussion of these tests.
1.5.1.7  Incore Flow Mixing The experimental test program to determine the effects of the fuel assembly geometry on mixing has been completed. Refer to Reference 6 for a discussion
 
of these tests.
1.5.2  FIRE STOPS A test program to determine the adequacy of various fire stop designs has been completed. Penetration seals compatible with the WCGS design were successfully tested, using silicone foam sealant. Details of the tests are provided in
 
Section 9.5.1.
1.5.3  OTHER PROGRAMS 1.5.3.1  Generic Programs of Westinghouse Reference 7 summarizes ongoing safety-related research and development programs that are being carried out for, or by, or in conjunction with the Westinghouse
 
Nuclear Energy System Division and that are applicable to Westinghouse
 
pressurized water reactors. These programs are applicable to WCGS and may lead
 
to changes in safety analyses or modes of operation. Further progress on these
 
programs is not required for safe operation of WCGS.
Experimental test programs to determine the thermal-hydraulic characteristics of 17 x 17 fuel assemblies and to obtain experimental reflooding heat transfer data under simulated LOCA conditions have been completed. Refer to Reference 8
 
for a discussion of these tests. A single rod burst test program to quantify
 
the maximum assembly flow blockage which is assumed in the LOCA analyses has
 
been completed. Refer to Reference 9 for a discussion of these tests. The
 
results of these two test programs have been used in the ECCS analyses in
 
Section 15.6.5. 1.5-2 Rev. 0 WOLF CREEK Two general types of model boiler tests were conducted by Westinghouse (1) to confirm the thermal-hydraulic analyses used for the Model-F steam generator and
 
(2) to explore the potential for corrosion and other water-chemistry induced
 
effects in the Model-F steam generator. The initial series of each of these
 
tests were completed prior to startup of WCGS. Further information on the
 
steam generator test programs of Westinghouse is given in Section 5.4.2.
1.5.3.2  Generic Programs of Bechtel Wolf Creek through SNUPPS has contributed, with other utilities, to tests of prototypical cable trays under seismically induced loads. A primary objective
 
of the tests has been evaluation of damping coefficients under SSE conditions.
 
Mechanical bracing of cable trays at WCGS is verified by the results of this
 
test program.
1.5.3.3  Test of a Wolf Creek Steam Generator One of the steam generators in the Wolf Creek plant was equipped with special pressure and temperature instrumentation that enabled thermal-hydraulic
 
performance characteristics to be measured during the early stages of power
 
operation. The objective of these tests was primarily to confirm Westinghouse's design analyses. The test results are proprietary but are available for NRC review.
1.
 
==5.4  REFERENCES==
: 1. Eggleston, F. T., "Safety-Related Research and Development  for Westinghouse Pressurized Water Reactors, Program  Summaries - Spring 1976," WCAP-8768, June, 1976. 2. Gesinski, L. and Chiang, D., "Safety Analysis of the 17 x 17  Fuel Assembly for Combined Seismic and Loss-of-Coolant Accident," WCAP-8236 (Proprietary) and WCAP-8288 (Non-Proprietary), December, 1973. 3. DeMario, E. E., "Hydraulic Flow Test of the 17 x 17 Fuel  Assembly," WCAP-8278 (Proprietary) and WCAP-8279 (Non-  Proprietary), February, 1974. 1.5-3 Rev. 0 WOLF CREEK 4. Cooper, F. W., Jr., "17 x 17 Driveline Component Tests -  Phase IB, II, III, D-Loop Drop and Deflection," WCAP-8446 (Proprietary) and WCAP-8449 (Non-Proprietary), December, 1974. 5. Hill, K. W., et al., "Effect of 17 x 17 Fuel Assembly  Geometry on DNB," WCAP-8296-P-A (Proprietary) and WCAP-8297-A  (Non-Proprietary), February, 1975. 6. Cadek, F. F., Motley, F. E. and Dominicis, D. P., "Effect of  Axial Spacing on Interchannel Thermal Mixing with the R Mixing Vane Grid," WCAP-7941-P-A (Proprietary) and WCAP-7959-  A (Non-Proprietary), January, 1975. 7. Eggleston, F. T., "Safety-Related Research and Development  for Westinghouse Pressurized Water Reactors, Program Summaries - Winter 1977 - Summer 1978," WCAP-8768, Revision 2, October, 1978. 8. "Westinghouse ECCS Evaluation Model - October 1975 Version,"  WCAP-8622 (Proprietary) and WCAP-8623 (Non-Proprietary),
November, 1975. 9. Kuchirka, P. J., "17 x 17 Design Fuel Rod Behavior During  Simulated Loss-of-Coolant Accident Conditions," WCAP-8289  (Proprietary) and WCAP-8290 (Non-Proprietary), November, 1974. 1.5-4 Rev. 0 WOLF CREEK 1.6  MATERIAL INCORPORATED BY REFERENCE The Wolf Creek USAR incorporates, by reference, various topical reports as part
 
of the application. Bechtel topical reports are listed in Table 1.6-1, and
 
Westinghouse topical reports are listed in Table 1.6-2. The Bechtel and
 
Westinghouse topical reports have been filed separately in support of this and
 
similar applications.
 
Amendment No. 89 relocated various Technical Specifications to the USAR. The
 
relocated Technical Specifications have subsequently been incorporated into the
 
Technical Requirements Manual (TRM) with the same format and content they
 
possessed in the Technical Specifications. The TRM is a physically separate
 
document from the USAR, but by this specific reference, it is considered part
 
of the USAR and is thereby incorporated by reference. Implementation of, and
 
revision to, the TRM is controlled through administrative procedures.
 
Controlled drawings were removed from the USAR at Revision 17. The drawings
 
are considered incorporated by reference. Table 1.6-3 identifies the
 
controlled drawings that are incorporated by reference and also provides a
 
cross-reference of the controlled drawings to the respective USAR figure
 
number. The contents of the drawings are controlled by WCGS procedures.
 
Appendix 9.5B, "Fire Hazard Analyses", was removed from the USAR at Revision
 
19, and is considered incorporated by reference. Table 1.6-4 identifies the
 
section and provides a cross-reference of the controlled document, E-1F9905,
 
"Fire Hazard Analysis", which supersedes the information originally provided in
 
Appendix 9.5B of the USAR. The contents of the Fire Hazard Analysis is
 
controlled by WCGS procedures.
 
Chapter 17.2 Quality Assurance, was removed from the USAR at Revision 21. 
 
Chapter 17.2 is considered incorporated by reference. The Quality Program
 
Manual supercedes the information originally provided in Chapter 17.2 of the
 
USAR. The contents of the Quality Program Manual are controlled by WCGS
 
procedures.
 
Table 3.11(B)-1, Plant Environmental Normal Conditions; Table 3.11(B)-2, Environmental Qualification Parameters for SNUPPS NUREG-0588 (LOCA, MSLB and HELB); Table 3.11(B)-3, Identification of Safety-Related Equipment and Components: Equipment Qualification; Table 3.11(B)-4, Containment Worst Case Radiation Levels (MRADs); Table3.11(B)-5, Containment Spray Requirements; Table 3.11(B)-8, Exemptions from NUREG-0588 Qualification; Table 3.11(B)-10, Equipment Added for NUREG-0737; Figures 3.11(B)-1 through 3.11(B)-49, were removed from the USAR at Revision 28. The listed Tables and Figures are considered incorporated by reference. EQSD-I, EQ Summary Document Section I Program Description, and EQSD-II, EQ Master List Section II, supercedes the information provided by listed Tables and Figures. The contents of EQSD-I and EQSD-II are controlled by WCGS procedures. 
 
1.6-1 Rev. 28 WOLF CREEK TABLE 1.6-1 BECHTEL TOPICAL REPORTS INCORPORATED BY REFERENCE Bechtel USAR Report  Topical Revision Section Submitted Review(1)
 
Report No
. Title Number Reference  to the NRC Status BC-TOP-1 Containment Building Rev. 1 3.7(B)-3 1/73 A Liner Plate Design 3.8
 
Report
 
BC-TOP-3-A Tornado and Extreme Rev. 3 3.3 8/74 A Wind Design Criteria 3.8 for Nuclear Power
 
Plants
 
BC-TOP-4-A Seismic Analyses of Rev. 3 3.7(B).2 11/74 A Structures and 3.7(B).3 Equipment for Nuclear 3.8 Power Plants
 
BC-TOP-5-A Prestressed Concrete Rev. 3 3.8 2/75 A Nuclear Reactor 3A Containment Structures
 
BC-TOP-7 Full Scale Buttress Rev. 0 3.8 9/72 A Test for Prestressed 3A Nuclear Containment
 
Structures
 
BC-TOP-8 Tendon End Anchor Rev. 0 3.8 9/72 A Reinforcement Test 3A
 
BC-TOP-9-A Design of Structures Rev. 2 3.8 9/74 A for Missile Impact 3.5.3.2
 
Rev. 0 WOLF CREEK TABLE 1.6-1 (Sheet 2)
BECHTEL TOPICAL REPORTS INCORPORATED BY REFERENCE Bechtel  USAR Report  Topical  Revision Section Submitted Review(1)
 
Report No
. Title Number Reference to the NRC Status BN-TOP-1 Test Criteria for Rev. 1 3.8 11/72 A Integrated Leak Rate 6.2 Testing of Primary Containment Structures for Nuclear Power
 
Plants
 
BN-TOP-2 Design for Pipe Break Rev. 2 3.6 5/74 A Effects 3.8
 
BN-TOP-3 Performance and Siz- Rev. 3  8/75 P ing of Dry Pressure 6.2.1
 
Containments
 
BN-TOP-4 Subcompartment Rev. 1 6.2.1 10/77 A Pressure and  3.6 Temperature Transient
 
Analysis
 
BP-TOP-1 Seismic Analysis of Rev. 3 3.7.(B).2 1/76 A Piping Systems  3.7.(B).3 3.9.(B).7
 
_____________________
 
(1)  See Notes on Table 1.6-2
 
Rev. 0 WOLF CREEK TABLE 1.6-2 WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse  USAR Report Topical  Revision Section Submitted Review(1)
 
Report No
. Title Number Reference to the NRC Status WCAP-2048 "The Doppler Effect for a Rev. 0 4.3 7/62 0 Non-Uniform Temperature Distribution in Reactor Fuel Elements"
 
WCAP-2850-L(P) "Single Phase Local Boiling Rev. 0 4.4  5/66 0 WCAP-7916 And Bulk Boiling Pressure Drop Correlations"
 
WCAP-2923 "In-Pile Measurement of Rev. 0 4.4 3/66 0 UO2 Thermal Conductivity"
 
WCAP-3269-8 "Hydraulic Tests of the Rev. 0 4.4 6/64 0 San Onofre Reactor Model"
 
WCAP-3269-26 "LEOPARD - A Spectrum Rev. 0 4.3, 15.0, 9/63 0 Dependent Non-Spatial 15.4 Depletion Code for the IBM - 7094"
 
WCAP-3385-56 "Saxton Core II Fuel Rev. 0 4.3, 4.4 7/70 0 Performance Evaluation,"
WCAP-3385-56, Part II "Evaluation of Mass Spectrometric and Radiochemical Materials Analyses of Irradiated Saxton Plutonium Fuel"
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 2)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse  USAR Report Topical  Revision Section Submitted Review(1)
Report No.
Title Number Reference to the NRC Status WCAP-3680-20 "Xenon-Induced Spatial Rev. 0 4.3 3/68 0 Instabilities in Large Pressurized Water Reactors" (EURAEC-1974)
 
WCAP-3680-21 "Control Procedures for Rev. 0 4.3 2/69 0 Xenon-Induced X-Y Instabilities in Large Pressurized Water Reactors" (EURAEC-2111)
 
WCAP-3680-22 "Xenon-Induced Spatial Rev. 0 4.3 9/69 0 Instabilities in
 
Three-Dimensions"
 
(EURAEC-2116)
 
WCAP-3696-8 "Pressurized Water Rev. 0 4.3 10/68 0 Reactor pH-Reactivity Effect Final Report"
 
(EURAEC-2074)
 
WCAP-3726-1 "Pu02 -U02 Fueled Critical Rev. 0 4.3 7/67 0
 
Experiments"
 
WCAP-6065 "Melting Point of Rev. 0 4.4 2/65 0 Irradiated U02"
 
WCAP-6069 "Burnup Physics of Rev. 0 4.4 6/65 0 Heterogeneous Reactor
 
Lattices"
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 3)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse  USAR Report Topical  Revision Section Submitted Review(1)
 
Report No
. Title Number Reference to the NRC Status  WCAP-6073 "LASER - A Depletion Rev. 0 4.3 4/66 0 Program for Lattice Calculations Based on MUFT and THERMOS" WCAP 6086 "Supplementary Report Rev. 0 4.3 8/69 0 on Evaluation of Mass Spectrometric and Radiochemical Analyses of Yankee Core I Spent Fuel, Including Isotopes of Elements Thorium Through Curium" WCAP-7015 "Subchannel Thermal Rev. 1 4.4 2/14/69 0 Analysis of Rod Bundle
 
Cores  WCAP-7048 "The PANDA Code" Rev. 0 4.3 1/9/75 A P-
 
A(P)
WCAP-7757-A WCAP-7198-L(P) "Evaluation of Protective Rev. 0 6.1 4/23/69 0 WCAP-7825 Coatings for use in  12/16/71 Reactor Containment" WCAP-7213- "The TURTLE 24.0 Diffusion Rev. 0 4.3, 15.0, 1/9/75 A P-A(P) Depletion Code" 15.4 WCAP-7758-A WCAP-7240(P) "An Experimental Investi- Rev. 0 7/7/72 B gation of the Effect of Open Channel Flow on Thermal-Hydrodynamic Flow
 
Stability"
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 4)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse  USAR Report Topical  Revision Section Submitted Review(1)
Report No
. Title Number Reference to the NRC Status WCAP-7308-L(P) "Evaluation of Nuclear Rev. 0 4.3 7/9/70 U WCAP-7810 Hot Channel Factor 12/16/71
 
Uncertainties"
 
WCAP-7359-L(P) "Application of the THINC Rev. 0 4.4 9/8/69 0 WCAP-7838 Program to PWR Design" 1/17/72
 
WCAP-7397-L(P) "Seismic Testing of Rev. 0 3.10(N) 2/6/70 U WCAP-7817 Electrical and Control 12/16/71
 
Equipment"
 
WCAP-7397-L(P) "Seismic Testing of Supple- 3.10(N) 1/27/71 U WCAP-7817 Electrical and Control ment 1 12/16/71 Equipment (WCID Process Control Equipment)"
 
WCAP-7477-L(P) "Sensitized Stainless Rev. 0 5.2 3/26/70 A WCAP-7735 Steel in Westinghouse 8/12/71 PWR Nuclear Steam Supply
 
Systems"
 
WCAP-7488-L(P) "Solid State Logic Rev. 0 7.2, 7.3 3/24/71 B WCAP-7672 Protection System 5/27/71
 
Description"
 
WCAP-7558 "Seismic Vibration Testing Rev. 0 3.10(N) 9/25/72 U with Sine Beats"
 
WCAP-7588 "An Evaluation of the Rev. 1A 15.4 1/7/75 A Rod Ejection Accident in Westinghouse Pressurized Water Reactors Using Spatial Kinetics Methods"
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 5)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse  USAR Report Topical  Revision Section Submitted Review(1)
Report No.
Title Number Reference to the NRC Status WCAP-7595-A (See WCAP-7941-P-A(P))
 
WCAP-7667-P- "Interchannel Thermal Mixing Rev. 0 4.4 1/27/75 A A(P) with Mixing Vane Grids"
 
WCAP-7755-A
 
WCAP-7695- "DNB Tests Results for  Rev. 0 4.4 1/21/75 A P-A(P) New Mixing Vane Grids (R)"
 
WCAP-7958-A
 
WCAP-7695, "DNB Test Results for R Rev. 0 4.4 1/21/75 A Addendum Grid Thimble Cold Wall
 
1-P-A(P) Cells"
 
WCAP-7985,
 
Addendum 1-A
 
WCAP-7672 (See WCAP 7488-L(P))
 
WCAP-7705 "Testing of Engineered Rev. 2 5/5/76 B Safety Features Actuation
 
System"
 
WCAP-7706-L(P) "An Evaluation of Solid Rev. 0 4.6, 7.1 9/2/71 U WCAP-7706 State Logic Reactor 7.2, 7.3 Protection in Anticipated
 
Transients"
 
WCAP-7709-L(P) "Electrical Hydrogen Rev. 0 7/14/71 A WCAP-7820 Recombiner for Water 6.2.5 12/16/71 Reactor Containments"
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 6)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse  USAR Report Topical Revision Section Submitted Review(1)
Report No.
Title Number Reference to the NRC Status WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 5/23/72 A WCAP-7820 for PWR Containments - Final ment 1 6.2.5 5/31/72 Development Report"
 
WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 9/24/73 A WCAP-7820 for PWR Containments - Equip- ment 2 6.2.5 11/2/73 ment Qualification Report"
 
WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 1/23/74 A WCAP-7820 for PWR Containments - Long- ment 3 6.2.5 3/22/74 Term Tests"
 
WCAP-7709-L(P "Electric Hydrogen Recombiner Supple- 4/21/74 A WCAP-7820 for PWR Containments" ment 4 6.2.5
 
WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 1/7/76 A WCAP-7820 Special Tests" ment 5 6.2.5
 
WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 11/5/76 A WCAP-7820 IEEE 323-1974 Qualification" ment 6 6.2.5
 
WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 9/21/77 A WCAP-7820 LWR Containments - Supple- ment 7 6.2.5 mental Test Number 2"
 
WCAP-7735 (See WCAP-7477-L(P))
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 7)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical  Revision Section Submitted Review(1)
 
Report No
. Title Number Reference to the NRC Status WCAP-7750 "A Comprehensive Space Time Rev. 0 3.6.3 8/31/71 0 Dependent Analysis of Loss-of-Coolant (SATAN-IV Digital
 
(Code)"
 
WCAP-7755-A (See WCAP-7667-P-A(P))
 
WCAP-7757-A (See WCAP-7048-P-A(P))
 
WCAP-7758-A (See WCAP-7213-P-A(P))
 
WCAP-7769 "Overpressure Protection for Rev. 1 5.2, 15.2 7/5/72 U Westinghouse Pressurized Water Reactors"
 
WCAP-7798-L(P) "Behavior of Austenitic Rev. 0 6.1 12/6/71 0 WCAP-7803 Stainless Steel in Post 1/4/72 Hypothetical Loss-of-Coolant
 
Environment"
 
WCAP-7800 "Nuclear Fuel Division Rev. 4A 3A 4/28/75 A Quality Assurance Program 4.2
 
Plan"
 
WCAP-7803 (See WCAP-7798-L(P))
 
WCAP-7806 "Nuclear Design of Westing- Rev. 0 4.3 21/16/71 B house Pressurized Water Reactors with Burnable Poison Rods"
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 8)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)
 
Report No.
Title Number Reference to the NRC Status WCAP-7810 (See WCAP-7308-L(P))
 
WCAP-7811 "Power Distribution Control Rev. 0 4.3 12/16/71 0 of Westinghouse Pressurized Water Reactors"
 
WCAP-7817 (See WCAP-7397-L(P)) Rev. 0
 
WCAP-7817 (See WCAP-7477-L(P)) Supple-ment 1
 
WCAP-7817 "Seismic Testing of Electrical Supple- 3.10(N) 1/17/72 U and Control Equipment (Low ment 2 Seismic Plants)"
 
WCAP-7817 "Seismic Testing of Electrical Supple- 3.10(N) 1/17/72 U and Control Equipment (Westing ment 3 house Solid State Protection System) (Low Seismic Plants)"
 
WCAP-7817 "Seismic Testing of Electrical Supple- 3.10(N) 12/14/72 U and Control Equipment (WCID ment 4 NUCANA 7300 Series) (Low Seismic Plants)"
 
WCAP-7817 "Seismic Testing of Electrical Supple- 3.10(N) 12/14/72 U and Control Equipment (Instru- ment 5 ment Bus Distribution Panel)
(Low Seismic Plants)"
 
WCAP-7817 "Seismic Testing of Electrical Supple- 3.10(N) 8/00/74 U and control Equipment (Type DB ment 6 Reactor Trip Switchgear)
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 9)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)
 
Report No.
Title Number Reference to the NRC Status WCAP-7820 (See WCAP 7709-L[P])
 
WCAP-7825 (See WCAP 7198-L[P])
 
WCAP-7832 "Evaluation of Steam Generator Rev. 0 5.4 21/26/73 A Tube, Tube Sheet and Divider Plate Under Combined LOCA Plus SSE Conditions"
 
WCAP-7836 "Inlet Orificing of Open PWR Rev. 0 4.4 1/17/72 B
 
Cores"
 
WCAP-7838 (See WCAP 7359-L[P])
 
WCAP-7870 "Neutron Shielding Pads" Rev. 0 3.9 (N) 7/17/72 A
 
WCAp-7907 "LOFTRAN Code Description" Rev. 0 5.2, 10/11/72 U
 
15.0, 15.1 15.2, 15.3, 15.4, 15.5 15.6 WCAP-7908 "FACTRAN - A FORTRAN-IV code Rev. 0 15.0, 9/20/72 U for Thermal Transients in a  15.3, U02 Fuel Rod"  15.4
 
WCAP-7909 "MARVEL - A Digital Computer        Rev. 0  10/11/72 U Code for Transient Analysis of a Multiploop PWR System"
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 10)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)
 
Report No.
Title Number Reference to the NRC Status WCAP-7912- "Power Peaking Factors" Rev. 0 4.3, 4.4 1/16/75 A
 
P-A (P)
 
WCAP-7912-A
 
WCAP-7913 "Process Instrumentation Rev. 0 7.2, 7.3 3/9/73 B for Westinghouse Nuclear Steam Supply System (4-Loop Plant Using WCID-7300 Series Process Instrumentation)"
 
WCAP-7916 (See WCAP 2850-L[P])
 
WCAP-7921-AR "Damping Values of Nuclear Rev. 0 3.7(N), 3A 7/11/74 A Power Plant Components"
 
WCAP-7924-A "Basis for Heatup and Rev. 0 4/28/75 A Cooldown Limit Curves"
 
WCAP-7941- "Effect of Axial Spacing on Rev. 0 1.5, 4.4 1/27/75 A P-A (P) Interchannel Thermal Mixing WCAP-7595-A with the R Mixing Van Grid"
 
WCAP-7956 "THINC-IV - An Improved Program Rev. 0 4.4 10/22/73 A for Thermal-Hydraulic Analysis of Rod Bundle Cores"
 
WCAP-7958 (See WCAP-7695-P-A(P))
 
WCAP-7964 "Axial Zenon Transient Tests Rev. 0 4.3 6/15/71 O at the Rochester Gas and Electric Reactor"
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 11)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)
 
Report No.
Title Number Reference to the NRC Status WCAP-7979- "TWINKLE - A Multi-Dimensional Rev. 0 15.0, 1/7/75 A P-A (P) Neutron Kinetics Computer 15.4
 
WCAP-8028-A Code"
 
WCAP-7985 (See WCAP-7695, Addendum 1-P-A[P]) Addendum 1A
 
WCAP-8028-A (See WCAP-7979-P-A(P))
 
WCAP-8054 (P) "Application of the THINC-IV Rev. 0 4.4 12/7/73 A WCAP-8195 Program to PWR Design" 1/11/74
 
WCAP-8082- "Pipe Breaks for the LOCA Rev. 0 3.6.3 1/16/75 A P-A (P) Analysis of the Westinghouse WCAP-8172-A Primary Coolant Loop"
 
WCAP-8099 "A Summary Analysis of the Rev. 0 4/20/73 B April 30 Incident at the San Onofre Nuclear Generation Station, Unit 1"
 
WCAP-8163 "Reactor Coolant Pump Rev. 0 3A, 5.4 9/20/73 U Integrity in LOCA"
 
WCAP-8170 (P) "Calculational Model for Core Rev. 0 15.16 7/3/74 AE WCAP-8171 Reflooding After a Loss-of-Coolant Accident (WREFLOOD
 
Code)"
 
WCAP-8172-A (See WCAP 8082-P-A[P])
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 12)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)
 
Report No.
Title Number Reference to the NRC Status WCAP-8183 "Operational Experience with Rev. 7 4.2 4/20/78 B Westinghouse Cores (up to December 31, 1977)"
 
WCAP-8195 (See WCAP-8054(P))
 
WCAP-8200 (P) "WFLASH - A FORTRAN-IV Rev. 2 15.6 7/3/74 AE WCAP-8261 Computer Program for Simula- Rev. 1 tion of Transients in a Multi-Loop PWR"
 
WCAP-8218 "Improved Fuel Performance Rev. 0 3A, 4.2, 4.4 June 1985 A  P-A (P) Models for Westinghouse Fuel WCAP-8219-A Rod Design and Safety Evaluations."
 
WCAP-8236 (P) "Safety Analysis of the 17 x 17 Rev. 0 1.5, 4.2 2/28/74 U WCAP-8288 Fuel Assembly for Combined 3/1/74 Seismic and Loss-of-Coolant
 
Accident"
 
WCAP-8236 (P) "Safety Analysis of the 8-Grid Addendum 3.7(N) 4/15/74 A WCAP-8288 17 x 17 Fuel Assembly for 1 Combined Seismic and Loss-of-Coolant Accident"
 
Rev. 14 WOLF CREEK TABLE 1.6-2 (Sheet 13)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)
 
Report No.
Title Number Reference to the NRC Status WCAP-8252 "Documentation of Selected Rev. 1 3.6.3, 3.9(N) 7/19/77 U Westinghouse Structural Analysis Computer Codes"
 
WCAP-8253 "Source Term Data for Westing- Amendment 2/13/76 B house Pressurized Water 1
 
Reactors"
 
WCAP-8255 "Nuclear Instrumentation Rev. 0 7.2, 7.7 4/9/74 B
 
System"
 
WCAP-8261 (See WCAP-8200(P))
 
WCAP-8278 (P) "Hydraulic Flow Test of the Rev. 0 1.5, 4.2, 4.4 2/28/74 U WCAP-8279 17 x 17 Fuel Assembly" 3/1/74
 
WCAP-8288 (See WCAP-8236(P))
 
WCAP-8289 (P) "17 x 17 Design Fuel Rod Rev. 0 1.5 11/18/74 A WCAP-8290 Behavior During Simulated Loss-of-Coolant Accident
 
Conditions"
 
WCAP-8296- "Effect of 17 x 17 Fuel Rev. 0 1.5 2/6/75 A P-A (P) Assembly Geometry on DNB"
 
WCAP-8297-A
 
WCAP-8298- "The Effect of 17 x 17 Rev. 0 4.4 1/28/75 0A P-A (P) Fuel Assembly Geometry on WCAP-8299-A Interchannel Thermal Mixing"
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 14)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)
 
Report No.
Title Number Reference to the NRC Status WCAP-8301 (P) "LOCTA-IV Program: Loss-of Rev. 0 15.0, 15.6 7/12/74 AE WCAP-8305 Coolant Transient Analysis"
 
WCAP-8302 (P) "SATAN-VI Program:  Compre- Rev. 0 15.0, 15.6 7/12/74 AE WCAP-8306 hensive Space-Time Dependent Analysis of Loss-of-Coolant"
 
WCAP-8303- "Prediction of the Flow-Induced Rev. 0 3.9(N) 7/18/75 A P-A (P) Vibration of Reactor Internals WCAP-8317-A by Scale Model Test"
 
WCAP-8305 (See WCAP-8301(P))
 
WCAP-8306 (See WCAP-8302(P))
 
WCAP-8317-A (See WCAP-8303-P-A(P))
 
WCAP-8324-A "Control of Delta Ferrite in Rev. 0 5.2 6/23/75 A Austenitic Stainless Steel
 
Weldments"
 
WCAP-8327 (P) "Containment Pressure Analysis Rev. 0 15.6 7/3/74 AE WCAP-8326 Code (COCO)"
 
WCAP-8330 "Westinghouse Anticipated Rev. 0 4.3, 4.6 9/25/74 U Transients Without Trip
 
Analysis"
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 15)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report  Topical  Revision Section Submitted Review(1)
 
Report No.
Title Number Reference to the NRC Status WCAP-8339 "Westinghouse Emergency Core Rev. 0 15.6 7/3/74 AE Cooling System Evaluation Model - Summary"
 
WCAP-8340 (P) "Westinghouse Emergency Core Rev. 0 15.6 8/1/74 AE WCAP-8356 Cooling System - Plant Sensitivity Studies"
 
WCAP-8341 (P) "Westinghouse Emergency Core Rev. 0 15.6 7/3/74 AE WCAP-8342 Cooling System Evaluation Model-Sensitivity Studies"
 
WCAP-8359 "Effects of Fuel Densification Rev. 0 4.3 8/2/74 A Power Spikes on Clad Thermal
 
Transients"
 
WCAP-8370 "Quality Assurance Plan Rev. 7A 3A 2/5/75 A Westinghouse Nuclear Energy Systems Divisions"
 
WCAP-8370 "Westinghouse Water Reactor Rev. 8A 3A 11/14/77 A Divisions Quality Assurance  
 
Plan"  


WCAP-8370 "Westinghouse Water Reactor Rev. 9A 3A U Divisions Quality Assurance Plan  
WCAP-8370 "Westinghouse Water Reactor Rev. 9A 3A U Divisions Quality Assurance Plan  


WCAP-8373 "Qualification of Westinghouse Rev. 0 3.10(N) 8/23/74 U Seismic Testing Procedure for Electrical Equipment Tested Prior to May 1974"  
WCAP-8373 "Qualification of Westinghouse Rev. 0 3.10(N) 8/23/74 U Seismic Testing Procedure for Electrical Equipment Tested Prior to May 1974"  
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 16)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse  USAR Report Topical  Revision Section Submitted Review(1)
Report No.
Title Number Reference to the NRC Status WCAP-8377 (P) "Revised Clad Flattening Rev. 0 4.2 8/7/74 A WCAP-8381 Model"  8/6/74
 
WCAP-8385 (P) "Power Distribution Control and Rev. 0 4.3, 4.4 10/9/74 A WCAP-8403 Load Following Procedures"
 
WCAP-8424 "An Evaluation of Loss of Rev. 1 15.3 5/30/75 U Flow Accidents Caused by Power System Frequency Transients in Westinghouse PWRs"
 
WCAP-8446 (P) "17 x 17 Driveline Com- Rev. 0 1.5, 3.9(N) 12/31/74 A WCAP-8449 ponents Tests Phase IB, II, III D-Loop Drop and
 
Deflection"
 
WCAP-8453-A "Analysis of Data from the Rev. 0 4.4 5/10/76 A Zion (Unit 1), THINC Veri-fication Test"
 
WCAP-8471 (P) "Westinghouse ECCS Evaluation Rev. 0 15.6 2/10/75 AE WCAP-8472 Model - Supplementary Informa-  2/11/75
 
tion"
 
WCAP-8485 "Safety-Related Research and Rev. 0  4/2/75 B Development for Westinghouse Pressurized Water Reactors, Program Summaries - Fall 1974"
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 17)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)
Report No.
Title Number Reference to the NRC Status  WCAP-8498 "Incore Power Distribution Rev. 0 4.3 7/22/75 U Determination in Westinghouse Pressurized Water Reactors, Program Summaries - Fall 1974" WCAP-8510 Method for Fracture Mechanics Rev. 0 5.3 12/00/75 U Analysis of Nuclear Reactor Vessels Under Severe Thermal
 
Transients WCAP-8516-P(P) UHI Plant Internals Vibration Rev. 0 3.9(N) 4/11/75 A WCAP-8517 Measurement Program and Pre and Post Hot Functional Examinations" WCAP-8536(P) "Critical Heat Flux Testing of Rev. 0 4.4 5/30/75 A WCAP-8537 17 x 17 Fuel Assembly Geometry with 22-Inch Grid Spacing" WCAP-8565- "Westinghouse ECCS-Four Loop Rev. 0 15.6 7/17/75 A P-A (P) Plant (17 x 17) Sensitivity
 
WCAP-8566-A Studies" WCAP-8577 "The Application of Preheat Rev. 0 6.1 2/3/76 A Temperatures after Welding Pressure Vessel Steels" WCAP-8584 (P) "Failure Mode and Effects Rev. 1 4.6, 7.3 3/20/80 U WCAP-8760 Analysis (FMEA) of the Engineered Safety Features Actuation System" WCAP-8587 "Methodology for Qualifying Rev. 6A 3.10(N), 11/00/83 U Westinghouse WRD Supplied 3.11(N),
NSSS Safety-Related Electrical 3A
 
Equipment"
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 18)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)
 
Report No.
Title Number Reference to the NRC Status WCAP-8587 "Equipment Qualification Rev. 1 3.11(N) 4/17/78 U Data Packages" Supple- 3.10(N) ment 1
 
WCAP-8622 (P) "Westinghouse ECCS Evaluation Rev. 0 1.5, 15.6 11/20/75 AE WCAP-8623 Model - October 1975 Version"
 
WCAP-8624(P) "General Method of Developing Rev. 0 3.10(N) 0/00/00 U Multi-Frequency Biaxial Test Inputs for Bistables"
 
WCAP-8682 (P) "Experimental Verification of Rev. 0 4.3 3/18/76 B WCAP-8683 Wet Fuel Storage Criticality
 
Analyses"
 
WCAP-8691 (P) "Fuel Rod Bow Evaluation" Rev. 0 4.2, 4.4 11/83 U
 
WCAP-8692
 
WCAP-8693 "Delta Ferrite in Production Rev. 0 5.2 3/16/76 B Austenitic Stainless Steel
 
Weldments"
 
WCAP-8708-P-A "MULTIFLEX - A FORTRAN-IV Rev. 0 3.6.3 9/16/77 A (P), Vol. I & II Computer Program for Analyzing  3.9(N)
 
WCAP-8709-A, Thermal-Hydraulic-Structure Volumes I & II System Dynamics"
 
WCAP-8720 (P) "Improved Analytical Models Rev. 0 4.2 11/2/76 A WCAP-8785 Used in Westinghouse Fuel Rod Design Computations"
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 19)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse  USAR Report Topical  Revision Section Submitted Review(1)
Report No.
Title Number Reference to the NRC Status WCAP-8768 "Safety-Related Research and Rev. 2 1.5, 4.2, 9/28/78 B Development for Westinghouse  4.3, 5.4 Pressurized Water Reactors, Program Summaries - Winter 1977 - Summer 1978"
 
WCAP-8766 (P) "Verification of Neutron Pad Rev. 0 3.9(N) 5/21/76 A WCAP-8780 and 17 x 17 Guide Tube Designs by Preoperational Tests on the Trojan 1 Power Plant"
 
WCAP-8865-A "Westinghouse ECCS - Four Loop Rev. 0  5/6/77 A Plant (17 x 17) Sensitivity Studies with Upper Head Fluid Temperature at THOT"
 
WCAP-8872 "Design, Inspection, Operation Rev. 0 12.1 4/27/77 B and Maintenance Aspects of the Westinghouse NSSS to Maintain Occupational Radiation Exposures as Low as Reasonably Achievable"
 
WCAP-8892-A "Westinghouse 7300 Series Rev. 0 7.1 6/15/77 A Process Control System Noise
 
Tests"
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 20)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse  USAR Report  Topical  Revision Section Submitted Review(1)
Report No.
Title Number Reference to the NRC Status WCAP-8929 "Benchmark Problem Solutions Rev. 0 3.9(N) 5/26/77 U Employed for Verification of the WECAN Computer Program"
 
WCAP-8963 (P) "Safety Analysis for the Rev. 0 4.2 3/31/71 A WCAP-8964 Revised Fuel Rod Internal  8/11/77 Pressure Design Basis"
 
WCAP-8970(P) "Westinghouse emergency Core Rev. 0 15.6 4/77 U WCAP-8971 Cooling System Small Break -
October 1975 Model"
 
WCAP-8976 "Failure Mode and Effects Rev. 0 4.6, 10/26/77 U Analysis (FMEA) of the  7.7 Solid State Full Length Rod Control System"
 
WCAP-9166 "Westinghouse Emergency Core Rev. 0 15.6 2/00/78 U Cooling System Evaluation Model for Analyzing Large LOCA's During Operation With One Loop Out of Service for Plants Without Loop Isolation Values"
 
WCAP-9168 (P) "Westinghouse Emergency Core Rev. 0 15.6 9/27/77 U WCAP-9169 Cooling System Evaluation Model -
Modified October 1975 Version"
 
WCAP-9179 (P) "Properties of Fuel and Core Rev. 1 4.2 8/2/78 U Component Materials"
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 21)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse  USAR Report  Topical  Revision Section Submitted Review(1)
 
Report No
. Title Number Reference to the NRC Status WCAP-9207 (P) "Evaluation of Mispositioned Rev. 0 6.3 3/21/78 U WCAP-8966 ECCS Valves"
 
WCAP-9220-P-A(P) Westinghouse ECCS Evaluation Rev. 0 15.6 2/00/78 U WCAP-9221-P-A Model, February 1978 Version
 
WCAP-9224, Ap- "Hafnium" Rev. 0 10/00/80  U
 
pendix A
 
WCAP-9226(P) Reactor Core Response to  15.1 7/00/78 U WCAP-9227 Excessive Secondary Steam
 
Releases
 
WCAP-9230 (P) "Report on the Consequences Rev. 0 15.2 1/27/78 U WCAP-9231 of a Postulated Main Feedline
 
Rupture"
 
WCAP-9279 "Combination of Safe Shutdown Rev. 0 3.9(N) 3/21/78 U Earthquake and Loss-of-Coolant Accident Responses for Faulted Condition Evaluation of Nuclear Power Plants"
 
WCAP-9283 "Integrity of the Primary Rev. 0 3.9(N) 3/21/78 U Piping Systems of Westinghouse Nuclear Power Plants During Postulated Seismic Events"
 
Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 22)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse  USAR Report Topical  Revision Section Submitted Review(1)
 
Report No
. Title Number Reference to the NRC Status  WCAP-9292  "Dynamic Fracture Toughness Rev. 0 5.2 3/17/78 U of ASME SA508 Class 2a and ASME SA533 Grade A Class 2 Base and Heat Affected Zone Material and Applicable Weld Metals" WCAP-9346 "Electric Hydrogen Recombiner Rev. 0 6.2.5 7/00/78 U Qualification Testing for Model B WCAP-9714-PA(P) Methodology for the Seismic  3.10.(N) 00/00/00 A WCAP-9750-A Qualification of Westinghouse WRD Supplied Equip.
WCAP-9944(P) "Verification of Upper Head In- Rev. 0 3.9(N) 7/00/81 U WCAP-9945 jection Reactor Vessel Internals by Preoperational Tests on Sequoyah 1 Power Plant WCAP-10297-P-A Dropped Rod Methodology for Rev. 0 15.4 6/00/83 A Negative Flux Rate Trip Plants WCAP-10043 "Steam Generator Tube Plugging Rev. 0 5.4.2.5 12/3/82 U Analysis for the Westinghouse Standardized Nuclear Power Plant (P) System" WCAP-10858P-A "AMSAC Generic Design Package" Rev. 1 7.7.1.11 07/25/85 A
& Addendum 1    02/26/87 WCAP-13589-A "Assessment of Clad Flattening Rev. 0 4.3 01/18/93 A  and Densificaiton Power Spike Factor  Elimination in Westinghouse Nuclear Fuel"
 
Rev. 11 WOLF CREEK TABLE 1.6-2 (Sheet 23)
WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE (P) - Proprietary
 
(1) A legend to the review status code letters follows:
 
A - NRC review complete; NRC acceptance letter issued.
 
AE- NRC accepted as part of the Westinghouse emergency core cooling system (ECCS) evaluation model
 
only; does not constitute acceptance for any purpose other than for ECCS analyses.
 
B - Submitted to NRC as background information; not undergoing formal NRC review.
 
O - On file with NRC; older generations report with current validity; not actively under formal NRC
 
review.
 
U - Actively under formal NRC review.
 
P - Pending approval by the NRC.
 
Rev. 0 WOLF CREEK Table 1.6-3 USAR Figure/Controlled Drawing Cross-Reference  Figure # Sheet Title Drawing #
1.1-1 1 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-120101 1.1-1 2 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-120102    1.1-1 3 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-020103 1.1-1 4 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-020104 1.2-1 0 Peninsular Plant Arrangement Standard Power Systems & Structure Interface M-1G001 1.2-2 0 Equipment Location Radwaste Building Plan El.
1976'-0"M-1G010 1.2-3 0 Equipment Location Radwaste Building Plan El.
2000'-0"M-1G011 1.2-4 0 Equipment Location Radwaste Building Plan El.
2022'-0"M-0G012 1.2-5 0 Equipment Location Radwaste Building El. 2031'-
6" & Roof Plan M-1G013 1.2-6 0 Equipment Location Radwaste Building Sections A
& B M-1G014 1.2-7 0 Equipment Location Radwaste Building Sections C
& E M-1G015 1.2-8 0 Equipment Location Radwaste Building Sections D
& F M-1G016 1.2-9 0 Equipment Location Reactor and Auxiliary Bldgs Plan - Basement El. 1974'-0" M-1G020 1.2-10 0 Equipment Location Auxiliary Building Partial Plan El. 1988'-0" & El. 2013'-6" M-1G021 1.2-11 0 Equipment Location Reactor and Auxiliary Building Plan Ground Floor Elevation 2000'-0" M-1G022 1.2-12 0 Equipment Location Reactor and Auxiliary Building Plan El. 2026'-0" M-1G023 1.2-13 0 Equipment Location Reactor and Auxiliary Buildings Plan Operating Floor El. 2047'-6" M-1G024 1.2-14 0 Equipment Locations Reactor and Auxiliary Buildings Plan El. 2068'-8" M-1G025 1.2-15 0 Equipment Location Reactor and Auxiliary Building Section A M-1G026 1.2-16 0 Equipment Locations Reactor and Auxiliary Buildings Section B M-1G027Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 2)
USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #
1.2-170Equipment Location Reactor and Auxiliary Building Section C M-1G0281.2-180Equipment Location Reactor and Auxiliary Building Section D M-1G0291.2-190Equipment Location Auxiliary Building Sections E, F, & G M-1G0301.2-200Equipment Location Fuel Building Plan Elevation 2000'- 0", 2026'-0" and 2047'-6" M-1G0401.2-210Equipment Location Fuel Building Sections A, B, &
CM-1G0411.2-220Equipment Location Fuel Building Sections D, E, &
FM-1G0421.2-230Equipment Location Control Building &
Communication Corridor Plan Elevation 1974'- 0" &
1984'-0"M-1G0501.2-240Equipment Location Control & Diesel Generator Buildings & Communication Corridor Plan Elevation 2000'-0" & 2016'-0" M-1G0511.2-250Equipment Location Control & Diesel Generator Buildings & Communication Corridor Plan Elevation 2032'-0" & 2047'-6" M-1G0521.2-260Equipment Location Control & Diesel Generator Buildings & Corridor Plan Elevation 2061'- 6",
2066'-0" & 2073'-6" & Section D.
M-1G0531.2-270Equipment Location Control & Diesel Generator Buildings & Communication Corridor Section A M-1G0541.2-280Equipment Location Control & Diesel Generator Buildings Sections B & C M-1G0551.2-290Equipment Location Turbine Building Condenser Pit Plan Elevation 1983'-0" M-1G0601.2-300Equipment Location Turbine Building Ground Floor Plan Elevation 2000'-0" M-1G0611.2-310Equipment Location Turbine Building Partial Plan Elevation 2015'-4" M-1G0621.2-320Equipment Location Turbine Building Mezzanine Floor Plan Elevation 2033'-0" M-1G0631.2-330Equipment Location Turbine Building Operating Floor Plan Elevation 2065'-0" M-1G064Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 3)
USAR Figure/Controlled Drawing Cross-Reference Figure # Sheet Title Drawing #
1.2-34 0 Equipment Location Turbine Building Section A M-1G065 1.2-35 0 Equipment Location Turbine Building Section B M-1G066 1.2-36 0 Equipment Location Turbine Building Section C M-1G067 1.2-37 0 Equipment Location Turbine Building Section D M-0G068 1.2-38 0 Equipment Location Turbine Building Section E M-1G069 1.2-39 0 Equipment Location Turbine Building Section F M-1G070 1.2-40 0 Equipment Location Turbine Building Section G M-0G071 1.2-41 0 Equipment Location Turbine Building Section H M-1G072 1.2-42 0 Turbine Component Laydown Area, Elevation 2065'-0" M-1G073 1.2-44 0 Site Plan 8025-C-KG1202 2.4-3 2 Grading Plan Switchyard Area S-0172 2.4-3 3 Drainage Plan Plant Area S-0186 2.4-3 4A Manhole, Pipe & Culvert Schedule S-0189 Sheet 1 2.4-3 4B Manhole, Pipe & Culvert Schedule S-0189 Sheet 2 2.4-3 4C Manhole, Pipe & Culvert Schedule S-0189 Sheet 3 2.4-3 4D Manhole, Pipe & Culvert Schedule S-0189 Sheet 4 2.4-3 5 Manhole & Pipe Details S-0191 2.4-3 6A Manhole & Pipe Details S-0296 Sheet 1  2.4-3 6B Manhole & Pipe Details S-0296 Sheet 2  2.4-3 7 Plant Area Roadway Grading & Drainage S-0297 5.1-1 1 Reactor Coolant System M-12BB01 5.1-1 2 Reactor Coolant System M-12BB02 5.1-1 3 Reactor Coolant System M-12BB03 5.1-1 4 Reactor Coolant System M-12BB04 5.4-7 0 Residual Heat Removal System M-12EJ01 5.4-21 0 Hot and Cold Leg Lateral Restraints C-03BB53 6.2.2-1 0 Containment Spray System M-12EN01 6.2.2-2 1 Containment Spray System Reactor Building A & B Trains M-13EN03 6.2.2-2 2 Containment Spray System Reactor Building A & B Trains M-13EN04 6.2.2-2 3 Containment Spray System Reactor Building A & B Trains M-13EN05 6.2.5-1 0 Containment Hydrogen Control System M-12GS01 6.2.6-1 0 Containment Integrated Leak Rate Test M-12GP01 6.3-1 1 Borated Refueling Water Storage System M-12BN01 6.3-1 2 High Pressure Coolant Injection System M-12EM01 6.3-1 3 High Pressure Coolant Injection System M-12EM02 6.3-1 4 Accumulator Safety Injection M-12EP01
 
Rev. 28 WOLF CREEK Table 1.6-3 (Sheet 4)
USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #7.2-1 1 Functional Diagrams (Index and Symbols) M-744-00018 7.2-1 2 Functional Diagrams (Reactor Trip Signals) M-744-00019 7.2-1 3 Functional Diagrams (Nuclear Instrumentation and Manual Trip Signals) M-744-00020 7.2-1 4 Functional Diagrams (Nuclear Instrumentation Permissives and Blocks) M-744-00021 7.2-1 5 Functional Diagrams (Primary Coolant System Trip SignalsM-744-00022 7.2-1 6 Functional Diagrams (Pressurizer Trip Signals) M-744-00023 7.2-1 7 Functional Diagrams (Steam Generator Trip Signals)M-744-00024 7.2-1 8 Functional Diagrams (Safeguards Actuation Signals)M-744-00025 7.2-1 9 Functional Diagrams (Rod Controls and Rod Blocks)M-744-00026 7.2-1 10 Functional Diagrams (Steam Dump Control) M-744-00027 7.2-1 11 Functional Diagrams (Pressurizer Pressure and Level Control) M-744-00028 7.2-1 12 Functional Diagrams (Pressurizer Heater Control) M-744-00029 7.2-1 13 Functional Diagrams (Feedwater Control and Isolation)M-744-00030 7.2-1 14 Functional Diagrams (Feedwater Control and Isolation)M-744-00031 7.2-1 15 Functional Diagrams (Auxiliary Feedwater Pumps Start-up)M-744-00032 7.2-1 16 Functional Diagrams (Turbine Trips, Runbacks and Other Signals) M-744-00033 7.2-1 17 Functional Diagram (Pressurizer Pressure Relief System Train A) M-744-00039 7.2-1 18 Functional Diagram (Pressurizer Pressure Relief System Train B) M-744-00040 7.3-1 2 Logic Diagram Engineered Safety Features Actuation System (BOP)
J-104-00390 7.6-4 1 Train B Functional Diagram Showing Logic Requirements for Pressurizer Pressure Relief SystemM-744-00039 7.6-4 2 Train A Functional Diagram Showing Logic Requirements for Pressurizer Pressure Relief SystemM-744-00040 8.2-3 0 Wolf Creek Substation General Plan KD-7750 8.2-4 0 One-Line Diagram KD-7496 Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 5)
USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #8.3-1 1 Main Single Line Diagram E-11001 8.3-1 2 Single Line Diagram, Essential Service Water SystemE-K10018.3-1 3 Single Line Diagram Site Area Loads E-1001 8.3-2 0 List of Loads Supplied by the Emergency Diesel Generator E-110058.3-3 0 Logic Diagram Standby Generation Excitation ControlE-12NE018.3-4 0 Logic Diagram Standby Generator System Protection E-12NE028.3-5 0 Logic Diagram Standby Generator Engine and Governor Control E-12KJ018.3-6 1 DC Main Single Line Diagram E-11010 8.3-7 0 DC Main Single Line Diagram (PK03 and PK04 Bus)E-11010A9.1-31Fuel Pool Cooling and Cleanup System M-12EC019.1-32Fuel Pool Cooling and Cleanup System M-12EC029.2-1 1 Service Water System M-12EA019.2-1 2 Service Water System M-12EA02 9.2-1 3 Service Water System M-0022 Sheet 1 9.2-2 1 Essential Service Water System M-12EF019.2-2 2 Essential Service Water System M-12EF029.2-2 3 Essential Service Water System M-K2EF019.2-2 4 Essential Service Water System M-K2EF039.2-3 0 ESW Pumphouse Equipment Location - Plan M-KG0809.2-4 0 ESWS Pumphouse Equipment Location - Sections M-KG0819.2-5 1 Makeup Demineralizer System M-0025 Sheet 1 9.2-5 2 Makeup Demineralizer System M-0025 Sheet 2 9.2-5 3 Makeup Demineralizer System M-0025 Sheet 3 9.2-5 4 Makeup Demineralizer System M-0025 Sheet 4 9.2-5 4A Makeup Demineralizer System M-0025 Sheet 4A 9.2-5a 0 Potable Water System A-0503 Sheet 1 9.2-13 0 Reactor Make-up Water System M-12BL019.2-14 0 Closed Cooling Water System M-12EB019.2-15 1 Component Cooling Water System M-12EG019.2-15 2 Component Cooling Water System M-12EG029.2-15 3 Component Cooling Water System M-12EG039.2-16 0 Demineralized Water Storage and Transfer System M-12AN019.2-17 1 Domestic Water System M-12KD019.2-17 2 Domestic Water System M-12KD02 9.2-23 0 Condensate Storage and Transfer System M-12AP01Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 6)
USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #9.2-24 1 Waste Water Treatment Facility M-12WT01 9.2-25 1 Waste Water Treatment Facility M-12WT03 9.3-1 1 Compressed Air System M-12KA01 9.3-1 2 Compressed Air System (Service Air) M-12KA02 9.3-1 3 Instrument Air System M-12KA03 9.3-1 4 Instrument Air System M-12KA04 9.3-1 5 Compressed Air System M-12KA05 9.3-1 6 Compressed Air System M-12KA06 9.3-1 7 Compressed Air System M-12KA079.3-2 1 Nuclear Sampling System M-12SJ019.3-2 2 Nuclear Sampling System M-12SJ039.3-3 0 Nuclear Sampling System M-12SJ029.3-4 1 Process Sampling System M-12RM019.3-4 2 Process Sampling System M-12RM029.3-4 3 Process Sampling System M-12RM039.3-5 1 Sanitary Lift Station & Turb. Bldg. Sanitary Drainage System M-12LA019.3-5 2 Comm. Corridor & Control Bldg. Sanitary Drainage
 
SystemM-12LA029.3-5 3 Chemical and Detergent Waste M-12LD019.3-5 4 Turbine Bldg. and Aux. Feedwater Pump Rooms
 
Oily Waste System M-12LE019.3-5 5 Control and Diesel Generator Bldg. Oily Waste
 
SystemM-12LE029.3-5 6 Turbine Bldg. and Aux. Boiler Room Oily Waste
 
SystemM-12LE039.3-5 7 Tendon Access Gallery and Turbine Bldg. Oily
 
Waste System M-12LE049.3-5 8 Auxiliary Building Floor and Equipment Drain (FED) System M-12LF019.3-5 9 Auxiliary Building Floor and Equipment Drain
 
SystemM-12LF029.3-5 10 Auxiliary Building Floor and Equipment Drain
 
SystemM-12LF039.3-5 11 Auxiliary Building Floor and Equipment Drain
 
SystemM-12LF049.3-5 12 Auxiliary Building Floor and Equipment Drain
 
SystemM-12LF059.3-5 13 Radwaste and Fuel Bldgs. FED System M-12LF069.3-5 14 Radwaste Bldg. FED System M-12LF079.3-5 15 Control and Fuel Bldgs. FED System M-12LF089.3-5 16 Reactor Bldg. and Hot Machine Shop FED System M-12LF099.3-5 17 Radwaste Bldg. and Tunnel FED System M-12LF10Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 7)
USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #9.3-7 1 Reactor Building, Stainless Steel Liner Plate, Reactor Refueling Canal C-0L29319.3-7 2 Fuel Building-Area 1, Stainless Steel Liner Plate Plan, Spent Fuel Pool C-1L61119.3-8 1 Chemical and Volume Control System M-12BG01 9.3-8 2 Chemical and Volume Control System M-12BG02 9.3-8 3 Chemical and Volume Control System M-12BG03 9.3-8 4 Chemical and Volume Control System M-12BG049.3-8 5 Chemical and Volume Control System M-12BG059.3-9 1 Service Gas System M-12KH019.3-9 2 Service Gas System M-12KH029.3-11 1 Boron Recycle System M-12HE019.3-11 2 Boron Recycle System M-12HE029.3-11 3 Boron Recycle System M-12HE039.4-1 1 Control Building HVAC M-12GK019.4-1 2 Control Building HVAC M-12GK029.4-1 3 Control Building HVAC M-12GK039.4-1 4 Control Building HVAC M-12GK049.4-2 1 Fuel Building HVAC M-12GG019.4-2 2 Fuel Building HVAC M-12GG029.4-3 1 Miscellaneous Buildings HVAC M-12GF019.4-3 2 Miscellaneous Buildings HVAC M-12GF029.4-3 3 Auxiliary Building HVAC M-12GL039.4-3 4 Auxiliary Building HVAC M-12GL029.4-3 5 Auxiliary Building HVAC M-12GL019.4-4 1 Turbine Building HVAC M-12GE019.4-4 2 Turbine Building HVAC M-12GE029.4-4 3 Turbine Building HVAC M-12GE039.4-4 4 Turbine Building HVAC M-12GE049.4-5 1 Radwaste Building HVAC M-12GH019.4-5 2 Radwaste Building HVAC M-12GH029.4-6 1 Containment Cooling System M-12GN019.4-6 2 Containment Cooling System M-12GN029.4-6 3 Containment Atmospheric Control System M-12GR019.4-6 4 Containment Purge Systems HVAC M-12GT019.4-7 0 Diesel Generators Building HVAC M-12GM019.4-8 0 Essential Service Water Pump House HVAC M-K2GD01 9.4-9 1 Plant Heating System M-12GA019.4-9 2 Plant Heating System M-12GA029.4-10 0 Central Chilled Water System M-12GB019.4-11 0 Waste Water Treatment Facility HVAC M-12VW01Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 8)
USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #9.5-1 1 Fire Protection System (site) M-0023 Sheet 1 9.5-1 2 Fire Protection System (site) M-0023 Sheet 2 9.5-1 3 Fire Protection System (site) M-0023 Sheet 3 9.5-1 4 Fire Protection System (site) M-0023 Sheet 4 9.5-2 0 Outdoor Piping, Key Plan and General Notes M-0051 9.5.1-1 1 Fire Protection Turbine Building M-12KC01 9.5.1-1 2 Fire Protection System (power block) M-12KC02 9.5.1-1 3 Fire Protection System (power block)
M-12KC039.5.1-1 4 Fire Protection (Halon) System M-12KC049.5.1-1 5 Fire Protection System (power block)
M-12KC059.5.1-1 6 Fire Protection (Halon) System M-12KC069.5.1-1 7 Fire Protection (Halon) System M-12KC079.5.1-2 1 Fire Area Delineation el. 1974 10466-A-1801 9.5.1-2 2 Fire Area Delineation el. 2000 10466-A-1802 9.5.1-2 3 Fire Area Delineation el. 2026 10466-A-1803 9.5.1-2 4 Fire Area Delineation el. 2047-6 10466-A-1804 9.5.2-1 0 Telephone System Riser Diagram E-14QE019.5.2-2 0 Public Address System Riser Diagram E-1L99039.5.3-1 0 Lighting Distribution Riser Diagram E-1L99019.5.4-1 0 Emergency Fuel Oil System M-12JE019.5.5-1 1 Standby Diesel Generator "A" Cooling Water SystemM-12KJ019.5.5-1 2 Standby Diesel Generator "B" Cooling Water
 
SystemM-12KJ049.5.6-1 1 Standby Diesel Generator "A" Intake, Exh., F.0.
 
and Starting Air System M-12KJ029.5.6-1 2 Standby Diesel Generator "B" Intake, Exh., F.0.
 
and Starting Air System M-12KJ059.5.7-1 1 Standby Diesel Generator "A" Lube Oil System M-12KJ039.5.7-1 2 Standby Diesel Generator "B" Lube Oil System M-12KJ069.5.9-1 1 Auxiliary Boiler System M-12FA019.5.9-1 2 Auxiliary Steam System M-12FB019.5.9-1 3 Auxiliary Steam System M-12FB029.5.9-1 4 Auxiliary Steam Chemical Addition System M-12FE019.5.10-1 1 Breathing Air System M-12KB019.5.10-1 2 Breathing Air System M-12KB029.5.10-1 3 Breathing Air System M-12KB03Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 9)
USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #10.2-1 1 Main Turbine M-12AC01 10.2-1 2 Main Turbine M-12AC02 10.2-1 3 Main Turbine M-12AC03 10.2-1 4 Main Turbine M-12AC04 10.2-1 5 Lube Oil Storage, Transfer and Purification System M-12CF01 10.2-1 6 Lube Oil Storage, Transfer and Purification System M-12CF02 10.2-1 7 Main Turbine Control Oil System M-12CH01 10.2-1 8 Main Turbine Control Oil System M-12CH02 10.3-1 1 Main Steam System M-12AB01 10.3-1 2 Main Steam System M-12AB02 10.3-1 3 Main Steam System M-12AB03 10.4-1 1 Circulating Water & Waterbox Drains System M-12DA0110.4-12Circulating Water System M-002110.4-13Circulating Water Waterbox Venting System M-12DA0210.4-14Circulating Water Screenhouse Plans M-000410.4-15Circulating Water Screenhouse - Sections M-000510.4-21Condensate System M-12AD0110.4-22Condensate System M-12AD0210.4-23Condensate System M-12AD0310.4-24Condensate System M-12AD0410.4-25Condensate System M-12AD0510.4-26Condensate System M-12AD0610.4-30Condenser Air Removal M-12CG0110.4-40Steam Seal System M-12CA0110.4-51Condensate Demineralizer System M-12AK0110.4-52Condensate Demineralizer System M-12AK0210.4-53Condensate Demineralizer System M-12AK0310.4-61Feedwater System M-12AE0110.4-62Feedwater System M-12AE0210.4-63Feedwater Heater Extraction Drains & Vents M-12AF0110.4-64Feedwater Heater Extraction Drains & Vents M-12AF0210.4-65Feedwater Heater Extraction Drains & Vents M-12AF0310.4-66Feedwater Heater Extraction Drains & Vents M-12AF0410.4-67Auxiliary Turbines S.G.F.P. Turbine A M-12FC0310.4-68Auxiliary Turbines S.G.F.P. Turbine "B" M-12FC0410.4-71Condensate Chemical Addition System M-12AQ0110.4-72Feedwater Chemical Addition System M-12AQ0210.4-81Steam Generator Blowdown System M-12BM0110.4-82Steam Generator Blowdown System M-12BM0210.4-83Steam Generator Blowdown System M-12BM0310.4-84Steam Generator Blowdown System M-12BM0410.4-85Steam Generator Blowdown System M-12BM05Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 10)
USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #
10.4-90Auxiliary Feedwater System M-12AL0110.4-100Auxiliary Turbines Auxiliary Feedwater Pump TurbineM-12FC0210.4-121Secondary Liquid Waste System M-12HF0110.4-122Secondary Liquid Waste System M-12HF0210.4-123Secondary Liquid Waste System M-12HF0310.4-124Secondary Liquid Waste System M-12HF0411.2-11Liquid Radwaste System M-12HB0111.2-12Liquid Radwaste System M-12HB0211.2-13Liquid Radwaste System M-12HB0311.2-14Liquid Radwaste System M-12HB0411.3-11Gaseous Radwaste System M-12HA0111.3-12Gaseous Radwaste System M-12HA0211.3-13Gaseous Radwaste System M-12HA0311.4-11Solid Radwaste System M-12HC0111.4-12Solid Radwaste System M-12HC0211.4-13Solid Radwaste System M-12HC0311.4-14Solid Radwaste System M-12HC0412.3-21Radiation Zones for Normal Operation El. 1974 10466-A-1701 12.3-22Radiation Zones for Normal Operation El. 2000 10466-A-1702 12.3-23Radiation Zones for Normal Operation El. 2026 10466-A-1703 12.3-24Radiation Zones for Normal Operation El. 2047-6 10466-A-1704 12.3-25Radiation Zones for Normal Operation Turbine Bldg El. 1983 & 2000 10466-A-1705 12.3-26Radiation Zones for Normal Operation Turbine Bldg El. 2033 & 2065 10466-A-1706 12.3-40Decontamination System M-12HD0118.2-150Nuclear Sampling System M-12SJ04Rev. 17 WOLF CREEK Table 1.6-4 (sheet 1)
Incorporated by Reference USAR Section/Controlled Do cument Cross-Reference Section Title Document # Table 3.11(B)-1 Plant Environmental Normal Conditions EQSD-I, Attachment A and B Table 3.11(B)-2 Environmental Qualification Parameters for SNUPPS NUREG-0588 (LOCA, MSLB and HELB)
EQSD-I, Attachment A and B Table 3.11(B)-3 Identification of Safety-Related Equipment and Components: Equipment Qualification EQSD-I, Attachment A and B; EQSD-II, Tables 1 and 2 Table 3.11(B)-4 Containment Worst Case Radiation Levels (MRADs)
EQSD-I, Attachment A Table3.11(B)-5 Containment Spray Requirements EQSD-I, Attachment A  Table 3.11(B)-8 Exemptions from NUREG-0588 Qualification EQSD-I, Attachment C  Table 3.11(B)-10 Equipment Added for NUREG-0737 EQSD-II, Tables 1 and 2 Figures 3.11(B)-
1 through 3.11(B)-49 Figures EQSD-I, Attachment A Section 9.5.1.2.2.3*
Fire Barriers *Note: Only portions of this section have been relocated and Incorporated by Reference M-663-00017A Appendix 9.5B.1 Fire Hazard Analyses - Introduction E-1F9905 Table 9.5B-1 Minimum Equipment Required for Safe Shutdown XX-E-013 Appendix 9.5B.2 Fire Hazard Analyses - Assumption on Plant Conditions E-1F9905 Table 9.5B-2 Equipment Required for Shutdown following a Fire XX-E-013 Appendix 9.5B.3 Fire Hazard Analyses - Fire Effects on Electrical Equipment and Safe Shutdown Information E-1F9905 Rev. 28 WOLF CREEK Table 1.6-4 (sheet 2)
Incorporated by Reference USAR Section/Controlled Do cument Cross-Reference Section Title Document #
Table 9.5B-3 Safety-Related Fire Areas Containing Rooms Without Detection Provisions E-1F9905, Attachment A Appendix 9.5B.4 Fire Hazard Analyses - General Information on Design Features E-1F9905, or XX-E-013, or 
 
E-1F9900 Table 9.5B-4 Safety-Related Fire Areas Outside Containment With Area Suppression Coverage E-1F9905
 
Attachment A Appendix 9.5B.5 Fire Hazard Analyses - Combustible Loadings and Flame Spread E-1F9905 Table 9.5B-5 Non-Safety Related Site Structures E-1F9905,
 
Attachment C Appendix 9.5B.6 Fire Hazard Analyses - Fire Hazard Review Methodology E-1F9905, or XX-E-013 Appendix 9.5B.7 Fire Hazard Analyses - Power Block Fire Hazards Analysis E-1F9905 Appendix 9.5B.8 Fire Hazard Analyses - Site Specific Fire Hazards Analysis E-1F9905 Appendix 9.5B Design Basis Document for OFN AP-017, Control Room Evacuation E-1F9915 Chapter 16.0 Technical Requirements Manual Technical Requirements
 
Manual Chapter 17.2 Quality Assurance During the Operation Phase Quality Program Manual 
 
Rev. 29 WOLF CREEK 1.7  DRAWINGS AND OTHER DETAILED INFORMATION The engineering drawings listed in Tables 1.7-1, 1.7-2 and 1.7-3 reflect the
 
detailed design configuration as described in USAR text and tables. The
 
controlled drawings that were removed from the USAR in Revision 17 and incorporated by reference are listed in Table 1.6-3
 
1.7.1  Electrical, Instrumentation and Control Drawings
 
Table 1.7-1 contains a list of electrical, instrumentation, and control
 
drawings that are considered to be necessary to evaluate the safety-related
 
features pertaining to the power block.
 
1.7.2  Piping and Instrumentation Diagrams Table 1.7-2 contains a list of each piping and instrumentation diagram and the
 
corresponding USAR figure number as it appears at the end of the respective
 
text section. The P&ID legend, Figure 1.1-1, provides an explanation of
 
symbols and characters used in these USAR figures.
 
1.7.3  Miscellaneous Controlled Drawings
 
Table 1.7-3 contains a list of other controlled drawings utilized as figures in
 
the USAR and the corresponding USAR figure number as it appears at the end of
 
the respective text section.
 
1.7.4 Long-Term Temporary Modifications
 
Scaffolding materials being used in support of plant Operations, regardless of
 
duration, are utilized under the requirements specified within the Plant
 
Scaffolding Program. This material includes items such as; camera poles,
 
rigging frames, and barricades, that may be installed within all Power Block
 
structures. Table 1.7-4 contains a list of erected scaffold that is expected to be in place throughout the next required USAR update cycle.
 
1.7-1    Rev. 23 WOLF CREEK TABLE 1.7-1 ELECTRICAL, INSTRUMENTATION, AND CONTROL DRAWINGS DRAWING NUMBER  TITLE        E-K1001  SINGLE LINE DIAGRAM ESSENTIAL SERVICE WATER SYSTEM E-11NB01  LOWER MED VOLTAGE SYS CLASS 1E 4.16 KV SINGLE LN E-11NB02  LOWER MED VOLTAGE SYS CLASS 1E 4.16 KV SINGLE LN E-11NE01  STBY GENERATOR CLASS 1E 4.16 KV S/L E-11NG01  CLASS 1E LOW VOLTAGE 480V SYS S/L M & R E-K1NG01  LOW VOLTAGE SYSTEM CLASS 1E 480V SINGLE LINE METER & RELAY DIAGRAM E-11NG02  CLASS 1E LOW VOLTAGE 480V SYS S/L M & R E-11NG20  LOW VOLTAGE SYSTEM CLASS 1E MOTOR CONTROL CENTERS SUMMARY E-11NK01  CLASS 1E 125 DC SYS S/L M & R  E-11NK02  CLASS 1E 125 DC SYS S/L M & R  E-11PA01  HIGH MED VOLT SYS 13.8 KV M & R  E-11PA02  HIGH MED VOLT SYS 13.8 KV M & K  E-11PG06  NON-CLASS 1E LOW VOLTAGE SYS 480V S/L M & R E-11PN01  NON-CLASS 1E INSTRUMENT AC POWER E-12KJ01  STANDBY GENERATOR SYSTEM  E-K2NG01  LOGIC DIAGRAM - 4.16 KV MOTOR CONTROL CENTER TRANSFORMER
 
FEEDER BREAKERS (VOID)
E-K2NG02  LOGIC DIAGRAM - 480V MOTOR CONTROL CENTER TRANSFORMER
 
FEEDER BREAKERS (VOID)
E-K2NG03  LOGIC DIAGRAM - 480V SYSTEM NOTES   
  & REFERENCES E-13AB01  MAINSTEAM SUPPLY VLV TO TURB DR AUX FEEDW PUMP E-13AB03A  MAIN STEAM LINE DRAIN VLV  E-13AB03B  MAIN STEAM LINE DRAIN VLV  E-13AB06A  MAIN STM ATMOS VENT VLV POS INT LIGHT
 
Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 2)
DRAWING NUMBER  TITLE        E-13AB06B  MAIN STM ATMOS VENT VLV POS INT LIGHT E-13AB08  MN STM COOLDOWN VLV  E-13AB11A  SCHEMAT DIAG MAIN DUMP VLVS  E-13AB11B  SCHEMAT DIAG MAIN STM DUMP VLV E-13AB11C  SCHEMAT DIAG MAIN STM DUMP VLV E-13AB17  MN STM BYPASS VAL TO AUX FEEDWTR PUMP TURB E-13AB23A  SCHEMAT DIAG MAIN STM BYPASS VLVS E-13AB23B  SCHEMAT DIAG MAIN STM BYPASS VLVS E-13AB26  SCHEMATIC DIAGRAM MAIN STEAM  ISO VALVES ALL CLOSE - SEPARATION GROUP 1 E-13AB27  SCHEMATIC DIAGRAM MAIN STEAM  ISO VALVES ALL CLOSE - SEPARATION GROUP 4 E-13AB28  SCHEMATIC DIAGRAM MAIN STEAM  ISO VALVES CONTROL PART 1 E-13AB29  SCHEMATIC DIAGRAM MAIN STEAM  ISO VALVES CONTROL PART 2 E-13AB30  SCHEMATIC DIAGRAM MAIN STEAM AND  FEEDWATER ISO VLV MISCELLANEOUS
 
CIRCUITS E-13AB31  STEAM DUMP CONTROL & BYPASS INDICATION E-13AC38  MAIN TURB SYS WITH NSSS INTERFACE E-13AE05  SCH DIAG STEAM GENER CHEMICAL INJECT  E-13AE06  SCH DIAG MAIN FEEDWTR CONTR VALVES 
 
E-13AE07  SCH DIAG MAIN FEEDWTR CONTR VALVES  E-13AE14  SCHEMATIC DIAGRAM FEEDWATER ISOLATION  VALVES ALL CLOSE - SEPARATION GROUP 1 E-13AE15  SCHEMATIC DIAGRAM FEEDWATER ISOLATION VALVES ALL CLOSE - SEPARATION GROUP 4 E-13AE16  SCHEMATIC DIAGRAM FEEDWATER ISO VALVES CONTROL PART 1 E-13AE17  SCHEMATIC DIAGRAM FEEDWATER ISO VALVES CONTROL PART 2 E-13AE18  BYPASS FEEDWATER CONTROL VALVES E-13AL00  AUX FEEDWATER SCHEMATIC INDEX SHEET  E-13AL01A  AUX FEEDWATER SYSTEM MOTOR DRIVEN PUMP E-13AL01B  AUX FEEDWATER SYSTEM MOTOR DRIVEN PUMP E-13AL02A  AUX FEEDWATER SYSTEM MOTOR OPERATED VALVES
 
Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 3)
DRAWING NUMBER  TITLE        E-13AL02B  AUX FEEDWATER SYSTEM MOTOR OPERATED VALVES E-13AL02C  SCHEMATIC DIAGRAM MOTOR OPERATED  VALVE ALHV0036 E-13AL03A  AUX FEEDWATER PUMPS DISCH CONTR MOVS E-13AL03B  AUX FEEDWATER PUMPS DISCH CONTROL MOVS E-13AL04A  SUPPLY FROM ESS SERV WTR SYS  E-13AL04B  SUPPLY FROM ESS SERV WTR SYS  E-13AL05A  AUX FDWR PUMPS DISCH CONTR AIR OP VALVES E-13AL05B  AUX FDWR PUMPS DISCH CONTR AIR OP VALVES E-13AL06  SCHEMATIC DIAGRAM INSTRUMENTATION & ALARMS E-13AL07A  SCHEMATIC DIAGRAM INSTRUMENTATION & ALARMS E-13AL07B  SCHEMATIC DIAGRAM INSTRUMENTATION & ALARMS E-13AL08  SCHEMATIC DIAGRAM INSTRUMENTATION & ALARMS E-13AL09  SCHEMATIC DIAGRAM MISCELLANEOUS CIRCUITS E-13AL10  SCHEMATIC DIAGRAM AUX FDWTR SYS  E-13AP04  SCHEMATIC DIAGRAM CONDENSATE SYSTEM E-13BB03  S.D. RCP THERM BARRIER CCW ISO VLVS E-13BB04  S.D. SEAL WTR INJECT ISO VALVE 
 
E-13BB11  S.D. PRZR RELIEF TANK VENT TO WPS ISO VLV E-13BB12A  S.D. RHR LOOP INLET ISO VALVE  E-13BB12B  S.D. RHR LOOP INLET ISO VALVE  E-13BB13  S.D. PRZR RELIEF TK VENT TO WPRS ISO VLV E-13BB27  SCH DIAG REACTOR COOLANT PUMP MOTORS E-13BB28  SCHEMATIC DIAGRAM REACTOR COOLANT PUMP E-13BB30  SCHEMATIC DIAGRAM REACTOR COOLANT PUMP E-13BB31  SCHEMATIC DIAGRAM REACTOR COOLANT PUMP E-13BB33  SCHEMATIC DIAGRAM  E-13BB34    SCHEMATIC DIAGRAM  E-13BB35    SCHEMATIC DIAGRAM REACTOR COOLANT PUMP E-13BB36  SCHEMATIC DIAGRAM REACTOR COOLANT PUMP
 
Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 4)
DRAWING NUMBER  TITLE        E-13BB37  SCHEMATIC DIAGRAM REACTOR COOLANT PUMP E-13BB38  SCHEMATIC DIAGRAM REACTOR COOLANT PUMP E-13BB39  SCHEMATIC DIAGRAM REACTOR COOLANT PUMP E-13BB40  SCHEMATIC DIAGRAM REACTOR COOLANT PUMP E-13BG01  CENTRIFUGAL CHARGING PUMPS SCHEMATIC DIAGRAM E-13BG11A  CHARGING PUMP TO REACTOR COOLANT & MINIFLOW ISO E-13BG11B  CHARGING PUMP TO REACTOR COOLANT & MINIFLOW ISO E-13BG11C  SCHEMATIC DIAGRAM CHARGING PUMP TO  REACTOR COOLANT AND MINIFLOW ISOLATION VALVE BGHV8111 E-13BG12  VOLUME CONT TANK OUTLET ISO VLVS SCH DIAG E-13BG12A  VOLUME CONTROL TANK OUTLET ISO VALVE E-13BG13  BORIC ACID FILTER TO CHG PUMP VLV  E-13BG17  LETDOWN LINE ISO VLV SCH DIAG  E-13BG24  REACTOR COOLANT PUMP SEAL WATER ISO VLV SCH DIAG E-13BG27  BORIC ACID TRANSFER PUMPS  E-13BG36  LETDOWN CONTAINMENT ISO VLV SCH DIAG E-13BG38  REACTOR COOLANT PUMP SEAL WATER ISO VLV SCH DIAG E-13BG48  EXCESS LETDOWN LINE ISO VLV SCH DIAG E-13BG52  RCP SEAL INJECTION FLOW THROTTLING VALVES E-13BL01  PRZR RELIEF TANK REACTOR TO MAKEUP WTR SUPPLY E-13BM01    STEAM GENERATOR BLOWDOWN SCHEMATIC E-13BM02    STEAM GENERATOR BLOWDOWN SCHEMATIC E-13BM03    STEAM GENERATOR BLOWDOWN SCHEMATIC E-13BM06A    STEAM GENERATOR BLOWDOWN SCHEMATIC E-13BM06B    STEAM GENERATOR BLOWDOWN SCHEMATIC E-13BM06C    STEAM GENERATOR BLOWDOWN SCHEMATIC E-13BN01    REFUELG WTR STRG TK TO CHARGE PUMP MOV E-13BN01A  SCHEMATIC DIAGRAM REFUELING WATER  STORAGE TANK TO CHARGING PUMP MOV
 
BNLCV0112E
 
Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 5)
DRAWING NUMBER  TITLE        E-13BN02  REFUELG WTR STRG TK TO SFPCS PUMP MOV E-13BN03  REFUELG WTR STRG TK RHR PUMP MOV E-13BN04  RWST TO CONTMET SPRAY PUMP MOV E-13BN06  RWST TO SAFETY INJECT PUMP VLV E-13BN08  SIS PUMP MINIFLW ISO VLV  E-13BN10  SCHEMATIC DIAGRAM  E-13EC01  FUEL POOL COOLING PUMPS SCHEMATIC DIAGRAM E-13EC02  SCHEM DIAG CCW DISCHARGE VLVS FROM FUEL POOL CLG E-13EF01  ESW TO AIR COMP ISOL VALVES SCHEMATIC DIAGRAM E-K3EF01  SCHEMATIC DIAGRAM - ESW PUMPS  E-13EF02  SCHEMATIC DIAG ESW TO SW SYS ISOL VLVS E-K3EF02  SCHEMATIC DIAGRAM - TRAVELING WATER SCREENS E-13EF03  SCHEMATIC DIAG ESW TO SW SYS ISOL VLVS E-K3EF03  SCHEMATIC DIAGRAM - SCREEN WASH WATER VALVE E-13EF04  SCHEM DIAG ESW FROM COMPONENT COOLG WTR HEAT EXC E-K3EF04  SCHEMATIC DIAGRAM - ESW SELF-CLEANING STRAINER E-13EF05  SCHEMATIC DIAGRAM ESW TO COMPONENT COOLG WTR HEA E-13EF05A  SCHEMATIC DIAGRAM ESW TO COMPONENT  COOLING WATER HEAT EXCHANGER ISOLATION VALVE EFHV0052 E-K3EF05  SCHEMATIC DIAGRAM - SELF-CLEANING STRAINER TRASH VALVE E-13EF06  SCHEMATIC DIAG ESW TO ULTIM HEAT SINK ISOL VALVE E-K3EF06  SCHEMATIC DIAGRAM - ESW PUMP DISCHARGE AIR RELEASE VALVE E-13EF07  ESWS CONTAIN COOLER VALVE  E-13EF07A  SCHEMATIC DIAGRAM ESW TO CONTAINMENT  AIR COOLERS ISOLATION VALVE
 
EFHV0032 E-K3EF07  SCHEMATIC DIAGRAM - SYSTEM BACKPRESSURE CONTROL VALVE E-13EF08  SCHEM DIAG ESW FROM CONTAIN-MENT AIR COOLERS ISOL E-K3EF08  SCHEMATIC DIAGRAM - MISCELLANEOUS CIRCUITS E-13EF08A  SCHEMATIC DIAGRAM ESW TO CONTAINMENT  AIR COOLERS ISOLATION VALVE
 
EFHV0050 E-13EF09  SCHEM DIAG ESW TO/FROM CONTAIN AIR COOL ISOL VLV E-13EF09A  ESW TO/FROM CONTAIN AIR COOLERS  ISOLATION VALVES E-K3EF09  SCHEMATIC DIAGRAM - STATUS PANEL CIRCUITS E-13EF10  SCHEM DIAG ESW FROM CONTAIN AIR COOLERS ISOL VLV Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 6)
DRAWING NUMBER  TITLE        E-K3EF10  SCHEMATIC DIAGRAM - MISCELLANEOUS CIRCUITS E-13EG01A  CCW PUMPS A & B  E-13EG01B  CCW PUMPS C & D  E-13EG01C  SCHEMATIC DIAGRAM COMPONENT COOLING WATER E-13EG01D  SCHEMATIC DIAGRAM  E-13EG03  CCW SURGE TANK VENT  E-13EG04  ESW MAKEUP TO CCW SYS  E-13EG05A  CCWS SUPPLY RETURN FROM NUCLEAR AUX COMPONENT E-13EG05B  CCWS SUPPLY TO NUCLEAR AUX COMPONENT E-13EG05C  SCHEMATIC DIAGRAM COMPONENT COOLING  WATER RETURN FROM NUCLEAR AUX.
COMPONENT EGHV0015 E-13EG05D  SCHEMATIC DIAGRAM COMPONENT COOLING  WATER SUPPLY FROM NUCLEAR AUX.
COMPONENT EGHV0054 E-13EG06  CCW TO CONTAINMENT ISO VALVES  E-13EG07  CCW SUPPLY TO RHR HEAT EXCHANGER E-13EG07A  COMPONENT COOLING WATER SUPPLY TO RHR  HEAT EXCHANGER EGHV0102 E-13EG08  CCW SUPPLY RETURN FROM RADWASTE BLDG  E-13EG09  CCW CONTAINMENT ISO VALVES  E-13EG10  CONTAINMENT ISO VALVE RETURN FROM THERM BAR COOL E-13EG16  CCW HEAT EXCHANGER OUTLET TEMP CONT VALVES E-13EG17  SCHEMATIC DIAGRAM ISOMETRIC VALVES E-13EG18  SCHEMATIC DIAGRAM ISOMETRIC VALVES E-13EG19  SCHEMATIC DIAGRAM ISOMETRIC VALVES E-13EG20  SCHEMATIC DIAGRAM ISOMETRIC VALVES E-13EJ01  RESIDUAL HEAT REMOVAL PUMPS 1 & 2 SCHEM DIAGRAM E-13EJ02  NUCLEAR SAMPLE LINE VALVES SCHEMATIC DIAGRAM E-13EJ03  RHR CROSS CONNECT VALVES SCHEMATIC DIAGRAM E-13EJ04A  RHR PUMP TO CHG PUMP VLV SCH DIA  E-13EJ04B  RHR PUMP TO CHARGING PUMP VALVE  E-13EJ05A  RHR PUMP TO CHG PUMP VLV SCH DIAG E-13EJ05B  RHR LOOP INLET ISO VALVE  E-13EJ06A  RHR PUMP TO CHG PUMP VLV SCH DIAG  E-13EJ06B  SUMP TO RESIDUAL HEAT REMOVAL PUMP Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 7)
DRAWING NUMBER  TITLE        E-13EJ07  RESIDUAL HEAT REMOV HOT & COLD LEG TEST LINE E-13EJ08  RESIDUAL HEAT REMOV MINI FLOW VALVES E-13EJ08A  SCHEMATIC DIAGRAM RESIDUAL HEAT  REMOVAL PUMP MINIFLOW VALVE
 
EJFCV0611 E-13EJ09A  RHR COLD & HOT LEG VALVES  E-13EJ09B  RHR COLD & HOT LEG VALVES  E-13EJ09C  SCHEMATIC DIAGRAM RHR TO COLD AND HOT  LEG VALVES EJHV8809B AND EJHV8840 E-13EJ13  SCHEMATIC DIAGRAM  E-13EJ14  SCHEMATIC DIAGRAM  E-13EM01  HIGH HEAD SAFETY INJECTION SCHEMATIC E-13EM02  BORON INJ TANK DISCH & INLET ISOLA VALVES E-13EM02A  SCHEMATIC DIAGRAM BORON INJECTION  TANK DISCHARGE & INLET ISOLATION VALVE EMHV8801B E-13EM02B  SCHEMATIC DIAGRAM BORON INJECTION  TANK DISCHARGE ISOLATION VALVE
 
EMHV8803B E-13EM02C  SCHEMATIC DIAGRAM BORON INJECTION TANK DISCHARGE AND INLET ISOLATION
 
VALVE EMHV8801A E-13EM03  SIS MINI FLOW ISOLATION VALVES 
 
E-13EM04  SAFETY INJ & CHARGING PUMPS HOT
  & COLD LEG TEST E-13EM04A  SCHEMATIC DIAGRAM CHARGING PUMPS COLD LEG E-13EM08  SUCTION HEADER & SAFETY INJ CROSS CONNECTION E-13EM09  SAFETY INJECTION PUMP SUCTION VALVES E-13EM11  SAFETY INJECTION PUMP TO HOT LEG MOV E-13EM12  ACCUMULATOR FILL LINE & TEST HEADER LINE E-13EM13A  SAFETY INJ PUMP TO HOT & COLD LEGS  E-13EM13B  SAFETY INJ PUMP TO HOT & COLD LEGS  E-13EM17  SCHEMATIC DIAGRAM  E-13EN01  CONTAINMENT SPRAY SYS SCHEMAT DIAG  E-13EN02  CONTAINMENT SPRAY PUMP SUCT SCHEMATIC DIAGRAM E-13EN03  CONT SPRAY P.P ISOLATION SCH DIAG  E-13EN04  CONT SPRAY PP ISO DIAG  E-13EP01  ACCUMULATOR N2 SUPP ISO VLV  E-13EP02A  ACCUMULATOR ISO VLV  E-13EP02B  ACCUMULATOR ISO VLV  E-13EP07  SD ACCUMULATOR ISO VLV  E-13EP09 SAFETY DRY ACCUMULATOR VENT VLVS                  Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 8)
DRAWING NUMBER  TITLE        E-13FC21  SCH DIAG SGFP  E-13FC23  SCH DIAG AUX WATER TURB TRIP
  & THROTTLE VALVE E-13FC24  SCH DIAG AUX WATER TURB TRIP
  & THROTTLE VALVE E-13FC25  SCH DIAG AUX WATER TURB TRIP
  & THROTTLE VALVE E-13FC26  SCH DIAG AUX WATER TURB TRIP
  & THROTTLE VALVE E-13FC27  SGFPT ISOLATION INPUT TO ESFAS  E-K3GD01  SCHEMATIC DIAGRAM - ESW PUMP ROOM SUPPLY FANS E-K3GD02  SCHEMATIC DIAGRAM - ESW PUMP ROOM UNIT HEATERS E-K3GD03  SCHEMATIC DIAGRAM - ESW PUMP ROOM EXHAUST VALVE E-K3GD04  SCHEMATIC DIAGRAM - ESW PUMP ROOM MISCELLANEOUS CIRCUITS E-K3GD05  SCHEMATIC DIAGRAM - ESW VALVE PIT UNIT HEATER E-13GE18  COND AIR REMOVAL FILTER SYS DAMPERS E-13GF01  AUX FDWTR PUMP RM COOLS FANS  E-13GF07  MAIN STREAM ENCL BLDG EXHAUST FANS & DAMPERS E-13GF08  TENDON GALLERY SUPPLY/RETURN ISOL DAMPERS E-13GF13  MAIN STEAM ENCLOSURE BLDG MISC DAMPERS E-13GF14  MISC MOTOR SPACE HEATERS  E-13GG01  EMERGING EXHAUST FAN & DIS-CHARGE DAMPERS E-13GG02  SPENT FUEL PUMP ROOM COOLERS  E-13GG03  EMERGENCY EXHAUST HTG COILS  E-13GG08  FUEL BLDG ISOL DAMPERS OUTSIDE AIR SUPPLY E-13GG09  FUEL BLDG EXHAUST TO EMERG FILT ADSORB UNITS ISO E-13GG10  EMERG FILTER ADSORB UNITS AUX BLDG INTAKE ISOL E-13GG11  SPENT FUEL POOL DISCHARGE TO AUX BLDG DAMPER E-13GG12  FUEL BLDG INSTRUMENTATION  E-13GG15  EMERG EXHAUST CROSS CONNECTION DAMPER E-13GG17  SPENT FUEL POOL NORMAL/EMRGNCY EXHAUST RADIOACTIVITY SAMPLE
 
Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 9)
DRAWING NUMBER  TITLE        E-13GG18  MANUAL INITIATION FUEL BLDG ISOL SIGNAL E-13GK01A  SCHEMATIC DIAG CONTROL ROOM FAN DAMPER E-13GK01B  CONTROL ROOM HVAC SYSTEM  E-13GK02A  CONTROL ROOM A/C UNIT FAN  E-13GK02B  CONTROL ROOM A/C UNIT FAN  E-13GK02C  CONTROL ROOM A/C UNIT SUP  E-13GK03A  FIRE ISOLATION DAMPERS  E-13GK03B  MISCELLANEOUS DAMPERS  E-13GK07  MISCELLANEOUS DAMPERS  E-13GK09A  ISO DAMPERS  E-13GK09B  ISO DAMPERS  E-13GK10A  CONTROL ROOM PRESSURIZATION FAN & SUP DAMPERS E-13GK10B  CONTROL ROOM PRESSURIZATION FAN
    & SUPPLY DAMPERS  E-13GK11  SCH DIAG CONTROL ROOM E-13GK13  CLASS IE ELE A/C UNIT E-13GK13A  SCHEMATIC DIAGRAM E-13GK17  SCH DIAGRAM ISO DAMPERS E-13GK19  SCH DIAGRAM AIR RETURN CONT RM ASB UNITS  E-13GK23  SCH DIAG FIRE ISO DAMPERS E-13GK25  SCH DIAGRAM MISCELLANEOUS ALARMS E-13GK28  CONTROL ROOM HVAC SYSTEM  E-13GK30A  ISOLATION DAMPERS E-13GK30B  ISOLATION DAMPERS E-13GK31  FIRE SIGN ISOMETRIC E-13GL02  AUX BLDG SUPPLY AIR UNIT SUPPLY DAMPERS E-13GL05  PUMP ROOM COOLERS E-13GL06  PUMP ROOM COOLERS E-13GL12  PENETRATION ROOM COOLERS E-13GL12A  PENETRATION ROOM COOLER E-13GL14  SCH DIAGRAM ISOL DAMPERS E-13GL14A  SCHEMATIC DIAGRAM E-13GL16  FUEL BLDG NORMAL EXHAUST ISOL DAMPERS  E-13GL27  CCW PUMP ROOM EXHAUST DAMP E-13GL30  ISOLATION DAMPERS E-13GM01  DIESEL GENERATOR VENTILATION SUPPLY FANS SCHEM  E-13GM02  DIESEL GENERATOR SUPPLY DAMPER CONTROL & MISC AL  E-13GM04  DIESEL GENERATOR BLDG EXHAUST DAMPERS SCHEMATIC  E-13GM04A  SCHEMATIC DIAGRAM
 
Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 10)
DRAWING NUMBER  TITLE        E-13GN01  HYDROGEN MIXING FANS E-13GN02  CONTAINMENT COOLER FANS E-13GN02A  SCHEMATIC DIAGRAM MISC FAN SPACE HEATER  E-13GN03  CRDM COOLING FANS & DISCHARGE DAMPERS  E-13GN09  MISC FAN SPACE HTRS E-13GS01A  SCHEMATIC DIAGRAM E-13GS01B  SCHEMATIC DIAGRAM E-13GS02A  SCHEMATIC DIAGRAM E-13GS02B  SCHEMATIC DIAGRAM E-13GS03  SCHEMATIC DIAG E-13GS04  SCHEMATIC DIAG E-13GS05  SCHEMATIC DIAG E-13GS06  SCHEMATIC DIAG E-13GS07  SCHEMATIC DIAG E-13GS10  SCHEMATIC DIAGRAM E-13GS11  SCHEMATIC DIAGRAM E-13GS12  SCHEMATIC DIAGRAM E-13GS13  SCHEMATIC DIAGRAM E-13GS14  SCHEMATIC DIAGRAM E-13GT03  CONTAINMENT PURGE SYSTEM SCHEMATIC E-13GT04  CONTAINMENT PURGE SYSTEM SCHEMATIC E-13GT05  MINI PURGE FAN SCHEMATIC E-13GT06  SCH DIAGRAM CON PUR SUP EX DM E-13GT13  CTMT PURGE EXHAUST SMPL VLVS E-13HB02  REACTOR COOLANT DRAIN TK PUMP DISC & VENT ISOL VALVE  E-13HB03  REACTOR COOLANT DRAIN TK VENT ISOL VLV E-13HB19  REACTOR COOLANT DRAIN TK PUMP DISCH VLV E-13JE01  EMERGENCY FUEL OIL TRANSFER PUMPS  E-13JE01A  SCHEMATIC DIAGRAM EMERGENCY FUEL OIL TRANSFER PUMP PJE01B E-13JE02  MISC CIRCUITS E-13JE03  FIRE SIGNAL ISOL RELAY E-13KA01A  SCH DIA AIR COMPR ISOL CIRCUIT BREAKER  E-13KA02  SCH DIA COMPRESSED AIR CONTAIN-MENT ISO VLV  E-13KA04  SCH DIA HYDROGEN CONTR SYST MAKE-UP AIR VALVE E-13KC08  FIRE PROTECTION SYSTEM ISO VLV E-13KJ01A  DIESEL GEN KKJ01A ENG CON SCH E-13KJ01B  DIESEL GEN KKJ01A ENG CON SCH E-13KJ02  S.D. DIESEL GEN CONTROLS E-13KJ03A  DG KKJ01B ENG CON SCH
 
Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 11)
DRAWING NUMBER  TITLE        E-13KJ03B  DG KKJ01B ENG CON SCH E-13KJ04  DG KKJ01B ANNUN MISC CKTS SCH DIAG E-13KJ05  JKT COOL & LUBE OIL LEVEL CON E-13KJ06  DIESEL GEN KKJ01B GOV CON E-13KJ07  DIESEL GEN KKJ01B GOV CON E-13KJ08  STANDBY JKT COOL HTR E-13KJ09  STANDBY JKT COOL CIRC PMP E-13KJ10  STANDBY LUBE OIL HTR E-13KJ11  SCH DIAGRAM LUBE OIL KEEP WARM PUMP E-13KJ12  SCH DIAG GEN SPACE HEATER E-13KJ13  ROCKER ARM PRE LUBE PUMP E-13KJ16  DIESEL GEN RTD'S THERMOCOUPLES E-13KJ20  STANDBY D/G STARTING AIR SYSTEM E-13LF07  SUMP DISCHARGE VALVES E-13LF08  SUMP PUMP DISCHARGE ISOLATION VALVE  E-13LF09A  REACTOR BLDG SUMP PUMP DISCHARGE 
 
ISO VLVS  E-13LF09B  REACTOR BLDG SUMP PUMP DISCHARGE 
 
ISO VALVES  E-13NB01  LOWER MED VOLTAGE SYS CLASS IE 4.16 KV 3/L METER  E-13NB02  LOWER MED VOLTAGE SYS CLASS IE 4.16 KV 3/L METER  E-13NB03  LOWER MED VOLTAGE SYS CLASS IE 4.16 KV 3/L METER  E-13NB04  LOWER MED VOLTAGE SYS CLASS IE 4.16 KV 3/L METER  E-13NB05  LOWER MED VOLTAGE SYS CLASS IE 4.16 KV 3/L METER  E-13NB06  LOWER MED VOLTAGE SYS CLASS IE 4.16 KV 3/L METER  E-13NB10  SCHEMAT DIAGRAM FEEDER BRKR 13.8 KV  E-13NB11  SCHEMAT DIAGRAM FEEDER BRKR 13.8 KV  E-13NB12  SCHEMAT DIAGRAM FEEDER BRKR 13.8 KV  E-13NB13  SCHEMAT DIAGRAM FEEDER BRKR 13.8 KV  E-13NB14  SCHEMAT DIAGRAM FEEDER BRKR 13.8 KV  E-13NB15  SCHEMAT DIAGRAM FEEDER BRKR 13.8 KV  E-13NE01  STANDBY GENER. SYS. 3/L M&R DIAG  E-13NE02  STANDBY GENER. SYS. 3/L M&R DIAG 
 
Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 12)
DRAWING NUMBER  TITLE        E-13NE10  SCHEMATIC DIAGRAM E-13NE11  SCHEMATIC DIAGRAM E-13NE12  STANDBY GEN SYS E-13NE13  STANDBY GEN SYS E-13NF01  LOAD SHEDDER AND LOAD SEQUENCER E-03NG01  CLASS IE LOW VOLTAGE SYSTEM 3/L M&R  E-K3NG01  LOW VOLTAGE SYSTEM CLASS IE 480 V THREE LINE METER & RELAY    DIAGRAM  E-03NG10  CLASS IE 4.16 KV LC XFMR FDR BKRS  E-K3NG10  SCHEMATIC DIAGRAM 4.16 KV TRANSFORMER FEEDER BREAKERS  E-03NG10A  SCHEMATIC DIAGRAM E-03NG11  BREAKER CLASS IE LOW VO E-03NG11A  SCHEMATIC DIAGRAM E-03NG11B  SCHEMATIC DIAGRAM 480 V LC MAIN FEEDER  E-03NG12  SCHEMATIC DIAG 480 V LC TIE BREAKER MISC COMP INPU  E-03NK10  125 VDC & 250 VDC POW SYS SCHEMATICS E-03NK11  125 VDC CLASS IE POWER SYSTEM E-13NN01  CLASS IE INSTRUMENT AC SCHEMATIC  E-13PA02  HIGH MED VOLT SYS 13.8 KV 3/L M&R  E-13PA05  HIGH MED VOLT SYS MED 3/L M&R E-03PG05  NON-CLASS IE L.V. SYSTEM 3/L M&R  E-03PG12  NON-CLASS IE L.V. SYSTEM SCHEMATIC E-03PG12A  SCHEMATIC DIAGRAM E-13PG15B  480 V & LC TIE BKR SCHEMATIC E-03PJ11  250 VDC POW SYS SCHEMAT E-13PN01  NON CLASS IE INST AC LINE DIAG E-03QB01  STANDBY LIGHTING SYSTEM PWR FDRS  E-K3QB01  SCHEMATIC DIAGRAM STANDBY LIGHTING SYSTEM POWER FEEDER  E-03QB02  STANDBY LIGHTING SYSTEM PWR FDRS  E-13SB12A  REACTOR TRIP & SAFETY INJEC SWITCHES E-13SB12B  REACTOR TRIP AND SAFETY INJECT SWITCHES E-13SB13  SCH DIAG SPRAY ACTUATION &
CTMT ISO SWITCHES  E-03SB14  SCH DIAG SWITCH DEVEL E-13SB15  CONTROL BOARD SWITCHES
 
Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 13)
DRAWING NUMBER  TITLE        E-13SB17  SAF INJ (RWST) RESET SWITCH/
SWITCHOVER STATUS INDICATOR  E-13SB19  SCHEMATIC DIAGRAM E-13SJ01  NUC SAMP SYS CTMT ISO VLVS E-13SJ02  NUC SAMP SYS SCHEMAT CTMT ISO VLVS  E-13SJ05  NUCLEAR SAMPLE SYSTEM E-13SJ06  NUCLEAR SAMPLE SYSTEM E-13SJ07  NUCLEAR SAMPLE SYSTEM ISO VLVS E-13SJ09  SCHEMATIC DIAGRAM E-13SJ11  SCHEMATIC DIAGRAM E-1R0223  RACEWAY PLAN - STATION SERVICE AND STARTUP XFMR AREA  E-0R0224  RACEWAY PLAN - ESF TRANSFORMER AREA E-1R3211  RACEWAY PLAN CONTROL BLDG.
AREA 1  E-1R3221  RACEWAY PLAN - COMMUNICATION CORRIDOR AREA - 2 EL. 1974'-0" AND EL. 1984'-0"  E-1R3321  RACEWAY PLAN - COMMUNICATION CORRIDOR AREA - 2 EL. 2000'-0"  E-1R4321  RACEWAY PLAN - TURBINE BUILDING AREA - 2 EL. 2000'-0"  E-1R4331  RACEWAY PLAN - TURBINE BUILDING AREA - 3 EL. 2000'-0"  J-020101  SYMBOLS & LEGEND FOR LOGIC DIAGRAMS J-02AB01  CONTROL LOGIC DIAGRAM J-02AB02  MN STM ATMOS VENT VLVS INDICATING LIGHTS  J-02AB02A  CONTROL LOGIC DIAGRAM J-02AB02B  CONTROL LOGIC DIAGRAM J-02AB03  MAIN STEAM SUPPLY TD AUX FEED-WATER PUMP  J-12AB04  MAIN STEAM LINE DRAIN VALVES J-02AB10  MAIN STEAM SYSTEM BYPASS VALVE AUX FDWTR PUMP  J-02AB12  MAIN STEAM STOP VALVE BYPASS VALVE  J-02AC06  MAIN TURBINE TRIP LOGIC LEGENDS
    & NOTES  J-02AC07  MAIN TURBINE TRIP BLOCK DIAGRAM J-02AC08  MAIN TURBINE TRIP LOGIC DIAGRAM J-12AC09  CONTROL LOGIC DIAGRAM J-12AE08  STEAM GENERATOR CHEMICAL INJEC VALVE J-02AL01  MOTOR DRIVEN AUX FEEDWATER PUMPS 
 
Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 14)
DRAWING NUMBER  TITLE        J-02AL01A  CONTROL LOGIC DIAGRAM AUX FW    SYSTEM  J-02AL01B  CONTROL LOGIC DIAGRAM AUX FW    SYSTEM  J-02AL02  AUX FDWTR SYS SUPPLY FROM COND    STORAGE TANK  J-02AL02A  CONTROL LOGIC DIAGRAM  J-02AL03  AUX FEEDWATER PUMPS DISC    CONTROL VALVES  J-12AL04  AUX FEEDWATER PUMPS SUPPLY ESWS    SYSTEM  J-12AL04A  CONTROL LOGIC DIAGRAM  J-12AL05  AUX FEEDWATER SYS PUMPS SUCTION    DISC PRESS ALAR  J-02AL06  CONTROL LOGIC DIAGRAM  J-02AL07  CONTROL LOGIC DIAGRAM  J-02BB01  REACTOR COOLANT SYSTEM RCP    THERM BAR ISO VALVE  J-02BM01  STEAM GENERATOR BLOWDOWN LOGIC    DIAG CTMNT VLVS  J-02BM04  STU BEN BLOWDOWN ISOLATION    VALVES  J-02BN01  BORON REFUELING WATER STORAGE    RWST HEATER VALVE  J-02BN02  STEAM CONTROL VALVE  J-12EC01  FUEL POOL COOLING & CLEANUP    SYSTEM  J-02EC02  FUEL POOL COOL CLEANUP SYS DIXC    VLV HEAT EXCHAN  J-12EC05  SYSTEM ALARMS  J-12EF01A  ESWS MOTOR OPERATED ISOLATION    VALVES  J-K2EF01A  ESWS LOGIC DIAGRAM  J-02EF01B  ESWS MOTOR OPERATED ISOLATION    VALVES  J-K2EF01B  ESWS LOGIC DIAGRAM  J-02EF02  ESWS AIR COMPRESSORS ISOLATION    VALVES  J-K2EF02A  ESWS ESW PUMPS LOGIC DIAGRAM  J-K2EF02B  ESWS ESW PUMP LUBE VALVE LOGIC    DIAGRAM  J-12EF03  ESWS CTMT AIR COOLERS ISOLATION    VALVES  J-K2EF03A  ESWS SELF-CLEANING STRAINER LOGIC    DIAGRAM  J-K2EF03B  ESWS SELF-CLEANING STRAINER LOGIC    DIAGRAM  J-12EF04  ESWS CTMT AIR COOLERS ISOL VALVE    BYPASS VALVE
 
Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 15)
DRAWING NUMBER  TITLE        J-12EF05  ESWS MOTOR OPERATED ISOLATION    VALVES  J-K2EF06  ESWS ESW PUMP DISCHARGE AIR RELEASE    VALVE LOGIC DIAGRAM  J-02EF07  CONTROL LOGIC DIAGRAM STR SYS    ESWS  J-K2EF07  ESWS BACKPRESSURE CONTROL VALVE    LOGIC DIAGRAM (VOID)  J-02EG01A  COMPONENT COOLING WATER SYSTEM    PUMPS  J-02EG01B  COMPONENT COOLING WATER SYSTEM    PUMPS  J-02EG01C  CONTROL LOGIC DIAG COOL WTR    SYSTEM  J-12EG02  CCWS DEMIN WATER MAKEUP CCW    SURGE TANK  J-02EG04  CCW ESWS MAKE-UP SURGE TANK    VENT  J-02EG05A  CCWS SUPPLY RETURN NUCLEAR AUX    CMPNT SHEET A  J-02EG05B  CCWS SUPPLY RETURN NUCLEAR AUX    CMPNT  J-02EG05C  CCWS SUP RTRN NUC AUX CMPNT VLV    POSITION ALARM  J-02EG06  CCWS HX'S DISC TEMP ALARM RHR    HX'S FLOW ALARM  J-02EG07  CCWS SUPPLY RHR HX'S  J-12EG08A  CCWS SUPPLY RETURN RADWASTE    BLDG  J-12EG08B  CCWS SUPPLY RETURN RADWASTE BLDG  J-12EG09  CCWS CONTAINMENT ISOLATION    VALVE  J-12EG10  CCWS INSIDE CTMT ISO VLV RTRN    THRM BAR COOL CO  J-02EG11  CCWS HEAT EXCHANGER OUTLET TEMP    CONT  J-12EG13A  CONTROL LOGIC DIAGRAM  J-02EG13B  CONTROL LOGIC DIAGRAM  J-12EG13C  CONTROL LOGIC DIAGRAM  J-12EG14  CONTROL LOGIC DIAGRAM  J-02EJ01  RESIDUAL HEAT RMVL SYS NUC SAMP    SYS VALVE  J-02EJ03  RESIDUAL HEAT REMOVAL CONTROL    LOGIC DIAGRAM  J-02EJ04  CONTROL LOGIC DIAGRAM  J-02EN01  CONTAINMENT SPRAY SYS CONTAIN    SPRAY PUMPS  J-02EN02  CONT SPRAY SYSTEM CTMT RECIRC    SUMP ISOL VALVE
 
Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 16)
DRAWING NUMBER  TITLE        J-12EN03  CONT SPRAY SYSTEM SPRAY ADD    TANK ISOL VLVS  J-12EN04  CONT SPRAY SYSTEM SPRAY ADD    TANK ALARMS  J-02EN05  CONT SPRAY SYSTEM CTMT SPRAY    NOZZLES ISOL VLV  J-02FC18  AUX TURB AFP STEAMLINE WATER    TRAP DRAIN  J-02FC19  CONTROL LOGIC DIAGRAM  J-K2GD01  ESSENTIAL SERVICE WATER PUMPHOUSE    HVAC SUPPLY FANS LOGIC DIAGRAM  J-K2GD02  ESSENTIAL SERVICE WATER PUMPHOUSE    HVAC UNIT HEATER LOGIC DIAGRAM  J-02GE08  TURB BLDG HVAC LOGIC DIAG COND    AIR REMVL FILTER  J-02GF03  MISC BLDG HVAC MAIN STM BLDG    SUP EXH DAMPER  J-12GF06  MISC BLDG HVAC TENDON GALL SUP    RETURN DAMPER  J-12GF06A  CONTROL LOGIC DIAGRAM MISC. BUILDING HVAC  J-12GF07  MISC BLDG HVAC FDWTR PUMP ROOM    COOLER FANS  J-12GF09A  CONTROL LOGIC DIAGRAM MISC. BUILDING HVAC  J-12GF09B  CONTROL LOGIC DIAGRAM MISC. BUILDING HVAC  J-02GG04  FB HVAC ISOLATION DAMPERS  J-02GG05  FUEL BLDG SPENT FUEL POOL ROOM    COOLERS  J-12GG06  FB HVAC FILTER UNITS INTAKE    ISOL DAMPERS  J-02GG07  FB HVAC FILTER UNITS AUX BLDG    ISOLATION DAMPERS  J-02GG08  FB HVAC MANUAL INITIATION OF    FBIS  J-02GG09  FB HVAC SPENT FUEL POOL DISC  J-02GG10A  FB HVAC EMERGENCY EXHAUST FAN  J-02GG13  FB HVAC EMERGENCY EXHAUST CROSS    CONNENC DAMPERS  J-02GG14A  FUEL BLDG HVAC SPENT FUEL POOL  J-02GG14B  FUEL BLDG HVAC SPENT FUEL POOL  J-12GK01A  LOGIC DIAG CONTROL ROOM    FILTRATION FAN  J-12GK01B  FILTER ABSORBER UNIT SUPPLY  J-12GK01C  FILTER ABSORBER UNIT DISK    DAMPER  J-12GK01D  CONTROL ROOM RECIRC DAMPERS    CONTROL BLDG HVAC
 
Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 17)
DRAWING NUMBER  TITLE        J-12GK01E  CONTROL BLDG HVAC CONTROL A/C    UNIT DISCHARG DMP  J-02GK02A  CONTROL ROOM A/C UNIT FAN & TEMP  J-02GK02B  CONTROL ROOM A/C UNIT SUPPLY    DAMPER  J-02GK02C  CONTROL BLDG HVAC CONT ROOM    A/C UNIT DISC DAMPE  J-02GK03A  CONTROL BLDG HVAC FIRE ISO-    LATION DAMPERS  J-02GK07  MISC DAMPERS  J-02GK09  ISO DAMPERS  J-12GK10A  CONTROL ROOM PRESS FAN  J-12GK10B  CONTROL ROOM PRESS SUPPLY    DAMPER  J-12GK10C  CONT BLDG HVAC CONT ROOM PRESS    SYS UNIT SUP DAM  J-12GK11  CONTROL ROOM PRESS SYSTEM FIL    UNIT J-12GK13  CLASS IE ELEC EQUIP A/C UNIT  J-12GK15  CHLORINE ALAR  J-12GK17A  CONTROL LOGIC DIAGRAM CONTROL    BLDG HVAC  J-12GK17B  CONTROL LOGIC DIAGRAM CONTROL    BLDG HVAC  J-02GK19  CONT BLDG HVAC RETRN DAMPERS RM    FLTR ABSORB UNI  J-02GK23  CONTROL BLDG HVAC FIRE ISO    DAMPERS  J-02GK25  CONTROL LOGIC DIAGRAM FOR    CONTROL BLDG HVAC  J-02GK26  CONTROL LOGIC DIAGRAM FOR    CONTROL BLDG HVAC  J-02GK27  CONTROL LOGIC DIAGRAM FOR    CONTROL BLDG HVAC  J-02GL01A  AUX BLDG HVAC AIR SUPPLY UNIT  J-02GL01B  AUX BLDG HVAC AIR SUPPLY  J-12GL03A  AUX BLDG HVAC MISC ROOM COOLERS  J-12GL03B  AUX BLDG HVAC MISC ROOM COOLER  J-12GL03C  AUX BLDG HVAC MISC ROOM COOLER  J-12GL11  AUX BLDG HVAC PENE RM COOLER    FANS  J-02GL13  AUX BLDG HVAC ISO DAMPERS  J-02GL15  AUX BLDG HVAC FUEL BLDG HVAC    DISCH ISO DAMPERS  J-02GL21  AUX BLDG HVAC CCW PUMP ROOM EXH    DAMPERS  J-12GL23  AUX BLDG HVAC AUX/FUEL BLDG    EXH FANS DISC 
 
Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 18)
DRAWING NUMBER  TITLE        J-12GM01A  DIESEL GENERATOR BLDG HVAC FAN    & DAMPER  J-02GM01B  DIESEL GENERATOR BLDG EXH DAMPERS  J-12GN01  CONTAINMENT COOLING  J-12GN02A  CONTROL LOGIC DIAGRAM    CONTAINMENT COOLING SYS  J-12GN02B  CONTROL LOGIC DIAGRAM    CONTAINMENT COOLING SYS  J-02GN03A  CONTAINMENT COOLING FANS  J-02GS02  CTMT HYDROGEN CONTROL THERMAL    HYDROGEN RECOM  J-02GS03  CTMT HYDROGEN CONTROL SOLENOID    ISO VLV  J-02GS06  CTMT HYDROGEN CONTROL PURGE    SUBSYS ISO VLV J-02GS08  CONTROL LOGIC DIAGRAM  J-02GS09  CONTROL LOGIC DIAGRAM  J-02GS10  CONTROL LOGIC DIAGRAM  J-02GT03  CONTAINMENT PURGE SYSTEM VALVES  J-02GT06  CONTAINMENT PURGE SYS ISO DAMPERS  J-02GT10  CONTROL LOGIC DIAGRAM  J-12JE01  EMERGENCY FUEL OIL TRANSFER    PUMPS  J-12JE02  CONTROL LOGIC DIAGRAM  J-02KA02  COMPRESSED AIR SYS COMP AIR    CONTAIN ISO VALVE  J-02KA03  COMPRESSED AIR SYS HYDROGEN CS    M/U AIR VALVE J-02KA08  CONTROL LOGIC DIAGRAM COMPRESSED    AIR SYSTEM  J-02KC08  CONTROL LOGIC DIAG FIRE    PROTECTION SYSTEM  J-12KJ02  CONTROL LOGIC DIAGRAM  J-02KJ03  CONTROL LOGIC DIAGRAM  J-12LF03  FLOOR & EQUIP DRAINS REACT BLDG    SUMP PUMP ISO VL  J-02LF04  FLOOR & EQUIP DRAINS REACT BLDG    SUMP PMP ISO VLV  J-02LF08  FLOOR & EQUIP DRAINS DISCHARGE    VALVES  J-02RP01  CONTROL LOGIC DIAGRAM  J-02RP01A  CONTROL LOGIC DIAGRAM  J-12SA03  CONTROL LOGIC DIAGRAM  J-12SA04  CONTROL LOGIC DIAGRAM  J-12SA05  CONTROL LOGIC DIAGRAM  J-02SJ01  NUC SYSTEM CON ISOLATION VALVES  J-02SJ03  CONTROL LOGIC DIAGRAM 
 
Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 19)
DRAWING NUMBER  TITLE        J-14001  CONTROL ROOM EQUIPMENT    ARRANGEMENT  J-14002  REACT COOL SUPRT SYSTEM CONSOLE    RL001 & RL002  J-14003  REACTOR OPERATORS CONSOLE RL003    & RL004  J-14004  TURB GEN & FEEDWATER CONSOLE    RL005 & RL006  J-14005  SITE RELATED MAIN CONT BOARD    RL013 & RL014  J-14006  STATION ELEC DIST MAIN CONT    BOARD RL015 & RL016  J-14007  ENG SAFETY FEATURES MAIN CONT    BOARD RL017 & RL018  J-14008  ENG SAFETY FEATURES MAIN CONT    BOARD RL019 & RL020  J-14009  REACT AUX MAIN CONTROL BOARD    RL021 & RL022  J-14010  TURBOGENERATORS & FDWTR MAIN    CONT BD RL023 & RL024  J-14011  TURBOGENERATORS & FDWTR MAIN    CONT BD RL025 & RL026  J-14013  END SECTION MAIN CONT BRD RL011    & RL012  J-04014  MAIN CONTROL BOARD DETAILS  J-04015  OPERATORS CONSOLE DETAILS  J-14016  BILL OF MAT MAIN CONTROL PANEL  J-05001  AUX CONTROL PANEL DWGS  J-05002  AUX SHUTDOWN PANEL DETAILS  J-05003  AUX SHUTDOWN PANEL RP 118 7    SHTS  J-05021  LOCAL CONT PANEL RPO 68 MISC    BOP INST PANEL  J-15023  MISC BOP INST PANEL RP068 BILL    OF MAT  J-K5041  ESSENTIAL SERVICE WATER PANEL    (EF 155 & EF 156) DRAWING  J-K5042  ESSENTIAL SERVICE WATER PANEL    (EF 155) BILL OF MATERIAL  J-K5043  ESSENTIAL SERVICE WATER PANEL    (EF 156) BILL OF MATERIAL  J-16002  ANN WINDOW ARRGT RK016.018.020  J-16003  ANN WINDOW ARRGT RK022.024.026 
 
Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 20)
DRAWING NUMBER  TITLE        M-761-0066 Through 0104 and 0459, 0460, 0494  (8756d37*)  PROCESS CONTROL BLOCK DIAGRAM    (1 THROUGH 42) 
 
M-762-0001  NIS SOURCE RANGE FUNCTIONAL  (5655D49*)  BLOCK DIAGRAM 
 
M-762-0002  NIS INTERMEDIATE RANGE  (5655D50*)  FUNCTIONAL BLOCK DIAGRAM 
 
M-762-0417  NIS POWER RANGE FUNCTIONAL  (9552D32*)  BLOCK DIAGRAM 
 
M-762-0032  NIS AUXILIARY CHANNELS  (5655D52*)  FUNCTIONAL BLOCK DIAGRAM 
 
M-767-221 THROUGH 240  (8761D17*)  SAFEGUARDS TEST CABINET    (1 THROUGH 20) 
 
J-104-00347  INSTRUCTION MANUAL ESFAS/LSELS  J-104-00437  SIGNAL FLOW BLOCK DIAGRAM FOR    THE ENGINEERED SAFETY    FEATURES ACTUATION SYSTEMS (SHEET 1)  J-104-00438  ISOLATION AND DISTRIBUTION    OF ANALOG SIGNALS TO    COMPUTER (ESFAS SHEET lA)  J-104-00439  CHANNEL IV BLOCK DIAGRAM    (ESFAS SHEET 2)  J-104-00440  CHANNEL II BLOCK DIAGRAM    (ESFAS SHEET 3)  J-104-00441  ATI BLOCK DIAGRAM (ESFAS    SHEET 4)  J-104-00442  BISTABLE RACK - CHANNEL I    (ESFAS SHEET 5)  J-104-00443  ISOLATION RACK - CHANNEL I    (ESFAS SHEET 6)  J-104-00444  ACTUATION INPUTS - CHANNEL I    (ESFAS SHEET 7)  J-104-00445  ACTUATION OUTPUTS AND STATUS    INDICATIONS - CHANNEL I    (ESFAS SHEET 8)  J-104-00446  ANNUNCIATOR/COMPUTERS OUTPUTS -    CHANNEL I (ESFAS SHEET 9)
* Drawings suplied by NSSS Vendor.
 
Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 21)
DRAWING NUMBER  TITLE        J-104-00447  ANALOG SIGNALS - CHANNEL II    (ESFAS SHEET 10)  J-104-00448  ISOLATION RACK LOGIC SIGNALS -    CHANNEL II (ESFAS SHEET 11)  J-104-00449  RELAY OUTPUTS - CHANNEL II    (ESFAS SHEET 12)  J-104-00450  BISTABLE RACK - CHANNEL IV    (ESFAS SHEET 13)  J-104-00451  ISOLATION RACK - CHANNEL IV    (ESFAS SHEET 14)  J-104-00452  ACTUATION INPUTS - CHANNEL IV    (ESFAS SHEET 15)  J-104-00453  ACTUATION OUTPUTS AND STATUS    INDICATIONS - CHANNEL IV    (ESFAS SHEET 16)  J-104-00454  ANNUNCIATOR/COMPUTER OUTPUTS -    CHANNEL IV (ESFAS SHEET 17)  J-104-00455  ATI MODULE A (ESFAS SHEET 18)  J-104-00456  ATI MODULE B (ESFAS SHEET 19)  J-200-00029  TURB SUPERVISORY MAIN CONT BRD    RL027 & RL028
 
Rev. 15
 
WOLF CREEK TABLE 1.7-2 PIPING AND INSTRUMENTATION DIAGRAMS
 
Drawing Figure Number Number Sheet Title 
 
M-120101 1.1-1 1 Symbols and Legend for System Flow and Piping 
& Instrumentation Diagrams M-120102 1.1-1 2 Symbols and Legend for System Flow and Piping 
& Instrumentation Diagrams M-120103 1.1-1 3 Symbols and Legend for System Flow and Piping
  & Instrumentation Diagrams  M-120104 1.1-1 4 Symbols and Legend for System Flow and Piping
  & Instrumentation Diagrams  M-12AB01 10.3-1 1 Main Steam System M-12AB02 10.3-1 2 Main Steam System M-12AB03 10.3-1 3 Main Steam System M-12AC01 10.2-1 1 Main Turbine M-12AC02 10.2-1 2 Main Turbine M-12AC03 10.2-1 3 Main Turbine M-12AC04 10.2-1 4 Main Turbine M-12AD01 10.4-2 1 Condensate System M-12AD02 10.4-2 2 Condensate System M-12AD03 10.4-2 3 Condensate System M-12AD04 10.4-2 4 Condensate System M-12AD05 10.4-2 5 Condensate System M-12AD06 10.4-2 6 Condensate System M-12AE01 10.4-6 1 Feedwater System M-12AE02 10.4-6 2 Feedwater System M-12AF01 10.4-6 3 Feedwater Heater Extraction 
 
Drains & Vents M-12AF02 10.4-6 4 Feedwater Heater Extraction 
 
Drains & Vents M-12AF03 10.4-6 5 Feedwater Heater Extraction 
 
Drains & Vents M-12AF04 10.4-6 6 Feedwater Heater Extraction 
 
Drains & Vents M-12AK01 10.4-5 1 Condensate Demineralizer 
 
System M-12AK02 10.4-5 2 Condensate Demineralizer 
 
System M-12AK03 10.4-5 3 Condensate Demineralizer 
 
System
 
Rev. 27 WOLF CREEK TABLE 1.7-2 (SHEET 2)
 
Drawing Figure
 
Number Number Sheet Title M-12AL01 10.4-9 Auxiliary Feedwater System M-12AN01 9.2-16 Demineralized Water Storage and Transfer System  M-12AP01 9.2-23 Condensate Storage and Transfer System M-12AQ01 10.4-7 1 Condensate Chemical Addition System M-12AQ02 10.4-7 2 Feedwater Chemical Addition System M-12BB01 5.1-1 1 Reactor Coolant System M-12BB02 5.1-1 2 Reactor Coolant System M-12BB03 5.1-1 3 Reactor Coolant System M-12BB04 5.1-1 4 Reactor Coolant System  M-12BG01 9.3-8 1 Chemical and Volume Control  System M-12BG02 9.3-8 2 Chemical and Volume Control System M-12BG03 9.3-8 3 Chemical and Volume Control System M-12BG04 9.3-8 4 Chemical and Volume Control System M-12BG05 9.3-8 5 Chemical and Volume Control System M-12BL01 9.2-13 Reactor Makeup Water System M-12BM01 10.4-8 1 Steam Generator Blowdown System M-12BM02 10.4-8 2 Steam Generator Blowdown System  M-12BM03 10.4-8 3 Steam Generator Blowdown  System M-12BM04 10.4-8 4 Steam Generator Blowdown System M-12BM05 10.4-8 5 Steam Generator Blowdown System M-12BN01 6.3-1 1 Borated Refueling Water Storage System M-12CA01 10.4-4 Steam Seal System M-12CF01 10.2-1 5 Lube Oil Storage, Transfer and Purification System M-12CF02 10.2-1 6 Lube Oil Storage, Transfer and Purification System M-12CG01 10.4-3  Condenser Air Removal  M-12CH01 10.2-1 7 Main Turbine Control Oil  System M-12CH02 10.2-1 8 Main Turbine Control Oil System 
 
Rev. 21 WOLF CREEK TABLE 1.7-2 (SHEET 3)
 
Drawing Figure
 
Number Number Sheet Title M-12DA01 10.4-1 1 Circulating Water & Water  Box Drains System M-12DA02 10.4-1 3 Circulating Water & Water  Box Venting System M-12EA01 9.2-1 1 Service Water System  M-12EA02 9.2-1 2 Service Water System  M-12EB01 9.2-14 Closed Cooling Water System  M-12EC01 9.1-3 1 Fuel Pool Cooling and  Cleanup System M-12EC02 9.1-3 2 Fuel Pool Cooling and  Cleanup System M-12EF01 9.2-2 1 Essential Service Water System  M-12EF02 9.2-2 2 Essential Service Water System  M-K2EF01 9.2-2 3 Essential Service Water System  M-K2EF03 9.2-2 4 Essential Service Water System  M-12EG01 9.2-15 1 Component Cooling Water  System M-12EG02 9.2-15 2 Component Cooling Water  System M-12EG03 9.2-15 3 Component Cooling Water  System M-12EJ01 5.4-7 Residual Heat Removal System  M-12EM01 6.3-1 2 High Pressure Coolant  Injection System M-12EM02 6.3-1 3 High Pressure Coolant  Injection System M-12EN01 6.2.2-1 Containment Spray System  M-12EP01 6.3-1 4 Accumulator Safety Injection  M-12FA01 9.5.9-1 1 Auxiliary Boiler System  M-12FB01 9.5.9-1 2 Auxiliary Steam System  M-12FB02 9.5.9-1 3 Auxiliary Steam System  M-12FC02 10.4-10 Auxiliary Feedwater Pump  Turbine M-12FC03 10.4-6 7 S.G.F.P. Turbine "A"  M-12FC04 10.4-6 8 S.G.F.P. Turbine "B"  M-12FE01 9.5.9-1 4 Auxiliary Steam Chemical  Addition System M-12GA01 9.4-9 1 Plant Heating System  M-12GA02 9.4-9 2 Plant Heating System  M-12GB01 9.4-10 Central Chilled Water  System M-K2GD01 9.4-8 1 Essential Service Water  Pump House HVAC
 
Rev. 17 WOLF CREEK TABLE 1.7-2 (SHEET 4)
 
Drawing Figure
 
Number Number Sheet Title M-12GE01 9.4-4 1 Turbine Building HVAC  M-12GE02 9.4-4 2 Turbine Building HVAC  M-12GE03 9.4-4 3 Turbine Building HVAC  M-12GE04 9.4-4 4 Turbine Building HVAC  M-12GF01 9.4-3 1 Miscellaneous Buildings HVAC  M-12GF02 9.4-3 2 Miscellaneous Buildings HVAC  M-12GG01 9.4-2 1 Fuel Building HVAC  M-12GG02 9.4-2 2 Fuel Building HVAC  M-12GH01 9.4-5 1 Radwaste Building HVAC  M-12GH02 9.4-5 2 Radwaste Building HVAC  M-12GK01 9.4-1 1 Control Building HVAC  M-12GK02 9.4-1 2 Control Building HVAC  M-12GK03 9.4-1 3 Control Building HVAC  M-12GK04 9.4-1 4 Control Building HVAC  M-12GL01 9.4-3 5 Auxiliary Building HVAC  M-12GL02 9.4-3 4 Auxiliary Building HVAC  M-12GL03 9.4-3 3 Auxiliary Building HVAC  M-12GM01 9.4-7 Diesel Generators Building  HVAC M-12GN01 9.4-6 1 Containment Cooling System  M-12GN02 9.4-6 2 Containment Cooling System  M-12GP01 6.2.6-1 Containment Integrated Leak  Rate Test M-12GR01 9.4-6 3 Containment Atmospheric  Control System M-12GS01 6.2.5-1 Containment Hydrogen Control  System M-12GT01 9.4-6 4 Containment Purge System  HVAC M-12HA01 11.3-1 1 Gaseous Radwaste System  M-12HA02 11.3-1 2 Gaseous Radwaste System  M-12HA03 11.3-1 3 Gaseous Radwaste System  M-12HB01 11.2-1 1 Liquid Radwaste System  M-12HB02 11.2-1 2 Liquid Radwaste System  M-12HB03 11.2-1 3 Liquid Radwaste System  M-12HB04 11.2-1 4 Liquid Radwaste System  M-12HC01 11.4-1 1 Solid Radwaste System  M-12HC02 11.4-1 2 Solid Radwaste System  M-12HC03 11.4-1 3 Solid Radwaste System  M-12HC04 11.4-1 4 Solid Radwaste System  M-12HD01 12.3-4 Decontamination System  M-12HE01 9.3-11 1 Boron Recycle System  M-12HE02 9.3-11 2 Boron Recycle System  M-12HE03 9.3-11 3 Boron Recycle System 
 
Rev. 17 WOLF CREEK TABLE 1.7-2 (SHEET 5)
 
Drawing Figure
 
Number Number Sheet Title M-12HF01 10.4-12 1 Secondary Liquid Waste  System M-12HF02 10.4-12 2 Secondary Liquid Waste  System M-12HF03 10.4-12 3 Secondary Liquid Waste  System M-12HF04 10.4-12 4 Secondary Liquid Waste  System M-12JE01 9.5.4-1 Emergency Fuel Oil System  M-12KA01 9.3-1 1 Compressed Air System  M-12KA02 9.3-1 2 Compressed Air System  (Service Air)
M-12KA03 9.3-1 3 Instrument Air System  M-12KA04 9.3-1 4 Instrument Air System  M-12KA05 9.3-1 5 Compressed Air System  M-12KA06 9.3-1 6 Compressed Air System  M-12KA07 9.3-1 7 Compressed Air System  M-12KB01 9.5.10-1 1 Breathing Air System  M-12KB02 9.5.10-1 2 Breathing Air System  M-12KB03 9.5.10-1 3 Breathing Air System  M-12KC01 9.5.1-1 1 Fire Protection System  M-12KC02 9.5.1-1 2 Fire Protection System  M-12KC03 9.5.1-1 3 Fire Protection System  M-12KC04 9.5.1-1 4 Fire Protection (Halon)  System M-12KC05 9.5.1-1 5 Fire Protection System  M-12KC06 9.5.1-1 6 Fire Protection (Halon)  System M-12KC07 9.5.1-1 7 Fire Protection (Halon)  System M-12KD01 9.2-17 1 Domestic Water System  M-12KD02 9.2-17 2 Domestic Water System  M-12KH01 9.3-9 1 Service Gas System  M-12KH02 9.3-9 2 Service Gas System  M-12KJ01 9.5.5-1 1 Standby Diesel Generator "A"  Cooling Water System M-12KJ04 9.5.5-1 2 Standby Diesel Generator "B"  Cooling Water System M-12KJ02 9.5.6-1 1 SDG "A" Intake, Exh., F.O.  & Starting Air System M-12KJ05 9.5.6-1 2 SDG "B" Intake, Exh., F.O.  & Starting Air System M-12KJ03 9.5.7-1 1 Standby Diesel Generator "A"  Lube Oil System M-12KJ06 9.5.7-1 2 Standby Diesel Generator "B"  Lube Oil System 
 
Rev. 17 WOLF CREEK TABLE 1.7-2 (SHEET 6)
 
Drawing Figure Number Number Sheet Title 
 
M-12LA01 9.3-5 1 Sanitary Lift Station &
Turb. Bldg. Sanitary Drainage System M-12LA02 9.3-5 2 Comm. Corridor & Control Bldg. Sanitary Drainage System M-12LD01 9.3-5 3 Chemical and Detergent Waste M-12LE01 9.3-5 4 Turb. Bldg. & Aux. Feedwater Pump Rooms Oily Waste System M-12LE02 9.3-5 5 Control & Diesel Gen. Bldg.
Oily Waste System M-12LE03 9.3-5 6 Turb. Bldg. & Aux. Boiler Room Oily Waste System M-12LE04 9.3-5 7 Tendon Access Gallery &
Turb. Bldg. Oily Waste System M-12LF01 9.3-5 8 Aux. Bldg. Floor and Equip-ment Drain System M-12LF02 9.3-5 9 Aux. Bldg. Floor and Equip-ment Drain System M-12LF03 9.3-5 10 Aux. Bldg. Floor and Equip-ment Drain System M-12LF04 9.3-5 11 Aux. Bldg. Floor and Equip-ment Drain System M-12LF05 9.3-5 12 Aux. Bldg. Floor and Equip- 
 
ment Drain System M-12LF06 9.3-5 13 Radwaste & Fuel Bldgs.
FED System  M-12LF07 9.3-5 14 Radwaste Bldg. FED System M-12LF08 9.3-5 15 Control and Fuel Bldgs. 
 
FED System  M-12LF09 9.3-5 16 Reactor Bldg. & Hot Machine Shop FED System  M-12LF10 9.3-5 17 Radwaste Bldg. and Tunnel 
 
FED System  M-12RM01 9.3-4 1 Process Sampling System M-12RM02 9.3-4 2 Process Sampling System M-12RM03 9.3-4 3 Process Sampling System M-12SJ01 9.3-2 1 Nuclear Sampling System 
 
Primary Sampling System  M-12SJ02 9.3-3 Nuclear Sampling System Radwaste Sampling System  M-12SJ03 9.3-2 2 Nuclear Sampling System 
 
Primary Sampling System 
 
Rev. 27 WOLF CREEK TABLE 1.7-2 (SHEET 7)
 
Drawing Figure
 
Number Number Sheet Title M-12SJ04 18.2-15 Nuclear Sampling System 
 
M-12WT01 9.2-24 1 Wastewater Treatment Facility M-12WT03 9.2-25 1 Wastewater Treatment Facility 
 
M-12VW01 9.4-11  Wastewater Treatment Facility  HVAC System 
 
M-0021 10.4-1 2 Circulating Water System M-0022 9.2-1 3 Service Water System M-0023 9.5-1 1 Fire Protection System (Site)  M-0023 9.5-1 2 Fire Protection System (Site)
M-0023 9.5-1 3 Fire Protection System (Site)
M-0023 9.5-1 4 Fire Protection System (Site)
M-0025 9.2-5 1 Demineralized Water Makeup System M-0025 9.2-5 2 Demineralized Water Makeup System M-0025 9.2-5 3 Demineralized Water Makeup System M-0025 9.2-5 4 Demineralized Water Makeup  System  M-0025 9.2-5 4A Demineralized Water Makeup System M-0051 9.5-2 Outdoor Piping, Key Plans &    General Notes
 
Rev. 21 WOLF CREEK TABLE 1.7-3 ADDITIONAL CONTROLLED DRAWINGS USED IN THE USAR
 
Drawing Figure Number Number Sheet Title  A-0503 9.2-5A Potable Water System 10466-A-1701 12.3-2 1 Radiation Zones For Normal  Operation 10466-A-1702 12.3-2 2 Radiation Zones For Normal  Operation 10466-A-1703 12.3-2 3 Radiation Zones For Normal  Operation 10466-A-1704 12.3-2 4 Radiation Zones For Normal  Operation 10466-A-1705 12.3-2 5 Radiation Zones For Normal  Operation 10466-A-1706 12.3-2 6 Radiation Zones for Normal  Operation 10466-A-1801 9.5.1-2 1 Fire Delineation Floor Plan  EL. 1974'-0" 10466-A-1802 9.5.1-2 2 Fire Delineation Floor Plan  EL. 2000'-0" 10466-A-1803 9.5.1-2 3 Fire Delineation Floor Plan  EL. 2026'-0" 10466-A-1804 9.5.1-2 4 Fire Delineation Floor Plan  EL. 2047'-0" 8025-C-KG1202 1.2-44 Site Plan C-0L2931 9.3-7 1 Reactor Building Stainless Steal  Liner Plate Reactor Refueling Canal C-1L6111 9.3-7 2 Reactor Building Stainless Steel Liner Plate  Reactor Refueling Canal C-03BB53 5.4-21 Hot and Cold Leg Lateral Restraints E-1L9901 9.5.3-1 Lighting Distribution Riser Diagram E-1L9903 9.5.2-2 Public Address System Riser  Diagram E-11005 8.3-2 List of Loads Supplied by the Emergency Diesel Generator E-1001 8.3-1 3 Single Line Diagram Site Area Loads E-K1001 8.3-1 2 Single Line Diagram Essential Service Water System E-11001 8.3-1 1 Main Single Line Diagram E-11010 8.3-6 1 DC Main Single Line Diagram E-11010A 8.3-7 DC Main Single Line Diagram  (PK03 & PK04 Bus) E-12KJ01 8.3-5 Standby Generator Engine and Governor Control Logic Diagram
 
Rev. 21 WOLF CREEK TABLE 1.7-3 (Sheet 2)
Drawing Figure
 
Number Number Sheet Title E-12NE01 8.3-3 Logic Diagram Standby Generator Excitation Control E-12NE02 8.3-4 Logic Diagram Standby Generator  System Protection E-14QE01 9.5.2-1 Telephone System Riser Diagram J-104-00390 7.3-1 2 Logic Diagram Engineered Safety Features Actuation System (BOP)
KD-7496 8.2-4 WCGS Electrical One-Line Diagram KD-7750 8.2-3 Wolf Creek Substation General Plan M-0004 10.4-1 4 Circulating Water Screenhouse Planview  M-0005 10.4-1 5 Circulating Water Screenhouse  Section View M-1G001 1.2-1 Peninsular Plant Arrangement  Standard Power System & Structure Interface M-1G010 1.2-2 Equipment Location Radwaste  Building Plan EL 1976'-0" M-1G011 1.2-3 Equipment Location Radwaste Building Plan EL 2000'-0" M-0G012 1.2-4 Equipment Location Radwaste  Building Plan EL 2022'-0" M-1G013 1.2-5 Equipment Location Radwaste Building Plan EL 2031'-6" and Roof Plan M-1G014 1.2-6 Equipment Location Radwaste Building Sections A & B M-1G015 1.2-7 Equipment Location Building Sections C & E M-1G016 1.2-8 Equipment Location Building Sections D & F  M-1G020 1.2-9 Equipment Location Reactor and  Auxiliary Building Plan Basement EL. 1974'-0" M-1G021 1.2-10 Equipment Location Auxiliary Building Partial Plan EL. 1988'-0" and 2013'-6" M-1G022 1.2-11 Equipment Location Reactor and Auxiliary Building Plan Ground Floor Elevation 2000'-0" M-1G023 1.2-12 Equipment Location Reactor and Auxiliary Building Plan EL. 2026'-0" M-1G024 1.2-13 Equipment Location Reactor and Auxiliary Building Plan Operating Floor Elevation  2047'-6" 
 
Rev. 21 WOLF CREEK TABLE 1.7-3 (Sheet 3)
 
Drawing Figure
 
Number Number Sheet Title M-1G025 1.2-14 Equipment Location Reactor and  Auxiliary Building Plan Elevation 2068'-8" M-1G026 1.2-15 Equipment Location Reactor and  Auxiliary Building Section A M-1G027 1.2-16 Equipment Location Reactor and  Auxiliary Building Section B M-1G028 1.2-17 Equipment Location Reactor and  Auxiliary Building Section C M-1G029 1.2-18 Equipment Location Reactor and  Auxiliary Building Section D M-1G030 1.2-19 Equipment Location Auxiliary  Building Sections E, F & G M-1G040 1.2-20 Equipment Location Fuel  Building Plan Elevation 2000'-0", 2026'-0" and 2047'-6" M-1G041 1.2-21 Equipment Location Fuel  Building Sections A, B & C M-1G042 1.2-22 Equipment Location Fuel  Building Sections D, E & F M-1G050 1.2-23 Equipment Location Control  Building & Communication Corridor Plan Elevation 1974'-0" & 1984'-0" M-1G051 1.2-24 Equipment Location Control and  Diesel Generator Buildings &
Communication Corridor Plan Elevation 2000'-0" and 2016'-0" M-1G052 1.2-25 Equipment Location Control and  Diesel Generator Buildings &
Communication Corridor Plan Elevation 2032'-0" & 2047'-6" M-1G053 1.2-26 Equipment Location Control and  Diesel Generator Buildings &
Communication Corridor Plan Elevation 2061'-6", 2066'-0" &
2073'-6" & Section D M-1G054 1.2-27 Equipment Location Control and    Diesel Generator Building Communication Corridor Section A M-1G055 1.2-28 Equipment Location Control and    Diesel Generator Building Sections B & C M-1G060 1.2-29 Equipment Location Turbine    Building Condenser Pit Plan Elevation 1983'-0" M-1G061 1.2-30 Equipment Location Turbine    Building Ground Floor Plan Elevation 2000'-0" 
 
Rev. 17 WOLF CREEK TABLE 1.7-3 (Sheet 4)
 
Drawing Figure
 
Number Number Sheet Title M-1G062 1.2-31 Equipment Location Partial Plan Elevation 2015'-4" M-1G063 1.2-32 Equipment Location Turbine  Building Mezzanine Floor Plan Elevation 2033'-0" M-1G064 1.2-33 Equipment Location Turbine Building Operating Floor Plan Elevation 2065'-0" M-1G065 1.2-34 Equipment Location Turbine Building Section "A" M-1G066 1.2-35 Equipment Location Turbine Building Section "B" M-1G067 1.2-36 Equipment Location Turbine  Building Section "C"  M-0G068 1.2-37 Equipment Location Turbine Building Section "D" M-1G069 1.2-38 Equipment Location Turbine Building Section "E" M-0G070 1.2-39 Equipment Location Turbine Building Section "F" M-0G071 1.2-40 Equipment Location Turbine Building Section "G" M-1G072 1.2-41 Equipment Location Turbine Building Section "H" M-0G073 1.2-42 Turbine Component Laydown Area Elevation 2065'-0" M-13EN03 6.2.2-2 1 Containment Spray System Reactor      Building A & B Trains  M-13EN04 6.2.2-2 2 Containment Spray System Reactor      Building A & B Trains  M-13EN05 6.2.2-2 3 Containment Spray System Reactor      Building A & B Trains  M-KG080 9.2-3 ESWS Pumphouse  Equipment    Location - Plan M-KG081 9.2-4 ESWS Pumphouse  Equipment Location - Sections M-744-00018 7.2-1 1 Functional Diagrams Index and    Symbols M-744-00019 7.2-1 2 Functional Diagrams (Reactor    Trip Signals)
M-744-00020 7.2-1 3 Functional Diagrams (Nuclear    Instrumentation and Manual Trip Signals)
M-744-00021 7.2-1 4 Functional Diagrams (Nuclear    Instrumentation Permissives and Blocks)
M-744-00022 7.2-1 5 Functional Diagrams (Primary    Coolant System Trip Signals)
M-744-00023 7.2-1 6 Functional Diagrams (Pressurizer    Trip Signals)
M-744-00024 7.2-1 7 Functional Diagrams (Steam    Generator Trip Signals) 
 
Rev. 21 WOLF CREEK TABLE 1.7-3 (Sheet 5)
 
Drawing Figure
 
Number Number Sheet Title M-744-00025 7.2-1 8 Functional Diagrams (Safe-  guards Activation Signals)
M-744-00026 7.2-1 9 Functional Diagrams (Rod  Controls and Rod Blocks)
M-744-00027 7.2-1 10 Functional Diagrams (Steam  Dump Control)
M-744-00028 7.2-1 11 Functional Diagrams (Pressur-  izer Pressure & Level Control)
M-744-00029 7.2-1 12 Functional Diagrams (Pressur-  izer Heater Control)
M-744-00030 7.2-1 13 Functional Diagrams (Feedwater  Control and Isolation)
M-744-00031 7.2-1 14 Functional Diagrams (Feedwater  Control and Isolation)
M-744-00032 7.2-1 15 Functional Diagrams (Auxiliary  Feedwater Pumps Startup)
M-744-00033 7.2-1 16 Functional Diagram (Turbine  Trip Runbacks and Other Signals)
M-744-00039 7.2-1 17 Functional Diagram (Pressurizer  Pressure Relief)
M-744-00040 7.2-1 18 Functional Diagram (Pressurizer  Pressure Relief)
SK-C-250 3B-2 Plan and Elevation View of Main Steam/Main Feedwater Isolation Valve Compartment 
 
S-0172 2.4-3 2 Grading Plan Switchyard Area  S-0186 2.4-3 3 Drainage Plan Plant Area  S-0189-1 2.4-3 4A Manhole, Pipe & Culvert Schedule  S-0189-2 2.4-3 4B Manhole, Pipe & Culvert Schedule  S-0189-3 2.4-3 4C Manhole, Pipe & Culvert Schedule  S-0189-4 2.4-3 4D Manhole, Pipe & Culvert Schedule  S-0191 2.4-3 5 Manhole & Pipe Details  S-0296 2.4-3 6 Manhole & Pipe Details  S-0297 2.4-3 7 Plant Area Roadway Grading &  Drainage 
 
Rev. 21 WOLF CREEK TABLE 1.7-4 ERECTED SCAFFOLD EXPECTED TO BE IN PLACE THROUGHOUT NEXT REQUIRED USAR UPDATE CYCLE
 
WCGS Scaffold Request Building Elevation Location System 13-S0213 Auxiliary 1974' 20' N A14 13' W AN Essential Service Water (ESW) 13-S0219 Containment 2047' Above Containment Room Fire Protection 13-S6209 Fuel 2000'  1' S F1 2' W FC Component Cooling Water, Other 14-S9089 Containment 2005' 10' E 58' N Ladders 14-S0068 Auxiliary 1974' 3' E CA 3' N A11 Essential Service Water 14-S0070 Auxiliary 1974' 3' N A-14 3' E C-A Essential Service Water 14-S0069 Auxiliary 1974' 10' N A9 13' W AN Essential Service Water 14-S7104 Auxiliary 2000'  3' S of A11 AK ESW Vertical Loop Chase 14-S7107 Auxiliary 2000' 6'S A11 2' W AJ Component Cooling Water 15-S0050 Auxiliary 2026' 5' S A3 5' E AM Drain and Vent 15-S7207 Containment 1983' ESW Pipe Chase ESW Vertical Loop Chase 15-S7208 Containment 2000' ESW Pipe Chase ESW Vertical Loop Chase 15-S7225 Auxiliary 1974' E of CA 6' N A2 Fukushima 15-S7229 Containment 2032' NE Corner ESW Vertical Loop Chase 15-S7230 Containment 2042' NE Corner ESW Vertical Loop Chase 15-S7226 Containment 2000' NE Corner ESW Vertical Loop Chase 15-S7227 Containment 2012' NE Corner ESW Vertical Loop Chase 15-S7228 Containment 2021' NE Corner ESW Vertical Loop Chase 15-S7232 Containment 2064' NE Corner ESW Vertical Loop Chase 15-S7231 Containment 2053' NE Corner ESW Vertical Loop Chase 15-S7233 Containment 1987' ESW Pipe Chase ESW Vertical Loop Chase 15-S7240 Containment 2064' ESW Pipe Chase Essential Service Water 15-S7241 Containment 2074' ESW Pipe Chase Essential Service Water Rev. 29 WOLF CREEK TABLE 1.7-4 (sheet 2)
ERECTED SCAFFOLD EXPECTED TO BE IN PLACE THROUGHOUT NEXT REQUIRED USAR UPDATE CYCLE WCGS Scaffold Request Building Elevation Location System 15-S7239 Containment 2053' ESW Pipe Chase Essential Service Water 15-S7236 Containment 2021' ESW Pipe Chase Essential Service Water 15-S7234 Containment 2000' ESW Pipe Chase Essential Service Water 15-S7235 Containment 2010' ESW Pipe Chase Essential Service Water 15-S0235 Containment 2000' 30' N 45' W High Pressure Coolant Injection 15-S0234 Auxiliary 2000' 3' N A14' AN Essential Service Water 15-S0237 Auxiliary 2000' 18' N A4 3' E CA Essential Service Water 15-S0236 Auxiliary 2000' 3'E CA 9' N A4 Essential Service Water 15-S0241 Auxiliary 2000' 1' E AJ 6' S A3 Essential Service Water 15-S0242 Auxiliary 2000' N 2' A14 5' E AN Essential Service Water 15-S0253 Auxiliary 1967' 3' W AM 10' N A8 Essential Service Water 15-S7255 Containment 2000' 1' E CF 6' S C5 Fukushima 15-S7254 Containment 2000' 11 E' CF 3' S C5 Fukushima 15-S7253 Containment 2000' 11' E CF C5 Fukushima 15-S7257 Containment 2000' 11' W CC 9' S C5 Fukushima 15-S7258 Containment 2000' Water Hammer Tower ESW Vertical Loop Chase 15-S7256 Containment 2000' 4' W CA 9' S C5 Fukushima 15-S7262 Containment 2000' CC 9' S C5 Fukushima 15-S7260 Containment 2010' Water Hammer Tower ESW Vertical Loop Chase 15-S7259 Containment 2010' Water Hammer Tower ESW Vertical Loop Chase 15-S7246 Containment 2000' CA 8'S C3 Fukushima 15-S7263 Other 2032' S Side of Tower ESW Vertical Loop Chase 15-S7264 Other 2021' N Side of Tower ESW Vertical Loop Chase 15-S7267 Containment 2042' WH Tower ESW Vertical Loop Chase Rev. 29 WOLF CREEK TABLE 1.7-4 (sheet 3)
ERECTED SCAFFOLD EXPECTED TO BE IN PLACE THROUGHOUT NEXT REQUIRED USAR UPDATE CYCLE WCGS Scaffold Request Building Elevation Location System 13-S0134 Diesel Generator 2000' 6'S D1 5' TO30' D-8 Emergency Diesel Generator 13-S0127 Auxiliary 2026' 2'S A6 2'E AL Component Cooling Water 13-S0122 Auxiliary 2026' 2'N A13 2'W AJ Component Cooling Water 13-S0120 Diesel Generator 2032' D2-D3 10'E DB Standby Diesel13-S0119 Diesel Generator 2032' D2-D3 10'E DC Standby Diesel13-S0100 Diesel Generator 2000' 6'S D1 3'W DR 7' E Emergency Diesel Generator 13-S0066 Auxiliary 1974' 20' S A1 7'E AH Residual Heat Removal 13-S0064 Auxiliary 2026' 4'N AS 6'E AM Component Cooling Water 13-S0063 Auxiliary 2026' 3'S A4 C/L AM Component Cooling Water 13-S0060 Essential Service Water 2000' Prelube Storage Tank Essential Service Water 13-S0052 Auxiliary 1974' 9'S A2 3'W AH High Pressure Coolant Injection 13-S0051 Auxiliary 1974' 7'N A3 7'W AF High Pressure Coolant Injection 13-S0050 Containment 2000' 5'S C7 5'E CF Fire Protection 13-S0048 Auxiliary 2026' 3'S A7 3'E AL Component Cooling Water 13-S0046 Auxiliary 2026' 6'S A3 7'E AM Component Cooling Water 13-S0043 Auxiliary 2026' 2'S A9 8'E AN Component Cooling Water
 
Rev. 29 WOLF CREEK TABLE 1.7-4 (sheet 4)
ERECTED SCAFFOLD EXPECTED TO BE IN PLACE THROUGHOUT NEXT REQUIRED USAR UPDATE CYCLE
 
13-S0042 Auxiliary  2026' 3'E CA C/L A11 Component Cooling Water 13-S0041 Auxiliary 2026' 3'E CA C/L A9 Component Cooling Water 13-S0040 Auxiliary 2026' 3'W AL 8'N A12 Component Cooling Water 13-S0039 Auxiliary 2026' 4'S A13 6'E AL  Component Cooling Water 13-S0038 Auxiliary 2026' 4'E AN 9'N A14 Component Cooling Water 13-S0037 Auxiliary  2026' 5'W AN C/L A10 Component Cooling Water 13-S0036 Essential Service Water 2000' 1'N C Wall 38'E W Wall Essential Service Water 13-S0035 Auxiliary 2026' C/L A11 6'E AN Component Cooling Water 13-S0034 Auxiliary 2026' 10'S A9 3'W AL Component Cooling Water 11-S8180 Auxiliary 2000' 9'S A6 13'W AL Residual Heat Removal 11-S8127 Auxiliary 2000' 4'S A9 10'E AK Component Cooling Water 11-S0237 Auxiliary 2000' 5'S A8 2'W AK Component Cooling Water 11-S0229 Auxiliary 2000' 5'E AK C/L A11 Component Cooling Water 11-S0228 Auxiliary 2000' 6'W AJ 17'S A9 Component Cooling Water 11-S0227 Auxiliary 2000' 3'W AJ 14'S A8 Component Cooling Water 10-S0088 Auxiliary  2026' 2'S A13 2'W AK Component Cooling Water 10-S0086 Auxiliary 2026' 8'N A4 3'W AM Component Cooling Water 10-S0080 Auxiliary 2026' 5'N A6 15'W AM Component Cooling Water 08-S0201 Fuel 2000' 5'S FI 15'W FD Fuel Pool 08-S0136 Auxiliary 2043' East Bay Main and Reheat Steam 08-S0135 Auxiliary 2043' West Bay Main and Reheat Steam


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 16) WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse  USAR Report Topical  Revision Section Submitted Review(1) Report No. Title Number Reference to the NRC Status WCAP-8377 (P) "Revised Clad Flattening Rev. 0 4.2 8/7/74 A WCAP-8381 Model"   8/6/74
Rev. 29 WOLF CREEK TABLE 1.7-4 (sheet 5)
ERECTED SCAFFOLD EXPECTED TO BE IN PLACE THROUGHOUT NEXT REQUIRED USAR UPDATE CYCLE WCGS Scaffold Request Building Elevation Location System 04-S9001 Auxiliary 1974' 1' N A7 4" W AL Camera 04-S9002 Auxiliary 1974" 2' N A7 4' W AL Camera 04-S9008 Auxiliary 2000' 4' S A7 10' W AM Camera 04-S9009 Auxiliary 2000' C/L A13 C/L AE Camera 04-S9010 Auxiliary 2000' 6' N A7 4' W AL Camera 04-S9011 Auxiliary 2000' 1' S A12 1' E AN Camera 04-S9013 Fuel 2047' 10'N F4 4" W FC Camera 04-S9017 Fuel 2047' 2' N F7 6' E FB Camera 04-S9018 Auxiliary 2000' C/L A4 C/L AJ Camera 08-S9010 Auxiliary 2000' C/L A9 3' E AM Camera                      Rev. 29 WOLF CREEK 1.8  CONFORMANCE TO NRC REGULATORY GUIDES A discussion of the extent to which WCGS complies with each of the NRC Division 1 Regulatory Guides is provided in Appendix 3A. Appendix 3A gives a brief


WCAP-8385 (P) "Power Distribution Control and Rev. 0 4.3, 4.4 10/9/74 A WCAP-8403 Load Following Procedures"
statement of WCGS compliance and refers to the most appropriate section of the


WCAP-8424 "An Evaluation of Loss of Rev. 1 15.3 5/30/75 U Flow Accidents Caused by Power System Frequency Transients in Westinghouse PWRs"
USAR for the complete description of how the design complies with the


WCAP-8446 (P) "17 x 17 Driveline Com- Rev. 0 1.5, 3.9(N) 12/31/74 A WCAP-8449 ponents Tests Phase IB, II, III D-Loop Drop and Deflection"
regulatory recommendations.      1.8-1    Rev. 0 WOLF CREEK 1.9 NRC REGULATORY REQUIREMENTS REVIEW COMMITTEE CATEGORY 2, 3, AND 4 MATTERS The Office of Nuclear Reactor Regulation (NRR) established a Regulatory Requirements Review Committee (RRRC) which reviewed proposed changes to the


WCAP-8453-A "Analysis of Data from the Rev. 0 4.4 5/10/76 A Zion (Unit 1), THINC Veri-fication Test"
regulatory requirements issued by the staff and recommended a course of action


WCAP-8471 (P) "Westinghouse ECCS Evaluation Rev. 0 15.6 2/10/75 AE WCAP-8472 Model - Supplementary Informa-  2/11/75 tion"
to the Office of NRR. The course of action includes an implementation


WCAP-8485 "Safety-Related Research and Rev. 0  4/2/75 B Development for Westinghouse Pressurized Water Reactors, Program Summaries - Fall 1974"
schedule. The Director's approval was then used by the NRR staff as review guidance on individual licensing matters.
The RRRC developed a categorization nomenclature to aid in the uniform implementation of new and revised regulatory staff concerns. The system


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 17)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse USAR Report Topical Revision Section Submitted Review(1) Report No. Title Number Reference to the NRC Status  WCAP-8498 "Incore Power Distribution Rev. 0 4.3 7/22/75 U Determination in Westinghouse Pressurized Water Reactors, Program Summaries - Fall 1974"  WCAP-8510 Method for Fracture Mechanics Rev. 0 5.3 12/00/75 U Analysis of Nuclear Reactor Vessels Under Severe Thermal Transients  WCAP-8516-P(P) UHI Plant Internals Vibration Rev. 0 3.9(N) 4/11/75 A WCAP-8517 Measurement Program and Pre and Post Hot Functional Examinations"  WCAP-8536(P) "Critical Heat Flux Testing of Rev. 0 4.4 5/30/75 A WCAP-8537 17 x 17 Fuel Assembly Geometry with 22-Inch Grid Spacing"  WCAP-8565- "Westinghouse ECCS-Four Loop Rev. 0 15.6 7/17/75 A P-A (P) Plant (17 x 17) Sensitivity WCAP-8566-A Studies"  WCAP-8577 "The Application of Preheat Rev. 0 6.1 2/3/76 A Temperatures after Welding Pressure Vessel Steels"  WCAP-8584 (P) "Failure Mode and Effects Rev. 1 4.6, 7.3 3/20/80 U WCAP-8760 Analysis (FMEA) of the Engineered Safety Features Actuation System"  WCAP-8587 "Methodology for Qualifying Rev. 6A 3.10(N), 11/00/83 U Westinghouse WRD Supplied 3.11(N),
included four categories (1 through 4) which correspond to the evaluation by
NSSS Safety-Related Electrical 3A Equipment" Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 18)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse USAR Report Topical Revision Section Submitted Review(1)
Report No. Title Number Reference to the NRC Status WCAP-8587 "Equipment Qualification Rev. 1 3.11(N) 4/17/78 U Data Packages" Supple- 3.10(N) ment 1


WCAP-8622 (P) "Westinghouse ECCS Evaluation Rev. 0 1.5, 15.6 11/20/75 AE WCAP-8623 Model - October 1975 Version"
the RRRC of the need for applying the regulatory concerns to new and ongoing


WCAP-8624(P) "General Method of Developing Rev. 0 3.10(N) 0/00/00 U Multi-Frequency Biaxial Test Inputs for Bistables"
license applications. The four categories are defined as follows: Category 1: Matters whose applicability is to be applied to  applications in accordance with the implementation  section of the published guide. The RRRC considers it necessary to forward fit (on new applications) the requirements of these matters. Category 2: A new position whose applicability is to be deter-  mined on a case-by-case basis. The NRC staff will give further consideration to the need for backfit-ting certain identified items of the regulatory


WCAP-8682 (P) "Experimental Verification of Rev. 0 4.3 3/18/76 B WCAP-8683 Wet Fuel Storage Criticality Analyses"
concerns. Category 3: Positions to which the NRC staff considers confor- mance necessary, either by direct implementation or by implementation of an acceptable alternative.
These positions could be the cause of backfitting if an acceptable alternative is not available. Category 4: Positions of concern to the NRC staff which have  not been reviewed by the RRRC and subsequently categorized as Category 1, 2, or 3. Since these items are of concern to the NRC staff, for review  purposes, they are to be considered on the same  basis as Category 2, potential for backfitting  certain identified regulatory concerns. 1.9-1 Rev. 0 WOLF CREEK The Office of NRR, by letter dated November 21, 1978, transmitted a list of Category 2, 3, and 4 matters for consideration in preparing the WCGS FSAR. A discussion of how Wolf Creek complies with each of the listed matters is contained in Tables 1.9-1 through 1.9-4. The RRRC Category Designation columns in the tables correspond to those contained in the November 21, 1978 letter.
Table 1.9 Lists all Category 2, 3, and 4 regulatory guides and references the location in which the regulatory guides are addressed.
Table 1.9 Lists all Category 2, 3, and 4 branch technical positions (BTPs),
provides remarks on the extent to which the recommendations of the BTPs are


WCAP-8691 (P) "Fuel Rod Bow Evaluation" Rev. 0 4.2, 4.4 11/83 U WCAP-8692
met, and references the location of more complete discussions of the RRRC


WCAP-8693 "Delta Ferrite in Production Rev. 0 5.2 3/16/76 B Austenitic Stainless Steel Weldments"
matter.Tables 1.9-3 and 1.9 Address the Category 4 SRP criteria and other Category 4 positions, respectively. 1.9-2 Rev. 0 WOLF CREEK TABLE 1.9-1 CATEGORY 2, 3, AND 4 REGULATORY GUIDES*
Regulatory Guide            RRRC Category Number      Revision 2
3   4          1.12          1                        X 1.13          1                        X


WCAP-8708-P-A "MULTIFLEX - A FORTRAN-IV Rev. 0 3.6.3 9/16/77 A (P), Vol. I & II Computer Program for Analyzing  3.9(N)
1.14          1                        X 1.27          2                X 1.52          1                X
WCAP-8709-A, Thermal-Hydraulic-Structure Volumes I & II System Dynamics"


WCAP-8720 (P) "Improved Analytical Models Rev. 0 4.2 11/2/76 A WCAP-8785 Used in Westinghouse Fuel Rod Design Computations"
1.56          1                    X


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 19)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse  USAR Report Topical  Revision Section Submitted Review(1) Report No. Title Number Reference to the NRC Status WCAP-8768 "Safety-Related Research and Rev. 2 1.5, 4.2, 9/28/78 B Development for Westinghouse  4.3, 5.4 Pressurized Water Reactors, Program Summaries - Winter 1977 - Summer 1978"
1.59          2               X


WCAP-8766 (P) "Verification of Neutron Pad Rev. 0 3.9(N) 5/21/76 A WCAP-8780 and 17 x 17 Guide Tube Designs by Preoperational Tests on the Trojan 1 Power Plant"
1.63          2                X 1.68.2        1                    X 1.75          1                       X


WCAP-8865-A "Westinghouse ECCS - Four Loop Rev. 0 5/6/77 A Plant (17 x 17) Sensitivity Studies with Upper Head Fluid Temperature at THOT"
1.76          0                       X


WCAP-8872 "Design, Inspection, Operation Rev. 0 12.1 4/27/77 B and Maintenance Aspects of the Westinghouse NSSS to Maintain Occupational Radiation Exposures as Low as Reasonably Achievable"
1.79          1                       X


WCAP-8892-A "Westinghouse 7300 Series Rev. 0 7.1 6/15/77 A Process Control System Noise Tests"
1.80          0                       X


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 20)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse  USAR Report  Topical  Revision Section Submitted Review(1) Report No. Title Number Reference to the NRC Status WCAP-8929 "Benchmark Problem Solutions Rev. 0 3.9(N) 5/26/77 U Employed for Verification of the WECAN Computer Program"
1.82          0                       X


WCAP-8963 (P) "Safety Analysis for the Rev. 0 4.2 3/31/71 A WCAP-8964 Revised Fuel Rod Internal  8/11/77 Pressure Design Basis"
1.83          1                        X


WCAP-8970(P) "Westinghouse emergency Core Rev. 0 15.6 4/77 U WCAP-8971 Cooling System Small Break -
1.89          0                       X 1.91          1                X
October 1975 Model"


WCAP-8976 "Failure Mode and Effects Rev. 0 4.6, 10/26/77 U Analysis (FMEA) of the  7.7 Solid State Full Length Rod Control System"
1.93          0                       X


WCAP-9166 "Westinghouse Emergency Core Rev. 0 15.6 2/00/78 U Cooling System Evaluation Model for Analyzing Large LOCA's During Operation With One Loop Out of Service for Plants Without Loop Isolation Values"
1.97          1                    X


WCAP-9168 (P) "Westinghouse Emergency Core Rev. 0 15.6 9/27/77 U WCAP-9169 Cooling System Evaluation Model -
1.99          1                    X
Modified October 1975 Version"


WCAP-9179 (P) "Properties of Fuel and Core Rev. 1 4.2 8/2/78 U Component Materials"
1.101          1                   X


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 21)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse  USAR Report  Topical  Revision Section Submitted Review(1)
1.102          1               X
Report No. Title Number Reference to the NRC Status WCAP-9207 (P) "Evaluation of Mispositioned Rev. 0 6.3 3/21/78 U WCAP-8966 ECCS Valves"


WCAP-9220-P-A(P) Westinghouse ECCS Evaluation Rev. 0 15.6 2/00/78 U WCAP-9221-P-A Model, February 1978 Version
1.104          0                       X


WCAP-9224, Ap- "Hafnium" Rev. 0 10/00/80  U pendix A
1.105          1                X


WCAP-9226(P) Reactor Core Response to  15.1 7/00/78 U WCAP-9227 Excessive Secondary Steam Releases
1.108          1               X


WCAP-9230 (P) "Report on the Consequences Rev. 0 15.2 1/27/78 U WCAP-9231 of a Postulated Main Feedline Rupture"
1.114          1                   X


WCAP-9279 "Combination of Safe Shutdown Rev. 0 3.9(N) 3/21/78 U Earthquake and Loss-of-Coolant Accident Responses for Faulted Condition Evaluation of Nuclear Power Plants"
1.115          1                X


WCAP-9283 "Integrity of the Primary Rev. 0 3.9(N) 3/21/78 U Piping Systems of Westinghouse Nuclear Power Plants During Postulated Seismic Events"
1.117          1                X


Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 22)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  Westinghouse  USAR Report Topical  Revision Section Submitted Review(1)
1.121          0                   X
Report No. Title Number Reference to the NRC Status  WCAP-9292  "Dynamic Fracture Toughness Rev. 0 5.2 3/17/78 U of ASME SA508 Class 2a and ASME SA533 Grade A Class 2 Base and Heat Affected Zone Material and Applicable Weld Metals"  WCAP-9346 "Electric Hydrogen Recombiner Rev. 0 6.2.5 7/00/78 U Qualification Testing for Model B  WCAP-9714-PA(P) Methodology for the Seismic  3.10.(N) 00/00/00 A WCAP-9750-A Qualification of Westinghouse WRD Supplied Equip. WCAP-9944(P) "Verification of Upper Head In- Rev. 0 3.9(N) 7/00/81 U WCAP-9945 jection Reactor Vessel Internals by Preoperational Tests on Sequoyah 1 Power Plant  WCAP-10297-P-A Dropped Rod Methodology for Rev. 0 15.4 6/00/83 A Negative Flux Rate Trip Plants  WCAP-10043 "Steam Generator Tube Plugging Rev. 0 5.4.2.5 12/3/82 U Analysis for the Westinghouse Standardized Nuclear Power Plant (P) System"  WCAP-10858P-A "AMSAC Generic Design Package" Rev. 1 7.7.1.11 07/25/85 A
& Addendum 1    02/26/87  WCAP-13589-A "Assessment of Clad Flattening Rev. 0 4.3 01/18/93 A  and Densificaiton Power Spike Factor  Elimination in Westinghouse Nuclear Fuel" 


Rev. 11 WOLF CREEK TABLE 1.6-2 (Sheet 23)  WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE  (P) - Proprietary (1) A legend to the review status code letters follows:
1.124          1               X


A - NRC review complete; NRC acceptance letter issued.  
1.127          1                    X


AE- NRC accepted as part of the Westinghouse emergency core cooling system (ECCS) evaluation model only; does not constitute acceptance for any purpose other than for ECCS analyses.  
1.130          0                X 1.137          0                X


B - Submitted to NRC as background information; not undergoing formal NRC review.  
1.141          0                X


O - On file with NRC; older generations report with current validity; not actively under formal NRC review.  
8.8            2                X
          *All regulatory guides are addressed in Appendix 3A with the exception of Regulatory Guide 8.8, which is


U - Actively under formal NRC review.  
addressed in Section 12.1.
Rev. 0 WOLFCREEKTABLE1.9-2CATEGORY2,3,AND4BRANCHTECHNICALPOSITIONSBranchTechnicalRRRCPositionTitle Cat.RemarksASB9.5-1,GuidelinesforFire2TherecommendationsofRev.1ProtectionforNu-thisBTParemettoclearPowerPlantstheextentdescribedinSection9.5.1.MTEB5-7MaterialSelection2TherecommendationsofandProcessingthisBTParenotap-GuidelinesforBWRplicabletotheWCGSCoolantPressure(PWR)design.
BoundaryRSB5-1,DesignRequirements3TherecommendationsofRev.1oftheResidualHeatthisBTParemettotheRemovalSystemextentdescribedinSec-tions5.2.2and7.6.6.RSB5-2Overpressurization3TherecommendationsofProtectionofPres-thisBTParemettothesurizedWaterReactorsextentdescribedinSec-WhileOperatingatLowtions5.2.2and7.6.6.
TemperaturesMTEB5-3MonitoringofSec-4.B.1TherecommendationsofondarySideWaterthisBTParemet.ReferChemistryinPWRtoSections9.3.2and SteamGenerators10.3.5.CSB6-1MinimumContainment4.B.2TherecommendationsofPressureModelforthisBTParemet.ReferPWRECCSPerformancetoSections6.2.1andEvaluation15.6.5.CSB6-2ControlofCombus-4.B.3TherecommendationsoftibleGasConcentra-thisBTParemet.RefertionsinContainmenttoSection6.2.5.FollowingaLoss-of-CoolantAccidentRev.0 WOLFCREEKTABLE1.9-2(Sheet2)BranchTechnicalRRRCPositionTitle Cat.RemarksCSB6-3Determinationof4.B.4TherecommendationsofBypassLeakagePathsBTParenotapplicableinDualContainmenttotheWCGSdesign,Plantssincethereisnodual containment.CSB6-4ContainmentPurging4.B.5TherecommendationsofDuringNormalPlantthisBTParemettothe OperationsextentdescribedinTable 9.4-13.ASB9.1OverheadHandling4.B.6TherecommendationsofSystemsforNu-thisBTParemet.NoclearPowerPlantscriticalloadsarehandled.Referto Section9.1.4.ASB10.1DesignGuidelines4.B.7TherecommendationsofforAuxiliaryFeed-thisBTParemet.Refer waterSystemPumptoSection10.4.9.DriveandPowerSup-plyDiversityforPWRPlantsRev.0 WOLF CREEK TABLE 1.9-3 CATEGORY 4 SRP CRITERIA SRP    RRRC Section  Cateqory Title 3.5.3    4.B.8    Procedures for Composite  The recommendations of this (Par II.1.C)      Section Local Damage Pre- SRP are met to the extent diction                    described in Section 3.5.3.
3.7.1    4.B.9    Development of Design      The recommendations of (Par. II.2)        Time History for Soil-    this SRP are met to the


P - Pending approval by the NRC.
Structure Interaction      extent described in


Rev. 0 WOLF CREEK Table 1.6-3USAR Figure/Controlled Drawing Cross-Reference  Figure # Sheet Title Drawing #  1.1-1 1 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-120101 1.1-1 2 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-120102    1.1-1 3 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-020103 1.1-1 4 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-020104 1.2-1 0 Peninsular Plant Arrangement Standard Power Systems & Structure Interface M-1G001 1.2-2 0 Equipment Location Radwaste Building Plan El. 1976'-0"M-1G010 1.2-3 0 Equipment Location Radwaste Building Plan El. 2000'-0"M-1G011 1.2-4 0 Equipment Location Radwaste Building Plan El. 2022'-0"M-0G012 1.2-5 0 Equipment Location Radwaste Building El. 2031'-6" & Roof Plan M-1G013 1.2-6 0 Equipment Location Radwaste Building Sections A & B M-1G014 1.2-7 0 Equipment Location Radwaste Building Sections C & E M-1G015 1.2-8 0 Equipment Location Radwaste Building Sections D & F M-1G016 1.2-9 0 Equipment Location Reactor and Auxiliary Bldgs Plan - Basement El. 1974'-0" M-1G020 1.2-10 0 Equipment Location Auxiliary Building Partial Plan El. 1988'-0" & El. 2013'-6" M-1G021 1.2-11 0 Equipment Location Reactor and Auxiliary Building Plan Ground Floor Elevation 2000'-0" M-1G022 1.2-12 0 Equipment Location Reactor and Auxiliary Building Plan El. 2026'-0" M-1G023 1.2-13 0 Equipment Location Reactor and Auxiliary Buildings Plan Operating Floor El. 2047'-6" M-1G024 1.2-14 0 Equipment Locations Reactor and Auxiliary Buildings Plan El. 2068'-8" M-1G025 1.2-15 0 Equipment Location Reactor and Auxiliary Building Section A M-1G026 1.2-16 0 Equipment Locations Reactor and Auxiliary Buildings Section B M-1G027Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 2) USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #1.2-170Equipment Location Reactor and Auxiliary Building Section C M-1G0281.2-180Equipment Location Reactor and Auxiliary Building Section D M-1G0291.2-190Equipment Location Auxiliary Building Sections E, F, & G M-1G0301.2-200Equipment Location Fuel Building Plan Elevation 2000'- 0", 2026'-0" and 2047'-6" M-1G0401.2-210Equipment Location Fuel Building Sections A, B, & CM-1G0411.2-220Equipment Location Fuel Building Sections D, E, & FM-1G0421.2-230Equipment Location Control Building & Communication Corridor Plan Elevation 1974'- 0" & 1984'-0"M-1G0501.2-240Equipment Location Control & Diesel Generator Buildings & Communication Corridor Plan Elevation 2000'-0" & 2016'-0" M-1G0511.2-250Equipment Location Control & Diesel Generator Buildings & Communication Corridor Plan Elevation 2032'-0" & 2047'-6" M-1G0521.2-260Equipment Location Control & Diesel Generator Buildings & Corridor Plan Elevation 2061'- 6", 2066'-0" & 2073'-6" & Section D. M-1G0531.2-270Equipment Location Control & Diesel Generator Buildings & Communication Corridor Section A M-1G0541.2-280Equipment Location Control & Diesel Generator Buildings Sections B & C M-1G0551.2-290Equipment Location Turbine Building Condenser Pit Plan Elevation 1983'-0" M-1G0601.2-300Equipment Location Turbine Building Ground Floor Plan Elevation 2000'-0" M-1G0611.2-310Equipment Location Turbine Building Partial Plan Elevation 2015'-4" M-1G0621.2-320Equipment Location Turbine Building Mezzanine Floor Plan Elevation 2033'-0" M-1G0631.2-330Equipment Location Turbine Building Operating Floor Plan Elevation 2065'-0" M-1G064Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 3) USAR Figure/Controlled Drawing Cross-Reference  Figure # Sheet Title Drawing # 1.2-34 0 Equipment Location Turbine Building Section A M-1G065 1.2-35 0 Equipment Location Turbine Building Section B M-1G066 1.2-36 0 Equipment Location Turbine Building Section C M-1G067 1.2-37 0 Equipment Location Turbine Building Section D M-0G068 1.2-38 0 Equipment Location Turbine Building Section E M-1G069 1.2-39 0 Equipment Location Turbine Building Section F M-1G070 1.2-40 0 Equipment Location Turbine Building Section G M-0G071 1.2-41 0 Equipment Location Turbine Building Section H M-1G072 1.2-42 0 Turbine Component Laydown Area, Elevation 2065'-0" M-1G073 1.2-44 0 Site Plan 8025-C-KG1202 2.4-3 2 Grading Plan Switchyard Area S-0172 2.4-3 3 Drainage Plan Plant Area S-0186 2.4-3 4A Manhole, Pipe & Culvert Schedule S-0189 Sheet 1 2.4-3 4B Manhole, Pipe & Culvert Schedule S-0189 Sheet 2 2.4-3 4C Manhole, Pipe & Culvert Schedule S-0189 Sheet 3 2.4-3 4D Manhole, Pipe & Culvert Schedule S-0189 Sheet 4 2.4-3 5 Manhole & Pipe Details S-0191 2.4-3 6A Manhole & Pipe Details S-0296 Sheet 1  2.4-3 6B Manhole & Pipe Details S-0296 Sheet 2  2.4-3 7 Plant Area Roadway Grading & Drainage S-0297 5.1-1 1 Reactor Coolant System M-12BB01 5.1-1 2 Reactor Coolant System M-12BB02 5.1-1 3 Reactor Coolant System M-12BB03 5.1-1 4 Reactor Coolant System M-12BB04 5.4-7 0 Residual Heat Removal System M-12EJ01 5.4-21 0 Hot and Cold Leg Lateral Restraints C-03BB53 6.2.2-1 0 Containment Spray System M-12EN01 6.2.2-2 1 Containment Spray System Reactor Building A & B Trains M-13EN03 6.2.2-2 2 Containment Spray System Reactor Building A & B Trains M-13EN04 6.2.2-2 3 Containment Spray System Reactor Building A & B Trains M-13EN05 6.2.5-1 0 Containment Hydrogen Control System M-12GS01 6.2.6-1 0 Containment Integrated Leak Rate Test M-12GP01 6.3-1 1 Borated Refueling Water Storage System M-12BN01 6.3-1 2 High Pressure Coolant Injection System M-12EM01 6.3-1 3 High Pressure Coolant Injection System M-12EM02 6.3-1 4 Accumulator Safety Injection M-12EP01 
Analysis                  Section 3.7(B).1.
3.7.2   4.B.10    Procedures for Seismic    The recommendations of (Par. II)          System Analysis            this SRP are met. Refer


Rev. 28 WOLF CREEK Table 1.6-3 (Sheet 4) USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #7.2-1 1 Functional Diagrams (Index and Symbols) M-744-00018 7.2-1 2 Functional Diagrams (Reactor Trip Signals) M-744-00019 7.2-1 3 Functional Diagrams (Nuclear Instrumentation and Manual Trip Signals) M-744-00020 7.2-1 4 Functional Diagrams (Nuclear Instrumentation Permissives and Blocks) M-744-00021 7.2-1 5 Functional Diagrams (Primary Coolant System Trip SignalsM-744-00022 7.2-1 6 Functional Diagrams (Pressurizer Trip Signals) M-744-00023 7.2-1 7 Functional Diagrams (Steam Generator Trip Signals)M-744-00024 7.2-1 8 Functional Diagrams (Safeguards Actuation Signals)M-744-00025 7.2-1 9 Functional Diagrams (Rod Controls and Rod Blocks)M-744-00026 7.2-1 10 Functional Diagrams (Steam Dump Control) M-744-00027 7.2-1 11 Functional Diagrams (Pressurizer Pressure and Level Control) M-744-00028 7.2-1 12 Functional Diagrams (Pressurizer Heater Control) M-744-00029 7.2-1 13 Functional Diagrams (Feedwater Control and Isolation)M-744-00030 7.2-1 14 Functional Diagrams (Feedwater Control and Isolation)M-744-00031 7.2-1 15 Functional Diagrams (Auxiliary Feedwater Pumps Start-up)M-744-00032 7.2-1 16 Functional Diagrams (Turbine Trips, Runbacks and Other Signals) M-744-00033 7.2-1 17 Functional Diagram (Pressurizer Pressure Relief System Train A) M-744-00039 7.2-1 18 Functional Diagram (Pressurizer Pressure Relief System Train B) M-744-00040 7.3-1 2 Logic Diagram Engineered Safety Features Actuation System (BOP) J-104-00390 7.6-4 1 Train B Functional Diagram Showing Logic Requirements for Pressurizer Pressure Relief SystemM-744-00039 7.6-4 2 Train A Functional Diagram Showing Logic Requirements for Pressurizer Pressure Relief SystemM-744-00040 8.2-3 0 Wolf Creek Substation General Plan KD-7750 8.2-4 0 One-Line Diagram KD-7496 Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 5) USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #8.3-1 1 Main Single Line Diagram E-11001 8.3-1 2 Single Line Diagram, Essential Service Water SystemE-K10018.3-1 3 Single Line Diagram Site Area Loads E-1001 8.3-2 0 List of Loads Supplied by the Emergency Diesel GeneratorE-110058.3-3 0 Logic Diagram Standby Generation Excitation ControlE-12NE018.3-4 0 Logic Diagram Standby Generator System ProtectionE-12NE028.3-5 0 Logic Diagram Standby Generator Engine and Governor Control E-12KJ018.3-6 1 DC Main Single Line Diagram E-11010 8.3-7 0 DC Main Single Line Diagram (PK03 and PK04 Bus)E-11010A9.1-31Fuel Pool Cooling and Cleanup System M-12EC019.1-32Fuel Pool Cooling and Cleanup System M-12EC029.2-1 1 Service Water System M-12EA019.2-1 2 Service Water System M-12EA02 9.2-1 3 Service Water System M-0022 Sheet 1 9.2-2 1 Essential Service Water System M-12EF019.2-2 2 Essential Service Water System M-12EF029.2-2 3 Essential Service Water System M-K2EF019.2-2 4 Essential Service Water System M-K2EF039.2-3 0 ESW Pumphouse Equipment Location - Plan M-KG0809.2-4 0 ESWS Pumphouse Equipment Location - Sections M-KG0819.2-5 1 Makeup Demineralizer System M-0025 Sheet 1 9.2-5 2 Makeup Demineralizer System M-0025 Sheet 2 9.2-5 3 Makeup Demineralizer System M-0025 Sheet 3 9.2-5 4 Makeup Demineralizer System M-0025 Sheet 4 9.2-5 4A Makeup Demineralizer System M-0025 Sheet 4A 9.2-5a 0 Potable Water System A-0503 Sheet 1 9.2-13 0 Reactor Make-up Water System M-12BL019.2-14 0 Closed Cooling Water System M-12EB019.2-15 1 Component Cooling Water System M-12EG019.2-15 2 Component Cooling Water System M-12EG029.2-15 3 Component Cooling Water System M-12EG039.2-16 0 Demineralized Water Storage and Transfer System M-12AN019.2-17 1 Domestic Water System M-12KD019.2-17 2 Domestic Water System M-12KD02 9.2-23 0 Condensate Storage and Transfer System M-12AP01Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 6) USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #9.2-24 1 Waste Water Treatment Facility M-12WT01 9.2-25 1 Waste Water Treatment Facility M-12WT03 9.3-1 1 Compressed Air System M-12KA01 9.3-1 2 Compressed Air System (Service Air) M-12KA02 9.3-1 3 Instrument Air System M-12KA03 9.3-1 4 Instrument Air System M-12KA04 9.3-1 5 Compressed Air System M-12KA05 9.3-1 6 Compressed Air System M-12KA06 9.3-1 7 Compressed Air System M-12KA079.3-2 1 Nuclear Sampling System M-12SJ019.3-2 2 Nuclear Sampling System M-12SJ039.3-3 0 Nuclear Sampling System M-12SJ029.3-4 1 Process Sampling System M-12RM019.3-4 2 Process Sampling System M-12RM029.3-4 3 Process Sampling System M-12RM039.3-5 1 Sanitary Lift Station & Turb. Bldg. Sanitary Drainage System M-12LA019.3-5 2 Comm. Corridor & Control Bldg. Sanitary Drainage SystemM-12LA029.3-5 3 Chemical and Detergent Waste M-12LD019.3-5 4 Turbine Bldg. and Aux. Feedwater Pump Rooms Oily Waste System M-12LE019.3-5 5 Control and Diesel Generator Bldg. Oily Waste SystemM-12LE029.3-5 6 Turbine Bldg. and Aux. Boiler Room Oily Waste SystemM-12LE039.3-5 7 Tendon Access Gallery and Turbine Bldg. Oily Waste System M-12LE049.3-5 8 Auxiliary Building Floor and Equipment Drain (FED) System M-12LF019.3-5 9 Auxiliary Building Floor and Equipment Drain SystemM-12LF029.3-5 10 Auxiliary Building Floor and Equipment Drain SystemM-12LF039.3-5 11 Auxiliary Building Floor and Equipment Drain SystemM-12LF049.3-5 12 Auxiliary Building Floor and Equipment Drain SystemM-12LF059.3-5 13 Radwaste and Fuel Bldgs. FED System M-12LF069.3-5 14 Radwaste Bldg. FED System M-12LF079.3-5 15 Control and Fuel Bldgs. FED System M-12LF089.3-5 16 Reactor Bldg. and Hot Machine Shop FED System M-12LF099.3-5 17 Radwaste Bldg. and Tunnel FED System M-12LF10Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 7) USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #9.3-7 1 Reactor Building, Stainless Steel Liner Plate, Reactor Refueling Canal C-0L29319.3-7 2 Fuel Building-Area 1, Stainless Steel Liner Plate Plan, Spent Fuel Pool C-1L61119.3-8 1 Chemical and Volume Control System M-12BG01 9.3-8 2 Chemical and Volume Control System M-12BG02 9.3-8 3 Chemical and Volume Control System M-12BG03 9.3-8 4 Chemical and Volume Control System M-12BG049.3-8 5 Chemical and Volume Control System M-12BG059.3-9 1 Service Gas System M-12KH019.3-9 2 Service Gas System M-12KH029.3-11 1 Boron Recycle System M-12HE019.3-11 2 Boron Recycle System M-12HE029.3-11 3 Boron Recycle System M-12HE039.4-1 1 Control Building HVAC M-12GK019.4-1 2 Control Building HVAC M-12GK029.4-1 3 Control Building HVAC M-12GK039.4-1 4 Control Building HVAC M-12GK049.4-2 1 Fuel Building HVAC M-12GG019.4-2 2 Fuel Building HVAC M-12GG029.4-3 1 Miscellaneous Buildings HVAC M-12GF019.4-3 2 Miscellaneous Buildings HVAC M-12GF029.4-3 3 Auxiliary Building HVAC M-12GL039.4-3 4 Auxiliary Building HVAC M-12GL029.4-3 5 Auxiliary Building HVAC M-12GL019.4-4 1 Turbine Building HVAC M-12GE019.4-4 2 Turbine Building HVAC M-12GE029.4-4 3 Turbine Building HVAC M-12GE039.4-4 4 Turbine Building HVAC M-12GE049.4-5 1 Radwaste Building HVAC M-12GH019.4-5 2 Radwaste Building HVAC M-12GH029.4-6 1 Containment Cooling System M-12GN019.4-6 2 Containment Cooling System M-12GN029.4-6 3 Containment Atmospheric Control System M-12GR019.4-6 4 Containment Purge Systems HVAC M-12GT019.4-7 0 Diesel Generators Building HVAC M-12GM019.4-8 0 Essential Service Water Pump House HVAC M-K2GD01 9.4-9 1 Plant Heating System M-12GA019.4-9 2 Plant Heating System M-12GA029.4-10 0 Central Chilled Water System M-12GB019.4-11 0 Waste Water Treatment Facility HVAC M-12VW01Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 8) USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #9.5-1 1 Fire Protection System (site) M-0023 Sheet 1 9.5-1 2 Fire Protection System (site) M-0023 Sheet 2 9.5-1 3 Fire Protection System (site) M-0023 Sheet 3 9.5-1 4 Fire Protection System (site) M-0023 Sheet 4 9.5-2 0 Outdoor Piping, Key Plan and General Notes M-0051 9.5.1-1 1 Fire Protection Turbine Building M-12KC01 9.5.1-1 2 Fire Protection System (power block) M-12KC02 9.5.1-1 3 Fire Protection System (power block) M-12KC039.5.1-1 4 Fire Protection (Halon) System M-12KC049.5.1-1 5 Fire Protection System (power block) M-12KC059.5.1-1 6 Fire Protection (Halon) System M-12KC069.5.1-1 7 Fire Protection (Halon) System M-12KC079.5.1-2 1 Fire Area Delineation el. 1974 10466-A-18019.5.1-2 2 Fire Area Delineation el. 2000 10466-A-18029.5.1-2 3 Fire Area Delineation el. 2026 10466-A-18039.5.1-2 4 Fire Area Delineation el. 2047-6 10466-A-18049.5.2-1 0 Telephone System Riser Diagram E-14QE019.5.2-2 0 Public Address System Riser Diagram E-1L99039.5.3-1 0 Lighting Distribution Riser Diagram E-1L99019.5.4-1 0 Emergency Fuel Oil System M-12JE019.5.5-1 1 Standby Diesel Generator "A" Cooling Water SystemM-12KJ019.5.5-1 2 Standby Diesel Generator "B" Cooling Water SystemM-12KJ049.5.6-1 1 Standby Diesel Generator "A" Intake, Exh., F.0.
to Sections 3.7(B).2 and
and Starting Air System M-12KJ029.5.6-1 2 Standby Diesel Generator "B" Intake, Exh., F.0.
and Starting Air System M-12KJ059.5.7-1 1 Standby Diesel Generator "A" Lube Oil System M-12KJ039.5.7-1 2 Standby Diesel Generator "B" Lube Oil System M-12KJ069.5.9-1 1 Auxiliary Boiler System M-12FA019.5.9-1 2 Auxiliary Steam System M-12FB019.5.9-1 3 Auxiliary Steam System M-12FB029.5.9-1 4 Auxiliary Steam Chemical Addition System M-12FE019.5.10-1 1 Breathing Air System M-12KB019.5.10-1 2 Breathing Air System M-12KB029.5.10-1 3 Breathing Air System M-12KB03Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 9) USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #10.2-1 1 Main Turbine M-12AC01 10.2-1 2 Main Turbine M-12AC02 10.2-1 3 Main Turbine M-12AC03 10.2-1 4 Main Turbine M-12AC04 10.2-1 5 Lube Oil Storage, Transfer and Purification System M-12CF01 10.2-1 6 Lube Oil Storage, Transfer and Purification System M-12CF02 10.2-1 7 Main Turbine Control Oil System M-12CH01 10.2-1 8 Main Turbine Control Oil System M-12CH02 10.3-1 1 Main Steam System M-12AB01 10.3-1 2 Main Steam System M-12AB02 10.3-1 3 Main Steam System M-12AB03 10.4-1 1 Circulating Water & Waterbox Drains System M-12DA0110.4-12Circulating Water System M-002110.4-13Circulating Water Waterbox Venting System M-12DA0210.4-14Circulating Water Screenhouse Plans M-000410.4-15Circulating Water Screenhouse - Sections M-000510.4-21Condensate System M-12AD0110.4-22Condensate System M-12AD0210.4-23Condensate System M-12AD0310.4-24Condensate System M-12AD0410.4-25Condensate System M-12AD0510.4-26Condensate System M-12AD0610.4-30Condenser Air Removal M-12CG0110.4-40Steam Seal System M-12CA0110.4-51Condensate Demineralizer System M-12AK0110.4-52Condensate Demineralizer System M-12AK0210.4-53Condensate Demineralizer System M-12AK0310.4-61Feedwater System M-12AE0110.4-62Feedwater System M-12AE0210.4-63Feedwater Heater Extraction Drains & Vents M-12AF0110.4-64Feedwater Heater Extraction Drains & Vents M-12AF0210.4-65Feedwater Heater Extraction Drains & Vents M-12AF0310.4-66Feedwater Heater Extraction Drains & Vents M-12AF0410.4-67Auxiliary Turbines S.G.F.P. Turbine A M-12FC0310.4-68Auxiliary Turbines S.G.F.P. Turbine "B" M-12FC0410.4-71Condensate Chemical Addition System M-12AQ0110.4-72Feedwater Chemical Addition System M-12AQ0210.4-81Steam Generator Blowdown System M-12BM0110.4-82Steam Generator Blowdown System M-12BM0210.4-83Steam Generator Blowdown System M-12BM0310.4-84Steam Generator Blowdown System M-12BM0410.4-85Steam Generator Blowdown System M-12BM05Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 10) USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #10.4-90Auxiliary Feedwater System M-12AL0110.4-100Auxiliary Turbines Auxiliary Feedwater Pump TurbineM-12FC0210.4-121Secondary Liquid Waste System M-12HF0110.4-122Secondary Liquid Waste System M-12HF0210.4-123Secondary Liquid Waste System M-12HF0310.4-124Secondary Liquid Waste System M-12HF0411.2-11Liquid Radwaste System M-12HB0111.2-12Liquid Radwaste System M-12HB0211.2-13Liquid Radwaste System M-12HB0311.2-14Liquid Radwaste System M-12HB0411.3-11Gaseous Radwaste System M-12HA0111.3-12Gaseous Radwaste System M-12HA0211.3-13Gaseous Radwaste System M-12HA0311.4-11Solid Radwaste System M-12HC0111.4-12Solid Radwaste System M-12HC0211.4-13Solid Radwaste System M-12HC0311.4-14Solid Radwaste System M-12HC0412.3-21Radiation Zones for Normal Operation El. 1974 10466-A-170112.3-22Radiation Zones for Normal Operation El. 2000 10466-A-170212.3-23Radiation Zones for Normal Operation El. 2026 10466-A-170312.3-24Radiation Zones for Normal Operation El. 2047-6 10466-A-170412.3-25Radiation Zones for Normal Operation Turbine Bldg El. 1983 & 2000 10466-A-170512.3-26Radiation Zones for Normal Operation Turbine Bldg El. 2033 & 2065 10466-A-170612.3-40Decontamination System M-12HD0118.2-150Nuclear Sampling System M-12SJ04Rev. 17 WOLF CREEK Table 1.6-4 (sheet 1) Incorporated by Reference USAR Section/Controlled Document Cross-Reference  Section Title Document # Table 3.11(B)-1 Plant Environmental Normal Conditions  EQSD-I, Attachment A and B Table 3.11(B)-2 Environmental Qualification Parameters for SNUPPS NUREG-0588 (LOCA, MSLB and HELB) EQSD-I, Attachment A and B Table 3.11(B)-3 Identification of Safety-Related Equipment and Components: Equipment Qualification  EQSD-I, Attachment A and B; EQSD-II, Tables 1 and 2 Table 3.11(B)-4 Containment Worst Case Radiation Levels (MRADs) EQSD-I, Attachment A  Table3.11(B)-5 Containment Spray Requirements  EQSD-I, Attachment A  Table 3.11(B)-8 Exemptions from NUREG-0588 Qualification  EQSD-I, Attachment C  Table 3.11(B)-10 Equipment Added for NUREG-0737 EQSD-II, Tables 1 and 2 Figures 3.11(B)-1 through 3.11(B)-49 Figures EQSD-I, Attachment A  Section 9.5.1.2.2.3* Fire Barriers *Note: Only portions of this section have been relocated and Incorporated by Reference M-663-00017A Appendix 9.5B.1 Fire Hazard Analyses - Introduction E-1F9905 Table 9.5B-1 Minimum Equipment Required for Safe Shutdown XX-E-013 Appendix 9.5B.2 Fire Hazard Analyses - Assumption on Plant Conditions E-1F9905 Table 9.5B-2 Equipment Required for Shutdown following a Fire XX-E-013 Appendix 9.5B.3 Fire Hazard Analyses - Fire Effects on Electrical Equipment and Safe Shutdown Information E-1F9905        Rev. 28 WOLF CREEK Table 1.6-4 (sheet 2) Incorporated by Reference USAR Section/Controlled Document Cross-Reference  Section Title Document # Table 9.5B-3 Safety-Related Fire Areas Containing Rooms Without Detection Provisions E-1F9905, Attachment A Appendix 9.5B.4 Fire Hazard Analyses - General Information on Design Features E-1F9905, or XX-E-013, or E-1F9900 Table 9.5B-4 Safety-Related Fire Areas Outside Containment With Area Suppression Coverage E-1F9905 Attachment A Appendix 9.5B.5 Fire Hazard Analyses - Combustible Loadings and Flame Spread E-1F9905 Table 9.5B-5 Non-Safety Related Site Structures E-1F9905, Attachment C Appendix 9.5B.6 Fire Hazard Analyses - Fire Hazard Review Methodology E-1F9905, or XX-E-013 Appendix 9.5B.7 Fire Hazard Analyses - Power Block Fire Hazards Analysis E-1F9905 Appendix 9.5B.8 Fire Hazard Analyses - Site Specific Fire Hazards Analysis E-1F9905 Appendix 9.5B Design Basis Document for OFN AP-017, Control Room Evacuation E-1F9915 Chapter 16.0 Technical Requirements Manual Technical Requirements Manual Chapter 17.2 Quality Assurance During the Operation Phase Quality Program Manual 


Rev. 29 WOLF CREEK 1.7 DRAWINGS AND OTHER DETAILED INFORMATION  The engineering drawings listed in Tables 1.7-1, 1.7-2 and 1.7-3 reflect the detailed design configuration as described in USAR text and tables. The controlled drawings that were removed from the USAR in Revision 17 and incorporated by reference are listed in Table 1.6-3 1.7.1  Electrical, Instrumentation and Control Drawings Table 1.7-1 contains a list of electrical, instrumentation, and control drawings that are considered to be necessary to evaluate the safety-related features pertaining to the power block.
3.7(N).2.
1.7.2  Piping and Instrumentation Diagrams  Table 1.7-2 contains a list of each piping and instrumentation diagram and the corresponding USAR figure number as it appears at the end of the respective text section. The P&ID legend, Figure 1.1-1, provides an explanation of symbols and characters used in these USAR figures.
3.7.3   4.B.11    Procedures for Seismic    The recommendations of (Par. II)          Subsystem Analysis        this SRP are met. Refer to Sections 3.7(B).3 and 3.7(N).3 3.8.1   4.B.12    Design and Construction    The design of the con-(Par. II)          of Concrete Containments  tainment structure is
1.7.3  Miscellaneous Controlled Drawings Table 1.7-3 contains a list of other controlled drawings utilized as figures in the USAR and the corresponding USAR figure number as it appears at the end of the respective text section.  


1.7.4 Long-Term Temporary Modifications
described in Section


Scaffolding materials being used in support of plant Operations, regardless of duration, are utilized under the requirements specified within the Plant Scaffolding Program. This material includes items such as; camera poles, rigging frames, and barricades, that may be installed within all Power Block structures. Table 1.7-4 contains a list of erected scaffold that is expected to be in place throughout the next required USAR update cycle. 
3.8.1. The load combi-


1.7-1    Rev. 23 WOLF CREEK TABLE 1.7-1  ELECTRICAL, INSTRUMENTATION, AND CONTROL DRAWINGS  DRAWING NUMBER  TITLE        E-K1001  SINGLE LINE DIAGRAM ESSENTIAL  SERVICE WATER SYSTEM  E-11NB01  LOWER MED VOLTAGE SYS CLASS 1E  4.16 KV SINGLE LN  E-11NB02  LOWER MED VOLTAGE SYS CLASS 1E  4.16 KV SINGLE LN  E-11NE01  STBY GENERATOR CLASS 1E  4.16 KV S/L  E-11NG01  CLASS 1E LOW VOLTAGE 480V  SYS S/L M & R  E-K1NG01  LOW VOLTAGE SYSTEM CLASS 1E 480V  SINGLE LINE METER & RELAY DIAGRAM  E-11NG02  CLASS 1E LOW VOLTAGE 480V  SYS S/L M & R  E-11NG20  LOW VOLTAGE SYSTEM CLASS 1E MOTOR  CONTROL CENTERS SUMMARY  E-11NK01  CLASS 1E 125 DC SYS S/L M & R  E-11NK02  CLASS 1E 125 DC SYS S/L M & R  E-11PA01  HIGH MED VOLT SYS 13.8 KV  M & R  E-11PA02  HIGH MED VOLT SYS 13.8 KV  M & K  E-11PG06  NON-CLASS 1E LOW VOLTAGE  SYS 480V S/L M & R  E-11PN01  NON-CLASS 1E INSTRUMENT  AC POWER  E-12KJ01  STANDBY GENERATOR SYSTEM  E-K2NG01  LOGIC DIAGRAM - 4.16 KV MOTOR  CONTROL CENTER TRANSFORMER FEEDER BREAKERS (VOID)  E-K2NG02  LOGIC DIAGRAM - 480V MOTOR              CONTROL CENTER TRANSFORMER FEEDER BREAKERS (VOID)  E-K2NG03  LOGIC DIAGRAM - 480V SYSTEM NOTES      & REFERENCES  E-13AB01  MAINSTEAM SUPPLY VLV TO TURB            DR AUX FEEDW PUMP  E-13AB03A  MAIN STEAM LINE DRAIN VLV  E-13AB03B  MAIN STEAM LINE DRAIN VLV  E-13AB06A  MAIN STM ATMOS VENT VLV POS  INT LIGHT       
nations used meet or


Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 2) DRAWING NUMBER  TITLE        E-13AB06B  MAIN STM ATMOS VENT VLV POS  INT LIGHT  E-13AB08  MN STM COOLDOWN VLV  E-13AB11A  SCHEMAT DIAG MAIN DUMP VLVS  E-13AB11B  SCHEMAT DIAG MAIN STM DUMP VLV E-13AB11C  SCHEMAT DIAG MAIN STM DUMP VLV E-13AB17  MN STM BYPASS VAL TO AUX FEEDWTR  PUMP TURB  E-13AB23A  SCHEMAT DIAG MAIN STM BYPASS VLVS E-13AB23B  SCHEMAT DIAG MAIN STM BYPASS VLVS E-13AB26  SCHEMATIC DIAGRAM MAIN STEAM  ISO VALVES ALL CLOSE - SEPARATION GROUP 1  E-13AB27  SCHEMATIC DIAGRAM MAIN STEAM  ISO VALVES ALL CLOSE - SEPARATION GROUP 4  E-13AB28  SCHEMATIC DIAGRAM MAIN STEAM  ISO VALVES CONTROL PART 1  E-13AB29  SCHEMATIC DIAGRAM MAIN STEAM  ISO VALVES CONTROL PART 2  E-13AB30  SCHEMATIC DIAGRAM MAIN STEAM AND  FEEDWATER ISO VLV MISCELLANEOUS CIRCUITS  E-13AB31  STEAM DUMP CONTROL & BYPASS  INDICATION  E-13AC38  MAIN TURB SYS WITH NSSS INTERFACE E-13AE05  SCH DIAG STEAM GENER CHEMICAL INJECT  E-13AE06  SCH DIAG MAIN FEEDWTR CONTR VALVES E-13AE07  SCH DIAG MAIN FEEDWTR CONTR VALVES  E-13AE14  SCHEMATIC DIAGRAM FEEDWATER ISOLATION  VALVES ALL CLOSE - SEPARATION GROUP 1  E-13AE15  SCHEMATIC DIAGRAM FEEDWATER ISOLATION VALVES ALL CLOSE - SEPARATION GROUP 4  E-13AE16  SCHEMATIC DIAGRAM FEEDWATER  ISO VALVES CONTROL PART 1  E-13AE17  SCHEMATIC DIAGRAM FEEDWATER  ISO VALVES CONTROL PART 2  E-13AE18  BYPASS FEEDWATER CONTROL VALVES E-13AL00  AUX FEEDWATER SCHEMATIC INDEX  SHEET  E-13AL01A  AUX FEEDWATER SYSTEM MOTOR  DRIVEN PUMP  E-13AL01B  AUX FEEDWATER SYSTEM MOTOR  DRIVEN PUMP  E-13AL02A  AUX FEEDWATER SYSTEM MOTOR  OPERATED VALVES       
exceed ACI 359/SRP criteria.
3.8.2    4.B.13    Design and Construction    The recommendations of (Par. II)         of Steel Containments      this SRP are not applic-


Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 3) DRAWING NUMBER  TITLE        E-13AL02B  AUX FEEDWATER SYSTEM MOTOR  OPERATED VALVES  E-13AL02C  SCHEMATIC DIAGRAM MOTOR OPERATED  VALVE ALHV0036  E-13AL03A  AUX FEEDWATER PUMPS DISCH  CONTR MOVS  E-13AL03B  AUX FEEDWATER PUMPS DISCH  CONTROL MOVS  E-13AL04A  SUPPLY FROM ESS SERV WTR SYS  E-13AL04B  SUPPLY FROM ESS SERV WTR SYS  E-13AL05A  AUX FDWR PUMPS DISCH CONTR AIR  OP VALVES  E-13AL05B  AUX FDWR PUMPS DISCH CONTR AIR  OP VALVES  E-13AL06  SCHEMATIC DIAGRAM  INSTRUMENTATION & ALARMS  E-13AL07A  SCHEMATIC DIAGRAM  INSTRUMENTATION & ALARMS  E-13AL07B  SCHEMATIC DIAGRAM  INSTRUMENTATION & ALARMS  E-13AL08  SCHEMATIC DIAGRAM  INSTRUMENTATION & ALARMS  E-13AL09  SCHEMATIC DIAGRAM MISCELLANEOUS  CIRCUITS  E-13AL10  SCHEMATIC DIAGRAM AUX FDWTR  SYS  E-13AP04  SCHEMATIC DIAGRAM CONDENSATE  SYSTEM  E-13BB03  S.D. RCP THERM BARRIER CCW  ISO VLVS  E-13BB04  S.D. SEAL WTR INJECT ISO VALVE E-13BB11 S.D. PRZR RELIEF TANK VENT TO  WPS ISO VLV  E-13BB12A  S.D. RHR LOOP INLET ISO VALVE  E-13BB12B  S.D. RHR LOOP INLET ISO VALVE  E-13BB13  S.D. PRZR RELIEF TK VENT TO  WPRS ISO VLV  E-13BB27  SCH DIAG REACTOR COOLANT PUMP  MOTORS  E-13BB28  SCHEMATIC DIAGRAM REACTOR  COOLANT PUMP  E-13BB30  SCHEMATIC DIAGRAM REACTOR  COOLANT PUMP  E-13BB31  SCHEMATIC DIAGRAM REACTOR  COOLANT PUMP  E-13BB33  SCHEMATIC DIAGRAM  E-13BB34    SCHEMATIC DIAGRAM  E-13BB35    SCHEMATIC DIAGRAM REACTOR  COOLANT PUMP  E-13BB36  SCHEMATIC DIAGRAM REACTOR  COOLANT PUMP   
able to WCGS.
3.8.3    4.B.14    Structural Design Cri-    The design meets or ex-(Par. II)         teria for Category I      ceeds the load combina-Structures Inside Con-     tions of ACI 359/SRP tainment                  criteria. Refer to Sections 3.8.3 and 5.4, respectively, for dis-cussion of the Bechtel and Westinghouse com-ponent supports.
3.8.4    4.B.15    Structural Design Cri-     The design meets or ex-(Par. II)          teria for Other Seismic    ceeds the load combina-Category I Structures      tions of ACI 359/SRP criteria. Refer to Section 3.8.4.
Rev. 0 WOLF CREEK TABLE 1.9-3 (Sheet 2)
SRP      RRRC Section Category        Title                        Remarks 3.8.5    4.B.16    Structural Design Cri-       The design meets or exceeds (Par. II)          teria for Foundations        the load combinations of ACI 359/SRP criteria.
Refer to Section 3.8.5.


Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 4)  DRAWING NUMBER  TITLE        E-13BB37  SCHEMATIC DIAGRAM REACTOR  COOLANT PUMP  E-13BB38  SCHEMATIC DIAGRAM REACTOR  COOLANT PUMP  E-13BB39  SCHEMATIC DIAGRAM REACTOR  COOLANT PUMP  E-13BB40  SCHEMATIC DIAGRAM REACTOR  COOLANT PUMP  E-13BG01  CENTRIFUGAL CHARGING PUMPS  SCHEMATIC DIAGRAM  E-13BG11A  CHARGING PUMP TO REACTOR  COOLANT & MINIFLOW ISO  E-13BG11B  CHARGING PUMP TO REACTOR  COOLANT & MINIFLOW ISO  E-13BG11C  SCHEMATIC DIAGRAM CHARGING PUMP TO  REACTOR COOLANT AND MINIFLOW ISOLATION VALVE BGHV8111  E-13BG12  VOLUME CONT TANK OUTLET ISO  VLVS SCH DIAG  E-13BG12A  VOLUME CONTROL TANK OUTLET  ISO VALVE  E-13BG13  BORIC ACID FILTER TO CHG PUMP  VLV  E-13BG17  LETDOWN LINE ISO VLV SCH DIAG  E-13BG24  REACTOR COOLANT PUMP SEAL  WATER ISO VLV SCH DIAG  E-13BG27  BORIC ACID TRANSFER PUMPS  E-13BG36  LETDOWN CONTAINMENT ISO VLV  SCH DIAG  E-13BG38  REACTOR COOLANT PUMP SEAL  WATER ISO VLV SCH DIAG  E-13BG48  EXCESS LETDOWN LINE ISO VLV  SCH DIAG  E-13BG52  RCP SEAL INJECTION FLOW  THROTTLING VALVES  E-13BL01  PRZR RELIEF TANK REACTOR TO  MAKEUP WTR SUPPLY  E-13BM01    STEAM GENERATOR BLOWDOWN  SCHEMATIC  E-13BM02    STEAM GENERATOR BLOWDOWN  SCHEMATIC  E-13BM03    STEAM GENERATOR BLOWDOWN  SCHEMATIC  E-13BM06A    STEAM GENERATOR BLOWDOWN  SCHEMATIC  E-13BM06B    STEAM GENERATOR BLOWDOWN  SCHEMATIC  E-13BM06C    STEAM GENERATOR BLOWDOWN  SCHEMATIC  E-13BN01    REFUELG WTR STRG TK TO  CHARGE PUMP MOV  E-13BN01A  SCHEMATIC DIAGRAM REFUELING WATER  STORAGE TANK TO CHARGING PUMP MOV BNLCV0112E   
The safety factors for sliding are discussed in


Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 5)  DRAWING NUMBER  TITLE        E-13BN02  REFUELG WTR STRG TK TO  SFPCS PUMP MOV  E-13BN03  REFUELG WTR STRG TK RHR  PUMP MOV  E-13BN04  RWST TO CONTMET SPRAY PUMP MOV E-13BN06  RWST TO SAFETY INJECT PUMP VLV E-13BN08  SIS PUMP MINIFLW ISO VLV  E-13BN10  SCHEMATIC DIAGRAM  E-13EC01  FUEL POOL COOLING PUMPS  SCHEMATIC DIAGRAM  E-13EC02  SCHEM DIAG CCW DISCHARGE  VLVS FROM FUEL POOL CLG  E-13EF01  ESW TO AIR COMP ISOL VALVES  SCHEMATIC DIAGRAM  E-K3EF01  SCHEMATIC DIAGRAM - ESW PUMPS  E-13EF02  SCHEMATIC DIAG ESW TO SW SYS  ISOL VLVS  E-K3EF02  SCHEMATIC DIAGRAM - TRAVELING  WATER SCREENS  E-13EF03  SCHEMATIC DIAG ESW TO SW SYS  ISOL VLVS  E-K3EF03  SCHEMATIC DIAGRAM - SCREEN  WASH WATER VALVE  E-13EF04  SCHEM DIAG ESW FROM COMPONENT  COOLG WTR HEAT EXC  E-K3EF04  SCHEMATIC DIAGRAM - ESW SELF-  CLEANING STRAINER  E-13EF05  SCHEMATIC DIAGRAM ESW TO  COMPONENT COOLG WTR HEA  E-13EF05A  SCHEMATIC DIAGRAM ESW TO COMPONENT  COOLING WATER HEAT EXCHANGER ISOLATION VALVE EFHV0052  E-K3EF05  SCHEMATIC DIAGRAM - SELF-CLEANING  STRAINER TRASH VALVE  E-13EF06  SCHEMATIC DIAG ESW TO ULTIM  HEAT SINK ISOL VALVE  E-K3EF06  SCHEMATIC DIAGRAM - ESW PUMP  DISCHARGE AIR RELEASE VALVE  E-13EF07  ESWS CONTAIN COOLER VALVE  E-13EF07A  SCHEMATIC DIAGRAM ESW TO CONTAINMENT  AIR COOLERS ISOLATION VALVE EFHV0032  E-K3EF07  SCHEMATIC DIAGRAM - SYSTEM  BACKPRESSURE CONTROL VALVE  E-13EF08  SCHEM DIAG ESW FROM CONTAIN-  MENT AIR COOLERS ISOL  E-K3EF08  SCHEMATIC DIAGRAM - MISCELLANEOUS  CIRCUITS  E-13EF08A  SCHEMATIC DIAGRAM ESW TO CONTAINMENT  AIR COOLERS ISOLATION VALVE EFHV0050  E-13EF09  SCHEM DIAG ESW TO/FROM CONTAIN  AIR COOL ISOL VLV  E-13EF09A  ESW TO/FROM CONTAIN AIR COOLERS  ISOLATION VALVES  E-K3EF09  SCHEMATIC DIAGRAM - STATUS PANEL  CIRCUITS  E-13EF10  SCHEM DIAG ESW FROM CONTAIN  AIR COOLERS ISOL VLV              Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 6)  DRAWING NUMBER  TITLE        E-K3EF10  SCHEMATIC DIAGRAM - MISCELLANEOUS  CIRCUITS  E-13EG01A  CCW PUMPS A & B   E-13EG01B  CCW PUMPS C & D  E-13EG01C  SCHEMATIC DIAGRAM COMPONENT  COOLING WATER  E-13EG01D  SCHEMATIC DIAGRAM  E-13EG03  CCW SURGE TANK VENT  E-13EG04  ESW MAKEUP TO CCW SYS  E-13EG05A  CCWS SUPPLY RETURN FROM NUCLEAR  AUX COMPONENT  E-13EG05B  CCWS SUPPLY TO NUCLEAR AUX  COMPONENT  E-13EG05C  SCHEMATIC DIAGRAM COMPONENT COOLING  WATER RETURN FROM NUCLEAR AUX.
Section 3.8.5.5.
COMPONENT EGHV0015  E-13EG05D  SCHEMATIC DIAGRAM COMPONENT COOLING  WATER SUPPLY FROM NUCLEAR AUX.
3.7     4.B.17    Seismic Design Require-     The recommendations of 11.2               ments for Radwaste Systems   this SRP are met as 11.3              and their Housing Struc-     described in Appendix 11.4              tures (SRP Section 11.2,    3A in the response BTP ETSB 11-1, Par. B.v.)    to Regulatory Guide
COMPONENT EGHV0054  E-13EG06  CCW TO CONTAINMENT ISO VALVES  E-13EG07  CCW SUPPLY TO RHR HEAT  EXCHANGER  E-13EG07A  COMPONENT COOLING WATER SUPPLY TO RHR  HEAT EXCHANGER EGHV0102  E-13EG08  CCW SUPPLY RETURN FROM RADWASTE  BLDG  E-13EG09  CCW CONTAINMENT ISO VALVES  E-13EG10  CONTAINMENT ISO VALVE RETURN  FROM THERM BAR COOL  E-13EG16  CCW HEAT EXCHANGER OUTLET TEMP  CONT VALVES  E-13EG17  SCHEMATIC DIAGRAM ISOMETRIC  VALVES  E-13EG18  SCHEMATIC DIAGRAM ISOMETRIC  VALVES  E-13EG19  SCHEMATIC DIAGRAM ISOMETRIC  VALVES  E-13EG20  SCHEMATIC DIAGRAM ISOMETRIC  VALVES  E-13EJ01  RESIDUAL HEAT REMOVAL PUMPS  1 & 2 SCHEM DIAGRAM   E-13EJ02  NUCLEAR SAMPLE LINE VALVES  SCHEMATIC DIAGRAM  E-13EJ03  RHR CROSS CONNECT VALVES  SCHEMATIC DIAGRAM  E-13EJ04A  RHR PUMP TO CHG PUMP VLV SCH  DIA  E-13EJ04B  RHR PUMP TO CHARGING PUMP  VALVE  E-13EJ05A  RHR PUMP TO CHG PUMP VLV  SCH DIAG  E-13EJ05B  RHR LOOP INLET ISO VALVE  E-13EJ06A  RHR PUMP TO CHG PUMP VLV SCH  DIAG  E-13EJ06B  SUMP TO RESIDUAL HEAT REMOVAL  PUMP Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 7)  DRAWING NUMBER  TITLE        E-13EJ07  RESIDUAL HEAT REMOV HOT & COLD  LEG TEST LINE  E-13EJ08  RESIDUAL HEAT REMOV MINI FLOW  VALVES  E-13EJ08A  SCHEMATIC DIAGRAM RESIDUAL HEAT  REMOVAL PUMP MINIFLOW VALVE EJFCV0611  E-13EJ09A  RHR COLD & HOT LEG VALVES  E-13EJ09B  RHR COLD & HOT LEG VALVES  E-13EJ09C  SCHEMATIC DIAGRAM RHR TO COLD AND HOT  LEG VALVES EJHV8809B AND EJHV8840  E-13EJ13  SCHEMATIC DIAGRAM  E-13EJ14  SCHEMATIC DIAGRAM  E-13EM01  HIGH HEAD SAFETY INJECTION  SCHEMATIC  E-13EM02  BORON INJ TANK DISCH & INLET  ISOLA VALVES  E-13EM02A  SCHEMATIC DIAGRAM BORON INJECTION  TANK DISCHARGE & INLET ISOLATION VALVE EMHV8801B  E-13EM02B  SCHEMATIC DIAGRAM BORON INJECTION  TANK DISCHARGE ISOLATION VALVE EMHV8803B  E-13EM02C  SCHEMATIC DIAGRAM BORON INJECTION TANK DISCHARGE AND INLET ISOLATION VALVE EMHV8801A  E-13EM03  SIS MINI FLOW ISOLATION VALVES E-13EM04  SAFETY INJ & CHARGING PUMPS HOT  & COLD LEG TEST  E-13EM04A  SCHEMATIC DIAGRAM CHARGING  PUMPS COLD LEG  E-13EM08  SUCTION HEADER & SAFETY INJ  CROSS CONNECTION  E-13EM09  SAFETY INJECTION PUMP SUCTION  VALVES  E-13EM11  SAFETY INJECTION PUMP TO HOT  LEG MOV  E-13EM12  ACCUMULATOR FILL LINE & TEST  HEADER LINE  E-13EM13A  SAFETY INJ PUMP TO HOT & COLD  LEGS  E-13EM13B  SAFETY INJ PUMP TO HOT & COLD  LEGS  E-13EM17  SCHEMATIC DIAGRAM  E-13EN01  CONTAINMENT SPRAY SYS SCHEMAT  DIAG  E-13EN02  CONTAINMENT SPRAY PUMP SUCT  SCHEMATIC DIAGRAM  E-13EN03  CONT SPRAY P.P ISOLATION SCH  DIAG  E-13EN04  CONT SPRAY PP ISO DIAG  E-13EP01  ACCUMULATOR N2 SUPP ISO VLV  E-13EP02A  ACCUMULATOR ISO VLV  E-13EP02B  ACCUMULATOR ISO VLV  E-13EP07  SD ACCUMULATOR ISO VLV  E-13EP09  SAFETY DRY ACCUMULATOR VENT  VLVS                  Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 8) DRAWING NUMBER  TITLE        E-13FC21  SCH DIAG SGFP  E-13FC23  SCH DIAG AUX WATER TURB TRIP  & THROTTLE VALVE  E-13FC24  SCH DIAG AUX WATER TURB TRIP  & THROTTLE VALVE  E-13FC25  SCH DIAG AUX WATER TURB TRIP  & THROTTLE VALVE  E-13FC26  SCH DIAG AUX WATER TURB TRIP  & THROTTLE VALVE  E-13FC27  SGFPT ISOLATION INPUT TO  ESFAS  E-K3GD01  SCHEMATIC DIAGRAM - ESW PUMP  ROOM SUPPLY FANS  E-K3GD02  SCHEMATIC DIAGRAM - ESW PUMP  ROOM UNIT HEATERS  E-K3GD03  SCHEMATIC DIAGRAM - ESW PUMP  ROOM EXHAUST VALVE  E-K3GD04  SCHEMATIC DIAGRAM - ESW PUMP  ROOM MISCELLANEOUS CIRCUITS  E-K3GD05  SCHEMATIC DIAGRAM - ESW VALVE PIT  UNIT HEATER  E-13GE18  COND AIR REMOVAL FILTER SYS  DAMPERS  E-13GF01  AUX FDWTR PUMP RM COOLS FANS  E-13GF07  MAIN STREAM ENCL BLDG EXHAUST  FANS & DAMPERS  E-13GF08  TENDON GALLERY SUPPLY/RETURN  ISOL DAMPERS  E-13GF13  MAIN STEAM ENCLOSURE BLDG  MISC DAMPERS  E-13GF14  MISC MOTOR SPACE HEATERS  E-13GG01  EMERGING EXHAUST FAN & DIS-  CHARGE DAMPERS  E-13GG02  SPENT FUEL PUMP ROOM COOLERS  E-13GG03  EMERGENCY EXHAUST HTG COILS  E-13GG08  FUEL BLDG ISOL DAMPERS OUTSIDE  AIR SUPPLY  E-13GG09  FUEL BLDG EXHAUST TO EMERG FILT  ADSORB UNITS ISO  E-13GG10  EMERG FILTER ADSORB UNITS AUX  BLDG INTAKE ISOL  E-13GG11  SPENT FUEL POOL DISCHARGE TO  AUX BLDG DAMPER  E-13GG12  FUEL BLDG INSTRUMENTATION  E-13GG15  EMERG EXHAUST CROSS CONNECTION  DAMPER  E-13GG17  SPENT FUEL POOL NORMAL/EMRGNCY  EXHAUST RADIOACTIVITY SAMPLE    


Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 9)  DRAWING NUMBER  TITLE        E-13GG18  MANUAL INITIATION FUEL BLDG  ISOL SIGNAL  E-13GK01A  SCHEMATIC DIAG CONTROL ROOM  FAN DAMPER  E-13GK01B  CONTROL ROOM HVAC SYSTEM  E-13GK02A  CONTROL ROOM A/C UNIT FAN  E-13GK02B  CONTROL ROOM A/C UNIT FAN  E-13GK02C  CONTROL ROOM A/C UNIT SUP  E-13GK03A  FIRE ISOLATION DAMPERS  E-13GK03B  MISCELLANEOUS DAMPERS  E-13GK07  MISCELLANEOUS DAMPERS  E-13GK09A  ISO DAMPERS  E-13GK09B  ISO DAMPERS  E-13GK10A  CONTROL ROOM PRESSURIZATION  FAN & SUP DAMPERS  E-13GK10B  CONTROL ROOM PRESSURIZATION FAN    & SUPPLY DAMPERS  E-13GK11  SCH DIAG CONTROL ROOM  E-13GK13  CLASS IE ELE A/C UNIT  E-13GK13A  SCHEMATIC DIAGRAM  E-13GK17  SCH DIAGRAM ISO DAMPERS  E-13GK19  SCH DIAGRAM AIR RETURN CONT      RM ASB UNITS  E-13GK23  SCH DIAG FIRE ISO DAMPERS  E-13GK25  SCH DIAGRAM MISCELLANEOUS ALARMS E-13GK28  CONTROL ROOM HVAC SYSTEM  E-13GK30A  ISOLATION DAMPERS  E-13GK30B  ISOLATION DAMPERS  E-13GK31  FIRE SIGN ISOMETRIC  E-13GL02  AUX BLDG SUPPLY AIR UNIT SUPPLY      DAMPERS E-13GL05  PUMP ROOM COOLERS  E-13GL06  PUMP ROOM COOLERS  E-13GL12  PENETRATION ROOM COOLERS  E-13GL12A  PENETRATION ROOM COOLER  E-13GL14  SCH DIAGRAM ISOL DAMPERS  E-13GL14A  SCHEMATIC DIAGRAM  E-13GL16  FUEL BLDG NORMAL EXHAUST ISOL      DAMPERS  E-13GL27  CCW PUMP ROOM EXHAUST DAMP  E-13GL30  ISOLATION DAMPERS  E-13GM01  DIESEL GENERATOR VENTILATION      SUPPLY FANS SCHEM  E-13GM02  DIESEL GENERATOR SUPPLY DAMPER      CONTROL & MISC AL  E-13GM04  DIESEL GENERATOR BLDG EXHAUST      DAMPERS SCHEMATIC  E-13GM04A  SCHEMATIC DIAGRAM   
1.143. Refer to Chapter


Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 10)  DRAWING NUMBER  TITLE        E-13GN01  HYDROGEN MIXING FANS  E-13GN02  CONTAINMENT COOLER FANS  E-13GN02A  SCHEMATIC DIAGRAM MISC FAN     SPACE HEATER  E-13GN03  CRDM COOLING FANS & DISCHARGE    DAMPERS  E-13GN09  MISC FAN SPACE HTRS  E-13GS01A  SCHEMATIC DIAGRAM  E-13GS01B  SCHEMATIC DIAGRAM  E-13GS02A  SCHEMATIC DIAGRAM  E-13GS02B  SCHEMATIC DIAGRAM  E-13GS03  SCHEMATIC DIAG  E-13GS04  SCHEMATIC DIAG  E-13GS05  SCHEMATIC DIAG  E-13GS06  SCHEMATIC DIAG  E-13GS07  SCHEMATIC DIAG  E-13GS10  SCHEMATIC DIAGRAM  E-13GS11  SCHEMATIC DIAGRAM  E-13GS12  SCHEMATIC DIAGRAM  E-13GS13  SCHEMATIC DIAGRAM  E-13GS14  SCHEMATIC DIAGRAM  E-13GT03  CONTAINMENT PURGE SYSTEM    SCHEMATIC  E-13GT04  CONTAINMENT PURGE SYSTEM    SCHEMATIC  E-13GT05  MINI PURGE FAN SCHEMATIC  E-13GT06  SCH DIAGRAM CON PUR SUP EX DM  E-13GT13  CTMT PURGE EXHAUST SMPL VLVS  E-13HB02  REACTOR COOLANT DRAIN TK PUMP    DISC & VENT ISOL VALVE  E-13HB03  REACTOR COOLANT DRAIN TK VENT    ISOL VLV E-13HB19  REACTOR COOLANT DRAIN TK PUMP    DISCH VLV  E-13JE01  EMERGENCY FUEL OIL TRANSFER PUMPS  E-13JE01A  SCHEMATIC DIAGRAM EMERGENCY FUEL OIL TRANSFER PUMP PJE01B E-13JE02  MISC CIRCUITS  E-13JE03  FIRE SIGNAL ISOL RELAY  E-13KA01A  SCH DIA AIR COMPR ISOL CIRCUIT    BREAKER  E-13KA02  SCH DIA COMPRESSED AIR CONTAIN-     MENT ISO VLV  E-13KA04  SCH DIA HYDROGEN CONTR SYST     MAKE-UP AIR VALVE E-13KC08  FIRE PROTECTION SYSTEM ISO VLV   E-13KJ01A  DIESEL GEN KKJ01A ENG CON SCH  E-13KJ01B  DIESEL GEN KKJ01A ENG CON SCH  E-13KJ02  S.D. DIESEL GEN CONTROLS  E-13KJ03A  DG KKJ01B ENG CON SCH   
11.0. Section 3.8.6 des-cribes the seismic deisgn capabilities of the rad-waste building.
3.3.2    4.B.18    Tornado Load Effect Com-    The recommendations of (Par. II.2.d)     binations                    this SRP are met.
Refer to Section 3.3.2.
3.4.2    4.B.19    Dynamic Effects of Wave     The recommendations of (Par II)          Action                      this SRP are met.
Refer to Section 3.4.2.
10.4.7   4.B.20    Water Hammer for Steam      The WCGS steam qenerators (Par. I.2.b)      Generators with Pre-        (Model F) have no pre-


Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 11)  DRAWING NUMBER  TITLE        E-13KJ03B  DG KKJ01B ENG CON SCH  E-13KJ04  DG KKJ01B ANNUN MISC CKTS SCH DIAG E-13KJ05  JKT COOL & LUBE OIL LEVEL CON  E-13KJ06  DIESEL GEN KKJ01B GOV CON  E-13KJ07  DIESEL GEN KKJ01B GOV CON  E-13KJ08  STANDBY JKT COOL HTR  E-13KJ09  STANDBY JKT COOL CIRC PMP  E-13KJ10  STANDBY LUBE OIL HTR  E-13KJ11  SCH DIAGRAM LUBE OIL KEEP WARM PUMP E-13KJ12  SCH DIAG GEN SPACE HEATER  E-13KJ13  ROCKER ARM PRE LUBE PUMP  E-13KJ16  DIESEL GEN RTD'S THERMOCOUPLES  E-13KJ20  STANDBY D/G STARTING AIR SYSTEM  E-13LF07  SUMP DISCHARGE VALVES  E-13LF08  SUMP PUMP DISCHARGE ISOLATION  VALVE  E-13LF09A  REACTOR BLDG SUMP PUMP DISCHARGE ISO VLVS  E-13LF09B  REACTOR BLDG SUMP PUMP DISCHARGE ISO VALVES  E-13NB01  LOWER MED VOLTAGE SYS CLASS IE  4.16 KV 3/L METER  E-13NB02  LOWER MED VOLTAGE SYS CLASS IE  4.16 KV 3/L METER  E-13NB03  LOWER MED VOLTAGE SYS CLASS IE  4.16 KV 3/L METER  E-13NB04  LOWER MED VOLTAGE SYS CLASS IE  4.16 KV 3/L METER  E-13NB05  LOWER MED VOLTAGE SYS CLASS IE  4.16 KV 3/L METER  E-13NB06  LOWER MED VOLTAGE SYS CLASS IE  4.16 KV 3/L METER  E-13NB10  SCHEMAT DIAGRAM FEEDER BRKR  13.8 KV  E-13NB11  SCHEMAT DIAGRAM FEEDER BRKR  13.8 KV  E-13NB12  SCHEMAT DIAGRAM FEEDER BRKR  13.8 KV  E-13NB13  SCHEMAT DIAGRAM FEEDER BRKR  13.8 KV  E-13NB14  SCHEMAT DIAGRAM FEEDER BRKR  13.8 KV  E-13NB15  SCHEMAT DIAGRAM FEEDER BRKR  13.8 KV  E-13NE01  STANDBY GENER. SYS. 3/L M&R  DIAG  E-13NE02  STANDBY GENER. SYS. 3/L M&R  DIAG 
heaters                      heaters. Refer to Sections


Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 12)  DRAWING NUMBER  TITLE        E-13NE10  SCHEMATIC DIAGRAM  E-13NE11  SCHEMATIC DIAGRAM  E-13NE12  STANDBY GEN SYS  E-13NE13  STANDBY GEN SYS  E-13NF01  LOAD SHEDDER AND LOAD SEQUENCER  E-03NG01  CLASS IE LOW VOLTAGE SYSTEM  3/L M&R  E-K3NG01  LOW VOLTAGE SYSTEM CLASS IE    480 V THREE LINE METER & RELAY    DIAGRAM  E-03NG10  CLASS IE 4.16 KV LC XFMR FDR BKRS  E-K3NG10  SCHEMATIC DIAGRAM 4.16 KV    TRANSFORMER FEEDER BREAKERS  E-03NG10A  SCHEMATIC DIAGRAM  E-03NG11  BREAKER CLASS IE LOW VO  E-03NG11A  SCHEMATIC DIAGRAM  E-03NG11B  SCHEMATIC DIAGRAM 480 V    LC MAIN FEEDER  E-03NG12  SCHEMATIC DIAG 480 V LC TIE    BREAKER MISC COMP INPU  E-03NK10  125 VDC & 250 VDC POW SYS    SCHEMATICS  E-03NK11  125 VDC CLASS IE POWER SYSTEM  E-13NN01  CLASS IE INSTRUMENT AC SCHEMATIC  E-13PA02  HIGH MED VOLT SYS 13.8 KV 3/L    M&R  E-13PA05  HIGH MED VOLT SYS MED 3/L M&R  E-03PG05  NON-CLASS IE L.V. SYSTEM 3/L M&R  E-03PG12  NON-CLASS IE L.V. SYSTEM    SCHEMATIC  E-03PG12A  SCHEMATIC DIAGRAM  E-13PG15B  480 V & LC TIE BKR SCHEMATIC  E-03PJ11  250 VDC POW SYS SCHEMAT  E-13PN01  NON CLASS IE INST AC LINE DIAG  E-03QB01  STANDBY LIGHTING SYSTEM PWR FDRS  E-K3QB01  SCHEMATIC DIAGRAM STANDBY    LIGHTING SYSTEM POWER FEEDER  E-03QB02  STANDBY LIGHTING SYSTEM PWR FDRS  E-13SB12A  REACTOR TRIP & SAFETY INJEC    SWITCHES  E-13SB12B  REACTOR TRIP AND SAFETY INJECT    SWITCHES  E-13SB13  SCH DIAG SPRAY ACTUATION &    CTMT ISO SWITCHES  E-03SB14  SCH DIAG SWITCH DEVEL  E-13SB15  CONTROL BOARD SWITCHES 
5.4.2 and 10.4.7.
4.4      4.B.21    Thermal-Hydraulic Sta-       The recommendations of (Par. II.5)        bility                      this SRP are met as dis-


Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 13)  DRAWING NUMBER  TITLE        E-13SB17  SAF INJ (RWST) RESET SWITCH/    SWITCHOVER STATUS INDICATOR  E-13SB19  SCHEMATIC DIAGRAM  E-13SJ01  NUC SAMP SYS CTMT ISO VLVS  E-13SJ02  NUC SAMP SYS SCHEMAT CTMT ISO    VLVS  E-13SJ05  NUCLEAR SAMPLE SYSTEM  E-13SJ06  NUCLEAR SAMPLE SYSTEM  E-13SJ07  NUCLEAR SAMPLE SYSTEM ISO VLVS  E-13SJ09  SCHEMATIC DIAGRAM  E-13SJ11  SCHEMATIC DIAGRAM  E-1R0223  RACEWAY PLAN - STATION SERVICE    AND STARTUP XFMR AREA  E-0R0224  RACEWAY PLAN - ESF TRANSFORMER    AREA E-1R3211  RACEWAY PLAN CONTROL BLDG. AREA 1  E-1R3221  RACEWAY PLAN - COMMUNICATION    CORRIDOR AREA - 2 EL. 1974'-0"    AND EL. 1984'-0"  E-1R3321  RACEWAY PLAN - COMMUNICATION    CORRIDOR AREA - 2 EL. 2000'-0"  E-1R4321  RACEWAY PLAN - TURBINE BUILDING    AREA - 2 EL. 2000'-0"  E-1R4331  RACEWAY PLAN - TURBINE BUILDING    AREA - 3 EL. 2000'-0"  J-020101  SYMBOLS & LEGEND FOR LOGIC    DIAGRAMS  J-02AB01  CONTROL LOGIC DIAGRAM  J-02AB02  MN STM ATMOS VENT VLVS    INDICATING LIGHTS  J-02AB02A  CONTROL LOGIC DIAGRAM  J-02AB02B  CONTROL LOGIC DIAGRAM  J-02AB03  MAIN STEAM SUPPLY TD AUX FEED-    WATER PUMP  J-12AB04  MAIN STEAM LINE DRAIN VALVES  J-02AB10  MAIN STEAM SYSTEM BYPASS VALVE    AUX FDWTR PUMP  J-02AB12  MAIN STEAM STOP VALVE BYPASS    VALVE  J-02AC06  MAIN TURBINE TRIP LOGIC LEGENDS    & NOTES  J-02AC07  MAIN TURBINE TRIP BLOCK DIAGRAM  J-02AC08  MAIN TURBINE TRIP LOGIC DIAGRAM  J-12AC09  CONTROL LOGIC DIAGRAM  J-12AE08  STEAM GENERATOR CHEMICAL    INJEC VALVE J-02AL01  MOTOR DRIVEN AUX FEEDWATER    PUMPS 
cussed in Section


Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 14) DRAWING NUMBER  TITLE        J-02AL01A  CONTROL LOGIC DIAGRAM AUX FW    SYSTEM  J-02AL01B  CONTROL LOGIC DIAGRAM AUX FW    SYSTEM  J-02AL02  AUX FDWTR SYS SUPPLY FROM COND    STORAGE TANK  J-02AL02A  CONTROL LOGIC DIAGRAM  J-02AL03  AUX FEEDWATER PUMPS DISC    CONTROL VALVES  J-12AL04  AUX FEEDWATER PUMPS SUPPLY ESWS    SYSTEM  J-12AL04A  CONTROL LOGIC DIAGRAM  J-12AL05  AUX FEEDWATER SYS PUMPS SUCTION    DISC PRESS ALAR  J-02AL06  CONTROL LOGIC DIAGRAM  J-02AL07  CONTROL LOGIC DIAGRAM  J-02BB01  REACTOR COOLANT SYSTEM RCP    THERM BAR ISO VALVE  J-02BM01  STEAM GENERATOR BLOWDOWN LOGIC    DIAG CTMNT VLVS  J-02BM04  STU BEN BLOWDOWN ISOLATION    VALVES  J-02BN01  BORON REFUELING WATER STORAGE    RWST HEATER VALVE  J-02BN02  STEAM CONTROL VALVE  J-12EC01  FUEL POOL COOLING & CLEANUP    SYSTEM  J-02EC02  FUEL POOL COOL CLEANUP SYS DIXC    VLV HEAT EXCHAN  J-12EC05  SYSTEM ALARMS  J-12EF01A  ESWS MOTOR OPERATED ISOLATION    VALVES  J-K2EF01A  ESWS LOGIC DIAGRAM  J-02EF01B  ESWS MOTOR OPERATED ISOLATION    VALVES  J-K2EF01B  ESWS LOGIC DIAGRAM  J-02EF02  ESWS AIR COMPRESSORS ISOLATION    VALVES  J-K2EF02A  ESWS ESW PUMPS LOGIC DIAGRAM  J-K2EF02B  ESWS ESW PUMP LUBE VALVE LOGIC    DIAGRAM  J-12EF03  ESWS CTMT AIR COOLERS ISOLATION    VALVES  J-K2EF03A  ESWS SELF-CLEANING STRAINER LOGIC    DIAGRAM  J-K2EF03B  ESWS SELF-CLEANING STRAINER LOGIC    DIAGRAM  J-12EF04  ESWS CTMT AIR COOLERS ISOL VALVE    BYPASS VALVE 
4.4.4.6.
5.2.5    4.B.22    Intersystem Leakage Detec-  Intersystem leakage de-(Par II.4)        tion (See RG 1.45)           tection requirements


Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 15)  DRAWING NUMBER  TITLE        J-12EF05  ESWS MOTOR OPERATED ISOLATION    VALVES  J-K2EF06  ESWS ESW PUMP DISCHARGE AIR RELEASE    VALVE LOGIC DIAGRAM  J-02EF07  CONTROL LOGIC DIAGRAM STR SYS    ESWS  J-K2EF07  ESWS BACKPRESSURE CONTROL VALVE    LOGIC DIAGRAM (VOID)  J-02EG01A  COMPONENT COOLING WATER SYSTEM    PUMPS  J-02EG01B  COMPONENT COOLING WATER SYSTEM    PUMPS  J-02EG01C  CONTROL LOGIC DIAG COOL WTR    SYSTEM  J-12EG02  CCWS DEMIN WATER MAKEUP CCW    SURGE TANK  J-02EG04  CCW ESWS MAKE-UP SURGE TANK    VENT  J-02EG05A  CCWS SUPPLY RETURN NUCLEAR AUX    CMPNT SHEET A  J-02EG05B  CCWS SUPPLY RETURN NUCLEAR AUX    CMPNT  J-02EG05C  CCWS SUP RTRN NUC AUX CMPNT VLV    POSITION ALARM  J-02EG06  CCWS HX'S DISC TEMP ALARM RHR    HX'S FLOW ALARM  J-02EG07  CCWS SUPPLY RHR HX'S  J-12EG08A  CCWS SUPPLY RETURN RADWASTE    BLDG  J-12EG08B  CCWS SUPPLY RETURN RADWASTE BLDG  J-12EG09  CCWS CONTAINMENT ISOLATION    VALVE  J-12EG10  CCWS INSIDE CTMT ISO VLV RTRN    THRM BAR COOL CO  J-02EG11  CCWS HEAT EXCHANGER OUTLET TEMP    CONT  J-12EG13A  CONTROL LOGIC DIAGRAM  J-02EG13B  CONTROL LOGIC DIAGRAM  J-12EG13C  CONTROL LOGIC DIAGRAM  J-12EG14  CONTROL LOGIC DIAGRAM  J-02EJ01  RESIDUAL HEAT RMVL SYS NUC SAMP    SYS VALVE  J-02EJ03  RESIDUAL HEAT REMOVAL CONTROL    LOGIC DIAGRAM  J-02EJ04  CONTROL LOGIC DIAGRAM  J-02EN01  CONTAINMENT SPRAY SYS CONTAIN    SPRAY PUMPS  J-02EN02  CONT SPRAY SYSTEM CTMT RECIRC    SUMP ISOL VALVE 
and capabilities are


Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 16)  DRAWING NUMBER  TITLE        J-12EN03  CONT SPRAY SYSTEM SPRAY ADD    TANK ISOL VLVS  J-12EN04  CONT SPRAY SYSTEM SPRAY ADD    TANK ALARMS  J-02EN05  CONT SPRAY SYSTEM CTMT SPRAY    NOZZLES ISOL VLV  J-02FC18  AUX TURB AFP STEAMLINE WATER    TRAP DRAIN  J-02FC19  CONTROL LOGIC DIAGRAM  J-K2GD01  ESSENTIAL SERVICE WATER PUMPHOUSE    HVAC SUPPLY FANS LOGIC DIAGRAM  J-K2GD02  ESSENTIAL SERVICE WATER PUMPHOUSE    HVAC UNIT HEATER LOGIC DIAGRAM  J-02GE08  TURB BLDG HVAC LOGIC DIAG COND    AIR REMVL FILTER  J-02GF03  MISC BLDG HVAC MAIN STM BLDG    SUP EXH DAMPER  J-12GF06  MISC BLDG HVAC TENDON GALL SUP    RETURN DAMPER  J-12GF06A  CONTROL LOGIC DIAGRAM MISC. BUILDING HVAC  J-12GF07  MISC BLDG HVAC FDWTR PUMP ROOM    COOLER FANS  J-12GF09A  CONTROL LOGIC DIAGRAM MISC. BUILDING HVAC  J-12GF09B  CONTROL LOGIC DIAGRAM MISC. BUILDING HVAC  J-02GG04  FB HVAC ISOLATION DAMPERS  J-02GG05  FUEL BLDG SPENT FUEL POOL ROOM    COOLERS  J-12GG06  FB HVAC FILTER UNITS INTAKE    ISOL DAMPERS  J-02GG07  FB HVAC FILTER UNITS AUX BLDG    ISOLATION DAMPERS  J-02GG08  FB HVAC MANUAL INITIATION OF    FBIS  J-02GG09  FB HVAC SPENT FUEL POOL DISC  J-02GG10A  FB HVAC EMERGENCY EXHAUST FAN  J-02GG13  FB HVAC EMERGENCY EXHAUST CROSS    CONNENC DAMPERS  J-02GG14A  FUEL BLDG HVAC SPENT FUEL POOL  J-02GG14B  FUEL BLDG HVAC SPENT FUEL POOL  J-12GK01A  LOGIC DIAG CONTROL ROOM    FILTRATION FAN  J-12GK01B  FILTER ABSORBER UNIT SUPPLY  J-12GK01C  FILTER ABSORBER UNIT DISK    DAMPER  J-12GK01D  CONTROL ROOM RECIRC DAMPERS    CONTROL BLDG HVAC 
discussed in Section


Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 17)  DRAWING NUMBER  TITLE        J-12GK01E  CONTROL BLDG HVAC CONTROL A/C    UNIT DISCHARG DMP  J-02GK02A  CONTROL ROOM A/C UNIT FAN & TEMP  J-02GK02B  CONTROL ROOM A/C UNIT SUPPLY    DAMPER  J-02GK02C  CONTROL BLDG HVAC CONT ROOM    A/C UNIT DISC DAMPE  J-02GK03A  CONTROL BLDG HVAC FIRE ISO-    LATION DAMPERS  J-02GK07  MISC DAMPERS  J-02GK09  ISO DAMPERS  J-12GK10A  CONTROL ROOM PRESS FAN  J-12GK10B  CONTROL ROOM PRESS SUPPLY    DAMPER  J-12GK10C  CONT BLDG HVAC CONT ROOM PRESS    SYS UNIT SUP DAM  J-12GK11  CONTROL ROOM PRESS SYSTEM FIL    UNIT J-12GK13  CLASS IE ELEC EQUIP A/C UNIT  J-12GK15  CHLORINE ALAR  J-12GK17A  CONTROL LOGIC DIAGRAM CONTROL    BLDG HVAC  J-12GK17B  CONTROL LOGIC DIAGRAM CONTROL    BLDG HVAC  J-02GK19  CONT BLDG HVAC RETRN DAMPERS RM    FLTR ABSORB UNI  J-02GK23  CONTROL BLDG HVAC FIRE ISO    DAMPERS  J-02GK25  CONTROL LOGIC DIAGRAM FOR    CONTROL BLDG HVAC  J-02GK26  CONTROL LOGIC DIAGRAM FOR    CONTROL BLDG HVAC  J-02GK27  CONTROL LOGIC DIAGRAM FOR    CONTROL BLDG HVAC  J-02GL01A  AUX BLDG HVAC AIR SUPPLY UNIT  J-02GL01B  AUX BLDG HVAC AIR SUPPLY  J-12GL03A  AUX BLDG HVAC MISC ROOM COOLERS  J-12GL03B  AUX BLDG HVAC MISC ROOM COOLER  J-12GL03C  AUX BLDG HVAC MISC ROOM COOLER  J-12GL11  AUX BLDG HVAC PENE RM COOLER    FANS  J-02GL13  AUX BLDG HVAC ISO DAMPERS  J-02GL15  AUX BLDG HVAC FUEL BLDG HVAC    DISCH ISO DAMPERS  J-02GL21  AUX BLDG HVAC CCW PUMP ROOM EXH    DAMPERS  J-12GL23  AUX BLDG HVAC AUX/FUEL BLDG    EXH FANS DISC   
5.2.5.
3.2.2    4.B.23    Main Steam Isolation Valve  The recommendations of Leakage Control System      this SRP are not appli-(SRP Section 10.3, Par.      cable to the WCGS


Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 18)  DRAWING NUMBER  TITLE        J-12GM01A  DIESEL GENERATOR BLDG HVAC FAN     & DAMPER  J-02GM01B  DIESEL GENERATOR BLDG EXH DAMPERS  J-12GN01  CONTAINMENT COOLING  J-12GN02A  CONTROL LOGIC DIAGRAM     CONTAINMENT COOLING SYS  J-12GN02B  CONTROL LOGIC DIAGRAM    CONTAINMENT COOLING SYS  J-02GN03A  CONTAINMENT COOLING FANS  J-02GS02  CTMT HYDROGEN CONTROL THERMAL    HYDROGEN RECOM  J-02GS03  CTMT HYDROGEN CONTROL SOLENOID    ISO VLV  J-02GS06  CTMT HYDROGEN CONTROL PURGE    SUBSYS ISO VLV J-02GS08  CONTROL LOGIC DIAGRAM  J-02GS09  CONTROL LOGIC DIAGRAM  J-02GS10  CONTROL LOGIC DIAGRAM  J-02GT03  CONTAINMENT PURGE SYSTEM VALVES  J-02GT06  CONTAINMENT PURGE SYS ISO DAMPERS  J-02GT10  CONTROL LOGIC DIAGRAM  J-12JE01  EMERGENCY FUEL OIL TRANSFER    PUMPS  J-12JE02  CONTROL LOGIC DIAGRAM  J-02KA02  COMPRESSED AIR SYS COMP AIR   CONTAIN ISO VALVE  J-02KA03  COMPRESSED AIR SYS HYDROGEN CS    M/U AIR VALVE J-02KA08  CONTROL LOGIC DIAGRAM COMPRESSED    AIR SYSTEM  J-02KC08  CONTROL LOGIC DIAG FIRE    PROTECTION SYSTEM  J-12KJ02  CONTROL LOGIC DIAGRAM  J-02KJ03  CONTROL LOGIC DIAGRAM  J-12LF03  FLOOR & EQUIP DRAINS REACT BLDG    SUMP PUMP ISO VL  J-02LF04  FLOOR & EQUIP DRAINS REACT BLDG    SUMP PMP ISO VLV  J-02LF08  FLOOR & EQUIP DRAINS DISCHARGE    VALVES  J-02RP01  CONTROL LOGIC DIAGRAM  J-02RP01A  CONTROL LOGIC DIAGRAM  J-12SA03  CONTROL LOGIC DIAGRAM  J-12SA04  CONTROL LOGIC DIAGRAM  J-12SA05  CONTROL LOGIC DIAGRAM  J-02SJ01  NUC SYSTEM CON ISOLATION VALVES  J-02SJ03  CONTROL LOGIC DIAGRAM 
III.3 and BTP RSB-3.2)      (PWR) design.
Rev. 0 WOLF CREEK TABLE 1.9-4 OTHER CATEGORY 4 POSITIONS SRP      RRRC Section  Category          Title                    Remarks 3.5.3    4.C.1    Ductility of Reinforced     The recommendations of this Concrete and Steel Struc-   item are met to the ex-tural Elements Subjected   tent described in Section


Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 19)  DRAWING NUMBER   TITLE        J-14001  CONTROL ROOM EQUIPMENT    ARRANGEMENT  J-14002  REACT COOL SUPRT SYSTEM CONSOLE    RL001 & RL002  J-14003  REACTOR OPERATORS CONSOLE RL003    & RL004  J-14004  TURB GEN & FEEDWATER CONSOLE    RL005 & RL006  J-14005  SITE RELATED MAIN CONT BOARD    RL013 & RL014  J-14006  STATION ELEC DIST MAIN CONT    BOARD RL015 & RL016  J-14007  ENG SAFETY FEATURES MAIN CONT    BOARD RL017 & RL018  J-14008  ENG SAFETY FEATURES MAIN CONT    BOARD RL019 & RL020  J-14009  REACT AUX MAIN CONTROL BOARD    RL021 & RL022  J-14010  TURBOGENERATORS & FDWTR MAIN    CONT BD RL023 & RL024  J-14011  TURBOGENERATORS & FDWTR MAIN    CONT BD RL025 & RL026  J-14013  END SECTION MAIN CONT BRD RL011    & RL012  J-04014  MAIN CONTROL BOARD DETAILS  J-04015  OPERATORS CONSOLE DETAILS  J-14016  BILL OF MAT MAIN CONTROL PANEL  J-05001  AUX CONTROL PANEL DWGS  J-05002  AUX SHUTDOWN PANEL DETAILS  J-05003  AUX SHUTDOWN PANEL RP 118 7    SHTS  J-05021  LOCAL CONT PANEL RPO 68 MISC    BOP INST PANEL  J-15023  MISC BOP INST PANEL RP068 BILL    OF MAT  J-K5041  ESSENTIAL SERVICE WATER PANEL    (EF 155 & EF 156) DRAWING  J-K5042  ESSENTIAL SERVICE WATER PANEL    (EF 155) BILL OF MATERIAL  J-K5043  ESSENTIAL SERVICE WATER PANEL    (EF 156) BILL OF MATERIAL  J-16002  ANN WINDOW ARRGT RK016.018.020  J-16003  ANN WINDOW ARRGT RK022.024.026 
to Impactive or Impulsive   3.5.3.


Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 20)  DRAWING NUMBER  TITLE        M-761-0066 Through 0104 and 0459, 0460, 0494  (8756d37*)  PROCESS CONTROL BLOCK DIAGRAM    (1 THROUGH 42)
Loads 3.7.1    4.C.2     Response Spectra in VertiThe recommendations of this cal Direction              item are met. Refer to Section 3.7(B).1. West-inghouse utilizes the
M-762-0001  NIS SOURCE RANGE FUNCTIONAL  (5655D49*)  BLOCK DIAGRAM M-762-0002  NIS INTERMEDIATE RANGE  (5655D50*)  FUNCTIONAL BLOCK DIAGRAM M-762-0417  NIS POWER RANGE FUNCTIONAL  (9552D32*)  BLOCK DIAGRAM M-762-0032  NIS AUXILIARY CHANNELS  (5655D52*)  FUNCTIONAL BLOCK DIAGRAM M-767-221 THROUGH 240  (8761D17*)  SAFEGUARDS TEST CABINET   (1 THROUGH 20)
J-104-00347  INSTRUCTION MANUAL ESFAS/LSELS  J-104-00437  SIGNAL FLOW BLOCK DIAGRAM FOR    THE ENGINEERED SAFETY     FEATURES ACTUATION SYSTEMS (SHEET 1)  J-104-00438 ISOLATION AND DISTRIBUTION    OF ANALOG SIGNALS TO    COMPUTER (ESFAS SHEET lA)  J-104-00439  CHANNEL IV BLOCK DIAGRAM    (ESFAS SHEET 2)  J-104-00440  CHANNEL II BLOCK DIAGRAM    (ESFAS SHEET 3)  J-104-00441  ATI BLOCK DIAGRAM (ESFAS    SHEET 4)  J-104-00442  BISTABLE RACK - CHANNEL I    (ESFAS SHEET 5)  J-104-00443  ISOLATION RACK - CHANNEL I    (ESFAS SHEET 6)  J-104-00444  ACTUATION INPUTS - CHANNEL I    (ESFAS SHEET 7)  J-104-00445  ACTUATION OUTPUTS AND STATUS    INDICATIONS - CHANNEL I    (ESFAS SHEET 8) J-104-00446  ANNUNCIATOR/COMPUTERS OUTPUTS -     CHANNEL I (ESFAS SHEET 9)
* Drawings suplied by NSSS Vendor.


Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 21)  DRAWING NUMBER  TITLE        J-104-00447  ANALOG SIGNALS - CHANNEL II    (ESFAS SHEET 10)  J-104-00448  ISOLATION RACK LOGIC SIGNALS -    CHANNEL II (ESFAS SHEET 11)  J-104-00449  RELAY OUTPUTS - CHANNEL II    (ESFAS SHEET 12)  J-104-00450  BISTABLE RACK - CHANNEL IV    (ESFAS SHEET 13)  J-104-00451  ISOLATION RACK - CHANNEL IV    (ESFAS SHEET 14)  J-104-00452  ACTUATION INPUTS - CHANNEL IV    (ESFAS SHEET 15)  J-104-00453  ACTUATION OUTPUTS AND STATUS    INDICATIONS - CHANNEL IV    (ESFAS SHEET 16)  J-104-00454  ANNUNCIATOR/COMPUTER OUTPUTS -    CHANNEL IV (ESFAS SHEET 17)  J-104-00455  ATI MODULE A (ESFAS SHEET 18)  J-104-00456  ATI MODULE B (ESFAS SHEET 19)  J-200-00029  TURB SUPERVISORY MAIN CONT BRD    RL027 & RL028 
damping values of WCAP 7921-


Rev. 15 WOLF CREEK TABLE 1.7-2  PIPING AND INSTRUMENTATION DIAGRAMS Drawing Figure Number Number Sheet Title M-120101 1.1-1 1 Symbols and Legend for System Flow and Piping 
AR. See also the response
& Instrumentation Diagrams M-120102 1.1-1 2 Symbols and Legend for System Flow and Piping 
& Instrumentation Diagrams M-120103 1.1-1 3 Symbols and Legend for  System Flow and Piping  & Instrumentation Diagrams  M-120104 1.1-1 4 Symbols and Legend for  System Flow and Piping  & Instrumentation Diagrams  M-12AB01 10.3-1 1 Main Steam System  M-12AB02 10.3-1 2 Main Steam System  M-12AB03 10.3-1 3 Main Steam System  M-12AC01 10.2-1 1 Main Turbine  M-12AC02 10.2-1 2 Main Turbine  M-12AC03 10.2-1 3 Main Turbine  M-12AC04 10.2-1 4 Main Turbine  M-12AD01 10.4-2 1 Condensate System  M-12AD02 10.4-2 2 Condensate System  M-12AD03 10.4-2 3 Condensate System  M-12AD04 10.4-2 4 Condensate System  M-12AD05 10.4-2 5 Condensate System  M-12AD06 10.4-2 6 Condensate System  M-12AE01 10.4-6 1 Feedwater System  M-12AE02 10.4-6 2 Feedwater System  M-12AF01 10.4-6 3 Feedwater Heater Extraction Drains & Vents M-12AF02 10.4-6 4 Feedwater Heater Extraction Drains & Vents M-12AF03 10.4-6 5 Feedwater Heater Extraction Drains & Vents M-12AF04 10.4-6 6 Feedwater Heater Extraction Drains & Vents M-12AK01 10.4-5 1 Condensate Demineralizer System M-12AK02 10.4-5 2 Condensate Demineralizer System M-12AK03 10.4-5 3 Condensate Demineralizer System


Rev. 27 WOLF CREEK TABLE 1.7-2 (SHEET 2)
to Regulatory Guide 1.60 in Appendix 3A.
Drawing Figure Number Number Sheet Title M-12AL01 10.4-9 Auxiliary Feedwater System M-12AN01 9.2-16 Demineralized Water Storage and Transfer System  M-12AP01 9.2-23 Condensate Storage and Transfer System M-12AQ01 10.4-7 1 Condensate Chemical Addition System M-12AQ02 10.4-7 2 Feedwater Chemical Addition System M-12BB01 5.1-1 1 Reactor Coolant System M-12BB02 5.1-1 2 Reactor Coolant System M-12BB03 5.1-1 3 Reactor Coolant System M-12BB04 5.1-1 4 Reactor Coolant System  M-12BG01 9.3-8 1 Chemical and Volume Control  System M-12BG02 9.3-8 2 Chemical and Volume Control System M-12BG03 9.3-8 3 Chemical and Volume Control System M-12BG04 9.3-8 4 Chemical and Volume Control System M-12BG05 9.3-8 5 Chemical and Volume Control System M-12BL01 9.2-13 Reactor Makeup Water System M-12BM01 10.4-8 1 Steam Generator Blowdown System M-12BM02 10.4-8 2 Steam Generator Blowdown System  M-12BM03 10.4-8 3 Steam Generator Blowdown  System M-12BM04 10.4-8 4 Steam Generator Blowdown System M-12BM05 10.4-8 5 Steam Generator Blowdown System M-12BN01 6.3-1 1 Borated Refueling Water Storage System M-12CA01 10.4-4 Steam Seal System M-12CF01 10.2-1 5 Lube Oil Storage, Transfer and Purification System M-12CF02 10.2-1 6 Lube Oil Storage, Transfer and Purification System M-12CG01 10.4-3 Condenser Air Removal  M-12CH01 10.2-1 7 Main Turbine Control Oil  System M-12CH02 10.2-1 8 Main Turbine Control Oil System 
3.8.1   4.C.3     BWR Mark III Containment    The recommendations of this 3.8.2             Pool Dynamics              item are not applicable


Rev. 21 WOLF CREEK TABLE 1.7-2 (SHEET 3)
to the WCGS (PWR) design.
Drawing Figure Number Number Sheet Title M-12DA01 10.4-1 1 Circulating Water & Water  Box Drains System M-12DA02 10.4-1 3 Circulating Water & Water  Box Venting System M-12EA01 9.2-1 1 Service Water System  M-12EA02 9.2-1 2 Service Water System  M-12EB01 9.2-14 Closed Cooling Water System  M-12EC01 9.1-3 1 Fuel Pool Cooling and  Cleanup System M-12EC02 9.1-3 2 Fuel Pool Cooling and  Cleanup System M-12EF01 9.2-2 1 Essential Service Water System  M-12EF02 9.2-2 2 Essential Service Water System  M-K2EF01 9.2-2 3 Essential Service Water System  M-K2EF03 9.2-2 4 Essential Service Water System  M-12EG01 9.2-15 1 Component Cooling Water  System M-12EG02 9.2-15 2 Component Cooling Water  System M-12EG03 9.2-15 3 Component Cooling Water  System M-12EJ01 5.4-7 Residual Heat Removal System  M-12EM01 6.3-1 2 High Pressure Coolant  Injection System M-12EM02 6.3-1 3 High Pressure Coolant  Injection System M-12EN01 6.2.2-1 Containment Spray System  M-12EP01 6.3-1 4 Accumulator Safety Injection  M-12FA01 9.5.9-1 1 Auxiliary Boiler System  M-12FB01 9.5.9-1 2 Auxiliary Steam System  M-12FB02 9.5.9-1 3 Auxiliary Steam System  M-12FC02 10.4-10 Auxiliary Feedwater Pump  Turbine M-12FC03 10.4-6 7 S.G.F.P. Turbine "A"  M-12FC04 10.4-6 8 S.G.F.P. Turbine "B"  M-12FE01 9.5.9-1 4 Auxiliary Steam Chemical   Addition System M-12GA01 9.4-9 1 Plant Heating System  M-12GA02 9.4-9 2 Plant Heating System  M-12GB01 9.4-10 Central Chilled Water  System M-K2GD01 9.4-8 1 Essential Service Water  Pump House HVAC
3.8.4   4.C.4     Air Blast Loads            Air blast loads from trans-portation are less than the external pressure design capabilities described in Section 3.8.
3.5.3   4.C.5    Tornado Missile Impact      The recommendations of this item are met. Refer to Section 3.5.3.1.
6.3     4.C.6     Passive Failures During    The recommendations of this Long-Term Cooling Followitem are met to the ex-


Rev. 17 WOLF CREEK TABLE 1.7-2 (SHEET 4)
ing LOCA                    tent described in Sections
Drawing Figure Number Number Sheet Title M-12GE01 9.4-4 1 Turbine Building HVAC  M-12GE02 9.4-4 2 Turbine Building HVAC  M-12GE03 9.4-4 3 Turbine Building HVAC  M-12GE04 9.4-4 4 Turbine Building HVAC  M-12GF01 9.4-3 1 Miscellaneous Buildings HVAC  M-12GF02 9.4-3 2 Miscellaneous Buildings HVAC  M-12GG01 9.4-2 1 Fuel Building HVAC  M-12GG02 9.4-2 2 Fuel Building HVAC  M-12GH01 9.4-5 1 Radwaste Building HVAC  M-12GH02 9.4-5 2 Radwaste Building HVAC  M-12GK01 9.4-1 1 Control Building HVAC  M-12GK02 9.4-1 2 Control Building HVAC  M-12GK03 9.4-1 3 Control Building HVAC  M-12GK04 9.4-1 4 Control Building HVAC  M-12GL01 9.4-3 5 Auxiliary Building HVAC  M-12GL02 9.4-3 4 Auxiliary Building HVAC  M-12GL03 9.4-3 3 Auxiliary Building HVAC  M-12GM01 9.4-7 Diesel Generators Building  HVAC M-12GN01 9.4-6 1 Containment Cooling System  M-12GN02 9.4-6 2 Containment Cooling System  M-12GP01 6.2.6-1 Containment Integrated Leak  Rate Test M-12GR01 9.4-6 3 Containment Atmospheric  Control System M-12GS01 6.2.5-1 Containment Hydrogen Control  System M-12GT01 9.4-6 4 Containment Purge System  HVAC M-12HA01 11.3-1 1 Gaseous Radwaste System  M-12HA02 11.3-1 2 Gaseous Radwaste System  M-12HA03 11.3-1 3 Gaseous Radwaste System  M-12HB01 11.2-1 1 Liquid Radwaste System  M-12HB02 11.2-1 2 Liquid Radwaste System  M-12HB03 11.2-1 3 Liquid Radwaste System  M-12HB04 11.2-1 4 Liquid Radwaste System  M-12HC01 11.4-1 1 Solid Radwaste System  M-12HC02 11.4-1 2 Solid Radwaste System  M-12HC03 11.4-1 3 Solid Radwaste System  M-12HC04 11.4-1 4 Solid Radwaste System  M-12HD01 12.3-4 Decontamination System  M-12HE01 9.3-11 1 Boron Recycle System  M-12HE02 9.3-11 2 Boron Recycle System  M-12HE03 9.3-11 3 Boron Recycle System 


Rev. 17 WOLF CREEK TABLE 1.7-2 (SHEET 5)
3.1 and 6.3.
Drawing Figure Number Number Sheet Title M-12HF01 10.4-12 1 Secondary Liquid Waste  System M-12HF02 10.4-12 2 Secondary Liquid Waste  System M-12HF03 10.4-12 3 Secondary Liquid Waste  System M-12HF04 10.4-12 4 Secondary Liquid Waste  System M-12JE01 9.5.4-1 Emergency Fuel Oil System  M-12KA01 9.3-1 1 Compressed Air System  M-12KA02 9.3-1 2 Compressed Air System  (Service Air)
6.3     4.C.7    Control Room Position      The recommendations of this Indication of Manual        item are met. Refer to (Handwheel) Valves in      Sections 7.5.2.2.1 and the ECCS                    7.5.2.2.2.
M-12KA03 9.3-1 3 Instrument Air System  M-12KA04 9.3-1 4 Instrument Air System  M-12KA05 9.3-1 5 Compressed Air System  M-12KA06 9.3-1 6 Compressed Air System  M-12KA07 9.3-1 7 Compressed Air System  M-12KB01 9.5.10-1 1 Breathing Air System  M-12KB02 9.5.10-1 2 Breathing Air System  M-12KB03 9.5.10-1 3 Breathing Air System  M-12KC01 9.5.1-1 1 Fire Protection System  M-12KC02 9.5.1-1 2 Fire Protection System  M-12KC03 9.5.1-1 3 Fire Protection System  M-12KC04 9.5.1-1 4 Fire Protection (Halon)  System M-12KC05 9.5.1-1 5 Fire Protection System M-12KC06 9.5.1-1 6 Fire Protection (Halon)  System M-12KC07 9.5.1-1 7 Fire Protection (Halon)  System M-12KD01 9.2-17 1 Domestic Water System  M-12KD02 9.2-17 2 Domestic Water System  M-12KH01 9.3-9 1 Service Gas System  M-12KH02 9.3-9 2 Service Gas System M-12KJ01 9.5.5-1 1 Standby Diesel Generator "A"  Cooling Water System M-12KJ04 9.5.5-1 2 Standby Diesel Generator "B"  Cooling Water System M-12KJ02 9.5.6-1 1 SDG "A" Intake, Exh., F.O.  & Starting Air System M-12KJ05 9.5.6-1 2 SDG "B" Intake, Exh., F.O.   & Starting Air System M-12KJ03 9.5.7-1 1 Standby Diesel Generator "A"  Lube Oil System M-12KJ06 9.5.7-1 2 Standby Diesel Generator "B"  Lube Oil System 
15.1.5   4.C.8    Long-Term Recovery from    The recommendations of this Steamline Break: Opera-   item are met to the extent tor Action to Prevent      described in Section Overpressurization          15.0.13. Operator action is not assumed for 10 minutes.
Rev. 0 WOLF CREEK TABLE 1.9-4 (Sheet 2)
SRP      RRRC Section Category        Title                      Remarks 5.4.6   4.C.9   Pump Operability RequireThe recommendations of this 5.4.7             ments                      item are met. Refer to


Rev. 17 WOLF CREEK TABLE 1.7-2 (SHEET 6)
6.3                                           Section 6.2.2.1.2.2 and Section 6.3.2.5.
Drawing Figure Number Number Sheet Title M-12LA01 9.3-5 1 Sanitary Lift Station &
3.5.1    4.C.10  Gravity Missiles, Vessel    The recommendations of this Seal Ring Missiles Inside  item are met. Refer to Containment                Appendix 3B. Section 9.1.4.2.2 discusses the reactor cavity seal ring.
Turb. Bldg. Sanitary Drainage System M-12LA02 9.3-5 2 Comm. Corridor & Control Bldg. Sanitary Drainage System M-12LD01 9.3-5 3 Chemical and Detergent Waste M-12LE01 9.3-5 4 Turb. Bldg. & Aux. Feedwater Pump Rooms Oily Waste System M-12LE02 9.3-5 5 Control & Diesel Gen. Bldg.
4.4     4.C.11   Core Thermal-Hydraulic      The recommendations of this Analysis                    item are met. However, Westinghouse is generically reducing rod bow penalties through experience gained by
Oily Waste System M-12LE03 9.3-5 6 Turb. Bldg. & Aux. Boiler Room Oily Waste System M-12LE04 9.3-5 7 Tendon Access Gallery &
Turb. Bldg. Oily Waste System M-12LF01 9.3-5 8 Aux. Bldg. Floor and Equip-ment Drain System M-12LF02 9.3-5 9 Aux. Bldg. Floor and Equip-ment Drain System M-12LF03 9.3-5 10 Aux. Bldg. Floor and Equip-ment Drain System M-12LF04 9.3-5 11 Aux. Bldg. Floor and Equip-   ment Drain System  M-12LF05 9.3-5 12 Aux. Bldg. Floor and Equip-ment Drain System  M-12LF06 9.3-5 13 Radwaste & Fuel Bldgs. FED System  M-12LF07 9.3-5 14 Radwaste Bldg. FED System M-12LF08 9.3-5 15 Control and Fuel Bldgs.
FED System  M-12LF09 9.3-5 16 Reactor Bldg. & Hot  Machine Shop FED System  M-12LF10 9.3-5 17 Radwaste Bldg. and Tunnel FED System  M-12RM01 9.3-4 1 Process Sampling System M-12RM02 9.3-4 2 Process Sampling System M-12RM03 9.3-4 3 Process Sampling System M-12SJ01 9.3-2 1 Nuclear Sampling System Primary Sampling System  M-12SJ02 9.3-3 Nuclear Sampling System   Radwaste Sampling System  M-12SJ03 9.3-2 2 Nuclear Sampling System Primary Sampling System 


Rev. 27 WOLF CREEK TABLE 1.7-2 (SHEET 7)
test surveillance. Refer
Drawing Figure Number Number Sheet Title M-12SJ04 18.2-15 Nuclear Sampling System 


M-12WT01 9.2-24 1 Wastewater Treatment Facility M-12WT03 9.2-25 1 Wastewater Treatment Facility 
to Section 4.2.3.1.
8.3      4.C.12  Degraded Grid Voltage      The recommendations of this Conditions                  item are met to the ex-


M-12VW01 9.4-11  Wastewater Treatment Facility  HVAC System M-0021 10.4-1 2 Circulating Water System M-0022 9.2-1 3 Service Water System M-0023 9.5-1 1 Fire Protection System (Site)  M-0023 9.5-1 2 Fire Protection System (Site)
tent described in Section
M-0023 9.5-1 3 Fire Protection System (Site)
M-0023 9.5-1 4 Fire Protection System (Site)
M-0025 9.2-5 1 Demineralized Water Makeup System M-0025 9.2-5 2 Demineralized Water Makeup System M-0025 9.2-5 3 Demineralized Water Makeup System M-0025 9.2-5 4 Demineralized Water Makeup  System  M-0025 9.2-5 4A Demineralized Water Makeup System M-0051 9.5-2 Outdoor Piping, Key Plans &    General Notes 


Rev. 21 WOLF CREEK TABLE 1.7-3 ADDITIONAL CONTROLLED DRAWINGS USED IN THE USAR Drawing Figure Number Number Sheet Title  A-0503 9.2-5A Potable Water System 10466-A-1701 12.3-2 1 Radiation Zones For Normal  Operation 10466-A-1702 12.3-2 2 Radiation Zones For Normal  Operation 10466-A-1703 12.3-2 3 Radiation Zones For Normal  Operation 10466-A-1704 12.3-2 4 Radiation Zones For Normal  Operation 10466-A-1705 12.3-2 5 Radiation Zones For Normal  Operation 10466-A-1706 12.3-2 6 Radiation Zones for Normal  Operation 10466-A-1801 9.5.1-2 1 Fire Delineation Floor Plan  EL. 1974'-0" 10466-A-1802 9.5.1-2 2 Fire Delineation Floor Plan  EL. 2000'-0" 10466-A-1803 9.5.1-2 3 Fire Delineation Floor Plan  EL. 2026'-0" 10466-A-1804 9.5.1-2 4 Fire Delineation Floor Plan  EL. 2047'-0" 8025-C-KG1202 1.2-44 Site Plan C-0L2931 9.3-7 1 Reactor Building Stainless Steal   Liner Plate Reactor Refueling Canal C-1L6111 9.3-7 2 Reactor Building Stainless Steel Liner Plate  Reactor Refueling Canal C-03BB53 5.4-21 Hot and Cold Leg Lateral Restraints E-1L9901 9.5.3-1 Lighting Distribution Riser Diagram E-1L9903 9.5.2-2 Public Address System Riser  Diagram E-11005 8.3-2 List of Loads Supplied by the Emergency Diesel Generator E-1001 8.3-1 3 Single Line Diagram Site Area Loads E-K1001 8.3-1 2 Single Line Diagram Essential Service Water System E-11001 8.3-1 1 Main Single Line Diagram E-11010 8.3-6 1 DC Main Single Line Diagram E-11010A 8.3-7 DC Main Single Line Diagram  (PK03 & PK04 Bus) E-12KJ01 8.3-5 Standby Generator Engine and Governor Control Logic Diagram
8.3.1.1.3 and Technical Specifications.
6.2.1.2 4.C.13   Asymmetric Loads on Com-   The recommendations of this ponents Located Within      item are met. Refer to Containment Subcompart-     Section 6.2.1.2.


Rev. 21 WOLF CREEK TABLE 1.7-3 (Sheet 2)  Drawing Figure Number Number Sheet Title E-12NE01 8.3-3 Logic Diagram Standby Generator Excitation Control E-12NE02 8.3-4 Logic Diagram Standby Generator  System Protection E-14QE01 9.5.2-1 Telephone System Riser Diagram J-104-00390 7.3-1 2 Logic Diagram Engineered Safety Features Actuation System (BOP)
ments 6.2.6    4.C.14   Containment Leak Testing    The recommendations of this Program                    item are met. Refer to
KD-7496 8.2-4 WCGS Electrical One-Line Diagram KD-7750 8.2-3 Wolf Creek Substation General Plan M-0004 10.4-1 4 Circulating Water Screenhouse Planview  M-0005 10.4-1 5 Circulating Water Screenhouse  Section View M-1G001 1.2-1 Peninsular Plant Arrangement  Standard Power System & Structure Interface M-1G010 1.2-2 Equipment Location Radwaste  Building Plan EL 1976'-0" M-1G011 1.2-3 Equipment Location Radwaste Building Plan EL 2000'-0" M-0G012 1.2-4 Equipment Location Radwaste  Building Plan EL 2022'-0" M-1G013 1.2-5 Equipment Location Radwaste Building Plan EL 2031'-6" and Roof Plan M-1G014 1.2-6 Equipment Location Radwaste Building Sections A & B M-1G015 1.2-7 Equipment Location Building Sections C & E M-1G016 1.2-8 Equipment Location Building Sections D & F  M-1G020 1.2-9 Equipment Location Reactor and   Auxiliary Building Plan Basement EL. 1974'-0" M-1G021 1.2-10 Equipment Location Auxiliary Building Partial Plan EL. 1988'-0" and 2013'-6" M-1G022 1.2-11 Equipment Location Reactor and Auxiliary Building Plan Ground Floor Elevation 2000'-0" M-1G023 1.2-12 Equipment Location Reactor and Auxiliary Building Plan EL. 2026'-0" M-1G024 1.2-13 Equipment Location Reactor and Auxiliary Building Plan Operating Floor Elevation  2047'-6" 


Rev. 21 WOLF CREEK TABLE 1.7-3 (Sheet 3)
Section 6.2.6.
Drawing Figure Number Number Sheet Title M-1G025 1.2-14 Equipment Location Reactor and  Auxiliary Building Plan Elevation 2068'-8" M-1G026 1.2-15 Equipment Location Reactor and   Auxiliary Building Section A M-1G027 1.2-16 Equipment Location Reactor and   Auxiliary Building Section B M-1G028 1.2-17 Equipment Location Reactor and  Auxiliary Building Section C M-1G029 1.2-18 Equipment Location Reactor and   Auxiliary Building Section D M-1G030 1.2-19 Equipment Location Auxiliary  Building Sections E, F & G M-1G040 1.2-20 Equipment Location Fuel   Building Plan Elevation 2000'-0", 2026'-0" and 2047'-6" M-1G041 1.2-21 Equipment Location Fuel  Building Sections A, B & C M-1G042 1.2-22 Equipment Location Fuel  Building Sections D, E & F M-1G050 1.2-23 Equipment Location Control  Building & Communication Corridor Plan Elevation 1974'-0" & 1984'-0" M-1G051 1.2-24 Equipment Location Control and  Diesel Generator Buildings &
6.2.1.4  4.C.15  Containment Response Due    The recommendations of this to Main Steamline Break    item are met. Refer to and Failure of MSLIV to    Sections 6.2.1, 3.11(B),
Communication Corridor Plan Elevation 2000'-0" and 2016'-0" M-1G052 1.2-25 Equipment Location Control and  Diesel Generator Buildings &
Close                      and 3.11(N).
Communication Corridor Plan Elevation 2032'-0" & 2047'-6" M-1G053 1.2-26 Equipment Location Control and  Diesel Generator Buildings &
3.6.1   4.C.16   Main Steam and Feedwater    The recommendations of this 3.6.2             Pipe Failures              item are met. Refer to Sections 3.6.1 and 3.6.2.
Communication Corridor Plan Elevation 2061'-6", 2066'-0" &
Rev. 0 WOLF CREEK TABLE 1.9-4 (Sheet 3)
2073'-6" & Section D M-1G054 1.2-27 Equipment Location Control and   Diesel Generator Building Communication Corridor Section A M-1G055 1.2-28 Equipment Location Control and    Diesel Generator Building Sections B & C M-1G060 1.2-29 Equipment Location Turbine     Building Condenser Pit Plan Elevation 1983'-0" M-1G061 1.2-30 Equipment Location Turbine    Building Ground Floor Plan Elevation 2000'-0" 
Category          Title                      Remarks 9.2.2    4.C.17  Design Requirements for     The recommendations of this Cooling Water to Reactor    item are met to the extent


Rev. 17 WOLF CREEK TABLE 1.7-3 (Sheet 4)
Coolant Pumps              described in Sections 5.4.1, 9.2.2, and 9.3.4 10.4.7   4.C.18  Design Guidelines for      The design meets the rec-Water Hammer in Steam       ommendations of this item;
Drawing Figure Number Number Sheet Title M-1G062 1.2-31 Equipment Location Partial Plan Elevation 2015'-4" M-1G063 1.2-32 Equipment Location Turbine  Building Mezzanine Floor Plan Elevation 2033'-0" M-1G064 1.2-33 Equipment Location Turbine Building Operating Floor Plan Elevation 2065'-0" M-1G065 1.2-34 Equipment Location Turbine Building Section "A" M-1G066 1.2-35 Equipment Location Turbine Building Section "B" M-1G067 1.2-36 Equipment Location Turbine  Building Section "C"  M-0G068 1.2-37 Equipment Location Turbine Building Section "D" M-1G069 1.2-38 Equipment Location Turbine Building Section "E" M-0G070 1.2-39 Equipment Location Turbine Building Section "F" M-0G071 1.2-40 Equipment Location Turbine Building Section "G" M-1G072 1.2-41 Equipment Location Turbine Building Section "H" M-0G073 1.2-42 Turbine Component Laydown Area Elevation 2065'-0" M-13EN03 6.2.2-2 1 Containment Spray System Reactor      Building A & B Trains  M-13EN04 6.2.2-2 2 Containment Spray System Reactor      Building A & B Trains  M-13EN05 6.2.2-2 3 Containment Spray System Reactor      Building A & B Trains  M-KG080 9.2-3 ESWS Pumphouse  Equipment    Location - Plan M-KG081 9.2-4 ESWS Pumphouse  Equipment Location - Sections M-744-00018 7.2-1 1 Functional Diagrams Index and    Symbols M-744-00019 7.2-1 2 Functional Diagrams (Reactor    Trip Signals)
M-744-00020 7.2-1 3 Functional Diagrams (Nuclear    Instrumentation and Manual Trip Signals)
M-744-00021 7.2-1 4 Functional Diagrams (Nuclear    Instrumentation Permissives and Blocks)
M-744-00022 7.2-1 5 Functional Diagrams (Primary    Coolant System Trip Signals)
M-744-00023 7.2-1 6 Functional Diagrams (Pressurizer    Trip Signals)
M-744-00024 7.2-1 7 Functional Diagrams (Steam   Generator Trip Signals) 


Rev. 21 WOLF CREEK TABLE 1.7-3 (Sheet 5)
Generators with Top        however, no testing was
Drawing Figure Number Number Sheet Title M-744-00025 7.2-1 8 Functional Diagrams (Safe-  guards Activation Signals)
M-744-00026 7.2-1 9 Functional Diagrams (Rod  Controls and Rod Blocks)
M-744-00027 7.2-1 10 Functional Diagrams (Steam  Dump Control)
M-744-00028 7.2-1 11 Functional Diagrams (Pressur-  izer Pressure & Level Control)
M-744-00029 7.2-1 12 Functional Diagrams (Pressur-  izer Heater Control)
M-744-00030 7.2-1 13 Functional Diagrams (Feedwater  Control and Isolation)
M-744-00031 7.2-1 14 Functional Diagrams (Feedwater  Control and Isolation)
M-744-00032 7.2-1 15 Functional Diagrams (Auxiliary  Feedwater Pumps Startup)
M-744-00033 7.2-1 16 Functional Diagram (Turbine  Trip Runbacks and Other Signals)
M-744-00039 7.2-1 17 Functional Diagram (Pressurizer  Pressure Relief)
M-744-00040 7.2-1 18 Functional Diagram (Pressurizer  Pressure Relief)
SK-C-250 3B-2 Plan and Elevation View of Main Steam/Main Feedwater Isolation Valve Compartment S-0172 2.4-3 2 Grading Plan Switchyard Area  S-0186 2.4-3 3 Drainage Plan Plant Area  S-0189-1 2.4-3 4A Manhole, Pipe & Culvert Schedule  S-0189-2 2.4-3 4B Manhole, Pipe & Culvert Schedule  S-0189-3 2.4-3 4C Manhole, Pipe & Culvert Schedule  S-0189-4 2.4-3 4D Manhole, Pipe & Culvert Schedule  S-0191 2.4-3 5 Manhole & Pipe Details  S-0296 2.4-3 6 Manhole & Pipe Details  S-0297 2.4-3 7 Plant Area Roadway Grading &  Drainage 


Rev. 21 WOLF CREEK TABLE 1.7-4  ERECTED SCAFFOLD EXPECTED TO BE IN PLACE THROUGHOUT NEXT REQUIRED USAR UPDATE CYCLE WCGS Scaffold Request Building Elevation Location System 13-S0213 Auxiliary 1974' 20' N A14 13' W AN Essential Service Water (ESW) 13-S0219 Containment 2047' Above Containment Room Fire Protection 13-S6209 Fuel 2000'  1' S F1 2' W FC Component Cooling Water, Other 14-S9089 Containment 2005' 10' E 58' N Ladders 14-S0068 Auxiliary 1974' 3' E CA 3' N A11 Essential Service Water 14-S0070 Auxiliary 1974' 3' N A-14 3' E C-A Essential Service Water 14-S0069 Auxiliary 1974' 10' N A9 13' W AN Essential Service Water 14-S7104 Auxiliary 2000'  3' S of A11 AK ESW Vertical Loop Chase  14-S7107 Auxiliary 2000' 6'S A11 2' W AJ Component Cooling Water 15-S0050 Auxiliary 2026' 5' S A3 5' E AM Drain and Vent15-S7207 Containment 1983' ESW Pipe Chase ESW Vertical Loop Chase 15-S7208 Containment 2000' ESW Pipe Chase ESW Vertical Loop Chase 15-S7225 Auxiliary 1974' E of CA 6' N A2 Fukushima 15-S7229 Containment 2032' NE Corner  ESW Vertical Loop Chase 15-S7230 Containment 2042' NE Corner ESW Vertical Loop Chase 15-S7226 Containment 2000' NE Corner ESW Vertical Loop Chase 15-S7227 Containment 2012' NE Corner ESW Vertical Loop Chase 15-S7228 Containment 2021' NE Corner ESW Vertical Loop Chase 15-S7232 Containment 2064' NE Corner ESW Vertical Loop Chase 15-S7231 Containment 2053' NE Corner ESW Vertical Loop Chase 15-S7233 Containment 1987' ESW Pipe Chase ESW Vertical Loop Chase 15-S7240 Containment 2064' ESW Pipe Chase Essential Service Water 15-S7241 Containment 2074' ESW Pipe Chase Essential Service Water  Rev. 29 WOLF CREEK TABLE 1.7-4 (sheet 2)  ERECTED SCAFFOLD EXPECTED TO BE IN PLACE THROUGHOUT NEXT REQUIRED USAR UPDATE CYCLE  WCGS Scaffold Request Building Elevation Location System 15-S7239 Containment 2053' ESW Pipe Chase Essential Service Water 15-S7236 Containment 2021' ESW Pipe Chase Essential Service Water 15-S7234 Containment 2000' ESW Pipe Chase Essential Service Water 15-S7235 Containment 2010' ESW Pipe Chase Essential Service Water 15-S0235 Containment 2000' 30' N 45' W High Pressure Coolant Injection 15-S0234 Auxiliary 2000' 3' N A14' AN Essential Service Water 15-S0237 Auxiliary 2000' 18' N A4 3' E CA Essential Service Water 15-S0236 Auxiliary 2000' 3'E CA 9' N A4 Essential Service Water 15-S0241 Auxiliary 2000' 1' E AJ 6' S A3 Essential Service Water 15-S0242 Auxiliary 2000' N 2' A14 5' E AN Essential Service Water 15-S0253 Auxiliary 1967' 3' W AM 10' N A8 Essential Service Water 15-S7255 Containment 2000' 1' E CF 6' S C5 Fukushima 15-S7254 Containment 2000' 11 E' CF 3' S C5 Fukushima 15-S7253 Containment 2000' 11' E CF C5 Fukushima 15-S7257 Containment 2000' 11' W CC 9' S C5 Fukushima 15-S7258 Containment 2000' Water Hammer Tower ESW Vertical Loop Chase 15-S7256 Containment 2000' 4' W CA 9' S C5 Fukushima 15-S7262 Containment 2000' CC 9' S C5 Fukushima 15-S7260 Containment 2010' Water Hammer Tower ESW Vertical Loop Chase 15-S7259 Containment 2010' Water Hammer Tower ESW Vertical Loop Chase 15-S7246 Containment 2000' CA 8'S C3 Fukushima 15-S7263 Other 2032' S Side of Tower ESW Vertical Loop Chase 15-S7264 Other 2021' N Side of Tower ESW Vertical Loop Chase 15-S7267 Containment 2042' WH Tower ESW Vertical Loop Chase Rev. 29 WOLF CREEK TABLE 1.7-4 (sheet 3)  ERECTED SCAFFOLD EXPECTED TO BE IN PLACE THROUGHOUT NEXT REQUIRED USAR UPDATE CYCLE  WCGS Scaffold Request Building Elevation Location System 13-S0134 Diesel Generator 2000' 6'S D1 5' TO30' D-8 Emergency Diesel Generator 13-S0127 Auxiliary 2026' 2'S A6 2'E AL Component Cooling Water 13-S0122 Auxiliary 2026' 2'N A13 2'W AJ Component Cooling Water 13-S0120 Diesel Generator 2032' D2-D3 10'E DB Standby Diesel13-S0119 Diesel Generator 2032' D2-D3 10'E DC Standby Diesel13-S0100 Diesel Generator 2000' 6'S D1  3'W DR 7' E Emergency Diesel Generator 13-S0066 Auxiliary 1974' 20' S A1  7'E AH Residual Heat Removal 13-S0064 Auxiliary 2026' 4'N AS 6'E AM Component Cooling Water 13-S0063 Auxiliary 2026' 3'S A4 C/L AM Component Cooling Water 13-S0060 Essential Service Water 2000' Prelube Storage Tank Essential Service Water 13-S0052 Auxiliary 1974' 9'S A2 3'W AH High Pressure Coolant Injection 13-S0051 Auxiliary 1974' 7'N A3 7'W AF High Pressure Coolant Injection 13-S0050 Containment 2000' 5'S C7 5'E CF Fire Protection 13-S0048 Auxiliary 2026' 3'S A7 3'E AL Component Cooling Water 13-S0046 Auxiliary 2026' 6'S A3 7'E AM Component Cooling Water 13-S0043 Auxiliary 2026' 2'S A9 8'E AN Component Cooling Water 
Feedring Design (BTP        performed. Refer to


Rev. 29 WOLF CREEK  TABLE 1.7-4 (sheet 4)  ERECTED SCAFFOLD EXPECTED TO BE IN PLACE THROUGHOUT NEXT REQUIRED USAR UPDATE CYCLE 13-S0042 Auxiliary  2026' 3'E CA C/L A11 Component Cooling Water 13-S0041 Auxiliary 2026' 3'E CA C/L A9 Component Cooling Water 13-S0040 Auxiliary 2026' 3'W AL 8'N A12 Component Cooling Water 13-S0039 Auxiliary 2026' 4'S A13 6'E AL  Component Cooling Water 13-S0038 Auxiliary 2026' 4'E AN 9'N A14 Component Cooling Water 13-S0037 Auxiliary  2026' 5'W AN C/L A10 Component Cooling Water 13-S0036 Essential Service Water 2000' 1'N C Wall 38'E W Wall Essential Service Water 13-S0035 Auxiliary 2026' C/L A11 6'E AN Component Cooling Water 13-S0034 Auxiliary 2026' 10'S A9 3'W AL Component Cooling Water 11-S8180 Auxiliary 2000' 9'S A6 13'W AL Residual Heat Removal 11-S8127 Auxiliary 2000' 4'S A9 10'E AK Component Cooling Water 11-S0237 Auxiliary 2000' 5'S A8 2'W AK Component Cooling Water 11-S0229 Auxiliary 2000' 5'E AK C/L A11 Component Cooling Water 11-S0228 Auxiliary 2000' 6'W AJ 17'S A9 Component Cooling Water 11-S0227 Auxiliary 2000' 3'W AJ 14'S A8 Component Cooling Water 10-S0088 Auxiliary  2026' 2'S A13 2'W AK Component Cooling Water 10-S0086 Auxiliary 2026' 8'N A4  3'W AM Component Cooling Water 10-S0080 Auxiliary 2026' 5'N A6 15'W AM Component Cooling Water 08-S0201 Fuel 2000' 5'S FI 15'W FD Fuel Pool 08-S0136 Auxiliary 2043' East Bay Main and Reheat Steam 08-S0135 Auxiliary 2043' West Bay Main and Reheat Steam Rev. 29 WOLF CREEK TABLE 1.7-4 (sheet 5)  ERECTED SCAFFOLD EXPECTED TO BE IN PLACE THROUGHOUT NEXT REQUIRED USAR UPDATE CYCLE  WCGS Scaffold Request Building Elevation Location System 04-S9001 Auxiliary 1974' 1' N A7 4" W AL Camera 04-S9002 Auxiliary 1974" 2' N A7 4' W AL Camera 04-S9008 Auxiliary 2000' 4' S A7 10' W AM Camera 04-S9009 Auxiliary 2000' C/L A13 C/L AE Camera 04-S9010 Auxiliary 2000' 6' N A7 4' W AL Camera 04-S9011 Auxiliary 2000' 1' S A12 1' E AN Camera 04-S9013 Fuel 2047' 10'N F4 4" W FC Camera 04-S9017 Fuel 2047' 2' N F7 6' E FB Camera 04-S9018 Auxiliary 2000' C/L A4 C/L AJ Camera 08-S9010 Auxiliary 2000' C/L A9 3' E AM Camera                      Rev. 29 WOLF CREEK 1.8  CONFORMANCE TO NRC REGULATORY GUIDESA discussion of the extent to which WCGS complies with each of the NRC Division 1 Regulatory Guides is provided in Appendix 3A. Appendix 3A gives a brief statement of WCGS compliance and refers to the most appropriate section of the USAR for the complete description of how the design complies with the regulatory recommendations.      1.8-1    Rev. 0 WOLF CREEK 1.9 NRC REGULATORY REQUIREMENTS REVIEW COMMITTEE CATEGORY 2, 3, AND 4 MATTERSThe Office of Nuclear Reactor Regulation (NRR) established a Regulatory Requirements Review Committee (RRRC) which reviewed proposed changes to the regulatory requirements issued by the staff and recommended a course of action to the Office of NRR. The course of action includes an implementation schedule. The Director's approval was then used by the NRR staff as review guidance on individual licensing matters. The RRRC developed a categorization nomenclature to aid in the uniform implementation of new and revised regulatory staff concerns. The system included four categories (1 through 4) which correspond to the evaluation by the RRRC of the need for applying the regulatory concerns to new and ongoing license applications. The four categories are defined as follows: Category 1: Matters whose applicability is to be applied to  applications in accordance with the implementation  section of the published guide. The RRRC considers it necessary to forward fit (on new applications) the requirements of these matters. Category 2: A new position whose applicability is to be deter-  mined on a case-by-case basis. The NRC staff will give further consideration to the need for backfit-ting certain identified items of the regulatory concerns. Category 3: Positions to which the NRC staff considers confor-  mance necessary, either by direct implementation or by implementation of an acceptable alternative.
ASB-10.2)                  Section 10.4.7.
These positions could be the cause of backfitting if an acceptable alternative is not available. Category 4: Positions of concern to the NRC staff which have  not been reviewed by the RRRC and subsequently categorized as Category 1, 2, or 3. Since these items are of concern to the NRC staff, for review  purposes, they are to be considered on the same  basis as Category 2, potential for backfitting  certain identified regulatory concerns. 1.9-1 Rev. 0 WOLF CREEK The Office of NRR, by letter dated November 21, 1978, transmitted a list of Category 2, 3, and 4 matters for consideration in preparing the WCGS FSAR. A discussion of how Wolf Creek complies with each of the listed matters is contained in Tables 1.9-1 through 1.9-4. The RRRC Category Designation columns in the tables correspond to those contained in the November 21, 1978 letter. Table 1.9 Lists all Category 2, 3, and 4 regulatory guides and references the location in which the regulatory guides are addressed. Table 1.9 Lists all Category 2, 3, and 4 branch technical positions (BTPs), provides remarks on the extent to which the recommendations of the BTPs are met, and references the location of more complete discussions of the RRRC matter.Tables 1.9-3 and 1.9 Address the Category 4 SRP criteria and other Category 4 positions, respectively. 1.9-2 Rev. 0 WOLF CREEK                            TABLE 1.9-1                      CATEGORY 2, 3, AND 4                        REGULATORY GUIDES*            Regulatory Guide            RRRC Category          Number      Revision            2  3  4          1.12          1                        X          1.13          1                        X 1.14          1                        X          1.27          2                X          1.52          1                X 1.56          1                    X 1.59          2                X 1.63          2                X          1.68.2        1                    X          1.75          1                        X 1.76          0                        X 1.79          1                        X 1.80          0                        X 1.82          0                        X 1.83          1                        X 1.89          0                        X          1.91          1                X 1.93          0                        X 1.97          1                    X 1.99          1                    X 1.101          1                    X 1.102          1                X 1.104          0                        X 1.105          1                X 1.108          1                X 1.114          1                    X 1.115          1                X 1.117          1                X 1.121          0                    X 1.124          1                X 1.127          1                    X 1.130          0                X          1.137          0                X 1.141          0                X 8.8            2                X          *All regulatory guides are addressed in Appendix 3A with          the exception of Regulatory Guide 8.8, which is addressed in Section 12.1.Rev. 0 WOLFCREEKTABLE1.9-2CATEGORY2,3,AND4BRANCHTECHNICALPOSITIONSBranchTechnicalRRRCPositionTitleCat.RemarksASB9.5-1,GuidelinesforFire2TherecommendationsofRev.1ProtectionforNu-thisBTParemettoclearPowerPlantstheextentdescribedinSection9.5.1.MTEB5-7MaterialSelection2TherecommendationsofandProcessingthisBTParenotap-GuidelinesforBWRplicabletotheWCGSCoolantPressure(PWR)design.BoundaryRSB5-1,DesignRequirements3TherecommendationsofRev.1oftheResidualHeatthisBTParemettotheRemovalSystemextentdescribedinSec-tions5.2.2and7.6.6.RSB5-2Overpressurization3TherecommendationsofProtectionofPres-thisBTParemettothesurizedWaterReactorsextentdescribedinSec-WhileOperatingatLowtions5.2.2and7.6.6.TemperaturesMTEB5-3MonitoringofSec-4.B.1TherecommendationsofondarySideWaterthisBTParemet.ReferChemistryinPWRtoSections9.3.2and SteamGenerators10.3.5.CSB6-1MinimumContainment4.B.2TherecommendationsofPressureModelforthisBTParemet.ReferPWRECCSPerformancetoSections6.2.1andEvaluation15.6.5.CSB6-2ControlofCombus-4.B.3TherecommendationsoftibleGasConcentra-thisBTParemet.RefertionsinContainmenttoSection6.2.5.FollowingaLoss-of-CoolantAccidentRev.0 WOLFCREEKTABLE1.9-2(Sheet2)BranchTechnicalRRRCPositionTitleCat.RemarksCSB6-3Determinationof4.B.4TherecommendationsofBypassLeakagePathsBTParenotapplicableinDualContainmenttotheWCGSdesign,Plantssincethereisnodualcontainment.CSB6-4ContainmentPurging4.B.5TherecommendationsofDuringNormalPlantthisBTParemettothe OperationsextentdescribedinTable9.4-13.ASB9.1OverheadHandling4.B.6TherecommendationsofSystemsforNu-thisBTParemet.NoclearPowerPlantscriticalloadsarehandled.Referto Section9.1.4.ASB10.1DesignGuidelines4.B.7TherecommendationsofforAuxiliaryFeed-thisBTParemet.Refer waterSystemPumptoSection10.4.9.DriveandPowerSup-plyDiversityforPWRPlantsRev.0 WOLF CREEK                                TABLE 1.9-3                          CATEGORY 4 SRP CRITERIA  SRP    RRRCSection  Cateqory          Title3.5.3    4.B.8    Procedures for Composite  The recommendations of this(Par II.1.C)       Section Local Damage Pre-  SRP are met to the extent                   diction                    described in Section 3.5.3.3.7.1    4.B.9    Development of Design      The recommendations of(Par. II.2)        Time History for Soil-    this SRP are met to the Structure Interaction      extent described in Analysis                  Section 3.7(B).1.3.7.2    4.B.10   Procedures for Seismic    The recommendations of(Par. II)          System Analysis            this SRP are met. Refer to Sections 3.7(B).2 and 3.7(N).2.3.7.3    4.B.11    Procedures for Seismic    The recommendations of(Par. II)          Subsystem Analysis        this SRP are met. Refer                                              to Sections 3.7(B).3 and                                              3.7(N).33.8.1    4.B.12    Design and Construction    The design of the con-(Par. II)          of Concrete Containments  tainment structure is described in Section 3.8.1. The load combi-nations used meet or exceed ACI 359/SRP criteria.3.8.2    4.B.13    Design and Construction    The recommendations of(Par. II)          of Steel Containments      this SRP are not applic-able to WCGS.3.8.3    4.B.14    Structural Design Cri-    The design meets or ex-(Par. II)          teria for Category I      ceeds the load combina-                  Structures Inside Con-    tions of ACI 359/SRP                  tainment                  criteria. Refer to                                              Sections 3.8.3 and 5.4,                                              respectively, for dis-                                              cussion of the Bechtel                                              and Westinghouse com-                                              ponent supports.3.8.4    4.B.15    Structural Design Cri-    The design meets or ex-(Par. II)          teria for Other Seismic    ceeds the load combina-                  Category I Structures      tions of ACI 359/SRP                                              criteria. Refer to                                              Section 3.8.4.Rev. 0 WOLF CREEK                          TABLE 1.9-3 (Sheet 2)  SRP      RRRCSection  Category        Title                        Remarks3.8.5    4.B.16    Structural Design Cri-      The design meets or exceeds(Par. II)          teria for Foundations        the load combinations of                                                ACI 359/SRP criteria.                                                Refer to Section 3.8.5.
3.11    4.C.19  Environmental Control      The recommendations of this Systems for Safety-Re-      item are met to the ex-lated Equipment            tent described in Section 3.11(B).
The safety factors for                                                sliding are discussed in Section 3.8.5.5.3.7      4.B.17    Seismic Design Require-      The recommendations of11.2              ments for Radwaste Systems  this SRP are met as11.3              and their Housing Struc-    described in Appendix11.4              tures (SRP Section 11.2,    3A in the response                  BTP ETSB 11-1, Par. B.v.)    to Regulatory Guide 1.143. Refer to Chapter 11.0. Section 3.8.6 des-                                                cribes the seismic deisgn                                                capabilities of the rad-                                                waste building.3.3.2    4.B.18    Tornado Load Effect Com-    The recommendations of(Par. II.2.d)      binations                    this SRP are met.                                                Refer to Section 3.3.2.3.4.2    4.B.19    Dynamic Effects of Wave      The recommendations of(Par II)          Action                      this SRP are met.                                                Refer to Section 3.4.2.10.4.7  4.B.20    Water Hammer for Steam      The WCGS steam qenerators(Par. I.2.b)      Generators with Pre-        (Model F) have no pre-heaters                      heaters. Refer to Sections 5.4.2 and 10.4.7.4.4      4.B.21    Thermal-Hydraulic Sta-      The recommendations of(Par. II.5)        bility                      this SRP are met as dis-cussed in Section 4.4.4.6.5.2.5    4.B.22    Intersystem Leakage Detec-  Intersystem leakage de-(Par II.4)        tion (See RG 1.45)          tection requirements and capabilities are discussed in Section 5.2.5.3.2.2    4.B.23    Main Steam Isolation Valve  The recommendations of                  Leakage Control System      this SRP are not appli-                  (SRP Section 10.3, Par.      cable to the WCGS III.3 and BTP RSB-3.2)      (PWR) design.Rev. 0 WOLF CREEK                                TABLE 1.9-4                        OTHER CATEGORY 4 POSITIONS  SRP      RRRCSection  Category          Title                    Remarks3.5.3    4.C.1    Ductility of Reinforced    The recommendations of this                  Concrete and Steel Struc-  item are met to the ex-                  tural Elements Subjected    tent described in Section to Impactive or Impulsive  3.5.3.
Rev. 0}}
Loads3.7.1    4.C.2    Response Spectra in Verti-  The recommendations of this                  cal Direction              item are met. Refer to                                              Section 3.7(B).1. West-                                              inghouse utilizes the damping values of WCAP 7921-AR. See also the response to Regulatory Guide 1.60 in                                              Appendix 3A.3.8.1    4.C.3    BWR Mark III Containment    The recommendations of this3.8.2              Pool Dynamics              item are not applicable to the WCGS (PWR) design.3.8.4    4.C.4    Air Blast Loads            Air blast loads from trans-                                              portation are less than the                                              external pressure design                                              capabilities described in                                              Section 3.8.3.5.3    4.C.5    Tornado Missile Impact      The recommendations of this                                              item are met. Refer to                                              Section 3.5.3.1.6.3      4.C.6    Passive Failures During    The recommendations of this                  Long-Term Cooling Follow-  item are met to the ex-ing LOCA                    tent described in Sections 3.1 and 6.3.6.3      4.C.7    Control Room Position      The recommendations of this                  Indication of Manual        item are met. Refer to                  (Handwheel) Valves in      Sections 7.5.2.2.1 and                  the ECCS                    7.5.2.2.2.15.1.5  4.C.8    Long-Term Recovery from    The recommendations of this                  Steamline Break:  Opera-    item are met to the extent                  tor Action to Prevent      described in Section                  Overpressurization          15.0.13. Operator action is                                              not assumed for 10 minutes.Rev. 0 WOLF CREEK                          TABLE 1.9-4 (Sheet 2)  SRP      RRRCSection  Category        Title                      Remarks5.4.6    4.C.9    Pump Operability Require-  The recommendations of this5.4.7            ments                      item are met. Refer to 6.3                                          Section 6.2.2.1.2.2 and                                              Section 6.3.2.5.3.5.1    4.C.10  Gravity Missiles, Vessel    The recommendations of this                  Seal Ring Missiles Inside  item are met. Refer to                  Containment                Appendix 3B. Section                                              9.1.4.2.2 discusses the                                              reactor cavity seal ring.4.4      4.C.11  Core Thermal-Hydraulic      The recommendations of this                  Analysis                    item are met. However,                                              Westinghouse is generically                                              reducing rod bow penalties                                              through experience gained by test surveillance. Refer to Section 4.2.3.1.8.3      4.C.12  Degraded Grid Voltage      The recommendations of this                  Conditions                  item are met to the ex-tent described in Section 8.3.1.1.3 and Technical                                              Specifications.6.2.1.2  4.C.13  Asymmetric Loads on Com-    The recommendations of this                  ponents Located Within      item are met. Refer to                  Containment Subcompart-    Section 6.2.1.2.
ments6.2.6    4.C.14  Containment Leak Testing    The recommendations of this                  Program                    item are met. Refer to Section 6.2.6.6.2.1.4  4.C.15  Containment Response Due    The recommendations of this                  to Main Steamline Break    item are met. Refer to                  and Failure of MSLIV to    Sections 6.2.1, 3.11(B),                  Close                      and 3.11(N).3.6.1    4.C.16  Main Steam and Feedwater    The recommendations of this3.6.2            Pipe Failures              item are met. Refer to                                              Sections 3.6.1 and 3.6.2.Rev. 0 WOLF CREEK                          TABLE 1.9-4 (Sheet 3)        Category          Title                      Remarks9.2.2    4.C.17  Design Requirements for    The recommendations of this                  Cooling Water to Reactor    item are met to the extent Coolant Pumps              described in Sections 5.4.1,                                              9.2.2, and 9.3.410.4.7  4.C.18  Design Guidelines for      The design meets the rec-                  Water Hammer in Steam      ommendations of this item; Generators with Top        however, no testing was Feedring Design (BTP        performed. Refer to ASB-10.2)                  Section 10.4.7.3.11    4.C.19  Environmental Control      The recommendations of this                 Systems for Safety-Re-      item are met to the ex-                 lated Equipment            tent described in Section                                             3.11(B).Rev. 0}}

Revision as of 04:46, 30 June 2018

Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, Chapter 1.0 - Introduction and General Description of the Plant
ML16203A368
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/31/2016
From:
Wolf Creek
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16203A351 List: ... further results
References
WM 16-0008
Download: ML16203A368 (199)


Text

WOLF CREEK

TABLE OF CONTENTS CHAPTER

1.0 INTRODUCTION

AND GENERAL DESCRIPTION OF THE PLANT

Section Page

1.1 INTRODUCTION

1.1-1

1.1.1 LICENSES REQUESTED 1.1-1

1.1.2 PLANT UNITS 1.1-1

1.1.3 PLANT LOCATION 1.1-2

1.1.4 CONTAINMENT STRUCTURE 1.1-3

1.1.5 NUCLEAR STEAM SUPPLY AND TURBINE-GENERATOR 1.1-3

1.1.6 SCHEDULE FOR FUEL LOADING AND OPERATION 1.1-3

1.1.7 DESIGN BASES 1.1-3

1.2 GENERAL PLANT DESCRIPTION 1.2-1

1.2.1 PLANT SITE DESCRIPTION 1.2-1 1.2.1.1 Site Location 1.2-1 1.2.1.2 Site Ownership 1.2-1 1.2.1.3 Access to the Site 1.2-1 1.2.1.4 Environs 1.2-1 1.2.1.5 Geology 1.2-2 1.2.1.6 Seismology 1.2-3 1.2.1.7 Hydrology 1.2-3 1.2.1.8 Meteorology 1.2-5

1.2.2 GENERAL ARRANGEMENTS OF STRUCTURES 1.2-5

1.2.3 PRINCIPAL DESIGN CRITERIA 1.2-8 1.2.3.1 SNUPPS Design Envelope 1.2-8

1.2.4 NUCLEAR STEAM SUPPLY SYSTEM 1.2-8

1.2.5 ENGINEERED SAFETY FEATURES AND EMERGENCY SYSTEMS 1.2-10 1.2.5.1 Containment 1.2-10 1.2.5.2 Emergency Core Cooling System 1.2-12 1.2.5.3 Auxiliary Feedwater System 1.2-12

1.0-i Rev. 29 WOLF CREEK

TABLE OF CONTENTS (CONTINUED)

Section Page

1.2.6 PLANT INSTRUMENTATION AND CONTROL SYSTEMS 1.2-13 1.2.6.1 Protection System 1.2-14 1.2.6.2 Reactor Instrumentation and Control System 1.2-14 1.2.6.3 Radiation Monitoring System 1.2-15 1.2.6.4 Balance-of-Plant Instrumentation and Control Systems 1.2-15

1.2.7 PLANT ELECTRIC POWER SYSTEM 1.2-15 1.2.7.1 Transmission and Generation Systems 1.2-15 1.2.7.2 Electric Power Distribution System 1.2-16

1.2.8 POWER CONVERSION SYSTEM 1.2-17 1.2.8.1 Main Steam Supply System 1.2-17 1.2.8.2 Main Condenser Evacuation System 1.2-17 1.2.8.3 Turbine Gland Sealing System 1.2-18 1.2.8.4 Turbine Bypass System 1.2-18 1.2.8.5 Circulating Water System 1.2-18 1.2.8.6 Condensate Cleanup System 1.2-18 1.2.8.7 Condensate and Feedwater System 1.2-19 1.2.8.8 Steam Generator Blowdown System 1.2-19 1.2.8.9 Secondary Liquid Waste System 1.2-19 1.2.8.10 Wastewater Treatment System 1.2-19

1.2.9 AUXILIARY SYSTEMS 1.2-20 1.2.9.1 Chemical and Volume Control System 1.2-20 1.2.9.2 Residual Heat Removal System 1.2-20 1.2.9.3 Fuel Handling and Storage System 1.2-21 1.2.9.4 Service Water Systems 1.2-21 1.2.9.5 Component Cooling Water System 1.2-22 1.2.9.6 Compressed Air Systems 1.2-23 1.2.9.7 Fire Protection Systems 1.2-23 1.2.9.8 Heating, Ventilating, and Air-Conditioning Systems 1.2-24 1.2.9.9 Sampling Systems 1.2-25 1.2.9.10 Service Gas System 1.2-25 1.2.9.11 Communications System 1.2-25 1.2.9.12 Diesel Generator Support Systems 1.2-26

1.2.10 WASTE PROCESSING SYSTEMS 1.2-26

1.2.11 SHARED FACILITIES AND COMPONENTS 1.2-27

1.2.12 REFERENCES 1.2-27

1.0-ii Rev. 29 WOLF CREEK

TABLE OF CONTENTS (CONTINUED)

Section Page

1.3 COMPARISON TABLES 1.3-1

1.3.1 COMPARISON WITH SIMILAR FACILITY DESIGNS 1.3-1

1.3.2 COMPARISON OF FINAL AND PRELIMINARY INFORMATION 1.3-1

1.3.3 COMPLIANCE WITH NRC REGULATIONS 1.3-1

1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS 1.4-1

1.4.1 APPLICANTS 1.4-1

1.4.2 SNUPPS 1.4-1

1.4.3 NUCLEAR STEAM SUPPLY SYSTEM MANUFACTURER 1.4-3

1.4.4 STANDARD PLANT (LEAD) ARCHITECT/ENGINEER 1.4-4

1.4.5 TURBINE-GENERATOR MANUFACTURER 1.4-4

1.4.6 SITE ARCHITECT/ENGINEER 1.4-5

1.4.7 CONSULTANT FIRMS 1.4-5 1.4.7.1 SNUPPS Consultants 1.4-5 1.4.7.2 WCGS Specific Consultants 1.4-7

1.4.8 CONSTRUCTOR 1.4-10

1.4.9 DIVISION OF RESPONSIBILITIES 1.4-11 1.4.9.1 Utility Company 1.4-11 1.4.9.2 Standard Plant Architect/Engineer 1.4-11 1.4.9.3 SNUPPS Staff 1.4-12 1.4.9.4 Site Architect/Engineer 1.4-12 1.4.9.5 Security Consultant 1.4-12

1.5 REQUIREMENTS FOR FURTHER TECHNICAL INFORMATION 1.5-1 1.5.1 17 x 17 FUEL ASSEMBLY 1.5-1 1.5.1.1 Rod Cluster Control Spider Tests 1.5-1 1.5.1.2 Grid Tests 1.5-1 1.5.1.3 Fuel Assembly Structural Tests 1.5-1 1.5.1.4 Guide Tube Tests 1.5-1 1.5.1.5 Prototype Assembly Tests 1.5-2 1.5.1.6 Departure from Nucleate Boiling Tests 1.5-2 1.5.1.7 Incore Flow Mixing 1.5-2

1.0-iii Rev. 29 WOLF CREEK

TABLE OF CONTENTS (CONTINUED)

Section Page 1.5.2 FIRE STOPS 1.5-2

1.5.3 OTHER PROGRAMS 1.5-2 1.5.3.1 Generic Programs of Westinghouse 1.5-2 1.5.3.2 Generic Programs of Bechtel 1.5-3 1.5.3.3 Test of a Wolf Creek Steam Generator 1.5-3

1.

5.4 REFERENCES

1.5-3

1.6 MATERIAL INCORPORATED BY REFERENCE 1.6-1

1.7 DRAWINGS AND OTHER DETAILED INFORMATION 1.7-1

1.7.1 ELECTRICAL, INSTRUMENTATION AND CONTROL DRAWINGS 1.7-1

1.7.2 PIPING AND INSTRUMENTATION DIAGRAMS 1.7-1

1.7.3 MISCELLANEOUS CONTROLLED DRAWINGS 1.7-1

1.7.4 LONG-TERM TEMPORARY MODIFICATIONS 1.7-1

1.8 CONFORMANCE TO NRC REGULATORY GUIDES 1.8-1

1.9 NRC REGULATORY REQUIREMENTS REVIEW COMMITTEE CATEGORY 2, 3, AND 4 MATTERS 1.9-1

1.0-iv Rev. 29 WOLF CREEK

TABLE OF CONTENTS (CONTINUED)

LIST OF TABLES

Table no. Title

1.1-1 Acronyms Used in the USAR

1.2-1 Design Envelope

1.3-1 Design Comparison

1.3-2 Major Analyses Not Included in Topical Reports

1.3-3 Significant Design Changes from the PSAR

1.3-4 Compliance with NRC Regulations, 10 CFR

1.4-1 Nuclear Power Plants Completed or Currently Under Design by Sargent & Lundy

1.4-2 Other Nuclear Power Plants with Partial Sargent & Lundy Design Responsibility

1.6-1 Bechtel Topical Reports Incorporated by Reference

1.6-2 Westinghouse Topical Reports Incorporated by Reference

1.6-3 USAR Figure/Controlled Drawing Cross-Reference

1.6-4 Incorporated by Reference USAR Section.Controlled Document Cross-Reference

1.7-1 Electrical, Instrumentation, and Control Drawings

1.7-2 Piping and Instrumentation Diagrams

1.7-3 Additional Controlled Drawings Used in the USAR

1.7-4 Erected Scaffold Expected to be in Place Throughout Next Required USAR Update Cycle

1.9-1 Category 2, 3 and 4 Regulatory Guides

1.9-2 Category 2, 3, and 4 Branch Technical Positions

1.9-3 Category 4 SRP Criteria

1.9-4 Other Category 4 Positions

1.0-v Rev. 29 WOLF CREEK CHAPTER 1 - LIST OF FIGURES

  • Refer to Section 1.6 and Table 1.6-3. Controlled drawings were removed from the USAR at Revision 17 and are considered incorporated by reference.

Figure #

Sheet TitleDrawing #*1.1-1 1 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-120101 1.1-1 2 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-120102 1.1-1 3 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-020103 1.1-1 4 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-020104 1.2-1 0 Peninsular Plant Arrangement Standard Power Systems & Structure Interface M-1G001 1.2-2 0 Equipment Location Radwaste Building Plan El.

1976'-0" M-1G010 1.2-3 0 Equipment Location Radwaste Building Plan El.

2000'-0" M-1G011 1.2-4 0 Equipment Location Radwaste Building Plan El.

2022'-0" M-0G012 1.2-5 0 Equipment Location Radwaste Building El. 2031'-

6" & Roof Plan M-1G013 1.2-6 0 Equipment Location Radwaste Building Sections A

& B M-1G014 1.2-7 0 Equipment Location Radwaste Building Sections C

& E M-1G015 1.2-8 0 Equipment Location Radwaste Building Sections D

& F M-1G016 1.2-9 0 Equipment Location Reactor and Auxiliary Bldgs Plan - Basement El. 1974'-0" M-1G020 1.2-10 0 Equipment Location Auxiliary Building Partial Plan El. 1988'-0" & El. 2013'-6" M-1G021 1.2-11 0 Equipment Location Reactor and Auxiliary Building Plan Ground Floor Elevation 2000'-0" M-1G022 1.2-12 0 Equipment Location Reactor and Auxiliary Building Plan El. 2026'-0" M-1G023 1.2-13 0 Equipment Location Reactor and Auxiliary Buildings Plan Operating Floor El. 2047'-6" M-1G024 1.2-14 0 Equipment Locations Reactor and Auxiliary Buildings Plan El. 2068'-8" M-1G025 1.2-15 0 Equipment Location Reactor and Auxiliary Building Section A M-1G026 1.2-16 0 Equipment Locations Reactor and Auxiliary Buildings Section B M-1G027 1.2-17 0 Equipment Location Reactor and Auxiliary Building Section C M-1G028 1.2-18 0 Equipment Location Reactor and Auxiliary Building Section D M-1G029 1.0-vi Rev.

17 WOLF CREEK CHAPTER 1 - LIST OF FIGURES

  • Refer to Section 1.6 and Table 1.6-3. Controlled drawings were removed from the USAR at Revision 17 and are considered incorporated by reference.

Figure # Sheet TitleDrawing #* 1.2-19 0 Equipment Location Auxiliary Building Sections E, F, & G M-1G030 1.2-20 0 Equipment Location Fuel Building Plan Elevation 2000'- 0", 2026'-0" and 2047'-6" M-1G040 1.2-21 0 Equipment Location Fuel Building Sections A, B, &

C M-1G041 1.2-22 0 Equipment Location Fuel Building Sections D, E, &

F M-1G042 1.2-23 0 Equipment Location Control Building &

Communication Corridor Plan Elevation 1974'- 0" &

1984'-0" M-1G050 1.2-24 0 Equipment Location Control & Diesel Generator Buildings & Communication Corridor Plan Elevation 2000'-0" & 2016'-0" M-1G051 1.2-25 0 Equipment Location Control & Diesel Generator Buildings & Communication Corridor Plan Elevation

2032'-0" & 2047'-6" M-1G052 1.2-26 0 Equipment Location Control & Diesel Generator Buildings & Corridor Plan Elevation 2061'- 6",

2066'-0" & 2073'-6" & Section D.

M-1G053 1.2-27 0 Equipment Location Control & Diesel Generator Buildings & Communication Corridor Section A M-1G054 1.2-28 0 Equipment Location Control & Diesel Generator Buildings Sections B & C M-1G055 1.2-29 0 Equipment Location Turbine Building Condenser Pit Plan Elevation 1983'-0" M-1G060 1.2-30 0 Equipment Location Turbine Building Ground Floor Plan Elevation 2000'-0" M-1G061 1.2-31 0 Equipment Location Turbine Building Partial Plan Elevation 2015'-4" M-1G062 1.2-32 0 Equipment Location Turbine Building Mezzanine Floor Plan Elevation 2033'-0" M-1G063 1.2-33 0 Equipment Location Turbine Building Operating Floor Plan Elevation 2065'-0" M-1G064 1.2-34 0 Equipment Location Turbine Building Section A M-1G065 1.2-35 0 Equipment Location Turbine Building Section B M-1G066 1.2-36 0 Equipment Location Turbine Building Section C M-1G067 1.2-37 0 Equipment Location Turbine Building Section D M-0G068 1.2-38 0 Equipment Location Turbine Building Section E M-1G069 1.2-39 0 Equipment Location Turbine Building Section F M-1G070 1.2-40 0 Equipment Location Turbine Building Section G M-0G071 1.2-41 0 Equipment Location Turbine Building Section H M-1G072 1.2-42 0 Turbine Component Laydown Area, Elevation 2065'-

0" M-1G073 1.2-43 0 Site Area Layout 1.2-44 0 Site Plan 8025-C-KG1202

1.0-vii Rev. 29

WOLF CREEK CHAPTER

1.0 INTRODUCTION

AND GENERAL DESCRIPTION OF THE PLANT

1.1 INTRODUCTION

Kansas City Power & Light Company, Kansas Gas and Electric Company (KG&E) and Union Electric Company joined together to design, purchase, and license a nuclear block for a generating station acceptable at any of several sites, under the acronym of SNUPPS, Standardized Nuclear Unit Power Plant System. The terminology "the Operating Agent" is used throughout this report to identify the managing corporation for WCGS. At this time the Operating Agent is Wolf Creek Nuclear Operating Corporation (WCNOC) 1.1.1 LICENSE REQUESTED

The Safety Analysis Report was submitted to the Nuclear Regulatory Commission (NRC) in support of the application by the Operating Agent for a Class 103 license to operate a nuclear power facility.

The participants in the Wolf Creek project and their portions of ownership are:

Kansas City Power & Light Company (47 percent), Kansas Electric Power Cooperative, Incorporated (6 percent), and Kansas Gas and Electric Company (47

percent). See Section 1.4.1 for additional discussion of plant ownership.

This report was originally submitted in two parts, the SNUPPS FSAR and the Wolf Creek Site Addendum. It was combined into one report, the Wolf Creek Updated

Safety Analysis Report, in the first update after receipt of the Operating

License. This report follows the format recommended by Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants. Sufficiently detailed design information is provided in this report to make a definitive evaluation that the Wolf Creek Generating Station (WCGS) can

be operated without undue risk to the health and safety of the public.

The Licensees received a low power (less than five percent) license to operate the Wolf Creek Generating Station on March 11, 1985. The full power license was issued on June 4, 1985. 1.1.2 PLANT UNITS

The application was for a single pressurized water reactor nuclear unit. The power block was built to the SNUPPS duplicate plant 1.1-1 Rev. 2 WOLF CREEK design. The ESWS vertical loop chase design is not included in the SNUPPS duplicate plant design. Evaluations of the site characteristics and the design of the cooling system and other site-related systems and facilities have

considered the installation of a second nuclear unit at a later date.

The WCGS power block, consists of these structures, including enclosed systems

and components:

a. Reactor building (containment)
b. Turbine building
c. Control building
d. Auxiliary building
e. Diesel generator building
f. Fuel building
g. Radwaste building
h. Storage tanks (refueling water, condensate, demineralized water, reactor makeup water, and emergency fuel oil)
i. Transformers (main, unit auxiliary, ESF, and station service) and vaults
j. ESWS Vertical Loop Chase

Due to the use of the SNUPPS standard design for these items, design envelopes

were developed by use of the most restrictive site conditions imposed by any

one of the four original sites or by generic design criteria which were

conservative for each of the sites. With the cancellation of the Tyrone plant,

however, the four-site enveloping approach was modified in the seismic design

area (e.g. development of spectra) for work not yet completed to include only

the three remaining sites. Refer to Sections 2.5 and 3.7(B) for details. The

design envelopes were not revised to reflect the cancellation of Sterling.

The ESWS vertical loop chase design was analyzed using the design envelopes applied to the original SNUPPS standard plant design.

1.1.3 PLANT LOCATION

The site for the Wolf Creek Generating Station, Unit No. 1, is located

approximately 3.5 miles northeast of the town of Burlington, in Coffey County,

Kansas. The site is situated approximately 3.5 miles east of the Neosho River

and the John Redmond Reservoir. The nearest population center is Emporia,

Kansas, located 28 miles west-northwest of the site. It is approximately 75

miles southwest of Kansas City, Kansas.

1.1-2 Rev. 29 WOLF CREEK 1.1.4 CONTAINMENT STRUCTURE

The containment, which was designed by the Bechtel Power Corporation, is a carbon steel-lined, concrete structure. The walls and dome are post-tensioned, prestressed concrete, and the base slab is reinforced concrete.

1.1.5 NUCLEAR STEAM SUPPLY SYSTEM AND TURBINE-GENERATOR

The nuclear steam supply system (NSSS) for Wolf Creek is a pressurized water

reactor (PWR) which was designed and supplied by the Westinghouse Electric

Corporation.

The reactor core was designed for an output of 3,411 MWt. When the reactor coolant pump input of 14 MWt was added to the core output, the warranted nuclear steam supply system output was 3,425 MWt, which was defined as the

rated power in the license application. The engineered safety features were

designed for a core power of 3,565 MWt. An additional 2 percent conservatism

was added for some analyses to give a maximum accident analysis power of 3,636

MWt. Analyses were performed in 1992 to uprate the reactor core power to 3565

MWt.

The turbine generator is rated for operation at the NSSS output of 3,425 MWt.

The corresponding turbine generator electrical output is 1,186 MWe. The

turbine generator has a valve wide open capability of 1,234 MWe, assuming an

NSSS output of approximately 105 percent of the rated steam flow. The turbine

generator was designed and supplied by the General Electric Company.

The Wolf Creek Power Rerate Program increases the licensed reactor core power level from 3411 MW (th) to 3565 MW (th). The estimated turbine-generator output is 1228 MW (e) at the Power Rerate condition, which is based on an NSSS output of 3579 MW (th) and a Reactor Coolant System hot leg (T hot) temperature of 618.2 F. The turbine has been upgraded with new monoblock rotors on both the high pressure (HP) and low pressure (LP) turbines. The new HP turbine is a dense pack design (increase in stages from 7 to 9). The last stage buckets in the LP turbines have been increased from 38" to 43". These efficiency enhancements resulted in an expected turbine-generator output of 1268 MWe.

1.1.6 SCHEDULE FOR FUEL LOADING AND OPERATION

A low power operating license was issued for WCGS on March 11, 1985. WCGS first entered commercial operation on September 3, 1985.

1.1.7 DESIGN BASES

As used within this USAR, the design bases are a list of requirements that the

system must meet in order to:

a. Perform directly a specified safety or power generation function including support of another function (e.g.,

provide cooling water flow for other components, maintain a given compartment temperature).

b. Comply with a regulatory or statutory requirement or guideline (e.g., a jurisdictional building code).

1.1-3 Rev. 25 WOLF CREEK c. Meet a specific operator interface, startup, or specific testing requirement. d. Meet a design classification or code requirement (e.g., be designed to withstand the safe shutdown earthquake).

Items implicit in contemporary design practices (e.g., use of the English system of weights and measures or the exercise of good engineering practice) are not specified as design bases.

Safety design bases are engineering objectives which must be met by safety-related structures, systems, or components.

Safety-related items are defined as those plant features necessary to ensure the following: a. The integrity of the reactor coolant pressure boundary. b. The capability to shut down the reactor after a design basis accident and maintain it in a post-accident safe shutdown condition. c. The capability to prevent or mitigate the consequences of accidents that could potentially result in offsite exposures approaching the guideline exposures of 10 CFR 100. Items which are associated with safety-related equipment, but which in themselves are not absolutely essential to the safety function of the

equipment, are not considered safety-related.

Power generation design bases support, either directly or indirectly,the major electrical power generation function of the station. Examples of power generation design bases are the requirements to provide adequate radiation shielding and domestic water for plant personnel.

Sections describing Westinghouse-supplied systems and components do not provide safety design bases or power generation design bases as such. These sections do give functional descriptions and are in compliance with Regulatory Guide 1.70. 1.1-4 Rev. 14 WOLF CREEK TABLE 1.1-1 ACRONYMS USED IN THE USAR AC Alternating Current ACI American Concrete Institute ACRS Advisory Committee on Reactor Safeguards A/E Architect/Engineer AFAS Auxiliary Feedwater Actuation System AFS Auxiliary Feedwater System AISC American Institute of Steel Construction ALARA As Low as Reasonably Achievable

AMSAC (ATWS) Mitigation System Activation Circuitry ANSI American National Standards Institute APRM Average Power Range Monitor ARM Area Radiation Monitor ARW Chemical Waste ASCE American Society of Civil Engineers ASME American Society of Mechanical Engineers ASTM American Society for Testing and Materials ATWS Anticipated Transients Without Scram AVT All Volatile Treatment AWS American Welding Society BOP Balance of Plant B&PVC Boiler and Pressure Vessel Codes BRS Boron Recycle System BTP Branch Technical Position CAS Compressed Air System CCS Condensate Cleanup System CCWS Component Cooling Water System CDS Condensate Demineralizer System CeCWS Central Chilled Water System CFR Code of Federal Regulations CFS Condensate and Feedwater System CGCS Combustible Gas Control System CHF Critical Heat Flux CIS Containment Isolation Signal ClCWS Closed Cooling Water System CM Center of Mass CMAA Crane Manufacturing Association of America CP Construction Permit CPR Critical Power Ratio CPIS Containment Purge Isolation System/Signal CR Center of Rigidity CRD Control Rod Drive CRDA Control Rod Drop Accident CRDM Control Rod Drive Mechanism CREA Control Rod Ejection Accident CRVIS Control Room Ventilation Isolation System/Signal CRW Tritiated Waste

Rev. 4 WOLF CREEK TABLE 1.1-1 (Sheet 2)

CSD Cold Shutdown CST Condensate Storage Tank CSTS Condensate Storage and Transfer System CtCS Containment Cooling System CVCS Chemical and Volume Control System CWS Circulating Water System DAC Derived Air Concentration DBA Design Basis Accident DBE Design Basis Event DC Direct Current DEPSG Double Ended Pump Suction Guillotine DG Diesel Generator DGB Diesel Generator Building DoWS Domestic Water System DNB Departure From Nucleate Boiling DNBR Departure From Nucleate Boiling Ratio DRW Potentially Radioactive Nontritiated Waste DWMS Demineralized Water Makeup System DWST Demineralized Water Storage Tank DWSTS Demineralized Water Storage and Transfer System DWT Dead Weight Test ECCS Emergency Core Cooling System EHC Electrohydraulic Control EOL End of Life EDECAIES Emergency Diesel Engine Combustion Air Intake and Exhaust System EDECWS Emergency Diesel Engine Cooling Water System EDEFSTS Emergency Diesel Engine Fuel Oil Storage and Transfer System EDELS Emergency Diesel Engine Lubrication System EDESS Emergency Diesel Engine Start System EFOST Emergency Fuel Oil Storage Tank ER Environmental Report ESFS Engineered Safety Feature System ESFAS Engineered Safety Feature Actuation System ESWS Essential Service Water System

ESWVLC Essential Service Water Vertical Loop Chase FBIS Fuel Building Isolation Signal FED Floor and Equipment Drainage FDDR Field Deviation Disposition Request FHA Fuel Handling Accident FHS Fuel Handling System FMEA Failure Modes and Effects Analysis FPCC Fuel Pool Cooling and Cleanup FPRCS Fission Product Removal and Control System FPS Fire Protection System FRS Floor Response Spectra FSAR Final Safety Analysis Report FSF Fuel Storage Facility GDC General Design Criteria

Rev. 29 WOLF CREEK TABLE 1.1-1 (Sheet 3)

GRWS Gaseous Radwaste System HELB High Energy Line Break HEPA High Efficiency Particulate Air (filter) HEX Heat Exchanger Hga Inches of Mercury Absolute HSST Heavy Section Steel Technology HVAC Heating, Ventilation and Air Conditioning IAC Interim Acceptance Criteria IEEE Institute of Electrical and Electronics Engineers ILRT Integrated Leakage Rate Test ISI Inservice Inspection LCO Limiting Condition of Operation LEFM Linear Elastic Fracture Mechanics LOCA Loss-of-Coolant Accident LPRM Local Power Range Monitor LPZ Low Population Zone LRWS Liquid Radwaste System LRW Potentially Radioactive Secondary Liquid Waste LSP Low Suction Pressure MCARS Main Condenser Air Removal System MCC Motor Control Center MCES Main Condenser Evacuation System MCPR Minimum Critical Power Ratio MFIV Main Feedwater Isolation Valve MG Motor Generator Set MOV Motor-Operated Valve MPC Maximum Permissible Concentration MS Manufacturer's Standard MSIV Main Steam Isolation Valve MSL Mean Sea Level MSLB Main Steam Line Break MSSS Main Steam Supply System NDT Nondestructive Testing NDTT Nil-Ductility Transition Temperature NFSF New Fuel Storage Facility NPSH Net Positive Suction Head NRC Nuclear Regulatory Commission NSSS Nuclear Steam Supply System OBE Operating Basis Earthquake OL Operating License OPS Offsite Power Systems ORE Occupational Radiation Exposures PA Public Address PAMS Post-Accident Monitoring System PCT Peak Cladding Temperature PHS Plant Heating System

Rev. 0 WOLF CREEK TABLE 1.1-1 (Sheet 4)

P&ID Piping and Instrumentation Diagram PLS Precautions, Limitations, and Setpoints PMF Probable Maximum Flood PRA Peak Recording Accelograph PRM Process Radiation Monitoring PSAR Preliminary Safety Analysis Report PSS Process Sampling System PWR Pressurized Water Reactor RCP Reactor Coolant Pumps RCPB Reactor Coolant Pressure Boundary RCS Reactor Coolant System RHR Residual Heat Removal RMWCS Reactor Makeup Water Control System RMWS Reactor Makeup Water System RMWST Reactor Makeup Water Storage Tank RO Reactor Operator RPV Reactor Pressure Vessel RRS Required Response Spectrum RWB Radwaste Building RWST Refueling Water Storage Tank SACF Single Active Component Failure SAR Safety Analysis Report SAS Secondary Alarm Station

SGB Steam Generator Blowdown SGBIS Steam Generator Blowdown Isolation System/Signal SGBS Steam Generator Blowdown System SIS Safety Injection Signal SIT Structural Integrity Test SJAE Steam Jet Air Ejectors SLWS Secondary Liquid Waste System SMA Strong Motion Accelerometer SNUPPS Standard Nuclear Unit Power Plant System SRO Senior Reactor Operator SRP Standard Review Plan SRS Solid Radwaste System SRSS Square Root of the Sum of the Squares SRW Detergent Waste SSE Safe Shutdown Earthquake SWS Service Water System TBS Turbine Bypass System TG Turbine Generator TGSS Turbine Gland Sealing System TRS Test Response Spectrum UHS Ultimate Heat Sink USAR Updated Safety Analysis Report USGS U.S. Geological Survey

Rev. 14 WOLF CREEK TABLE 1.1-1 (Sheet 5)

UT Ultrasonic Testing VWO Valves Wide Open W Westinghouse WCGS Wolf Creek Generating Station WCNOC Wolf Creek Nuclear Operating Corporation

Rev. 2 WOLF CREEK 1.2 GENERAL PLANT DESCRIPTION This section describes the plant site, general arrangement of plant structures,

design criteria and general design of major systems. Comparisons between the

WCGS design and to the design at other plants were made at the time of application for the Operating License. These comparisons are considered

historic references and will not be updated to reflect changes in other

utilities designs.

1.2.1 PLANT SITE DESCRIPTION

1.2.1.1 Site Location The WCGS site is located approximately 3.5 miles northeast of the town of

Burlington in Coffey County, Kansas. The site is situated approximately 3.5

miles east of the Neosho River and the John Redmond Reservoir. It is approximately 75 miles southwest of Kansas City, Kansas. Site location is

discussed in more detail in Section 2.1.1.

1.2.1.2 Site Ownership The Licensees have either purchased or have obtained easements on the necessary

land within the site boundary. Full ownership control of the exclusion area is

presently exercised by the Operating Agent and will continue including all mineral rights with full authority to determine all activities within the

exclusion area including exclusion or removal of personnel and property from

the area. This is in accordance with the exclusion area requirements of 10 CFR

100.3(a).

1.2.1.3 Access to the Site There are no public highways, county and/or township roads, public waterways,

or public railroads that traverse the exclusion area. There are no persons

living in the exclusion area. There is to be no one working in the exclusion area except employees of the Applicants and their authorized agents. The

exclusion area is patrolled periodically by plant guards to ensure awareness of

access to the area by individuals. See Section 2.1.2 for further details on

access to the exclusion area and details concerning lake use. Controlled

access to the protected area is monitored by guards on a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day basis.

1.2.1.4 Environs The area within 10 miles of the site is rural and of low population; in 1980

the population within the 10-mile radius was 6,652. The only incorporated

1.2-1 Rev. 0 WOLF CREEK places,as defined by the U.S. Bureau of Census, within 10 miles of the site

are Burlington and New Strawn. In 1980, Burlington recorded a population of

2,901 and New Strawn, which was incorporated in 1971, had a 1980 population of

457. Topeka, located 53 miles north of the site, recorded a metropolitan population of 115,266 in 1980 and Emporia, 28 miles west-northwest of the site,

in 1980 recorded a population of 25,287. Most of the land surrounding the site

is used for agricultural purposes with the exception of such rural service

centers as Burlington. All recreational facilities are city-owned parks with

the exception of the John Redmond Reservoir area, the main recreational

facility in the area which is federally operated. Use of the Wolf Creek lake for recreation is discussed in Section 2.1.2. The region is expected to retain its distinctly rural character.

The Low Population Zone is chosen as the area within a 2.5-mile radius of the

plant site.

1.2.1.5 Geology The WCGS site is located within the Central Stable Region of the North American

Continent. This region was subjected to gentle structural uparching and down-

warping during Mesozoic and Paleozoic time. These structural movements resulted in the formation of broad-scale basins and arches which have been

modified locally by folding and faulting. Geotechnical investigations at the

site during construction excavation have identified the presence of localized

zones of penecontemporaneous deformation in the bedrock. However, the

investigations have established the last age of deformation as Pennsylvanian,

and there is no known macroseismic activity associated with these zones and no

structural association with capable faults (Reference 1). The faulting,

shearing and deformation, therefore, are noncapable as defined by Appendix A to

10 CFR 100.

The surface bedrock in the site area consists of alternating layers of Pennsylvanian age shales, limestones, sandstones, and a few thin coal seams.

These bedrock units dip gently to the west and northwest and have been folded

locally into small-scale plunging anticlines and synclines. At the site, the

Precambrian basement is present at a depth of approximately 2,500 feet. The

Precambrian rocks consist of approximately 1,000 feet of sedimentary deposits

which rest on a granitic basement complex.

The site area has been submaturely to maturely dissected by the Neosho River

and its tributaries to form flat to gently rolling uplands with a maximum

topographic relief of 100 feet or less from the uplands to the valley floors.

Residual soils ranging in thickness from 0 to 16 feet are developed

1.2-2 Rev. 10 WOLF CREEK on the Pennsylvanian strata. Quaternary alluvium reaches a thickness of approximately 25 feet in the Wolf Creek valley. Scattered Tertiary age

deposits of clayey gravel cap some of the higher hills in the site area.

Glacial deposits are not present at the site. The alternating Pennsylvanian

strata forming the bedrock surface consist of competent rock units with a low amount of structural discontinuities in the rock mass. No major geologic

features have been identified which could adversely affect the stability of

subsurface materials at seismic Category I facilities. Minor geologic

features, such as jointing, the zones of penecontemporaneous deformation, and

the weathering profile in the rock, were considered during design and

construction of facilities. Comprehensive geotechnical investigations of the

site have determined the subsurface conditions in adequate detail to provide

design criteria for foundation support of safety-related facilities. Major

seismic Category I structures are supported on competent rock. Only minor,

localized modifications to foundation materials were required in design and construction to provide uniform support of safety-related facilities.

1.2.1.6 Seismology The plant site is located in a relatively seismic stable region of the central

United States. No earthquake epicenter has been reported closer than 40 miles

to the site, and the nearest shocks have had epicentral intensities no greater than Intensity III. At distances of 85 and 105 miles from the site,

earthquakes of Intensity VII to VII-VIII have been recorded. Since 1800, only

seven earthquakes of Intensity V or greater have occurred within 100 miles of

the site, and 16 events of Intensity VI or greater have been recorded within

200 miles. Previously recorded earthquakes probably have not generated

intensities greater than VI at the site, and none of the buildings in the

vicinity of the site have sustained any known structural damage due to

earthquakes.

An Operating Basis Earthquake corresponding to a horizontal acceleration of six percent of gravity and a Safe Shutdown Earthquake corresponding to a horizontal acceleration of 12 percent of gravity was selected for the site. However, a seismic evaluation of these structures, systems, and components using the Lawrence Livermore Laboratories spectrum anchored at 0.15g for structures supported on bedrock is contained in Appendix 3C.

1.2.1.7 Hydrology

1.2.1.7.1 Surface Water Hydrology

The plant site is located within the Wolf Creek watershed northeast of Burlington, Kansas. The topography within the watershed varies from

1.2-3 Rev. 14 WOLF CREEK undulating hills upstream of the plant site to a floodplain area shared with

the Neosho River with a drainage area within Kansas of 6,300 sq. miles near the

mouth of Wolf Creek with a drainage area of 35 sq. miles. The cooling lake

alters the draining pattern of the watershed, but safety-related facilities are protected from severe hydrological events.

The cooling lake is designed to supply adequate cooling water to the plant

during a one in fifty year drought. Makeup water is supplied to the cooling

lake from the Wolf Creek watershed runoff and from makeup water pumped from

John Redmond Reservoir. The region surrounding the site is not characterized

by events such as tsunamis, surge activity, or severe ice flooding. Major dam

failures on the Neosho River above Wolf Creek watershed will not affect safety-

related facilities.

The flow of the Neosho River is controlled by three reservoirs above the site.

The Maximum flood design elevation of 1097.5 ft. msl., resulting from the

probable maximum flood routed through the cooling lake with coincident wave

activity, is below the plant site grade of 1099.5 ft. msl.

1.2.1.7.2 Groundwater Hydrology Only small quantities of groundwater are available within a 50-mile radius of

the plant site. The groundwater is produced from three types of aquifers: the alluvial deposits in the river valleys, the weathered bedrock including the shallow soil, and the unweathered bedrock.

The alluvial aquifers are composed of silts, sands, and gravel. Yields from wells in the alluvial aquifers are up to 100 gallons per minute. Recharge to such aquifers occurs from precipitation and from rivers during periods of high flow. Regionally, discharge from the alluvial aquifers normally flows into the rivers.

The weathered bedrock aquifer consists of weathered shales, siltstones,

sandstones, and limestones. Pressure tests indicate that this aquifer is

sufficiently permeable to yield up to 10 gallons per minute for livestock and domestic wells. Recharge occurs from precipitation and locally from downward

percolation through the overlying alluvium. Discharge occurs into both

alluvium and streams.

The consolidated bedrock aquifers are composed of sandstones and limestones which are limited to yields ranging from about l to 10 gallons per minute.

Recharge to such aquifers occurs by precipitation and infiltration of

1.2-4 Rev. 1 WOLF CREEK surface water at the outcrops. Where overlain by shales and siltstones, which

act as aquitards and aquicludes, vertical recharge to the limestones and

sandstones is minimal.

There is no anticipated use of groundwater at the plant site. The operation of

the plant will not have any detrimental effect on the groundwater environment,

nor will local groundwater use affect the operation of the plant.

1.2.1.8 Meteorology

The continental location of the site ensures a wide seasonal range of

temperature and frequent day to day temperature changes due to frequent passage

of cyclonic systems through the vicinity. The maximum temperature was 117

degrees Fahrenheit recorded at Burlington, Kansas. The lowest extreme

temperature was -26 degrees Fahrenheit. The prevailing winds are from the

south to southeast except during the winter when north to northwest winds

prevail. There are no meteorologically significant terrain features or bodies

of water within 50 miles of the site.

The site vicinity is subject to occasional severe thunderstorms and the

possibility of a tornado from early spring until autumn. The world record 42

minute rainfall of 12 inches occurred at Holt, Missouri, approximately 120

miles from the Wolf Creek Site. However, precipitation is generally moderate

throughout the year and snowfall ranges from very little during some winters to

substantial during others.

The fastest wind, excluding tornadoes was 86 mph.

The diffusion climatology is generally favorable due to the frequent passage of

cyclonic storm systems. The poorest diffusion conditions occur during (1)

nighttime inversions which become most developed during winters and (2)

dominance of the site area by stagnant anticyclonic systems which may persist

for several consecutive days, especially during late summer and autumn.

1.2.2 GENERAL ARRANGEMENT OF STRUCTURES

The principal structures located on the Wolf Creek Generating Station site are

listed below.

a. Reactor Building - houses the reactor, reactor coolant piping, steam generators, pressurizer, reactor coolant pumps, accumulators, and the containment air coolers;

1.2-5 Rev. 27 WOLF CREEK

b. Auxiliary Building - houses the engineered safety features and nuclear auxiliary systems equipment;
c. Turbine Building - houses the turbine generator, condensers, main feed pumps, and other power-conversion equipment;
d. Fuel Building - houses the new fuel storage vault, the fuel storage pool, the fuel handling system, and a portion of the spent fuel pool cooling and cleanup system;
e. Radwaste Building - houses the radioactive waste treatment facilities and boron recycle system components;
f. Control Building - houses the main control room, the computer,the Class IE switchgear, the Class IE battery rooms, the access control area, cable spreading rooms, and portions of the main control room emergency ventilation systems;
g. Storage Tanks - include the condensate storage tank, the refueling water storage tank, the reactor makeup water storage tank, the demineralized water tank, and the emergency fuel oil storage tanks;
h. Diesel Generator Building - houses the diesel generators and associated equipment;
i. Transformer Vaults - house oil retaining pits for the main transformers, startup transformer, station service transformer, unit auxiliary transformer, and ESF transformers;
j. Communication Corridor;
k. Deleted
l. Cooling lake and ultimate heat Sink;
m. Circulating Water Screenhouse - houses traveling screens, service water pumps and strainers, circulating water pumps, fire protection pumps, and chemical injection systems for raw water treatment;
n. Essential Service Water Pumphouse - houses pumps and strainers for the essential service water system;
o. Deleted
p. Hot Machine Shop;
q. Administration Building;

1.2-6 Rev. 28 WOLF CREEK

r. Shop building;
s. Materials Center (Warehouse);
t. Technical Support Center;
u. Prescreening and Main Security Buildings;
v. Covered Walkway;
w. Education Center (emergency operations facility -

simulator/training complex);

x. Non Discharging Sewage Lagoon;
y. Switchyard;
z. Make-up Water Screenhouse (located below John Redmond Dam);

aa. Make-up Discharge Structure;

bb. Outage Processing Center;

cc. Support Building West;

dd. General Office Building

ee. Waste Water Treatment Facility;

ff. Waste Water Treatment Facility -- houses the recirculation pumps, chemical reagent storage tanks and feedpumps for the wastewater treatment system;

gg. Waste Water Retention Basins -- two 300,000 gallon open top concrete basins used for retaining and neutralizing secondary regenerative wastewaters prior to discharging to the WCGS cooling lake.

hh. Owens Corning Building

ii. Cathodic Protection Building (Rectifier Shelter #1)

jj. Cable Reel Yard Building

kk. X-Ray Building

ll. Water Treatment Building North

mm. Chemical Addition Building

nn. Station Blackout Diesel Generator Missile Barrier oo. Cathodic Protection Building (Rectifier Shelter #2, near Firing Range) pp. ESWS Vertical Loop Chase - houses both trains of the ESWS vertical loops. NOTE: The above list gives a general use description of the principal

structures. The actual name of the structure may differ.

The general arrangement of these and other structures and equipment is shown in

Figures 1.2-1 through 1.2-43. The site area layout is shown in Figure 1.2-44.

1.2-7 Rev. 29 WOLF CREEK 1.2.3 PRINCIPAL DESIGN CRITERIA

The plant was designed so that it could be constructed and operated to produce electric power in a safe and reliable manner. Plant design conforms to applicable codes, standards, and regulations identified in appropriate sections

of the USAR.

The plant was designed, fabricated, constructed, and is operated in such a way

that the release of radioactive materials to the environment is limited to

values less than the limits and guideline values of applicable federal

regulations pertaining to the release of radioactive materials for normal

operations, abnormal events, and design basis accidents.

The plant was designed in accordance with 10 CFR 50, Appendix A, General Design Criteria for Nuclear Power Plants, as described in Section 3.1.

1.2.3.1 SNUPPS Design Envelope The Wolf Creek power block was designed and evaluated to the SNUPPS design

envelope which was established by:

a. A design criterion which is conservative for all of the sites, or
b. The limiting site condition existing at any site for the condition of interest.

A tabulation of the SNUPPS design envelope is presented in Table 1.2-1.

1.2.4 NUCLEAR STEAM SUPPLY SYSTEM The nuclear steam supply system (NSSS) consists of a reactor and four closed reactor coolant loops connected in parallel to the reactor vessel, each loop

containing a reactor coolant pump and a steam generator. The NSSS also

contains an electrically heated pressurizer and various other auxiliary

systems.

High pressure water circulates through the reactor core to remove the heat

generated by the nuclear chain reaction. The heated water exits from the

reactor vessel and passes via the coolant loop piping to the steam generators.

Here it gives up its thermal energy to the feedwater to generate steam for the

turbine generator. The cycle is completed when the water is pumped back to the

reactor vessel. The entire reactor coolant system is composed of leaktight

components to ensure that all fluids are confined to the system.

The core is of the multiregion type. All fuel assemblies are mechanically

compatible, although the fuel enrichment is not the same in all the assemblies.

The initial reactor core design for WCGS is essentially identical to the design

for the Comanche Peak units (Docket Nos. 50-445 and 50-446).

1.2-8 Rev. 18 WOLF CREEK In the initial core loading, three fuel enrichments are used. Fuel assemblies

with the highest enrichments are placed in the core periphery, or outer region,

and the two groups of lower enrichment fuel assemblies are arranged in a

selected pattern in the central region. In subsequent refuelings, some of the fuel assemblies (e.g., one-third) are discharged. The remaining fuel

assemblies are, in general, moved to other positions in the core, and fresh

fuel assemblies are added to fill out the core.

Rod cluster control assemblies, which consist of clusters of cylindrical

absorber rods, are used for controlling core reactivity. The absorber rods

move within guide tubes in certain fuel assemblies. Each absorber rod is

attached to a spider connector above the core. The spider connector is

attached to a drive shaft, which may be raised and lowered by a drive mechanism

mounted on the reactor vessel head. The rod cluster control assemblies drop into the core under the effect of gravity when a reactor trip (SCRAM) occurs.

Supplementary reactivity control is provided by boric acid dissolved in the

reactor coolant water.

The reactor coolant pumps are Westinghouse Model 93Al vertical, single stage,

centrifugal pumps of the shaft-seal type. WCGS was one of the first domestic

operating units to utilize Model 93Al reactor coolant pumps. However,

Westinghouse Model 93Al pumps were previously reviewed by the NRC in

conjunction with the RESAR-3S application (Docket No. STN-50-545). A Safety

Evaluation Report (NUREG-0104) and Preliminary Design Approval (PDA-7) were

issued on RESAR-3S in December 1976. In addition, the Model 93Al reactor

coolant pumps are similar to the Model 93A pumps used in the Comanche Peak

units (the major difference is the flow capacity as indicated in Table 1.3-1).

The pumps utilized at WCGS are identical to those used at Callaway.

The steam generators are Westinghouse Model F vertical U-tube units, which contain thermally treated Inconel tubes. The Model F steam generator includes

features (discussed in detail in Section 5.4.2) such as improved tube support

plate design and high circulation ratio, which are designed to minimize most

forms of corrosion, sludge buildup, and chemical attack. Integral moisture

separation equipment reduces the moisture content of the existing steam to one-

quarter percent or less. WCGS was the second domestic operating unit to

utilize Model F steam generators, (Callaway was the first domestic operating

unit to utilize the Westinghouse Model F steam Generator). Westinghouse Model

F steam generators were previously reviewed by the NRC in conjunction with the

Sundesert PSAR application (Docket Nos. 50-582 and 50-583). An interim Safety

Evaluation Report (NUREG-0469) was issued on the Sundesert PSAR application in

October 1978.

1.2-9 Rev. 5 WOLF CREEK Essentially all of the metal surfaces in contact with the reactor water are stainless steel, except the steam generator tubes (Inconel), fuel assembly skeleton (stainless steel, Inconel and zirconium ally) and fuel rod cladding (zirconium ally).

An electrically heated pressurizer connected to one reactor coolant loop

maintains reactor coolant system pressure during normal operation and limits

pressure variations during plant load transients. The pressurizer utilized at

WCGS is essentially identical to those utilized in the Comanche Peak units, Callaway and many other facilities that are currently in operation.

Auxiliary system components are provided to charge makeup water into the

reactor coolant system, purify reactor coolant water, provide chemicals for

corrosion inhibition and reactivity control, cool system components, remove

decay heat when the reactor is shut down, and provide for emergency safety

injection.

1.2.5 ENGINEERED SAFETY FEATURES AND EMERGENCY SYSTEMS 1.2.5.1 Containment 1.2.5.1.1 Containment Structure

The containment structure is a prestressed, post-tensioned concrete structure with a cylindrical wall, a hemispherical dome, and a flat foundation slab. The

wall and dome form a prestressed, post-tensioned system consisting of

horizontal tendons in the wall and inverted U-shaped vertical tendons in the

wall and dome. The foundation slab is reinforced with carbon steel. The

inside surface of the structure is lined with a carbon steel liner to ensure a

high degree of leaktightness. The containment structure completely encloses

the reactor and reactor coolant system, i.e, the reactor pressure vessel, the

steam generators, the reactor coolant loops and portions of the associated

auxiliary systems, the pressurizer, accumulator tanks, and associated piping,

described in Section 1.2.4. The design ensures that the containment structure is protected against postulated missiles from both equipment failures and external sources. The containment design provides means for the integrated

leak rate testing of the containment structure and for local leak rate testing

of individual piping, electrical, and access penetrations of the containment.

For details, refer to Chapters 3.0 and 6.0.

The containment structure design is the same standard state-of-the-art design

that has been applied to several other Bechtel-designed plants. The basic

structure is similar to the containment structures at Farley, Palo Verde, and

Turkey Point and identical to the structure at Callaway.

1.2-10 Rev. 18 WOLF CREEK 1.2.5.1.2 Containment Spray System

The containment spray system is one of the two independent pressure-reducing

systems and is operated in conjunction with the containment fan coolers to

provide adequate cooling of the containment atmosphere following a LOCA. Two of the four fan coolers and one of the two containment spray pumps operating

are sufficient to cool the containment atmosphere. This reduces the pressure

inside the containment, thus minimizing the release of radioactivity from the

structure.

The containment spray system supplies borated water to cool the containment

atmosphere. The pumps take suction from the refueling water storage tank.

When the storage tank supply is depleted, suction of the pumps is aligned to

pump water from the containment sump directly into the containment during the

recirculation mode of operation. Sodium hydroxide is added to the spray to remove iodine from the containment atmosphere in the post-LOCA condition.

The containment spray system is similar in design and function to the reactor

building spray system at the Midland Plant, Units 1 and 2. Although the WCGS

containment spray system utilizes two containment sumps, versus one for

Midland, both systems function under equivalent conditions. The WCGS containment spray system is identical to the system used at Callaway.

1.2.5.1.3 Containment Cooling System

The containment fan cooler system is the second of the two independent

pressure-reducing systems. The system consists of four fan cooling units. The operation of two of these units and one of the containment spray pumps is

sufficient to meet the design requirements for containment depressurization

after a postulated LOCA. Containment atmosphere is drawn through the fan

cooler units to cool the air and condense steam from the containment atmosphere

after a LOCA. During normal plant operation, three fan cooler units are

required to remove sensible heat generated from equipment inside the

containment and maintain the containment atmosphere below 120 F.

The containment cooling system design is a state-of-the-art design used

throughout the nuclear industry. Components of the containment cooling system are similar in design and function to individual components that are used in the containment cooling systems at Farley, Palo Verde, and Midland and are

identical to components used in the system at Callaway.

1.2-11 Rev. 1 WOLF CREEK 1.2.5.1.4 Combustible Gas Control Systems

Control of combustible gases in the containment following a LOCA is provided by

two 100-percent-capacity electric (thermal) hydrogen recombiners located within the containment, which maintain the post-LOCA hydrogen concentration in the

containment atmosphere below the lower flammability limit.

A hydrogen purge subsystem is also provided for combustible gas control as a

backup system.

The combustible gas control system including the hydrogen recombiner system,

hydrogen monitoring system, and the hydrogen purge system has components that

are similar in design and function to the combustible gas control system used

at Midland Plant, Units 1 and and 2.

The hydrogen recombiners utilized at WCGS are essentially identical to those

utilized in the Comanche Peak units, Callaway, and many other facilities that

are currently in operation.

1.2.5.1.5 Containment Isolation System

The containment isolation system preserves the ability of the containment

boundary to minimize the release of fission products to the environment while

at the same time allowing the normal and emergency passage of fluids through

the containment boundary. System components include isolation valves that

satisfy the containment isolation criteria. The containment isolation system

is similar in design and function to the standard design that has been applied

to several other Bechtel-designed plants. The containment isolation system

used at WCGS is essentially identical to that utilized at Callaway.

1.2.5.2 Emergency Core Cooling System The emergency core cooling system (ECCS) injects borated water into the reactor

coolant system following a LOCA. This limits damage to the fuel assemblies and

limits metal-water reactions and fission product release. The ECCS also provides continuous long-term post-LOCA cooling of the core by recirculating

borated water between the containment sumps and the reactor core. The ECCS

design at WCGS is functionally identical to the ECCS design for the Comanche

Peak units and Callaway.

1.2.5.3 Auxiliary Feedwater System When the main feedwater system is not in operation and the reactor coolant temperature is greater than 350° degrees F, the auxiliary

1.2-12 Rev. 1 WOLF CREEK feedwater system is used to supply water to the secondary side of the steam generators.

The system consists of two motor-driven pumps which are powered by the

emergency diesel generators if there is loss of offsite power and one steam-turbine-driven pump. During normal plant cooldown, the auxiliary feedwater

system can, if necessary, be used to supply feedwater to the steam generators

for removal of decay and sensible heat from the reactor coolant system. See

section 7.3.6.1.1 for a description of this operation.

The auxiliary feedwater system has a design that is similar to the auxiliary

feedwater system design on the Midland Plant, Units 1 and 2. Both designs

utilize steam-driven and ac-powered motor-driven auxiliary feedwater pumps.

However, the WCGS design utilizes an additional motor-driven pump for

reliability. The auxiliary feedwater system utilized at WCGS is identical to that used at Callaway.

1.2.6 PLANT INSTRUMENTATION AND CONTROL SYSTEMS

The plant instrumentation and control systems ensure safe and orderly operation

of all systems and processes over the full operating range of the plant. The

control room is designed to enable operators to start up, operate, and shutdown

the plant. Supervision of both the nuclear and turbine generator systems is

accomplished from the control room. Additional controls at appropriate

locations outside the control room (in particular, an auxiliary shutdown panel

in the auxiliary building) ensure the capability of reaching and maintaining a

post-accident or post-fire shutdown condition in the unlikely event that the control room becomes uninhabitable. (Note that the control room is protected from fire, breach of security, and missiles, and contains a redundant

ventilation system filtered to remove iodine.)

The WCGS instrumentation and control systems summarized below and discussed in detail in Chapter 7.0 are functionally similar to those systems utilized in the

Comanche Peak units and are essentially identical to those systems utilized at

Callaway.

1.2-13 Rev. 14 WOLF CREEK 1.2.6.1 Protection System

The plant protection system monitors selected plant parameters in order to

initiate reactor trip and/or engineered safety features actuation. Multiple

independent channels monitor each of the selected plant parameters. The plant protection system logic was designed to initiate automatically protective

action whenever the monitored parameters reach a limiting safety system

setting. Redundancy was provided to assure that no single failure would

prevent protective action when it was required. The plant protection system

was designed in conformance to IEEE Standard 279"Criteria for Protection

Systems for Nuclear Power Generating Stations."

1.2.6.1.1 Reactor Trip System

The reactor trip system shuts down the reactor whenever the limits of safe operation are approached. The safe operating region was defined by such considerations as mechanical/hydraulic limitations on equipment and heat

transfer phenomena. Therefore, the reactor trip system keeps surveillance on

process or calculated variables which are directly related to those equipment

limitations. Whenever a direct process or calculated variable exceeds a

setpoint, the reactor would automatically be shut down.

1.2.6.1.2 Engineered Safety Features Actuation System

The engineered safety features actuation system was designed to detect symptoms

of a loss-of-coolant accident, a steam-line break, a feedwater-line break, loss

of offsite power, or a fuel handling accident and to actuate the appropriate

engineered safety features systems as certain threshold levels of each

indicator symptom are passed.

1.2.6.2 Reactor Instrumentation and Control System The reactor is controlled (1) by taking advantage of inherent neutronic

characteristics, e.g., temperature coefficients of reactivity; (2) by control

rod cluster motion, which is used for load transients and for startup and shutdown; (3) and by a soluble neutron absorber, boron, in the form of boric

acid inserted during cold shutdown, partially removed at startup, and adjusted

in concentration during core lifetime to compensate for fuel consumption and

accumulation of fission products. The control system allows the plant to

accept step load increases of up to 10 percent and ramp load increases of up to

5 percent per minute over the load range of 15 to 100 percent of full power.

Equal step and ramp load reductions are possible, over the range of 100 to 15

percent of full power.

1.2-14 Rev. 0 WOLF CREEK 1.2.6.3 Radiation Monitoring System

The liquid and gaseous effluents from the plant are continuously monitored for

radioactivity. Release rates are monitored and recorded. The process

radiation monitoring system detects radioactivity in fluid systems which is

indicative of fuel clad defects and/or fluid leakage between process systems.

Area monitoring stations are provided to measure gamma radiation at selected

locations in the plant. Radiation levels, as detected by these monitors, are

indicated in the control room, and above normal values are annunciated.

1.2.6.4 Balance-of-Plant Instrumentation and Control Systems

The turbine and generator control systems are designed to regulate generator

load. The turbine-generator protection system is designed to ensure safe

operation of the unit. The analog Electro-Hydraulic Control (EHC) system has been replaced with a new digital Turbine Control System (TCS). The new system utilizes an Ovation-Based Distributed Control System (DCS). Two redundant sets of controllers are used in the turbine control system. The TCS architecture is based on combined functional and hardware redundancy to create a robust and reliable system.

Additional instrumentation and controls allow manual or automatic control of

various temperatures, pressures, flows, and liquid levels throughout the plant.

Indicators, recorders, annunciators, and the plant computer inform the

operating personnel at the equipment location and/or the control room of plant

conditions and performance.

1.2.7 PLANT ELECTRIC POWER SYSTEM

1.2.7.1 Transmission and Generation Systems

The generating units are connected to the respective utility transmission

systems. The transmission system voltage is 345 kV for Kansas Gas and Electric

Company (KG&E) and Kansas City Power & Light Company (KCP&L). The utilities

have integrated transmission networks and interconnections with neighboring

systems. A description of system network and interconnection for each utility

is given in Chapter 8.0.

The main generator is a General Electric 1,800 rpm, three-phase, 60-cycle

synchronous unit. The generator is connected directly to the turbine shaft and

is equipped with an excitation system coupled directly to the generator shaft.

Power from the generators is stepped up from 25 kV by the unit main

transformers and supplied by overhead lines to the switchyard. A unit

auxiliary transformer is connected to the main generator through an isolated

phase bus duct to supply the auxiliary loads of the unit during power

generation.

1.2-15 Rev. 27 WOLF CREEK 1.2.7.2 Electric Power Distribution System

Electric power is supplied from the switchyard to the onsite power system for

the electrical auxiliaries of each unit through two independent circuits. One

circuit supplies power through a startup transformer and the other through an engineered safety features (ESF) transformer. The startup transformer feeds

two 13.8-kV buses and a second ESF transformer. Power is supplied to

auxiliaries at 13.8 kV, 4.16 kV, 480 V, 480/277 V, and 208/120 V ac. Refer to

Figure 8.3-1.

The power distribution system includes the Class IE and non-Class IE ac and dc

power systems. The Class IE power system supplies equipment used to shut down

the reactor and limit the release of radioactive material following a design

basis event.

The Class IE ac system for each unit consists of two independent and redundant load groups and four independent 120-V vital ac instrumentation and control

power supply systems. The load groups include 4.16-kV switchgear, 480-V load

centers, and motor control centers.

Two diesel generators are provided as a standby power source for each unit, one

for each of the two Class IE load groups. Each generator has sufficient

capacity to operate all the equipment of one load group, which is necessary to

prevent undue risk to public health and safety in the event of a design basis

accident.

The non-Class IE ac system includes 13.8-kV switchgear, 4.16-kV switchgear,

480-V load centers, and motor control centers.

The vital ac instrumentation and control power supply systems include battery systems, static inverters, and distribution panels. All voltages listed are nominal values, and all electrical Class IE equipment is designed to accept the

expected range in voltage.

The Class IE electrical systems are similar to Class IE systems utilized on

many other Bechtel-designed plants since designs that meet the requirements and

standards of the nuclear industry develop in a similar manner. For instance,

Class IE system and components have a similar design and function to the ac

systems and components at the Midland Plant, Units 1 and 2. In addition, the

Class IE dc systems and components are similar to the dc systems and components

at Palo Verde. The Class IE system used at WCGS is similar to the system used

at Callaway.

Direct current power for the Class IE dc loads of each unit is supplied by four

independent Class IE 125-V dc batteries and

1.2-16 Rev. 0 WOLF CREEK associated battery chargers. One 250-V and four 125-V non-Class 1E batteries

and associated battery chargers are also provided to supply 250-V and 125-V dc

power for the non-Class 1E dc system loads.

The Station Blackout Diesel Generator power system consists of three (3) non-safety related diesel generators that are capable of supplying essential loads on bus NB001 or bus NB002 required to reliably and safely shut down the unit following a station blackout event. Station blackout means the complete loss of alternating current (ac) electric power to the essential and nonessential switchgear buses in a nuclear power plant (i.e., loss of offsite electric power system concurrent with turbine trip and unavailability of the onsite emergency ac power system).

This equipment is not credited for coping with a station blackout per NRC Regulatory Guide 1.155 and NUMARC 87-00, but is instead installed to provide plant MSPI/PRA margin.

The equipment is located within a missile barrier designed to limit the average wind speed downstream of the barrier entrance to less than or equal to 150 mph during a 230 mph tornado event in accordance with NRC Regulatory Guide 1.76, Rev. 1. 1.2.8 POWER CONVERSION SYSTEM

Thermal energy that is generated by the NSSS is converted into electrical

energy through the steam cycle process by the turbine generator.

The turbine is a tandem-compound, six-flow, four-element, 1,800-rpm unit,

having one high-pressure and three low-pressure elements. Combination moisture

separator-reheaters are employed to dry and reheat the steam between the high-

and low-pressure turbines. The auxiliaries include deaerating surface

condensers, condenser evacuation system, turbine-driven main feedwater pumps,

motor-driven condensate pumps, and seven stages of feedwater heating. The

steam and turbine systems were designed to receive the heat energy produced in

the reactor during normal operation as well as a 50-percent load reduction of

the turbine-generator. Heat dissipation under the latter condition is

accomplished by steam dump to the condenser (40-percent full load). The steam

dump enables the plant to accept a loss of 50-percent external load without

reactor or turbine trip. The condensers are cooled by the circulating water

system.

1.2.8.1 Main Steam Supply System

The main steam supply system consists of the piping and valves that are

necessary to deliver saturated steam from the steam generators to the turbine

generator. Four 28-inch main steam lines carry steam from the top of the steam

generators, through four main steam isolation valves, one in each line, to the

turbine stop valves at the inlet to the turbine generator. Each main steam

line is also equipped with five code safety valves and one atmospheric relief

valve. The main steam supply system is similar to the main steam supply system

at Palo Verde and identical to the main steam supply system at Callaway.

1.2.8.2 Main Condenser Evacuation System

The main condenser evacuation system provides a means for removing air and

noncondensible gases from the main condenser. The main condenser evacuation

system uses three vacuum pumps to perform this function; two for normal

operation and the third that is started to help draw a vacuum during the

startup mode.

1.2-17 Rev. 27 WOLF CREEK This system is similar to the main condenser evacuation system that is utilized

on Palo Verde with the exception that the Palo Verde design includes a fourth

vacuum pump. The system used at WCGS is identical to the system used at

Callaway.

1.2.8.3 Turbine Gland Sealing System The turbine gland sealing system seals the turbine shaft penetrations and the

turbine valve stems to prevent the escape of steam or the introduction of air

at these places in the steam areas of the turbine. This system utilizes standard industry components and is similar in design and function to the

system utilized at San Onofre and identical to the system used at Callaway.

1.2.8.4 Turbine Bypass System The turbine bypass system, more commonly known as the steam dump system, is

provided to reduce the transient effects of plant startup, hot shutdown,

cooldown, and step reductions in generator loadings on the reactor coolant system. The steam dump system has the capability to bypass up to 40 percent of

full steam flow from the steam generators to the main condenser. This system

uses air-operated globe valves to perform its function and is similar in design

and function to the steam dump system at Palo Verde and identical to the system

at Callaway.

1.2.8.5 Circulating Water System The circulating water system supplies cooling water from the plant's cooling

water source to the main condenser to condense the steam that discharges from

the exhaust of the turbine or the turbine bypass system. The Wolf Creek site utilizes a large cooling lake for its source of circulating water and cooling

mechanism as does Comanche Peak.

1.2.8.6 Condensate Cleanup System The condensate cleanup system, more commonly known as the condensate

demineralizer system, contains demineralizers that are utilized to maintain the

required purity of the feedwater which supplies the steam generators. The condensate demineralizer system is similar in design and function to the

cleanup system utilized at Midland Plant, Units 1 and 2. The WCGS design

includes additional components, such as a waste collection tank and sluice

water pumps. The system used at WCGS is identical to the system used at

Callaway.

1.2-18 Rev.1 WOLF CREEK 1.2.8.7 Condensate and Feedwater System The condensate and feedwater system receives condensate from the condenser

hotwells and delivers feedwater to the steam generators at a temperature that

provides maximum steam plant efficiency.

The condensate and feedwater system includes seven stages of feedwater heaters,

six demineralizer vessels, and various pumps, valves, and piping to perform its

intended function. This system is similar in design and function to the

condensate and feedwater system at Trojan and identical to the system used at

Callaway.

During normal plant cooldown and startup, the feedwater system is used to

supply feedwater to the steam generators for removal of decay and sensible heat

from the reactor coolant system.

1.2.8.8 Steam Generator Blowdown System The steam generator blowdown system functions to maintain the secondary side

water within the NSSS supplier's water chemistry specifications. This system

includes a flash tank, filters, demineralizers, containment isolation valves, and various piping, all of which are common to most plant designs. This

system, however, employs an improved design which provides much larger flow

rates, four to five times larger, which enhances the blow-down function.

1.2.8.9 Secondary Liquid Waste System The secondary liquid waste system processes condensate demineralizer

regeneration wastes and either directs these wastes for processing and re-use

or discharge. This system also processes potentially radioactive liquid wastes. Secondary liquid waste systems are usually plant specific and depend

upon the design of the systems they serve. The secondary liquid waste system

is similar in design and function to most other Bechtel-designed projects.

1.2.8.10 Wastewater Treatment System The wastewater treatment facility processes wastewater discharges from the makeup demineralized water system (WM), the condensate demineralized system

(AK), the secondary liquid waste system (HF), water treatment plant acid and

caustic skid drains, the water treatment plant chemical spill catch basin, and

the wastewater treatment facility chemical spill catch basin prior to discharge

to the WCGS cooling lake. This system is designed to ensure that the above mentioned wastewater are in compliance with the pH limitations set forth in the

NPDES permit. This system shall also process wastewater as allowed by the

Offsite Dose Calculation Manual.

1.2-19 Rev. 19 WOLF CREEK 1.2.9 AUXILIARY SYSTEMS

1.2.9.1 Chemical and Volume Control System

The chemical and volume control system (CVCS) performs the following functions:

a. Reactivity control
b. Regulation of reactor coolant inventory
c. Reactor coolant purification
d. Chemical additions for corrosion control
e. Seal water injection to reactor coolant pump seals

Reactor coolant system is continuously purified by removing a small fraction of the reactor coolant flow through the letdown system. Letdown water is cooled in the regenerative heat exchanger. From there, the coolant flows to a letdown

heat exchanger and through a demineralizer where corrosion and fission products

are removed. The coolant then passes through a filter and is sprayed into the

volume control tank, from which it is returned to the reactor coolant system by

the charging system.

The CVCS automatically adjusts the amount of reactor coolant to compensate for

changes in specific volume due to coolant temperature changes and reactor

coolant pump shaft seal leakage in order to maintain a programmed level in the

pressurizer.

The CVCS design for WCGS is similar to the CVCS design for the Comanche Peak

units. The major difference is that WCGS includes provisions in the CVCS and

residual heat removal system (see Section 7.4) to improve the capability to achieve and maintain cold shutdown. The CVCS system at WCGS is identical to the system used by Callaway.

1.2.9.2 Residual Heat Removal System

The residual heat removal system (RHRS) is used to remove heat from the reactor

coolant at a controlled rate when the reactor coolant pressure is less than

approximately 425 psig and the temperature is from 350 degrees F to 140 degrees F, and to maintain the proper reactor coolant temperature during refueling.

The design of the RHRS includes two motor-operated isolation valves that are

closed during normal operations. They are provided with both a "prevent-open"

interlock and "RHRS-Iso-Valve-Open" alarm which are designed to prevent

possible exposure of the RHRS to normal RCS operating pressure.

The isolation valves are opened for residual heat removal during a plant cooldown after the RCS temperature is reduced to approximately 350F and RCS pressure is less than approximately 360 psig. During a plant startup, the inlet isolation valves are shut after drawing a bubble in the pressurizer and

prior to increasing RCS pressure above approximately 425 psig (alarm setpoint).

1.2-20 Rev. 14 WOLF CREEK The residual heat removal pumps are used to circulate the reactor coolant through two residual heat removal heat exchangers, returning it to the reactor

coolant system through the lowpressure injection header.

The RHRS design for WCGS is similar to the RHRS design for the Comanche Peak units. The major difference is that at Wolf Creek, provisions are included in

the CVCS and RHRS (see Section 7.4) to improve the capability to achieve and maintain cold shutdown. The RHRS used at WCGS is identical to the system used by Callaway.

1.2.9.3 Fuel Handling and Storage System

The reactor is refueled using equipment designed to handle and store spent fuel

under water from the time it leaves the reactor vessel until it is placed in a

cask for shipment from the site. Underwater transfer of spent fuel provides an optically transparent radiation shield, as well as a reliable source of coolant

for removal of decay heat. This system also provides capability for receiving,

handling, and storing new fuel.

The fuel handling system is divided into two areas: the reactor cavity, which

is flooded for refueling, and the fuel storage pool, which is outside the reactor containment and is accessible to plant personnel. The fuel storage pool consists of the spent fuel pool and the cask loading pool (with fuel storage racks installed). The reactor cavity and the fuel storage pool are connected by a fuel transfer system which carries the fuel through an opening in the reactor containment. The fuel pool cooling and cleanup system removes

decay heat from fuel stored in the spent fuel pool and maintains the purity of

the fuel pool water.

Spent fuel is removed from the reactor vessel by a refueling machine and placed

in the fuel transfer system. In the spent fuel pool, the fuel is removed from

the transfer system and placed into storage racks. After a suitable decay

period, the fuel is removed from storage and loaded into a shipping cask for

transfer.

The fuel handling system and new fuel storage racks utilized at WCGS are

similar to those utilized in the Comanche Peak units and many other facilities

that are currently in operation.

1.2.9.4 Service Water Systems 1.2.9.4.1 Service Water System

During normal plant operation, the service water system (SWS) supplies cooling water to the turbine building closed cooling water heat exchangers, central

chiller condensers, and pump out units, condenser vacuum pump seal water

coolers, steam packing exhauster, generator stator coolers, generator hydrogen

coolers, turbine-generator lube oil coolers, steam generator blowdown non-

regenerative heat exchanger, CVCS chiller unit, waterbox venting pump seal

water coolers, motor driven feed pump, and air compressors. The system also supplies cooling water to the essential service water system during normal operation.

The system draws water from the cooling lake, pumps the coolant through the

heat exchangers, and discharges it into the circulating water discharge, where it is directed back to the cooling

1.2-21 Rev. 14 WOLF CREEK lake. Water returning from the essential service water system is returned to the Ultimate Heat Sink and/or the cooling lake. Makeup water for the cooling lake is provided by pumps in the makeup water screenhouse. The SWS is

described in detail in Section 9.2.1.

The system is similar in design and function to the service water system

utilized at Midland Plant, Units 1 and 2.

1.2.9.4.2 Essential Service Water System

The essential service water system (ESWS) provides cooling water from the

ultimate heat sink (cooling lake) for plant components which require cooling

for safe shutdown of the reactor following an accident and/or loss of offsite

power. These components are the component cooling water heat exchangers,

containment air coolers, diesel generator coolers, safety injection pump room

coolers, RHR pump room coolers, containment spray pump room coolers,

centrifugal charging pump room coolers, component cooling water pump room coolers, auxiliary feedwater pump room coolers, control room air-conditioning condensers, Class 1E switchgear air-conditioning condensers, penetration room coolers, fuel pool cooling pump room cooler, and air compressor and after cooler. The ESW cooling water is discharged to the ultimate heat sink. The essential

service water pumps, prelube storage tanks, self-cleaning strainers, and

traveling water screens are located in a seismic Category I pumphouse. Other

parts of the system located outside the power block are either buried underground or located in seismic Category I structures. The ESWS is described

in detail in Section 9.2.1.

The essential service water system provides emergency makeup to the spent fuel pool and component cooling water systems. It is also the backup water supply to the auxiliary feedwater system.

The essential service water system is similar in design and function to the

essential service water system utilized at the Midland Plant, Units 1 and 2.

1.2.9.5 Component Cooling Water System The component cooling water system is a closed loop circulating water system

serving heat exchangers whose operation is required for the safe shutdown of

the reactor. Heat is removed from the closed loop by the essential service water system. Radiation monitors are provided to detect any radioactive

leakage into the component cooling system.

1.2-22 Rev. 14 WOLF CREEK The component cooling water system is similar in design and function to the

component cooling water system that is utilized at the Midland Plant, Units 1

and 2 and is identical to the system utilized at Callaway.

1.2.9.6 Compressed Air Systems Four nonlubricated air compressors, with separate aftercoolers, discharge compressed air to three air receivers that supply compressed air to a common

header. This header furnishes compressed air for both the plant air system and

the instrument air system. Instrument air is dried and filtered downstream of

the common supply header.

The plant air system provides compressed air for normal maintenance service at

various stations throughout the plant. The instrument air system provides

compressed air for the operation of all air-operated instruments and valves.

The compressed air system is similar in design and function to the compressed

air systems that are utilized at the Trojan and Midland Plant, Units 1 and 2

and is identical to the system utilized at Callaway.

1.2.9.7 Fire Protection Systems The fire protection system was designed to provide water to the plant fire

protection system and site fire protection facilities. An outside underground

yard loop surrounds the power block and provides water to all buildings and hydrants spaced around the plant site. Water for the fire protection system is

provided from the circulating water screenhouse intake bay. The system is

described in detail in Section 9.5.1.

The plant fire protection system consists of the following materials,

structures, detection devices, alarms, and suppression and extinguishing

facilities, selected and designed to minimize fire hazards and fire damage:

a. Automatic wet-pipe sprinklers;
b. Automatic pre-action systems;
c. Water spray systems;
d. Halon 1301 systems;
e. Standpipe and hoserack assemblies;

1.2-23 Rev. 14 WOLF CREEK

f. Portable extinguishers;
g. Fire and smoke detection and alarm systems;
h. Fire walls and barriers;
i. Fire resistant and noncombustible materials of construction; and
j. Smoke and heat vents;

Portions of the fire protection system that protect or pass through areas

containing equipment required for safe shutdown of the plant during and after

an earthquake are seismically analyzed and supported to prevent damage to this equipment. The system is designed to preclude flooding of safety-related equipment under seismic conditions.

The fire protection system provides an adequate supply of water to hydrants,

hose stations, sprinklers, and deluge systems, based on the maximum automatic

sprinkler or fixed water spray system demand with the simultaneous flow for

hose streams outside the power block.

Noncombustible and heat-resistant materials are used throughout the plant.

Plant fire walls are provided and rated according to their particular location

in the plant, and penetrations through fire barriers are fitted with fire stops

having, as a minimum, the same rating as the barrier.

Instrumentation and controls are provided for the proper operation of the fire-

fighting systems and for fire detection and annunciation.

The fire protection system was designed with components and systems that are

common to many plants throughout the nuclear industry and, therefore, is

comparable to most fire protection systems utilized at other plants. This

system is most similar in design and function to the fire protection system

utilized at San Onofre.

1.2.9.8 Heating, Ventilating, and Air-Conditioning Systems The heating, ventilating, and air-conditioning (HVAC) systems are designed to

provide a suitable environment for equipment and to ensure the safety of

personnel.

Redundant cooling and ventilating systems serving engineered safety features

equipment rooms and the main control room meet

1.2-24 Rev. 0 WOLF CREEK seismic Category I requirements and are each supplied from separate Class IE

electrical buses. These systems satisfy the single failure criterion.

The HVAC systems serving the control room areas are similar in design and function to the HVAC systems at the Midland Plant, Units 1 and 2 and Callaway.

The nonsafety-related HVAC systems are specifically tailored to suit the design

of other portions of the plant but are similar in design and function to that

of other Bechtel-designed projects.

1.2.9.9 Sampling Systems The sampling systems collect representative samples of the various process

fluids. The systems include a primary sampling system, secondary sampling

system, radwaste sampling system, and local grab sample provisions. Samples are routed to centralized sampling stations or local sample stations, all of

which are located outside the reactor containment. Both liquid and gaseous

samples are taken. Automatic and "on-line" analyses are made for some samples.

Chemical and radiochemical laboratory analyses are performed on other samples

to determine chemical composition, boron concentration, fission and corrosion

product activity levels, dissolved gas concentration, gross radioactivity, and

specific isotopic analyses. The results are used to regulate boron control

adjustments, monitor fuel rod integrity, evaluate demineralizer performance,

control effluent releases, and maintain correct water chemistry.

The sampling system is specifically tailored to suit the design of other portions of the plant but is similar in design and function to sampling systems

utilized throughout the nuclear industry.

1.2.9.10 Service Gas System The service gas system provides for the handling and storage of commonly used

service gases. The service gas system has provisions to protect against

nitrogen and hydrogen gas ruptures and is comparable in design and function to the service gas system at Palo Verde. The service gas system also provides its

function for several other gases, e.g. carbon dioxide and oxygen.

1.2.9.11 Communications System The communications system provides components and distribution for the total

communications network of the plant including intercom systems and remote

communications devices. The communication system is similar in design and function to the communications system at Arkansas Nuclear One - Unit 2 and

Callaway.

1.2-25 Rev. 0 WOLF CREEK 1.2.9.12 Diesel Generator Support Systems

The emergency diesel engine fuel oil storage and transfer system provides

onsite fuel oil storage and transfer of fuel oil to the diesel engines. The

storage capacity of this system is somewhat larger than the storage capacity at other plants with a similar design.

The emergency diesel engine cooling water system is a closed cycle system that

provides a source of cooling water to the diesel engines. The emergency diesel

engine cooling water system is the intermediate system that transfers heat

between the diesel engine and the essential service water system and is similar

in design and function to the typical nuclear industry design.

The emergency diesel engine starting system provides startup air to the diesel

engines with two independent, redundant starting air trains per engine. The emergency diesel engine lubricating system consists of two major subsystems; 1) the main oil system, and 2) the rocker oil system. Each engine has its own

independent redundant lubricating system. The emergency diesel engine

combustion air intake and exhaust system provides filtered combustion air to

the diesel engines and discharges the exhaust via silencers in the discharge

stacks.

The diesel generator support systems are tailored to the specific design of the

diesel engines and are similar in design and function to the diesel generator

support systems at San Onofre and Midland Plant, Units 1 and 2 and identical to

the system at Callaway.

1.2.10 WASTE PROCESSING SYSTEMS

The waste processing systems provide all the equipment necessary for controlled

treatment and preparation for retention or disposal of all liquid, gaseous, and

solid wastes produced as a result of reactor operation. The liquid waste

processing system collects, processes, and removes or concentrates radioactive

constituents, and processes them until suitable for processing in the solid

radwaste system. The gaseous waste processing system removes fission product

gases from the reactor coolant and contains these gases during normal plant

operation. The solid radwaste system receives, processes, packages, and stores all radioactive wastes generated until shipment offsite.

1.2-26 Rev. 19 WOLF CREEK 1.2.11 SHARED FACILITIES AND COMPONENTS WCGS utilized the SNUPPS standard plant or power block design which was

developed to be acceptable for installation at any one of several sites. Wolf

Creek is a single unit site and has no shared safety-related facilities and

components.

1.2.12 REFERENCES SECTION 1.2

1. Dames & Moore, 1977, Penecontemporaneous Deformation Zones Wolf Creek Generating Station; for Kansas Gas and Electric Co.

and Kansas City Power & Light Co., Dames & Moore, May 20,

1977.

1.2-27 Rev. 14 WOLF CREEK TABLE 1.2-1 DESIGN ENVELOPE (Sheet 1) (1)

Parameter SNUPPS USAR Reference

Hazards There are no hazards which have an Section 2.2 Explosions from acci- adverse effect on structures dents involving ex- plosives or gases were postulated in accordance with Regulatory Guide 1.91. The maximum overpressure and ground shock on the plant structures from such explosions are well below the design pressures for tornado protection and the design OBE ground accelerations.

Temperatures (2) Sections 2.3, These temperatures 3.11(B).2.5, and 9.4 envelop the histori- 1. Design min. and -60 F to 120 F cally recorded mini- max. for exposed mum and maximum re-outside structures gional temperatures or components and are within a range of 100-year

2. Design for ulti- Cooling pond recurrence temperatures.

mate heat sink

3. Design winter -25 F and 15 mph wind air conditions for ventilation
4. Design for summer 97 F dry bulb, 79 F wet bulb ventilation

Flood level Flooding is precluded by the Section 2.4 and No special flood elevation of the plant and by Table 3.4-2 protection measures the site drainage system. (such as external flood doors) are incorporated.

Maximum rainfall 7.4 in/hr, excess allowed to run Section 2.4 Site drainage designed off roofs to preclude local flooding.

Rev. 6 WOLF CREEK TABLE 1.2-1 (Sheet 2)

Parameter SNUPPS USAR Reference Remarks Ice and snow loading Section 2.4 Basic snow load (100- year recurrence snow-

1. Basic snow load, 91 psf pack) adjusted for normal and severe geometry and drifting environmental for roof design using Section 7.2 of ANSI
2. Basic snow load, 153 psf A58.1-1972. "Extreme extreme environ- environmental" includes mental the effects of PMWP.

Ground water elevation Maximum hydrostatic level is at Section 2.4 Conservative assumption Grade for buoyancy calcula-tions and computation of uplift pressure on foundation base mats.

Seismology (OBE and OBE - 0.12g, SSE - 0.20g Section 2.5 The standard plant SSE)

OBE and SSE were used with each site's soil

properties to generate seismic structural loads. These loads were enveloped for design.

Floor response spectra were generated in the same manner. All items were designed either to the envelope or all of the individual floor response spectra so that these items could be interchangeable at all sites, thus the Wolf Creek site design was limited by the other SNUPPS plants floor response spectra.

Foundation character-

istics

1. Settlement Design settlements are within the Section 2.5 following criteria:
a. Total - 3 in.
b. Post construction - 1 in.
c. Post construction differen-tial (between buildings and/or columns) - 1/2 in.

Rev. 0 WOLF CREEK TABLE 1.2-1 (Sheet 3)

Parameter SNUPPS USAR Reference Remarks

2. Static and dy- The equations for the lateral earth Section 2.5 Used for design of namic lateral pressures, shown in Figure 2.5-152, subsurface Category earth pressures are used in conjunction with the I walls soil parameters and the enveloping earthquake parameters (i.e., enveloping SSE and OBE) to compute the lateral pressures on the foundation walls.

The maximum earth pressure thus computed is taken as the envelope pressure and is used in design.

3. Liquefaction Subsurface materials at all sites Section 2.5 not susceptible to liquefaction
4. Local subsidence No evidence of any actual or poten- Section 2.4 WCGS is free from tial subsidence major surface or sub-

surface subsidence or collapse resulting from tectonic depressions, cavernous conditions, solutioning, or extraction of subsurface fluids or mining resulting from man-made activities.

Windspeed 100 mph. Tornado maximum wind speed Sections 3.3.1 and BC-TOP-3-A, ANSI-is 360 mph with 3 psi pressure drop 3.3.2 A58.1-1972, and Reg-in 1-1/2 secs ulatory Guide 1.76.

Relative humidity (2) 97 F dry bulb Section 9.4 and These are temperature 79 F wet bulb 45% (summer) Table 9.4-1 conditions based

-25 F dry bulb (winter) on 1972 ASHRAE Handbook of Fundamentals and are used for design of the plant HVAC systems for safety-related structures.

(1) The design envelope was conservatively developed using data from all SNUPPS sites.

(2) The winter temperature conditions have been re-evaluated for Wolf Creek. The acceptable design minimum temperature for exposed outside structures or components is -30°F. The acceptable design winter temperature for HVAC design is 7°F.

Rev. 14

WOLF CREEK 1.3 COMPARISON TABLES 1.3.1 COMPARISON WITH SIMILAR FACILITY DESIGNS Table 1.3-1 presents a design comparison of the major NSSS parameters or features of WCGS with Comanche Peak, Units 1 and 2 (Docket Nos. 50-445 and 50-

446), W. B. McGuire, Units 1 and 2 (Docket Nos. 50-369 and 50-370), and Trojan

(Docket No. 50-344). Wolf Creek and Callaway were both designed using the

SNUPPS powerblock design. These comparisons were made at the time of

application for the Operating License and are considered historic data. Table

1.3-1 will not be updated to reflect changes made at these facilities.

For a general design comparison of the major BOP systems utilized by WCGS with

similar systems on other Bechtel-designed plants, refer to the general system

descriptions in Section 1.2.

Refer to Table 1.3-2 for a listing of major analyses that have been used on

WCGS but are not included in topical reports. Most of these analyses have been

previously reviewed by the NRC on other dockets. Note that approved topical

reports issued by Bechtel and Westinghouse are listed in Section 1.6.

1.3.2 COMPARISON OF FINAL AND PRELIMINARY INFORMATION

Table 1.3-3 identifies all the significant changes that were made to the power

block since submittal of the SNUPPS PSAR but prior to receipt of the operating

license. Only items not reported in the PSAR and its subsequent amendments are

listed in Table 1.3-3.

1.3.3 COMPLIANCE WITH NRC REGULATIONS

Table 1.3-4 presents a list of NRC regulations and a corresponding description

regarding the degree of compliance to each regulation. Compliance with 10 CFR

Parts 20, 26, 50, 51, 55, 70, 71, 73, and 100 is considered.

1.3-1 Rev. 23 WOLF CREEK TABLE 1.3-1 DESIGN COMPARISON USAR Parameter or Feature Chapter/Section WCGS(b) Comanche Peak W. B. McGuire Trojan Reactor core heat 4.0, 5.0, 15.0 3,411 3,411 3,411 3,411

output, MWt Minimum DNBR for 4.1, 4.4, 15.0 >1.30 >1.30 >1.30 >1.30

design transients Total thermal flow 4.1, 4.4, 5.1 142.1 142.1 140.3 132.7

rate, 106 lb/hr Reactor coolant tem- 4.1, 4.4

peratures, F Core outlet 621.4 621.4 620.8 619.5 Vessel outlet 618.2 618.2 618.2 616.8 Core average 591.8 591.8 589.4 585.9 Vessel average 588.5 588.5 588.2 584.7 Core inlet 558.8 558.8 558.1 552.5 Vessel inlet 558.8 558.8 558.1 552.5 Average linear power, 4.1, 4.4 5.44 5.44 5.44 5.44

kW/ft Peak linear power for 4.1, 4.4 12.6 12.6 12.6 13.6

normal operation, kW/ft Heat flux hot channel 4.1, 4.4, 15.0 2.32 2.32 2.32 2.50

factor, FQ Fuel assembly array 4.1, 4.3 17 x 17 17 x 17 17 x 17 17 x 17

Rev. 7 WOLF CREEK TABLE 1.3-1 (Sheet 2)

DESIGN COMPARISON USAR Parameter or Feature Chapter/Section WCGS (b) Comanche Peak W. B. McGuire Trojan Number of fuel 4.1, 4.3 193 193 193 193

assemblies Uranium dioxide rods 4.1, 4.3 264 264 264 264

per assembly Fuel weight as uranium 4.1, 4.3 222,739 222,739 222,739 222,739

dioxide, lb Number of grids per 4.1, 4.3 8-Type R 8-Type R 8-Type R 8-Type R

assembly Rod cluster control 4.1, 4.3

assemblies Number of full/part 53/- 53/- 53/8 53/8 length assemblies Absorber material Ag-In-Cd Ag-In-Cd Ag-In-Cd Ag-In-Cd Hafnium Clad material Stainless Stainless Stainless Stainless Steel Steel Steel Steel Clad thickness 0.0185 0.0185 0.0185 0.0185 Equivalent core 4.1, 4.3 132.7 132.7 132.7 132.7

diameter, in.

Active fuel length, in. 4.1, 4.3 143.7 143.7 143.7 143.7 Fuel enrichment (weight` 4.1, 4.3 Core A Unit 1 percent)

Region 1 2.10 1.60 2.10 2.10 Region 2 2.60 2.40 2.60 2.60 Region 3 3.10 3.10 3.10 3.10 Rev. 7 WOLF CREEK TABLE 1.3-1 (Sheet 3)

DESIGN COMPARISON USAR Parameter or Feature Chapter/Section WCGS(b) Comanche Peak W. B. McGuire Trojan Number of coolant loops 5.0 4 4 4 4 Total steam flow, 5.1 15.14 15.14 15.14 5.07

106 lb/hr Reactor vessel 5.3 Inside diameter, in. 173 173 173 173 Inlet nozzle inside 27-1/2 27-1/2 27-1/2 27-1/2 diameter, in.

Outlet nozzle inside 29 29 29 29 diameter, in.

Number of reactor 54 54 54 54 closure head studs Reactor coolant pumps 5.4.1 Horsepower 7,000 7,000 7,000 6,000 Capacity, gpm 100,600 99,000 99,000 88,500 Steam generators 5.4.2 Model F D D D Heat transfer areas, ft.2 55,000 48,000 48,000 51,500 Number of U-tubes 5,626 4,578 4,674 3,388 Residual heat removal 5.4.7 Initiation pressure, ~425 ~425 ~425 ~400 psig

Rev. 12 WOLF CREEK TABLE 1.3-1 (Sheet 4)

DESIGN COMPARISON USAR Parameter or Feature Chapter/Section WCGS(b) Comanche Peak W. B. McGuire Trojan Initiation/completion ~350/140 ~350/140 ~350/140 ~350/140 temperature, F Component cooling water 105 105 95 95 design temperature, F Cooldown time after ~16 ~16 ~16 ~16 initiation, hr Heater exchanger removal 39.0 39.1 34.15 34.2 capacity, 106 Btu/hr Pressurizer 5.4.10 Heatup rate using 55 55 55 55 heaters, F/hr Internal volume, ft3 1,800 1,800 1,800 1,800 Pressurizer safety 5.4.13

valves Number 3 3 3 3 Maximum relieving 420,000(c) 420,000 420,000 420,000 capacity, lb/hr Accumulators 6.3 Number 4 4 4 4 Operating pressure, 600 600 600 600 minimum, psig Minimum operating water 819 950 950 870 volume, each, ft3

Rev. 16 WOLF CREEK TABLE 1.3-1 (Sheet 5)

DESIGN COMPARISON USAR Parameter or Feature Chapter/Section WCGS(b) Comanche Peak W. B. McGuire Trojan Centrifugal charging 6.3

pumps Number 2 2 2 2 Design flow, gpm 150 150 150 150 Design head, ft 5,800 5,800 5,800 5,800 Safety injection 6.3

pumps Number 2 2 2 2 Design flow, gpm 440 425 425 425 Design head, ft 2,780 2,680 2,500 2,500 Residual heat removal 5.4.7, 6.3

pumps Number 2 2 2 2 Design flow, gpm 3,800 3,800 3,000 3,000 Design head, ft 350 350 375 375 Instrumentation and 7.0 (a) (a) (a) (a)

controls New fuel storage racks 9.1.1 21 21 21 21

center-to-center

spacing, in.

Chemical and volume 9.3.4

control Total seal water 32 32 32 32 supply flow rate, nominal, gpm

Rev. 7 WOLF CREEK TABLE 1.3-1 (Sheet 6)

DESIGN COMPARISON USAR Parameter or Feature Chapter/Section WCGS(b) Comanche Peak W. B. McGuire Trojan Total seal water 12 12 12 12 return flow rate, nominal, gpm Letdown flow, normal/maximum, 75/120 75/120 75/120 75/120 gpm Charging flow, 55/100 55/100 55/100 55/100 normal/maximum, gpm

NOTES:

(a) The instrumentation and control systems discussed in Chapter 7.0 are functionally similar to those systems implemented in Comanche Peak, W. B. McGuire, and Trojan.

(b) The design conditions for WCGS listed in this Table have been changed by the Wolf Creek Power Rerate Program. However, since the comparisons were made at the time of application for the Operating License and are considered historic data, the Table will not be updated to reflect the new

information.

(c) The capacity is reduced to 415,764 lb/hr due to the setpoint change from 2485 psig to 2460 psig.

Rev. 16 WOLF CREEK TABLE 1.3-2 MAJOR ANALYSES NOT INCLUDED IN TOPICAL REPORTS Analysis Previously Description and Applicable Reviewed on Other

Name USAR Section Projects Control Room Habitability

a. Control room air intake 2.3 Partial use in X/Q due to accidental Calvert Cliffs and releases of radiological Grand Gulf

materials

b. All other accidents, e.g., 2.2 Grand Gulf explosions, toxic chemical spills, fire, etc.

Reactor Building

a. Tendon Gallery 3.8 Grand Gulf (1)

[CE 901 (STRUDL)]

[CE 800 (BSAP)]

b. Base Slab Bending 3.8 Grand Gulf (1)

[CE 779 (SAP 1.9)]

c. Containment 3.8 San Onofre Units Wall-Flexure 2 and 3 (1)

[CE 779 (SAP 1.9)]

Reactor Building Internals

a. Secondary Shield Walls 3.8 San Onofre Units

[CE 779 (SAP 1.9)] 2 and 3

b. Refueling Pool 3.8 San Onofre Units (CE 779 (SAP 1.9)] 2 and 3
c. Compartment Analysis 3.8 Grand Gulf (1)

[CE 901 (STRUDL)]

Other Category I Structures

a. Structural Steel Framing 3.8 Grand Gulf Units

[CE 901 (STRUDL)] 1 and 2

b. Reinforced Concrete Analysis 3.8 Grand Gulf Units

[CE 901 (STRUDL)] 1 and 2

[CE 800 (BSAP)]

Rev.0 WOLF CREEK TABLE 1.3-2 (Sheet 2)

Analysis Previously Description and Applicable Reviewed on Other

Name USAR Section Projects

Seismic

a. Impedance Functions for 3.7(B) Palo Verde Layered Soils

[CE 970 (LUCON)]

b. Floor Response Spectra 3.7(B) None (FLUSH). Although not specifically named, a description of this program is included in

BC-TOP-4-A

c. Seismic Displacement 3.7(B) None

Analysis

[CE 933 (FASS)] (DISCOM)

Piping Analysis

a. ME-101 3.9(B) Grand Gulf, Farley

ME-632

Used to calculate the stresses

and loads in piping systems due

to restrained thermal expansion;

deadweight and seismic anchor

movements, and earthquake

b. ANSYS 3.9(B) Grand Gulf, Farley

General static, thermal, and

dynamic analysis for linear

elastic and plastic analysis

c. ME-210 3.9(B) Grand Gulf, Farley

Computes local stresses in

piping due to external loads

Rev. 0 WOLF CREEK TABLE 1.3-2 (Sheet 3)

Analysis Previously Description and Applicable Reviewed on Other Name USAR Section Projects

d. ICES/STRUDL 3.9(B) Grand Gulf, Farley (CE 901)

Analysis of indeterminate frame

structures, both spatial and plane.

Used to evaluate reactions,

deflections, stresses, and code

check

Essential Service Water Vertical Loop Chase

a. Foundation and Substructure 3.8 N/A Walls Analysis (020544.14.01-C-002)
b. Vertical Loop Chase 3.8 N/A Structural Analysis (020544.14.01-C-005)
c. ESW Waterhammer 9.2.1.2 N/A Mitigation Analysis (EF-M-076)

(1) Although this program was not necessarily used for analysis of the same structure on another plant, it was used for

similar applications.

Rev. 29 WOLF CREEK TABLE 1.3-4 COMPLIANCE WITH NRC REGULATIONS, 10 CFR Regulation

(10 CFR) Compliance

20.1001(a) This regulation states the general purpose for which the Part 20 regulations are established and does not impose any independent obligations on licensees.

20.1001(b) This regulation describes the overall purpose of the Part 20 regulations to control the possession, use, and transfer of licensed material by any licensee, so that the total dose to an individual will not exceed the standards prescribed therein. It does not impose any independent obligations on licensees.

20.1101(b) Conformance with the ALARA principle stated in this regulation is ensured by the implementation of Company policies and appropriate Technical Specifications and health physics procedures.

Chapters 11.0 and 12.0 of the USAR describe the specific equipment and design features utilized in this effort.

20.1002 This regulation states the general purpose for the Part 20 regulations and imposes no independent obligations on those licensees to which they apply.

20.1003 The definitions contained in this regulation are adhered to in appropriate Technical Specifications and procedures and in applicable sections of the

USAR. 20.1004 The units of radiation dose specified in this regulation are accepted and conformed to in all applicable station procedures.

20.1005 The units of radioactivity specified in this regulation are accepted and conformed to in all applicable station procedures.

20.1006 This regulation governs the interpretation of regulations by the NRC and does not impose independent obligations on licensees.

20.1007 This regulation gives the address of the NRC and does not impose independent obligations on

licensees.

Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 2)

Regulation (10 CFR) Compliance

20.1201 The radiation dose limits specified in this regulation are complied with through the implementation of and adherence to administrative policies and controls and appropriate health physics procedures developed for this purpose.

Conformance is documented by the use of appropriate personnel monitoring devices and the maintenance of all required records.

20.2104(d) When required by this regulation, the accumulated dose for any individual permitted to exceed the exposure limits specified in 20.1201 is determined by the use of Form NRC-4. Appropriate health physics procedures and administrative policies control this process.

20.1204 Compliance with this regulation is ensured through the implementation of appropriate health physics procedures relating to air sampling for radioactive materials and bioassay of individuals for internal contamination. Administrative policies and controls provide adequate margins of safety for the protection of individuals against intake of radioactive materials. The systems and equipment described in Chapters 11.0 and 12.0 of the USAR provide the capability to minimize these hazards.

20.1701 Appropriate process and engineering controls and equipment, as described in Chapters 11.0 and 12.0 of the USAR, are installed and operated to maintain levels of airborne radioactivity as low as reasonably achievable.

20.1703 This regulation allows credit in estimating individual exposures for operators who are wearing respiratory protective equipment. Operating manuals contain procedures that ensure that approved respiratory protection equipment is being properly used and that plant practices are in compliance with Regulatory Guide 8.15, "Acceptable Programs for Respiratory Protection."

20.1703(c) This regulation prohibits the licensee from assigning protection factors higher than those specified in Appendix A and allows the Commission to authorize higher protection factors under certain conditions.

Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 3)

Regulation (10 CFR) Compliance 20.1703(a)(2) This regulation requires the licensee to obtain specific authorization from the NRC in order to make allowance for certain respiratory protection equipment and provides the requirements for the application for such authorization.

20.1703(c) This regulation states the requirements for respiratory equipment which can be used as emergency devices.

20.1703(d) The proper notification specified by this regulation will be made to the appropriate authority within the appropriate time limit.

20.1207 Conformance with this regulation is ensured by appropriate company policies regarding employment of individuals under the age of 18 and the station procedures restricting these individuals' access to the station restricted areas.

20.1301(c) Chapter 11.0 of the USAR provides the information and related radiation dose assessments specified by this regulation.

20.1301(c) The radiation dose rate limits specified in this regulation are complied with through the implementation of station procedures, Technical Specifications, and administrative policies which control the use and transfer of radioactive materials. Appropriate surveys and monitoring devices document this compliance.

20.1301(a) Conformance with the limits specified in this regulation is ensured through the implementation of station procedures and applicable Technical Specifications which provide adequate sampling and analyses and monitoring of radioactive materials in effluents prior to and during their release. The level of radioactivity in station effluents is minimized to the extent practicable by the use of appropriate equipment designed for this purpose, as described in Chapter 11.0 of the USAR.

20.1301(c) The Operating Agent has not and does not currently 20.106(c) intend to include in any license or amendment application proposed limits higher than those specified in 20.1301(a), as provided for in these regulations.

Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 4)

Regulation (10 CFR) Compliance 20.1206 This regulation allows for Planned Special Exposures that are authorized by the licensee. These exposures are tracked separately with their own exposure limits. The lifetime whole body limit for Planned Special Exposure is 25 rem.

20.1302(b)(2) Appropriate allowances for dilution and disper- sion of radioactive effluents are made in conformance with this regulation, and are described in detail in Chapter 11.0 of the USAR and in appropriate reports required by the Technical

Specifications.

20.1301 This regulation provides criteria by which the Commission may impose further limitations on releases of radioactive materials made by a licensee. It imposes no independent obligations on

licensees.

20.1301(a) This regulation states that the provisions of 20.2003 do not apply to disposal of radioactive material into sanitary sewage systems. It imposes no independent obligations on licensees.

20.1301(d) This regulation pertains to licensees engaged in Uranium fuel cycle operations and does not apply to

WCGS. 20.1002 This regulation clarifies that the Part 20 regulations are not intended to apply to the intentional exposure of patients to radiation for the purpose of medical diagnosis or therapy. It does not impose any independent obligations on

licensees.

20.1204 Necessary bioassay equipment and procedures, including Whole Body Counting, are utilized at the station to determine exposure of individuals to concentrations of radioactive materials.

Appropriate health physics procedures and administrative policies implement this require-

ment. 20.1501(a) The surveys required by this regulation are performed at adequate frequencies and contain such detail as to be consistent with the radiation hazard being evaluated. Applicable health physics procedures require these surveys and provide for their documentation in such a manner as to ensure compliance with the regulations of 10 CFR 20.

Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 5)

Regulation

(10 CFR) Compliance

20.1502 Applicable health physics procedures set forth policies and practices which ensure that all individuals are supplied with and required to use appropriate personnel monitoring equipment. Work procedures are established to provide additional control of personnel working in radiation areas and to ensure that the level of protection afforded to these individuals is consistent with the radiological hazards in the work place.

20.1501 The terminology set forth in this regulation is accepted and conformed to in all applicable station procedures, Technical Specifications, and those portions of the station procedures in which its use is made.

20.1501(c) This regulation pertains to personnel dosimeter processing and evaluation and is conformed to through appropriate Health Physics procedures.

20.1901(a) All materials used for labeling, posting, or otherwise designating radiation hazards or radioactive materials, and using the radiation symbol, conform to the conventional design pre-scribed in this regulation.

20.1902(a) This regulation is conformed to through the implementation of appropriate health physics procedures relating to posting of radiation areas, as defined in 10 CFR Part 20.1501.

20.1902(b) The requirements of this regulation for "High Radiation Areas" are conformed to by the imple-mentation of the Technical Specifications and appropriate health physics procedures. The controls and other protective measures set forth in the regulation are maintained under the surveillance of the station Health Physics group.

20.1902(d) Each Airborne Radioactivity Area, as defined in this regulation, is required to be posted in accordance with appropriate health physics procedures. These procedures also provide for the surveillance requirements necessary to determine airborne radioactivity levels.

Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 6)

Regulation

(10 CFR) Compliance

20.1902 The area and room posting requirements set forth in this regulation pertaining to radioactive materials are complied with through the implementation of appropriate health physics procedures.

20.1902(e) The container labeling requirements set forth in this regulation are complied with through the implementation of appropriate health physics

procedures.

20.1904(a) The posting requirement exceptions described in this regulation are used where appropriate and necessary at the station. Adequate controls are provided within the station health physics procedures to ensure safe and proper application of these exceptions.

20.1906 All of the requirements of this regulation per- taining to procedures for picking up, receiving, and opening packages of radioactive materials are implemented by the station procedures and appropriate health physics procedures. These procedures also provide for the necessary documentation to ensure an auditable record of

compliance.

20.1801 The storage and control requirements for licensed 20.1802 materials in unrestricted areas are conformed to and documented through the implementation of station health physics procedures.

20.2001 The general requirements for waste disposal set forth in this regulation are complied with through station health physics procedures, the Technical Specifications, and the provisions of the station license. Chapter 11.0 of the USAR describes the solid waste disposal system installed at the

station.

Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 7)

Regulation (10 CFR) Compliance 20.2002 No such application for proposed disposal procedures as described in this regulation is

contemplated.

20.2003 No such plans for disposal of licensed material by release into sanitary sewage systems as provided for in this regulation are contemplated.

20.2004 No such incineration of licensed material as provided for in this regulation is contemplated.

20.2005 This regulation pertains to disposal of specific wastes and is not applicable to WCGS.

20.2006 This regulation provides requirements which are designed to control transfers of radioactive waste intended for a land disposal facility and establishes a tracking system, in addition to supplementing existing requirements concerning transfer and record keeping. These requirements are met via implementation of appropriate health physics procedures.

20.2101 All of the requirements of this regulation are 20.2103 complied with through the implementation of appropriate Technical Specifications and health physics procedures pertaining to records of-surveys, radiation monitoring, and waste dis-posal. The retention periods specified for such records are also provided for in these specifications and procedures.

20.2201 The station has established an appropriate inventory and control program to ensure strict accountability for all licensed radioactive materials. Reports of theft or loss of licensed material are required by reference to the regulations of 10 CFR in the Technical Specifi-

cations.

20.2202 Notifications of accidents, as described in this regulation, are assured by the requirements of the Technical Specifications and appropriate health physics procedures, which also provide for the necessary assessments to determine the occurrence of such incidents.

Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 8)

Regulation

(10 CFR) Compliance

20.2203 Reports of overexposures to radiation and the occurrence of excessive levels and concentra-tions, as required by this regulation, are provided for by reference in the Technical Specifications and in appropriate health physics procedures.

20.2206 The personnel monitoring required by this regulation is provided for by the Technical Specifications. Appropriate health physics procedures establish the data base from which this report is generated.

20.2206 The report of radiation exposure required by this regulation upon termination of an individual's employment or work assignment is generated through the provisions of a station health physics

procedure.

20.2301 This regulation provides for the granting of exemptions from 10 CFR Part 20 regulations, provided that such exemptions are authorized by law and will not result in undue hazard to life or property. It does not impose independent obligations on licensees.

20.2302 This regulation describes the means by which the Commission may impose upon any licensee requirements which are in addition to the regulations of Part 20. It does not impose independent obligations on licensees.

20.2401 This regulation describes the remedies which the Commission may obtain in order to enforce its regulations, and sets forth those penalties or punishments which may be imposed for violations of its rules. It does not impose any independent obligations on licensees.

26.1-26.11 Subpart A, This subpart prescibes requirements and standards for the establishment, implementation, and maintenance of fitness-for-duty (FFD) programs.

26.21-26.41 Subpart B, This subpart requires the establishment, implementation, and maintenance of FFD progrzms.

26.51-26.71 Subpart C, This subpart specifies the requirements to grant initial authorization, authorization update, authorization reinstatement, or authorization with potentially disqualifying FFD information.

26.73-26.77 Subpart D, This section defines the minimum sanctions that licensees and other entities shall impose when an individual has violated the drug and alcohol provisions of an FFD policy.

Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 9)

Regulation

(10 CFR) Compliance 26.81-26.119 Subpart E, This subpart contains requirements for collecting specimens for drug testing and conducting alcohol tests by or on behalf of the licensees and other entities.

26.151-26.169 Subpart G, This subpart contains requirements for the HHS-certified laboratories that licensees and other entities who are subject to this part use for testing urine specimens for validty and the presence of drugs and drug metabolites.

26.181-26.189 Subpart H, This subpart contains requirements for determining whether a donor has violated the FFD policy and for making a determination of fitness.

26.201-26.211 Subpart I, This subpart contains requirements for work hour controls and rest-break periods for select categories of workers.

26.709-26.719 Subpart N, This subpart contains the requirements for maintaining records and submitting certain reports to the NRC.

26.821-26.825 Subpart O, This subpart requires the allowance of duly authorized NRC inspectors.

50.1 This regulation states the purpose of the Part 50 regulations and does not impose any independent obligations on licensees.

50.2 This regulation defines various terms and does not impose independent obligations on licensees.

50.3 This regulation governs the interpretation of the regulations by the NRC and does not impose independent obligations on licensees.

50.4 This regulation gives the address of the NRC and does not impose independent obligations on

licensees.

50.7 This regulation provides the requirements for employee protection and provides for remedy on the part of the employee who is discriminated against for engaging in certain protected activities as well as the penalty for violation.

Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 10)

Regulation

(10 CFR) Compliance

50.8 This regulation provides the NRC information collection requirements and specifies associated OMB approval.

50.9 This regulation provides the requirements for completeness and accuracy of information provided by the licensee to the NRC.

50.10 These regulations specify the types of activities 50.11 that may not be undertaken without a license from the NRC. The Operating Agent does not propose to conduct any such activities at Wolf Creek without an NRC license.

50.12 This regulation provides for the granting of exemptions from 10 CFR Part 50 regulations, provided that such exemptions are authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. It does not impose independent obligations on licensees.

50.13 This regulation says that a license applicant need not design against acts of war. It imposes no independent obligations on licensees.

50.20 These regulations described the types of licenses 50.21 that the NRC issues. They do not address the sub-50.22 stantive requirements that an applicant must sat-50.23 isfy to qualify for such licenses.

50.30 This regulation sets forth procedural requirements for the filing of license applications concerning items such as place of filing, oath or affirmation, number of copies of application, application for operating license, filing fees, and an environmental report. The procedural requirements of this regulation have been met in the license application and will continue to be met for subsequent amendments to the license application.

50.31 These regulations permit more efficient organiza 50.32 tion of the license application and impose no independent obligations on licensees.

50.33 This regulation requires the licensee's application to contain certain general information, such as identification of the applicant, information about the applicant's financial qualifications, and a list of regulatory agencies with jurisdiction over the applicant's rates and services. This information is provided in the operating license

application.

Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 11)

Regulation (10 CFR) Compliance 50.33a This regulation requires applicants for construction permits to submit information required for the antitrust review. The requirements set forth by this regulation were satisfied at the time the application for a construction permit was submitted.

50.34(a) This regulation sets forth requirements which govern the content of technical information in the Preliminary Safety Analysis Report and is relevant to the construction permit stage. The requirements of this regulation were satisfied as part of the construction permit application.

50.34(b) An Updated Safety Analysis Report (USAR) has been prepared and submitted which addresses in the chapters indicated the information required:

1. Site evaluation factors - Chapter 2.0
2. Structures, systems, and components - Chapters 3.0, 4.0, 5.0, 6.0, 7.0, 8.0, 9.0, 10.0, 11.0, 12.0, and 15.0
3. Radioactive effluents and radiation protection - Chapters 11.0 and 12.0
4. Design and performance evaluation - ECCS performance is discussed and shown to meet the requirements of 10 CFR 50.46 in Chapters 6.0 and 15.0
5. Results of research program - Section 1.5
6. i. Organizational structure - Chapter 13.0 ii. Managerial and administrative controls -

Chapters 13.0 and 17.0. Chapter 17.0 discusses compliance with the quality assurance requirements of Appendix B.

iii. Preoperational testing and initial operations - Chapter 14.0

iv. Plans for conduct of normal operations -

Chapters 13.0 and 17.0. Surveillance and periodic testing is specified in the Technical Specifications.

v. Plans for coping with emergencies - Emergency Plan.

vi. Technical Specifications

vii. Potential hazards analysis (Appendix 3B)

7. Technical qualifications - Chapter 13.0
8. Operator requalification program - Chapter 13.0

Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 12)

Regulation

(10 CFR) Compliance

50.34(c) The information required in these sections was 50.34(d) submitted for Wolf Creek pursuant to Paragraph 2.790(d) 10 CFR 2, "Rules of Practice." This information includes both the Physical Security Plan and the Safeguards Contingency Plan.

50.34(e) This regulation requires that the licensee who prepares a physical security plan, a safeguards contingency plan, or a guard qualification and training plan protect the plans and other Safeguards Information against unauthorized disclosure in accordance with 10 CFR 73.21.

50.34(f) This regulation provides additional TMI-related requirements for applicants for a construction permit whose application was pending as of February 16, 1982. Wolf Creek is not impacted by this regulation.

50.34a This regulation sets forth the requirements for including in the construction permit application a description of the design objectives and the preliminary design of equipment to control the release of radioactive material in nuclear power reactor effluents. The requirements of this regulation were satisfied as part of the construction permit application.

50.35 This regulation is relevant to the construction permit stage rather than the operating license

stage.

50.36 Technical Specifications are prepared for implemen- tation and include 1) safety limits and limiting safety settings, 2) limiting conditions for operations, 3) surveillance requirements, 4) design features, and 5) administrative controls.

Technical Specifications will take the form prescribed by NUREG 0452, Revision 3, dated November 1980 which are the "Standard Technical Specifications for Westinghouse Pressurized Water

Reactors."

50.36(a) Radiological Effluent Technical Specifications (RETS) were prepared for implementation as required by this regulation. The RETS have taken the form prescribed by NUREG 0472, Revision 2, dated July

1979.

Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 13)

Regulation

(10 CFR) Compliance

50.36b This regulation allows the NRC to attach to and incorporate in the license additional conditions to protect the environment.

50.37 This regulation requires the applicant to agree to limit access to restricted data. This requirement was satisfied at the time of application for the construction permit.

50.38 This regulation prohibits the NRC from issuing a license to any person who is a citizen, national, or agent of a foreign country or any corporation or other entity which is owned, controlled, or dominated by an alien, a foreign corporation, or a foreign government. The licensees were eligible to apply for and obtain a license as stated in their applications for operating licenses. Therefore, the requirements of this regulation are not applicable.

50.39 This regulation provides that applications and related documents may be made available for public inspection. This imposes no direct obligations on applicants and licensees.

50.40 This regulation provides considerations to "guide" the Commission in granting licenses, as follows:

50.40(a) The design and operation of the facility is to provide reasonable assurance that the health and safety of the public will not be endangered. The basis for the assurance that the regulations will be met and the public protected is contained in this document and in the license application and the related correspondence over the years.

Moreover, the lengthy process by which the plant was designed, constructed, and reviewed, including reviews by the architect-engineer, the NSSS vendor, the licensees individual staffs, and the NRC Staff, provides a great deal of assurance that the public health and safety will not be endangered.

50.40(b) This regulation requires that the applicant be both technically and financially qualified to engage in the proposed activities as specified in the license application. Technical and financial adequacy of the applicants was determined to be satisfactory during the hearing process at the construction permit stage. Additional information was provided in the operating license application.

Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 14)

Regulation

(10 CFR) Compliance

50.40(c) The issuance of a license to the applicants was not inimical to the common defense and security or to the health and safety of the public. The individual showings of compliance with particular regulations contained in this section as well as the contents of the USAR and related correspondence on the record, plus the lengthy process of design, construction, and review by the applicants, the architect-engineer, the NSSS vendor, and the government ensure that the license will not be inimical to the health and safety of the public.

Compliance with the requirements in 10 CFR 50.40(a) demonstrated that a license was not inimical to the common defense and security.

50.40(d) The requirements set forth in this regulation were satisfied in that Environmental Reports were submitted in accordance with 10 CFR 51 as part of the operating license application.

50.41 This regulation applies to class 104 licensees, such as those for devices used in medical therapy.

The Operating Agent has not applied for a class 104 license, and therefore 50.41 is not applicable.

50.42 This regulation requires the Commission to consider additional standards in determining whether or not a license should be issued, i.e., 1) that the proposed activities will serve a useful purpose proportionate to the quantities of special nuclear material or source material to be utilized and 2) that due account will be taken of the antitrust advice provided by the Attorney General.

Information pertinent to these standards was made known to the Commission at the construction permit stage 1) by the licensing board verification of the need for power and 2) by the Attorney General's satisfactory review of the antitrust information.

An update of this information was provided with the operating license application, in accordance with Regulatory Guide 9.3.

Rev. 0 WOLF CREEK TABLE 1.3-4 (Sheet 15)

Regulation

(10 CFR) Compliance

50.43 This regulation imposes certain duties on the NRC and addresses the applicability of the Federal Power Act and the right of

government agencies to obtain NRC licenses. It imposes no direct obligations on licensees.

50.44 10 CFR 50.44 was revised in 2003. The revised 10 CFR 50.44 no longer defines a design-basis LOCA hydrogen release, and eliminates the requirements for hydrogen control systems to mitigate such a release. The installation of hydrogen recombiners and/or vent and purge systems required by 10 CFR 50.44(b)(3) was intended to address the limited quantity and rate of hydrogen generation that was postulated from a design-basis LOCA. The Commission has found that the hydrogen release is not risk-significant because the design-basis LOCA hydrogen release does not contribute to the conditional probability of a large relase up to approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the onset of core damage. In addition, these systems were ineffective at mitigating hydrogen releases from risk-significant beyond design-basis accidents. License Amendment No. 157 was issued by the NRC on January 31, 2005 and deleted the Technical Specification requirements for the hydrogen recombiners and relocated the requirements for the hydrogen monitors.

The WCGS power block combustible gas control system is described in USAR Section 6.2.5.2. The system is designed to maintain the hydrogen concentration in containment at a safe level following a LOCA, without purging

the containment atmosphere, as specified in 10 CFR 50.44(c).

The system consists of a hydrogen monitoring subsystem, and hydrogen recombiners.

Sections 6.2.5.2 and 6.2.5.3 of the USAR describe the hydrogen

mixing provisions and indicate that adequate mixing occurs

following a LOCA without reliance on the hydrogen mixing fans.

Section 6.2.5.2 of the USAR indicates that the recombiners or

the hydrogen purge subsystem can be utilized in sufficient time

to limit hydrogen concentration following a LOCA to less than 4

volume percent. In accordance with 50.44(d), the hydrogen contribution of the core metal-water reaction is assumed to be that resulting from reaction of 5 percent of the fuel cladding.

50.45 This regulation provides standards for construction permits rather than operating licenses and is therefore not pertinent to

this operating license proceeding.

50.46 USAR Section 6.3 describes the emergency core cooling system and the methods used to analyze ECCS performance following the

course of an accident. The results of the loss-of-coolant

accident analyses presented in USAR Section 15.6.5 demonstrate conformance with 50.46.

Rev. 19 WOLF CREEK TABLE 1.3-4 (Sheet 16)

Regulation (10 CFR) Compliance

50.47 This regulation states that the NRC will not issue an operating license until adequate emergency plans have

been assured based upon their evaluation of FEMA's

assessments of state and local emergency plans and the

NRC's assessment of the onsite emergency plans.

50.48 This regulation governs the fire protection plans required for operating nuclear power plants. USAR

Section 9.5 describes the fire protection system

designed to provide fire protection in accordance with

10 CFR 50 Appendix A, GDC3. USAR Appendix

9.5A provides a summary of the compliance with NRC

Branch Technical Position APCSB 9.5-1, Appendix A. USAR

Appendix 9.5B provides a summary of analyses performed

to demonstrate that WCGS could meet the requirements of

10 CFR 50, Appendix R.

Table 9.5E-1 of USAR Appendix 9.5E provides a design comparison to 10 CFR 50 Appendix R.

50.49 This regulation provides the requirements for environmental qualification of electrical equipment

important to safety for nuclear power plants.

50.50 This regulation provides that the NRC will issue a license upon determining that the application meets the

standards and requirements of the Atomic Energy Act and

the regulations and that the necessary notifications to

other agencies or bodies have been duly made. It imposes

no direct obligations on the licensees.

50.51 This regulation specifies the maximum duration of licenses. Compliance will be affected by the

Commission's issuing the license in order to comply.

50.52 This regulation provides for the combining in a single license of a number of activities. It imposes no

independent obligation on the licensee.

50.53 This regulation provides that licenses are not to be issued for activities that are not under or within the

jurisdiction of the United States. The operation of

WCGS will be within the United States and subject to the

jurisdiction of the United

States, as is evident from the description of the

facility in Part A of the operating license

application.

50.54 This regulation specifies certain conditions that are incorporated in every license issued. Compliance was

effected by the inclusion of these conditions in the

license when it was issued.

50.54(jj) The regulation changes published in the Federal Register Vol. 79, No. 214, pages 65776 through 65814 on Nov. 5, 2014, relocated previous regulation 50.55a(a)(1) to 50.54(jj). As originally stated with regard to 50.55a(a)(1) and now with regard to 50.54(jj), Section 3.2 of the USAR describes compliance with this regulation.

Rev. 29 WOLF CREEK TABLE 1.3-4 (Sheet 17)

Regulation (10 CFR) Compliance

50.55 This regulation addresses conditions of con-struction permits, not operating licenses, and therefore it is not applicable to this applica-

tion.

50.55a(a) The regulation changes published in the Federal Register Vol. 79, No. 214, pages 65776 through 65814 on Nov. 5, 2014, relocated standards and other documents incorporated by reference from 50.55a(b) to a new 50.55a(a). Therefore, 50.55a(a) provides guidance concerning the approved edition and addenda of ASME Codes and IEEE Standards that are incorporated by reference in the regulations.

Note: The previous 50.55a introductory text and 50.55a(a)(2), which specified the requirements for systems and components and protection systems for nuclear power reactors, were moved into 50.55a(b),

50.55a(c), 50.55a(d), 50.55a(e), 50.55a(f), 50.55a(g) and 50.55a(h).

50.55a(b)(1) This regulation provides conditions on use of ASME BPV Code Section III.

50.55a(b)(2) This regulation provides conditions on use of ASME BPV Code Section XI 50.55a(b)(3) This regulation provides conditions on use of ASME OM Code. 50.55a(b)(4) This regulation provides conditions on use of ASME BPV Code Section III Code Cases for design, fabrication and materials.

50.55a(b)(5) This regulation provides conditions on use of ASME BPV Code Section XI Code Cases for inservce inspection and repair/replacement activities.

50.55a(b)(6) This regulation provides conditions on use of ASME OM Code Code Cases.

50.55a(c) This regulation provides the code requirements for components which are part of the reactor coolant pressure boundary and for components which are connected to the reactor coolant system, including inservice inspection requirements.

Rev. 29 WOLF CREEK TABLE 1.3-4 (Sheet 18)

Regulation (10 CFR)

Compliance

Design and fabrication of the reactor vessel, reactor coolant system piping, reactor coolant pumps, and reactor coolant system valves were carried out in accordance with ASME Section III as described in Section 5 of the USAR.

50.55a(d) These regulations apply to nuclear power plants 50.55a(e) whose application for a construction permit was docketed after May 14, 1984.

50.55a(f) Inservice testing (IST) requirements delineated in this part are specified in the Technical Specifications.

50.55a(g) Inservice inspection (ISI) requirements delineated in this part are specified in the Technical Requirements Manual and Inservice Inspection Program.

50.55a(z) The regulation changes published in the Federal Register Vol. 79, No. 214, pages 65776 through 65814 on Nov. 5, 2014, relocated te allowance for proposed alternatives contained in the previous 50.55a(a)(3) to a new paragraph 50.55a(z). 50.55a(z) allows for proposed alternatives to 50.55a paragraphs (b), (c), (d), (e),

(f), (g), and (h).

50.55(h) As discussed in Chapter 7.0, Section 7.1, the protection systems meet IEEE 279-1971.

50.55b This regulation has been revoked. 43 Fed. Reg.

49775.

50.56 This regulation provides that the Commission will, in the absence of good cause shown to the contrary, issue an operating license upon completion of the construction of a facility in compliance with the terms and conditions of the construction permit.

This imposes no independent obligations on the

applicant.

50.57(a) This regulation required the Commission to make certain findings prior to the issuance of the operating license.

50.57(b) The license, as issued, contains appropriate conditions to ensure that items of construction or modification were completed on a schedule acceptable to the Commission.

50.57(c) This regulation provided for a low-power testing

license.

50.58 This regulation provided for the review and report of the Advisory Committee on Reactor Safeguards.

50.59 This regulation provides for the licensing of certain changes, tests, and experiments at a licensed facility. Technical Specifications and procedures provide implementation of this

regulation.

Rev. 29 WOLF CREEK TABLE 1.3-4 (Sheet 19)

Regulation (10 CFR)

Compliance 50.60 This regulation provides the acceptance criteria for fracture prevention measures for nuclear power reactors

during normal operation. Section 5.3 of the USAR details

vessel material parameters in terms of the fracture

toughness requirements set forth in Appendices G and H of

10 CFR 50.

50.61 This regulation provides the fracture toughness requirements for protection against pressurized thermal

shock events. Fracture toughness for the reactor

pressure vessel is addressed in Section 5.3 of the USAR.

Compliance with Regulatory Guide 1.99 is addressed in

Appendix 3A of the USAR.

50.62 This regulation specifies the requirements for reduction of risk from anticipated transients without scram (ATWS)

events for light-water nuclear power plants.

50.63 This regulation pertains to the Station Blackout rule.

50.64 This regulation pertains to non-power reactors only and is not applicable to WCGS.

50.65 This regulation requires the implementation of a program to monitor the effectiveness of maintenance programs by monitoring performance of plant SSCs. Plant procedures implement and control this program.

50.68 This regulation provides the licensee with eight requirements that may be complied with in lieu of

compliance with 10CFR70.24 for criticality monitoring.

WCGS complies with this regulation.

50.70 The Commission has assigned resident inspectors to WCGS and space was provided in conformance with 50.70(b)(1) through (3).

50.71 Records are and will be maintained and reports will be made in accordance with the requirements of sections (a) through (e) of this regulation and the

license.

50.72 This regulation provides the immediate notification requirements for operating nuclear power reactors.

50.73 This regulation requires the licensee to submit Licensee Event Reports for certain specific events.

50.74 This regulation requires the licensee to notify the NRC pertaining to a change in Reactor Operator or Senior Reactor Operator status.

50.78 This regulation pertains to holders of construction permits and does not apply to WCGS.

50.80 This regulation provides that licenses may not be transferred without NRC consent. No application for transfer has been made by the WCGS Licensees.

Rev. 29 WOLF CREEK TABLE 1.3-4 (Sheet 20)

Regulation (10 CFR) Compliance

50.81 This regulation permits the creation of mort-gages, pledges, and liens on licensed facilities, subject to certain provisions. The regulation prohibits secured creditors from violating the Atomic Energy Act and the Commission's regulations.

50.82 This regulation provides for the termination of licenses. It does not apply to WCGS because no termination of licenses has been requested.

50.90 This regulation governs applications for amend-ments to licenses. Future request for license amendments will be made in accordance with these

requirements.

50.91 This regulation provides guidance to the NRC regarding no significant hazards considerations, notices for public comment and state consultation.

50.92 This regulation provides guidance to the NRC in issuing license amendments including no significant hazards consideration determinations.

50.100 These regulations govern the revocation, suspen-50.101 sion, and modification of licenses by the Com-50.102 mission under unusual circumstances. No such 50.103 circumstances are present and these regulations are not applicable.

50.109 This regulation specifies the conditions under which the NRC may require the backfitting of a facility. This regulation imposes no independent obligations on a licensee unless the NRC proposes a backfitting requirement and, therefore, this regulation is not applicable.

50.110 This regulation governs enforcement of the Atomic Energy Act, the Energy Reorganization Act of 1974, and the NRC's regulations and orders. No enforcement action is at issue and, therefore, this regulation is not applicable.

50.120 This regulation provides guidance for the training and qualifications of Nuclear Power Plant Personnel.

This regulation establishes the requirements for a training program. Appropriate procedures control this program.

Appendix A USAR Section 3.1 discusses the extent to which the design criteria for the WCGS's plant structures, systems, and components important to safety comply with Title 10, Code of Federal Regulations, Part 50 (10 CFR 50), Appendix A, "General Design Criteria for Nuclear Power Plants" (GDC). As presented in Section 3.1, each criterion is first quoted and then discussed in enough detail to demonstrate SNUPPS' compliance with each criterion. In some cases, detailed evaluations of compliance with the various general design criteria are incorporated in more appropriate USAR sections, and are located by

reference.

Rev. 29 WOLF CREEK TABLE 1.3-4 (Sheet 21)

Regulation (10 CFR) Compliance

Appendix B Chapter 17.0 describes in detail the provisions of the operating Quality program which have been implemented to meet all applicable requirements of Appendix B.

Appendix C This appendix provides a guide for establishing an applicant's financial qualifications. Financial qualifications were established at the construction permit stage, and it was found that there is reasonable assurance that the funds needed to operate the facility in compliance with the Commission's regulations are available.

Updated information addressing financial quali-fication was submitted with the operating license

application.

Appendix D This appendix has been superseded by 10 CFR Part

51. As noted in the discussion for 10 CFR 50.40(d), the requirements of Part 51 have been

satisfied.

Appendix E This appendix specifies requirements for emer-gency plans. Emergency plans were developed to provide reasonable assurance that appropriate measures can and will be taken in the event of an emergency to protect the public's health and safety and prevent damage to property. The new criteria for emergency planning developed subsequent to the event at Three Mile Island, Unit 2 were factored into the emergency plans for the WCGS utilities. The Emergency Plan and associated facilities (EOF and Alternate TSC) were updated in 2011 to comply with revised regulations pertaining to "Enhancements to Emergency Preparedness Regulations" (Reference Section 18).

Appendix F This appendix applies to fuel reprocessing plants and related waste management facilities, not to power reactors such as those found in WCGS plants and is, therefore, not applicable.

Appendix G Fracture toughness compliance can be found in USAR Section 5.3.1.5. Assurance of adequate fracture toughness of ferritic materials in the reactor coolant pressure boundary (ASME Code,Section III, Class 1 components) is provided by compliance with the requirements for fracture toughness testing included in NB-2300 to Section III of the ASME Code and Appendix G of 10 CFR 50.

Appendix H Reactor vessel material surveillance program requirements are delineated in this part. Technical Specifications and operating procedures have been established to implement their requirements.

Further information is provided in USAR Chapter

5.0.

Rev. 28 WOLF CREEK TABLE 1.3-4 (Sheet 22)

Regulation

(10 CFR) Compliance

Appendix I This appendix provides numerical guides for design objectives and limiting conditions for operation to meet the criteria "as low as is reasonably achievable" for radioactive material in light water-cooled nuclear power reactor effluents. USAR Chapters 2.0, 11.0, and 12.0 discuss the extent to which the criteria for Appendix I are met.

Appendix J Reactor containment leakage testing for water-cooled power reactors is delineated in this appendix. These requirements are given in the Technical Specifications. Additional information concerning compliance can be found in USAR Chapter 6.0, Sections 6.2.3 and 6.2.6.

Appendix K This appendix specifies features of acceptable ECCS evaluation models. As stated in USAR Section 6.3, the ECCS subsystem functional parameters are integrated so that the Appendix K requirements are met over the range of anticipated accidents and single failure assumptions.

In addition, the ECCS evaluation model used to demonstrate conformance with 10 CFR 50.46 (see USAR Section 15.6.5) is in conformance with Appendix K

requirements.

Appendix L This appendix identifies the information required to be submitted by the applicant to the Attorney General to satisfy the requirements when applying for a facility license. The requirements of this appendix were satisfied prior to the time of application for the operating license.

Appendix M This appendix lists guidelines for the licensing of plants whose site requirements are not considered in the design of the plant structures. Since all WCGS sites are considered in the plant design, this appendix is not applicable.

Appendix N This appendix dictates the requirements applicable to duplicate plant designs on multiple sites. As allowed in this regulation, WCGS used a common Safety Analysis Report prior to issuance of the first update after receipt of the Operating License; however, where site specific needs were addressed Addenda were included for reference. The two reports have been merged into one Wolf Creek Specific Safety Analysis Report.

Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 23)

Regulation

(10 CFR) Compliance

Appendix 0 Appendix 0 dictates guidelines for the Staff in reviewing standardization of design. No inde-pendent obligation on the licensee is required.

Appendix P Reserved.

Appendix Q Appendix Q dictates guidelines for the staff in early review of the site and does not deal with operating license review.

Appendix R Appendix R delineates the fire protection program for nuclear power facilities operating prior to January 1, 1979. Appendix 9B of the USAR provides a summary of analyses performed to demonstrate that WCGS could meet the requirements of Appendix R.

Table 9.5E-1 of the USAR appendix 9.5E provides a design comparison of WCGS to Appendix R.

51.1 This regulation states the general purpose and scope for which the Part 51 regulations are established and does not impose any independent obligations on licensees.

51.2 This regulation specifies that Subpart A of Part 51 implements section 102(2) of the NEPA act of 1969, as amended.

51.3 This regulation states that in any conflict between the general rule and Subpart A of Part 51 (or other applicable part of this chapter) the special rule

governs.

51.4 The definitions contained in this regulation are adhered to in all appropriate documents.

51.5 This regulation governs the interpretation of regulations and does not impose independent obligations on licensees. This regulation specifies that interpretations of the regulations in Part 51 are not authorized other than a written interpretation by the General Counsel.

51.6 This regulation specifies the authority of the NRC in granting exemptions and does not impose independent obligations on licensees.

Subpart A 51.10 This regulation provides the purpose and scope of Subpart A which is to implement Section 102(2) of the National Environmental Policy Act (NEPA) in a manner consistent with NRC's domestic licensing and regulatory authority.

Rev. 9 WOLF CREEK TABLE 1.3-4 (Sheet 24)

Regulation

(10 CFR) Compliance

51.11 [Reserved]

51.12 This regulation states that subpart A applies to the NRC's ongoing environmental work and does not require retroactive measures for environmental reports or supplements filed prior to June 7, 1984. This regulation does not impose independent obligations or licensees.

51.13 This regulation permits the NRC to take immediate action in emergencies where the health and safety of the public may be adversely affected without observing the NEPA regulations. This regulation does not impose independent obligations on licensees.

51.14 This regulation provides a pertinent definitions related to NEPA which are adhered to in all appropriate documents.

51.15 This regulation provides the requirements for establishing time schedules for NRC-NEPA processes.

51.16 This regulation provides the requirements for the submittal of proprietary information.

51.17 This regulation indicates that the NRC has submitted the information requirements to OMB related to this part of the Code of Federal Regulations.

51.20 This regulation sets forth the requirements for an applicant for filing an Environmental Impact Report. These requirements were satisfied during the review of the Environmental Reports that were submitted with the application for a construction permit and the application for an operating license.

51.21 This regulation specifies that all licensing and regulatory actions subject to Part 51 require an environmental assessment except those identified in 51.20(b) as requiring an environmental impact statement and those identified in 51.22(c) as categorical exclusions.

51.22 This regulation sets forth the criterion for an identification of licensing and regulatory actions eligible for categorical exclusion.

Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 25)

Regulation

(10 CFR) Compliance

51.23 This regulation indicates that the NRC will require no environmental reports, impact statements, assessments or other analyses in connection with issuance of license amendment for storage of spent fuel up to 30 years beyond the expiration of

reactor operating license.51.25 This regulation states than an appropriate NRC staff director will determine when a categorical exclusion environmental impact statement or environment assessment should be prepared.

51.26 This regulation states that when an NRC staff director determines that an environmental impact statement will be prepared a notice of intent will be published in the Federal Register and a scoping process will be conducted.

51.27 This regulation describes the requirements for the Notice of Intent as required by 10 CFR 51.26.

51.28 This regulation specifies who the NRC staff director shall invite to participate in the scoping process for an environmental impact statement.

51.29 This regulation provides the requirements for the scoping process for an environmental impact

statement.

51.30 This regulation sets fourth the requirements for an environmental assessment by the NRC.

51.31 This regulation states that the NRC staff director will make the determination (based upon environmental assessments) whether to prepare an environmental impact statement or a finding of no significant impact.

51.32-51.35 These regulations provide the requirements for a finding of no significant impact by the NRC.

51.40 This regulation provides guidance to prospective applicants or petitioners for rulemaking for consultation with the NRC staff.5

51.41 This regulation gives the NRC authority to require permit or license applicants amendment applicants or petitioners to submit information useful in aiding NRC compliance with Section 102(2) of NEPA.

Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 26)

Regulation

(10 CFR) Compliance

51.45-51.69 These regulations set fourth the requirements for environmental reports.

51.70-51.125 These regulations set fourth the requirements for environmental impact statements.

Appendix A to Subpart A This Appendix to Part 51 Subpart A provides the format for presentation of material in environmental impact statements.

55.1-55.71 These regulations set forth the requirements for nuclear power plant operator's licenses.

70.1 This regulation states the general purpose for which Part 70 regulations are established and does not impose any independent obligations on licensees.

70.2 This regulation states the general scope of Part 70 and does not impose any independent obligations on

licensees.

70.3 This regulation gives the Commission the power to authorize licenses for the shipment and possession of special nuclear material.

70.4 The definitions contained in this regulation are adhered to in all appropriate documents.

70.5 This regulation sets forth the requirements for communications with the NRC regarding special nuclear materials and includes with addresses for the Director, Office of Nuclear material Safety and

Safeguards.

70.6 This regulation governs the interpretation of regulations and does not impose any independent obligations on licensees.

70.7 This regulation prohibits discrimination against and otherwise protects employees of all licensee engaged in certain protected activities.

Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 27)

Regulation

(10 CFR) Compliance

70.8 This regulation sets forth the information collection requirements and specifies OMB approval.

70.9 This regulation addresses the completeness and accuracy of information provided to the NRC.

70.11 - These regulations specify those persons exempted 70.14 from complying with Part 70. The licensees are not exempt from complying with the applicable requirements of Part 70.

70.15 Reserved.

70.18 - These regulations list types of licenses issued 70.20b for special nuclear material. WCGS adhered to all applicable requirements.

70.21 This regulation sets forth the requirements concerning the filing of special nuclear material license applications. The requirements of this regulation were satisfied.

70.22 This regulation sets forth the requirements concerning the contents of special nuclear material license applications. The requirements of this regulation were satisfied.

70.23 This regulation defines the requirements for the approval of an application for a license to possess special nuclear material. It does not impose independent obligations on licensees.

70.24 This regulation requires licensees to install monitors which have the capability of initiating audible alarms in the event of accidental criticality. On June 24, 1997, the NRC issued to WCNOC an exemption from the requirements of 10CFR70.24. On November 12, 1998 the NRC issued 10CFR50.68, which provides eight criteria that may be followed in lieu of criticality monitoring per 10CFR70.24 and revised 10CFR70.24 to make any exemption ineffective so long as the licensee elects to comply to 10CFR50.68.

70.31 This regulation lists guidelines for the Com-mission to follow in issuing a license.

70.32 This regulation defines the conditions by which the licensee must abide in order to keep the special nuclear materials license. The health physics program found in Chapter 12.0, Section 12.5 provides information relating to the compliance of this regulation.

Rev. 13 WOLF CREEK TABLE 1.3-4 (Sheet 28)

Regulation

(10 CFR) Compliance

70.33 - These regulations dictate procedural require-70.35 ments for renewing or amending a license. The Operating Agent shall follow these guidelines when the need to renew or amend arises.

70.36 This regulation prohibits the transfer of the license. No such transfer is planned by WCGS.

70.37 This is a disclaimer of warranty and does not affect the Licensees.

70.38 This regulation sets forth the requirements for expiration and termination of licenses.

70.39 This regulation sets guidelines for the manu-facture of source material and does not apply to power units such as WCGS.

70.41 This regulation provides the requirements for authorized use of special nuclear material.

70.42 This regulation provides guidance on the transfer of special nuclear material. WCGS follows these guidelines as appropriate.

70.44 This regulation sets forth the requirements in regard to creditors concerning special nuclear material. Information concerning creditors has been included, as applicable, in the information submitted with the operating license applica-tions. The primary financial constituents have been identified and their relationships described.

70.51 This regulation sets forth the requirements in regard to licensees of special nuclear material that require them to maintain records and establish procedures for inventory of special nuclear material. At such a time when this regulation applies, records will be established and kept and procedures established to satisfy this regulation.

70.52 This regulation sets forth the requirements concerning reporting procedures in the event of an accidental criticality, loss or theft or attempted theft of special nuclear material. When applicable, the requirements of this regulation will be

satisfied.

Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 29)

Regulation

(10 CFR) Compliance

70.53 This regulation sets forth the requirements for submitting Material Status Reports. Where applicable, proper procedures were developed and submitted to properly account for quantities of special nuclear material and to describe appropriate actions that should be taken in the event that material is unaccounted for.

70.54 This regulation sets forth the requirements for the reporting of special nuclear material transfers in the Nuclear Material Transaction Report. When applicable, the proper transfer documentation will be completed.

70.55 This regulation sets forth the requirements regarding the responsibilities of the licensees with respect to affording support and access to NRC inspection personnel. Provisions have been made to satisfy the requirements of this regulation in conjunction with granting approval on an application for license for special nuclear

material.

70.56 This regulation sets forth the requirements for testing the administration of the regulations in 10 CFR 71. "The Operating Agent will support such testing to the extent practicable under the regulation."

70.57 This regulation sets forth the requirements for operations other than those involved in the operation of a nuclear reactor licensed to Part 50, waste disposal operations or sealed sources. No such operations are contemplated; therefore, the requirements of this regulation are not applicable.

70.58 This regulation sets forth the requirements concerning use of special nuclear material other than licensed by Part 50 and in a waste disposal operation and as sealed sources.

No such use is contemplated; therefore, the re-quirements of this regulation are not applicable.

70.59 This regulation sets forth the requirements for effluent monitoring reporting for special nuclear material. This regulation pertains to fuel pro-cessing and fabrication and is not applicable to a utilization facility.

Rev. 23 WOLF CREEK TABLE 1.3-4 (Sheet 30)

Regulation (10 CFR) Compliance

70.61 These regulations allow the Commission to revoke 70.62 any license for special nuclear material. It does not impose independent obligations on licensees.

70.71 This regulation governs enforcement of the Atomic Energy Act, the Energy Reorganization Act of 1974, and the NRC's regulations and orders. No enforcement action is at issue and, therefore, this regulation is not applicable.

Subpart A 71.0 This regulation establishes the purpose, scope and applicability for the Part 71 regulations and does not impose any independent obligations on licensees .

71.1 This regulation provides the address for communications with the NRC.

71.2 This regulation states that only written interpretations of Part 71 by the NRC's General Counsel are binding.

71.3 This regulation prohibits delivery or transport of licensed material, except as authorized by the

Commission.

71.4 The definitions contained in this regulation are adhered to in all appropriate documents.

71.5 This regulation specifies that transportation of licensed materials be done per the requirements of the Department of Transportation and Postal Service. This regulation shall be complied with per the revision of March 25, 1980.

71.6 This regulation states the information collection requirements submitted for OMB approval.

71.6a This regulation governs the completeness and accuracy of information provided to the NRC.

Subpart B 71.7-71.10 These regulations delineate the exemptions from Part 71.

Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 31)

Regulation (10 CFR) Compliance Subpart C 71.12 This regulation issues a general license for shipment in certain NRC approved containers and packages provided the licensee has an approved QA program. QA programs for WCGS are filed with the NRC during the operations phase as part of the license application.

71.13-71.24 These regulations set forth the general license requirements for shipments in specific packages or contains under a general license.

Subpart D 71.31-71.39 These regulations provide the requirements for an application for a proposed packaging design including the contents of the application, package description, package evaluation, and quality assurance requirements.

Subpart E 71.41-71.65 These regulations provide the requirements for packaging radioactive material for transport. Compliance with each of the individual parts and paragraphs was demonstrated in the license application proceedings. These requirements of these regulations are referenced as the standards.

Subpart F 71.71-71.77 These regulations address the testing requirements for packages, containers and special form radioactive materials.

Subpart G 71.81-71.99 These regulations provide various operating controls and procedures pertinent to the transport and packaging of radioactive materials.

Subpart H 71.101-71.137 These regulations set forth the quality assurance requirements applying to design, purchases, fabrication, handling, shipping, storing, cleaning, assembly, inspection, testing, operation, maintenance, repair and modification of components of packaging (for radioactive materials) which are important to safety.

Appendix A This regulation establishes the procedure for obtaining activity values A and A2 to be used in packaging and shipping processes.

Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 32)

Regulation (10 CFR) Compliance 73.1 This regulation states the general purpose and scope of Part 73 and does not impose independent obligations on the licensee.

73.2 The definitions contained in this regulation are adhered to in all appropriate documents.

73.3 This regulation governs the interpretation of regulations by the NRC and does not impose independent obligations on licensees.

73.4 This regulation gives the address of the NRC and does not impose any independent obligations on

licensees.

73.5 This regulation allows the Commission to grant exemptions as long as they will not endanger life or property or the common defense and security. It does not impose independent obligations on

licensees.

73.6 This regulation enumerates specific exemptions, including an exemption for the following: U-235 contained in uranium enriched to less than 20 percent in the U-235 isotope. Since this is the only special nuclear material for which WCGS is currently licensed, it is exempt from the requirements of 73.20, 73.25, 73.26, 73.27, 73.45, 73.46, 73.70, and 73.72. This regulation sets forth the information requirements established by the Commission and specifies OMB approval.

73.8 This regulation specifies the information collection requirements and submitted for OMB approval.

73.20 The licensee is exempt from the requirements of this regulation. See 73.6.

73.21 This regulation sets forth the requirements for the protection of safeguards information. These requirements are addressed by the WCGS Site Security Plan.

73.24 This regulation sets forth the requirements concerning transport of special nuclear material in passenger aircraft and in quantities in excess of formula quantities. Shipments of special nuclear material use the requirements of this regulation for reference when such requirements are

applicable.

Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 33)

Regulation (10 CFR) Compliance 73.25 - The licensee is exempt from the requirements of 73.27 these regulations. See 73.6.

73.30 - These requirements have been deleted.

73.36 73.37 This regulation sets forth the requirements regarding physical protection during the transport of irradiated reactor fuel.

73.40 This regulation sets forth the requirements regarding the establishment of and maintenance of physical security systems that provide physical protection against radiological sabotage and against theft of special nuclear material at fixed sites. Physical security systems are provided and maintained to provide adequate physical protection against sabotage and theft of special nuclear material. In addition, a safeguards contingency plan was prepared in accordance with the criteria in Appendix C of this part, submitted for Commission approval and

implemented.

73.45 The licensee is exempt from the requirements of 73.46 these regulations. See 73.6.

73.50 This regulation sets forth the requirements for physical protection of licensed activities at other than nuclear power reactors.

73.55 This regulation sets forth the requirements for physical protection of licensed activities in nuclear power reactors against radiological sabotage. Features were implemented to provide for physical barriers, access control, detection aids, and communications along with a physical security organization that ensures physical protection. The requirements, as prescribed by this regulation, has been satisfied to the extent practicable.

73.57 This regulation establishes the requirements for Criminal History Checks of individuals granted unescorted access to a nuclear power facility or access to Safeguards Information by power reactor licensees. These requirements are addressed in the WCGS Site Security Plan.

73.60 This regulation applies to non-power reactors and thus does not apply to WCGS.

Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 34)

Regulation (10 CFR) Compliance

73.67 This regulation sets forth licensee fixed site and in-transient requirements for the physical protection of special nuclear material of moderate and low strategic significance. The requirements of this regulation will be met in a manner similar to that described in the response to Paragraph

73.55.

73.70 This regulation sets forth the requirement for records for licensees subject to various Para-graphs in part 73. At this time the licensee is exempt from the requirements of this regulation (See 73.6).

73.71 This regulation sets forth requirements for reporting unaccounted for shipments, suspected theft, unlawful diversion, or radiological sabotage. The requirements of this regulation will be followed at such time as they become applicable.

73.72 This regulation sets forth the requirements for making advanced notice of shipment of special nuclear material. At this time the Licensee is exempt from the requirements of this regulation (See 73.6).

73.73 This regulation establishes the requirements for advance notice and protection of export shipments of special nuclear material of low strategy significance and does not apply to WCNOC since it is not licensed to export special nuclear material.

73.74 This regulation establishes the requirements for advance notice and protection of import shipments of nuclear materials from countries that are not party to the Convention of Physical Protection of Nuclear Material. It does not apply to WCNOC since it is not licensed to import special nuclear material.

73.80 This regulation governs enforcement of the Atomic Energy Act, the Energy Reorganization Act of 1974, and the NRC's regulations and orders. No enforcement action is at issue and so this regulation is not applicable.

Appendix A This appendix groups each state into regions to be supervised by the USNRC Inspection and Enforcement and requires no obligations by the licensee.

Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 35)

Regulation (10 CFR) Compliance

Appendix B The general criteria for security personnel are outlined in this appendix. The principles in this regulation were factored into the WCGS security

plans.

Appendix C This regulation sets forth the requirements for licensee safeguards contingency plans. This plan has been developed and implemented.

Appendix D This appendix requires that licensees who transport or deliver to a carrier for transport irradiated reactor fuel assure that shipment escorts have completed a training program. These requirements were satisfied at the time of submittal of the operating license application.

Appendix E This regulation specifies the levels of physical protection to be applied in international transport of Nuclear material and does not apply to WCGS, since WCNOC is not involved in such transport.

Appendix F This regulation merely lists the nations that are parties to the convention on the physical protection of nuclear material.

Appendix G This regulation sets forth the requirements for 3 reportable safeguards events and is addressed by the WCGS Site Emergency Plan.

100.1 This regulation is explanatory and does not impose independent obligations on licensees.

100.2 This regulation is explanatory. WCGS is not novel in design and is not unproven as a prototype or pilot plant.

100.3 The definitions contained in this regulation are adhered to in all appropriate documents.

100.8 This regulation sets forth the information requirements established by the NRC and specifies OMB approval.

Rev. 3 WOLF CREEK TABLE 1.3-4 (Sheet 36)

Regulation (10 CFR) Compliance

100.10 The factors listed related to both the unit design and the site have been provided in the applica-tion. Site specifics, including seismology, meteorology, geology, and hydrology, are presented in Chapter 2.0 of the USAR. The exclusion area, low population zone, and population center dis-tance are provided and described. The USAR also describes the characteristics of reactor design and

operation.

100.11 Exclusion areas have been established, as described in Section 2.1. The low population zone has been established in accordance with this requirement.

The USAR accident analyses, particularly those in Chapters 6.0 and 15.0, demonstrate that offsite doses resulting from postulated accidents would not exceed the criteria in this section of the

regulation.

Appendix A Appendix A to 10 CFR Part 100 provides seismic and geologic siting criteria for nuclear power plants.

Site suitability was determined at the construction permit stage.

Rev. 3 WOLF CREEK 1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS 1.4.1 APPLICANTS Kansas City Power & Light Company (KCPL), Kansas Electric Power Cooperative, Incorporated (KEPCo), and Kansas Gas and Electric Company (KG&E) are co-owners

of WCGS, having 47, 6 and 47 percent participation, respectively. For the

purposes of the operating license application KCPL and KG&E were considered co-

applicants for Wolf Creek. KG&E was the lead applicant and was initially

responsible for the design, construction and operation of WCGS.In Amendment No.

4 to the Operating License, Wolf Creek Nuclear Operating Corporation (WCNOC) was authorized to act as agent for KCPL, KG&E, and KEPCo and has exclusive

responsibility and control over the physical construction, operation, and

maintenance of the facility. WCNOC will be referred to as the Operating Agent

in matters where the corporation acts in the interests of all three licensees.

KCPL is an independent investor-owned utility with headquarters in Kansas City, Missouri that provides electric service in a 5,700 square mile area of western Missouri and eastern Kansas. KCPL serves 331,000 customers and also provides

electricity at wholesale to eight communities, three electric cooperatives and

two utilities.

KEPCo is a rural electric cooperative association of 25 member cooperatives which provide electric service to the rural areas of Kansas. KEPCo is

headquartered in Topeka, Kansas and was incorporated in 1975. KEPCo serves

approximately 90,000 meters to provide electricity to nearly 325,000 consumers

located throughout Kansas.

KG&E is an independent investor-owned utility that provides electric service in an 8,100 square mile area of south central and southeast Kansas. General

offices of the company are in Wichita, Kansas. KG&E serves 212,000 retail

customers and also provides, at wholesale, part or all of the electricity sold

by 24 municipal electric systems and by 8 rural electric cooperatives.

The owners have over 97 years of experience in the operation of electric generating plants. The owners do not maintain engineering and construction

staffs for power plants but do engage reputable engineering and construction

firms for these purposes. As of January 1, 1980, the owners had in operation

11 power stations in which they are full or partial owners with a total system

generator nameplate capacity of 4420 MW.

1.4.2 SNUPPS KCPL, KEPCO, KG&E and Union Electric Company joined together to share costs and manage a project to design, purchase, and license two nuclear power plants of standardized design, the Standardized Nuclear Unit Power Plant System (SNUPPS) units (Wolf Creek and Callaway). 1.4-1 Rev. 2 WOLF CREEK The SNUPPS utilities were signatories of an agreement for standardization for nuclear generating facilities known as the SNUPPS Agreement. The agreement

specified objectives of the undertaking, defined the responsibilities of the

utility participants, and established a method of sharing the costs.

Participation in the agreement was open to any entity proposing to construct or

participate with others in constructing nuclear generating facilities of approximately 1,100 electrical megawatts on a site without active earthquake potential. The SNUPPS Agreement provided for cost sharing of the duplicate portions of the plant, established an organizational structure for management

of the project, and defined a mechanism for reaching decisions on joint actions

on the basis of one share and one vote per unit.

The basic shared activities were: (1) design of the standardized portion of the plants, known as the power block; (2) procurement of the NSSS; (3) procurement of the turbine generators; (4) procurement of essentially all other

equipment and materials for the power block; and (5) design and fabrication of

the first fuel loading. Activities which were the responsibility of each

individual applicant utility were: (1) design and procurement of equipment and

materials for nonstandardized facilities outside of the power block; (2)

construction of both standardized and nonstandardized facilities; and (3)

procurement of certain power block materials to standard specifications.

The SNUPPS utilities controlled the project through a management committee composed of one officer of each company. The members elected a chairman

annually and held regular meetings. This senior executive group had overall

responsibility for administration of the project and for resolution of technical, contractual, and schedular problems during evolution of the project.

The SNUPPS utilities entered into individual, basically identical contracts with four contractors to purchase the materials and services for the shared

activities: 1) Bechtel Power Corporation to provide architect-engineering services for the power block; 2) Westinghouse to supply two identical NSSSs and, under a separate contract, and to supply the first fuel loading; 3)

General Electric to supply two identical turbine generators and directly

related auxiliaries; and 4) Nuclear Projects, Inc., for project management and

for furnishing the technical and administrative staff to represent the utility

owners and to engage consulting services and contractors, as required. These

contracts were administered as one project. 1.4-2 Rev. 0 WOLF CREEK Nuclear Projects, Inc., established in May 1974, furnished services to the SNUPPS utilities for management of the SNUPPS project, as authorized and

directed by the management committee. The SNUPPS Executive Director, appointed

by the management committee, and the SNUPPS technical and administrative staff

were employees of and consultants to Nuclear Projects, Inc.

They had the responsibility to act for the management committee and the utilities in the day-to-day administration of work under the lead architect-engineer contract. The lead architect-engineer, in turn, was delegated

responsibility for administration of the turbine generator and NSSS

procurement. The lead architect-engineer had responsibility for the power

block and authority to procure equipment and materials for the utilities. The Executive Director also had authority to administer the contracts for design and fabrication of the first core.

Various utility committees augmented the SNUPPS staff and provided communication links between SNUPPS activities and each individual utility.

Committees included a technical committee, quality assurance committee,

operations committee, legal committee, construction review group, licensing

coordination group, and committees for records management, spare parts, finance

and accounting, public relations, and numerous ad hoc groups and task forces

for special problems.

Outside of the shared activities, each utility managed site unique activities and construction. Each utility retained a site architect-engineer (Sargent &

Lundy for WCGS) to design non-standardized facilities. Construction management at the Wolf Creek site was by Daniel International Corporation. Bechtel staff was located at each construction site to interpret plans and specifications and

expedite procurements. A SNUPPS staff member was located at each active site

to ensure that construction experience was made available to later plants.

1.4.3 NUCLEAR STEAM SUPPLY SYSTEM MANUFACTURER Westinghouse Electric Corporation (Westinghouse) was responsible for supplying the NSSS and first fuel load for WCGS.

Westinghouse has designed, developed, and manufactured nuclear facilities since the 1950s, beginning with the world's first large central station nuclear power plant (Shippingport), which has produced power since 1957. Completed or

presently contracted commercial nuclear capacity totals in excess of 97,000 MW.

Westinghouse pioneered new nuclear design concepts, such as chemical shim

control of reactivity and the rod cluster control 1.4-3 Rev. 0 WOLF CREEK concept, throughout the last two decades. Among the company's own related manufacturing facilities are the Columbia Plant, Nuclear Fuel Division, the

largest commercial nuclear fuel fabrication facility in the world, and the Tampa Division Plant, the world's most modern heat transfer equipment production facility.

1.4.4 STANDARD PLANT (LEAD) ARCHITECT/ENGINEER The Gaithersburg Power Division of Bechtel Power Corporation (Bechtel) was retained by the SNUPPS utilities to provide architect/engineer services, including procurement, for the standardized portions of the nuclear electric generating facilities.

The Bechtel Corporation, the parent of Bechtel Power Corporation, has been continuously engaged in construction and engineering activities since 1898.

Since the close of World War II, Bechtel has placed strong emphasis on

electrical power generation projects. During this period, Bechtel has been

responsible for the design of over 204 thermal generating units, representing

more than 126,860 MW of new generating capacity. Of this number, a nuclear capacity of more than 65,800 MW has been or is being engineered by the company

itself.The ratings of thermal generating plants designed by Bechtel range up to 1,470 MW per unit and include most types of station designs and arrangements, such as reheat and nonreheat, indoor and outdoor stations, single and multiple units, and wide ranges of steam conditions up to 3,500 psig, 1,050/1,000 F. Also, some of the larger units are fully automated and computer controlled. The majority of contracts for these facilities provided Bechtel with complete responsibility for both engineering and construction, although several contracts have been engineering design assignments only.

For over 25 years, Bechtel has been actively working on nuclear projects involving power plants, as well as such facilities as nuclear accelerators,

research laboratories, hot cells, experimental reactors, and nuclear fuel processing plants. Its responsibilities have covered design, construction,

site surveys, license applications, feasibility studies, and equipment

procurement.

1.4.5 TURBINE-GENERATOR MANUFACTURER The General Electric Company was responsible for the design, fabrication, and delivery of the turbine generators, and provided technical assistance for

installation, startup, and operation of this equipment. 1.4-4 Rev. 1 WOLF CREEK General Electric has a long history in the application of turbine generators for nuclear power plants.

1.4.6 SITE ARCHITECT/ENGINEER For the site-related work covered by the application, except for certain environmental studies, Sargent & Lundy Engineers (S&L) was retained as the architect-engineer and design consultant. In general, the responsibilities

included the site layout, the location of the power block, the design of yard and construction facilities, and the location and design of the circulating water systems. They were responsible for the design of site-related systems

and facilities which are nonseismic Category I and for seismic Category I dams,

canals, ponds and earthwork.

Sargent & Lundy is an independent consulting engineering organization founded in Chicago in 1891. The firm has specialized in the design of generation, transmission and distribution systems for steam utilization, electric power,

and related facilities. The firm has provided the complete engineering

services for more than 600 turbine-generator units with a total installed

capacity of 53,000 MW. Of this, some 9,800 MW is nuclear generating capacity.

Table 1.4-1 lists the nuclear plants S&L itself has completed or is currently designing. Table 1.4-2 lists other nuclear plants Sargent & Lundy has had

partial responsibility for.

1.4.7 CONSULTANT FIRMS 1.4.7.1 SNUPPS Consultants Principal consultants for the SNUPPS portions (powerblock) of the WCGS and their related responsibilities are: a. Quadrex Corporation (formerly Nuclear Services Corporation This consultant assisted the SNUPPS staff to coordinate the owners' preparation of power block operating procedures and review and approval action by the owners of Bechtel-prepared flush, hydrostatic, preoperation, and special test procedures. The compilation of specific data lists, useful for operating procedure preparation, power plant operation, and maintenance, is assigned to this consultant on an as-needed basis. This consultant also performed third-level design reviews of selected systems for compliance with codes and regulations. 1.4-5 Rev. 0 WOLF CREEK b. Southwest Research Institute This consultant reviewed portions of the SNUPPS unit design to assure that adequate provision was made for preservice and inservice inspection, including access engineering, and to verify the performance of mechanical equipment. In the latter category, this consultant has performed analog simulation of the reactor charging system and recommended the design of pulsation suppressors chosen for use in the SNUPPS plants. c. NUS Corporation The nuclear engineering, plant design, and nuclear power plant licensing skills and experience of this consultant were drawn upon on an as-needed basis to perform a number of activities. Examples included drafting specifications for a loose parts monitor, carrying out an independent review of Bechtel's calculations for shielding the reactor cavity, and reviewing the SNUPPS units' cold shutdown capability. d. Nuclear Water & Waste Technology, Inc. This consultant, a specialist in water chemistry, re- viewed the design and assisted in the selection of fluid systems and equipment, particularly the condensate polisher, liquid radwaste systems, and process control instrumentation.

e. Pickard, Lowe and Garrick, Inc. This consultant was utilized early in the SNUPPS project to assist in bid evaluations and selection of the Stan-dard Plant A/E. This consultant remained available on an as-needed basis, and provided occasional assistance in matters related to nuclear design and performance, such as reviewing the performance of nuclear fuel designs.
f. Professional Loss Control, Inc. This consultant reviewed the WCGS fire protection system and assisted in making related design decisions. 1.4-6 Rev. 0 WOLF CREEK g. Energy Research & Consultants Corporation This consultant reviewed design and operation of pumps and other rotating equipment, including advising WCGS during the bid evaluation for several pumps, and per- forming tests necessary to evaluate the auxiliary feed- water pumps. h. Dr. James Halitsky This consultant developed calculations of atmospheric dispersion parameters for the control room fresh air intake for use in control room accident dose calcula-

tions. i. Energy Incorporated This consultant was engaged to assist the SNUPPS utilities to develop an independent plant transient and analysis capability using the RETRAN computer code. j. Essex Corporation This consultant was engaged to perform an independent design evaluation of the SNUPPS control room, emphasizing human factors considerations. 1.4.7.2 WCGS Specific Consultantsa. Dames & Moore The independent consulting firm of Dames & Moore was retained to perform site investigations relating to demography, geography and land use, meteorology, hydrology, geology and seismology. Having performed such safety-realted and environmental impact related investigations for over 75 nuclear power plant sites, Dames & Moore is an acknowledged leader in the field of site investigations related to nuclear plant construction. 1.4-7 Rev. 0 WOLF CREEK Listed below are some of the nuclear power plants for which Dames & Moore has performed geotechnical and/or environmental investigations:

U.S. NORTHEAST Atlantic James A. Fitzpatrick Salem Burlington Limerick Seabrook Calvert Cliffs Newbold Island Shoreham Douglas Point Nine-Mile Point Somerset Forked River Oyster Creek Sterling Hope Creek Peach Bottom Summit Indian Point Perryman Susquehanna Jamesport Robert E. Ginna Yankee U.S. MIDWEST Bailly N 1 Dresden Midland Braidwood Duane Arnold Monticello Byron Fermi Palisades Carroll County Fort Calhoun Point Beach Central Iowa Greenwood Prairie Island Clinton Haven Quad-Cities Cooper Kewaunee Zimmer Davis-Besse LaSalle Zion Donald C. Cook Marble Hill U.S. SOUTH Brunswick Joseph M. Farley Shearon Harris Catawba McGuire South Dade Cherokee North Anna St. Lucie Crystal River Nuclear One Surry DeSoto Oconee Turkey Point Edwin I. Hatch Perkins Virgil C. Summer Isolte Robinson U.S. SOUTHWEST Allens Creek Comanche Peak South Texas Project U.S. WEST AND NORTHWEST Humboldt Bay Skagit Trojan San Onofre Sundesert 1.4-8 Rev. 0 WOLF CREEK b. Ecological Analysts, Inc. The private research and service organization of Ecological Analysts, Inc. was retained to collect, analyze and report environmental data related to the environmental impact of the WCGS. These studies included biological, chemical, and radiological investigations. The organization was founded in 1978 and was formerly part of Industrial BIO-TEST Labora- tories, Inc. (1968-75), NALCO Chemical Company (1975-78) and Hazleton Environmental Sciences Corporation (1978- 80). The present full-time staff includes more than 160 scientists and technicians. Listed below are some of the nuclear power plants for which Ecological Analysts, Inc. has performed environmental studies and

investigations: Bailly Fort Calhoun Catawba Kewaunee Clinton LaSalle Cooper Quad-Cities Dresden Wm. H. Zimmer Duane Arnold Zion c. Hoad Engineers, Incorporated Hoad Engineers, Incorporated (HEI), a wholly-owned subsidiary of Blount, Incorporated, was retained to provide the design, plans and specifications along with equipment procurement and construction management services for the WCGS security system. The Operating Agent took over responsibility for these activities in late 1982. HEI prepared and provided documents for the Security Plan, Safeguard Contingency Plan and Security Training and Qualifications Plan. Since its inception in 1953, HEI has primarily served the investor-owned utilities in all of the usual engineering and architectural disciplines. HEI has been engaged in providing the design plans, specifications and equipment procurement services for security systems at two nuclear power plants for the Consumers Power Company in Jackson, Michigan. 1.4-9 Rev. 0 WOLF CREEK d. Phoenix Power Services, Incorporated Phoenix Power Services, Incorporated was retained to assist in preparing the early drafts of the Emergency Plan for WCGS. Phoenix has performed extensive work in the area of Emergency Planning. e. Professional Loss Control, Inc. Professional Loss Control, Inc., (PLC), was retained to review the Fire Plan and implementing procedures and advise The Operating Agent of their adequacy. Founded in 1976, PLC provides services in the fields of fire protection, safety and environmental engineering.

Listed below are some of the utilities for which PLC has performed loss control services Carolina Power and Light Company Florida Power Corporation Jersey Central Power and Light Company Maine Yankee Atomic Power Company Niagara Mohawk Power Corporation Portland General Electric Company Power Authority of the State of New York Rochester Gas and Electric Company Tennessee Valley Authority Washington Public Power Supply System Wisconsin Electric Power Company Yankee Atomic Electric Company 1.4.8 CONSTRUCTOR Daniel International Corporation, herein referred to as Daniel, was assigned construction and construction management responsibilities for WCGS.

Daniel's scope of work consisted of receiving design information as prepared by Bechtel, Westinghouse and Sargent & Lundy; receiving manufactured items and

materials as procured by Bechtel and Westinghouse; procuring additional bulk

materials and consumable items; procuring the services of various

subcontractors; planning and scheduling the activities of the construction forces and directly supervising the construction forces to assemble the power

plant in accordance with the design. 1.4-10 Rev. 0 WOLF CREEK Daniel Construction Company was awarded the ASME Certificate of Authorization to perform nuclear code construction (N stamp) on September 11, 1973, following

an ASME implementation and enforcement audit of Daniel's Quality Assurance Program.Daniel's experience, past and present, includes construction of nuclear and fossil fueled power plants. The first project of this nature was construction of the nuclear power Carolinas-Virginia Tube Reactor at Parr, South Carolina.

This facility operated several years as a prototype plant. Other nuclear power plants under construction, in operation or on which Daniel is performing

maintenance are specified below: Callaway Oconee H. B. Robinson Shearon Harris Joseph M. Farley Virgil Summer 1.4.9 DIVISION OF RESPONSIBILITIES 1.4.9.1 Utility Company The ultimate responsibility for the proper design, construction, and operation for the entire spectrum of safety of WCGS rests with The Operating Agent.

1.4.9.2 Standard Plant Architect/Engineer Bechtel Power Corporation was responsible for the design, engineering, and procurement of the standard power block, which included the following: a. Turbine building

b. Reactor building
c. Auxiliary building d. Fuel building e. Radwaste building
f. Diesel generator building g. Control building 1.4-11 Rev. 0 WOLF CREEK Bechtel was also responsible for the design of the standard plant storage tanks

and transformer vaults. However, the individual utilities arranged to procure

this equipment.

The NSSS portion of the facility was procurred by individual contract between

The Operating Agent and the NSSS supplier. Similarly, the turbine generator is

obtained by direct contract between the turbine generator supplier and The

Operating Agent. However, Bechtel Power Corporation (acting as agent) retained

responsibility for monitoring the design and integrating the system into the

power block to ensure that the NSSS and turbine generator components being

supplied were consistent with the needs of the facility. Other equipment and

material for areas within their scope were procured by Bechtel Power

Corporation.

Bechtel Power Corporation was also responsible for the design, engineering and

procurement of the portions of the WCGS seismic Category I essential service

water systems (ESWS) which lie outside the power block.

The design and engineering of all SSCs associated with the ESWS Vertical Loops and Chase were not part of the original SNUPPS standard plant design. Loops and Chase were added to both trains of the ESWS. Design and specification of these SSCs were obtained by direct contract between WCNOC and several contributing contractors. Interfaces were established and monitored by WCNOC to ensure compatibility in design between power block SSCs and the ESWS vertical Loops and Chase. WCNOC is ultimately responsible for the the design, engineering, and procurement of the SSCs associated with the ESWS Vertical Loops and Chase.

1.4.9.3 SNUPPS Staff

The SNUPPS Staff functioned as an extension of the management, engineering, and

operations organizations of the SNUPPS Utilities. During design and

construction phases, the SNUPPS Staff performed day-to-day administration of

all of the shared activities, primarily by interfacing with and providing

written direction to the Standard Plant Architect/Engineer. This required a

close relationship between the SNUPPS Staff and SNUPPS Utilities, which was

achieved by frequent communications and regularly scheduled meetings of the

various committees and groups.

1 4.9.4 Site Architect/Engineer

All systems, equipment and structures outside the power block except for the

ESWS components and station security-related systems were designed or specified

by Sargent & Lundy. The ultimate heat sink was the only seismic Category I

structure designed by Sargent & Lundy.

Interfaces were established and monitored by Bechtel Power Corporation to

ensure compatibility in design between power block and site-related systems and

equipment.

1.4.9.5 Security Consultant

The station security-related systems were initially designed and specified by

Hoad Engineers, Incorporated, who was retained to design a security system for

WCGS to meet the requirements of 10 CFR 73.55.

1.4-12 Rev. 29 WOLF CREEK TABLE 1.4-1 NUCLEAR POWER PLANTS COMPLETED OR CURRENTLY UNDER DESIGN BY SARGENT & LUNDY

NOMINAL GROSS*

UNIT RATING (MWe) POWER OPERATION

EBWR 5 1956 Elk River 22 1962 La Crosse 60 1969 SEFOR 20 (MWt) 1969 Dresden 2 850 1969 Dresden 3 850 1971 Quad-Cities 1 850 1971 Quad-Cities 2 850 1972 Zion 1 1085 1973 Zion 2 1085 1973 Fort St. Vrain, Unit 1 330 1973 La Salle County Station, Unit 1 1122 1982 La Salle County Station, Unit 2 1122 1983 Byron Station, Unit 1 1175 1984 Byron Station, Unit 2 1175 1985 Braidwood Station, Unit 1 1175 1985 Clinton Power Station, Unit 1 992 1985 Braidwood Station, Unit 2 1175 1986 Clinton Power Station, Unit 2 992 Cancelled Bailly Nuclear 1 685 Cancelled Marble Hill, Unit 1 1190 Cancelled Marble Hill, Unit 2 1190 Cancelled Wm. H Zimmer, Unit 1 840 Cancelled Carroll County Station, Unit 1 1175 Future Carroll County Station, Unit 2 Future

___________________________________________

  • Note that this is a gross rating, not a net rating.

Rev. 0 WOLF CREEK TABLE 1.4-2 OTHER NUCLEAR POWER PLANTS

WITH PARTIAL SARGENT & LUNDY DESIGN RESPONSIBILITY NOMINAL GROSS* SARGENT & LUNDY UNIT RATING (MWe)

RESPONSIBILITY Bellefonte, Unit 1 1235 Consulting Services on Containment

Bellefonte, Unit 2 1235 Design (Sructural Analysis of post-

tension containment structures).

D. C. Cook, Unit 1 1083 Design of water intake structures, crib D. C. Cook, Unit 2 1118 house, turbine room foundations and

miscellaneous electrical consulting

services.

Enrico Fermi, Unit 2 1223 Design of Residual Heat Removal complex, shielding design calculations and class

1 piping analysis.

Kaiseraugst 992 All design inside the containment including the containment itself.

Point Beach, Unit 1 519 Consulting services on water intake Point Beach, Unit 2 519 structures.

_____________________________________________

  • Note that this is a gross rating, not a net rating.

Rev. 0 WOLF CREEK 1.5 REQUIREMENTS FOR FURTHER TECHNICAL INFORMATION One of the design bases for WCGS has been to utilize well-developed and proven design concepts, systems, and equipment, in order to minimize the potential for

cost and schedule overruns and to enhance the reliability of operation. As a

consequence, there have been few requirements, as delineated by 10 CFR

50.34(a)(8), for research and development programs to confirm the adequacy of

the design. Two such programs were identified at the construction permit stage. Those programs have been satisfactorily completed, as described in

Sections 1.5.1 and 1.5.2. Other programs were identified at the construction

permit stage as not required but as valuable to define margins of conservatism or possible design improvements. Relevant programs in this latter category are

described in Section 1.5.3.

1.5.1 17 x 17 FUEL ASSEMBLY A comprehensive test program for the 17 x 17 assembly has been successfully completed by Westinghouse. Reference 1 contains a summary discussion of the program. The following sections present specific references documenting

individual portions of the program.

1.5.1.1 Rod Cluster Control Spider Tests Rod cluster control spider tests have been completed. For a further discussion of these tests, refer to Section 4.2.4.3.

1.5.1.2 Grid Tests Verification tests of the structural adequacy of the grid design have been completed. Refer to Section 4.2.3.4 and Reference 2 for a discussion of these tests.1.5.1.3 Fuel Assembly Structural Tests Fuel assembly structural tests have been completed. Refer to References 2 and 3 for a discussion of these tests.

1.5.1.4 Guide Tube Tests Verification tests of the structural adequacy of the guide tubes have been completed. Refer to References 3 and 4 for a discussion of these tests. 1.5-1 Rev. 0 WOLF CREEK 1.5.1.5 Prototype Assembly Tests Verification tests of the integrated fuel assembly and rod cluster control performance have been completed. Refer to References 3 and 4 for a discussion of these tests.

1.5.1.6 Departure from Nucleate Boiling Tests The test program for experimentally determining the effect of the fuel assembly geometry on the departure from nucleate boiling (DNB) heat flux has been

completed. Refer to Reference 5 for a discussion of these tests.

1.5.1.7 Incore Flow Mixing The experimental test program to determine the effects of the fuel assembly geometry on mixing has been completed. Refer to Reference 6 for a discussion

of these tests.

1.5.2 FIRE STOPS A test program to determine the adequacy of various fire stop designs has been completed. Penetration seals compatible with the WCGS design were successfully tested, using silicone foam sealant. Details of the tests are provided in

Section 9.5.1.

1.5.3 OTHER PROGRAMS 1.5.3.1 Generic Programs of Westinghouse Reference 7 summarizes ongoing safety-related research and development programs that are being carried out for, or by, or in conjunction with the Westinghouse

Nuclear Energy System Division and that are applicable to Westinghouse

pressurized water reactors. These programs are applicable to WCGS and may lead

to changes in safety analyses or modes of operation. Further progress on these

programs is not required for safe operation of WCGS.

Experimental test programs to determine the thermal-hydraulic characteristics of 17 x 17 fuel assemblies and to obtain experimental reflooding heat transfer data under simulated LOCA conditions have been completed. Refer to Reference 8

for a discussion of these tests. A single rod burst test program to quantify

the maximum assembly flow blockage which is assumed in the LOCA analyses has

been completed. Refer to Reference 9 for a discussion of these tests. The

results of these two test programs have been used in the ECCS analyses in

Section 15.6.5. 1.5-2 Rev. 0 WOLF CREEK Two general types of model boiler tests were conducted by Westinghouse (1) to confirm the thermal-hydraulic analyses used for the Model-F steam generator and

(2) to explore the potential for corrosion and other water-chemistry induced

effects in the Model-F steam generator. The initial series of each of these

tests were completed prior to startup of WCGS. Further information on the

steam generator test programs of Westinghouse is given in Section 5.4.2.

1.5.3.2 Generic Programs of Bechtel Wolf Creek through SNUPPS has contributed, with other utilities, to tests of prototypical cable trays under seismically induced loads. A primary objective

of the tests has been evaluation of damping coefficients under SSE conditions.

Mechanical bracing of cable trays at WCGS is verified by the results of this

test program.

1.5.3.3 Test of a Wolf Creek Steam Generator One of the steam generators in the Wolf Creek plant was equipped with special pressure and temperature instrumentation that enabled thermal-hydraulic

performance characteristics to be measured during the early stages of power

operation. The objective of these tests was primarily to confirm Westinghouse's design analyses. The test results are proprietary but are available for NRC review.

1.

5.4 REFERENCES

1. Eggleston, F. T., "Safety-Related Research and Development for Westinghouse Pressurized Water Reactors, Program Summaries - Spring 1976," WCAP-8768, June, 1976. 2. Gesinski, L. and Chiang, D., "Safety Analysis of the 17 x 17 Fuel Assembly for Combined Seismic and Loss-of-Coolant Accident," WCAP-8236 (Proprietary) and WCAP-8288 (Non-Proprietary), December, 1973. 3. DeMario, E. E., "Hydraulic Flow Test of the 17 x 17 Fuel Assembly," WCAP-8278 (Proprietary) and WCAP-8279 (Non- Proprietary), February, 1974. 1.5-3 Rev. 0 WOLF CREEK 4. Cooper, F. W., Jr., "17 x 17 Driveline Component Tests - Phase IB, II, III, D-Loop Drop and Deflection," WCAP-8446 (Proprietary) and WCAP-8449 (Non-Proprietary), December, 1974. 5. Hill, K. W., et al., "Effect of 17 x 17 Fuel Assembly Geometry on DNB," WCAP-8296-P-A (Proprietary) and WCAP-8297-A (Non-Proprietary), February, 1975. 6. Cadek, F. F., Motley, F. E. and Dominicis, D. P., "Effect of Axial Spacing on Interchannel Thermal Mixing with the R Mixing Vane Grid," WCAP-7941-P-A (Proprietary) and WCAP-7959- A (Non-Proprietary), January, 1975. 7. Eggleston, F. T., "Safety-Related Research and Development for Westinghouse Pressurized Water Reactors, Program Summaries - Winter 1977 - Summer 1978," WCAP-8768, Revision 2, October, 1978. 8. "Westinghouse ECCS Evaluation Model - October 1975 Version," WCAP-8622 (Proprietary) and WCAP-8623 (Non-Proprietary),

November, 1975. 9. Kuchirka, P. J., "17 x 17 Design Fuel Rod Behavior During Simulated Loss-of-Coolant Accident Conditions," WCAP-8289 (Proprietary) and WCAP-8290 (Non-Proprietary), November, 1974. 1.5-4 Rev. 0 WOLF CREEK 1.6 MATERIAL INCORPORATED BY REFERENCE The Wolf Creek USAR incorporates, by reference, various topical reports as part

of the application. Bechtel topical reports are listed in Table 1.6-1, and

Westinghouse topical reports are listed in Table 1.6-2. The Bechtel and

Westinghouse topical reports have been filed separately in support of this and

similar applications.

Amendment No. 89 relocated various Technical Specifications to the USAR. The

relocated Technical Specifications have subsequently been incorporated into the

Technical Requirements Manual (TRM) with the same format and content they

possessed in the Technical Specifications. The TRM is a physically separate

document from the USAR, but by this specific reference, it is considered part

of the USAR and is thereby incorporated by reference. Implementation of, and

revision to, the TRM is controlled through administrative procedures.

Controlled drawings were removed from the USAR at Revision 17. The drawings

are considered incorporated by reference. Table 1.6-3 identifies the

controlled drawings that are incorporated by reference and also provides a

cross-reference of the controlled drawings to the respective USAR figure

number. The contents of the drawings are controlled by WCGS procedures.

Appendix 9.5B, "Fire Hazard Analyses", was removed from the USAR at Revision

19, and is considered incorporated by reference. Table 1.6-4 identifies the

section and provides a cross-reference of the controlled document, E-1F9905,

"Fire Hazard Analysis", which supersedes the information originally provided in

Appendix 9.5B of the USAR. The contents of the Fire Hazard Analysis is

controlled by WCGS procedures.

Chapter 17.2 Quality Assurance, was removed from the USAR at Revision 21.

Chapter 17.2 is considered incorporated by reference. The Quality Program

Manual supercedes the information originally provided in Chapter 17.2 of the

USAR. The contents of the Quality Program Manual are controlled by WCGS

procedures.

Table 3.11(B)-1, Plant Environmental Normal Conditions; Table 3.11(B)-2, Environmental Qualification Parameters for SNUPPS NUREG-0588 (LOCA, MSLB and HELB); Table 3.11(B)-3, Identification of Safety-Related Equipment and Components: Equipment Qualification; Table 3.11(B)-4, Containment Worst Case Radiation Levels (MRADs); Table3.11(B)-5, Containment Spray Requirements; Table 3.11(B)-8, Exemptions from NUREG-0588 Qualification; Table 3.11(B)-10, Equipment Added for NUREG-0737; Figures 3.11(B)-1 through 3.11(B)-49, were removed from the USAR at Revision 28. The listed Tables and Figures are considered incorporated by reference. EQSD-I, EQ Summary Document Section I Program Description, and EQSD-II, EQ Master List Section II, supercedes the information provided by listed Tables and Figures. The contents of EQSD-I and EQSD-II are controlled by WCGS procedures.

1.6-1 Rev. 28 WOLF CREEK TABLE 1.6-1 BECHTEL TOPICAL REPORTS INCORPORATED BY REFERENCE Bechtel USAR Report Topical Revision Section Submitted Review(1)

Report No

. Title Number Reference to the NRC Status BC-TOP-1 Containment Building Rev. 1 3.7(B)-3 1/73 A Liner Plate Design 3.8

Report

BC-TOP-3-A Tornado and Extreme Rev. 3 3.3 8/74 A Wind Design Criteria 3.8 for Nuclear Power

Plants

BC-TOP-4-A Seismic Analyses of Rev. 3 3.7(B).2 11/74 A Structures and 3.7(B).3 Equipment for Nuclear 3.8 Power Plants

BC-TOP-5-A Prestressed Concrete Rev. 3 3.8 2/75 A Nuclear Reactor 3A Containment Structures

BC-TOP-7 Full Scale Buttress Rev. 0 3.8 9/72 A Test for Prestressed 3A Nuclear Containment

Structures

BC-TOP-8 Tendon End Anchor Rev. 0 3.8 9/72 A Reinforcement Test 3A

BC-TOP-9-A Design of Structures Rev. 2 3.8 9/74 A for Missile Impact 3.5.3.2

Rev. 0 WOLF CREEK TABLE 1.6-1 (Sheet 2)

BECHTEL TOPICAL REPORTS INCORPORATED BY REFERENCE Bechtel USAR Report Topical Revision Section Submitted Review(1)

Report No

. Title Number Reference to the NRC Status BN-TOP-1 Test Criteria for Rev. 1 3.8 11/72 A Integrated Leak Rate 6.2 Testing of Primary Containment Structures for Nuclear Power

Plants

BN-TOP-2 Design for Pipe Break Rev. 2 3.6 5/74 A Effects 3.8

BN-TOP-3 Performance and Siz- Rev. 3 8/75 P ing of Dry Pressure 6.2.1

Containments

BN-TOP-4 Subcompartment Rev. 1 6.2.1 10/77 A Pressure and 3.6 Temperature Transient

Analysis

BP-TOP-1 Seismic Analysis of Rev. 3 3.7.(B).2 1/76 A Piping Systems 3.7.(B).3 3.9.(B).7

_____________________

(1) See Notes on Table 1.6-2

Rev. 0 WOLF CREEK TABLE 1.6-2 WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No

. Title Number Reference to the NRC Status WCAP-2048 "The Doppler Effect for a Rev. 0 4.3 7/62 0 Non-Uniform Temperature Distribution in Reactor Fuel Elements"

WCAP-2850-L(P) "Single Phase Local Boiling Rev. 0 4.4 5/66 0 WCAP-7916 And Bulk Boiling Pressure Drop Correlations"

WCAP-2923 "In-Pile Measurement of Rev. 0 4.4 3/66 0 UO2 Thermal Conductivity"

WCAP-3269-8 "Hydraulic Tests of the Rev. 0 4.4 6/64 0 San Onofre Reactor Model"

WCAP-3269-26 "LEOPARD - A Spectrum Rev. 0 4.3, 15.0, 9/63 0 Dependent Non-Spatial 15.4 Depletion Code for the IBM - 7094"

WCAP-3385-56 "Saxton Core II Fuel Rev. 0 4.3, 4.4 7/70 0 Performance Evaluation,"

WCAP-3385-56, Part II "Evaluation of Mass Spectrometric and Radiochemical Materials Analyses of Irradiated Saxton Plutonium Fuel"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 2)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No.

Title Number Reference to the NRC Status WCAP-3680-20 "Xenon-Induced Spatial Rev. 0 4.3 3/68 0 Instabilities in Large Pressurized Water Reactors" (EURAEC-1974)

WCAP-3680-21 "Control Procedures for Rev. 0 4.3 2/69 0 Xenon-Induced X-Y Instabilities in Large Pressurized Water Reactors" (EURAEC-2111)

WCAP-3680-22 "Xenon-Induced Spatial Rev. 0 4.3 9/69 0 Instabilities in

Three-Dimensions"

(EURAEC-2116)

WCAP-3696-8 "Pressurized Water Rev. 0 4.3 10/68 0 Reactor pH-Reactivity Effect Final Report"

(EURAEC-2074)

WCAP-3726-1 "Pu02 -U02 Fueled Critical Rev. 0 4.3 7/67 0

Experiments"

WCAP-6065 "Melting Point of Rev. 0 4.4 2/65 0 Irradiated U02"

WCAP-6069 "Burnup Physics of Rev. 0 4.4 6/65 0 Heterogeneous Reactor

Lattices"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 3)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No

. Title Number Reference to the NRC Status WCAP-6073 "LASER - A Depletion Rev. 0 4.3 4/66 0 Program for Lattice Calculations Based on MUFT and THERMOS" WCAP 6086 "Supplementary Report Rev. 0 4.3 8/69 0 on Evaluation of Mass Spectrometric and Radiochemical Analyses of Yankee Core I Spent Fuel, Including Isotopes of Elements Thorium Through Curium" WCAP-7015 "Subchannel Thermal Rev. 1 4.4 2/14/69 0 Analysis of Rod Bundle

Cores WCAP-7048 "The PANDA Code" Rev. 0 4.3 1/9/75 A P-

A(P)

WCAP-7757-A WCAP-7198-L(P) "Evaluation of Protective Rev. 0 6.1 4/23/69 0 WCAP-7825 Coatings for use in 12/16/71 Reactor Containment" WCAP-7213- "The TURTLE 24.0 Diffusion Rev. 0 4.3, 15.0, 1/9/75 A P-A(P) Depletion Code" 15.4 WCAP-7758-A WCAP-7240(P) "An Experimental Investi- Rev. 0 7/7/72 B gation of the Effect of Open Channel Flow on Thermal-Hydrodynamic Flow

Stability"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 4)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No

. Title Number Reference to the NRC Status WCAP-7308-L(P) "Evaluation of Nuclear Rev. 0 4.3 7/9/70 U WCAP-7810 Hot Channel Factor 12/16/71

Uncertainties"

WCAP-7359-L(P) "Application of the THINC Rev. 0 4.4 9/8/69 0 WCAP-7838 Program to PWR Design" 1/17/72

WCAP-7397-L(P) "Seismic Testing of Rev. 0 3.10(N) 2/6/70 U WCAP-7817 Electrical and Control 12/16/71

Equipment"

WCAP-7397-L(P) "Seismic Testing of Supple- 3.10(N) 1/27/71 U WCAP-7817 Electrical and Control ment 1 12/16/71 Equipment (WCID Process Control Equipment)"

WCAP-7477-L(P) "Sensitized Stainless Rev. 0 5.2 3/26/70 A WCAP-7735 Steel in Westinghouse 8/12/71 PWR Nuclear Steam Supply

Systems"

WCAP-7488-L(P) "Solid State Logic Rev. 0 7.2, 7.3 3/24/71 B WCAP-7672 Protection System 5/27/71

Description"

WCAP-7558 "Seismic Vibration Testing Rev. 0 3.10(N) 9/25/72 U with Sine Beats"

WCAP-7588 "An Evaluation of the Rev. 1A 15.4 1/7/75 A Rod Ejection Accident in Westinghouse Pressurized Water Reactors Using Spatial Kinetics Methods"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 5)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No.

Title Number Reference to the NRC Status WCAP-7595-A (See WCAP-7941-P-A(P))

WCAP-7667-P- "Interchannel Thermal Mixing Rev. 0 4.4 1/27/75 A A(P) with Mixing Vane Grids"

WCAP-7755-A

WCAP-7695- "DNB Tests Results for Rev. 0 4.4 1/21/75 A P-A(P) New Mixing Vane Grids (R)"

WCAP-7958-A

WCAP-7695, "DNB Test Results for R Rev. 0 4.4 1/21/75 A Addendum Grid Thimble Cold Wall

1-P-A(P) Cells"

WCAP-7985,

Addendum 1-A

WCAP-7672 (See WCAP 7488-L(P))

WCAP-7705 "Testing of Engineered Rev. 2 5/5/76 B Safety Features Actuation

System"

WCAP-7706-L(P) "An Evaluation of Solid Rev. 0 4.6, 7.1 9/2/71 U WCAP-7706 State Logic Reactor 7.2, 7.3 Protection in Anticipated

Transients"

WCAP-7709-L(P) "Electrical Hydrogen Rev. 0 7/14/71 A WCAP-7820 Recombiner for Water 6.2.5 12/16/71 Reactor Containments"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 6)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No.

Title Number Reference to the NRC Status WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 5/23/72 A WCAP-7820 for PWR Containments - Final ment 1 6.2.5 5/31/72 Development Report"

WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 9/24/73 A WCAP-7820 for PWR Containments - Equip- ment 2 6.2.5 11/2/73 ment Qualification Report"

WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 1/23/74 A WCAP-7820 for PWR Containments - Long- ment 3 6.2.5 3/22/74 Term Tests"

WCAP-7709-L(P "Electric Hydrogen Recombiner Supple- 4/21/74 A WCAP-7820 for PWR Containments" ment 4 6.2.5

WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 1/7/76 A WCAP-7820 Special Tests" ment 5 6.2.5

WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 11/5/76 A WCAP-7820 IEEE 323-1974 Qualification" ment 6 6.2.5

WCAP-7709-L(P) "Electric Hydrogen Recombiner Supple- 9/21/77 A WCAP-7820 LWR Containments - Supple- ment 7 6.2.5 mental Test Number 2"

WCAP-7735 (See WCAP-7477-L(P))

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 7)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No

. Title Number Reference to the NRC Status WCAP-7750 "A Comprehensive Space Time Rev. 0 3.6.3 8/31/71 0 Dependent Analysis of Loss-of-Coolant (SATAN-IV Digital

(Code)"

WCAP-7755-A (See WCAP-7667-P-A(P))

WCAP-7757-A (See WCAP-7048-P-A(P))

WCAP-7758-A (See WCAP-7213-P-A(P))

WCAP-7769 "Overpressure Protection for Rev. 1 5.2, 15.2 7/5/72 U Westinghouse Pressurized Water Reactors"

WCAP-7798-L(P) "Behavior of Austenitic Rev. 0 6.1 12/6/71 0 WCAP-7803 Stainless Steel in Post 1/4/72 Hypothetical Loss-of-Coolant

Environment"

WCAP-7800 "Nuclear Fuel Division Rev. 4A 3A 4/28/75 A Quality Assurance Program 4.2

Plan"

WCAP-7803 (See WCAP-7798-L(P))

WCAP-7806 "Nuclear Design of Westing- Rev. 0 4.3 21/16/71 B house Pressurized Water Reactors with Burnable Poison Rods"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 8)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No.

Title Number Reference to the NRC Status WCAP-7810 (See WCAP-7308-L(P))

WCAP-7811 "Power Distribution Control Rev. 0 4.3 12/16/71 0 of Westinghouse Pressurized Water Reactors"

WCAP-7817 (See WCAP-7397-L(P)) Rev. 0

WCAP-7817 (See WCAP-7477-L(P)) Supple-ment 1

WCAP-7817 "Seismic Testing of Electrical Supple- 3.10(N) 1/17/72 U and Control Equipment (Low ment 2 Seismic Plants)"

WCAP-7817 "Seismic Testing of Electrical Supple- 3.10(N) 1/17/72 U and Control Equipment (Westing ment 3 house Solid State Protection System) (Low Seismic Plants)"

WCAP-7817 "Seismic Testing of Electrical Supple- 3.10(N) 12/14/72 U and Control Equipment (WCID ment 4 NUCANA 7300 Series) (Low Seismic Plants)"

WCAP-7817 "Seismic Testing of Electrical Supple- 3.10(N) 12/14/72 U and Control Equipment (Instru- ment 5 ment Bus Distribution Panel)

(Low Seismic Plants)"

WCAP-7817 "Seismic Testing of Electrical Supple- 3.10(N) 8/00/74 U and control Equipment (Type DB ment 6 Reactor Trip Switchgear)

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 9)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No.

Title Number Reference to the NRC Status WCAP-7820 (See WCAP 7709-L[P])

WCAP-7825 (See WCAP 7198-L[P])

WCAP-7832 "Evaluation of Steam Generator Rev. 0 5.4 21/26/73 A Tube, Tube Sheet and Divider Plate Under Combined LOCA Plus SSE Conditions"

WCAP-7836 "Inlet Orificing of Open PWR Rev. 0 4.4 1/17/72 B

Cores"

WCAP-7838 (See WCAP 7359-L[P])

WCAP-7870 "Neutron Shielding Pads" Rev. 0 3.9 (N) 7/17/72 A

WCAp-7907 "LOFTRAN Code Description" Rev. 0 5.2, 10/11/72 U

15.0, 15.1 15.2, 15.3, 15.4, 15.5 15.6 WCAP-7908 "FACTRAN - A FORTRAN-IV code Rev. 0 15.0, 9/20/72 U for Thermal Transients in a 15.3, U02 Fuel Rod" 15.4

WCAP-7909 "MARVEL - A Digital Computer Rev. 0 10/11/72 U Code for Transient Analysis of a Multiploop PWR System"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 10)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No.

Title Number Reference to the NRC Status WCAP-7912- "Power Peaking Factors" Rev. 0 4.3, 4.4 1/16/75 A

P-A (P)

WCAP-7912-A

WCAP-7913 "Process Instrumentation Rev. 0 7.2, 7.3 3/9/73 B for Westinghouse Nuclear Steam Supply System (4-Loop Plant Using WCID-7300 Series Process Instrumentation)"

WCAP-7916 (See WCAP 2850-L[P])

WCAP-7921-AR "Damping Values of Nuclear Rev. 0 3.7(N), 3A 7/11/74 A Power Plant Components"

WCAP-7924-A "Basis for Heatup and Rev. 0 4/28/75 A Cooldown Limit Curves"

WCAP-7941- "Effect of Axial Spacing on Rev. 0 1.5, 4.4 1/27/75 A P-A (P) Interchannel Thermal Mixing WCAP-7595-A with the R Mixing Van Grid"

WCAP-7956 "THINC-IV - An Improved Program Rev. 0 4.4 10/22/73 A for Thermal-Hydraulic Analysis of Rod Bundle Cores"

WCAP-7958 (See WCAP-7695-P-A(P))

WCAP-7964 "Axial Zenon Transient Tests Rev. 0 4.3 6/15/71 O at the Rochester Gas and Electric Reactor"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 11)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No.

Title Number Reference to the NRC Status WCAP-7979- "TWINKLE - A Multi-Dimensional Rev. 0 15.0, 1/7/75 A P-A (P) Neutron Kinetics Computer 15.4

WCAP-8028-A Code"

WCAP-7985 (See WCAP-7695, Addendum 1-P-A[P]) Addendum 1A

WCAP-8028-A (See WCAP-7979-P-A(P))

WCAP-8054 (P) "Application of the THINC-IV Rev. 0 4.4 12/7/73 A WCAP-8195 Program to PWR Design" 1/11/74

WCAP-8082- "Pipe Breaks for the LOCA Rev. 0 3.6.3 1/16/75 A P-A (P) Analysis of the Westinghouse WCAP-8172-A Primary Coolant Loop"

WCAP-8099 "A Summary Analysis of the Rev. 0 4/20/73 B April 30 Incident at the San Onofre Nuclear Generation Station, Unit 1"

WCAP-8163 "Reactor Coolant Pump Rev. 0 3A, 5.4 9/20/73 U Integrity in LOCA"

WCAP-8170 (P) "Calculational Model for Core Rev. 0 15.16 7/3/74 AE WCAP-8171 Reflooding After a Loss-of-Coolant Accident (WREFLOOD

Code)"

WCAP-8172-A (See WCAP 8082-P-A[P])

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 12)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No.

Title Number Reference to the NRC Status WCAP-8183 "Operational Experience with Rev. 7 4.2 4/20/78 B Westinghouse Cores (up to December 31, 1977)"

WCAP-8195 (See WCAP-8054(P))

WCAP-8200 (P) "WFLASH - A FORTRAN-IV Rev. 2 15.6 7/3/74 AE WCAP-8261 Computer Program for Simula- Rev. 1 tion of Transients in a Multi-Loop PWR"

WCAP-8218 "Improved Fuel Performance Rev. 0 3A, 4.2, 4.4 June 1985 A P-A (P) Models for Westinghouse Fuel WCAP-8219-A Rod Design and Safety Evaluations."

WCAP-8236 (P) "Safety Analysis of the 17 x 17 Rev. 0 1.5, 4.2 2/28/74 U WCAP-8288 Fuel Assembly for Combined 3/1/74 Seismic and Loss-of-Coolant

Accident"

WCAP-8236 (P) "Safety Analysis of the 8-Grid Addendum 3.7(N) 4/15/74 A WCAP-8288 17 x 17 Fuel Assembly for 1 Combined Seismic and Loss-of-Coolant Accident"

Rev. 14 WOLF CREEK TABLE 1.6-2 (Sheet 13)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No.

Title Number Reference to the NRC Status WCAP-8252 "Documentation of Selected Rev. 1 3.6.3, 3.9(N) 7/19/77 U Westinghouse Structural Analysis Computer Codes"

WCAP-8253 "Source Term Data for Westing- Amendment 2/13/76 B house Pressurized Water 1

Reactors"

WCAP-8255 "Nuclear Instrumentation Rev. 0 7.2, 7.7 4/9/74 B

System"

WCAP-8261 (See WCAP-8200(P))

WCAP-8278 (P) "Hydraulic Flow Test of the Rev. 0 1.5, 4.2, 4.4 2/28/74 U WCAP-8279 17 x 17 Fuel Assembly" 3/1/74

WCAP-8288 (See WCAP-8236(P))

WCAP-8289 (P) "17 x 17 Design Fuel Rod Rev. 0 1.5 11/18/74 A WCAP-8290 Behavior During Simulated Loss-of-Coolant Accident

Conditions"

WCAP-8296- "Effect of 17 x 17 Fuel Rev. 0 1.5 2/6/75 A P-A (P) Assembly Geometry on DNB"

WCAP-8297-A

WCAP-8298- "The Effect of 17 x 17 Rev. 0 4.4 1/28/75 0A P-A (P) Fuel Assembly Geometry on WCAP-8299-A Interchannel Thermal Mixing"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 14)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No.

Title Number Reference to the NRC Status WCAP-8301 (P) "LOCTA-IV Program: Loss-of Rev. 0 15.0, 15.6 7/12/74 AE WCAP-8305 Coolant Transient Analysis"

WCAP-8302 (P) "SATAN-VI Program: Compre- Rev. 0 15.0, 15.6 7/12/74 AE WCAP-8306 hensive Space-Time Dependent Analysis of Loss-of-Coolant"

WCAP-8303- "Prediction of the Flow-Induced Rev. 0 3.9(N) 7/18/75 A P-A (P) Vibration of Reactor Internals WCAP-8317-A by Scale Model Test"

WCAP-8305 (See WCAP-8301(P))

WCAP-8306 (See WCAP-8302(P))

WCAP-8317-A (See WCAP-8303-P-A(P))

WCAP-8324-A "Control of Delta Ferrite in Rev. 0 5.2 6/23/75 A Austenitic Stainless Steel

Weldments"

WCAP-8327 (P) "Containment Pressure Analysis Rev. 0 15.6 7/3/74 AE WCAP-8326 Code (COCO)"

WCAP-8330 "Westinghouse Anticipated Rev. 0 4.3, 4.6 9/25/74 U Transients Without Trip

Analysis"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 15)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No.

Title Number Reference to the NRC Status WCAP-8339 "Westinghouse Emergency Core Rev. 0 15.6 7/3/74 AE Cooling System Evaluation Model - Summary"

WCAP-8340 (P) "Westinghouse Emergency Core Rev. 0 15.6 8/1/74 AE WCAP-8356 Cooling System - Plant Sensitivity Studies"

WCAP-8341 (P) "Westinghouse Emergency Core Rev. 0 15.6 7/3/74 AE WCAP-8342 Cooling System Evaluation Model-Sensitivity Studies"

WCAP-8359 "Effects of Fuel Densification Rev. 0 4.3 8/2/74 A Power Spikes on Clad Thermal

Transients"

WCAP-8370 "Quality Assurance Plan Rev. 7A 3A 2/5/75 A Westinghouse Nuclear Energy Systems Divisions"

WCAP-8370 "Westinghouse Water Reactor Rev. 8A 3A 11/14/77 A Divisions Quality Assurance

Plan"

WCAP-8370 "Westinghouse Water Reactor Rev. 9A 3A U Divisions Quality Assurance Plan

WCAP-8373 "Qualification of Westinghouse Rev. 0 3.10(N) 8/23/74 U Seismic Testing Procedure for Electrical Equipment Tested Prior to May 1974"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 16)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No.

Title Number Reference to the NRC Status WCAP-8377 (P) "Revised Clad Flattening Rev. 0 4.2 8/7/74 A WCAP-8381 Model" 8/6/74

WCAP-8385 (P) "Power Distribution Control and Rev. 0 4.3, 4.4 10/9/74 A WCAP-8403 Load Following Procedures"

WCAP-8424 "An Evaluation of Loss of Rev. 1 15.3 5/30/75 U Flow Accidents Caused by Power System Frequency Transients in Westinghouse PWRs"

WCAP-8446 (P) "17 x 17 Driveline Com- Rev. 0 1.5, 3.9(N) 12/31/74 A WCAP-8449 ponents Tests Phase IB, II, III D-Loop Drop and

Deflection"

WCAP-8453-A "Analysis of Data from the Rev. 0 4.4 5/10/76 A Zion (Unit 1), THINC Veri-fication Test"

WCAP-8471 (P) "Westinghouse ECCS Evaluation Rev. 0 15.6 2/10/75 AE WCAP-8472 Model - Supplementary Informa- 2/11/75

tion"

WCAP-8485 "Safety-Related Research and Rev. 0 4/2/75 B Development for Westinghouse Pressurized Water Reactors, Program Summaries - Fall 1974"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 17)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No.

Title Number Reference to the NRC Status WCAP-8498 "Incore Power Distribution Rev. 0 4.3 7/22/75 U Determination in Westinghouse Pressurized Water Reactors, Program Summaries - Fall 1974" WCAP-8510 Method for Fracture Mechanics Rev. 0 5.3 12/00/75 U Analysis of Nuclear Reactor Vessels Under Severe Thermal

Transients WCAP-8516-P(P) UHI Plant Internals Vibration Rev. 0 3.9(N) 4/11/75 A WCAP-8517 Measurement Program and Pre and Post Hot Functional Examinations" WCAP-8536(P) "Critical Heat Flux Testing of Rev. 0 4.4 5/30/75 A WCAP-8537 17 x 17 Fuel Assembly Geometry with 22-Inch Grid Spacing" WCAP-8565- "Westinghouse ECCS-Four Loop Rev. 0 15.6 7/17/75 A P-A (P) Plant (17 x 17) Sensitivity

WCAP-8566-A Studies" WCAP-8577 "The Application of Preheat Rev. 0 6.1 2/3/76 A Temperatures after Welding Pressure Vessel Steels" WCAP-8584 (P) "Failure Mode and Effects Rev. 1 4.6, 7.3 3/20/80 U WCAP-8760 Analysis (FMEA) of the Engineered Safety Features Actuation System" WCAP-8587 "Methodology for Qualifying Rev. 6A 3.10(N), 11/00/83 U Westinghouse WRD Supplied 3.11(N),

NSSS Safety-Related Electrical 3A

Equipment"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 18)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No.

Title Number Reference to the NRC Status WCAP-8587 "Equipment Qualification Rev. 1 3.11(N) 4/17/78 U Data Packages" Supple- 3.10(N) ment 1

WCAP-8622 (P) "Westinghouse ECCS Evaluation Rev. 0 1.5, 15.6 11/20/75 AE WCAP-8623 Model - October 1975 Version"

WCAP-8624(P) "General Method of Developing Rev. 0 3.10(N) 0/00/00 U Multi-Frequency Biaxial Test Inputs for Bistables"

WCAP-8682 (P) "Experimental Verification of Rev. 0 4.3 3/18/76 B WCAP-8683 Wet Fuel Storage Criticality

Analyses"

WCAP-8691 (P) "Fuel Rod Bow Evaluation" Rev. 0 4.2, 4.4 11/83 U

WCAP-8692

WCAP-8693 "Delta Ferrite in Production Rev. 0 5.2 3/16/76 B Austenitic Stainless Steel

Weldments"

WCAP-8708-P-A "MULTIFLEX - A FORTRAN-IV Rev. 0 3.6.3 9/16/77 A (P), Vol. I & II Computer Program for Analyzing 3.9(N)

WCAP-8709-A, Thermal-Hydraulic-Structure Volumes I & II System Dynamics"

WCAP-8720 (P) "Improved Analytical Models Rev. 0 4.2 11/2/76 A WCAP-8785 Used in Westinghouse Fuel Rod Design Computations"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 19)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No.

Title Number Reference to the NRC Status WCAP-8768 "Safety-Related Research and Rev. 2 1.5, 4.2, 9/28/78 B Development for Westinghouse 4.3, 5.4 Pressurized Water Reactors, Program Summaries - Winter 1977 - Summer 1978"

WCAP-8766 (P) "Verification of Neutron Pad Rev. 0 3.9(N) 5/21/76 A WCAP-8780 and 17 x 17 Guide Tube Designs by Preoperational Tests on the Trojan 1 Power Plant"

WCAP-8865-A "Westinghouse ECCS - Four Loop Rev. 0 5/6/77 A Plant (17 x 17) Sensitivity Studies with Upper Head Fluid Temperature at THOT"

WCAP-8872 "Design, Inspection, Operation Rev. 0 12.1 4/27/77 B and Maintenance Aspects of the Westinghouse NSSS to Maintain Occupational Radiation Exposures as Low as Reasonably Achievable"

WCAP-8892-A "Westinghouse 7300 Series Rev. 0 7.1 6/15/77 A Process Control System Noise

Tests"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 20)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No.

Title Number Reference to the NRC Status WCAP-8929 "Benchmark Problem Solutions Rev. 0 3.9(N) 5/26/77 U Employed for Verification of the WECAN Computer Program"

WCAP-8963 (P) "Safety Analysis for the Rev. 0 4.2 3/31/71 A WCAP-8964 Revised Fuel Rod Internal 8/11/77 Pressure Design Basis"

WCAP-8970(P) "Westinghouse emergency Core Rev. 0 15.6 4/77 U WCAP-8971 Cooling System Small Break -

October 1975 Model"

WCAP-8976 "Failure Mode and Effects Rev. 0 4.6, 10/26/77 U Analysis (FMEA) of the 7.7 Solid State Full Length Rod Control System"

WCAP-9166 "Westinghouse Emergency Core Rev. 0 15.6 2/00/78 U Cooling System Evaluation Model for Analyzing Large LOCA's During Operation With One Loop Out of Service for Plants Without Loop Isolation Values"

WCAP-9168 (P) "Westinghouse Emergency Core Rev. 0 15.6 9/27/77 U WCAP-9169 Cooling System Evaluation Model -

Modified October 1975 Version"

WCAP-9179 (P) "Properties of Fuel and Core Rev. 1 4.2 8/2/78 U Component Materials"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 21)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No

. Title Number Reference to the NRC Status WCAP-9207 (P) "Evaluation of Mispositioned Rev. 0 6.3 3/21/78 U WCAP-8966 ECCS Valves"

WCAP-9220-P-A(P) Westinghouse ECCS Evaluation Rev. 0 15.6 2/00/78 U WCAP-9221-P-A Model, February 1978 Version

WCAP-9224, Ap- "Hafnium" Rev. 0 10/00/80 U

pendix A

WCAP-9226(P) Reactor Core Response to 15.1 7/00/78 U WCAP-9227 Excessive Secondary Steam

Releases

WCAP-9230 (P) "Report on the Consequences Rev. 0 15.2 1/27/78 U WCAP-9231 of a Postulated Main Feedline

Rupture"

WCAP-9279 "Combination of Safe Shutdown Rev. 0 3.9(N) 3/21/78 U Earthquake and Loss-of-Coolant Accident Responses for Faulted Condition Evaluation of Nuclear Power Plants"

WCAP-9283 "Integrity of the Primary Rev. 0 3.9(N) 3/21/78 U Piping Systems of Westinghouse Nuclear Power Plants During Postulated Seismic Events"

Rev. 0 WOLF CREEK TABLE 1.6-2 (Sheet 22)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE Westinghouse USAR Report Topical Revision Section Submitted Review(1)

Report No

. Title Number Reference to the NRC Status WCAP-9292 "Dynamic Fracture Toughness Rev. 0 5.2 3/17/78 U of ASME SA508 Class 2a and ASME SA533 Grade A Class 2 Base and Heat Affected Zone Material and Applicable Weld Metals" WCAP-9346 "Electric Hydrogen Recombiner Rev. 0 6.2.5 7/00/78 U Qualification Testing for Model B WCAP-9714-PA(P) Methodology for the Seismic 3.10.(N) 00/00/00 A WCAP-9750-A Qualification of Westinghouse WRD Supplied Equip.

WCAP-9944(P) "Verification of Upper Head In- Rev. 0 3.9(N) 7/00/81 U WCAP-9945 jection Reactor Vessel Internals by Preoperational Tests on Sequoyah 1 Power Plant WCAP-10297-P-A Dropped Rod Methodology for Rev. 0 15.4 6/00/83 A Negative Flux Rate Trip Plants WCAP-10043 "Steam Generator Tube Plugging Rev. 0 5.4.2.5 12/3/82 U Analysis for the Westinghouse Standardized Nuclear Power Plant (P) System" WCAP-10858P-A "AMSAC Generic Design Package" Rev. 1 7.7.1.11 07/25/85 A

& Addendum 1 02/26/87 WCAP-13589-A "Assessment of Clad Flattening Rev. 0 4.3 01/18/93 A and Densificaiton Power Spike Factor Elimination in Westinghouse Nuclear Fuel"

Rev. 11 WOLF CREEK TABLE 1.6-2 (Sheet 23)

WESTINGHOUSE TOPICAL REPORTS INCORPORATED BY REFERENCE (P) - Proprietary

(1) A legend to the review status code letters follows:

A - NRC review complete; NRC acceptance letter issued.

AE- NRC accepted as part of the Westinghouse emergency core cooling system (ECCS) evaluation model

only; does not constitute acceptance for any purpose other than for ECCS analyses.

B - Submitted to NRC as background information; not undergoing formal NRC review.

O - On file with NRC; older generations report with current validity; not actively under formal NRC

review.

U - Actively under formal NRC review.

P - Pending approval by the NRC.

Rev. 0 WOLF CREEK Table 1.6-3 USAR Figure/Controlled Drawing Cross-Reference Figure # Sheet Title Drawing #

1.1-1 1 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-120101 1.1-1 2 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-120102 1.1-1 3 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-020103 1.1-1 4 Symbols and Legend for System Flow and Piping and Instrumentation Diagrams M-020104 1.2-1 0 Peninsular Plant Arrangement Standard Power Systems & Structure Interface M-1G001 1.2-2 0 Equipment Location Radwaste Building Plan El.

1976'-0"M-1G010 1.2-3 0 Equipment Location Radwaste Building Plan El.

2000'-0"M-1G011 1.2-4 0 Equipment Location Radwaste Building Plan El.

2022'-0"M-0G012 1.2-5 0 Equipment Location Radwaste Building El. 2031'-

6" & Roof Plan M-1G013 1.2-6 0 Equipment Location Radwaste Building Sections A

& B M-1G014 1.2-7 0 Equipment Location Radwaste Building Sections C

& E M-1G015 1.2-8 0 Equipment Location Radwaste Building Sections D

& F M-1G016 1.2-9 0 Equipment Location Reactor and Auxiliary Bldgs Plan - Basement El. 1974'-0" M-1G020 1.2-10 0 Equipment Location Auxiliary Building Partial Plan El. 1988'-0" & El. 2013'-6" M-1G021 1.2-11 0 Equipment Location Reactor and Auxiliary Building Plan Ground Floor Elevation 2000'-0" M-1G022 1.2-12 0 Equipment Location Reactor and Auxiliary Building Plan El. 2026'-0" M-1G023 1.2-13 0 Equipment Location Reactor and Auxiliary Buildings Plan Operating Floor El. 2047'-6" M-1G024 1.2-14 0 Equipment Locations Reactor and Auxiliary Buildings Plan El. 2068'-8" M-1G025 1.2-15 0 Equipment Location Reactor and Auxiliary Building Section A M-1G026 1.2-16 0 Equipment Locations Reactor and Auxiliary Buildings Section B M-1G027Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 2)

USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #

1.2-170Equipment Location Reactor and Auxiliary Building Section C M-1G0281.2-180Equipment Location Reactor and Auxiliary Building Section D M-1G0291.2-190Equipment Location Auxiliary Building Sections E, F, & G M-1G0301.2-200Equipment Location Fuel Building Plan Elevation 2000'- 0", 2026'-0" and 2047'-6" M-1G0401.2-210Equipment Location Fuel Building Sections A, B, &

CM-1G0411.2-220Equipment Location Fuel Building Sections D, E, &

FM-1G0421.2-230Equipment Location Control Building &

Communication Corridor Plan Elevation 1974'- 0" &

1984'-0"M-1G0501.2-240Equipment Location Control & Diesel Generator Buildings & Communication Corridor Plan Elevation 2000'-0" & 2016'-0" M-1G0511.2-250Equipment Location Control & Diesel Generator Buildings & Communication Corridor Plan Elevation 2032'-0" & 2047'-6" M-1G0521.2-260Equipment Location Control & Diesel Generator Buildings & Corridor Plan Elevation 2061'- 6",

2066'-0" & 2073'-6" & Section D.

M-1G0531.2-270Equipment Location Control & Diesel Generator Buildings & Communication Corridor Section A M-1G0541.2-280Equipment Location Control & Diesel Generator Buildings Sections B & C M-1G0551.2-290Equipment Location Turbine Building Condenser Pit Plan Elevation 1983'-0" M-1G0601.2-300Equipment Location Turbine Building Ground Floor Plan Elevation 2000'-0" M-1G0611.2-310Equipment Location Turbine Building Partial Plan Elevation 2015'-4" M-1G0621.2-320Equipment Location Turbine Building Mezzanine Floor Plan Elevation 2033'-0" M-1G0631.2-330Equipment Location Turbine Building Operating Floor Plan Elevation 2065'-0" M-1G064Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 3)

USAR Figure/Controlled Drawing Cross-Reference Figure # Sheet Title Drawing #

1.2-34 0 Equipment Location Turbine Building Section A M-1G065 1.2-35 0 Equipment Location Turbine Building Section B M-1G066 1.2-36 0 Equipment Location Turbine Building Section C M-1G067 1.2-37 0 Equipment Location Turbine Building Section D M-0G068 1.2-38 0 Equipment Location Turbine Building Section E M-1G069 1.2-39 0 Equipment Location Turbine Building Section F M-1G070 1.2-40 0 Equipment Location Turbine Building Section G M-0G071 1.2-41 0 Equipment Location Turbine Building Section H M-1G072 1.2-42 0 Turbine Component Laydown Area, Elevation 2065'-0" M-1G073 1.2-44 0 Site Plan 8025-C-KG1202 2.4-3 2 Grading Plan Switchyard Area S-0172 2.4-3 3 Drainage Plan Plant Area S-0186 2.4-3 4A Manhole, Pipe & Culvert Schedule S-0189 Sheet 1 2.4-3 4B Manhole, Pipe & Culvert Schedule S-0189 Sheet 2 2.4-3 4C Manhole, Pipe & Culvert Schedule S-0189 Sheet 3 2.4-3 4D Manhole, Pipe & Culvert Schedule S-0189 Sheet 4 2.4-3 5 Manhole & Pipe Details S-0191 2.4-3 6A Manhole & Pipe Details S-0296 Sheet 1 2.4-3 6B Manhole & Pipe Details S-0296 Sheet 2 2.4-3 7 Plant Area Roadway Grading & Drainage S-0297 5.1-1 1 Reactor Coolant System M-12BB01 5.1-1 2 Reactor Coolant System M-12BB02 5.1-1 3 Reactor Coolant System M-12BB03 5.1-1 4 Reactor Coolant System M-12BB04 5.4-7 0 Residual Heat Removal System M-12EJ01 5.4-21 0 Hot and Cold Leg Lateral Restraints C-03BB53 6.2.2-1 0 Containment Spray System M-12EN01 6.2.2-2 1 Containment Spray System Reactor Building A & B Trains M-13EN03 6.2.2-2 2 Containment Spray System Reactor Building A & B Trains M-13EN04 6.2.2-2 3 Containment Spray System Reactor Building A & B Trains M-13EN05 6.2.5-1 0 Containment Hydrogen Control System M-12GS01 6.2.6-1 0 Containment Integrated Leak Rate Test M-12GP01 6.3-1 1 Borated Refueling Water Storage System M-12BN01 6.3-1 2 High Pressure Coolant Injection System M-12EM01 6.3-1 3 High Pressure Coolant Injection System M-12EM02 6.3-1 4 Accumulator Safety Injection M-12EP01

Rev. 28 WOLF CREEK Table 1.6-3 (Sheet 4)

USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #7.2-1 1 Functional Diagrams (Index and Symbols) M-744-00018 7.2-1 2 Functional Diagrams (Reactor Trip Signals) M-744-00019 7.2-1 3 Functional Diagrams (Nuclear Instrumentation and Manual Trip Signals) M-744-00020 7.2-1 4 Functional Diagrams (Nuclear Instrumentation Permissives and Blocks) M-744-00021 7.2-1 5 Functional Diagrams (Primary Coolant System Trip SignalsM-744-00022 7.2-1 6 Functional Diagrams (Pressurizer Trip Signals) M-744-00023 7.2-1 7 Functional Diagrams (Steam Generator Trip Signals)M-744-00024 7.2-1 8 Functional Diagrams (Safeguards Actuation Signals)M-744-00025 7.2-1 9 Functional Diagrams (Rod Controls and Rod Blocks)M-744-00026 7.2-1 10 Functional Diagrams (Steam Dump Control) M-744-00027 7.2-1 11 Functional Diagrams (Pressurizer Pressure and Level Control) M-744-00028 7.2-1 12 Functional Diagrams (Pressurizer Heater Control) M-744-00029 7.2-1 13 Functional Diagrams (Feedwater Control and Isolation)M-744-00030 7.2-1 14 Functional Diagrams (Feedwater Control and Isolation)M-744-00031 7.2-1 15 Functional Diagrams (Auxiliary Feedwater Pumps Start-up)M-744-00032 7.2-1 16 Functional Diagrams (Turbine Trips, Runbacks and Other Signals) M-744-00033 7.2-1 17 Functional Diagram (Pressurizer Pressure Relief System Train A) M-744-00039 7.2-1 18 Functional Diagram (Pressurizer Pressure Relief System Train B) M-744-00040 7.3-1 2 Logic Diagram Engineered Safety Features Actuation System (BOP)

J-104-00390 7.6-4 1 Train B Functional Diagram Showing Logic Requirements for Pressurizer Pressure Relief SystemM-744-00039 7.6-4 2 Train A Functional Diagram Showing Logic Requirements for Pressurizer Pressure Relief SystemM-744-00040 8.2-3 0 Wolf Creek Substation General Plan KD-7750 8.2-4 0 One-Line Diagram KD-7496 Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 5)

USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #8.3-1 1 Main Single Line Diagram E-11001 8.3-1 2 Single Line Diagram, Essential Service Water SystemE-K10018.3-1 3 Single Line Diagram Site Area Loads E-1001 8.3-2 0 List of Loads Supplied by the Emergency Diesel Generator E-110058.3-3 0 Logic Diagram Standby Generation Excitation ControlE-12NE018.3-4 0 Logic Diagram Standby Generator System Protection E-12NE028.3-5 0 Logic Diagram Standby Generator Engine and Governor Control E-12KJ018.3-6 1 DC Main Single Line Diagram E-11010 8.3-7 0 DC Main Single Line Diagram (PK03 and PK04 Bus)E-11010A9.1-31Fuel Pool Cooling and Cleanup System M-12EC019.1-32Fuel Pool Cooling and Cleanup System M-12EC029.2-1 1 Service Water System M-12EA019.2-1 2 Service Water System M-12EA02 9.2-1 3 Service Water System M-0022 Sheet 1 9.2-2 1 Essential Service Water System M-12EF019.2-2 2 Essential Service Water System M-12EF029.2-2 3 Essential Service Water System M-K2EF019.2-2 4 Essential Service Water System M-K2EF039.2-3 0 ESW Pumphouse Equipment Location - Plan M-KG0809.2-4 0 ESWS Pumphouse Equipment Location - Sections M-KG0819.2-5 1 Makeup Demineralizer System M-0025 Sheet 1 9.2-5 2 Makeup Demineralizer System M-0025 Sheet 2 9.2-5 3 Makeup Demineralizer System M-0025 Sheet 3 9.2-5 4 Makeup Demineralizer System M-0025 Sheet 4 9.2-5 4A Makeup Demineralizer System M-0025 Sheet 4A 9.2-5a 0 Potable Water System A-0503 Sheet 1 9.2-13 0 Reactor Make-up Water System M-12BL019.2-14 0 Closed Cooling Water System M-12EB019.2-15 1 Component Cooling Water System M-12EG019.2-15 2 Component Cooling Water System M-12EG029.2-15 3 Component Cooling Water System M-12EG039.2-16 0 Demineralized Water Storage and Transfer System M-12AN019.2-17 1 Domestic Water System M-12KD019.2-17 2 Domestic Water System M-12KD02 9.2-23 0 Condensate Storage and Transfer System M-12AP01Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 6)

USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #9.2-24 1 Waste Water Treatment Facility M-12WT01 9.2-25 1 Waste Water Treatment Facility M-12WT03 9.3-1 1 Compressed Air System M-12KA01 9.3-1 2 Compressed Air System (Service Air) M-12KA02 9.3-1 3 Instrument Air System M-12KA03 9.3-1 4 Instrument Air System M-12KA04 9.3-1 5 Compressed Air System M-12KA05 9.3-1 6 Compressed Air System M-12KA06 9.3-1 7 Compressed Air System M-12KA079.3-2 1 Nuclear Sampling System M-12SJ019.3-2 2 Nuclear Sampling System M-12SJ039.3-3 0 Nuclear Sampling System M-12SJ029.3-4 1 Process Sampling System M-12RM019.3-4 2 Process Sampling System M-12RM029.3-4 3 Process Sampling System M-12RM039.3-5 1 Sanitary Lift Station & Turb. Bldg. Sanitary Drainage System M-12LA019.3-5 2 Comm. Corridor & Control Bldg. Sanitary Drainage

SystemM-12LA029.3-5 3 Chemical and Detergent Waste M-12LD019.3-5 4 Turbine Bldg. and Aux. Feedwater Pump Rooms

Oily Waste System M-12LE019.3-5 5 Control and Diesel Generator Bldg. Oily Waste

SystemM-12LE029.3-5 6 Turbine Bldg. and Aux. Boiler Room Oily Waste

SystemM-12LE039.3-5 7 Tendon Access Gallery and Turbine Bldg. Oily

Waste System M-12LE049.3-5 8 Auxiliary Building Floor and Equipment Drain (FED) System M-12LF019.3-5 9 Auxiliary Building Floor and Equipment Drain

SystemM-12LF029.3-5 10 Auxiliary Building Floor and Equipment Drain

SystemM-12LF039.3-5 11 Auxiliary Building Floor and Equipment Drain

SystemM-12LF049.3-5 12 Auxiliary Building Floor and Equipment Drain

SystemM-12LF059.3-5 13 Radwaste and Fuel Bldgs. FED System M-12LF069.3-5 14 Radwaste Bldg. FED System M-12LF079.3-5 15 Control and Fuel Bldgs. FED System M-12LF089.3-5 16 Reactor Bldg. and Hot Machine Shop FED System M-12LF099.3-5 17 Radwaste Bldg. and Tunnel FED System M-12LF10Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 7)

USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #9.3-7 1 Reactor Building, Stainless Steel Liner Plate, Reactor Refueling Canal C-0L29319.3-7 2 Fuel Building-Area 1, Stainless Steel Liner Plate Plan, Spent Fuel Pool C-1L61119.3-8 1 Chemical and Volume Control System M-12BG01 9.3-8 2 Chemical and Volume Control System M-12BG02 9.3-8 3 Chemical and Volume Control System M-12BG03 9.3-8 4 Chemical and Volume Control System M-12BG049.3-8 5 Chemical and Volume Control System M-12BG059.3-9 1 Service Gas System M-12KH019.3-9 2 Service Gas System M-12KH029.3-11 1 Boron Recycle System M-12HE019.3-11 2 Boron Recycle System M-12HE029.3-11 3 Boron Recycle System M-12HE039.4-1 1 Control Building HVAC M-12GK019.4-1 2 Control Building HVAC M-12GK029.4-1 3 Control Building HVAC M-12GK039.4-1 4 Control Building HVAC M-12GK049.4-2 1 Fuel Building HVAC M-12GG019.4-2 2 Fuel Building HVAC M-12GG029.4-3 1 Miscellaneous Buildings HVAC M-12GF019.4-3 2 Miscellaneous Buildings HVAC M-12GF029.4-3 3 Auxiliary Building HVAC M-12GL039.4-3 4 Auxiliary Building HVAC M-12GL029.4-3 5 Auxiliary Building HVAC M-12GL019.4-4 1 Turbine Building HVAC M-12GE019.4-4 2 Turbine Building HVAC M-12GE029.4-4 3 Turbine Building HVAC M-12GE039.4-4 4 Turbine Building HVAC M-12GE049.4-5 1 Radwaste Building HVAC M-12GH019.4-5 2 Radwaste Building HVAC M-12GH029.4-6 1 Containment Cooling System M-12GN019.4-6 2 Containment Cooling System M-12GN029.4-6 3 Containment Atmospheric Control System M-12GR019.4-6 4 Containment Purge Systems HVAC M-12GT019.4-7 0 Diesel Generators Building HVAC M-12GM019.4-8 0 Essential Service Water Pump House HVAC M-K2GD01 9.4-9 1 Plant Heating System M-12GA019.4-9 2 Plant Heating System M-12GA029.4-10 0 Central Chilled Water System M-12GB019.4-11 0 Waste Water Treatment Facility HVAC M-12VW01Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 8)

USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #9.5-1 1 Fire Protection System (site) M-0023 Sheet 1 9.5-1 2 Fire Protection System (site) M-0023 Sheet 2 9.5-1 3 Fire Protection System (site) M-0023 Sheet 3 9.5-1 4 Fire Protection System (site) M-0023 Sheet 4 9.5-2 0 Outdoor Piping, Key Plan and General Notes M-0051 9.5.1-1 1 Fire Protection Turbine Building M-12KC01 9.5.1-1 2 Fire Protection System (power block) M-12KC02 9.5.1-1 3 Fire Protection System (power block)

M-12KC039.5.1-1 4 Fire Protection (Halon) System M-12KC049.5.1-1 5 Fire Protection System (power block)

M-12KC059.5.1-1 6 Fire Protection (Halon) System M-12KC069.5.1-1 7 Fire Protection (Halon) System M-12KC079.5.1-2 1 Fire Area Delineation el. 1974 10466-A-1801 9.5.1-2 2 Fire Area Delineation el. 2000 10466-A-1802 9.5.1-2 3 Fire Area Delineation el. 2026 10466-A-1803 9.5.1-2 4 Fire Area Delineation el. 2047-6 10466-A-1804 9.5.2-1 0 Telephone System Riser Diagram E-14QE019.5.2-2 0 Public Address System Riser Diagram E-1L99039.5.3-1 0 Lighting Distribution Riser Diagram E-1L99019.5.4-1 0 Emergency Fuel Oil System M-12JE019.5.5-1 1 Standby Diesel Generator "A" Cooling Water SystemM-12KJ019.5.5-1 2 Standby Diesel Generator "B" Cooling Water

SystemM-12KJ049.5.6-1 1 Standby Diesel Generator "A" Intake, Exh., F.0.

and Starting Air System M-12KJ029.5.6-1 2 Standby Diesel Generator "B" Intake, Exh., F.0.

and Starting Air System M-12KJ059.5.7-1 1 Standby Diesel Generator "A" Lube Oil System M-12KJ039.5.7-1 2 Standby Diesel Generator "B" Lube Oil System M-12KJ069.5.9-1 1 Auxiliary Boiler System M-12FA019.5.9-1 2 Auxiliary Steam System M-12FB019.5.9-1 3 Auxiliary Steam System M-12FB029.5.9-1 4 Auxiliary Steam Chemical Addition System M-12FE019.5.10-1 1 Breathing Air System M-12KB019.5.10-1 2 Breathing Air System M-12KB029.5.10-1 3 Breathing Air System M-12KB03Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 9)

USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #10.2-1 1 Main Turbine M-12AC01 10.2-1 2 Main Turbine M-12AC02 10.2-1 3 Main Turbine M-12AC03 10.2-1 4 Main Turbine M-12AC04 10.2-1 5 Lube Oil Storage, Transfer and Purification System M-12CF01 10.2-1 6 Lube Oil Storage, Transfer and Purification System M-12CF02 10.2-1 7 Main Turbine Control Oil System M-12CH01 10.2-1 8 Main Turbine Control Oil System M-12CH02 10.3-1 1 Main Steam System M-12AB01 10.3-1 2 Main Steam System M-12AB02 10.3-1 3 Main Steam System M-12AB03 10.4-1 1 Circulating Water & Waterbox Drains System M-12DA0110.4-12Circulating Water System M-002110.4-13Circulating Water Waterbox Venting System M-12DA0210.4-14Circulating Water Screenhouse Plans M-000410.4-15Circulating Water Screenhouse - Sections M-000510.4-21Condensate System M-12AD0110.4-22Condensate System M-12AD0210.4-23Condensate System M-12AD0310.4-24Condensate System M-12AD0410.4-25Condensate System M-12AD0510.4-26Condensate System M-12AD0610.4-30Condenser Air Removal M-12CG0110.4-40Steam Seal System M-12CA0110.4-51Condensate Demineralizer System M-12AK0110.4-52Condensate Demineralizer System M-12AK0210.4-53Condensate Demineralizer System M-12AK0310.4-61Feedwater System M-12AE0110.4-62Feedwater System M-12AE0210.4-63Feedwater Heater Extraction Drains & Vents M-12AF0110.4-64Feedwater Heater Extraction Drains & Vents M-12AF0210.4-65Feedwater Heater Extraction Drains & Vents M-12AF0310.4-66Feedwater Heater Extraction Drains & Vents M-12AF0410.4-67Auxiliary Turbines S.G.F.P. Turbine A M-12FC0310.4-68Auxiliary Turbines S.G.F.P. Turbine "B" M-12FC0410.4-71Condensate Chemical Addition System M-12AQ0110.4-72Feedwater Chemical Addition System M-12AQ0210.4-81Steam Generator Blowdown System M-12BM0110.4-82Steam Generator Blowdown System M-12BM0210.4-83Steam Generator Blowdown System M-12BM0310.4-84Steam Generator Blowdown System M-12BM0410.4-85Steam Generator Blowdown System M-12BM05Rev. 17 WOLF CREEK Table 1.6-3 (Sheet 10)

USAR Figure/Controlled Drawing Cross-Reference Figure #SheetTitleDrawing #

10.4-90Auxiliary Feedwater System M-12AL0110.4-100Auxiliary Turbines Auxiliary Feedwater Pump TurbineM-12FC0210.4-121Secondary Liquid Waste System M-12HF0110.4-122Secondary Liquid Waste System M-12HF0210.4-123Secondary Liquid Waste System M-12HF0310.4-124Secondary Liquid Waste System M-12HF0411.2-11Liquid Radwaste System M-12HB0111.2-12Liquid Radwaste System M-12HB0211.2-13Liquid Radwaste System M-12HB0311.2-14Liquid Radwaste System M-12HB0411.3-11Gaseous Radwaste System M-12HA0111.3-12Gaseous Radwaste System M-12HA0211.3-13Gaseous Radwaste System M-12HA0311.4-11Solid Radwaste System M-12HC0111.4-12Solid Radwaste System M-12HC0211.4-13Solid Radwaste System M-12HC0311.4-14Solid Radwaste System M-12HC0412.3-21Radiation Zones for Normal Operation El. 1974 10466-A-1701 12.3-22Radiation Zones for Normal Operation El. 2000 10466-A-1702 12.3-23Radiation Zones for Normal Operation El. 2026 10466-A-1703 12.3-24Radiation Zones for Normal Operation El. 2047-6 10466-A-1704 12.3-25Radiation Zones for Normal Operation Turbine Bldg El. 1983 & 2000 10466-A-1705 12.3-26Radiation Zones for Normal Operation Turbine Bldg El. 2033 & 2065 10466-A-1706 12.3-40Decontamination System M-12HD0118.2-150Nuclear Sampling System M-12SJ04Rev. 17 WOLF CREEK Table 1.6-4 (sheet 1)

Incorporated by Reference USAR Section/Controlled Do cument Cross-Reference Section Title Document # Table 3.11(B)-1 Plant Environmental Normal Conditions EQSD-I, Attachment A and B Table 3.11(B)-2 Environmental Qualification Parameters for SNUPPS NUREG-0588 (LOCA, MSLB and HELB)

EQSD-I, Attachment A and B Table 3.11(B)-3 Identification of Safety-Related Equipment and Components: Equipment Qualification EQSD-I, Attachment A and B; EQSD-II, Tables 1 and 2 Table 3.11(B)-4 Containment Worst Case Radiation Levels (MRADs)

EQSD-I, Attachment A Table3.11(B)-5 Containment Spray Requirements EQSD-I, Attachment A Table 3.11(B)-8 Exemptions from NUREG-0588 Qualification EQSD-I, Attachment C Table 3.11(B)-10 Equipment Added for NUREG-0737 EQSD-II, Tables 1 and 2 Figures 3.11(B)-

1 through 3.11(B)-49 Figures EQSD-I, Attachment A Section 9.5.1.2.2.3*

Fire Barriers *Note: Only portions of this section have been relocated and Incorporated by Reference M-663-00017A Appendix 9.5B.1 Fire Hazard Analyses - Introduction E-1F9905 Table 9.5B-1 Minimum Equipment Required for Safe Shutdown XX-E-013 Appendix 9.5B.2 Fire Hazard Analyses - Assumption on Plant Conditions E-1F9905 Table 9.5B-2 Equipment Required for Shutdown following a Fire XX-E-013 Appendix 9.5B.3 Fire Hazard Analyses - Fire Effects on Electrical Equipment and Safe Shutdown Information E-1F9905 Rev. 28 WOLF CREEK Table 1.6-4 (sheet 2)

Incorporated by Reference USAR Section/Controlled Do cument Cross-Reference Section Title Document #

Table 9.5B-3 Safety-Related Fire Areas Containing Rooms Without Detection Provisions E-1F9905, Attachment A Appendix 9.5B.4 Fire Hazard Analyses - General Information on Design Features E-1F9905, or XX-E-013, or

E-1F9900 Table 9.5B-4 Safety-Related Fire Areas Outside Containment With Area Suppression Coverage E-1F9905

Attachment A Appendix 9.5B.5 Fire Hazard Analyses - Combustible Loadings and Flame Spread E-1F9905 Table 9.5B-5 Non-Safety Related Site Structures E-1F9905,

Attachment C Appendix 9.5B.6 Fire Hazard Analyses - Fire Hazard Review Methodology E-1F9905, or XX-E-013 Appendix 9.5B.7 Fire Hazard Analyses - Power Block Fire Hazards Analysis E-1F9905 Appendix 9.5B.8 Fire Hazard Analyses - Site Specific Fire Hazards Analysis E-1F9905 Appendix 9.5B Design Basis Document for OFN AP-017, Control Room Evacuation E-1F9915 Chapter 16.0 Technical Requirements Manual Technical Requirements

Manual Chapter 17.2 Quality Assurance During the Operation Phase Quality Program Manual

Rev. 29 WOLF CREEK 1.7 DRAWINGS AND OTHER DETAILED INFORMATION The engineering drawings listed in Tables 1.7-1, 1.7-2 and 1.7-3 reflect the

detailed design configuration as described in USAR text and tables. The

controlled drawings that were removed from the USAR in Revision 17 and incorporated by reference are listed in Table 1.6-3

1.7.1 Electrical, Instrumentation and Control Drawings

Table 1.7-1 contains a list of electrical, instrumentation, and control

drawings that are considered to be necessary to evaluate the safety-related

features pertaining to the power block.

1.7.2 Piping and Instrumentation Diagrams Table 1.7-2 contains a list of each piping and instrumentation diagram and the

corresponding USAR figure number as it appears at the end of the respective

text section. The P&ID legend, Figure 1.1-1, provides an explanation of

symbols and characters used in these USAR figures.

1.7.3 Miscellaneous Controlled Drawings

Table 1.7-3 contains a list of other controlled drawings utilized as figures in

the USAR and the corresponding USAR figure number as it appears at the end of

the respective text section.

1.7.4 Long-Term Temporary Modifications

Scaffolding materials being used in support of plant Operations, regardless of

duration, are utilized under the requirements specified within the Plant

Scaffolding Program. This material includes items such as; camera poles,

rigging frames, and barricades, that may be installed within all Power Block

structures. Table 1.7-4 contains a list of erected scaffold that is expected to be in place throughout the next required USAR update cycle.

1.7-1 Rev. 23 WOLF CREEK TABLE 1.7-1 ELECTRICAL, INSTRUMENTATION, AND CONTROL DRAWINGS DRAWING NUMBER TITLE E-K1001 SINGLE LINE DIAGRAM ESSENTIAL SERVICE WATER SYSTEM E-11NB01 LOWER MED VOLTAGE SYS CLASS 1E 4.16 KV SINGLE LN E-11NB02 LOWER MED VOLTAGE SYS CLASS 1E 4.16 KV SINGLE LN E-11NE01 STBY GENERATOR CLASS 1E 4.16 KV S/L E-11NG01 CLASS 1E LOW VOLTAGE 480V SYS S/L M & R E-K1NG01 LOW VOLTAGE SYSTEM CLASS 1E 480V SINGLE LINE METER & RELAY DIAGRAM E-11NG02 CLASS 1E LOW VOLTAGE 480V SYS S/L M & R E-11NG20 LOW VOLTAGE SYSTEM CLASS 1E MOTOR CONTROL CENTERS SUMMARY E-11NK01 CLASS 1E 125 DC SYS S/L M & R E-11NK02 CLASS 1E 125 DC SYS S/L M & R E-11PA01 HIGH MED VOLT SYS 13.8 KV M & R E-11PA02 HIGH MED VOLT SYS 13.8 KV M & K E-11PG06 NON-CLASS 1E LOW VOLTAGE SYS 480V S/L M & R E-11PN01 NON-CLASS 1E INSTRUMENT AC POWER E-12KJ01 STANDBY GENERATOR SYSTEM E-K2NG01 LOGIC DIAGRAM - 4.16 KV MOTOR CONTROL CENTER TRANSFORMER

FEEDER BREAKERS (VOID)

E-K2NG02 LOGIC DIAGRAM - 480V MOTOR CONTROL CENTER TRANSFORMER

FEEDER BREAKERS (VOID)

E-K2NG03 LOGIC DIAGRAM - 480V SYSTEM NOTES

& REFERENCES E-13AB01 MAINSTEAM SUPPLY VLV TO TURB DR AUX FEEDW PUMP E-13AB03A MAIN STEAM LINE DRAIN VLV E-13AB03B MAIN STEAM LINE DRAIN VLV E-13AB06A MAIN STM ATMOS VENT VLV POS INT LIGHT

Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 2)

DRAWING NUMBER TITLE E-13AB06B MAIN STM ATMOS VENT VLV POS INT LIGHT E-13AB08 MN STM COOLDOWN VLV E-13AB11A SCHEMAT DIAG MAIN DUMP VLVS E-13AB11B SCHEMAT DIAG MAIN STM DUMP VLV E-13AB11C SCHEMAT DIAG MAIN STM DUMP VLV E-13AB17 MN STM BYPASS VAL TO AUX FEEDWTR PUMP TURB E-13AB23A SCHEMAT DIAG MAIN STM BYPASS VLVS E-13AB23B SCHEMAT DIAG MAIN STM BYPASS VLVS E-13AB26 SCHEMATIC DIAGRAM MAIN STEAM ISO VALVES ALL CLOSE - SEPARATION GROUP 1 E-13AB27 SCHEMATIC DIAGRAM MAIN STEAM ISO VALVES ALL CLOSE - SEPARATION GROUP 4 E-13AB28 SCHEMATIC DIAGRAM MAIN STEAM ISO VALVES CONTROL PART 1 E-13AB29 SCHEMATIC DIAGRAM MAIN STEAM ISO VALVES CONTROL PART 2 E-13AB30 SCHEMATIC DIAGRAM MAIN STEAM AND FEEDWATER ISO VLV MISCELLANEOUS

CIRCUITS E-13AB31 STEAM DUMP CONTROL & BYPASS INDICATION E-13AC38 MAIN TURB SYS WITH NSSS INTERFACE E-13AE05 SCH DIAG STEAM GENER CHEMICAL INJECT E-13AE06 SCH DIAG MAIN FEEDWTR CONTR VALVES

E-13AE07 SCH DIAG MAIN FEEDWTR CONTR VALVES E-13AE14 SCHEMATIC DIAGRAM FEEDWATER ISOLATION VALVES ALL CLOSE - SEPARATION GROUP 1 E-13AE15 SCHEMATIC DIAGRAM FEEDWATER ISOLATION VALVES ALL CLOSE - SEPARATION GROUP 4 E-13AE16 SCHEMATIC DIAGRAM FEEDWATER ISO VALVES CONTROL PART 1 E-13AE17 SCHEMATIC DIAGRAM FEEDWATER ISO VALVES CONTROL PART 2 E-13AE18 BYPASS FEEDWATER CONTROL VALVES E-13AL00 AUX FEEDWATER SCHEMATIC INDEX SHEET E-13AL01A AUX FEEDWATER SYSTEM MOTOR DRIVEN PUMP E-13AL01B AUX FEEDWATER SYSTEM MOTOR DRIVEN PUMP E-13AL02A AUX FEEDWATER SYSTEM MOTOR OPERATED VALVES

Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 3)

DRAWING NUMBER TITLE E-13AL02B AUX FEEDWATER SYSTEM MOTOR OPERATED VALVES E-13AL02C SCHEMATIC DIAGRAM MOTOR OPERATED VALVE ALHV0036 E-13AL03A AUX FEEDWATER PUMPS DISCH CONTR MOVS E-13AL03B AUX FEEDWATER PUMPS DISCH CONTROL MOVS E-13AL04A SUPPLY FROM ESS SERV WTR SYS E-13AL04B SUPPLY FROM ESS SERV WTR SYS E-13AL05A AUX FDWR PUMPS DISCH CONTR AIR OP VALVES E-13AL05B AUX FDWR PUMPS DISCH CONTR AIR OP VALVES E-13AL06 SCHEMATIC DIAGRAM INSTRUMENTATION & ALARMS E-13AL07A SCHEMATIC DIAGRAM INSTRUMENTATION & ALARMS E-13AL07B SCHEMATIC DIAGRAM INSTRUMENTATION & ALARMS E-13AL08 SCHEMATIC DIAGRAM INSTRUMENTATION & ALARMS E-13AL09 SCHEMATIC DIAGRAM MISCELLANEOUS CIRCUITS E-13AL10 SCHEMATIC DIAGRAM AUX FDWTR SYS E-13AP04 SCHEMATIC DIAGRAM CONDENSATE SYSTEM E-13BB03 S.D. RCP THERM BARRIER CCW ISO VLVS E-13BB04 S.D. SEAL WTR INJECT ISO VALVE

E-13BB11 S.D. PRZR RELIEF TANK VENT TO WPS ISO VLV E-13BB12A S.D. RHR LOOP INLET ISO VALVE E-13BB12B S.D. RHR LOOP INLET ISO VALVE E-13BB13 S.D. PRZR RELIEF TK VENT TO WPRS ISO VLV E-13BB27 SCH DIAG REACTOR COOLANT PUMP MOTORS E-13BB28 SCHEMATIC DIAGRAM REACTOR COOLANT PUMP E-13BB30 SCHEMATIC DIAGRAM REACTOR COOLANT PUMP E-13BB31 SCHEMATIC DIAGRAM REACTOR COOLANT PUMP E-13BB33 SCHEMATIC DIAGRAM E-13BB34 SCHEMATIC DIAGRAM E-13BB35 SCHEMATIC DIAGRAM REACTOR COOLANT PUMP E-13BB36 SCHEMATIC DIAGRAM REACTOR COOLANT PUMP

Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 4)

DRAWING NUMBER TITLE E-13BB37 SCHEMATIC DIAGRAM REACTOR COOLANT PUMP E-13BB38 SCHEMATIC DIAGRAM REACTOR COOLANT PUMP E-13BB39 SCHEMATIC DIAGRAM REACTOR COOLANT PUMP E-13BB40 SCHEMATIC DIAGRAM REACTOR COOLANT PUMP E-13BG01 CENTRIFUGAL CHARGING PUMPS SCHEMATIC DIAGRAM E-13BG11A CHARGING PUMP TO REACTOR COOLANT & MINIFLOW ISO E-13BG11B CHARGING PUMP TO REACTOR COOLANT & MINIFLOW ISO E-13BG11C SCHEMATIC DIAGRAM CHARGING PUMP TO REACTOR COOLANT AND MINIFLOW ISOLATION VALVE BGHV8111 E-13BG12 VOLUME CONT TANK OUTLET ISO VLVS SCH DIAG E-13BG12A VOLUME CONTROL TANK OUTLET ISO VALVE E-13BG13 BORIC ACID FILTER TO CHG PUMP VLV E-13BG17 LETDOWN LINE ISO VLV SCH DIAG E-13BG24 REACTOR COOLANT PUMP SEAL WATER ISO VLV SCH DIAG E-13BG27 BORIC ACID TRANSFER PUMPS E-13BG36 LETDOWN CONTAINMENT ISO VLV SCH DIAG E-13BG38 REACTOR COOLANT PUMP SEAL WATER ISO VLV SCH DIAG E-13BG48 EXCESS LETDOWN LINE ISO VLV SCH DIAG E-13BG52 RCP SEAL INJECTION FLOW THROTTLING VALVES E-13BL01 PRZR RELIEF TANK REACTOR TO MAKEUP WTR SUPPLY E-13BM01 STEAM GENERATOR BLOWDOWN SCHEMATIC E-13BM02 STEAM GENERATOR BLOWDOWN SCHEMATIC E-13BM03 STEAM GENERATOR BLOWDOWN SCHEMATIC E-13BM06A STEAM GENERATOR BLOWDOWN SCHEMATIC E-13BM06B STEAM GENERATOR BLOWDOWN SCHEMATIC E-13BM06C STEAM GENERATOR BLOWDOWN SCHEMATIC E-13BN01 REFUELG WTR STRG TK TO CHARGE PUMP MOV E-13BN01A SCHEMATIC DIAGRAM REFUELING WATER STORAGE TANK TO CHARGING PUMP MOV

BNLCV0112E

Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 5)

DRAWING NUMBER TITLE E-13BN02 REFUELG WTR STRG TK TO SFPCS PUMP MOV E-13BN03 REFUELG WTR STRG TK RHR PUMP MOV E-13BN04 RWST TO CONTMET SPRAY PUMP MOV E-13BN06 RWST TO SAFETY INJECT PUMP VLV E-13BN08 SIS PUMP MINIFLW ISO VLV E-13BN10 SCHEMATIC DIAGRAM E-13EC01 FUEL POOL COOLING PUMPS SCHEMATIC DIAGRAM E-13EC02 SCHEM DIAG CCW DISCHARGE VLVS FROM FUEL POOL CLG E-13EF01 ESW TO AIR COMP ISOL VALVES SCHEMATIC DIAGRAM E-K3EF01 SCHEMATIC DIAGRAM - ESW PUMPS E-13EF02 SCHEMATIC DIAG ESW TO SW SYS ISOL VLVS E-K3EF02 SCHEMATIC DIAGRAM - TRAVELING WATER SCREENS E-13EF03 SCHEMATIC DIAG ESW TO SW SYS ISOL VLVS E-K3EF03 SCHEMATIC DIAGRAM - SCREEN WASH WATER VALVE E-13EF04 SCHEM DIAG ESW FROM COMPONENT COOLG WTR HEAT EXC E-K3EF04 SCHEMATIC DIAGRAM - ESW SELF-CLEANING STRAINER E-13EF05 SCHEMATIC DIAGRAM ESW TO COMPONENT COOLG WTR HEA E-13EF05A SCHEMATIC DIAGRAM ESW TO COMPONENT COOLING WATER HEAT EXCHANGER ISOLATION VALVE EFHV0052 E-K3EF05 SCHEMATIC DIAGRAM - SELF-CLEANING STRAINER TRASH VALVE E-13EF06 SCHEMATIC DIAG ESW TO ULTIM HEAT SINK ISOL VALVE E-K3EF06 SCHEMATIC DIAGRAM - ESW PUMP DISCHARGE AIR RELEASE VALVE E-13EF07 ESWS CONTAIN COOLER VALVE E-13EF07A SCHEMATIC DIAGRAM ESW TO CONTAINMENT AIR COOLERS ISOLATION VALVE

EFHV0032 E-K3EF07 SCHEMATIC DIAGRAM - SYSTEM BACKPRESSURE CONTROL VALVE E-13EF08 SCHEM DIAG ESW FROM CONTAIN-MENT AIR COOLERS ISOL E-K3EF08 SCHEMATIC DIAGRAM - MISCELLANEOUS CIRCUITS E-13EF08A SCHEMATIC DIAGRAM ESW TO CONTAINMENT AIR COOLERS ISOLATION VALVE

EFHV0050 E-13EF09 SCHEM DIAG ESW TO/FROM CONTAIN AIR COOL ISOL VLV E-13EF09A ESW TO/FROM CONTAIN AIR COOLERS ISOLATION VALVES E-K3EF09 SCHEMATIC DIAGRAM - STATUS PANEL CIRCUITS E-13EF10 SCHEM DIAG ESW FROM CONTAIN AIR COOLERS ISOL VLV Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 6)

DRAWING NUMBER TITLE E-K3EF10 SCHEMATIC DIAGRAM - MISCELLANEOUS CIRCUITS E-13EG01A CCW PUMPS A & B E-13EG01B CCW PUMPS C & D E-13EG01C SCHEMATIC DIAGRAM COMPONENT COOLING WATER E-13EG01D SCHEMATIC DIAGRAM E-13EG03 CCW SURGE TANK VENT E-13EG04 ESW MAKEUP TO CCW SYS E-13EG05A CCWS SUPPLY RETURN FROM NUCLEAR AUX COMPONENT E-13EG05B CCWS SUPPLY TO NUCLEAR AUX COMPONENT E-13EG05C SCHEMATIC DIAGRAM COMPONENT COOLING WATER RETURN FROM NUCLEAR AUX.

COMPONENT EGHV0015 E-13EG05D SCHEMATIC DIAGRAM COMPONENT COOLING WATER SUPPLY FROM NUCLEAR AUX.

COMPONENT EGHV0054 E-13EG06 CCW TO CONTAINMENT ISO VALVES E-13EG07 CCW SUPPLY TO RHR HEAT EXCHANGER E-13EG07A COMPONENT COOLING WATER SUPPLY TO RHR HEAT EXCHANGER EGHV0102 E-13EG08 CCW SUPPLY RETURN FROM RADWASTE BLDG E-13EG09 CCW CONTAINMENT ISO VALVES E-13EG10 CONTAINMENT ISO VALVE RETURN FROM THERM BAR COOL E-13EG16 CCW HEAT EXCHANGER OUTLET TEMP CONT VALVES E-13EG17 SCHEMATIC DIAGRAM ISOMETRIC VALVES E-13EG18 SCHEMATIC DIAGRAM ISOMETRIC VALVES E-13EG19 SCHEMATIC DIAGRAM ISOMETRIC VALVES E-13EG20 SCHEMATIC DIAGRAM ISOMETRIC VALVES E-13EJ01 RESIDUAL HEAT REMOVAL PUMPS 1 & 2 SCHEM DIAGRAM E-13EJ02 NUCLEAR SAMPLE LINE VALVES SCHEMATIC DIAGRAM E-13EJ03 RHR CROSS CONNECT VALVES SCHEMATIC DIAGRAM E-13EJ04A RHR PUMP TO CHG PUMP VLV SCH DIA E-13EJ04B RHR PUMP TO CHARGING PUMP VALVE E-13EJ05A RHR PUMP TO CHG PUMP VLV SCH DIAG E-13EJ05B RHR LOOP INLET ISO VALVE E-13EJ06A RHR PUMP TO CHG PUMP VLV SCH DIAG E-13EJ06B SUMP TO RESIDUAL HEAT REMOVAL PUMP Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 7)

DRAWING NUMBER TITLE E-13EJ07 RESIDUAL HEAT REMOV HOT & COLD LEG TEST LINE E-13EJ08 RESIDUAL HEAT REMOV MINI FLOW VALVES E-13EJ08A SCHEMATIC DIAGRAM RESIDUAL HEAT REMOVAL PUMP MINIFLOW VALVE

EJFCV0611 E-13EJ09A RHR COLD & HOT LEG VALVES E-13EJ09B RHR COLD & HOT LEG VALVES E-13EJ09C SCHEMATIC DIAGRAM RHR TO COLD AND HOT LEG VALVES EJHV8809B AND EJHV8840 E-13EJ13 SCHEMATIC DIAGRAM E-13EJ14 SCHEMATIC DIAGRAM E-13EM01 HIGH HEAD SAFETY INJECTION SCHEMATIC E-13EM02 BORON INJ TANK DISCH & INLET ISOLA VALVES E-13EM02A SCHEMATIC DIAGRAM BORON INJECTION TANK DISCHARGE & INLET ISOLATION VALVE EMHV8801B E-13EM02B SCHEMATIC DIAGRAM BORON INJECTION TANK DISCHARGE ISOLATION VALVE

EMHV8803B E-13EM02C SCHEMATIC DIAGRAM BORON INJECTION TANK DISCHARGE AND INLET ISOLATION

VALVE EMHV8801A E-13EM03 SIS MINI FLOW ISOLATION VALVES

E-13EM04 SAFETY INJ & CHARGING PUMPS HOT

& COLD LEG TEST E-13EM04A SCHEMATIC DIAGRAM CHARGING PUMPS COLD LEG E-13EM08 SUCTION HEADER & SAFETY INJ CROSS CONNECTION E-13EM09 SAFETY INJECTION PUMP SUCTION VALVES E-13EM11 SAFETY INJECTION PUMP TO HOT LEG MOV E-13EM12 ACCUMULATOR FILL LINE & TEST HEADER LINE E-13EM13A SAFETY INJ PUMP TO HOT & COLD LEGS E-13EM13B SAFETY INJ PUMP TO HOT & COLD LEGS E-13EM17 SCHEMATIC DIAGRAM E-13EN01 CONTAINMENT SPRAY SYS SCHEMAT DIAG E-13EN02 CONTAINMENT SPRAY PUMP SUCT SCHEMATIC DIAGRAM E-13EN03 CONT SPRAY P.P ISOLATION SCH DIAG E-13EN04 CONT SPRAY PP ISO DIAG E-13EP01 ACCUMULATOR N2 SUPP ISO VLV E-13EP02A ACCUMULATOR ISO VLV E-13EP02B ACCUMULATOR ISO VLV E-13EP07 SD ACCUMULATOR ISO VLV E-13EP09 SAFETY DRY ACCUMULATOR VENT VLVS Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 8)

DRAWING NUMBER TITLE E-13FC21 SCH DIAG SGFP E-13FC23 SCH DIAG AUX WATER TURB TRIP

& THROTTLE VALVE E-13FC24 SCH DIAG AUX WATER TURB TRIP

& THROTTLE VALVE E-13FC25 SCH DIAG AUX WATER TURB TRIP

& THROTTLE VALVE E-13FC26 SCH DIAG AUX WATER TURB TRIP

& THROTTLE VALVE E-13FC27 SGFPT ISOLATION INPUT TO ESFAS E-K3GD01 SCHEMATIC DIAGRAM - ESW PUMP ROOM SUPPLY FANS E-K3GD02 SCHEMATIC DIAGRAM - ESW PUMP ROOM UNIT HEATERS E-K3GD03 SCHEMATIC DIAGRAM - ESW PUMP ROOM EXHAUST VALVE E-K3GD04 SCHEMATIC DIAGRAM - ESW PUMP ROOM MISCELLANEOUS CIRCUITS E-K3GD05 SCHEMATIC DIAGRAM - ESW VALVE PIT UNIT HEATER E-13GE18 COND AIR REMOVAL FILTER SYS DAMPERS E-13GF01 AUX FDWTR PUMP RM COOLS FANS E-13GF07 MAIN STREAM ENCL BLDG EXHAUST FANS & DAMPERS E-13GF08 TENDON GALLERY SUPPLY/RETURN ISOL DAMPERS E-13GF13 MAIN STEAM ENCLOSURE BLDG MISC DAMPERS E-13GF14 MISC MOTOR SPACE HEATERS E-13GG01 EMERGING EXHAUST FAN & DIS-CHARGE DAMPERS E-13GG02 SPENT FUEL PUMP ROOM COOLERS E-13GG03 EMERGENCY EXHAUST HTG COILS E-13GG08 FUEL BLDG ISOL DAMPERS OUTSIDE AIR SUPPLY E-13GG09 FUEL BLDG EXHAUST TO EMERG FILT ADSORB UNITS ISO E-13GG10 EMERG FILTER ADSORB UNITS AUX BLDG INTAKE ISOL E-13GG11 SPENT FUEL POOL DISCHARGE TO AUX BLDG DAMPER E-13GG12 FUEL BLDG INSTRUMENTATION E-13GG15 EMERG EXHAUST CROSS CONNECTION DAMPER E-13GG17 SPENT FUEL POOL NORMAL/EMRGNCY EXHAUST RADIOACTIVITY SAMPLE

Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 9)

DRAWING NUMBER TITLE E-13GG18 MANUAL INITIATION FUEL BLDG ISOL SIGNAL E-13GK01A SCHEMATIC DIAG CONTROL ROOM FAN DAMPER E-13GK01B CONTROL ROOM HVAC SYSTEM E-13GK02A CONTROL ROOM A/C UNIT FAN E-13GK02B CONTROL ROOM A/C UNIT FAN E-13GK02C CONTROL ROOM A/C UNIT SUP E-13GK03A FIRE ISOLATION DAMPERS E-13GK03B MISCELLANEOUS DAMPERS E-13GK07 MISCELLANEOUS DAMPERS E-13GK09A ISO DAMPERS E-13GK09B ISO DAMPERS E-13GK10A CONTROL ROOM PRESSURIZATION FAN & SUP DAMPERS E-13GK10B CONTROL ROOM PRESSURIZATION FAN

& SUPPLY DAMPERS E-13GK11 SCH DIAG CONTROL ROOM E-13GK13 CLASS IE ELE A/C UNIT E-13GK13A SCHEMATIC DIAGRAM E-13GK17 SCH DIAGRAM ISO DAMPERS E-13GK19 SCH DIAGRAM AIR RETURN CONT RM ASB UNITS E-13GK23 SCH DIAG FIRE ISO DAMPERS E-13GK25 SCH DIAGRAM MISCELLANEOUS ALARMS E-13GK28 CONTROL ROOM HVAC SYSTEM E-13GK30A ISOLATION DAMPERS E-13GK30B ISOLATION DAMPERS E-13GK31 FIRE SIGN ISOMETRIC E-13GL02 AUX BLDG SUPPLY AIR UNIT SUPPLY DAMPERS E-13GL05 PUMP ROOM COOLERS E-13GL06 PUMP ROOM COOLERS E-13GL12 PENETRATION ROOM COOLERS E-13GL12A PENETRATION ROOM COOLER E-13GL14 SCH DIAGRAM ISOL DAMPERS E-13GL14A SCHEMATIC DIAGRAM E-13GL16 FUEL BLDG NORMAL EXHAUST ISOL DAMPERS E-13GL27 CCW PUMP ROOM EXHAUST DAMP E-13GL30 ISOLATION DAMPERS E-13GM01 DIESEL GENERATOR VENTILATION SUPPLY FANS SCHEM E-13GM02 DIESEL GENERATOR SUPPLY DAMPER CONTROL & MISC AL E-13GM04 DIESEL GENERATOR BLDG EXHAUST DAMPERS SCHEMATIC E-13GM04A SCHEMATIC DIAGRAM

Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 10)

DRAWING NUMBER TITLE E-13GN01 HYDROGEN MIXING FANS E-13GN02 CONTAINMENT COOLER FANS E-13GN02A SCHEMATIC DIAGRAM MISC FAN SPACE HEATER E-13GN03 CRDM COOLING FANS & DISCHARGE DAMPERS E-13GN09 MISC FAN SPACE HTRS E-13GS01A SCHEMATIC DIAGRAM E-13GS01B SCHEMATIC DIAGRAM E-13GS02A SCHEMATIC DIAGRAM E-13GS02B SCHEMATIC DIAGRAM E-13GS03 SCHEMATIC DIAG E-13GS04 SCHEMATIC DIAG E-13GS05 SCHEMATIC DIAG E-13GS06 SCHEMATIC DIAG E-13GS07 SCHEMATIC DIAG E-13GS10 SCHEMATIC DIAGRAM E-13GS11 SCHEMATIC DIAGRAM E-13GS12 SCHEMATIC DIAGRAM E-13GS13 SCHEMATIC DIAGRAM E-13GS14 SCHEMATIC DIAGRAM E-13GT03 CONTAINMENT PURGE SYSTEM SCHEMATIC E-13GT04 CONTAINMENT PURGE SYSTEM SCHEMATIC E-13GT05 MINI PURGE FAN SCHEMATIC E-13GT06 SCH DIAGRAM CON PUR SUP EX DM E-13GT13 CTMT PURGE EXHAUST SMPL VLVS E-13HB02 REACTOR COOLANT DRAIN TK PUMP DISC & VENT ISOL VALVE E-13HB03 REACTOR COOLANT DRAIN TK VENT ISOL VLV E-13HB19 REACTOR COOLANT DRAIN TK PUMP DISCH VLV E-13JE01 EMERGENCY FUEL OIL TRANSFER PUMPS E-13JE01A SCHEMATIC DIAGRAM EMERGENCY FUEL OIL TRANSFER PUMP PJE01B E-13JE02 MISC CIRCUITS E-13JE03 FIRE SIGNAL ISOL RELAY E-13KA01A SCH DIA AIR COMPR ISOL CIRCUIT BREAKER E-13KA02 SCH DIA COMPRESSED AIR CONTAIN-MENT ISO VLV E-13KA04 SCH DIA HYDROGEN CONTR SYST MAKE-UP AIR VALVE E-13KC08 FIRE PROTECTION SYSTEM ISO VLV E-13KJ01A DIESEL GEN KKJ01A ENG CON SCH E-13KJ01B DIESEL GEN KKJ01A ENG CON SCH E-13KJ02 S.D. DIESEL GEN CONTROLS E-13KJ03A DG KKJ01B ENG CON SCH

Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 11)

DRAWING NUMBER TITLE E-13KJ03B DG KKJ01B ENG CON SCH E-13KJ04 DG KKJ01B ANNUN MISC CKTS SCH DIAG E-13KJ05 JKT COOL & LUBE OIL LEVEL CON E-13KJ06 DIESEL GEN KKJ01B GOV CON E-13KJ07 DIESEL GEN KKJ01B GOV CON E-13KJ08 STANDBY JKT COOL HTR E-13KJ09 STANDBY JKT COOL CIRC PMP E-13KJ10 STANDBY LUBE OIL HTR E-13KJ11 SCH DIAGRAM LUBE OIL KEEP WARM PUMP E-13KJ12 SCH DIAG GEN SPACE HEATER E-13KJ13 ROCKER ARM PRE LUBE PUMP E-13KJ16 DIESEL GEN RTD'S THERMOCOUPLES E-13KJ20 STANDBY D/G STARTING AIR SYSTEM E-13LF07 SUMP DISCHARGE VALVES E-13LF08 SUMP PUMP DISCHARGE ISOLATION VALVE E-13LF09A REACTOR BLDG SUMP PUMP DISCHARGE

ISO VLVS E-13LF09B REACTOR BLDG SUMP PUMP DISCHARGE

ISO VALVES E-13NB01 LOWER MED VOLTAGE SYS CLASS IE 4.16 KV 3/L METER E-13NB02 LOWER MED VOLTAGE SYS CLASS IE 4.16 KV 3/L METER E-13NB03 LOWER MED VOLTAGE SYS CLASS IE 4.16 KV 3/L METER E-13NB04 LOWER MED VOLTAGE SYS CLASS IE 4.16 KV 3/L METER E-13NB05 LOWER MED VOLTAGE SYS CLASS IE 4.16 KV 3/L METER E-13NB06 LOWER MED VOLTAGE SYS CLASS IE 4.16 KV 3/L METER E-13NB10 SCHEMAT DIAGRAM FEEDER BRKR 13.8 KV E-13NB11 SCHEMAT DIAGRAM FEEDER BRKR 13.8 KV E-13NB12 SCHEMAT DIAGRAM FEEDER BRKR 13.8 KV E-13NB13 SCHEMAT DIAGRAM FEEDER BRKR 13.8 KV E-13NB14 SCHEMAT DIAGRAM FEEDER BRKR 13.8 KV E-13NB15 SCHEMAT DIAGRAM FEEDER BRKR 13.8 KV E-13NE01 STANDBY GENER. SYS. 3/L M&R DIAG E-13NE02 STANDBY GENER. SYS. 3/L M&R DIAG

Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 12)

DRAWING NUMBER TITLE E-13NE10 SCHEMATIC DIAGRAM E-13NE11 SCHEMATIC DIAGRAM E-13NE12 STANDBY GEN SYS E-13NE13 STANDBY GEN SYS E-13NF01 LOAD SHEDDER AND LOAD SEQUENCER E-03NG01 CLASS IE LOW VOLTAGE SYSTEM 3/L M&R E-K3NG01 LOW VOLTAGE SYSTEM CLASS IE 480 V THREE LINE METER & RELAY DIAGRAM E-03NG10 CLASS IE 4.16 KV LC XFMR FDR BKRS E-K3NG10 SCHEMATIC DIAGRAM 4.16 KV TRANSFORMER FEEDER BREAKERS E-03NG10A SCHEMATIC DIAGRAM E-03NG11 BREAKER CLASS IE LOW VO E-03NG11A SCHEMATIC DIAGRAM E-03NG11B SCHEMATIC DIAGRAM 480 V LC MAIN FEEDER E-03NG12 SCHEMATIC DIAG 480 V LC TIE BREAKER MISC COMP INPU E-03NK10 125 VDC & 250 VDC POW SYS SCHEMATICS E-03NK11 125 VDC CLASS IE POWER SYSTEM E-13NN01 CLASS IE INSTRUMENT AC SCHEMATIC E-13PA02 HIGH MED VOLT SYS 13.8 KV 3/L M&R E-13PA05 HIGH MED VOLT SYS MED 3/L M&R E-03PG05 NON-CLASS IE L.V. SYSTEM 3/L M&R E-03PG12 NON-CLASS IE L.V. SYSTEM SCHEMATIC E-03PG12A SCHEMATIC DIAGRAM E-13PG15B 480 V & LC TIE BKR SCHEMATIC E-03PJ11 250 VDC POW SYS SCHEMAT E-13PN01 NON CLASS IE INST AC LINE DIAG E-03QB01 STANDBY LIGHTING SYSTEM PWR FDRS E-K3QB01 SCHEMATIC DIAGRAM STANDBY LIGHTING SYSTEM POWER FEEDER E-03QB02 STANDBY LIGHTING SYSTEM PWR FDRS E-13SB12A REACTOR TRIP & SAFETY INJEC SWITCHES E-13SB12B REACTOR TRIP AND SAFETY INJECT SWITCHES E-13SB13 SCH DIAG SPRAY ACTUATION &

CTMT ISO SWITCHES E-03SB14 SCH DIAG SWITCH DEVEL E-13SB15 CONTROL BOARD SWITCHES

Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 13)

DRAWING NUMBER TITLE E-13SB17 SAF INJ (RWST) RESET SWITCH/

SWITCHOVER STATUS INDICATOR E-13SB19 SCHEMATIC DIAGRAM E-13SJ01 NUC SAMP SYS CTMT ISO VLVS E-13SJ02 NUC SAMP SYS SCHEMAT CTMT ISO VLVS E-13SJ05 NUCLEAR SAMPLE SYSTEM E-13SJ06 NUCLEAR SAMPLE SYSTEM E-13SJ07 NUCLEAR SAMPLE SYSTEM ISO VLVS E-13SJ09 SCHEMATIC DIAGRAM E-13SJ11 SCHEMATIC DIAGRAM E-1R0223 RACEWAY PLAN - STATION SERVICE AND STARTUP XFMR AREA E-0R0224 RACEWAY PLAN - ESF TRANSFORMER AREA E-1R3211 RACEWAY PLAN CONTROL BLDG.

AREA 1 E-1R3221 RACEWAY PLAN - COMMUNICATION CORRIDOR AREA - 2 EL. 1974'-0" AND EL. 1984'-0" E-1R3321 RACEWAY PLAN - COMMUNICATION CORRIDOR AREA - 2 EL. 2000'-0" E-1R4321 RACEWAY PLAN - TURBINE BUILDING AREA - 2 EL. 2000'-0" E-1R4331 RACEWAY PLAN - TURBINE BUILDING AREA - 3 EL. 2000'-0" J-020101 SYMBOLS & LEGEND FOR LOGIC DIAGRAMS J-02AB01 CONTROL LOGIC DIAGRAM J-02AB02 MN STM ATMOS VENT VLVS INDICATING LIGHTS J-02AB02A CONTROL LOGIC DIAGRAM J-02AB02B CONTROL LOGIC DIAGRAM J-02AB03 MAIN STEAM SUPPLY TD AUX FEED-WATER PUMP J-12AB04 MAIN STEAM LINE DRAIN VALVES J-02AB10 MAIN STEAM SYSTEM BYPASS VALVE AUX FDWTR PUMP J-02AB12 MAIN STEAM STOP VALVE BYPASS VALVE J-02AC06 MAIN TURBINE TRIP LOGIC LEGENDS

& NOTES J-02AC07 MAIN TURBINE TRIP BLOCK DIAGRAM J-02AC08 MAIN TURBINE TRIP LOGIC DIAGRAM J-12AC09 CONTROL LOGIC DIAGRAM J-12AE08 STEAM GENERATOR CHEMICAL INJEC VALVE J-02AL01 MOTOR DRIVEN AUX FEEDWATER PUMPS

Rev. 27 WOLF CREEK TABLE 1.7-1 (SHEET 14)

DRAWING NUMBER TITLE J-02AL01A CONTROL LOGIC DIAGRAM AUX FW SYSTEM J-02AL01B CONTROL LOGIC DIAGRAM AUX FW SYSTEM J-02AL02 AUX FDWTR SYS SUPPLY FROM COND STORAGE TANK J-02AL02A CONTROL LOGIC DIAGRAM J-02AL03 AUX FEEDWATER PUMPS DISC CONTROL VALVES J-12AL04 AUX FEEDWATER PUMPS SUPPLY ESWS SYSTEM J-12AL04A CONTROL LOGIC DIAGRAM J-12AL05 AUX FEEDWATER SYS PUMPS SUCTION DISC PRESS ALAR J-02AL06 CONTROL LOGIC DIAGRAM J-02AL07 CONTROL LOGIC DIAGRAM J-02BB01 REACTOR COOLANT SYSTEM RCP THERM BAR ISO VALVE J-02BM01 STEAM GENERATOR BLOWDOWN LOGIC DIAG CTMNT VLVS J-02BM04 STU BEN BLOWDOWN ISOLATION VALVES J-02BN01 BORON REFUELING WATER STORAGE RWST HEATER VALVE J-02BN02 STEAM CONTROL VALVE J-12EC01 FUEL POOL COOLING & CLEANUP SYSTEM J-02EC02 FUEL POOL COOL CLEANUP SYS DIXC VLV HEAT EXCHAN J-12EC05 SYSTEM ALARMS J-12EF01A ESWS MOTOR OPERATED ISOLATION VALVES J-K2EF01A ESWS LOGIC DIAGRAM J-02EF01B ESWS MOTOR OPERATED ISOLATION VALVES J-K2EF01B ESWS LOGIC DIAGRAM J-02EF02 ESWS AIR COMPRESSORS ISOLATION VALVES J-K2EF02A ESWS ESW PUMPS LOGIC DIAGRAM J-K2EF02B ESWS ESW PUMP LUBE VALVE LOGIC DIAGRAM J-12EF03 ESWS CTMT AIR COOLERS ISOLATION VALVES J-K2EF03A ESWS SELF-CLEANING STRAINER LOGIC DIAGRAM J-K2EF03B ESWS SELF-CLEANING STRAINER LOGIC DIAGRAM J-12EF04 ESWS CTMT AIR COOLERS ISOL VALVE BYPASS VALVE

Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 15)

DRAWING NUMBER TITLE J-12EF05 ESWS MOTOR OPERATED ISOLATION VALVES J-K2EF06 ESWS ESW PUMP DISCHARGE AIR RELEASE VALVE LOGIC DIAGRAM J-02EF07 CONTROL LOGIC DIAGRAM STR SYS ESWS J-K2EF07 ESWS BACKPRESSURE CONTROL VALVE LOGIC DIAGRAM (VOID) J-02EG01A COMPONENT COOLING WATER SYSTEM PUMPS J-02EG01B COMPONENT COOLING WATER SYSTEM PUMPS J-02EG01C CONTROL LOGIC DIAG COOL WTR SYSTEM J-12EG02 CCWS DEMIN WATER MAKEUP CCW SURGE TANK J-02EG04 CCW ESWS MAKE-UP SURGE TANK VENT J-02EG05A CCWS SUPPLY RETURN NUCLEAR AUX CMPNT SHEET A J-02EG05B CCWS SUPPLY RETURN NUCLEAR AUX CMPNT J-02EG05C CCWS SUP RTRN NUC AUX CMPNT VLV POSITION ALARM J-02EG06 CCWS HX'S DISC TEMP ALARM RHR HX'S FLOW ALARM J-02EG07 CCWS SUPPLY RHR HX'S J-12EG08A CCWS SUPPLY RETURN RADWASTE BLDG J-12EG08B CCWS SUPPLY RETURN RADWASTE BLDG J-12EG09 CCWS CONTAINMENT ISOLATION VALVE J-12EG10 CCWS INSIDE CTMT ISO VLV RTRN THRM BAR COOL CO J-02EG11 CCWS HEAT EXCHANGER OUTLET TEMP CONT J-12EG13A CONTROL LOGIC DIAGRAM J-02EG13B CONTROL LOGIC DIAGRAM J-12EG13C CONTROL LOGIC DIAGRAM J-12EG14 CONTROL LOGIC DIAGRAM J-02EJ01 RESIDUAL HEAT RMVL SYS NUC SAMP SYS VALVE J-02EJ03 RESIDUAL HEAT REMOVAL CONTROL LOGIC DIAGRAM J-02EJ04 CONTROL LOGIC DIAGRAM J-02EN01 CONTAINMENT SPRAY SYS CONTAIN SPRAY PUMPS J-02EN02 CONT SPRAY SYSTEM CTMT RECIRC SUMP ISOL VALVE

Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 16)

DRAWING NUMBER TITLE J-12EN03 CONT SPRAY SYSTEM SPRAY ADD TANK ISOL VLVS J-12EN04 CONT SPRAY SYSTEM SPRAY ADD TANK ALARMS J-02EN05 CONT SPRAY SYSTEM CTMT SPRAY NOZZLES ISOL VLV J-02FC18 AUX TURB AFP STEAMLINE WATER TRAP DRAIN J-02FC19 CONTROL LOGIC DIAGRAM J-K2GD01 ESSENTIAL SERVICE WATER PUMPHOUSE HVAC SUPPLY FANS LOGIC DIAGRAM J-K2GD02 ESSENTIAL SERVICE WATER PUMPHOUSE HVAC UNIT HEATER LOGIC DIAGRAM J-02GE08 TURB BLDG HVAC LOGIC DIAG COND AIR REMVL FILTER J-02GF03 MISC BLDG HVAC MAIN STM BLDG SUP EXH DAMPER J-12GF06 MISC BLDG HVAC TENDON GALL SUP RETURN DAMPER J-12GF06A CONTROL LOGIC DIAGRAM MISC. BUILDING HVAC J-12GF07 MISC BLDG HVAC FDWTR PUMP ROOM COOLER FANS J-12GF09A CONTROL LOGIC DIAGRAM MISC. BUILDING HVAC J-12GF09B CONTROL LOGIC DIAGRAM MISC. BUILDING HVAC J-02GG04 FB HVAC ISOLATION DAMPERS J-02GG05 FUEL BLDG SPENT FUEL POOL ROOM COOLERS J-12GG06 FB HVAC FILTER UNITS INTAKE ISOL DAMPERS J-02GG07 FB HVAC FILTER UNITS AUX BLDG ISOLATION DAMPERS J-02GG08 FB HVAC MANUAL INITIATION OF FBIS J-02GG09 FB HVAC SPENT FUEL POOL DISC J-02GG10A FB HVAC EMERGENCY EXHAUST FAN J-02GG13 FB HVAC EMERGENCY EXHAUST CROSS CONNENC DAMPERS J-02GG14A FUEL BLDG HVAC SPENT FUEL POOL J-02GG14B FUEL BLDG HVAC SPENT FUEL POOL J-12GK01A LOGIC DIAG CONTROL ROOM FILTRATION FAN J-12GK01B FILTER ABSORBER UNIT SUPPLY J-12GK01C FILTER ABSORBER UNIT DISK DAMPER J-12GK01D CONTROL ROOM RECIRC DAMPERS CONTROL BLDG HVAC

Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 17)

DRAWING NUMBER TITLE J-12GK01E CONTROL BLDG HVAC CONTROL A/C UNIT DISCHARG DMP J-02GK02A CONTROL ROOM A/C UNIT FAN & TEMP J-02GK02B CONTROL ROOM A/C UNIT SUPPLY DAMPER J-02GK02C CONTROL BLDG HVAC CONT ROOM A/C UNIT DISC DAMPE J-02GK03A CONTROL BLDG HVAC FIRE ISO- LATION DAMPERS J-02GK07 MISC DAMPERS J-02GK09 ISO DAMPERS J-12GK10A CONTROL ROOM PRESS FAN J-12GK10B CONTROL ROOM PRESS SUPPLY DAMPER J-12GK10C CONT BLDG HVAC CONT ROOM PRESS SYS UNIT SUP DAM J-12GK11 CONTROL ROOM PRESS SYSTEM FIL UNIT J-12GK13 CLASS IE ELEC EQUIP A/C UNIT J-12GK15 CHLORINE ALAR J-12GK17A CONTROL LOGIC DIAGRAM CONTROL BLDG HVAC J-12GK17B CONTROL LOGIC DIAGRAM CONTROL BLDG HVAC J-02GK19 CONT BLDG HVAC RETRN DAMPERS RM FLTR ABSORB UNI J-02GK23 CONTROL BLDG HVAC FIRE ISO DAMPERS J-02GK25 CONTROL LOGIC DIAGRAM FOR CONTROL BLDG HVAC J-02GK26 CONTROL LOGIC DIAGRAM FOR CONTROL BLDG HVAC J-02GK27 CONTROL LOGIC DIAGRAM FOR CONTROL BLDG HVAC J-02GL01A AUX BLDG HVAC AIR SUPPLY UNIT J-02GL01B AUX BLDG HVAC AIR SUPPLY J-12GL03A AUX BLDG HVAC MISC ROOM COOLERS J-12GL03B AUX BLDG HVAC MISC ROOM COOLER J-12GL03C AUX BLDG HVAC MISC ROOM COOLER J-12GL11 AUX BLDG HVAC PENE RM COOLER FANS J-02GL13 AUX BLDG HVAC ISO DAMPERS J-02GL15 AUX BLDG HVAC FUEL BLDG HVAC DISCH ISO DAMPERS J-02GL21 AUX BLDG HVAC CCW PUMP ROOM EXH DAMPERS J-12GL23 AUX BLDG HVAC AUX/FUEL BLDG EXH FANS DISC

Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 18)

DRAWING NUMBER TITLE J-12GM01A DIESEL GENERATOR BLDG HVAC FAN & DAMPER J-02GM01B DIESEL GENERATOR BLDG EXH DAMPERS J-12GN01 CONTAINMENT COOLING J-12GN02A CONTROL LOGIC DIAGRAM CONTAINMENT COOLING SYS J-12GN02B CONTROL LOGIC DIAGRAM CONTAINMENT COOLING SYS J-02GN03A CONTAINMENT COOLING FANS J-02GS02 CTMT HYDROGEN CONTROL THERMAL HYDROGEN RECOM J-02GS03 CTMT HYDROGEN CONTROL SOLENOID ISO VLV J-02GS06 CTMT HYDROGEN CONTROL PURGE SUBSYS ISO VLV J-02GS08 CONTROL LOGIC DIAGRAM J-02GS09 CONTROL LOGIC DIAGRAM J-02GS10 CONTROL LOGIC DIAGRAM J-02GT03 CONTAINMENT PURGE SYSTEM VALVES J-02GT06 CONTAINMENT PURGE SYS ISO DAMPERS J-02GT10 CONTROL LOGIC DIAGRAM J-12JE01 EMERGENCY FUEL OIL TRANSFER PUMPS J-12JE02 CONTROL LOGIC DIAGRAM J-02KA02 COMPRESSED AIR SYS COMP AIR CONTAIN ISO VALVE J-02KA03 COMPRESSED AIR SYS HYDROGEN CS M/U AIR VALVE J-02KA08 CONTROL LOGIC DIAGRAM COMPRESSED AIR SYSTEM J-02KC08 CONTROL LOGIC DIAG FIRE PROTECTION SYSTEM J-12KJ02 CONTROL LOGIC DIAGRAM J-02KJ03 CONTROL LOGIC DIAGRAM J-12LF03 FLOOR & EQUIP DRAINS REACT BLDG SUMP PUMP ISO VL J-02LF04 FLOOR & EQUIP DRAINS REACT BLDG SUMP PMP ISO VLV J-02LF08 FLOOR & EQUIP DRAINS DISCHARGE VALVES J-02RP01 CONTROL LOGIC DIAGRAM J-02RP01A CONTROL LOGIC DIAGRAM J-12SA03 CONTROL LOGIC DIAGRAM J-12SA04 CONTROL LOGIC DIAGRAM J-12SA05 CONTROL LOGIC DIAGRAM J-02SJ01 NUC SYSTEM CON ISOLATION VALVES J-02SJ03 CONTROL LOGIC DIAGRAM

Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 19)

DRAWING NUMBER TITLE J-14001 CONTROL ROOM EQUIPMENT ARRANGEMENT J-14002 REACT COOL SUPRT SYSTEM CONSOLE RL001 & RL002 J-14003 REACTOR OPERATORS CONSOLE RL003 & RL004 J-14004 TURB GEN & FEEDWATER CONSOLE RL005 & RL006 J-14005 SITE RELATED MAIN CONT BOARD RL013 & RL014 J-14006 STATION ELEC DIST MAIN CONT BOARD RL015 & RL016 J-14007 ENG SAFETY FEATURES MAIN CONT BOARD RL017 & RL018 J-14008 ENG SAFETY FEATURES MAIN CONT BOARD RL019 & RL020 J-14009 REACT AUX MAIN CONTROL BOARD RL021 & RL022 J-14010 TURBOGENERATORS & FDWTR MAIN CONT BD RL023 & RL024 J-14011 TURBOGENERATORS & FDWTR MAIN CONT BD RL025 & RL026 J-14013 END SECTION MAIN CONT BRD RL011 & RL012 J-04014 MAIN CONTROL BOARD DETAILS J-04015 OPERATORS CONSOLE DETAILS J-14016 BILL OF MAT MAIN CONTROL PANEL J-05001 AUX CONTROL PANEL DWGS J-05002 AUX SHUTDOWN PANEL DETAILS J-05003 AUX SHUTDOWN PANEL RP 118 7 SHTS J-05021 LOCAL CONT PANEL RPO 68 MISC BOP INST PANEL J-15023 MISC BOP INST PANEL RP068 BILL OF MAT J-K5041 ESSENTIAL SERVICE WATER PANEL (EF 155 & EF 156) DRAWING J-K5042 ESSENTIAL SERVICE WATER PANEL (EF 155) BILL OF MATERIAL J-K5043 ESSENTIAL SERVICE WATER PANEL (EF 156) BILL OF MATERIAL J-16002 ANN WINDOW ARRGT RK016.018.020 J-16003 ANN WINDOW ARRGT RK022.024.026

Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 20)

DRAWING NUMBER TITLE M-761-0066 Through 0104 and 0459, 0460, 0494 (8756d37*) PROCESS CONTROL BLOCK DIAGRAM (1 THROUGH 42)

M-762-0001 NIS SOURCE RANGE FUNCTIONAL (5655D49*) BLOCK DIAGRAM

M-762-0002 NIS INTERMEDIATE RANGE (5655D50*) FUNCTIONAL BLOCK DIAGRAM

M-762-0417 NIS POWER RANGE FUNCTIONAL (9552D32*) BLOCK DIAGRAM

M-762-0032 NIS AUXILIARY CHANNELS (5655D52*) FUNCTIONAL BLOCK DIAGRAM

M-767-221 THROUGH 240 (8761D17*) SAFEGUARDS TEST CABINET (1 THROUGH 20)

J-104-00347 INSTRUCTION MANUAL ESFAS/LSELS J-104-00437 SIGNAL FLOW BLOCK DIAGRAM FOR THE ENGINEERED SAFETY FEATURES ACTUATION SYSTEMS (SHEET 1) J-104-00438 ISOLATION AND DISTRIBUTION OF ANALOG SIGNALS TO COMPUTER (ESFAS SHEET lA) J-104-00439 CHANNEL IV BLOCK DIAGRAM (ESFAS SHEET 2) J-104-00440 CHANNEL II BLOCK DIAGRAM (ESFAS SHEET 3) J-104-00441 ATI BLOCK DIAGRAM (ESFAS SHEET 4) J-104-00442 BISTABLE RACK - CHANNEL I (ESFAS SHEET 5) J-104-00443 ISOLATION RACK - CHANNEL I (ESFAS SHEET 6) J-104-00444 ACTUATION INPUTS - CHANNEL I (ESFAS SHEET 7) J-104-00445 ACTUATION OUTPUTS AND STATUS INDICATIONS - CHANNEL I (ESFAS SHEET 8) J-104-00446 ANNUNCIATOR/COMPUTERS OUTPUTS - CHANNEL I (ESFAS SHEET 9)

  • Drawings suplied by NSSS Vendor.

Rev. 15 WOLF CREEK TABLE 1.7-1 (SHEET 21)

DRAWING NUMBER TITLE J-104-00447 ANALOG SIGNALS - CHANNEL II (ESFAS SHEET 10) J-104-00448 ISOLATION RACK LOGIC SIGNALS - CHANNEL II (ESFAS SHEET 11) J-104-00449 RELAY OUTPUTS - CHANNEL II (ESFAS SHEET 12) J-104-00450 BISTABLE RACK - CHANNEL IV (ESFAS SHEET 13) J-104-00451 ISOLATION RACK - CHANNEL IV (ESFAS SHEET 14) J-104-00452 ACTUATION INPUTS - CHANNEL IV (ESFAS SHEET 15) J-104-00453 ACTUATION OUTPUTS AND STATUS INDICATIONS - CHANNEL IV (ESFAS SHEET 16) J-104-00454 ANNUNCIATOR/COMPUTER OUTPUTS - CHANNEL IV (ESFAS SHEET 17) J-104-00455 ATI MODULE A (ESFAS SHEET 18) J-104-00456 ATI MODULE B (ESFAS SHEET 19) J-200-00029 TURB SUPERVISORY MAIN CONT BRD RL027 & RL028

Rev. 15

WOLF CREEK TABLE 1.7-2 PIPING AND INSTRUMENTATION DIAGRAMS

Drawing Figure Number Number Sheet Title

M-120101 1.1-1 1 Symbols and Legend for System Flow and Piping

& Instrumentation Diagrams M-120102 1.1-1 2 Symbols and Legend for System Flow and Piping

& Instrumentation Diagrams M-120103 1.1-1 3 Symbols and Legend for System Flow and Piping

& Instrumentation Diagrams M-120104 1.1-1 4 Symbols and Legend for System Flow and Piping

& Instrumentation Diagrams M-12AB01 10.3-1 1 Main Steam System M-12AB02 10.3-1 2 Main Steam System M-12AB03 10.3-1 3 Main Steam System M-12AC01 10.2-1 1 Main Turbine M-12AC02 10.2-1 2 Main Turbine M-12AC03 10.2-1 3 Main Turbine M-12AC04 10.2-1 4 Main Turbine M-12AD01 10.4-2 1 Condensate System M-12AD02 10.4-2 2 Condensate System M-12AD03 10.4-2 3 Condensate System M-12AD04 10.4-2 4 Condensate System M-12AD05 10.4-2 5 Condensate System M-12AD06 10.4-2 6 Condensate System M-12AE01 10.4-6 1 Feedwater System M-12AE02 10.4-6 2 Feedwater System M-12AF01 10.4-6 3 Feedwater Heater Extraction

Drains & Vents M-12AF02 10.4-6 4 Feedwater Heater Extraction

Drains & Vents M-12AF03 10.4-6 5 Feedwater Heater Extraction

Drains & Vents M-12AF04 10.4-6 6 Feedwater Heater Extraction

Drains & Vents M-12AK01 10.4-5 1 Condensate Demineralizer

System M-12AK02 10.4-5 2 Condensate Demineralizer

System M-12AK03 10.4-5 3 Condensate Demineralizer

System

Rev. 27 WOLF CREEK TABLE 1.7-2 (SHEET 2)

Drawing Figure

Number Number Sheet Title M-12AL01 10.4-9 Auxiliary Feedwater System M-12AN01 9.2-16 Demineralized Water Storage and Transfer System M-12AP01 9.2-23 Condensate Storage and Transfer System M-12AQ01 10.4-7 1 Condensate Chemical Addition System M-12AQ02 10.4-7 2 Feedwater Chemical Addition System M-12BB01 5.1-1 1 Reactor Coolant System M-12BB02 5.1-1 2 Reactor Coolant System M-12BB03 5.1-1 3 Reactor Coolant System M-12BB04 5.1-1 4 Reactor Coolant System M-12BG01 9.3-8 1 Chemical and Volume Control System M-12BG02 9.3-8 2 Chemical and Volume Control System M-12BG03 9.3-8 3 Chemical and Volume Control System M-12BG04 9.3-8 4 Chemical and Volume Control System M-12BG05 9.3-8 5 Chemical and Volume Control System M-12BL01 9.2-13 Reactor Makeup Water System M-12BM01 10.4-8 1 Steam Generator Blowdown System M-12BM02 10.4-8 2 Steam Generator Blowdown System M-12BM03 10.4-8 3 Steam Generator Blowdown System M-12BM04 10.4-8 4 Steam Generator Blowdown System M-12BM05 10.4-8 5 Steam Generator Blowdown System M-12BN01 6.3-1 1 Borated Refueling Water Storage System M-12CA01 10.4-4 Steam Seal System M-12CF01 10.2-1 5 Lube Oil Storage, Transfer and Purification System M-12CF02 10.2-1 6 Lube Oil Storage, Transfer and Purification System M-12CG01 10.4-3 Condenser Air Removal M-12CH01 10.2-1 7 Main Turbine Control Oil System M-12CH02 10.2-1 8 Main Turbine Control Oil System

Rev. 21 WOLF CREEK TABLE 1.7-2 (SHEET 3)

Drawing Figure

Number Number Sheet Title M-12DA01 10.4-1 1 Circulating Water & Water Box Drains System M-12DA02 10.4-1 3 Circulating Water & Water Box Venting System M-12EA01 9.2-1 1 Service Water System M-12EA02 9.2-1 2 Service Water System M-12EB01 9.2-14 Closed Cooling Water System M-12EC01 9.1-3 1 Fuel Pool Cooling and Cleanup System M-12EC02 9.1-3 2 Fuel Pool Cooling and Cleanup System M-12EF01 9.2-2 1 Essential Service Water System M-12EF02 9.2-2 2 Essential Service Water System M-K2EF01 9.2-2 3 Essential Service Water System M-K2EF03 9.2-2 4 Essential Service Water System M-12EG01 9.2-15 1 Component Cooling Water System M-12EG02 9.2-15 2 Component Cooling Water System M-12EG03 9.2-15 3 Component Cooling Water System M-12EJ01 5.4-7 Residual Heat Removal System M-12EM01 6.3-1 2 High Pressure Coolant Injection System M-12EM02 6.3-1 3 High Pressure Coolant Injection System M-12EN01 6.2.2-1 Containment Spray System M-12EP01 6.3-1 4 Accumulator Safety Injection M-12FA01 9.5.9-1 1 Auxiliary Boiler System M-12FB01 9.5.9-1 2 Auxiliary Steam System M-12FB02 9.5.9-1 3 Auxiliary Steam System M-12FC02 10.4-10 Auxiliary Feedwater Pump Turbine M-12FC03 10.4-6 7 S.G.F.P. Turbine "A" M-12FC04 10.4-6 8 S.G.F.P. Turbine "B" M-12FE01 9.5.9-1 4 Auxiliary Steam Chemical Addition System M-12GA01 9.4-9 1 Plant Heating System M-12GA02 9.4-9 2 Plant Heating System M-12GB01 9.4-10 Central Chilled Water System M-K2GD01 9.4-8 1 Essential Service Water Pump House HVAC

Rev. 17 WOLF CREEK TABLE 1.7-2 (SHEET 4)

Drawing Figure

Number Number Sheet Title M-12GE01 9.4-4 1 Turbine Building HVAC M-12GE02 9.4-4 2 Turbine Building HVAC M-12GE03 9.4-4 3 Turbine Building HVAC M-12GE04 9.4-4 4 Turbine Building HVAC M-12GF01 9.4-3 1 Miscellaneous Buildings HVAC M-12GF02 9.4-3 2 Miscellaneous Buildings HVAC M-12GG01 9.4-2 1 Fuel Building HVAC M-12GG02 9.4-2 2 Fuel Building HVAC M-12GH01 9.4-5 1 Radwaste Building HVAC M-12GH02 9.4-5 2 Radwaste Building HVAC M-12GK01 9.4-1 1 Control Building HVAC M-12GK02 9.4-1 2 Control Building HVAC M-12GK03 9.4-1 3 Control Building HVAC M-12GK04 9.4-1 4 Control Building HVAC M-12GL01 9.4-3 5 Auxiliary Building HVAC M-12GL02 9.4-3 4 Auxiliary Building HVAC M-12GL03 9.4-3 3 Auxiliary Building HVAC M-12GM01 9.4-7 Diesel Generators Building HVAC M-12GN01 9.4-6 1 Containment Cooling System M-12GN02 9.4-6 2 Containment Cooling System M-12GP01 6.2.6-1 Containment Integrated Leak Rate Test M-12GR01 9.4-6 3 Containment Atmospheric Control System M-12GS01 6.2.5-1 Containment Hydrogen Control System M-12GT01 9.4-6 4 Containment Purge System HVAC M-12HA01 11.3-1 1 Gaseous Radwaste System M-12HA02 11.3-1 2 Gaseous Radwaste System M-12HA03 11.3-1 3 Gaseous Radwaste System M-12HB01 11.2-1 1 Liquid Radwaste System M-12HB02 11.2-1 2 Liquid Radwaste System M-12HB03 11.2-1 3 Liquid Radwaste System M-12HB04 11.2-1 4 Liquid Radwaste System M-12HC01 11.4-1 1 Solid Radwaste System M-12HC02 11.4-1 2 Solid Radwaste System M-12HC03 11.4-1 3 Solid Radwaste System M-12HC04 11.4-1 4 Solid Radwaste System M-12HD01 12.3-4 Decontamination System M-12HE01 9.3-11 1 Boron Recycle System M-12HE02 9.3-11 2 Boron Recycle System M-12HE03 9.3-11 3 Boron Recycle System

Rev. 17 WOLF CREEK TABLE 1.7-2 (SHEET 5)

Drawing Figure

Number Number Sheet Title M-12HF01 10.4-12 1 Secondary Liquid Waste System M-12HF02 10.4-12 2 Secondary Liquid Waste System M-12HF03 10.4-12 3 Secondary Liquid Waste System M-12HF04 10.4-12 4 Secondary Liquid Waste System M-12JE01 9.5.4-1 Emergency Fuel Oil System M-12KA01 9.3-1 1 Compressed Air System M-12KA02 9.3-1 2 Compressed Air System (Service Air)

M-12KA03 9.3-1 3 Instrument Air System M-12KA04 9.3-1 4 Instrument Air System M-12KA05 9.3-1 5 Compressed Air System M-12KA06 9.3-1 6 Compressed Air System M-12KA07 9.3-1 7 Compressed Air System M-12KB01 9.5.10-1 1 Breathing Air System M-12KB02 9.5.10-1 2 Breathing Air System M-12KB03 9.5.10-1 3 Breathing Air System M-12KC01 9.5.1-1 1 Fire Protection System M-12KC02 9.5.1-1 2 Fire Protection System M-12KC03 9.5.1-1 3 Fire Protection System M-12KC04 9.5.1-1 4 Fire Protection (Halon) System M-12KC05 9.5.1-1 5 Fire Protection System M-12KC06 9.5.1-1 6 Fire Protection (Halon) System M-12KC07 9.5.1-1 7 Fire Protection (Halon) System M-12KD01 9.2-17 1 Domestic Water System M-12KD02 9.2-17 2 Domestic Water System M-12KH01 9.3-9 1 Service Gas System M-12KH02 9.3-9 2 Service Gas System M-12KJ01 9.5.5-1 1 Standby Diesel Generator "A" Cooling Water System M-12KJ04 9.5.5-1 2 Standby Diesel Generator "B" Cooling Water System M-12KJ02 9.5.6-1 1 SDG "A" Intake, Exh., F.O. & Starting Air System M-12KJ05 9.5.6-1 2 SDG "B" Intake, Exh., F.O. & Starting Air System M-12KJ03 9.5.7-1 1 Standby Diesel Generator "A" Lube Oil System M-12KJ06 9.5.7-1 2 Standby Diesel Generator "B" Lube Oil System

Rev. 17 WOLF CREEK TABLE 1.7-2 (SHEET 6)

Drawing Figure Number Number Sheet Title

M-12LA01 9.3-5 1 Sanitary Lift Station &

Turb. Bldg. Sanitary Drainage System M-12LA02 9.3-5 2 Comm. Corridor & Control Bldg. Sanitary Drainage System M-12LD01 9.3-5 3 Chemical and Detergent Waste M-12LE01 9.3-5 4 Turb. Bldg. & Aux. Feedwater Pump Rooms Oily Waste System M-12LE02 9.3-5 5 Control & Diesel Gen. Bldg.

Oily Waste System M-12LE03 9.3-5 6 Turb. Bldg. & Aux. Boiler Room Oily Waste System M-12LE04 9.3-5 7 Tendon Access Gallery &

Turb. Bldg. Oily Waste System M-12LF01 9.3-5 8 Aux. Bldg. Floor and Equip-ment Drain System M-12LF02 9.3-5 9 Aux. Bldg. Floor and Equip-ment Drain System M-12LF03 9.3-5 10 Aux. Bldg. Floor and Equip-ment Drain System M-12LF04 9.3-5 11 Aux. Bldg. Floor and Equip-ment Drain System M-12LF05 9.3-5 12 Aux. Bldg. Floor and Equip-

ment Drain System M-12LF06 9.3-5 13 Radwaste & Fuel Bldgs.

FED System M-12LF07 9.3-5 14 Radwaste Bldg. FED System M-12LF08 9.3-5 15 Control and Fuel Bldgs.

FED System M-12LF09 9.3-5 16 Reactor Bldg. & Hot Machine Shop FED System M-12LF10 9.3-5 17 Radwaste Bldg. and Tunnel

FED System M-12RM01 9.3-4 1 Process Sampling System M-12RM02 9.3-4 2 Process Sampling System M-12RM03 9.3-4 3 Process Sampling System M-12SJ01 9.3-2 1 Nuclear Sampling System

Primary Sampling System M-12SJ02 9.3-3 Nuclear Sampling System Radwaste Sampling System M-12SJ03 9.3-2 2 Nuclear Sampling System

Primary Sampling System

Rev. 27 WOLF CREEK TABLE 1.7-2 (SHEET 7)

Drawing Figure

Number Number Sheet Title M-12SJ04 18.2-15 Nuclear Sampling System

M-12WT01 9.2-24 1 Wastewater Treatment Facility M-12WT03 9.2-25 1 Wastewater Treatment Facility

M-12VW01 9.4-11 Wastewater Treatment Facility HVAC System

M-0021 10.4-1 2 Circulating Water System M-0022 9.2-1 3 Service Water System M-0023 9.5-1 1 Fire Protection System (Site) M-0023 9.5-1 2 Fire Protection System (Site)

M-0023 9.5-1 3 Fire Protection System (Site)

M-0023 9.5-1 4 Fire Protection System (Site)

M-0025 9.2-5 1 Demineralized Water Makeup System M-0025 9.2-5 2 Demineralized Water Makeup System M-0025 9.2-5 3 Demineralized Water Makeup System M-0025 9.2-5 4 Demineralized Water Makeup System M-0025 9.2-5 4A Demineralized Water Makeup System M-0051 9.5-2 Outdoor Piping, Key Plans & General Notes

Rev. 21 WOLF CREEK TABLE 1.7-3 ADDITIONAL CONTROLLED DRAWINGS USED IN THE USAR

Drawing Figure Number Number Sheet Title A-0503 9.2-5A Potable Water System 10466-A-1701 12.3-2 1 Radiation Zones For Normal Operation 10466-A-1702 12.3-2 2 Radiation Zones For Normal Operation 10466-A-1703 12.3-2 3 Radiation Zones For Normal Operation 10466-A-1704 12.3-2 4 Radiation Zones For Normal Operation 10466-A-1705 12.3-2 5 Radiation Zones For Normal Operation 10466-A-1706 12.3-2 6 Radiation Zones for Normal Operation 10466-A-1801 9.5.1-2 1 Fire Delineation Floor Plan EL. 1974'-0" 10466-A-1802 9.5.1-2 2 Fire Delineation Floor Plan EL. 2000'-0" 10466-A-1803 9.5.1-2 3 Fire Delineation Floor Plan EL. 2026'-0" 10466-A-1804 9.5.1-2 4 Fire Delineation Floor Plan EL. 2047'-0" 8025-C-KG1202 1.2-44 Site Plan C-0L2931 9.3-7 1 Reactor Building Stainless Steal Liner Plate Reactor Refueling Canal C-1L6111 9.3-7 2 Reactor Building Stainless Steel Liner Plate Reactor Refueling Canal C-03BB53 5.4-21 Hot and Cold Leg Lateral Restraints E-1L9901 9.5.3-1 Lighting Distribution Riser Diagram E-1L9903 9.5.2-2 Public Address System Riser Diagram E-11005 8.3-2 List of Loads Supplied by the Emergency Diesel Generator E-1001 8.3-1 3 Single Line Diagram Site Area Loads E-K1001 8.3-1 2 Single Line Diagram Essential Service Water System E-11001 8.3-1 1 Main Single Line Diagram E-11010 8.3-6 1 DC Main Single Line Diagram E-11010A 8.3-7 DC Main Single Line Diagram (PK03 & PK04 Bus) E-12KJ01 8.3-5 Standby Generator Engine and Governor Control Logic Diagram

Rev. 21 WOLF CREEK TABLE 1.7-3 (Sheet 2)

Drawing Figure

Number Number Sheet Title E-12NE01 8.3-3 Logic Diagram Standby Generator Excitation Control E-12NE02 8.3-4 Logic Diagram Standby Generator System Protection E-14QE01 9.5.2-1 Telephone System Riser Diagram J-104-00390 7.3-1 2 Logic Diagram Engineered Safety Features Actuation System (BOP)

KD-7496 8.2-4 WCGS Electrical One-Line Diagram KD-7750 8.2-3 Wolf Creek Substation General Plan M-0004 10.4-1 4 Circulating Water Screenhouse Planview M-0005 10.4-1 5 Circulating Water Screenhouse Section View M-1G001 1.2-1 Peninsular Plant Arrangement Standard Power System & Structure Interface M-1G010 1.2-2 Equipment Location Radwaste Building Plan EL 1976'-0" M-1G011 1.2-3 Equipment Location Radwaste Building Plan EL 2000'-0" M-0G012 1.2-4 Equipment Location Radwaste Building Plan EL 2022'-0" M-1G013 1.2-5 Equipment Location Radwaste Building Plan EL 2031'-6" and Roof Plan M-1G014 1.2-6 Equipment Location Radwaste Building Sections A & B M-1G015 1.2-7 Equipment Location Building Sections C & E M-1G016 1.2-8 Equipment Location Building Sections D & F M-1G020 1.2-9 Equipment Location Reactor and Auxiliary Building Plan Basement EL. 1974'-0" M-1G021 1.2-10 Equipment Location Auxiliary Building Partial Plan EL. 1988'-0" and 2013'-6" M-1G022 1.2-11 Equipment Location Reactor and Auxiliary Building Plan Ground Floor Elevation 2000'-0" M-1G023 1.2-12 Equipment Location Reactor and Auxiliary Building Plan EL. 2026'-0" M-1G024 1.2-13 Equipment Location Reactor and Auxiliary Building Plan Operating Floor Elevation 2047'-6"

Rev. 21 WOLF CREEK TABLE 1.7-3 (Sheet 3)

Drawing Figure

Number Number Sheet Title M-1G025 1.2-14 Equipment Location Reactor and Auxiliary Building Plan Elevation 2068'-8" M-1G026 1.2-15 Equipment Location Reactor and Auxiliary Building Section A M-1G027 1.2-16 Equipment Location Reactor and Auxiliary Building Section B M-1G028 1.2-17 Equipment Location Reactor and Auxiliary Building Section C M-1G029 1.2-18 Equipment Location Reactor and Auxiliary Building Section D M-1G030 1.2-19 Equipment Location Auxiliary Building Sections E, F & G M-1G040 1.2-20 Equipment Location Fuel Building Plan Elevation 2000'-0", 2026'-0" and 2047'-6" M-1G041 1.2-21 Equipment Location Fuel Building Sections A, B & C M-1G042 1.2-22 Equipment Location Fuel Building Sections D, E & F M-1G050 1.2-23 Equipment Location Control Building & Communication Corridor Plan Elevation 1974'-0" & 1984'-0" M-1G051 1.2-24 Equipment Location Control and Diesel Generator Buildings &

Communication Corridor Plan Elevation 2000'-0" and 2016'-0" M-1G052 1.2-25 Equipment Location Control and Diesel Generator Buildings &

Communication Corridor Plan Elevation 2032'-0" & 2047'-6" M-1G053 1.2-26 Equipment Location Control and Diesel Generator Buildings &

Communication Corridor Plan Elevation 2061'-6", 2066'-0" &

2073'-6" & Section D M-1G054 1.2-27 Equipment Location Control and Diesel Generator Building Communication Corridor Section A M-1G055 1.2-28 Equipment Location Control and Diesel Generator Building Sections B & C M-1G060 1.2-29 Equipment Location Turbine Building Condenser Pit Plan Elevation 1983'-0" M-1G061 1.2-30 Equipment Location Turbine Building Ground Floor Plan Elevation 2000'-0"

Rev. 17 WOLF CREEK TABLE 1.7-3 (Sheet 4)

Drawing Figure

Number Number Sheet Title M-1G062 1.2-31 Equipment Location Partial Plan Elevation 2015'-4" M-1G063 1.2-32 Equipment Location Turbine Building Mezzanine Floor Plan Elevation 2033'-0" M-1G064 1.2-33 Equipment Location Turbine Building Operating Floor Plan Elevation 2065'-0" M-1G065 1.2-34 Equipment Location Turbine Building Section "A" M-1G066 1.2-35 Equipment Location Turbine Building Section "B" M-1G067 1.2-36 Equipment Location Turbine Building Section "C" M-0G068 1.2-37 Equipment Location Turbine Building Section "D" M-1G069 1.2-38 Equipment Location Turbine Building Section "E" M-0G070 1.2-39 Equipment Location Turbine Building Section "F" M-0G071 1.2-40 Equipment Location Turbine Building Section "G" M-1G072 1.2-41 Equipment Location Turbine Building Section "H" M-0G073 1.2-42 Turbine Component Laydown Area Elevation 2065'-0" M-13EN03 6.2.2-2 1 Containment Spray System Reactor Building A & B Trains M-13EN04 6.2.2-2 2 Containment Spray System Reactor Building A & B Trains M-13EN05 6.2.2-2 3 Containment Spray System Reactor Building A & B Trains M-KG080 9.2-3 ESWS Pumphouse Equipment Location - Plan M-KG081 9.2-4 ESWS Pumphouse Equipment Location - Sections M-744-00018 7.2-1 1 Functional Diagrams Index and Symbols M-744-00019 7.2-1 2 Functional Diagrams (Reactor Trip Signals)

M-744-00020 7.2-1 3 Functional Diagrams (Nuclear Instrumentation and Manual Trip Signals)

M-744-00021 7.2-1 4 Functional Diagrams (Nuclear Instrumentation Permissives and Blocks)

M-744-00022 7.2-1 5 Functional Diagrams (Primary Coolant System Trip Signals)

M-744-00023 7.2-1 6 Functional Diagrams (Pressurizer Trip Signals)

M-744-00024 7.2-1 7 Functional Diagrams (Steam Generator Trip Signals)

Rev. 21 WOLF CREEK TABLE 1.7-3 (Sheet 5)

Drawing Figure

Number Number Sheet Title M-744-00025 7.2-1 8 Functional Diagrams (Safe- guards Activation Signals)

M-744-00026 7.2-1 9 Functional Diagrams (Rod Controls and Rod Blocks)

M-744-00027 7.2-1 10 Functional Diagrams (Steam Dump Control)

M-744-00028 7.2-1 11 Functional Diagrams (Pressur- izer Pressure & Level Control)

M-744-00029 7.2-1 12 Functional Diagrams (Pressur- izer Heater Control)

M-744-00030 7.2-1 13 Functional Diagrams (Feedwater Control and Isolation)

M-744-00031 7.2-1 14 Functional Diagrams (Feedwater Control and Isolation)

M-744-00032 7.2-1 15 Functional Diagrams (Auxiliary Feedwater Pumps Startup)

M-744-00033 7.2-1 16 Functional Diagram (Turbine Trip Runbacks and Other Signals)

M-744-00039 7.2-1 17 Functional Diagram (Pressurizer Pressure Relief)

M-744-00040 7.2-1 18 Functional Diagram (Pressurizer Pressure Relief)

SK-C-250 3B-2 Plan and Elevation View of Main Steam/Main Feedwater Isolation Valve Compartment

S-0172 2.4-3 2 Grading Plan Switchyard Area S-0186 2.4-3 3 Drainage Plan Plant Area S-0189-1 2.4-3 4A Manhole, Pipe & Culvert Schedule S-0189-2 2.4-3 4B Manhole, Pipe & Culvert Schedule S-0189-3 2.4-3 4C Manhole, Pipe & Culvert Schedule S-0189-4 2.4-3 4D Manhole, Pipe & Culvert Schedule S-0191 2.4-3 5 Manhole & Pipe Details S-0296 2.4-3 6 Manhole & Pipe Details S-0297 2.4-3 7 Plant Area Roadway Grading & Drainage

Rev. 21 WOLF CREEK TABLE 1.7-4 ERECTED SCAFFOLD EXPECTED TO BE IN PLACE THROUGHOUT NEXT REQUIRED USAR UPDATE CYCLE

WCGS Scaffold Request Building Elevation Location System 13-S0213 Auxiliary 1974' 20' N A14 13' W AN Essential Service Water (ESW) 13-S0219 Containment 2047' Above Containment Room Fire Protection 13-S6209 Fuel 2000' 1' S F1 2' W FC Component Cooling Water, Other 14-S9089 Containment 2005' 10' E 58' N Ladders 14-S0068 Auxiliary 1974' 3' E CA 3' N A11 Essential Service Water 14-S0070 Auxiliary 1974' 3' N A-14 3' E C-A Essential Service Water 14-S0069 Auxiliary 1974' 10' N A9 13' W AN Essential Service Water 14-S7104 Auxiliary 2000' 3' S of A11 AK ESW Vertical Loop Chase 14-S7107 Auxiliary 2000' 6'S A11 2' W AJ Component Cooling Water 15-S0050 Auxiliary 2026' 5' S A3 5' E AM Drain and Vent 15-S7207 Containment 1983' ESW Pipe Chase ESW Vertical Loop Chase 15-S7208 Containment 2000' ESW Pipe Chase ESW Vertical Loop Chase 15-S7225 Auxiliary 1974' E of CA 6' N A2 Fukushima 15-S7229 Containment 2032' NE Corner ESW Vertical Loop Chase 15-S7230 Containment 2042' NE Corner ESW Vertical Loop Chase 15-S7226 Containment 2000' NE Corner ESW Vertical Loop Chase 15-S7227 Containment 2012' NE Corner ESW Vertical Loop Chase 15-S7228 Containment 2021' NE Corner ESW Vertical Loop Chase 15-S7232 Containment 2064' NE Corner ESW Vertical Loop Chase 15-S7231 Containment 2053' NE Corner ESW Vertical Loop Chase 15-S7233 Containment 1987' ESW Pipe Chase ESW Vertical Loop Chase 15-S7240 Containment 2064' ESW Pipe Chase Essential Service Water 15-S7241 Containment 2074' ESW Pipe Chase Essential Service Water Rev. 29 WOLF CREEK TABLE 1.7-4 (sheet 2)

ERECTED SCAFFOLD EXPECTED TO BE IN PLACE THROUGHOUT NEXT REQUIRED USAR UPDATE CYCLE WCGS Scaffold Request Building Elevation Location System 15-S7239 Containment 2053' ESW Pipe Chase Essential Service Water 15-S7236 Containment 2021' ESW Pipe Chase Essential Service Water 15-S7234 Containment 2000' ESW Pipe Chase Essential Service Water 15-S7235 Containment 2010' ESW Pipe Chase Essential Service Water 15-S0235 Containment 2000' 30' N 45' W High Pressure Coolant Injection 15-S0234 Auxiliary 2000' 3' N A14' AN Essential Service Water 15-S0237 Auxiliary 2000' 18' N A4 3' E CA Essential Service Water 15-S0236 Auxiliary 2000' 3'E CA 9' N A4 Essential Service Water 15-S0241 Auxiliary 2000' 1' E AJ 6' S A3 Essential Service Water 15-S0242 Auxiliary 2000' N 2' A14 5' E AN Essential Service Water 15-S0253 Auxiliary 1967' 3' W AM 10' N A8 Essential Service Water 15-S7255 Containment 2000' 1' E CF 6' S C5 Fukushima 15-S7254 Containment 2000' 11 E' CF 3' S C5 Fukushima 15-S7253 Containment 2000' 11' E CF C5 Fukushima 15-S7257 Containment 2000' 11' W CC 9' S C5 Fukushima 15-S7258 Containment 2000' Water Hammer Tower ESW Vertical Loop Chase 15-S7256 Containment 2000' 4' W CA 9' S C5 Fukushima 15-S7262 Containment 2000' CC 9' S C5 Fukushima 15-S7260 Containment 2010' Water Hammer Tower ESW Vertical Loop Chase 15-S7259 Containment 2010' Water Hammer Tower ESW Vertical Loop Chase 15-S7246 Containment 2000' CA 8'S C3 Fukushima 15-S7263 Other 2032' S Side of Tower ESW Vertical Loop Chase 15-S7264 Other 2021' N Side of Tower ESW Vertical Loop Chase 15-S7267 Containment 2042' WH Tower ESW Vertical Loop Chase Rev. 29 WOLF CREEK TABLE 1.7-4 (sheet 3)

ERECTED SCAFFOLD EXPECTED TO BE IN PLACE THROUGHOUT NEXT REQUIRED USAR UPDATE CYCLE WCGS Scaffold Request Building Elevation Location System 13-S0134 Diesel Generator 2000' 6'S D1 5' TO30' D-8 Emergency Diesel Generator 13-S0127 Auxiliary 2026' 2'S A6 2'E AL Component Cooling Water 13-S0122 Auxiliary 2026' 2'N A13 2'W AJ Component Cooling Water 13-S0120 Diesel Generator 2032' D2-D3 10'E DB Standby Diesel13-S0119 Diesel Generator 2032' D2-D3 10'E DC Standby Diesel13-S0100 Diesel Generator 2000' 6'S D1 3'W DR 7' E Emergency Diesel Generator 13-S0066 Auxiliary 1974' 20' S A1 7'E AH Residual Heat Removal 13-S0064 Auxiliary 2026' 4'N AS 6'E AM Component Cooling Water 13-S0063 Auxiliary 2026' 3'S A4 C/L AM Component Cooling Water 13-S0060 Essential Service Water 2000' Prelube Storage Tank Essential Service Water 13-S0052 Auxiliary 1974' 9'S A2 3'W AH High Pressure Coolant Injection 13-S0051 Auxiliary 1974' 7'N A3 7'W AF High Pressure Coolant Injection 13-S0050 Containment 2000' 5'S C7 5'E CF Fire Protection 13-S0048 Auxiliary 2026' 3'S A7 3'E AL Component Cooling Water 13-S0046 Auxiliary 2026' 6'S A3 7'E AM Component Cooling Water 13-S0043 Auxiliary 2026' 2'S A9 8'E AN Component Cooling Water

Rev. 29 WOLF CREEK TABLE 1.7-4 (sheet 4)

ERECTED SCAFFOLD EXPECTED TO BE IN PLACE THROUGHOUT NEXT REQUIRED USAR UPDATE CYCLE

13-S0042 Auxiliary 2026' 3'E CA C/L A11 Component Cooling Water 13-S0041 Auxiliary 2026' 3'E CA C/L A9 Component Cooling Water 13-S0040 Auxiliary 2026' 3'W AL 8'N A12 Component Cooling Water 13-S0039 Auxiliary 2026' 4'S A13 6'E AL Component Cooling Water 13-S0038 Auxiliary 2026' 4'E AN 9'N A14 Component Cooling Water 13-S0037 Auxiliary 2026' 5'W AN C/L A10 Component Cooling Water 13-S0036 Essential Service Water 2000' 1'N C Wall 38'E W Wall Essential Service Water 13-S0035 Auxiliary 2026' C/L A11 6'E AN Component Cooling Water 13-S0034 Auxiliary 2026' 10'S A9 3'W AL Component Cooling Water 11-S8180 Auxiliary 2000' 9'S A6 13'W AL Residual Heat Removal 11-S8127 Auxiliary 2000' 4'S A9 10'E AK Component Cooling Water 11-S0237 Auxiliary 2000' 5'S A8 2'W AK Component Cooling Water 11-S0229 Auxiliary 2000' 5'E AK C/L A11 Component Cooling Water 11-S0228 Auxiliary 2000' 6'W AJ 17'S A9 Component Cooling Water 11-S0227 Auxiliary 2000' 3'W AJ 14'S A8 Component Cooling Water 10-S0088 Auxiliary 2026' 2'S A13 2'W AK Component Cooling Water 10-S0086 Auxiliary 2026' 8'N A4 3'W AM Component Cooling Water 10-S0080 Auxiliary 2026' 5'N A6 15'W AM Component Cooling Water 08-S0201 Fuel 2000' 5'S FI 15'W FD Fuel Pool 08-S0136 Auxiliary 2043' East Bay Main and Reheat Steam 08-S0135 Auxiliary 2043' West Bay Main and Reheat Steam

Rev. 29 WOLF CREEK TABLE 1.7-4 (sheet 5)

ERECTED SCAFFOLD EXPECTED TO BE IN PLACE THROUGHOUT NEXT REQUIRED USAR UPDATE CYCLE WCGS Scaffold Request Building Elevation Location System 04-S9001 Auxiliary 1974' 1' N A7 4" W AL Camera 04-S9002 Auxiliary 1974" 2' N A7 4' W AL Camera 04-S9008 Auxiliary 2000' 4' S A7 10' W AM Camera 04-S9009 Auxiliary 2000' C/L A13 C/L AE Camera 04-S9010 Auxiliary 2000' 6' N A7 4' W AL Camera 04-S9011 Auxiliary 2000' 1' S A12 1' E AN Camera 04-S9013 Fuel 2047' 10'N F4 4" W FC Camera 04-S9017 Fuel 2047' 2' N F7 6' E FB Camera 04-S9018 Auxiliary 2000' C/L A4 C/L AJ Camera 08-S9010 Auxiliary 2000' C/L A9 3' E AM Camera Rev. 29 WOLF CREEK 1.8 CONFORMANCE TO NRC REGULATORY GUIDES A discussion of the extent to which WCGS complies with each of the NRC Division 1 Regulatory Guides is provided in Appendix 3A. Appendix 3A gives a brief

statement of WCGS compliance and refers to the most appropriate section of the

USAR for the complete description of how the design complies with the

regulatory recommendations. 1.8-1 Rev. 0 WOLF CREEK 1.9 NRC REGULATORY REQUIREMENTS REVIEW COMMITTEE CATEGORY 2, 3, AND 4 MATTERS The Office of Nuclear Reactor Regulation (NRR) established a Regulatory Requirements Review Committee (RRRC) which reviewed proposed changes to the

regulatory requirements issued by the staff and recommended a course of action

to the Office of NRR. The course of action includes an implementation

schedule. The Director's approval was then used by the NRR staff as review guidance on individual licensing matters.

The RRRC developed a categorization nomenclature to aid in the uniform implementation of new and revised regulatory staff concerns. The system

included four categories (1 through 4) which correspond to the evaluation by

the RRRC of the need for applying the regulatory concerns to new and ongoing

license applications. The four categories are defined as follows: Category 1: Matters whose applicability is to be applied to applications in accordance with the implementation section of the published guide. The RRRC considers it necessary to forward fit (on new applications) the requirements of these matters. Category 2: A new position whose applicability is to be deter- mined on a case-by-case basis. The NRC staff will give further consideration to the need for backfit-ting certain identified items of the regulatory

concerns. Category 3: Positions to which the NRC staff considers confor- mance necessary, either by direct implementation or by implementation of an acceptable alternative.

These positions could be the cause of backfitting if an acceptable alternative is not available. Category 4: Positions of concern to the NRC staff which have not been reviewed by the RRRC and subsequently categorized as Category 1, 2, or 3. Since these items are of concern to the NRC staff, for review purposes, they are to be considered on the same basis as Category 2, potential for backfitting certain identified regulatory concerns. 1.9-1 Rev. 0 WOLF CREEK The Office of NRR, by letter dated November 21, 1978, transmitted a list of Category 2, 3, and 4 matters for consideration in preparing the WCGS FSAR. A discussion of how Wolf Creek complies with each of the listed matters is contained in Tables 1.9-1 through 1.9-4. The RRRC Category Designation columns in the tables correspond to those contained in the November 21, 1978 letter.

Table 1.9 Lists all Category 2, 3, and 4 regulatory guides and references the location in which the regulatory guides are addressed.

Table 1.9 Lists all Category 2, 3, and 4 branch technical positions (BTPs),

provides remarks on the extent to which the recommendations of the BTPs are

met, and references the location of more complete discussions of the RRRC

matter.Tables 1.9-3 and 1.9 Address the Category 4 SRP criteria and other Category 4 positions, respectively. 1.9-2 Rev. 0 WOLF CREEK TABLE 1.9-1 CATEGORY 2, 3, AND 4 REGULATORY GUIDES*

Regulatory Guide RRRC Category Number Revision 2

3 4 1.12 1 X 1.13 1 X

1.14 1 X 1.27 2 X 1.52 1 X

1.56 1 X

1.59 2 X

1.63 2 X 1.68.2 1 X 1.75 1 X

1.76 0 X

1.79 1 X

1.80 0 X

1.82 0 X

1.83 1 X

1.89 0 X 1.91 1 X

1.93 0 X

1.97 1 X

1.99 1 X

1.101 1 X

1.102 1 X

1.104 0 X

1.105 1 X

1.108 1 X

1.114 1 X

1.115 1 X

1.117 1 X

1.121 0 X

1.124 1 X

1.127 1 X

1.130 0 X 1.137 0 X

1.141 0 X

8.8 2 X

  • All regulatory guides are addressed in Appendix 3A with the exception of Regulatory Guide 8.8, which is

addressed in Section 12.1.

Rev. 0 WOLFCREEKTABLE1.9-2CATEGORY2,3,AND4BRANCHTECHNICALPOSITIONSBranchTechnicalRRRCPositionTitle Cat.RemarksASB9.5-1,GuidelinesforFire2TherecommendationsofRev.1ProtectionforNu-thisBTParemettoclearPowerPlantstheextentdescribedinSection9.5.1.MTEB5-7MaterialSelection2TherecommendationsofandProcessingthisBTParenotap-GuidelinesforBWRplicabletotheWCGSCoolantPressure(PWR)design.

BoundaryRSB5-1,DesignRequirements3TherecommendationsofRev.1oftheResidualHeatthisBTParemettotheRemovalSystemextentdescribedinSec-tions5.2.2and7.6.6.RSB5-2Overpressurization3TherecommendationsofProtectionofPres-thisBTParemettothesurizedWaterReactorsextentdescribedinSec-WhileOperatingatLowtions5.2.2and7.6.6.

TemperaturesMTEB5-3MonitoringofSec-4.B.1TherecommendationsofondarySideWaterthisBTParemet.ReferChemistryinPWRtoSections9.3.2and SteamGenerators10.3.5.CSB6-1MinimumContainment4.B.2TherecommendationsofPressureModelforthisBTParemet.ReferPWRECCSPerformancetoSections6.2.1andEvaluation15.6.5.CSB6-2ControlofCombus-4.B.3TherecommendationsoftibleGasConcentra-thisBTParemet.RefertionsinContainmenttoSection6.2.5.FollowingaLoss-of-CoolantAccidentRev.0 WOLFCREEKTABLE1.9-2(Sheet2)BranchTechnicalRRRCPositionTitle Cat.RemarksCSB6-3Determinationof4.B.4TherecommendationsofBypassLeakagePathsBTParenotapplicableinDualContainmenttotheWCGSdesign,Plantssincethereisnodual containment.CSB6-4ContainmentPurging4.B.5TherecommendationsofDuringNormalPlantthisBTParemettothe OperationsextentdescribedinTable 9.4-13.ASB9.1OverheadHandling4.B.6TherecommendationsofSystemsforNu-thisBTParemet.NoclearPowerPlantscriticalloadsarehandled.Referto Section9.1.4.ASB10.1DesignGuidelines4.B.7TherecommendationsofforAuxiliaryFeed-thisBTParemet.Refer waterSystemPumptoSection10.4.9.DriveandPowerSup-plyDiversityforPWRPlantsRev.0 WOLF CREEK TABLE 1.9-3 CATEGORY 4 SRP CRITERIA SRP RRRC Section Cateqory Title 3.5.3 4.B.8 Procedures for Composite The recommendations of this (Par II.1.C) Section Local Damage Pre- SRP are met to the extent diction described in Section 3.5.3.

3.7.1 4.B.9 Development of Design The recommendations of (Par. II.2) Time History for Soil- this SRP are met to the

Structure Interaction extent described in

Analysis Section 3.7(B).1.

3.7.2 4.B.10 Procedures for Seismic The recommendations of (Par. II) System Analysis this SRP are met. Refer

to Sections 3.7(B).2 and

3.7(N).2.

3.7.3 4.B.11 Procedures for Seismic The recommendations of (Par. II) Subsystem Analysis this SRP are met. Refer to Sections 3.7(B).3 and 3.7(N).3 3.8.1 4.B.12 Design and Construction The design of the con-(Par. II) of Concrete Containments tainment structure is

described in Section

3.8.1. The load combi-

nations used meet or

exceed ACI 359/SRP criteria.

3.8.2 4.B.13 Design and Construction The recommendations of (Par. II) of Steel Containments this SRP are not applic-

able to WCGS.

3.8.3 4.B.14 Structural Design Cri- The design meets or ex-(Par. II) teria for Category I ceeds the load combina-Structures Inside Con- tions of ACI 359/SRP tainment criteria. Refer to Sections 3.8.3 and 5.4, respectively, for dis-cussion of the Bechtel and Westinghouse com-ponent supports.

3.8.4 4.B.15 Structural Design Cri- The design meets or ex-(Par. II) teria for Other Seismic ceeds the load combina-Category I Structures tions of ACI 359/SRP criteria. Refer to Section 3.8.4.

Rev. 0 WOLF CREEK TABLE 1.9-3 (Sheet 2)

SRP RRRC Section Category Title Remarks 3.8.5 4.B.16 Structural Design Cri- The design meets or exceeds (Par. II) teria for Foundations the load combinations of ACI 359/SRP criteria.

Refer to Section 3.8.5.

The safety factors for sliding are discussed in

Section 3.8.5.5.

3.7 4.B.17 Seismic Design Require- The recommendations of 11.2 ments for Radwaste Systems this SRP are met as 11.3 and their Housing Struc- described in Appendix 11.4 tures (SRP Section 11.2, 3A in the response BTP ETSB 11-1, Par. B.v.) to Regulatory Guide

1.143. Refer to Chapter

11.0. Section 3.8.6 des-cribes the seismic deisgn capabilities of the rad-waste building.

3.3.2 4.B.18 Tornado Load Effect Com- The recommendations of (Par. II.2.d) binations this SRP are met.

Refer to Section 3.3.2.

3.4.2 4.B.19 Dynamic Effects of Wave The recommendations of (Par II) Action this SRP are met.

Refer to Section 3.4.2.

10.4.7 4.B.20 Water Hammer for Steam The WCGS steam qenerators (Par. I.2.b) Generators with Pre- (Model F) have no pre-

heaters heaters. Refer to Sections

5.4.2 and 10.4.7.

4.4 4.B.21 Thermal-Hydraulic Sta- The recommendations of (Par. II.5) bility this SRP are met as dis-

cussed in Section

4.4.4.6.

5.2.5 4.B.22 Intersystem Leakage Detec- Intersystem leakage de-(Par II.4) tion (See RG 1.45) tection requirements

and capabilities are

discussed in Section

5.2.5.

3.2.2 4.B.23 Main Steam Isolation Valve The recommendations of Leakage Control System this SRP are not appli-(SRP Section 10.3, Par. cable to the WCGS

III.3 and BTP RSB-3.2) (PWR) design.

Rev. 0 WOLF CREEK TABLE 1.9-4 OTHER CATEGORY 4 POSITIONS SRP RRRC Section Category Title Remarks 3.5.3 4.C.1 Ductility of Reinforced The recommendations of this Concrete and Steel Struc- item are met to the ex-tural Elements Subjected tent described in Section

to Impactive or Impulsive 3.5.3.

Loads 3.7.1 4.C.2 Response Spectra in Verti- The recommendations of this cal Direction item are met. Refer to Section 3.7(B).1. West-inghouse utilizes the

damping values of WCAP 7921-

AR. See also the response

to Regulatory Guide 1.60 in Appendix 3A.

3.8.1 4.C.3 BWR Mark III Containment The recommendations of this 3.8.2 Pool Dynamics item are not applicable

to the WCGS (PWR) design.

3.8.4 4.C.4 Air Blast Loads Air blast loads from trans-portation are less than the external pressure design capabilities described in Section 3.8.

3.5.3 4.C.5 Tornado Missile Impact The recommendations of this item are met. Refer to Section 3.5.3.1.

6.3 4.C.6 Passive Failures During The recommendations of this Long-Term Cooling Follow- item are met to the ex-

ing LOCA tent described in Sections

3.1 and 6.3.

6.3 4.C.7 Control Room Position The recommendations of this Indication of Manual item are met. Refer to (Handwheel) Valves in Sections 7.5.2.2.1 and the ECCS 7.5.2.2.2.

15.1.5 4.C.8 Long-Term Recovery from The recommendations of this Steamline Break: Opera- item are met to the extent tor Action to Prevent described in Section Overpressurization 15.0.13. Operator action is not assumed for 10 minutes.

Rev. 0 WOLF CREEK TABLE 1.9-4 (Sheet 2)

SRP RRRC Section Category Title Remarks 5.4.6 4.C.9 Pump Operability Require- The recommendations of this 5.4.7 ments item are met. Refer to

6.3 Section 6.2.2.1.2.2 and Section 6.3.2.5.

3.5.1 4.C.10 Gravity Missiles, Vessel The recommendations of this Seal Ring Missiles Inside item are met. Refer to Containment Appendix 3B. Section 9.1.4.2.2 discusses the reactor cavity seal ring.

4.4 4.C.11 Core Thermal-Hydraulic The recommendations of this Analysis item are met. However, Westinghouse is generically reducing rod bow penalties through experience gained by

test surveillance. Refer

to Section 4.2.3.1.

8.3 4.C.12 Degraded Grid Voltage The recommendations of this Conditions item are met to the ex-

tent described in Section

8.3.1.1.3 and Technical Specifications.

6.2.1.2 4.C.13 Asymmetric Loads on Com- The recommendations of this ponents Located Within item are met. Refer to Containment Subcompart- Section 6.2.1.2.

ments 6.2.6 4.C.14 Containment Leak Testing The recommendations of this Program item are met. Refer to

Section 6.2.6.

6.2.1.4 4.C.15 Containment Response Due The recommendations of this to Main Steamline Break item are met. Refer to and Failure of MSLIV to Sections 6.2.1, 3.11(B),

Close and 3.11(N).

3.6.1 4.C.16 Main Steam and Feedwater The recommendations of this 3.6.2 Pipe Failures item are met. Refer to Sections 3.6.1 and 3.6.2.

Rev. 0 WOLF CREEK TABLE 1.9-4 (Sheet 3)

Category Title Remarks 9.2.2 4.C.17 Design Requirements for The recommendations of this Cooling Water to Reactor item are met to the extent

Coolant Pumps described in Sections 5.4.1, 9.2.2, and 9.3.4 10.4.7 4.C.18 Design Guidelines for The design meets the rec-Water Hammer in Steam ommendations of this item;

Generators with Top however, no testing was

Feedring Design (BTP performed. Refer to

ASB-10.2) Section 10.4.7.

3.11 4.C.19 Environmental Control The recommendations of this Systems for Safety-Re- item are met to the ex-lated Equipment tent described in Section 3.11(B).

Rev. 0