WM 16-0008, Wolf Creek Generating Station Updated Safety Analysis Report (Usar), Redacted Version of Revision 29, Calculation No. XX-E-013, Rev 4 - CN003, Post-Fire Safe Shutdown (Pfssd) Analysis

From kanterella
(Redirected from ML16204A119)
Jump to navigation Jump to search
Wolf Creek Generating Station Updated Safety Analysis Report (Usar), Redacted Version of Revision 29, Calculation No. XX-E-013, Rev 4 - CN003, Post-Fire Safe Shutdown (Pfssd) Analysis
ML16204A119
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/31/2016
From:
Wolf Creek
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16203A351 List: ... further results
References
WM 16-0008
Download: ML16204A119 (13)


Text

FORM APF-050-001-02, REV. II CALCULATION CHANGE NOTICE Base calc No. Rev NO. CALCULATION TITLE -Enter this item in CALCULATION TITLE field in EIS: Post-Fire Safe Shutdown (PFSSD) Analysis COMPUTER CODE: None VERSION: None Administrative?

DYES ASSOCIATED CHANGE #: ON/A -only if Administrative REGULATORY REVIEWS: D Attached Evaluation

  1. USAR STATEMENT:

ANY DOCUMENTS IMPACTED? Attached to: DCP 014658 RO D Requires a change to the USAR: Does not require a change to the USAR DYES (gl NO If yes, enter: Work Management Tool #, SWO #, and/or Condition Report #, if applicable Sequence No. 014658 Status: COMMITTED D FINAL D VOID D SUPERSEDED )t>/::z.l;/6 St15/14 ORIG Date Printed Name Date Signature QUALIFICATION REQUIRED:

Signature QUALIFICATION REQUIRED:

E$9280479 VERF VERF Printed Name Date Signature Signature QUALIFICATION REQUIRED:

ES9280479 QUALIFICATION REQUIRED:

ES9280479

\:fik Kana!

  • s t0/'(7.. Z:¥j-APP Printed Name 6/19/l4-APP Dale Printed Name Date Signature RPE Certification (For ASME Section III Stress Reports/Design Reports, refer to AP 050-001 for ualification re uirements FORM APF-050-001-02, REV 11 CALCULATION CHANGE NOTICE OYf CCN NO. XX-E-013 -------------------

Base Calc No. Rev No. Sequence No. CALCULATION SUBJECT (Statement Of Problem) -Enter this in SUBJECT field in EIS: Change package 14658 is replacing cable from EDGs speed signal generators to the EDGs speed switches.

Appendices 1, 2 and 3 are updated to reflect these changes.

FORM APF OSD-001 02 REV II . . Page 3 cat o/l)()g '1fl'-CALCULATION DATABASE INPUT CCN NO. XX-E-013 ---emHT't tiM. Base Calc No. Rev No. Sequence No. Link systems to the calculation/CCN in EIS. Systems KJ Affected:

Develop relationships between interdependent calculations in EIS. Additional None Calculations Providing Input to this calculation:

Additional None Calculations Impacted by this calculation:

Develop relationships between the calculation/CCN and controlled reference documents in EIS. Additional None Controlled Documents Inputs to this calculation:

Additional None Controlled Documents Impacted by this calculation:

The reference documents listed below are those that cannot be linked to the calculation/CCN and shall be entered in the INDUSTRY REFERENCE field in EIS, e.g., ASME Codes, ANSI Standards, letters, etc. Additional DCP 014658 Other Reference Documents:

Link components to the calculation/CCN in EIS. Additional KJSE0066,KJSE0166,KJSS0066,KJSS0166 components:

REFER TO DESKTOP GUIDE FOR PROCESSING CALCULATIONS IN EIS FORM APF-050-001-02, REV. II t'd/ LIST OF EFFECTIVE PAGES CCN NO. ___ xx_-_E_-...:..0...:..13

___ --CCN Page No. 5 6 7 8 9-13 DVR SCRN AD Calc. CCN calc. CCN Page Page Page Page Affected No. Affected No. DVR/SCRN/

/DVR/SCRN Other /Other App 1, pg 60 App 2, pgs 4 and 5 App 2, pgs 9 and 10 App 3, pg 69 DVR Design Verification Report (if applicable)

Regulatory Screening (if applicable)

Applicability Determination Base Calc No. Rev No. Calc. CCN Page Page Affected No. /DVR/SCRN

/Other sequence No. Calc. Page Affected /DVR/SCRN

/Other FORM APF*OSD-001-02, REV. II Page 5 CALCULATION SHEET tXf(

CCN NO. ___ xx_-_E_-0_1_3

___ --9W--

Base calc. No. Rev. No. Sequence No Revise Appendix 1 Table as follows, per change package 14658. (Changes shown in boldface)

Calculation Appendix 1. Page 60 Standby diesel generator speed/frequency is adjusted using a hydraulic actuator controlled remotely from the control room (Rl015) or locally in the standby diesel generator rooms on NE106 or NE107. In addition, speed signal generators on the standby diesel generators provide input to speed switches in the diesel engine gauge and control panels (KJ121 and KJ122). Speed/frequency controls required for PFSSD are identified in the following table: COMPONENT LOCATION .. ** .*.***** ... :.:.* .. * <*.DESCRIPTION KJHS0009 NE107 Diesel generator A master transfer hand switch KJHS0001D NE107 Diesel generator A emergency start hand switch NEHSOOOS RL015 Diesel generator A unit parallel hand switch KJHS0007A RL015 Diesel generator A raise/lower hand switch KJHS00078 NE107 Diesel Qenerator A raise/lower hand switch KJHS0109 NE106 Diesel generator 8 master transfer hand switch KJHS0101D NE106 Diesel Qenerator 8 emerQency start hand switch NEHSOOOS RL015 Diesel generator 8 unit parallel hand switch KJHS0107A NE106 Diesel generator 8 raise/lower hand switch KJHS01078 NE106 Diesel generator 8 raise/lower hand switch KJSE0066 KKJ01A Diesel generator A speed signal generator KJSE0166 KKJ01B Diesel generator B speed signal generator KJSSOOGG KJ121 Diesel generator A speed switch KJSS0166 KJ122 Diesel generator 8 speed switch FORM APF-OSD-00 1-02, REV II Page 6 CALCULATION SHEET ow oJOO:l -

CCN NO. XX-E-013 --------------------

Base Calc. NO. Rev. No. Sequence No Revise Appendix 2 Table A as follows, change cable identification from 11KJK01AM to 11KJK01AQ per change package 14658. (Changes shown in boldface)

I ' ' . *."" . ***.1 TABLE.A,-, ' . .:. '*' t' -: ' :} " "< .F OFF-SITE'POWERAND*EMERGENCY DIESEl:. GENERATOR.CAB.LES.

':: _ ,"i.* ,.. ">f .,_ ... ,.*

.. * ...... I* , , t, . . . *, . >;.: Revise Appendix 2 Table A as follows, change cable identification from 14KJK03AM to 14KJK03AQ per change package 14658. (Changes shown in boldface) 14KJK03AQ , ,'

FORM APF-050-00I-02.

REV. II Page 7 CALCULATION SHEET cot/ C;V.x6 CCN NO. XX-E-013 -GN997 -Base Calc No. Rev No. Sequence No Revise Appendix 2 Table B as follows, change cable i.dentification from 11KJK01AM to llKJKOlAQ per change package 14658. (Changes shown in boldface) . ' ...

-. " ,: ' : ._, CABLE D ':)

?N.t0's t 2 :cc1 T-2 ., *TURB I YARD 11KJK01AQ Revise Appendix 2 Table B as follows, change cable identification from 14KJK03AM to 14KJK03AQ per change package 14658. (Changes shown in boldface)

CABLE 14KJK03AQ

"'* .. '* ..

.:. . . £.,-.. :7*-c

". j

.... :-}* t ., T-2 I, TURB I YARD

FORM APFOSF-001.-01, REV. 04 .DESIGN VERIFICATION REPORT .DOCUMENT NO . .DOCUMENT TITLE: Post-Fire Safe Shutdown (PFSS.D) Analysis ORIGINATOR:

Bruce Reed/Howard Meyer DESIGN VERIFIED:

SAFETY CLASSIFICATION:

VERIFICATION METHOD: D PRELIMINARY D SAFETY -RELATED !8] DESIGN REVIEW !8] FINAL !8] SPECIAL SCOPE D ALTERNATE CALCULATION D REVISION D NON-SAFETY RELATED D TESTING [ZJ INDIVIDUAL VERIFICATION SIGNATURE:

DATE: 5/20/2014 QUALIFICATION REQUIRED--

ES9280465 OR ES9280479 D TEAM VERIFICATION Scope Verified:

SIGNATURE:

DATE: TEAM LEADER SIGNATURE: .DATE: QUALIFICATION REQUIRED ES9280465 OR ES9280479

  • Team leader signature certifies that adequate interfaces and overlaps have occurred.

OVERVIEW (PURPOSE AND SCOPE): Change package 14658 is replacing cable from EDGs speed signal generators to the EDGs speed switches.

Appendices I, 2 and 3 of Calculation XX-E-O 13 are updated to reflect these changes. The EDG speed signal generators and the EDG speed switches are being added as PFSSD components.

CRUCIAL AREAS: I. Verify that the new components and cable numbers are accurately depicted.

2. VerilY the Database Input sheet is filled out correctly.
3. VerifY the assumptions and methodology of the parent calculation are maintained.

ALTERNATE OR INDEPENDENT ITEMS USED FOR VERIFICATION:

1. Calculation XX-E-013, Rev. 3 2. DCP 14658 and associated drawings.

FORM APF 05F-00 l-0 1, REV 04 PAGE 10 OF 13 DESIGN VERIFICATION REPORT -c#oo:? DOCUMENT NO. XX-E-013-903 CN699 REV. 0 COMMENTS*

ORIGINATOR'S RESPONSE*

l. Delete E-1F9910 from the Additional Controlled Documents Deleted E-!F9910 from the Additional Controlled on page 3 of the CCN. E-1F9910 is not used as an input to Documents.

XX-E-013.

2. On Page 3, Additional Components the components are Corrected Asset numbers. duplicated.

Two of the components should be 'SS' instead of 'SE'. 3. On Page 5, In the new wording in the paragraph above the Corrected Asset number. table replace KJ!2 with KJ122. 4. On Page 8, add instrument locations for the four new Added instrument locations and appropriate sheet components consistent with the table on page 5. Also in the numbers to drawings.

Other Drawings column, add the applicable sheet number following drawing M-0 18-00259.

CONCLUSIONS:

Following incorporation of the above comments, the calculation change notice accurately reflects the crucial areas selelected for review and is acceptable.

FORM APF OSF-001-01, REV. 04 PAGE 11 OF 13 DESIGN VERIFICATION REPORT l DOCUMENT NO.

J REV. 0 TABLE A (This table is required for change packages, or when required by a Supervisor.)

If the answer to the question is yes, then provide a descriptive answer that explains why you came to this conclusion.

If the question is not applicable, then provide a descriptive explanation detailing why it is not applicable.

1. Were the design inputs correctly selected and incorporated into the design? 2. Are assumptions, necessary to perform the design: activity, documented, adequately described and reasonable?
3. Are the appropriate quality and quality assurance requirements specified?
4. Are the applicable codes, standards and regulatory requirements, including issue and addenda, properly identified and are their requirements for design met? 5. Has applicable plant and industry construction and operating experience been considered?
6. Have the hardware interface design requirements been satisfied?
7. Is the output reasonable compared to input? 8. Are the specified parts, equipment and processes suitable for the required application?
9. Are the specified materials compatible with each other and the design environmental conditions to which the material will be exposed?

FORM APF 05F-001-0l, REV. 04 PAGE 12 OF 13 DESIGN VERIFICATION REPORT DOCUMENT NO. XX-E-013 REV. 0 I OCI1-q,;a::x.J I TABLE A (This table is required for change packages, or when required by a Supervisor.)

If the answer to the question is yes, then provide a descriptive answer that explains why you came to this conclusion.

If the question is not applicable, then provide a descriJ!tive explanation why it is not applicable.

10. Have adequate maintenance features and requirements been specified?
11. Are accessibility and other design provisions adequate for performance of needed maintenance and repair? 12. Has adequa.te accessibility been provided to perform the in-service inspection expected to be required during the plant life? 13. Has the design properly considered radiation exposure to the public and plant personnel?
14. Have adequate pre-operational and subsequent periodic test requirements been appropriately specified?
15. Does each document contain the required signatures and date? 16. If a computer program was used in the analysis, has the program been verified?
17. If a component has been added, has a Safety Classification Analysis been completed?
18. Were the commitments provided in the USAR and the Design Criteria documents correctly incorporated into the design documents?

FORM APF 05F-001-01, REV. 04 PAGE 13 OF l3 DESIGN VERIFICATION REPORT 1 DOCUMENT NO.

1 REV. o TABLE A (This table is required for change packages, or when required by a Supervisor.)

If the answer to the question is yes, then provide a descriptive answer that explains why you came to this conclusion.

If the question is not applicable, then provide a descriptive explanation detailing why it is not applicable.

19. Have the appropriate design documents been identified and/or updated? 20. Has warehouse stock been considered for modification or retirement?