ML24114A174
From kanterella
Jump to navigation
Jump to search
ML24114A174 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 04/15/2024 |
From: | Wolf Creek |
To: | Office of Nuclear Reactor Regulation |
References | |
000347 | |
Download: ML24114A174 (1) | |
Similar Documents at Wolf Creek | |
---|---|
Category:Drawing
MONTHYEARML24114A1522024-04-15015 April 2024
[Table view]Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 11, Figures ML24114A1532024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 5, Figures ML24114A1542024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 2, Figures ML24114A1552024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 1, Figures ML24114A1562024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 12, Figures ML24114A1572024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 18, Figures ML24114A1742024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Drawing E-1F9900, Rev. 10, Post-Fire Safe Shutdown Operator Manual Actions ML24114A1502024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 7, Figures ML24114A1332024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 2, Figures ML24114A1482024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 8, Figures ML24114A1472024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 6, Figures ML24114A1492024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 9, Figures ML24114A1512024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 10, Figures ML23135A1192023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 8, Figures ML23135A1222023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 10, Figures ML23135A1182023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 6, Figures ML23135A1672023-05-0808 May 2023 6 to Updated Safety Analysis Report, Figures ML23135A1282023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 18, Figures ML23135A1232023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 11, Figures ML23135A1242023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 5, Figures ML23135A1272023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 12, Figures, Redacted ML23135A1212023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 7, Figures ML23135A1202023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 9, Figures, Redacted ML23135A1262023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 1, Figures - Redacted ML23135A1252023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 2, Figures ML23045A1952023-02-14014 February 2023 Transmittal of the National Pollution Discharge Elimination System Permit Renewal Application for Wolf Creek Generating Station I-NE07-PO02 ML22152A1772022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 12, Figures - Redacted ML22152A1832022-05-18018 May 2022 M-6630-00017A, Appendix G3D to Attachment H, Structural Steel Fireproofing Data, Page G3D-1 of G3D-50 to G5A-63 of G5A-63 ML22152A1692022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 8, Figures ML22152A1742022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 5, Figures ML22152A1722022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 10, Figures ML22152A1732022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 11, Figures ML22152A1682022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 6, Figures ML22152A1702022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 9, Figures ML22152A1712022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 7, Figures ML22152A1752022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 2, Figures ML22152A1782022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 18, Figures ML22152A1762022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 1, Figures - Redacted ML21168A1112021-06-0707 June 2021 4 to Updated Safety Analysis Report, Chapter 2, Figures ML21168A1252021-06-0707 June 2021 4 to Updated Safety Analysis Report, Chapter 8, Drawing No. KD-7750, Revision 14, Wolf Creek Substation General Plan ML21168A1262021-06-0707 June 2021 4 to Updated Safety Analysis Report, Chapter 9, Drawing M-12EC01, Revision 23, Piping & Instrumentation Diagram Fuel Pool Cooling and Clean-Up System. Redacted ML21168A1342021-06-0707 June 2021 4 to Updated Safety Analysis Report, Chapter 18, Drawing M-12SJ04, Revision 16, Piping and Instrumentation Diagram Nuclear Sampling System ML21168A1292021-06-0707 June 2021 4 to Updated Safety Analysis Report, Chapter 11, Drawing M-12HB01, Revision 16, Piping and Instrumentation Diagram Liquid Radwaste System ML21168A1282021-06-0707 June 2021 4 to Updated Safety Analysis Report, Chapter 10, Drawing M-12AC01, Revision 30, Piping & Instrumentation Diagram Main Turbine ML20290A5982020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 10, Figures ML20290A5972020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 9, Figures ML20290A5912020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 2, Figures ML20290A5992020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 11, Figures ML20290A6012020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 18, Drawing M12SJ04, Sheet 16, Piping and Instrumentation Diagram ML20290A5962020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 8, Figures 2024-04-15 Category:Fire Protection Plan MONTHYEARML24114A1592024-04-15015 April 2024
[Table view]Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configurations, Rev. 4 ML24114A1602024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Revision W01, Attachment C Through G3C, Fire Protection Evaluations for Unique or Unbounded Fire Wrap Configurations ML24114A1612024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Revision W08, Appendix G3D to H, Structural Steel Fireproofing Data ML24114A1622024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Attachment B7 Through B13, Fire Protection Evaluation for Penetrant Size Exceeding Typical Detail B-1 Limitation ML24114A1722024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9905, Rev. 13, Fire Hazard Analysis ML24114A1742024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Drawing E-1F9900, Rev. 10, Post-Fire Safe Shutdown Operator Manual Actions ML24114A1752024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9910, Rev. 18, Post-Fire Safe Shutdown Area Analysis ML24114A1772024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9915, Rev. 16, Design Basis Document for Ofn RP-017, Control Room Evaluation ML24114A1832024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9905, Rev. 14, Fire Hazard Analysis ML24114A1852024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9905, Rev. 12, Fire Hazard Analysis ML24114A1912024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9910, Rev. 19, Post-Fire Safe Shutdown Area Analysis ML23135A1872023-05-0808 May 2023 Report M-6630-00017A, Revision W08, Fire Protection Evaluation for Unique or Unbounded Fire Barrier Configurations ML23135A1882023-05-0808 May 2023 Report, M-6630-00017A, Revision W08, Fire Protection Evaluation for Unique or Unbounded Fire Wrap Configurations, Attachments C to G3C ML23135A1892023-05-0808 May 2023 Report, M-6630-00017A, Revision W08, Structural Steel Fireproofing Data ML23135A1902023-05-0808 May 2023 Report, M-6630-00017A, Revision W08, Fire Protection Evaluation for Penetrant Size Exceeding Typical Detail FB-1 Limitation ML23135A1922023-05-0808 May 2023 Report, E-1F9910 Rev 17, Post-Fire Shutdown Operator Manual Actions ML23135A1942023-05-0808 May 2023 Calculation XX-E-013 Rev. 4, CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1952023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN006, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1962023-05-0808 May 2023 Report, E-1F9900 Rev 10, Redacted, Post-Fire Shutdown Operator Manual Actions ML23135A1972023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN009, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1982023-05-0808 May 2023 Calculation XX-E-013, Rev. 4, CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A1992023-05-0808 May 2023 Fire Hazard Analysis Report, E-1F9905 Rev 11, Post-Fire Shutdown Operator Manual Actions ML23135A2002023-05-0808 May 2023 Calculation XX-E-013, Rev. 4, CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2022023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2032023-05-0808 May 2023 Calculation XX-E-013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML23135A2062023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN004, Post-Fire Safe Shutdown (PFSSD) Analysis WO 23-0006, Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis2023-05-0808 May 2023 Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis ET 23-0004, Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements2023-01-26026 January 2023 Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23135A2042022-11-0909 November 2022 E-1F9915, Rev. 16, Design Basis Document for Ofn RP-017, Control Room Evacuation ML22152A1812022-05-18018 May 2022 M-6630-00017A, Revision W08, Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configurations, Cover Through Appendix B6 ML22152A1822022-05-18018 May 2022 M-6630-00017A, Attachments C to Appendix G3C, Fire Protection Evaluations for Unique or Unbounded Fire Wrap Configurations ML22152A1832022-05-18018 May 2022 M-6630-00017A, Appendix G3D to Attachment H, Structural Steel Fireproofing Data, Page G3D-1 of G3D-50 to G5A-63 of G5A-63 ML22152A1852022-05-18018 May 2022 M-6630-00017A, Revision W08, Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configurations, Appendices B7 Though B13 ML22152A1922022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1932022-05-18018 May 2022 E-1F9905, Revision 11, Fire Hazard Analysis ML22152A1962022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1972022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A1982022-05-18018 May 2022 Calculation No. XX-E-013, Revision 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A2002022-05-18018 May 2022 E-1F9915, Revision 15, Design Basis Document for Ofn RP-017, Control Room Evacuation ML22152A2012022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN004, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A2022022-05-18018 May 2022 E-IF9900, Post-Fire Safe Shutdown Operator Manual Actions, Rev. 10 ML22152A2032022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN005, Post-Fire Safe Shutdown (PFSSD) Analysis ML22152A2062022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN006, Post-Fire Safe Shutdown (PFSSD) Analysis WO 22-0006, Ccn No. XX-E-013, Revision 4, Sequence No. CN002, Post-Fire Safe Shutdown (PFSSD) Analysis2022-05-18018 May 2022 Ccn No. XX-E-013, Revision 4, Sequence No. CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1592021-06-0707 June 2021 Fire Hazards Analysis, XX-E013, Rev 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1532021-06-0707 June 2021 Fire Hazards Analysis E-1F9900, Rev 9 - Redacted, Post Fire Safe Shutdown Operator Manual Actions ML21168A1542021-06-0707 June 2021 XX-E013,Rev 4, CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1552021-06-0707 June 2021 XX-E-013, Rev 4, CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1612021-06-0707 June 2021 Fire Hazards Analysis, XX-E013, Rev 4, CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML21168A1622021-06-0707 June 2021 Fire Hazards Analysis, XX-E-013, Rev 4_CN006, Post-Fire Safe Shutdown (PFSSD) Analysis 2024-04-15 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML24114A1912024-04-15015 April 2024
[Table view]Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9910, Rev. 19, Post-Fire Safe Shutdown Area Analysis ML24114A1602024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Revision W01, Attachment C Through G3C, Fire Protection Evaluations for Unique or Unbounded Fire Wrap Configurations ML24114A1482024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 8, Figures ML24114A1882024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1892024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, EQSD-II, Rev. 35, Equipment Qualification Summary Document ML24114A1742024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Drawing E-1F9900, Rev. 10, Post-Fire Safe Shutdown Operator Manual Actions ML24114A1852024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9905, Rev. 12, Fire Hazard Analysis ML24114A1862024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Rev. 14. Quality Program Manual ML24114A1782024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1522024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 11, Figures ML24114A1372024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 8, Electric Power ML24114A1362024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Cover Sheet ML24114A1422024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 12, Radiation Protection ML24114A1322024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Questions 005.1 Through 031.20 ML24114A1752024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9910, Rev. 18, Post-Fire Safe Shutdown Area Analysis ML24114A1572024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 18, Figures ML24114A1832024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9905, Rev. 14, Fire Hazard Analysis ML24114A1792024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation, XX-E-013, Rev. 4-CN006, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1562024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 12, Figures ML24114A1402024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 2, Site Characteristics ML24114A1332024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 2, Figures ML24114A1312024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 16, Relocated Technical Specifications ML24114A1382024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 7, Instrumentation and Controls ML24114A1272024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements ML24114A1392024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 5, Reactor Coolant System and Connected Systems ML24114A1872024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1292024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 14, Initial Test Program ML24114A1532024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 5, Figures ML24114A1842024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN004, Post-Fire Shutdown (PFSSD) Analysis ML24114A1282024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 13, Conduct of Operating ML24114A1732024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN011, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1922024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1822024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN009, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1352024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 9, Auxiliary Systems ML24114A1592024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configurations, Rev. 4 ML24114A1472024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 6, Figures ML24114A1612024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Revision W08, Appendix G3D to H, Structural Steel Fireproofing Data ML24114A1512024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 10, Figures ML24114A1342024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 4, Reactor ML24114A1772024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9915, Rev. 16, Design Basis Document for Ofn RP-017, Control Room Evaluation ML24114A1622024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Attachment B7 Through B13, Fire Protection Evaluation for Penetrant Size Exceeding Typical Detail B-1 Limitation ML24114A1242024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 3, Design of Structures, Components, Equipment, and Systems ML24114A1552024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 1, Figures ML24114A1802024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, EQSD-I, Rev. 19, Equipment Qualification Design Basis Document ML24114A1812024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN010, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1492024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 9, Figures ML24114A1262024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 11, Radioactive Waste Management ML24114A1502024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 7, Figures ML24114A1762024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013. Rev. 4-CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1412024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 6, Engineered Safety Features 2024-04-15 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML24114A174&oldid=3677538"