ML24114A153

From kanterella
Jump to navigation Jump to search
Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 5, Figures
ML24114A153
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/15/2024
From:
Wolf Creek
To:
Office of Nuclear Reactor Regulation
References
000347
Download: ML24114A153 (1)


Text

(1/4) 1" 1"

052-BCB-3/4 075-BCB-3/4 076-BCB-3/4 T AVG 076-BCB-2 BCB-3/4 008-BCA-6 024-BCA-1 1/2 (B-4)

NOTE 6 075-BCB-2 236-HCD-3/8 3/4"(V)

AE-020-EBB-16 NOTE 1 SEE NOTE 21 077-BCB-3/8 3/8"(V)

(M-12EJ01, B-8) 230-BCB-3/4 TR0413 TO (A-6)

(A-5)

STC 3/4"(V)

M-12EJ01, (A-8) 3" X 1 1/2" RED.

3/4"(D) 3/4"(D)

NOTE 4 TAVG 3" X 1 1/2" RED.

3" X 1 1/2" RED 3/4"(D)

NOTE 3 LOOP NO. 2 3/4"(D) 232-BCB-3/4 303-HCD-3/4 (D-3) 302-HCD-3/4 (G-4)

T TRENCH NOTE 1 NOTE 1 T AVG 003-BCA-4 NOTE 1 NOTE 1 NOTE 1 NOTE 1 020-BCA-2 M-12BB03 NOTE 6 NOTE 1 T

NOTE 1 NOTE 6 TO SSPS (H-1)

NOTE 1 NOTE 2 037-BCA-2 TO RVLIS (D-3)

AB-004-DBB-28 NOTE 1 T

T NOTE 13 NOTE 1 (M-12BB04, B-3)

TRENCH EP-003-BCA-10 TE0423B FROM NOTE 1 3" X 1 1/2" RED.

NOTE 1 EP-006-BCA-10 NOTE 1 NOTE 13 NOTE 1 LOOP NO 4 LOOP NO 1 NOTE 13 054-BCA-3 NOTE 1 NOTE 1 NOTE 23 059-BCA-1 1/2 EP-009-BCA-10 LOOP NO 3 057-BCA-3 NOTE 5 BCB-3/4" EP-012-BCA-10 NOTE 1 231-BCB-3/4 074-BCA-2 3/4"(V)

AE-022-EBB-16 (M-12BB04, B-3) 042-BCA-6 NOTE 1 NOTE 6 NOTE 1 AB-002-DBB-28 NOTE 23 AB-001-DBB-28 040-BCA-1 1/2 018-BCB-3/4 NOTE 1 (D-7)

M-12BB03 074-BCA-2 NOTE 1 NOTE 1 M-12BB03 AB-003-DBB-28 AE-023-EBB-16 AE-021-EBB-16 NOTE 1 M-12BB03 T AVG EJ-008-BCA-12 005-BCA-1 1/2 055-BCA-2 071-BCA-6 026-BCA-6 (B-4) 233-BCB-3/4 023-BCA-4 EJ-001-BCA-12 234-BCD-3/4 004-BCA-3 TB 0413M TY 0413M PAH 0405D 020 PB 0405C FB 0415A FB 0416A FI 0414 022 FI 0415 022 FT 0414 FT 0415 FI 0416 022 TI 0413Y 118 TI 0413A 021 TE 0413A HIS 8702B 017 PI 0402 FB 0446A FB 0445A FB 0444A FI 0446 022 FI 0445 022 FT 0446 FT 0445 QA 0040 022 TY 0441B TE 0443A TY 0441A3 TY 0441A2 TY 0441A1 TE 0440A2 TE 0441A2 TE 0411A1 TE 0411A3 TE 0411A2 TE 0410A3 TY 0411E PI 0404 ZS 8702AB ZS 8702AA TY 0411R TE 0413B TI 0413B 021 TR 0413 022 TI 0413X 118 TI 0423B 021 TI 0423X 118 TE 0423B TE 0443B TI 0433X 118 TI 0443X 118 TE 0433B TY 0421B TY 0431B TE 0430B TY 0431E QA 0039 022 TY 0431T TY 0431W TY 0421E QA 0038 022 FB 0425A LT 0054A LT 0054B LI 0054A 018 TY 0441P TY 0441Z TY 0411W TY 0431P TE 0420A1 TY 0421Z TY 0411A1 TY 0421U TY 0441T TY 0411U TY 0421T TY 0411A3 TE 0430A3 TY 0411Z TE 0421A1 TE 0441A1 TE 0411B TE 0420A2 TY 0421A1 TY 0431U TY 0431A3 TY 0421P TY 0431Z TY 0431R TE 0431A3 TY 0441R TY 0441U TY 0431A2 TY 0411A2 TY 0421W TY 0421A3 TE 0401 LSHL 0053 053 FI 0434 022 FB 0424A FI 0444 022 FI 0426 022 FI 0424 022 FT 0434 FT 0444 TR 0443 022 FI 0435 022 FI 0436 022 PV 8702A FB 0435A TY 0413J TI 0443A 118 FB 0426A FT 0435 LI 0053B 002 LI 0054B 002 PB 0405D FT 0424 FT 0436 LSHL 0054 053 FT 0426 FI 0425 022 ZS 8032 LT 0053A TE 0420A3 TE 0410A2 TY 0441W LT 0053B TE 0431A2 TY 0431A1 TE 0421B TR 0423 022 TY 0411B TY 0421R FT 0425 FT 0416 LI 0053A 018 TE 0431A1 TY 0421A2 TY 0411P TE 0441A3 TY 0441E TE 0421A3 TE 0441B TY 0411T TE 0421A2 S

S S

S S

S S

S S

U U

U U

U S

S S

S S

S I

I I

I I

I I

1 EBB01C S

3 2

1 BCB 3

3 3

3 3

3 R/E R/E R/E SPARE SPARE SPARE 2

2 2

2 2

SPARE SPARE SPARE 2

S V0475 V0266 BCD BCB BCB BCD BCD HCD EBB01B V0035 V0036 V0037 3

2 1

V0034 V0029 BCD BCA R/E R/E R/E 8949C BCD BCB V0290 8085 V0047 V0048 BCD BCA SPARE R/E 3

3 V0040 V0022 2

2 R/E PBB01B 2

V0289 BCA BCB RBB01 8948C V0059 V0291 BCD BCB 8379B BCB BCA 1

PBB01C V0067 BCD BCA (H-1) 1 PBB01D TE 0440B 4

4 SPARE BCB BCD V0292 8948D V0288 BCD BCB 8948A 2

1 TE 0410B 1

SPARE PBB01A BCD HCD V0311 V0312 BCD BCA V0021 BCB BCD V0008 V0009 QA 0037 022 R/E 1

1 HIS 8702A 017 4

V0079 BCD BCB V0081 4

4 4

SPARE SPARE SPARE 4

4 4

R/E R/E R/E BCD BCB V0066 V0293 V0065 V0078 R/E V0268 BCB TUB V0473 F.O.

BCB HCD F.O.

S 1

1 1

1 1

1 R/E R/E R/E SPARE SPARE SPARE S

BCB BCD BCB V0472 V0020 V0017 V0018 V0019 3

2 1

1 BCB V0007 V0409 2

BCD BCB V0075 V0076 V0077 2

3 EBB01D 8949D V0294 V0252 BCB BCD EBB01A FB 0414A V

1 4

TO TY0413J TUBING ID ID TE 0420B SPARE FROM TE0413A TO ID ID TE 0431B FROM TE0443A TO TY0413J FROM PS0493 TO TY-413J TO EJZA8701B TO TR0423 FROM PS0492 TO TY0413K (A-6)

TUBING A.S.

TO EJZA8701B M-12EJ01, A-8 TUBING TO TY0413J (H-1)

TO TAL0413J FROM PT0405 FROM TE0433B FROM TE0443B FROM PB0403D FROM TE0423A FROM TE0413A FROM PB0403A V0056 V0057 V0058 V0055 V0046 V0267 V0476 V0080 FROM PS0491 TO FROM PB0403A TO TR0443 (D-7)

TO TY0413K (A6)

FROM PS0494 STEAM GENERATOR REACTOR COOLANT PUMP REACTOR VESSEL TO TR0433 REACTOR COOLANT PUMP REACTOR COOLANT PUMP REACTOR COOLANT PUMP STEAM GENERATOR STEAM GENERATOR STEAM GENERATOR ID ID ID.

ID ID Z-8702B Q-0003 Z-8702A Q-0001 Q-0004 Q-0002 FD/0414 FD/0415 FD/0416 FD/0445 FD/0446 FD/0444 Z-8032 FD/0424 FD/0426 L0054A FD/0434 FD/0425 FD/0436 FD/0435 L0053B L0053A L0054B TE 0410A1 TE 0440A3 TE 0440A1 HIS 0037 021 TI 0423A 021 TE 0430A2 LAH 0053 018 LAL 0053 018 HIS 0038 021 HIS 0039 021 HIS 8032 021 HIS 0040 021 8378B 8949A 8378A V0001 8949B HV 8032 HY 8032 PV 8702B BB USAR FIG. 5.1-1-01 1

NOTE 1 TY0413K 8948B BCB BCD S

FB 0436A FB 0434A (G-7)

FROM (G-2)

TB0413M TO RVLIS TE0433B FROM (D-7)

TAL 0413J 020 TE 0433A PB 0403C PB 0403D TR 0433 022 TB 0413J TY 0413K I

V 2

2 FROM TE0443A FROM TE0423B (D-3)

FROM TE0413B (E-3)

FROM PT0403 TO PAH0405D (G-1)

TO CORE SUBCOOLING MONITOR U

S NOTE 1 8379A ID.

ID TY 0413P ID V0010 NOTES:

V0028 TD/0443A TD/0413A TD/0411H TD/0411F TD/0411G TD/0411E TD/0441E TD/0441F TD/0441H TD/0441G TD/0433B TD/0443B TD/0431E TD/0431H TD/0431F TD/0431G TD/0433A TD/0421E TD/0423A TD/0421H TD/0421G TD/0421F TD/0413B TD/0423B TD/0413B EJZA8701B HB-036-BCD-2 EM-083-BCA-1 1/2 HB-037-BCD-2 EM-086-BCA-1 1/2 EM-013-BCA-6 070-BCA-12 002-BCA-10 058-BCA-10 039-BCA-10 BG-001-BCA-3 HB-038-BCD-2 EM-084-BCA-1 1/2 EM-021-BCA-6 007-BCA-12 BG-025-BCB-3 EM-010-BCA-6 EM-087-BCA-1 1/2 069-BCA-14 022-BCA-10 HB-039-BCD-2 BG-183-BCA-2 053-BCA-31 021-BCA-27 1/2 036-BCA-31 038-BCA-27 1/2 001-BCA-27 1/2 019-BCA-31 072-BCA-31 041-BCA-29 025-BCA-29 056-BCA-27 1/2 060-BCA-29 006-BCA-29 EM-018-BCA-6 BG-024-BCB-3 EJHV8804B EJHV8811B BNHV8812B EJHV8804A EJHV8811A EJHV8804A EJHV8811A BNHV8812A V0477 TRENCH NOTE 23 HCD BCD 304-HCD-3/4 V0474 TRENCH BCD HCD NOTE 23 301-HCD-3/4

REFERENCE:

(H-4)

(E-7)

(M-12BB04, C-7)

(B-6)

(M-12BB04 B-3)

(B-6)

(G-6) 233-HCD-3/4 233-BCD-3/4 230-HCD-3/4 V0265 230-BCD-3/4 (H-1)

TE 0423A 231-HCD-3/4 231-BCD-3/4 232-BCD-3/4 232-HCD-3/4 TE 0430A1 NOTE 1 NOTE 1 REACTOR COOLANT SYSTEM DIAGRAM PIPING & INSTRUMENTATION 1

NONE (D-5)

M-12BB02 (D-7)

M-12BB02 (C-7)

M-12AE02 SYSTEM MAIN FEEDWATER (H-8)

M-12SJ04 SYSTEM NUCLEAR SAMPLING (B-8)

M-12HB01 DRAIN TANK REACTOR COOLANT (B-4)

M-12AB01 SYSTEM MAIN STEAM (C-4)

M-12AE02 SYSTEM FEEDWATER MAIN (E-2)

M-12EM01 HEAT REMOVAL PUMPS AND RESIDUAL SAFETY INJECTION (B-7)

M-12AB01 SYSTEM MAIN STEAM (B-8)

M-12HB01 DRAIN TANK REACTOR COOLANT (G-8)

M-12BG01 LETDOWN CVCS (F-2)

M-12EM02 INJECTION TANK SIS BORON (F-2)

M-12EM01 REMOVAL PUMPS RESIDUAL HEAT SAFETY INJECTION AND (G-2)

M-12EM02 INJECTION TANK SIS BORON (C-3)

M-12EP01 ACCUMULATOR SAFETY INJECTION (D-2)

M-12EM02 INJECTION TANK SIS BORON (C-8)

M-12HB01 DRAIN TANK REACTOR COOLANT (B-3)

M-12EP01 ACCUMULATOR SAFETY INJECTION (D-2)

M-12EM01 INJECTION PUMPS SAFETY (G-3)

M-12EP01 ACCUMULATOR SAFETY INJECTION (A-3)

M-12BB02 SPRAY PRESSURIZER (C-8)

M-12HB01 DRAIN TANK REACTOR COOLANT (F-8)

M-12EJ01 SUCTION REMOVAL PUMP RESIDUAL HEAT (F-4)

M-12AE02 SYSTEM FEEDWATER MAIN (F-8)

M-12SJ04 SYSTEM NUCLEAR SAMPLING (F-6)

M-12HB01 DRAIN TANK REACTOR COOLANT (A-6)

M-12BB02 SURGE LINE PRESSURIZER (F-7)

M-12AE02 SYSTEM MAIN FEEDWATER (F-7)

M-12AB01 SYSTEM MAIN STEAM (C-2)

M-12EM01 INJECTION PUMPS SAFETY (F-4)

M-12AB01 SYSTEM MAIN STEAM (F-3)

M-12BB01 (F-6)

M-12BB01 (B-4)

M-12BB01 (B-5)

M-12BB01 TRIP REACTOR LO FLOW TO MONITOR TO CORE SUBCOOLING SSPS TO M-12BB03 PUMP CONTROLS FROM OILLIFT SUBCOOLING MONITOR TO CORE SYSTEM PROTECTION CONTROL AND TO REACTOR MONITOR SUBCOOLING TO CORE FREQUENCY UNDER-RCP BUS M-12BB03 CONTROL LIFT PUMP FROM OIL FREQUENCY UNDER-RCP BUS SSPS TO COOLING MONITOR TO CORE SUB SYSTEM PROTECTION CONTROL AND TO REACTOR PROTECTION SYSTEM TO REACTOR CONTROL AND SSPS TO UNDERFREQUENCY RCP BUS M-12BB03 PUMP CONTROLS FROM OIL LIFT HOSE FOR TYGON CONNECTION (E-8)

M-12BB02(Q)

OPEN PORV NOTE 21 SEE TALE 3/4"TELL M-12BB03 CONTROL LIFT PUMP FROM OIL TRIP REACTOR LO FLOW TO COOLING MONITOR TO CORE SUB-TRIP REACTOR LO FLOW TO SYSTEM PROTECTION CONTROL AND TO REACTOR (B-3)

M-12BB02 SPRAY PRESSURIZER (E-3)

M-12EP01 ACCUMULATOR SAFETY INJECTION (F-8)

M-12BG01 CHARGING LINE CVCS ALTERNATE (D-8)

M-12BG01 LETDOWN CVCS EXCESS (B-8)

M-12EJ01 PUMP SUCTION HEAT REMOVAL RESIDUAL MONITOR SUBCOOLING TO CORE UNDERFREQUENCY BUS RCP COOLING MONITOR TO CORE SUB TRIP REACTOR LO FLOW TO (F-8)

M-12BB02 (Q)

OPEN PORV (E-2)

M-12EM02 INJECTION TANK SIS BORON (F-8)

M-12BG01 CHARGING NORMAL CVCS (M-12BN01, D-2)

FROM (M-12EJ01, D-7)

FROM/TO (M-12EJ01, B-3)

FROM/TO (M-12EJ01, F-7)

(M-12EJ01, H-4)

TO M-12BN01, B-2)

(M-12EJ01, F-7)

(M-12EJ04, H-4)

FROM &

P& I.D. M-12EM03.

THE HIGH PRESSURE COOLANT INJECTION SYS. TEST LINE ANY REVISION TO THIS DRAWING MAY REQUIRE A REVISION TO 47 HCD BCD NOTE 27 34X44 E SIZE 1

A B

C D

E F

G H

2 3

4 5

6 7

8 NUCLEAR OPERATING CORPORATION REVISED ISSUED X

CR #10020390 THIS DWG. SUPERSEDES REV.

THIS DWG. SUPERSEDED BY REV.

CHG. DOC.

INCORPORATED PKG. NO.

CHANGE W LF CREEK REVISION NOTES:

ELECTRONIC APPROVAL SCALE DRAWING NUMBER SHEET REV DCS 6

6.3.315 043 TAH 0401 020 TI 0401 021 CLASSIFICATION IS CHANGED FROM "A" TO "B" DRILLED RESTRICTION 3/8" IN DIAMETER. POINT AT WHICH QUALITY GROUP 1.

SEE WESTINGHOUSE DRAWING M-761-00072.

2.

SEE WESTINGHOUSE DRAWING M-761-00073.

3.

SEE WESTINGHOUSE DRAWING M-761-00074.

4.

SEE WESTINGHOUSE DRAWING M-761-00075.

5.

INJECTION, AND INSTRUMENTATION AND CONTROLS ARE SHOWN ON M-12BB03.

DETAILS OF REACTOR COOLANT PUMP MOTOR COOLING, SEAL WATER 6.

RTD STRAPPED TO LINE.

7.

DURING DRAINING AND FILLING.

TYGON HOSE TO BE INSTALLED AT THESE CONNECTIONS TO VENT PRESSURIZER 8.

DELETED 9.

M-738-00004.

REFERENCE WESTINGHOUSE DRAWINGS M-738-00002, M-738-00003, AND 10.

M-12BB01 PE DS 10466-M-120104.

FOR P&ID LEGEND AND SYMBOLS SEE DRAWINGS 10466-M-120101 THRU 12.

FOR CLARITY.

BOUNDARIES OF THESE PIPING SYSTEMS ARE IDENTIFIED WITH A SYMBOL PSI/ISI WORK PLANS PROVIDED UNDER SPECIFICATION 10466-M-189 AND THEIR INSPECTION REQUIREMENTS ARE DELINEATED IN THE APPLICABLE (PSI) AND/OR INSERVICE INSPECTION (ISI) PROGRAMS THE SPECIFIC WELDS SUBJECT TO VOLUMETRIC EXAMINATION DURING PRESERVICE INSPECTION III CLASS 1 PIPING OF NORMINAL PIPE SIZE GREATER THAN 1"MAY BE ALL WELDS IN ASME SECTION III CLASS 1 COMPONENTS AND ASME SECTION 11.

U PROVIDED ON M-12AB01, M-12AE02, AND M-12BM01.

DETAILS OF STEAM GENERATOR SECONDARY SIDE PIPING AND CONTROLS ARE 13.

INSTRUMENT CHANNELS.

COOLER, FOR PURPOSES OF CALIBRATING THE PRESSURIZER PRESSURE LINE AT THE NUCLEAR SAMPLE STATION, DOWN STREAM OF THE SAMPLE A DIRECT READING DIGITAL PRESSURE INDICATOR IS CONNECTED TO THIS 14.

DELETED 15.

& FOLLOWING AN SSE.

SO AS TO ASSURE THE INTEGRITY OF THE PRESSURIZER RELIEF TANK DURING PRESSURIZER SAFETY & RELIEF VALVE DISCHARGE LINE SHOULD BE ANALYZED 16.

DELETED 17.

DELETED 18.

WHILE ISOLATING THE MAIN CONTROL BOARD CONTROLS AND INDICATION.

RPHIS-0003 WHICH TRANSFERS CONTROL TO THE AUXILIARY SHUTDOWN PANEL ASTS(AUXILIARY SHUTDOWN TRANSFER SIGNAL) IS INITIATED AT RP118 B BY 19.

VIII COMPONENT.

THE PRESSURIZER RELIEF TANK IS A SEISMICALLY QUALIFIED ASME SECTION 20.

DURING MODES 1 THRU 4.

ISOLATE ALL RCS LEVEL INSTRUMENTATION USING REFERENCED VALVES 21.

27. DELETED
22. DELETED DURING MODES 1 THRU 4.

ISOLATE ALL RCS LEVEL INSTRUMENTATION USING REFERENCED VALVES 21.

INSTALLED TO ALLOW DRAINING TO THE CONTAINMENT SUMP TRENCH.

SECTION OF FLEXIBLE HOSE WITH QUICK DISCONNECT ENDS WILL BE GENERATOR BOWL DRAINING OPERATIONS, THE CAPS WILL BE REMOVED, AND A INSTALLED ON THE DRAIN ENDS WITH QUICK DISCONNECTS FOR STEAM DURING NORMAL PLANT OPERATION, QUICK DISCONNECT "DUST" CAPS WILL BE 23.

(8).

ACCELEROMETERS ARE INSTALLED AT EACH REACTOR COOLANT PUMP DISCHARGE 24.

HEAD(5).

AT ELBOW BELOW THE REACTOR COOLANT PUMP (4) REACTOR PRESSURE VESSEL D LOOP STEAM GENERATOR COOLANT OUTLET (1) ALL LOOP CROSSOVER LEGS LANYARD POTENTIOMETERS ARE ATTACHED AT THE FOLLOWING LOCATIONS:

25.

VESSEL NOZZLE.

ACCELEROMETERS ARE REMOVED OR ABANDONED AT THE "D" HOT LEG REACTOR 26.

THIS P&ID CONTAINS LICENSE RENEWAL DATA ADDED LICENSE RENEWAL BOUNDARIES