ML24114A151
ML24114A151 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 04/15/2024 |
From: | Wolf Creek |
To: | Office of Nuclear Reactor Regulation |
References | |
000347 | |
Download: ML24114A151 (1) | |
Similar Documents at Wolf Creek | |
---|---|
Category:Drawing
MONTHYEARML24114A1522024-04-15015 April 2024
[Table view]Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 11, Figures ML24114A1532024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 5, Figures ML24114A1542024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 2, Figures ML24114A1552024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 1, Figures ML24114A1562024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 12, Figures ML24114A1572024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 18, Figures ML24114A1742024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Drawing E-1F9900, Rev. 10, Post-Fire Safe Shutdown Operator Manual Actions ML24114A1502024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 7, Figures ML24114A1332024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 2, Figures ML24114A1482024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 8, Figures ML24114A1472024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 6, Figures ML24114A1492024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 9, Figures ML24114A1512024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 10, Figures ML23135A1192023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 8, Figures ML23135A1222023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 10, Figures ML23135A1182023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 6, Figures ML23135A1672023-05-0808 May 2023 6 to Updated Safety Analysis Report, Figures ML23135A1282023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 18, Figures ML23135A1232023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 11, Figures ML23135A1242023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 5, Figures ML23135A1272023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 12, Figures, Redacted ML23135A1212023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 7, Figures ML23135A1202023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 9, Figures, Redacted ML23135A1262023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 1, Figures - Redacted ML23135A1252023-05-0808 May 2023 6 to Updated Safety Analysis Report, Chapter 2, Figures ML23045A1952023-02-14014 February 2023 Transmittal of the National Pollution Discharge Elimination System Permit Renewal Application for Wolf Creek Generating Station I-NE07-PO02 ML22152A1772022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 12, Figures - Redacted ML22152A1832022-05-18018 May 2022 M-6630-00017A, Appendix G3D to Attachment H, Structural Steel Fireproofing Data, Page G3D-1 of G3D-50 to G5A-63 of G5A-63 ML22152A1692022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 8, Figures ML22152A1742022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 5, Figures ML22152A1722022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 10, Figures ML22152A1732022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 11, Figures ML22152A1682022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 6, Figures ML22152A1702022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 9, Figures ML22152A1712022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 7, Figures ML22152A1752022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 2, Figures ML22152A1782022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 18, Figures ML22152A1762022-05-18018 May 2022 5 to Updated Safety Analysis Report, Chapter 1, Figures - Redacted ML21168A1112021-06-0707 June 2021 4 to Updated Safety Analysis Report, Chapter 2, Figures ML21168A1252021-06-0707 June 2021 4 to Updated Safety Analysis Report, Chapter 8, Drawing No. KD-7750, Revision 14, Wolf Creek Substation General Plan ML21168A1262021-06-0707 June 2021 4 to Updated Safety Analysis Report, Chapter 9, Drawing M-12EC01, Revision 23, Piping & Instrumentation Diagram Fuel Pool Cooling and Clean-Up System. Redacted ML21168A1342021-06-0707 June 2021 4 to Updated Safety Analysis Report, Chapter 18, Drawing M-12SJ04, Revision 16, Piping and Instrumentation Diagram Nuclear Sampling System ML21168A1292021-06-0707 June 2021 4 to Updated Safety Analysis Report, Chapter 11, Drawing M-12HB01, Revision 16, Piping and Instrumentation Diagram Liquid Radwaste System ML21168A1282021-06-0707 June 2021 4 to Updated Safety Analysis Report, Chapter 10, Drawing M-12AC01, Revision 30, Piping & Instrumentation Diagram Main Turbine ML20290A5982020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 10, Figures ML20290A5972020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 9, Figures ML20290A5912020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 2, Figures ML20290A5992020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 11, Figures ML20290A6012020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 18, Drawing M12SJ04, Sheet 16, Piping and Instrumentation Diagram ML20290A5962020-07-23023 July 2020 Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 8, Figures 2024-04-15 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML24114A1912024-04-15015 April 2024
[Table view]Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9910, Rev. 19, Post-Fire Safe Shutdown Area Analysis ML24114A1602024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Revision W01, Attachment C Through G3C, Fire Protection Evaluations for Unique or Unbounded Fire Wrap Configurations ML24114A1482024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 8, Figures ML24114A1882024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN007, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1892024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, EQSD-II, Rev. 35, Equipment Qualification Summary Document ML24114A1742024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Drawing E-1F9900, Rev. 10, Post-Fire Safe Shutdown Operator Manual Actions ML24114A1852024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9905, Rev. 12, Fire Hazard Analysis ML24114A1862024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Rev. 14. Quality Program Manual ML24114A1782024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1592024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configurations, Rev. 4 ML24114A1362024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Cover Sheet ML24114A1382024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 7, Instrumentation and Controls ML24114A1422024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 12, Radiation Protection ML24114A1312024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 16, Relocated Technical Specifications ML24114A1752024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9910, Rev. 18, Post-Fire Safe Shutdown Area Analysis ML24114A1562024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 12, Figures ML24114A1832024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9905, Rev. 14, Fire Hazard Analysis ML24114A1802024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, EQSD-I, Rev. 19, Equipment Qualification Design Basis Document ML24114A1572024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 18, Figures ML24114A1402024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 2, Site Characteristics ML24114A1332024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 2, Figures ML24114A1322024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Questions 005.1 Through 031.20 ML24114A1372024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 8, Electric Power ML24114A1272024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements ML24114A1392024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 5, Reactor Coolant System and Connected Systems ML24114A1872024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN008, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1292024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 14, Initial Test Program ML24114A1532024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 5, Figures ML24114A1842024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN004, Post-Fire Shutdown (PFSSD) Analysis ML24114A1282024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 13, Conduct of Operating ML24114A1732024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN011, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1922024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN002, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1822024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN009, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1352024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 9, Auxiliary Systems ML24114A1522024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 11, Figures ML24114A1472024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 6, Figures ML24114A1612024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Revision W08, Appendix G3D to H, Structural Steel Fireproofing Data ML24114A1502024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 7, Figures ML24114A1342024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 4, Reactor ML24114A1772024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, E-1F9915, Rev. 16, Design Basis Document for Ofn RP-017, Control Room Evaluation ML24114A1622024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, M-663-00017A, Attachment B7 Through B13, Fire Protection Evaluation for Penetrant Size Exceeding Typical Detail B-1 Limitation ML24114A1242024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 3, Design of Structures, Components, Equipment, and Systems ML24114A1552024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 1, Figures ML24114A1792024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation, XX-E-013, Rev. 4-CN006, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1812024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013, Rev. 4-CN010, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1492024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 9, Figures ML24114A1262024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 11, Radioactive Waste Management ML24114A1512024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 10, Figures ML24114A1762024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Calculation XX-E-013. Rev. 4-CN003, Post-Fire Safe Shutdown (PFSSD) Analysis ML24114A1412024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, Chapter 6, Engineered Safety Features 2024-04-15 |
Text
Released by Document Services.
Release Date:
2011.08.15 10:14:47 -05'00'
V0318 V0317 V0316
V0315
V0263 V0261 V0259 V0257
V0177
V0179 V0181 V0183
V0264 V0262 V0260 V0258
014-ABD-30 014-ABD-30
CONDENSER AD-116-HBD-10 CONDENSER M-12AD03 AD-117-HBD-10 V0206 M-12AD03 CONN.NO.069
CONN.NO.070
V0171
V0167
V0278
AD AE ACD ABD V0200 005-ABD-30 GBD ABD V0224 ACD ABD V0043 V0046 V0050 V0060 V0065 003-ABD-24 011-ABD-28 012-ABD-28
V0164 CONDENSER V0168 V0361 V0251 M-12AD03
CONN.NO.071 V0239
V0252
030-ABD-10 (SEE NOTE 1)
V0240
V0018
V0238
V0020
067-HBD-1
068-HBD-1 1/2
M-12BM01
(G-4)
V0980 V0987
B.J. WCNOC B.J. WCNOC 015-ABD-18
AAD ABD V0172 AAD ABD
(SEE NOTE 11) V0175 M-12BM01
V0274 V0275 068-HBD-1 (G-3)
(SEE NOTE 11)
V0270 V0013
V0011 V0271
V0237
V0273 V0272
V0253 V0254
V0005 V0008
025-GBD-1 1/2 V0256 V0362 CONDENSATE 007-ABD-28 008-ABD-28 SYSTEM V0056 V0004 V0007 V0041 V0049 M-12AD02 V0225
(F-8) V0009 V0044 V0066 V0203 024-GBD-1 1/2 V0227
V0016 M-12BM02
(H-6)
V0255
V0017
V0310
V0338
V0339 V0340
V0336
V0337
V0341
V0344
V0358
V0354
154-HBD-3/4
157-HBD-3/4 V0353
V0350 155-HBD-1 158-HBD-1
V0351 156-HBD-1
159-HBD-3/4
153-HBD-3/4 V0352 V0343
V0360
005-ABD-6
V0335
Patty A Springeman Released by Document Services. Release Date:
2015.09.24 13:33:33 -05'00'
V0760
V0533
150-HBD-3/4 135-HBD-6
125-HBD-6
V0352
RADWASTE BLDG.
HVAC 127-HBD-6 NOTE 5 M-12GH01 125-HBD-6 (B-3)
V0065 135-HBD-6
V0171 V0163
146-HBD-3/4
V0172
V0164
V0173
V0165
151-HBD-3/4
V0515
351-HBD-3 G-7
V0175
340-HBD-1
348-HBD-1/2 V0176 3/4" X 1/2"
V0177
3/4" X 1/2"
349-HBD-1/2
V0178
132-HBD-1 V0180
HCD HBD
V0401
Kay L Smith Released by Document Services. Release Date:
2015.02.03 15:50:21 -06'00'
Kay L Smith Released by Document Services. Release Date:
2015.03.24 12:06:36 -05'00'