IR 05000498/2016501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 26: Line 26:


==Dear Mr. Koehl:==
==Dear Mr. Koehl:==
On December 31, 2016, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the South Texas Project Electric Generating Station, Units 1 and 2. This inspection began on January 1, 2016. Issuance of this letter closes NRC Inspection Report 05000498/2016501 and 05000499/2016501. The inspection results associated with the 2016-501 reports are documented in Integrated Resident Inspector Reports 2016-001, 2016-002, 2016-003, and 2016-004. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
On December 31, 2016, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the South Texas Project Electric Generating Station, Units 1 and 2. This inspection began on January 1, 2016. Issuance of this letter closes NRC Inspection Report 05000498/2016501 and 05000499/2016501. The inspection results associated with the 2016-501 reports are documented in Integrated Resident Inspector Reports 2016-001, 2016-002, 2016-003, and 2016-004.


Sincerely,/RA/ Heather J. Gepford, PhD, CHP Chief, Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of
 
this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,/RA/ Heather J. Gepford, PhD, CHP Chief, Plant Support Branch 2  
 
Division of Reactor Safety Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80  


cc: Electronic Distribution ML17018A371 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE SEPI:PSB2 BC:PSB NAME PElkmann HGepford SIGNATURE /RA/ /RA/ DATE 1/17/17 1/17/17
cc: Electronic Distribution ML17018A371 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE SEPI:PSB2 BC:PSB NAME PElkmann HGepford SIGNATURE /RA/ /RA/ DATE 1/17/17 1/17/17
}}
}}

Revision as of 00:06, 30 June 2018

South Texas Project Electric Generating Station, Units 1 and 2 - NRC Emergency Preparedness Annual Inspection Report 05000498/2016501 and 05000499/2016501
ML17018A371
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/17/2017
From: Gepford H J
NRC/RGN-IV/DRS/PSB-2
To: Koehl D
South Texas
References
IR 2016501
Download: ML17018A371 (2)


Text

January 17, 2017

Mr. Dennis Koehl President and CEO STP Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsworth, TX 77483

SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000498/2016501 AND 05000499/2016501

Dear Mr. Koehl:

On December 31, 2016, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the South Texas Project Electric Generating Station, Units 1 and 2. This inspection began on January 1, 2016. Issuance of this letter closes NRC Inspection Report 05000498/2016501 and 05000499/2016501. The inspection results associated with the 2016-501 reports are documented in Integrated Resident Inspector Reports 2016-001, 2016-002, 2016-003, and 2016-004.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of

this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Heather J. Gepford, PhD, CHP Chief, Plant Support Branch 2

Division of Reactor Safety Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80

cc: Electronic Distribution ML17018A371 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE SEPI:PSB2 BC:PSB NAME PElkmann HGepford SIGNATURE /RA/ /RA/ DATE 1/17/17 1/17/17