June 29, 2017
SUBJECT:
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000498/201601 O; 05000499/2016010 AND NRC INVESTIGATION REPORTS 4-2015-014 AND 4-2016-008
Dear Mr. Powell:
This letter refers to the investigations conducted at the South Texas Project Electric Generating Station, Units 1 and 2, by the U.S. Nuclear Regulatory Commission's (NRC's) Office of Investigations. The purpose of the investigations was to determine if willful fire protection-related violations of NRC requirements occurred at the South Texas Project Electric Generating Station, Units 1 and 2. The investigations were initiated on March 25, 2015, and December 2, 2015, and were completed on September 23, 2016, and February 24, 2017, respectively. The issues were discussed with you and other members of your staff during a telephone conversation on June 19, 2017. A factual summary (Enclosure 1) provides a summary of the staff's review of the facts of the case.
Based on the results of the investigations, two apparent violations were identified and are being considered for escalated enforcement action in accordance with the NRC Enforcement Policy.
The Enforcement Policy can be found on the NRC's VVeb site at http://www.nrc.gov/about-nrc/regulatory/enforcement/enforce-pol.html. The apparent violations being considered for escalated enforcement action involve two examples of the licensee's failure to implement written procedures covering the fire protection program; and three examples of the licensee's failure to ensure that information required by the Commission's regulations, orders, or license conditions to be maintained by the licensee shall be complete and accurate in all material respects. The details of the apparent violations are documented in Enclosure 2.
A licensee-identified violation which was determined to be of very low safety significance, is documented in Enclosure 2. The NRC is treating this violation as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.
Before the NRC makes its enforcement decision, we are providing you an opportunity to:
(1) respond to the apparent violations addressed in this inspection report within 30 days of the date of this letter, (2) request a predecisional enforcement conference (PEC), or (3) request alternative dispute resolution (ADR). If a PEC is held, the NRC may issue a press release to announce the time and date of the conference; however, the PEC will be closed to public observation since information related to an Office of Investigations report will be discussed and the report has not been made public.
If you decide to participate in a PEC or pursue ADR, please contact Mr. Gregory Werner, Chief, Engineering Branch 2, at 817-200-1137 within 1 O days of the date of this letter. A PEC should be held within 30 days and an ADR session within 45 days of the date of this letter.
If you choose to provide a written response, it should be clearly marked as a "Response to Apparent Violations in NRC Inspection Report 05000498/201601 O; 05000499/201601 O; EA-16-216" and should include for each apparent violation: (1) the reason for the apparent violation or, if contested, the basis for disputing the apparent violation; (2) the corrective steps that have been taken and the results achieved; (3) the corrective steps that will be taken; and (4) the date when full compliance will be achieved. Your response may reference or include previously docketed correspondence, if the correspondence adequately addresses the required response.
Your written response should be sent to the NRC's Document Control Center, with a copy mailed to Mr. Anton Vegel, Director, Division of Reactor Safety, U.S. Nuclear Regulatory Commission, Region IV, 1600 E. Lamar Blvd., Arlington, TX 76011-4511, within 30 days of the date of this letter. If an adequate response is not received within the time specified or an extension of time has not been granted by the NRC, the NRC will proceed with its enforcement decision or schedule a PEC.
If you choose to request a PEC, the conference will afford you the opportunity to provide your perspective on these matters and any other information that you believe the NRC should take into consideration before making an enforcement decision. The decision to hold a PEC does not mean that the NRC has determined that a violation has occurred or that enforcement action will be taken. This conference would be conducted to obtain information to assist the NRC in making an enforcement decision. The topics discussed during the conference may include information to determine whether a violation occurred, information to determine the significance of a violation, information related to the identification of a violation, and information related to any corrective actions taken or planned. In presenting your corrective actions, you should be aware that the promptness and comprehensiveness of your actions will be considered in assessing any civil penalty for the apparent violations.
In lieu of a PEC, you may request ADR with the NRC in an attempt to resolve this issue.
Alternative dispute resolution is a general term encompassing various techniques for resolving conflicts using a neutral third party. The technique that the NRC has decided to employ is mediation. Mediation is a voluntary, informal process in which a trained neutral mediator works with parties to help them reach resolution. If the parties agree to use ADR, they select a mutually agreeable neutral mediator who has no stake in the outcome and no power to make decisions. Mediation gives parties an opportunity to discuss issues, clear up misunderstandings, be creative, find areas of agreement, and reach a final resolution of the issues.
Additional information concerning the NRC's ADR program can be obtained at http://www.nrc.gov/about-nrc/regulatorv/enforcement/adr/post-investigation.html. The Institute on Conflict Resolution at Cornell University has agreed to facilitate the NRC's program as a neutral third party. Please contact Cornell at 877-733-9415 within 10 days of the date of this letter if you are interested in pursuing resolution of this issue through ADR. In addition, please be advised that the number and characterization of apparent violations described in the enclosed inspection report may change as a result of further NRC review.
You will be advised by separate correspondence of the results of our deliberations on this matter.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter, its enclosures, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS}, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
For administrative purposes, this letter is issued as NRC Inspection Report 05000498/2016010; 050000499/2016010 and the apparent violations will be issued as AV 05000498/2016010-01 ;05000499/2016010-01 and AV 05000498/2016010-02; 05000499/2016010-02, as described in Enclosure 2.
If you have any questions concerning this matter, please contact Mr. Gregory Werner of my staff at 817-200-1137.
Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80
Enclosures:
1. Factual Summary 2. NRC Inspection Report 05000498/201601 O; 050000499/2016010
REGION IV==
05000498 and 05000499 NPF-76 and NPF-80 05000498/201601 O; 05000499/2016010 STP Nuclear Operating Company.
South Texas Project Electric Generating Station, Units 1 and 2 FM 521 - 8 miles west of Wadsworth Wadsworth, Texas 77483 November 14, 2016-June 19, 2017 J. Watkins, Reactor Inspector Gregory E. Werner Chief, Engineering Branch 2 Division of Reactor Safety Enclosure 2
SUMMARY OF APPARENT VIOLATIONS A 1 b CFR 50.48(a)(1 )(iv) requires, in part, that a licensee must have a fire protection plan that outlines the plans for fire protection, fire detection, suppression capability, and limitation of fire damage.
STP Nuclear Operating Company Technical Specification 6;8.1.d requires, in part, that written procedures shall be established, implemented, and maintained covering the fire protection program implementation.
Procedure ZFG-0001, "Fire Watch Program Guideline," Revision 10, Step 4.2 requires, in part, that each hourly fire watch shall be responsible for inspecting all areas of the room for possible indications of smoke, fire, or potential fire hazards, which includes looking behind all accessible areas, behind panels and components that may obscure the fire watches' view.
Procedure ZFG-0001, "Fire Watch Program Guideline," Revision 11, Step 6.0, requires, in part, that a condition report shall be written for a missed fire watch. Procedure OPGP03-ZX-0002, "Condition Reporting Process," Revision 50, Step 3.7 requires, in part, that condition report owners are responsible for proper resolution of the condition, including ensuring that the condition report description is accurate and actions are initiated to address the condition.
Contrary to the above, the licensee failed to implement written procedures covering the fire protection program as evidenced by the following two examples:
1. On May 8-15, 2014, hourly fire watches failed to follow Procedure ZFG-0001 and inspect all areas of the room for possible indications of smoke, fire, or potential fire hazards. Specifically, 20 fire watches, 17 in Unit 1 and 3 in Unit 2, were improperly performed as a result of improper written instructions provided by a supervisor to direct the hourly fire watches to only look at areas of impairments or transient fire loads instead of inspecting all areas of the room as required by fire protection program requirements.
2. On March 4, 2015, a supervisor failed to follow Procedure OPGP03-ZX-0002 when the supervisor closed a condition report and failed to ensure that the condition report description was accurate and actions were initiated to address the condition. Specifically, the supervisor documented inaccurate information in Condition Report 15-4871 that stated, in part, that when a fire watch for Unit 2, Mechanical Auxiliary Building, Room 67 was inadvertently closed, fire watch personnel routinely traversed through the area while performing rounds, and once identified the round was performed immediately with no issues identified.
However, no fire watch personnel traversed the area because the room was locked and was not part of their normal route. Therefore, no fire watch personnel entered the room as documented in the condition report closure.
The apparent violation is designated as AV 05000498/2016010-01; 05000499/2016010-01, "Failure to Follow Fire Protection Program Procedure Requirements."
B. 10 CFR 50.9 requires, in part, that information required by the Commission's regulations, orders, or license conditions to be maintained by the licensee shall be complete and accurate in all material respects.
STP Nuclear Operating Company Technical Specification 6.8.1.d requires, in part, that written procedures shall be established, implemented, and maintained covering the fire protection program implementation.
Procedure ZFG-0001, "Fire Watch Program Guideline," Revision 10, Step 4.2 requires, in part, that each hourly fire watch shall be responsible for inspecting all areas of the room for possible indications of smoke, fire, or potential fire hazards, which includes looking behind all accessible areas, behind panels and components that may obscure the fire watches' view. Step 4.2.12 requires, in part, that after completing the inspection of the assigned area, scan the appropriate "Fire Watch Scan Point" above the fire watch posting.
Procedure ZFG-0001, "Fire Watch Program Guideline," Revision 11, Step 6.0, requires, in part, that a condition report shall be written for a missed fire watch. Procedure OPGP03-ZX-0002, "Condition Reporting Process, Revision 50, Step 3. 7 requires, in part, that condition report owners are responsible for proper resolution of the condition, including ensuring that the condition report description is accurate and actions are initiated to address the condition.
Contrary to the above, the licensee failed to ensure that information required by the Commission's regulations, orders, or license conditions to be maintained by the licensee shall be complete and accurate in all material respects as evidenced by the following three examples:
1. On May 8-15, 2014, the licensee failed to maintain complete and accurate records associated with hourly fire watches. Specifically, a total of 20 fire watch records, 17 in Unit 1 and 3 in Unit 2, were recorded (scanned) as being completed without inspecting all areas of the room for possible indications of smoke, fire, or potential fire hazards. This information was material to the NRC because the performance of fire watches enables the rapid detection, control, and suppression of a fire in accordance with the fire protection program requirements.
2. On March 4, 2015, the licensee failed to maintain complete and accurate records associated with a condition report. Specifically, a supervisor willfully documented inaccurate information in Condition Report 15-4871 that stated, in part, that when a fire watch for Unit 2, Mechanical Auxiliary Building, Room 67 was inadvertently closed, fire watch personnel routinely traversed through the area while performing rounds, and once identified the round was performed immediately with no issues identified. However, no fire watch personnel traversed the area because the room was locked and was not part of their normal route. Therefore, no fire watch personnel entered the room as documented in the condition report closure. This information was material to the NRC because condition reports associated with missed fire watches provide evidence of compliance with licensee procedures and NRC requirements.
3. On April 14, 2015, the licensee failed to maintain complete and accurate records associated with a condition report. Specifically, a supervisor deliberately documented inaccurate information in Condition Report 15-9793 that stated, in part, that field interviews with a fire watch manager and a fire watch lead indicated that the Unit 2 fire watches (FW8934) were properly performed.
However, the supervisor did not confirm with the fire watch manager or a fire watch lead that the fire watches had been performed. This information was material to the NRC because condition reports associated with missed fire watches provide evidence of compliance with licensee procedures and NRC requirements.
The apparent violation is designated as AV 05000498/2016010-02; 05000499/2016010-02, "Failure to Maintain Complete and Accurate Information for the Fire Protection Program."
LICENSEE-IDENTIFIED VIOLATION The following violation of very low safety significance (Green) was identified by the licensee and is a violation of NRG requirements which meets the criteria of the NRG Enforcement Policy for being dispositioned as a non-cited violation.
Title 10 CFR 50.48(a)(1)(iv) requires, in part, that a licensee must have a fire protection plan that outlines the plans for fire protection, fire detection, suppression capability, and limitation of fire damage. Technical Specification 6.8.1.d requires, in part, that written procedures shall be established, implemented, and maintained covering the fire protection program implementation. Procedure ZFG-0001, "Fire Watch Program Guideline," Revision 11, Step 2.5 defines a continuous fire watch, in part, as the act of monitoring an area for conditions that could lead to a fire without leaving the assigned area until relieved by another qualified fire watch person, or when the posting is closed.
Step 5.2.8 requires, in part, that, for a continuous fire watch, the fire watch is to inspect
_ the area of the posting to ensure the fire watch pays attention to any possible smells indicating problems (burning rubber, plastic, wood, etc.).
Contrary to the above, on January 30, 2015, a continuous fire watch failed to inspect the area of the posting, Unit 2 Electrical Auxiliary Building, Elevation 23, Room 101, and failed to ensure they were attentive to any possible smells indicating problems.
Specifically, the continuous fire watch was found inattentive.
In accordance with Inspection Manual Chapter 0609 Appendix F, "Fire Protection Significance Determination Process," dated September 20, 2013, the inspectors determined that this finding has a very low safety significance (Green) per Task 1.3.1,
"Screen Fire Finding for Ability to Achieve Safe Shutdown," because Train C was available for safe shutdown. This issue was entered into the licensee's corrective action program as Condition Report 15-2506.
5