Design Bases Inspection (Programs) Report 05000498/2016008 and 05000499/2016008
ML16113A269
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/22/2016
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Koehl D
South Texas
Farnholtz T
References
IR 2016008
Download: ML16113A269 (13)


Text

ril 22, 2016

SUBJECT:

SOUTH TEXAS PROJECT, UNITS 1 AND 2 - DESIGN BASES INSPECTION (PROGRAMS) REPORT 05000498/2016008 and 05000499/2016008

Dear Mr. Koehl:

On March 24, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the South Texas Project, Units 1 and 2. The NRC inspectors discussed the results of this inspection with Mr. G.T. Powell and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.

The NRC inspectors did not identify any findings or violations of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice and Procedure," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 05000498, 05000499 License Nos. NPF-76, NPF-80 Enclosure: NRC Inspection Report 05000498/2016008 and 05000499/2016008 w/Attachment: Supplemental Information Electronic Distribution for South Texas Project

ML16113A269 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: GAG Yes No Non-Publicly Available Sensitive NRC-002 OFFICE C:DRP-B RI:EB1:RII RI:EB1 SRI:EB1 C:EB1 NAME NTaylor MRiley MWilliams GGeorge TFarnholtz SIGNATURE /RA/ /RA/E-mail /RA/E-mail /RA/ /RA/

DATE 4/8/16 4/6/16 4/6/16 4/8/16 4/22/16

Letter to Dennis from Thomas R. Farnholtz dated April 22, 2016 SUBJECT: SOUTH TEXAS PROJECT, UNITS 1 AND 2 - DESIGN BASES INSPECTION (PROGRAMS) REPORT 05000498/2016008 and 05000499/2016008 Distribution w/enclosure:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Resident Inspector (Nicholas.Hernandez@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Shawn.Money@nrc.gov)

STP Administrative Assistant (Lynn.Wright@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Lisa.Regner@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

Docket: 05000498, 05000499 License: NPF-76, NPF-80 Report Nos.: 05000498/2016008, 05000499/2016008 Licensee: STP Nuclear Operating Company Facility: South Texas Project Location: FM 521 - 8 miles west of Wadsworth Dates: March 21 through March 24, 2016 Team Leader: G. George, Senior Reactor Inspector, Division of Reactor Safety, Engineering Branch 1, Region IV Inspectors: M. Riley, Reactor Inspector, Division of Reactor Safety, Engineering Branch 1, Region II M. Williams, Reactor Inspector, Division of Reactor Safety, Engineering Branch 1, Region IV Accompanying J. Isom, Senior Reactor Operations Engineer, Division of Inspection and Personnel: Regional Support, Reactor Inspection Branch, Office of Nuclear Reactor Regulation Approved By: Thomas R. Farnholtz, Branch Chief, Division of Reactor Safety, Engineering Branch 1, Region IV-1- Enclosure

SUMMARY

IR 05000498/2016008, 0500499/2016008; 03/21/2016 - 03/24/2016; South Texas Project,

Units 1 and 2; baseline inspection, NRC Inspection Procedure 71111.21N, Design Bases Inspection (Programs).

The inspection activities described in this report were performed between March 21, 2016, and March 24, 2016, by three inspectors from the NRCs Region II and Region IV offices. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process.

No findings were identified.

REPORT DETAILS

REACTOR SAFETY

Cornerstones:Initiating Events, Mitigating Systems, and Barrier Integrity

1R21 Component Design Basis Inspection

a. Inspection Scope

The inspection team performed a pilot inspection conducted as outlined in NRC Inspection Procedure (IP) 71111.21N, Attachment 1, Environmental Qualification under 10 CFR 50.49 Programs, Processes, and Procedures. The team assessed South Texas Projects implementation of the environmental qualification program as required by 10 CFR 50.49, Environmental qualification of electric equipment important to safety for nuclear power plants. The team evaluated whether South Texas Project staff properly maintained the environmental qualification of electrical equipment important to safety throughout plant life, established and maintained required environmental qualification documentation records, and implemented an effective corrective action program to identify and correct environmental qualification related deficiencies.

The inspection included review of environmental qualification program procedures, component environmental qualification files, environmental qualification test records, equipment maintenance and operating history, maintenance and operating procedures, vendor documents, design documents, and calculations. The team interviewed program owners, engineers, maintenance staff, and warehouse staff. The team performed in-plant walkdowns (where accessible) to verify equipment was installed as described in South Texas Projects environmental qualification component documentation files; and that the components were installed in their tested configuration. Additionally, the team performed in-plant walkdowns to determine whether equipment surrounding the components could fail in a manner that could prevent the safety functions of the components, and to verify that components located in areas susceptible to a high energy line break were properly evaluated for operation in a harsh environment. The team reviewed and inspected the storage of replacement parts and associated procurement records to verify environmental qualification parts approved for installation in the plant were properly identified and controlled, and that storage and environmental conditions did not adversely affect the components qualified lives. Documents reviewed for this inspection are listed in the Attachment.

The inspection procedure requires the team to select 6 to 10 components to assess the adequacy of the environmental qualification program. The team selected 7 components for this inspection. Component samples selected for this inspection are listed below:

  • A1SIMOV0016A, containment emergency sump 1A to safety injection train A pump suction isolation motor operated valve operator
  • 3V141VFN003, isolation valve cubicle train C auxiliary feedwater pump cubicle ventilation supply fan 11C
  • B1SILT0932, refueling water storage tank level transmitter
  • C2HCPT9760, reactor containment building pressure transmitter
  • 2N121NPA101A, high head safety injection pump 1A

b. Findings

No findings were identified.

OTHER ACTIVITIES

Cornerstones: Initiating Events, Mitigating Systems, Barrier Integrity

4OA2 Problem Identification and Resolution

a. Inspection Scope

The team reviewed a sample of issues which were previously identified and entered into the corrective action program. The team reviewed these issues to verify an appropriate threshold for identifying issues and to evaluate the effectiveness of corrective actions. In addition, condition reports written on issues identified during the inspection were reviewed to verify adequate problem identification and incorporation of the problem into the corrective action program. The specific condition reports that were sampled and reviewed by the team are listed in the Attachment.

b. Findings

No findings were identified.

4OA6 Meetings, Including Exit

Exit Meeting Summary

On March 24, 2016, the inspectors presented the final inspection results to G.T. Powell, Site Vice President, and other members of the licensee staff. The licensee acknowledged the issues presented. The licensee confirmed that any proprietary information reviewed by the inspectors had been returned or destroyed.

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

J. Atkins, Manager, Systems Engineering
M. Berg, Manager, Design Engineering/Test Programs
D. Chamberlain, Supervisor, Design Engineering
F. Comeaux, Engineer, Design Engineering
J. Connolly, General Manager, Engineering
J.B. Cook, Design Coordinator
S. Flaherty, Manager, Staff Support & Owner Liason
C. Georgeson, Supervisor, Design Engineering
M. Foster, Supervisor, Operations Support - Procedures
K. Frazier, Supervisor, System Engineering
R. Kersey, Engineer, Design Engineering
J. Konchak, Engineer, Design Engineering
G. Jonro Jr., Engineer, Design Engineering
B. Lane, Manager, Operations, Integrated Work Management & Outage
H. Leon, Engineer, Design Engineering
G. Lewis, Manager, Administration and Technical Support
T. Maxey, Engineer, Design Engineering
M. Murray, Manager, Regulatory Affairs/Licensing
G.T. Powell, Site Vice President
P. Reis, Supervisor, Material Handling
J. Rocha, Supervisor, Design Engineering
S. Rodgers, Risk Management
D. Rohan, Operations Support - Procedures
T. Russell, Engineer, Design Engineering
R.D. Savage, Engineer Specialist/Licensing Consultant, Licensing
G.E. Schinzel, Supervisor, Design Engineering
W. Schulz, Engineer, Design Engineering
L. Sterling, Supervisor, Licensing
D. Tran, Engineer, Design Engineering

NRC Personnel

A. Sanchez, Senior Resident Inspector
N. Hernandez, Resident Inspector

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Open and

Closed

None Attachment

LIST OF DOCUMENTS REVIEWED