ML24122C628: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 18: Line 18:
{{#Wiki_filter:Global Laser Enrichment
{{#Wiki_filter:Global Laser Enrichment


Tim Knowles Security Related Information                                                                                           Licensing & Regulatory Affairs Manger 3901 Castle Hayne Road Wilmington, NC 28402-0780 This letter forwards Security Related Information which must                                                             USA be withheld from unauthorized disclosure in accordance with                                                               T 910 623 4336 RIS2015-031. The cover letter may be decontrolled when                                                                 F 910 819 5731 separated from the enclosure.
Tim Knowles Security Related Information Licensing & Regulatory Affairs Manger 3901 Castle Hayne Road Wilmington, NC 28402-0780 This letter forwards Security Related Information which must USA be withheld from unauthorized disclosure in accordance with T 910 623 4336 RIS2015-031. The cover letter may be decontrolled when F 910 819 5731 separated from the enclosure.
C 432 425-5525 timothy.knowles@gle-us.com
C 432 425-5525 timothy.knowles@gle-us.com


Line 26: Line 26:


==Subject:==
==Subject:==
(U)RE-Submission of the GLE Standard Practice and Procedures Plan (SPPP) for Headquarters Facility (HQ), and Classified Matter Transportation Plan Ref. 1 - ML23243A847, Aug 25, 2023, LTR. from P. Jenny to NRC DSO Ref. 2 - ML23305A089, Nov 30, 2023, LTR. From M. Bartlett to P. Jenny Ref. 3 - GLE-INFOSEC-PHYS-1000001-LT R from P. Jenny to NSIR, dated Jan. 8, 2024 Ref. 4- GLE-INFOSEC-PHYS-1000001-LT R-2 from P. Jenny to NSIR dated Feb. 19, 2024 Ref. 5 - GLE-INFOSEC-PHYS-1000001-LT R-3 from P. Jenny to NSIR dated Feb. 28, 2024 Ref. 6 - GLE-INFOSEC-PHYS-1000001-LTR-4 from P. Jenny to NSIR dated Feb. 28, 2024 Ref. 7 - GLE-2023-0056, P. Jenny to NSIR dated Aug. 25, 2023 Ref. 8 - GLE-2023-0066, P. Jenny to NSIR dated Oct. 2, 2023
(U)RE-Submission of the GLE Standard Practice and Procedures Plan (SPPP) for Headquarters Facility (HQ), and Classified Matter Transportation Plan Ref. 1 - ML23243A847, Aug 25, 2023, LTR. from P. Jenny to NRC DSO Ref. 2 - ML23305A089, Nov 30, 2023, LTR. From M. Bartlett to P. Jenny Ref. 3 - GLE-INFOSEC-PHYS-1000001-LT R from P. Jenny to NSIR, dated Jan. 8, 2024 Ref. 4-GLE-INFOSEC-PHYS-1000001-LT R-2 from P. Jenny to NSIR dated Feb. 19, 2024 Ref. 5 - GLE-INFOSEC-PHYS-1000001-LT R-3 from P. Jenny to NSIR dated Feb. 28, 2024 Ref. 6 - GLE-INFOSEC-PHYS-1000001-LTR-4 from P. Jenny to NSIR dated Feb. 28, 2024 Ref. 7 - GLE-2023-0056, P. Jenny to NSIR dated Aug. 25, 2023 Ref. 8 - GLE-2023-0066, P. Jenny to NSIR dated Oct. 2, 2023


Global Laser Enrichment (GLE) originally submitted a new SPPP for the new HQ building in August of 2023 (Ref. 1). Through discussions with the NRC and reviews by NRC personnel several changes were made to the SPPP (GLEP-00100-R) as noted in references 2-6. GLE is submitting this revi sion as a result of discussions with the NRC Region II staff during the recent Facility Security Clearance, Operational Readiness Review (ORR).
Global Laser Enrichment (GLE) originally submitted a new SPPP for the new HQ building in August of 2023 (Ref. 1). Through discussions with the NRC and reviews by NRC personnel several changes were made to the SPPP (GLEP-00100-R) as noted in references 2-6. GLE is submitting this revi sion as a result of discussions with the NRC Region II staff during the recent Facility Security Clearance, Operational Readiness Review (ORR).


Global Laser Enrichment (GLE) original ly submitted a new Classified Matter Transportation Plan (GLEP-00101-R-Revisio n 0) in August of 2023 (Ref. 7). Through discussions with the NRC and reviews by NRC personnel several changes were made to the Transportation Plan (Ref. 8). GLE is submitting this revision as a result of
Global Laser Enrichment (GLE) original ly submitted a new Classified Matter Transportation Plan (GLEP-00101-R-Revisio n 0) in August of 2023 (Ref. 7). Through discussions with the NRC and reviews by NRC personnel several changes were made to the Transportation Plan (Ref. 8). GLE is submitting this revision as a result of

Revision as of 16:40, 4 October 2024

RE-Submission of the Gle Standard Practice and Procedures Plan (Sppp) for Headquarters Facility (Hq), and Classified Matter Transportation Plan
ML24122C628
Person / Time
Site: 07007033
Issue date: 04/26/2024
From: Knowles T
Global Laser Enrichment
To:
Office of Nuclear Material Safety and Safeguards, Document Control Desk, Office of Nuclear Security and Incident Response
Shared Package
ML24122C631 List:
References
Download: ML24122C628 (4)


Text

Global Laser Enrichment

Tim Knowles Security Related Information Licensing & Regulatory Affairs Manger 3901 Castle Hayne Road Wilmington, NC 28402-0780 This letter forwards Security Related Information which must USA be withheld from unauthorized disclosure in accordance with T 910 623 4336 RIS2015-031. The cover letter may be decontrolled when F 910 819 5731 separated from the enclosure.

C 432 425-5525 timothy.knowles@gle-us.com

April 26, 2024

Attn: Document Control Desk Chief, Information Security Branch, Division of Security Operations Office of Nuclear Security and Incident Response 11555 Rockville Pike Rockville, MD 20852 Docket 70-7033 SNM-7006

Subject:

(U)RE-Submission of the GLE Standard Practice and Procedures Plan (SPPP) for Headquarters Facility (HQ), and Classified Matter Transportation Plan Ref. 1 - ML23243A847, Aug 25, 2023, LTR. from P. Jenny to NRC DSO Ref. 2 - ML23305A089, Nov 30, 2023, LTR. From M. Bartlett to P. Jenny Ref. 3 - GLE-INFOSEC-PHYS-1000001-LT R from P. Jenny to NSIR, dated Jan. 8, 2024 Ref. 4-GLE-INFOSEC-PHYS-1000001-LT R-2 from P. Jenny to NSIR dated Feb. 19, 2024 Ref. 5 - GLE-INFOSEC-PHYS-1000001-LT R-3 from P. Jenny to NSIR dated Feb. 28, 2024 Ref. 6 - GLE-INFOSEC-PHYS-1000001-LTR-4 from P. Jenny to NSIR dated Feb. 28, 2024 Ref. 7 - GLE-2023-0056, P. Jenny to NSIR dated Aug. 25, 2023 Ref. 8 - GLE-2023-0066, P. Jenny to NSIR dated Oct. 2, 2023

Global Laser Enrichment (GLE) originally submitted a new SPPP for the new HQ building in August of 2023 (Ref. 1). Through discussions with the NRC and reviews by NRC personnel several changes were made to the SPPP (GLEP-00100-R) as noted in references 2-6. GLE is submitting this revi sion as a result of discussions with the NRC Region II staff during the recent Facility Security Clearance, Operational Readiness Review (ORR).

Global Laser Enrichment (GLE) original ly submitted a new Classified Matter Transportation Plan (GLEP-00101-R-Revisio n 0) in August of 2023 (Ref. 7). Through discussions with the NRC and reviews by NRC personnel several changes were made to the Transportation Plan (Ref. 8). GLE is submitting this revision as a result of

GLE-REGS-HQ-1000001-LTR SNM-7006 Docket 70-7033 discussions with the NRG Region II staff during the recent Facility Security Clearance, Operational Readiness Review (ORR).

The enclosure(s) to this transmittal contains the full SPPP and a Red-Lined markup of the revision, and Classified Matter Transportation Plan which are marked as Security Related Information.

If there are any questions regarding this letter and its contents, please do not hesitate to contact me at 910-623-4336 or at timothy.knowles@gle-u s.com.

Sincerely, Tim Knowles Licensing & Regulatory Affairs Manager

Enclosures:

1. (U) SPPP GLEP-00100-R Final - Security Related Information - Re-Submis sion
2. (U) SPPP GLEP-00100-R Red Lined M arkup - Security Related Information - Re-Submission

-Redline Markup copy

3. (U) Classified Mat ter Transportation Plan GLEP-00101-R - Security Related Information - Re Submission cc: M. Bartlett (NMSS) NRC S.Bazian (NSIR) NRC GLE-REGS-HQ-1000001-LTR SNM-7006 Docket 70-7033 Page 2