Global Laser Enrichment (Gle) Request for Approval of Intrusion Detection Installer and Equipment
ML23255A043
Person / Time
Site: 07007033
Issue date: 09/07/2023
From: Jenny P
Global Laser Enrichment
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Security and Incident Response, Document Control Desk, Division of Security Operations
References
GLE-2023-059
Download: ML23255A043 (1)


Text

GU.BAL Laser Enrichment PatJenny Regulatory Affairs/Lie. Manager 3901 Castle Hayne Road Security-Related Information Notice Wilmington, NC 28402-0780 This attachment to this letter contains security-related USA sensitive information which is to be withheld from public T 910 819 7447 disclosure in accordance with 10CFR2.390 and RIS F 910 819 5731 C 910 200 0744 2005-31. pat.jenny@gle-us.com GLE 2023-059 Attn: Document Control Desk Director, Division of Security Operations Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Docket 70-7033 SNM-7006 September 7, 2023

Subject:

Request for Approval of Intrusion Detection Installer and Equipment In accordance with 32CFR117.15(d)(l) and (d)(4), Global Laser Enrichment (GLE) is requesting approval for an Intrusion Detection System (IDS).

1. CSA approval is required before installing an IDS.
2. Any IDE that has not been tested and approved by an NRTL will require CSA approval.
3. The IDS will be installed by an NRTL-approved entity or by an entity approved in writing by the CSA.

GLE is constructing a classified machine shop and Headquarters (HQ). An IDS will be installed. This installation is expected to start around October 1. NRC approval prior to installing is required.

Some of the equipment being used has not been tested by an NRTL lab. The list of equipment and equipment vendors is in Enclosure 1. NRC approval of the non-NRTL tested equipment is required.

Security 2000 {52K) is our vendor. They have installed the IDS for the GLE TL and FGE buildings. They have experience with military installations and SCIFs. The new HQ facility secufity officers and the current TL officers will be using the same IDS systems as installed by S2K. This common use equipment and experience with the current equipment is important to our plan of redundancy. S2K is not currently an NRTL-approved entity and requires NRC approval. GLE has compared the planned IDS to UL2050 standards. That comparison is provided in Enclosure l.

Docket 70*7033 SNM-7006

Security Related Information Withhold from Public Disclosure In accordance with 10CFR 2.390 and RIS 2005-31 IDS Approval GLE-2023-0S9 If you require additional information, please let me know. My telephone number is 910-819-7447 or you can email me at Pat.Jenny@gle-us.com.

cc. 8. Fishel (GLE)

Enclosure:

IDS Equipment Testing and UL2050 standards comparison 2