ML24122C628

From kanterella
Jump to navigation Jump to search
RE-Submission of the Gle Standard Practice and Procedures Plan (Sppp) for Headquarters Facility (Hq), and Classified Matter Transportation Plan
ML24122C628
Person / Time
Site: 07007033
Issue date: 04/26/2024
From: Knowles T
Global Laser Enrichment
To:
Office of Nuclear Material Safety and Safeguards, Document Control Desk, Office of Nuclear Security and Incident Response
Shared Package
ML24122C631 List:
References
Download: ML24122C628 (4)


Text

Global Laser Enrichment GLE-REGS-HQ-1000001-LTR SNM-7006 Docket 70-7033 Tim Knowles Licensing & Regulatory Affairs Manger 3901 Castle Hayne Road Wilmington, NC 28402-0780 USA T 910 623 4336 F 910 819 5731 C 432 425-5525 timothy.knowles@gle-us.com Security Related Information This letter forwards Security Related Information which must be withheld from unauthorized disclosure in accordance with RIS2015-031. The cover letter may be decontrolled when separated from the enclosure.

April 26, 2024 Attn: Document Control Desk Chief, Information Security Branch, Division of Security Operations Office of Nuclear Security and Incident Response 11555 Rockville Pike Rockville, MD 20852 Docket 70-7033 SNM-7006

Subject:

(U)RE-Submission of the GLE Standard Practice and Procedures Plan (SPPP) for Headquarters Facility (HQ), and Classified Matter Transportation Plan Ref. 1 - ML23243A847, Aug 25, 2023, LTR. from P. Jenny to NRC DSO Ref. 2 - ML23305A089, Nov 30, 2023, LTR. From M. Bartlett to P. Jenny Ref. 3 - GLE-INFOSEC-PHYS-1000001-LTR from P. Jenny to NSIR, dated Jan. 8, 2024 Ref. 4-GLE-INFOSEC-PHYS-1000001-LTR-2 from P. Jenny to NSIR dated Feb. 19, 2024 Ref. 5 - GLE-INFOSEC-PHYS-1000001-LTR-3 from P. Jenny to NSIR dated Feb. 28, 2024 Ref. 6 - GLE-INFOSEC-PHYS-1000001-LTR-4 from P. Jenny to NSIR dated Feb. 28, 2024 Ref. 7 - GLE-2023-0056, P. Jenny to NSIR dated Aug. 25, 2023 Ref. 8 - GLE-2023-0066, P. Jenny to NSIR dated Oct. 2, 2023 Global Laser Enrichment (GLE) originally submitted a new SPPP for the new HQ building in August of 2023 (Ref. 1). Through discussions with the NRC and reviews by NRC personnel several changes were made to the SPPP (GLEP-00100-R) as noted in references 2-6. GLE is submitting this revision as a result of discussions with the NRC Region II staff during the recent Facility Security Clearance, Operational Readiness Review (ORR).

Global Laser Enrichment (GLE) originally submitted a new Classified Matter Transportation Plan (GLEP-00101-R-Revision 0) in August of 2023 (Ref. 7). Through discussions with the NRC and reviews by NRC personnel several changes were made to the Transportation Plan (Ref. 8). GLE is submitting this revision as a result of

discussions with the NRG Region II staff during the recent Facility Security Clearance, Operational Readiness Review (ORR).

The enclosure(s) to this transmittal contains the full SPPP and a Red-Lined markup of the revision, and Classified Matter Transportation Plan which are marked as Security Related Information.

If there are any questions regarding this letter and its contents, please do not hesitate to contact me at 910-623-4336 or at timothy.knowles@gle-us.com.

Sincerely, Tim Knowles Licensing & Regulatory Affairs Manager

Enclosures:

1.

(U) SPPP GLEP-00100-R Final - Security Related Information - Re-Submission 2.

(U) SPPP GLEP-00100-R Red Lined Markup - Security Related Information - Re-Submission

- Redline Markup copy 3.

(U) Classified Matter Transportation Plan GLEP-00101-R - Security Related Information - Re Submission cc: M. Bartlett (NMSS) NRC S. Bazian (NSIR) NRC GLE-REGS-HQ-1000001-LTR SNM-7006 Docket 70-7033 Page 2