ML20196A767: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20196A767
| number = ML20196A767
| issue date = 11/20/1998
| issue date = 11/20/1998
| title = Advises That Exemption Request,Dtd 980813 Being Treated as Withdrawn.Exemption Was for Deferral of Local Leak Rate Test of Primary Containment Penetration 1MC-042
| title = Advises That Exemption Request, Being Treated as Withdrawn.Exemption Was for Deferral of Local Leak Rate Test of Primary Containment Penetration 1MC-042
| author name = Hopkins J
| author name = Hopkins J
| author affiliation = NRC (Affiliation Not Assigned)
| author affiliation = NRC (Affiliation Not Assigned)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = TAC-MA3393, TAC-MA3754, NUDOCS 9811300144
| document report number = TAC-MA3393, TAC-MA3754, NUDOCS 9811300144
| title reference date = 08-13-1998
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 4
| page count = 4
| project =  
| project = TAC:MA3393, TAC:MA3754
| stage = Other
| stage = Other
}}
}}
Line 26: Line 27:
==Dear Mr. Sipek:==
==Dear Mr. Sipek:==


l By letter dated August 13,1998, you applied for an exemption from 10 CFR Part 50, Appendix                ,
l By {{letter dated|date=August 13, 1998|text=letter dated August 13,1998}}, you applied for an exemption from 10 CFR Part 50, Appendix                ,
J, " Primary Reactor Containment Leakage Testing For Water-Cooled Power Reactors," for the                !
J, " Primary Reactor Containment Leakage Testing For Water-Cooled Power Reactors," for the                !
Clinton Power Station. The exemption was for deferral of the localleak rate test of primary containment penetration 1MC-042. Subsequently, the NRC staff had discussions with your staff and it was determined that a license amendment was appropriate for your request and not an exemption. Therefore, by letter dated October 5,1998, you submitted a license amendment request and withdrew the exemption request.
Clinton Power Station. The exemption was for deferral of the localleak rate test of primary containment penetration 1MC-042. Subsequently, the NRC staff had discussions with your staff and it was determined that a license amendment was appropriate for your request and not an exemption. Therefore, by {{letter dated|date=October 5, 1998|text=letter dated October 5,1998}}, you submitted a license amendment request and withdrew the exemption request.
The purpose of this letter is to advise you that the exemption request is being treated as withdrawn and TAC No. MA3393 is closed. The license amendment request is being tracked by TAC No. MA3754.
The purpose of this letter is to advise you that the exemption request is being treated as withdrawn and TAC No. MA3393 is closed. The license amendment request is being tracked by TAC No. MA3754.
<                                                              Sincerely, Original signed by:                            l I
<                                                              Sincerely, Original signed by:                            l I
Line 48: Line 49:
==Dear Mr. Sipek:==
==Dear Mr. Sipek:==


j        By letter dated August 13,1998, you applied for an exemption from 10 CFR Part 50, Appendix l        J, " Primary Reactor Containment Leakage Testing For Water-Cooled Power Reactors," for the l        Clinton Power Station. The exemption was for deferral of the local leak rate test of primary l        containment penetration 1MC-042. Subsequently, the NRC staff had discussions with your I
j        By {{letter dated|date=August 13, 1998|text=letter dated August 13,1998}}, you applied for an exemption from 10 CFR Part 50, Appendix l        J, " Primary Reactor Containment Leakage Testing For Water-Cooled Power Reactors," for the l        Clinton Power Station. The exemption was for deferral of the local leak rate test of primary l        containment penetration 1MC-042. Subsequently, the NRC staff had discussions with your I
staff and it was determined that a license amendment was appropriate for your request and not an exemption. Therefore, by letter dated October 5,1998, you submitted a license amendment request and withdrew the exemption request.
staff and it was determined that a license amendment was appropriate for your request and not an exemption. Therefore, by {{letter dated|date=October 5, 1998|text=letter dated October 5,1998}}, you submitted a license amendment request and withdrew the exemption request.
l I                                                                                                                                                      I The purpose of this letter is to advise you that the exemption request is being treated as l        withdrawn and TAC No. MA3393 is closed. The license amendment request is being tracked by TAC No. MA3754.
l I                                                                                                                                                      I The purpose of this letter is to advise you that the exemption request is being treated as l        withdrawn and TAC No. MA3393 is closed. The license amendment request is being tracked by TAC No. MA3754.
Sincerely, Original signed by:
Sincerely, Original signed by:
Line 76: Line 77:
==Dear Mr. Sipek:==
==Dear Mr. Sipek:==


By letter dated August 13,1998, you applied for an exemption from 10 CFR Part 50, Appendix J, " Primary Reactor Containment Leakage Testing For Water Cooled Power Reactors," for the Clinton Power Station. The exemption was for deferral of the local leak rate test of primary containment penetration 1MC-042. Subsequently, the NRC staff had discussions with your staff and it was determined that a license amendment was appropriate for your request and not an exemption. Therefore, by letter dated October 5,1998, you submitted a license amendment request and withdrew the exemption request.
By {{letter dated|date=August 13, 1998|text=letter dated August 13,1998}}, you applied for an exemption from 10 CFR Part 50, Appendix J, " Primary Reactor Containment Leakage Testing For Water Cooled Power Reactors," for the Clinton Power Station. The exemption was for deferral of the local leak rate test of primary containment penetration 1MC-042. Subsequently, the NRC staff had discussions with your staff and it was determined that a license amendment was appropriate for your request and not an exemption. Therefore, by {{letter dated|date=October 5, 1998|text=letter dated October 5,1998}}, you submitted a license amendment request and withdrew the exemption request.
The purpose of this letter is to advise you that the exemption request is being treated as withdrawn and TAC No. MA3393 is closed. The license amendment request is being tracked by TAC No. MA3754.
The purpose of this letter is to advise you that the exemption request is being treated as withdrawn and TAC No. MA3393 is closed. The license amendment request is being tracked by TAC No. MA3754.
Sincerely, i-    .
Sincerely, i-    .

Latest revision as of 08:31, 9 December 2021

Advises That Exemption Request, Being Treated as Withdrawn.Exemption Was for Deferral of Local Leak Rate Test of Primary Containment Penetration 1MC-042
ML20196A767
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/20/1998
From: Hopkins J
NRC (Affiliation Not Assigned)
To: Sipek J
ILLINOIS POWER CO.
References
TAC-MA3393, TAC-MA3754, NUDOCS 9811300144
Download: ML20196A767 (4)


Text

., . . ~ .. __ - _ - -

November 20, 1998 Mr. Joseph V. Sipek Director - Licensing Clinton Power Station P.O. Box 678 Mail Code V920 Clinton,IL 61727 i

SUBJECT:

CLINTON POWER STATION - WITHDRAWAL OF APPLICATION FOR EXEMPTION FROM 10 CFR PART 50, APPENDIX J (TAC NO. MA3393)

Dear Mr. Sipek:

l By letter dated August 13,1998, you applied for an exemption from 10 CFR Part 50, Appendix ,

J, " Primary Reactor Containment Leakage Testing For Water-Cooled Power Reactors," for the  !

Clinton Power Station. The exemption was for deferral of the localleak rate test of primary containment penetration 1MC-042. Subsequently, the NRC staff had discussions with your staff and it was determined that a license amendment was appropriate for your request and not an exemption. Therefore, by letter dated October 5,1998, you submitted a license amendment request and withdrew the exemption request.

The purpose of this letter is to advise you that the exemption request is being treated as withdrawn and TAC No. MA3393 is closed. The license amendment request is being tracked by TAC No. MA3754.

< Sincerely, Original signed by: l I

Jon B. Hopkins, Senior Project Manager

, Project Directorate lil-2 Division of Reactor Projects ill/IV l Office of Nuclear Reactor Regulation

Docket No. 50-461 Distnb.utton Docket File PUBLIC

. cc: See next page PD3-2 R/F ACRS l EGA1 GGrant, Rlli OGC Document Name: G:\PD3-3\CLINTON\MA3393.WD OFFICE PM:PDIII-2 C LA:PDIII-2 (L D:PDIII-2 Ce NAME JHopkins & EBarnhill 8 6 SRichards PW DATE ll //7' /98 7 h / r1 /98 \\ / tt /98 Y/O\

0FFICIAL RECORD COPY VV% rm r;~ o m m, w,,.,

98113oo144 901120

$DR ADOCK 05000461 I "E ' .L--

- i bQi PDR

.7 November 20, 1998

! Mr. Joseph V. Sipek Director - Licensing Clinton Power Station l P.O. Box 678 l Mail Code V920 Clinton,IL 61727 l

SUBJECT:

CLINTON POWER STATION -WITHDRAWAL OF APPLICATION FOR EXEMPTION FROM 10 CFR PART 50, APPENDIX J (TAC NO. MA3393) j

Dear Mr. Sipek:

j By letter dated August 13,1998, you applied for an exemption from 10 CFR Part 50, Appendix l J, " Primary Reactor Containment Leakage Testing For Water-Cooled Power Reactors," for the l Clinton Power Station. The exemption was for deferral of the local leak rate test of primary l containment penetration 1MC-042. Subsequently, the NRC staff had discussions with your I

staff and it was determined that a license amendment was appropriate for your request and not an exemption. Therefore, by letter dated October 5,1998, you submitted a license amendment request and withdrew the exemption request.

l I I The purpose of this letter is to advise you that the exemption request is being treated as l withdrawn and TAC No. MA3393 is closed. The license amendment request is being tracked by TAC No. MA3754.

Sincerely, Original signed by:

l Jon B. Hopkins, Senior Project Manager

! Project Directorate ill-2 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-461 Distribution:

! Docket File PUBLIC

]

cc: See next page PD3-2 R/F ACRS EGA1 GGrant, Rlli OGC l

! Document Narae: G:\PD3-3\CLINTON\MA3393.WD

0FFICE PM
PDIII-2 lC LA:PDIII-2 lO D:PDIII-2 l c-I NAME JHopkins & EBarnhill W SRichards epC/

j DATE ll / /7 /98 7 lt/r1/98 \\ / tt /98

( 0FFICIAL RECORD COPY 4

7

6 g p rerp

,o t UNITED STATES

=

s*

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20ssH001

/

November 20, 1998 Mr. Joseph V. Sipek Director- Licensing Clinton Power Station P.O. Box 678 Mail Code V920 Clinton,IL 61727

SUBJECT:

CLINTON POWER STATION - WITHDRAWAL OF APPLICATION FOR EXEMPTION FROM 10 CFR PART 50, APPENDIX J (TAC NO. MA3393)

Dear Mr. Sipek:

By letter dated August 13,1998, you applied for an exemption from 10 CFR Part 50, Appendix J, " Primary Reactor Containment Leakage Testing For Water Cooled Power Reactors," for the Clinton Power Station. The exemption was for deferral of the local leak rate test of primary containment penetration 1MC-042. Subsequently, the NRC staff had discussions with your staff and it was determined that a license amendment was appropriate for your request and not an exemption. Therefore, by letter dated October 5,1998, you submitted a license amendment request and withdrew the exemption request.

The purpose of this letter is to advise you that the exemption request is being treated as withdrawn and TAC No. MA3393 is closed. The license amendment request is being tracked by TAC No. MA3754.

Sincerely, i- .

/Jon B. Hopkins, Senior Project Manager

/ Project Directorate lil 2 Division of Reactor Projects ll!"V Office of Nuclear Reactor Regulation Docket No. 50-461 cc: See next page

[.

l,

Joseph V. Sipek Clinton Power Station, Unit 1
lilinois Power Company i

! cc:

Walter G. MacFarland IV lilinois Department of Nuclear Safety Senior Vice President Office of Nuclear Facility Safety Clinton Power Station A1TN: Mr. Frank Nizidlek P.O. Box 678 1035 Outer Park Drive Clinton,IL 61727 Springfield,IL 62704 Wayne Romberg Leah Manning Stetzner Manager Nuclear Station VP, General Counsel & Corp. Secretary Engineering Department 500 South 27th Street Clinton Power Station Decatur,IL 62525 P.O. Box 678 Clinton,IL 61727 Resident inspector U.S. Nuclear Regulatory Commission .

RR#3, Box 229 A Clinton,IL 61727 R. T. Hill Licensing Services Manager General Electric Company 175 Curtner Avenue, M/C 481 San Jose, CA 95125 i

Regional Administrator, Region lli U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Chairman of DeWitt County c/o County Clerk's Office DeWitt County Courthouse Clinton,IL 61727 J. W. Blattner

' Project Manager l Sargent & Lundy Engineers l 55 East Monroe Street l Chicago,IL 60603 l