ML20134A981: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:_                          _ _ _ _
a ..
l l
l l
l l
1 l
l 1
W3F1-97-0015 ATTACHMENT A 9701290207 970127 PDR  ADOCK 05000382 P              PDR
 
                                                                            - - . . - - - . - - ~ . - . . ~ - - - .                  - . .
i*    ,
l.'
I                                                                                                                                        j PLANT SYSTEMS d                                                                                                                                        i
                                                                                                                                          ~
,            3/4.7.4 ULTIMATE HEAT SINK l
l 1            LIMITING CONDITION FOR OPERATION 1                                                                                                                                          i 4                                                                                                                                        1 4
i                                                                                                                                          1
;            3.7.4    Two independent trains of ultimate heat sink (UHS) cooling towers shall be OPERABLE with each train consisting of a dry coohng tower (DCT) and a wet mechanical draft cooling tower (WCT) and 1
its associated basin with:
i
: a.      A minimum water level in each wet tower basin of 97% (-9.86 ft MSL) j                    b.      An average basin water temperature of less than or equal to 953FF.                                    l
.                    c.      Fans as required by Table 3.7-3.                                                                            1 1
!            APPLICABILITY: MODES 1, 2, 3, and 4.                                                                                          l j            ACTION:
j                    a.      With lone UHS train inoperable wet mechanicat4 raft <,0c!!ng tcwcr inoperable due4e
)                          . !cw water !eveLand/or4ugtwaverage water-temperature- restore the inocerable train to -
2 the wc! mechanica! dra't coc!!ng tower OPERABLE status within 72 hours or be in l                            HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following
;                            30 hours.
i 1
l                    b.      With both UHS trains wet mechanica! dra't coc!!ng tcwcre inoperable due te !cw water i                            leuc! and/or4 ugh-average water temperature, restore at least one UHS train -wet
  ;                          mechanica! dram cooling-tower- to OPERABLE status within 1 hour and rettere both
]                            "!ct mechanica! dra't cookng tc=cre te OPERABLE state: w!!hin 72 hours of !rit:2!
!                            !ccc, otherwise_at be in at least HOT STANDBY within the next 6 hours and COLD i                            SHUTDOWN within the following 30 hours.
: c.      With the number of OPERABLE fans !e:S thamequired by Tab!e 3.7 3 ca-one OCT^^!CT train, restere4he number of OPEPABLE-fans to ">!!hin the requ!remente of Tab!e 3.7-3within 72 hours-(except at spec! Sed in Action e.), or b^ in HOT ST.^NOBY within the next& hour and in COLO SHUTDOWN within-the4olicwing 30 hours-
: d.      W44-the number of4PERABLE fan !ect than required 4>y-Tat!e 3 '' 3 en both                                  ;
DCT^^!CT traine, restore the rmmber of OPERAOLE fane te w!!h!n the requirements of                          j Tab!e 3.7 3 for 1 OCT^^!CT train within 1 hour and-ccmp!y "Ath ACT!ON c. (exapt-as                          i spec!f:ed !^ ^.CT!ON e.), or be in HOT STANDBY within the next S hour- -d ia m' n                            '
SHUTDOWN within the fc!!cw!ng 30-hous                                                                      )
WATERFORD - UNIT 3                              3/4 7-12                                              AME44DME44T-NO-9%}}

Latest revision as of 23:14, 22 July 2020

Proposed Tech Specs Re Suppl to TS Change Request NPF-38-180
ML20134A981
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/27/1997
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20134A972 List:
References
NUDOCS 9701290207
Download: ML20134A981 (2)


Text

_ _ _ _ _

a ..

l l

l l

l l

1 l

l 1

W3F1-97-0015 ATTACHMENT A 9701290207 970127 PDR ADOCK 05000382 P PDR

- - . . - - - . - - ~ . - . . ~ - - - . - . .

i* ,

l.'

I j PLANT SYSTEMS d i

~

, 3/4.7.4 ULTIMATE HEAT SINK l

l 1 LIMITING CONDITION FOR OPERATION 1 i 4 1 4

i 1

3.7.4 Two independent trains of ultimate heat sink (UHS) cooling towers shall be OPERABLE with each train consisting of a dry coohng tower (DCT) and a wet mechanical draft cooling tower (WCT) and 1

its associated basin with:

i

a. A minimum water level in each wet tower basin of 97% (-9.86 ft MSL) j b. An average basin water temperature of less than or equal to 953FF. l

. c. Fans as required by Table 3.7-3. 1 1

! APPLICABILITY: MODES 1, 2, 3, and 4. l j ACTION:

j a. With lone UHS train inoperable wet mechanicat4 raft <,0c!!ng tcwcr inoperable due4e

) . !cw water !eveLand/or4ugtwaverage water-temperature- restore the inocerable train to -

2 the wc! mechanica! dra't coc!!ng tower OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in l HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following

30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

i 1

l b. With both UHS trains wet mechanica! dra't coc!!ng tcwcre inoperable due te !cw water i leuc! and/or4 ugh-average water temperature, restore at least one UHS train -wet

mechanica! dram cooling-tower- to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and rettere both

] "!ct mechanica! dra't cookng tc=cre te OPERABLE state: w!!hin 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of !rit:2!

! !ccc, otherwise_at be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD i SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

c. With the number of OPERABLE fans !e:S thamequired by Tab!e 3.7 3 ca-one OCT^^!CT train, restere4he number of OPEPABLE-fans to ">!!hin the requ!remente of Tab!e 3.7-3within 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s-(except at spec! Sed in Action e.), or b^ in HOT ST.^NOBY within the next& hour and in COLO SHUTDOWN within-the4olicwing 30 hour3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />s-
d. W44-the number of4PERABLE fan !ect than required 4>y-Tat!e 3 3 en both  ;

DCT^^!CT traine, restore the rmmber of OPERAOLE fane te w!!h!n the requirements of j Tab!e 3.7 3 for 1 OCT^^!CT train within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and-ccmp!y "Ath ACT!ON c. (exapt-as i spec!f:ed !^ ^.CT!ON e.), or be in HOT STANDBY within the next S hour- -d ia m' n '

SHUTDOWN within the fc!!cw!ng 30-hous )

WATERFORD - UNIT 3 3/4 7-12 AME44DME44T-NO-9%