Proposed Tech Specs Re Suppl to TS Change Request NPF-38-180
ML20134A981
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/27/1997
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20134A972 List:
References
NUDOCS 9701290207
Download: ML20134A981 (2)


Text

_

a 1

1 W3F1-97-0015 ATTACHMENT A 9701290207 970127 PDR ADOCK 05000382 P

PDR

- -.. - - -. - - ~. -.. ~ - - -.

i*

l.'

I j

PLANT SYSTEMS d

i 3/4.7.4 ULTIMATE HEAT SINK

~

l 1

LIMITING CONDITION FOR OPERATION i

1 4

1 4

i 3.7.4 Two independent trains of ultimate heat sink (UHS) cooling towers shall be OPERABLE with each train consisting of a dry coohng tower (DCT) and a wet mechanical draft cooling tower (WCT) and its associated basin with:

1 i

a.

A minimum water level in each wet tower basin of 97% (-9.86 ft MSL) j b.

An average basin water temperature of less than or equal to 953FF.

l c.

Fans as required by Table 3.7-3.

1 1

APPLICABILITY: MODES 1, 2, 3, and 4.

.j ACTION:

j a.

With lone UHS train inoperable wet mechanicat4 raft <,0c!!ng tcwcr inoperable due4e

)

. !cw water !eveLand/or4ugtwaverage water-temperature-restore the inocerable train to -

2 the wc! mechanica! dra't coc!!ng tower OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in l

HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

i 1

l b.

With both UHS trains wet mechanica! dra't coc!!ng tcwcre inoperable due te !cw water i

leuc! and/or4 ugh-average water temperature, restore at least one UHS train -wet mechanica! dram cooling-tower-to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and rettere both

]

"!ct mechanica! dra't cookng tc=cre te OPERABLE state: w!!hin 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of !rit:2!

!ccc, otherwise_at be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD i

SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

c.

With the number of OPERABLE fans !e:S thamequired by Tab!e 3.7 3 ca-one OCT^^!CT train, restere4he number of OPEPABLE-fans to ">!!hin the requ!remente of Tab!e 3.7-3within 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s-(except at spec! Sed in Action e.), or b^ in HOT ST.^NOBY within the next& hour and in COLO SHUTDOWN within-the4olicwing 30 hour3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />s-d.

W44-the number of4PERABLE fan !ect than required 4>y-Tat!e 3 3 en both DCT^^!CT traine, restore the rmmber of OPERAOLE fane te w!!h!n the requirements of j

Tab!e 3.7 3 for 1 OCT^^!CT train within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and-ccmp!y "Ath ACT!ON c. (exapt-as spec!f:ed !^ ^.CT!ON e.), or be in HOT STANDBY within the next S hour- -d ia m' n SHUTDOWN within the fc!!cw!ng 30-hous

)

WATERFORD - UNIT 3 3/4 7-12 AME44DME44T-NO-9%