ML030290158: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Jan. 20, 2003 Page    1  of 1 MANUAL  HARD COPY    DISTRIBUTION DOCUMENT    TRANSMITTAL    2003-3306 USER  INFORMATION:
SCA#:                  0363 TRANSMITTAL    INFORMATION:
01/20/2003 LOCATION:    DOCUMENT CONTROL DESK FROM:  NUCLEAR RECORDS DOCUMENT CONTROL CENTER NUCSA-2)
ý-rHE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
100 -  100  -  EMERGENCY    DIRECTOR/CONTROL    ROOM:
EMERGENCY  PLAN-POSITION      SPECIFIC  PROCEDURE REMOVE  MANUAL    TABLE  OF  CONTENTS    DATE:  08/26/2002 ADD    MANUAL    TABLE  OF  CONTENTS    DATE:  01/17/2003 CATEGORY: PROCEDURES        TYPE: EP ID:  EP-PS-100 ADD: PCAF 2003-1038 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.      PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY.        FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
 
I                                        PROCEDURE CAANGE PROCESS FORM                                  in~
: 1. PCAF NO.                1JO yO12. PAGE 1 OF                              13. PROC. NO. EP-PS-4al1-A          REV. 4
: 4. FORMS REVISED          -  E R        .  -10R              .1 -    R-,          R_    , -      R      . -  - R
: 5. PROCEDURE TITLE TSC Emergency Director: Emergency Plan Position Specific Procedure
: 6. REQUESTED CHANGE PERIODIC REVIEW                E-  NO      %    YES INCORPORATE PCAFS 0                  NO      '-  YES        #              #              #                #
REVISION          El                PCAF      I                  DELETION      El] (CHECK ONE ONLY)
: 7.
 
==SUMMARY==
OF / REASON FOR CHANGE                                  I                                  "
Revised procedure steps to insure that the Shift Manager fills out Event Notificati6n Form. Also revised steps to clarify requirement to use PAR State Notification Form. Deleted PAR Notification form since it is no longer used by the Shift Manager - 6P-A D- 0 00-1)                                                  /
Continued  El
: 8. DETERMINE COMMITTEE REVIEW REQUIREMENTS (Refer to Section 6.1.4)                                          Y. r PORC REVIEW REQ'D?                                      NO 10, 'YES            9. PORC MTG#        N/A BLOCKS 11 THRU 16 ARE ON PAGE 2 OFFORM_',                                    _
: 17. T.C. Dalpiaz                I    3i27        I  *12/30/2002      18. COMMUNICATION OF CHANGE REQUIRED?
PREPARER            y    ETN,              DATE          El  NO N YES        (TYPE) E Mail (Print or Type)                  '",                  j                                      communication to ED's
                                        .SIGNATURE                                  ATTESTS THAT RESPONSIBLE SUPERVISOR HAS
: 20.                                                                    CONDUCTED QADR AND TECHNICAL REVIEW UNLESS OTHERWISE 1'  *..*                    l t,,/*        DOCUMENTED IN BLOCK 16 OR ATTACHED REVIqEW FORMS.
S-      CROSS DISCIPLINE REVIEW (IF REQUIRED) HAS BEEN COMPLETED RESfPdft*IB*=F SUPERVISOR'"                      DATEt        BY SIGNATURE IN BLOCK 16 OR ATTACHED REVIEW' FORMS.
: 20.            ""*,!*oI FU    lfOVAL                        'DATE1
: 21. RESPONSIBLE APPROVER                                              ENTER N/A IF FUM HAS APPROVAL AUTHORITY INITIALS                      DATE
                                                                                                                          ,;,  tr .
FORM NDAP-QA-0002-8, Rev. 8, Page 1 of 2 (EIE octronic Form)
JAN    1 5 2003    1:01 CONTROL DOCUMENT SERVICES - SSES
 
PROCEDURE CHANGE"PROCESS FORM
: 1. PCAF NO.      C20 ý/L-/O3        12. PAGE 2 OF            e  13. PROC. NO. EP-PS-.1-G1-A            REV. 4
: 11. This question documents the outcome of the 50.59 and 72.48 Review required by NDAP-QA-0726. Either la, b, c or d must be checked "YES" and the appropriate form attached or referenced.
: a. This change is an Administrative Correction for which 50.59 and 72.48 are not                    YES    Z N/A applicable.
: b. This change is a change to any surveillance, maintenance or administrative                  [    YES
* N/A procedure for which 50.59 and 72.48 are not applicable. /) - 0 1-- ') or&
: c. This change is bounded by a 50.59/72.48 Screen/Evaluation, therefore, no new                    1 YES    Z N/A 50.59/72.48 Evaluation is required.
Screen/Evaluation No.
: d. 50.59 and/or 72.48 are applicable to this change and a 50.59/72.48                          F-1  YES    I    N/A Screen/Evaluation is attached.
: 12. This change is consistent with the FSAR or an FSAR change is required.                          Z    YES Change Request No. N/A
: 13. Should this change be reviewed for potential effects on Training Needs or Material?                  YES    Z    NO If YES, enter an Action Item @ NIMS/Action/Gen Work Mech/PICN
: 14. Is a Surveillance Procedure Review Checklist required per NDAP-QA-0722?                          r    YES          NO
: 15. Is a Special, Infrequent or Complex Test/Evolution Analysis Form required per                      l YES          NO NDAP-QA-0320? (SICT/E form does not need to be attached.)
: 16. Reviews may be documented below or by attaching Document Review Forms NDAP-QA-0101-1.
REVIEWED BY WITH                          DATE REVIEW                                                          NO COMMENTS QADR TECHNICAL REVIEW REACTOR ENGINEERING/NUCLEAR FUELS
* IST **
OPERATIONS NUCLEAR SYSTEMS ENGINEERING NUCLEAR MODIFICATIONS MAINTENANCE HEALTH PHYSICS NUCLEAR TECHNOLOGY CHEMISTRY OTHER        10 CFR 50.54Q review                                        II 2 A{-    fAj                /z e2 Required for changes that affect, or have potential for affecting core reactivity, nuclear fuel, core power level indication or impact the thermal power heat balance. (58)
          "Requiredfor changes to Section XI Inservice Test Acceptance Criteria.
FORM NDAP-QA-0002-8, Rev. 8, Page 2 of 2 (Electronic Form)
 
EP-PS-100 rA F P.2~    --12~3Y                  Revision 16 PAGE          _.a--F                        Page 2 of 4 EMERGENCY DIRECTOR (ED) - CONTROL ROOM:
m    I Emer gency Plan-Position Specific Proce dure WHEN:        Anytime an abnormal event is occurring HOW NOTIFIED:          On shift REPORT TO:          Duty Manager WHERE TO REPORT:            Control Room OVERALL DUTY:
Take charge of the plant from the Control Room during an emergency condition, assigning duties and directing operations as necessary to return to a safe plant condition (NDAP-QA-300).
MAJOR TASKS:                                                TAB:                REVISION:
I      Classify the emergency as conditions indicate.
TAB A                    8 Manage the UNUSUAL EVENT.                              TAB B                    12 I      Manage the ALERT EMERGENCY.                            TAB C                    10 Manage the SITE AREA EMERGENCY.                        TAB D                    12 I      Manage the GENERAL EMERGENCY.                          TAB E                    9') 0 Il ak I      Manage the Security Threat or Event EAL series 16.
TAB G                    1
 
EP-PS-100 PCAF i*'*          - 05?_    Revision 16
                            -PAGE.Z.,OF            .-- *i> Page  3 of 4 SUPPORTING INFORMATION:                                        TAB:
Emergency Telephone Instructions                          TAB I Emergency Organization                                    TAB 2 Brief Non-Technical Description of EAL's                  TAB 3 Emergency Classification                                  TAB 4 Public Protective Action Recommendation Guide              TAB 5 PPL Emergency Personnel Dose Assessment and                TAB 6 Protective Action Recommendation (PAR) Guide Personnel Accountability                                  TAB 7 Restoration Organization Guidelines                        TAB 8 Emergency Forms                                            TAB 9 "o Protective Action State Notification Form "O Emergency Notification Report
          " Potassium Iodide Tracking Form                            LL
 
TABE EP-PS4*/+--:I pAF#                                      Revision 10 Page I of 4    ' .
MAJOR TASK                                          "
Manage the General Emergency.
SPECIFIC TASK:                        HOW
: 1. Document and Communicate the          Ia. Announce to Control Room Personnel:
Emergency Classification.                      (1) You are assuming the duties of Emergency Director.
(2) Emergency Classification (3) Time and Date of classification l b. Appoint a Control Room Communicator and instruct him to immediately perform EP-PS 126 CR Communicator.
: 2. When a General Emergency is declared  2a. Go to Tab 5 "Public Protective Action make a Protective Action Recommendation Recommendation Guide".
(PAR) within 15 minutes 2b. Choose appropriate PAR.
2c. Generate and approve the Emergency Notification Report                        .
2d. Provide the ENR form to the Control Room Communicator.
2e. The Shift Manager shall notify the Senior    IL State Official, using the PAR State Notification Form, at 717 651-2148.
HELP Protective Action Recommendation State Notification Form See Tab 9
 
TABE PCAF        Z3-2OY                  EP-PS-1-E- I/-' -F Revision 10        4L PAGE,,OF A"                            Page 2 of 4 SPECIFIC TASKS:                                HOW HOW
: 3. Approve Press Releases prior to issuance.
3a. Verbal Approval is acceptable for Press Releases LL
: 4. Communicate the need for employee NOTE.
emergency expoure conslderationsflc tablet Issuance.                  Twelve vials of Potaaskm' Iodide, (KI), am stored in the cabinet outsbie the Control Room kitchen area and one hundred vials are stored in the Health PhyslIc Instrument Shop.
HELP      .      .
m                            F PPL Emergency Personnel Dose Assssmepm And Protective Action Recommendation SeeGuide TAB 6 ..
: 5. Direct US/AUS to assume Sa. AUS notifled to assume OS.3 responsiblity of OSC Coordinator per            responsibilities.
EP-PS-13.2.                                                                    -              I
: 6. Manage the emergency until relived 6a. Monitor and obtain updates on:
by TSC Emergency Director.                        (1)    Plant Status (2)      Plant priorities (3)      Corrective actions (4)      Radiologica releases
: 7. Initiate emergency medical response, 7a. Reference SP-O0-308 search and rescue when required.
(Emergency Medical Response, Search/Rescue)
: 8. Initiate Core Damage Assessment          8a. Notify OSC Coordinator to obtain a Rx Coolant sample.
r
 
TABE PCAF Goa -; 3?                          EP-PS-100-E iL PAGE      ? OF    4f                  Revision..9-7/
                                                  / 0 Aw              Page 3 of 4 SPECIFIC TASKS:                            HOW:
: 9. If Rad release suspected/in progress,  9a. Notify HP Dose Calculator/OSC initiate off-site dose calculations.        that off-site dose calculations required.
: 10. When contacted, brief the following    1Oa. Brief Manager on:
managers of events:                        (1)    Plant status
    - Duty Manager                              (2)    Radiological condition
    - Recovery Manager                          (3)    Emergency
    - Public Info Manager (if time                      classification level perrpits)
: 11. If plant conditions change reclassify                            HELP emergency and enter appropriate tab                Emergency Classifications for classification level:                                    See TAB 4
    - For DOWNGRADING emergency:
UNUSUAL EVENT            TAB "Bo ALERT                    TAB "C" SITE AREA                TAB "D"
: 12. If conditions indicate that the emergency can be downgraded or terminated, provide a recommendation to the TSC/ED or EOF/RM as appropriate.
: 13. Transfer Emergency Management          13a. Review the followihg with TSC duties to TSC Emergency Director.          Emergency Director (1)    Classification of Emergency (2)    Radiological conditions in-plantloffsite/projected (3)    Priorities and corrective actions taken (4)    Plant status (5)    Offsite Notifications
 
TABE EP-PS-100-E PuAp #.24~3~6                    Revision.Wj'/
1.
Page 4 of 4    0 SPECIFIC TASKS:                        HOW:
: 14. Emergency Termination              14a.
                                                    ;TA-Instruct STA to collect and (1) Return Ops to normal                  organize paperwork for organization                          reconstructing the emergency OR                                and its management (2) Recommend creating a restoration organization                            HELP Restoration Organization Guidelines See TAB 8
 
TAB,9 PCAF #                                      EP-PS-1 00-9 Affected Unit                                "                        Control No.
PROTECTIVE ACTION RECOMMENDATION FORM SUSQUEHANNA STEAM ELECTRIC STATION E3 This is a Dri          13 This is NOT a Drill          Preparer:
The EMERGENCY CLASSIFICATION is:
El Unusual Event          El Alert      El Site Area Emergency        13 General Emergency Basis: EAL #
This represents:                          'Q E3 Initial Classification    [] Escalati    -E) Reduction      03 No Change in the Classification Status Emergency Action(s) implemented                  site:                                                  W E3] None                              [3 E cuation of non-essential personnel o3  Local Area Evacuation                KI t onsite personnel
                                                *3 El Site Accountability              El Othe Bases:
The PROTECTIVE ACTION RE OMMENDATION is:
13 No Protective Action Recommendation Required o3 Evacuate 0-2 miles and Shelter 2-10 miles                          Relocation El Evacuate 0-10 miles                                              tk.Control of Access S(Sontamination Controls/Decon E3 Divert Danville Drinking Water*                                E Otfier
*Expected arrival of release at Danville:
ThisA0represents: R Initial                1 Change            Recommendation,*
No Change in the Prpective Action EP-AD-000-1 10, Revision 7, Page 1 of 2(duplex)
 
PAGE PCAF  ;k3 -4F    fi~TAB 9 L3',EP-S-1                00-9 The    SIS for the Protective Action Recommendation is:
Plant St tus Radioactive R ease:        El Monitored              El Unmonitored Status                              Airborne            Liquid
< Tech RequirementLLimit (Routine)                            El
> Tech Requirements Limit (Event Related)                    El  _E Note: TRM Limits (jiCi/mir: Noble Gas 8.51 E+5; Iodine 1.04E+2; Particulate 7.72 E+2 (Airborne releases)
Data measured in the field co irm release rate estimations: El Yes      El No Weather Conditions: Wind Spee                        Wind Direction Dose Projections: El TEDE > 1 rem or th roid CDE > 5 rem at 2 miles 0 TEDE > 1 rem or thy id CDE > 5 rem at EPB U TEDE _ 1 rem and thyr id CDE _5 rem at EPB Approval:                                            DateS&:
Emergency Director or Recovery Manager approval required i:hange in Classification or Protective Action Recommendation.
RPC or DASU approval if no change in'the Classification or Prote ive Action Recommendation.
Transmittal:          0 Verbal          El Electronic        0 Both Communicated To:
NAME                              AGENCY                        DAT    ME EP-AD-O00-1 10, Revision 7, Page 2 of 2 (duplex)}}

Latest revision as of 04:02, 26 March 2020

Revision to Emergency Director/Control Room: Emergency Plan-Position Specific Procedure
ML030290158
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/20/2003
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
Download: ML030290158 (11)


Text

Jan. 20, 2003 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-3306 USER INFORMATION:

SCA#: 0363 TRANSMITTAL INFORMATION:

01/20/2003 LOCATION: DOCUMENT CONTROL DESK FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER NUCSA-2)

ý-rHE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:

100 - 100 - EMERGENCY DIRECTOR/CONTROL ROOM:

EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE: 08/26/2002 ADD MANUAL TABLE OF CONTENTS DATE: 01/17/2003 CATEGORY: PROCEDURES TYPE: EP ID: EP-PS-100 ADD: PCAF 2003-1038 REV: N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

I PROCEDURE CAANGE PROCESS FORM in~

1. PCAF NO. 1JO yO12. PAGE 1 OF 13. PROC. NO. EP-PS-4al1-A REV. 4
4. FORMS REVISED - E R . -10R .1 - R-, R_ , - R . - - R
5. PROCEDURE TITLE TSC Emergency Director: Emergency Plan Position Specific Procedure
6. REQUESTED CHANGE PERIODIC REVIEW E- NO  % YES INCORPORATE PCAFS 0 NO '- YES # # # #

REVISION El PCAF I DELETION El] (CHECK ONE ONLY)

7.

SUMMARY

OF / REASON FOR CHANGE I "

Revised procedure steps to insure that the Shift Manager fills out Event Notificati6n Form. Also revised steps to clarify requirement to use PAR State Notification Form. Deleted PAR Notification form since it is no longer used by the Shift Manager - 6P-A D- 0 00-1) /

Continued El

8. DETERMINE COMMITTEE REVIEW REQUIREMENTS (Refer to Section 6.1.4) Y. r PORC REVIEW REQ'D? NO 10, 'YES 9. PORC MTG# N/A BLOCKS 11 THRU 16 ARE ON PAGE 2 OFFORM_', _
17. T.C. Dalpiaz I 3i27 I *12/30/2002 18. COMMUNICATION OF CHANGE REQUIRED?

PREPARER y ETN, DATE El NO N YES (TYPE) E Mail (Print or Type) '", j communication to ED's

.SIGNATURE ATTESTS THAT RESPONSIBLE SUPERVISOR HAS

20. CONDUCTED QADR AND TECHNICAL REVIEW UNLESS OTHERWISE 1' *..* l t,,/* DOCUMENTED IN BLOCK 16 OR ATTACHED REVIqEW FORMS.

S- CROSS DISCIPLINE REVIEW (IF REQUIRED) HAS BEEN COMPLETED RESfPdft*IB*=F SUPERVISOR'" DATEt BY SIGNATURE IN BLOCK 16 OR ATTACHED REVIEW' FORMS.

20. ""*,!*oI FU lfOVAL 'DATE1
21. RESPONSIBLE APPROVER ENTER N/A IF FUM HAS APPROVAL AUTHORITY INITIALS DATE

,;, tr .

FORM NDAP-QA-0002-8, Rev. 8, Page 1 of 2 (EIE octronic Form)

JAN 1 5 2003 1:01 CONTROL DOCUMENT SERVICES - SSES

PROCEDURE CHANGE"PROCESS FORM

1. PCAF NO. C20 ý/L-/O3 12. PAGE 2 OF e 13. PROC. NO. EP-PS-.1-G1-A REV. 4
11. This question documents the outcome of the 50.59 and 72.48 Review required by NDAP-QA-0726. Either la, b, c or d must be checked "YES" and the appropriate form attached or referenced.
a. This change is an Administrative Correction for which 50.59 and 72.48 are not YES Z N/A applicable.
b. This change is a change to any surveillance, maintenance or administrative [ YES
  • N/A procedure for which 50.59 and 72.48 are not applicable. /) - 0 1-- ') or&
c. This change is bounded by a 50.59/72.48 Screen/Evaluation, therefore, no new 1 YES Z N/A 50.59/72.48 Evaluation is required.

Screen/Evaluation No.

d. 50.59 and/or 72.48 are applicable to this change and a 50.59/72.48 F-1 YES I N/A Screen/Evaluation is attached.
12. This change is consistent with the FSAR or an FSAR change is required. Z YES Change Request No. N/A
13. Should this change be reviewed for potential effects on Training Needs or Material? YES Z NO If YES, enter an Action Item @ NIMS/Action/Gen Work Mech/PICN
14. Is a Surveillance Procedure Review Checklist required per NDAP-QA-0722? r YES NO
15. Is a Special, Infrequent or Complex Test/Evolution Analysis Form required per l YES NO NDAP-QA-0320? (SICT/E form does not need to be attached.)
16. Reviews may be documented below or by attaching Document Review Forms NDAP-QA-0101-1.

REVIEWED BY WITH DATE REVIEW NO COMMENTS QADR TECHNICAL REVIEW REACTOR ENGINEERING/NUCLEAR FUELS

OPERATIONS NUCLEAR SYSTEMS ENGINEERING NUCLEAR MODIFICATIONS MAINTENANCE HEALTH PHYSICS NUCLEAR TECHNOLOGY CHEMISTRY OTHER 10 CFR 50.54Q review II 2 A{- fAj /z e2 Required for changes that affect, or have potential for affecting core reactivity, nuclear fuel, core power level indication or impact the thermal power heat balance. (58)

"Requiredfor changes to Section XI Inservice Test Acceptance Criteria.

FORM NDAP-QA-0002-8, Rev. 8, Page 2 of 2 (Electronic Form)

EP-PS-100 rA F P.2~ --12~3Y Revision 16 PAGE _.a--F Page 2 of 4 EMERGENCY DIRECTOR (ED) - CONTROL ROOM:

m I Emer gency Plan-Position Specific Proce dure WHEN: Anytime an abnormal event is occurring HOW NOTIFIED: On shift REPORT TO: Duty Manager WHERE TO REPORT: Control Room OVERALL DUTY:

Take charge of the plant from the Control Room during an emergency condition, assigning duties and directing operations as necessary to return to a safe plant condition (NDAP-QA-300).

MAJOR TASKS: TAB: REVISION:

I Classify the emergency as conditions indicate.

TAB A 8 Manage the UNUSUAL EVENT. TAB B 12 I Manage the ALERT EMERGENCY. TAB C 10 Manage the SITE AREA EMERGENCY. TAB D 12 I Manage the GENERAL EMERGENCY. TAB E 9') 0 Il ak I Manage the Security Threat or Event EAL series 16.

TAB G 1

EP-PS-100 PCAF i*'* - 05?_ Revision 16

-PAGE.Z.,OF .-- *i> Page 3 of 4 SUPPORTING INFORMATION: TAB:

Emergency Telephone Instructions TAB I Emergency Organization TAB 2 Brief Non-Technical Description of EAL's TAB 3 Emergency Classification TAB 4 Public Protective Action Recommendation Guide TAB 5 PPL Emergency Personnel Dose Assessment and TAB 6 Protective Action Recommendation (PAR) Guide Personnel Accountability TAB 7 Restoration Organization Guidelines TAB 8 Emergency Forms TAB 9 "o Protective Action State Notification Form "O Emergency Notification Report

" Potassium Iodide Tracking Form LL

TABE EP-PS4*/+--:I pAF# Revision 10 Page I of 4 ' .

MAJOR TASK "

Manage the General Emergency.

SPECIFIC TASK: HOW

1. Document and Communicate the Ia. Announce to Control Room Personnel:

Emergency Classification. (1) You are assuming the duties of Emergency Director.

(2) Emergency Classification (3) Time and Date of classification l b. Appoint a Control Room Communicator and instruct him to immediately perform EP-PS 126 CR Communicator.

2. When a General Emergency is declared 2a. Go to Tab 5 "Public Protective Action make a Protective Action Recommendation Recommendation Guide".

(PAR) within 15 minutes 2b. Choose appropriate PAR.

2c. Generate and approve the Emergency Notification Report .

2d. Provide the ENR form to the Control Room Communicator.

2e. The Shift Manager shall notify the Senior IL State Official, using the PAR State Notification Form, at 717 651-2148.

HELP Protective Action Recommendation State Notification Form See Tab 9

TABE PCAF Z3-2OY EP-PS-1-E- I/-' -F Revision 10 4L PAGE,,OF A" Page 2 of 4 SPECIFIC TASKS: HOW HOW

3. Approve Press Releases prior to issuance.

3a. Verbal Approval is acceptable for Press Releases LL

4. Communicate the need for employee NOTE.

emergency expoure conslderationsflc tablet Issuance. Twelve vials of Potaaskm' Iodide, (KI), am stored in the cabinet outsbie the Control Room kitchen area and one hundred vials are stored in the Health PhyslIc Instrument Shop.

HELP . .

m F PPL Emergency Personnel Dose Assssmepm And Protective Action Recommendation SeeGuide TAB 6 ..

5. Direct US/AUS to assume Sa. AUS notifled to assume OS.3 responsiblity of OSC Coordinator per responsibilities.

EP-PS-13.2. - I

6. Manage the emergency until relived 6a. Monitor and obtain updates on:

by TSC Emergency Director. (1) Plant Status (2) Plant priorities (3) Corrective actions (4) Radiologica releases

7. Initiate emergency medical response, 7a. Reference SP-O0-308 search and rescue when required.

(Emergency Medical Response, Search/Rescue)

8. Initiate Core Damage Assessment 8a. Notify OSC Coordinator to obtain a Rx Coolant sample.

r

TABE PCAF Goa -; 3? EP-PS-100-E iL PAGE  ? OF 4f Revision..9-7/

/ 0 Aw Page 3 of 4 SPECIFIC TASKS: HOW:

9. If Rad release suspected/in progress, 9a. Notify HP Dose Calculator/OSC initiate off-site dose calculations. that off-site dose calculations required.
10. When contacted, brief the following 1Oa. Brief Manager on:

managers of events: (1) Plant status

- Duty Manager (2) Radiological condition

- Recovery Manager (3) Emergency

- Public Info Manager (if time classification level perrpits)

11. If plant conditions change reclassify HELP emergency and enter appropriate tab Emergency Classifications for classification level: See TAB 4

- For DOWNGRADING emergency:

UNUSUAL EVENT TAB "Bo ALERT TAB "C" SITE AREA TAB "D"

12. If conditions indicate that the emergency can be downgraded or terminated, provide a recommendation to the TSC/ED or EOF/RM as appropriate.
13. Transfer Emergency Management 13a. Review the followihg with TSC duties to TSC Emergency Director. Emergency Director (1) Classification of Emergency (2) Radiological conditions in-plantloffsite/projected (3) Priorities and corrective actions taken (4) Plant status (5) Offsite Notifications

TABE EP-PS-100-E PuAp #.24~3~6 Revision.Wj'/

1.

Page 4 of 4 0 SPECIFIC TASKS: HOW:

14. Emergency Termination 14a.
TA-Instruct STA to collect and (1) Return Ops to normal organize paperwork for organization reconstructing the emergency OR and its management (2) Recommend creating a restoration organization HELP Restoration Organization Guidelines See TAB 8

TAB,9 PCAF # EP-PS-1 00-9 Affected Unit " Control No.

PROTECTIVE ACTION RECOMMENDATION FORM SUSQUEHANNA STEAM ELECTRIC STATION E3 This is a Dri 13 This is NOT a Drill Preparer:

The EMERGENCY CLASSIFICATION is:

El Unusual Event El Alert El Site Area Emergency 13 General Emergency Basis: EAL #

This represents: 'Q E3 Initial Classification [] Escalati -E) Reduction 03 No Change in the Classification Status Emergency Action(s) implemented site: W E3] None [3 E cuation of non-essential personnel o3 Local Area Evacuation KI t onsite personnel

  • 3 El Site Accountability El Othe Bases:

The PROTECTIVE ACTION RE OMMENDATION is:

13 No Protective Action Recommendation Required o3 Evacuate 0-2 miles and Shelter 2-10 miles Relocation El Evacuate 0-10 miles tk.Control of Access S(Sontamination Controls/Decon E3 Divert Danville Drinking Water* E Otfier

  • Expected arrival of release at Danville:

ThisA0represents: R Initial 1 Change Recommendation,*

No Change in the Prpective Action EP-AD-000-1 10, Revision 7, Page 1 of 2(duplex)

PAGE PCAF ;k3 -4F fi~TAB 9 L3',EP-S-1 00-9 The SIS for the Protective Action Recommendation is:

Plant St tus Radioactive R ease: El Monitored El Unmonitored Status Airborne Liquid

< Tech RequirementLLimit (Routine) El

> Tech Requirements Limit (Event Related) El _E Note: TRM Limits (jiCi/mir: Noble Gas 8.51 E+5; Iodine 1.04E+2; Particulate 7.72 E+2 (Airborne releases)

Data measured in the field co irm release rate estimations: El Yes El No Weather Conditions: Wind Spee Wind Direction Dose Projections: El TEDE > 1 rem or th roid CDE > 5 rem at 2 miles 0 TEDE > 1 rem or thy id CDE > 5 rem at EPB U TEDE _ 1 rem and thyr id CDE _5 rem at EPB Approval: DateS&:

Emergency Director or Recovery Manager approval required i:hange in Classification or Protective Action Recommendation.

RPC or DASU approval if no change in'the Classification or Prote ive Action Recommendation.

Transmittal: 0 Verbal El Electronic 0 Both Communicated To:

NAME AGENCY DAT ME EP-AD-O00-1 10, Revision 7, Page 2 of 2 (duplex)