|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17284A8941999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for WNP-2.With 991012 Ltr ML17284A8801999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for WNP-2.With 990910 Ltr ML17284A8691999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr ML17292B7271999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With 990707 Ltr ML17292B6961999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With 990608 Ltr ML17292B6641999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for WNP-2.With 990507 Ltr ML17292B6391999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr ML17292B5871999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With 990311 Ltr ML17292B5571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With 990210 Ltr ML17292B5351998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With 990112 Ltr ML17284A8231998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for WNP-2.With 981207 Ltr ML17284A8081998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With 981110 Ltr ML17284A7831998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for WNP-2.With 981007 Ltr ML17284A7681998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for WNP-2.With 980915 Ltr ML17284A7261998-07-31031 July 1998 Monthly Operating Rept for July 1998 for WNP-2.W/980810 Ltr ML17292B4031998-05-31031 May 1998 Monthly Operating Rept for May 1998 for WNP-2.W/980608 Ltr ML17292B3921998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for WNP-2.W/980513 Ltr ML17292B3371998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for WNP-2.W/980409 Ltr ML17292B2911998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for WNP-2.W/980313 Ltr ML17292B2471998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for WNP-2.W/980212 Ltr ML17292B2151997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for WNP-2.W/980115 Ltr ML17292B1341997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for WNP-2.W/971205 Ltr ML17292B1101997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for WNP-2.W/971111 Ltr ML17292B0851997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for WNP-2.W/971010 Ltr ML17292B0511997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for WNP-2.W/970911 Ltr ML17292A9611997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for WNP-2.W/970807 Ltr ML17292A9331997-06-30030 June 1997 Monthly Operating Rept for June 1997 for WNP-2.W/970715 Ltr ML17292A8971997-05-31031 May 1997 Monthly Operating Rept for May 1997 for WNP-2 ML17292A8531997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for WNP-2 ML17292A8561997-03-31031 March 1997 Corrected MOR for Mar 1997 for WNP-2 ML17292A8171997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for WNP-2.W/970411 Ltr ML17292A7391997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for WNP-2.W/970313 Ltr ML17292A7011997-01-31031 January 1997 Monthly Operating Rept for Jan 1996 for WNP-2.W/970212 Ltr ML17292A6631996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for WNP-2.W/970109 Ltr ML17292A6311996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for WNP-2.W/961210 Ltr ML17292A5921996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for WNP-2.W/961011 Ltr ML17292A5371996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for WNP-2.W/961009 Ltr ML17292A4761996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for WNP-2. W/960912 Ltr ML17292A4071996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for WNP-2.W/960807 Ltr ML17292A3611996-06-30030 June 1996 Monthly Operating Rept for June 1996 for WNP-2.W/960712 Ltr ML17292A3191996-05-31031 May 1996 Monthly Operating Rept for May 1996 for WNP-2.W/960610 Ltr ML17292A2671996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for WPPSS.W/960513 Ltr ML17291B2961996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for WNP-2.W/960410 Ltr ML17291B2631996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for WNP-2.W/960308 Ltr ML17291B2291996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Wnp Unit 2.W/960209 Ltr ML17291B1941995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for WNP-2.W/960111 Ltr ML17291B1541995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for WNP-2.W/951207 Ltr ML17291B1071995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for WNP-2.W/951110 Ltr ML17291B0731995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for WNP-2.W/951009 Ltr ML17291B0131995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for WNP-2.W/950911 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17284A9001999-10-31031 October 1999 Rev 0 to COLR 99-15, WNP-2 Cycle 15,COLR GO2-99-177, LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With1999-10-0101 October 1999 LER 99-S01-00:on 990903,failure to Take Compensatory Measure within Required Time Upon Failure of Isolation Zone Microwave Unit,Was Noted.Caused by Personnel Error.Provided Refresher Training on Compensatory Measures.With ML17284A8941999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for WNP-2.With 991012 Ltr ML17284A8801999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for WNP-2.With 990910 Ltr ML17284A8691999-07-31031 July 1999 Monthly Operating Rept for July 1999 for WNP-2.With 990813 Ltr ML17292B7421999-07-20020 July 1999 LER 99-001-00:on 990628,ESF Signal Closed All Eight MSIVs While Plant Was Shutdown.Caused by Failure of Relay RPS-RLY-K10D.Subject Relay Was Replaced & Tested on 990630. with 990720 Ltr ML17292B7271999-06-30030 June 1999 Monthly Operating Rept for June 1999 for WNP-2.With 990707 Ltr ML17292B6961999-05-31031 May 1999 Monthly Operating Repts for May 1999 for WNP-2.With 990608 Ltr ML17292B6641999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for WNP-2.With 990507 Ltr ML17292B6391999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for WNP-2.With 990413 Ltr ML17292B5871999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for WNP-2.With 990311 Ltr ML17292B5571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for WNP-2.With 990210 Ltr ML17292B5621999-01-31031 January 1999 Rev 1 to COLR 98-14, WNP-2 Cycle 14 Colr. ML17292B5341999-01-15015 January 1999 Part 21 Rept Re Incorrect Modeling of BWR Lower Plenum Vol in Bison.Defect Applies Only to Reload Fuel Assemblies Currently in Operation at WNP-2.BISON Code Model for WNP-2 Has Been Revised to Correct Error ML17292B5331999-01-15015 January 1999 Part 21 Rept Re XL-S96 CPR Correlation for SVEA-96 Fuel. Defect Applies Only to WNP-2,during Cycles 12,13 & 14 Operation.Evaluations of Defect Performed by ABB-CE ML17292B4791998-12-31031 December 1998 Washington Public Power Supply Sys 1998 Annual Rept. with 981215 Ltr ML17292B5351998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for WNP-2.With 990112 Ltr ML17292B5741998-12-31031 December 1998 WNP-2 1998 Annual Operating Rept. with 990225 Ltr ML17284A8231998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for WNP-2.With 981207 Ltr ML17284A8081998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for WNP-2.With 981110 Ltr ML17292B4451998-10-27027 October 1998 LER 98-012-01:on 980715,failure to Comply with Requirements of TS SR 3.8.4.7 Was Noted.Caused by Inadequate Work Practices.Training Session Was Held with Personnel.With 981027 Ltr ML17284A7831998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for WNP-2.With 981007 Ltr ML17284A7491998-09-10010 September 1998 WNP-2 Inservice Insp Summary Rept for Refueling Outage RF13 Spring,1998. ML17284A7561998-09-0303 September 1998 LER 98-013-00:on 980805,ESF Actuations Were Noted Due to Deenergization of Vital Electrical Bus SM-8.Caused by Inadequate Direction in Troubleshooting Plan.Will Conduct Training for Engineering Personnel.With 980903 Ltr ML17284A7571998-09-0202 September 1998 LER 98-014-00:on 980807,completion of TS 3.8.1.F Required Shutdown Due to Inoperability of EDG-2 Was Noted.Caused by Degraded Voltage Regulator for DG-2.Replaced Voltage Regulator & Associated Scrs.With 980902 Ltr ML17284A7551998-09-0202 September 1998 LER 98-015-00:on 980808,discovered Reactor Coolant Pressure Boundary Leak During Shutdown Conditions.Caused by Leakage from Socket Weld (Fwb 63) on Elbow Connection.Failed Piping Connection Was Replaced.With 980902 Ltr ML17284A7681998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for WNP-2.With 980915 Ltr ML17284A7311998-08-17017 August 1998 LER 98-012-00:on 980716,determined That 24-month SR 3.8.4.7 Had Not Been Fulfilled within Specified Frequency.Caused by Inadequate Work Practices.License Requested & Received Enforcement Discretion Re Battery Svc test.W/980817 Ltr ML17284A7261998-07-31031 July 1998 Monthly Operating Rept for July 1998 for WNP-2.W/980810 Ltr ML17284A7121998-07-23023 July 1998 LER 98-006-01:on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of 10CFR50,App R Calculations for High Impedance Faults.Caused by Inadequate Work Practices.Implemented Procedural Changes ML17284A6951998-07-17017 July 1998 LER 98-011-00:on 980617,ECCS Pump Room Flooding Was Noted Due to FP Sys Pipe Break.Caused by Inadequate Design of FP Sys.Detailed Review of FP Sys Design Was Conducted. W/980717 Ltr ML17284A6961998-07-15015 July 1998 LER 98-010-00:on 980615,TS Required Shutdown Due to Inoperability of TIP Sys Isolation Valve Was Noted.Caused by Improper Installation of TIP Tubing.Reattached Affected Tubing & Inspected Other TIP tubing.W/980715 Ltr ML17284A6731998-07-0101 July 1998 LER 98-009-00:on 980606,nuclear Steam Supply Shutoff Sys Group 3 & 4 Isolations During Testing Was Noted.Caused by Procedural Deficiency.Counseled Individuals Involved in preparation.W/980701 Ltr ML17284A6751998-06-30030 June 1998 Ro:On 980617,flooding of RB Northeast Stairwell with Consequential Flooding of Two ECCS Pump Rooms.Caused by Inadequate Fire Protection Sys Design.Pumped Out Water from Affected Areas to Point Below Berm Areas of Pump Rooms ML17284A6641998-06-24024 June 1998 LER 98-008-00:on 980531,inadvertent Full Scram During RPV Leak Testing in Mode 4 Was Noted.Caused by Change in Mgt Techniques.Revised Procedures to Take Into Account Addl Water Head in Pressure Sensing lines.W/980624 Ltr ML17284A6651998-06-24024 June 1998 LER 98-007-00:on 980530,inadvertent Full Scram & Division 1 ECCS Injection Was Noted.Caused by Failure to Meet Mgt Work Practice Expectation When Encountering Deficient Procedure. Incident Review Board Convened to Review event.W/980624 Ltr ML17284A6631998-06-19019 June 1998 LER 98-006-00:on 980520,discovered Discrepancies in Low Voltage Bus Calculations During Review of App R Calculations for High Impedance Fault Analysis.Caused Indeterminate. Implemented Procedural Changes Involving Operator Action ML17284A6551998-06-0404 June 1998 LER 98-005-00:on 980506,potential for Failure of RHR Sys Valve to Close on Isolation Signal Was Noted.Caused by Design Deficiency.Caution Tag Was Placed on RHR-V-40 Control Switch to Inform Plant Operators of limitation.W/980604 Ltr ML17284A6421998-06-0101 June 1998 LER 98-004-00:on 980502,determined That Primary Containment Penetration Overcurrent Protection Does Not Meet Reg Guide 1.63 Requirements.Caused by Inadequate Design Changes. Installed Addl Fuse in RHR-MO-9 circuit.W/980601 Ltr ML17284A6491998-05-31031 May 1998 Rev 0 to COLR 98-14, WNP-2,Cycle 14 Colr. ML17292B4031998-05-31031 May 1998 Monthly Operating Rept for May 1998 for WNP-2.W/980608 Ltr ML17292B3921998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for WNP-2.W/980513 Ltr ML17292B3291998-04-0909 April 1998 LER 98-003-00:on 980311,WNP-2 Experienced SCRAM Signal as Result of Low Rpv.Caused by Less than post-SCRAM Operational Strategy for Resetting SCRAM Signal in Conditions.Changes in post-SCRAM Operational Strategy implemented.W/980409 Ltr ML17292B3281998-04-0909 April 1998 LER 98-002-00:on 980311,reactor Scram & Plant Transient Occurred,Due to Failed Closed Main Steam Isolation Valve. Caused by Loss of Pneumatic Actuating Supply Pressure. Problem Evaluation Request Written for Failure of MS-V-22D ML17292B3371998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for WNP-2.W/980409 Ltr ML17292B2641998-03-0404 March 1998 Performance Self Assessment,WNP-2. ML17292B2661998-03-0404 March 1998 LER 98-001-00:on 980203,automatic Start of HPCS EDG Was Noted.Caused by Operator Error.Operations Crew Stabilized Plant at Approximately 75% Reactor Power & Investigation of Event Was initiated.W/980304 Ltr ML17292B2911998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for WNP-2.W/980313 Ltr ML17284A7971998-02-17017 February 1998 Rev 28 to Operational QA Program Description, WPPSS-QA-004.With Proposed Rev 29 ML17292B3591998-02-12012 February 1998 WNP-2 Cycle 14 Reload Design Rept. 1999-09-30
[Table view] |
Text
ACCELERATED D1S1N1BUTION DE M ON STR ON SYSj'Eg 1
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 4 ~/sf DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATXON HUTCHXSON,L. Washington Public Power Supply System POWERS,C.M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATXON
SUBJECT:
Monthly operating rept for Apr 1989 for WPN-2.R 90509 tr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)
J ENCL SIZE:
NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 4 4 PD5 PD 1 1 SAMWORTH,R 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 -
1 AEOD/DSP/TPAB 1 1 IRM TECH ADV 2 2 NRR/DLPQ/PEB 11 1 1 NRR/DOEA/EAB 11 1 1 NRR DRE 0 1 1 NUDOCS-ABSTRACT 1 1 1 1 RGN5 1 1 EXTERNAL: EG&G SIMPSON, F 1 1, LPDR 1 1 NRC PDR 1 1 NSIC 1 1' I
S h
~ TO ALL "RIDS" RECIPXENIS'LEASE D
S HELP US K) REMKZ WASTE! CXNZAC1'1HE DOQ3MEM1'GN1'ROL DESK, RCCM Pl-37 (EXT. 20079) TO ELOCUTE KRJR NAME FKR DISTKCBVX'ION LISTS FOR DOCUME2GS YOU DGNIT NEZD1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 30 ENCL 30
ii WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 May 9; 1989 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Dear Sir.:
SUBJECT:
NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for April 1989 as required by our Technical Specifications 6.9.1.6.
Very Truly Yours, C. N. Powers (N/D 927M)
WNP-2 Plant Manager CNP/lc Enclosure cc: Nr. J. B. Martin NRC Region V Nr,. C. J. Bosted NRC Site Representative (901A)
Ms. Dottie Sherman ANI, Farmington CT Nr. J. T. Wheelock INPO Mr. W. H. Lovelace NRC, Washington D.C.
OPERATING DATA REPORT WNP-2 Oj-Nay-89
- 1. DOCKET: 50-397
- 2. REPORTING PERIOD Apr-89 OUTAGE + ON-LINE HOURS 719
- 3. UTILITY CONTACT. LEONARD HUTCHISON (509) '77-2486
- 4. LICENSED THERNAL POWER (NWt): 3323
- 5. NAMEPLATE RATING (GROSS NWe) a 1200. 9
- 6. DESIGN ELECTRICAL RATING (NET NWe): 1100
- 7. NAXIMUN DEPENDABLE CAPACITY (GROSS NWe) ." 1140
- 8. NAXIMUN DEPENDABLE CAPACITY (NET NWe) c 1095
- 9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT~ GIVE REASONS.
- 10. POWER TO WHICH RESTRICTED~ 'IF ANY (NET NWe) a ii. REASONS FOR RESTRICTIONS, IF ANY! ~DMIN - NSIQ QQ IP+QEgQLF MONTH YEAR CUMULATIVE
- 12. REPORT PERIOD HOURS 719 2879 38383.2
- 13. HOURS REACTOR CRITICAL 675. 7 2703.8 '8921.4
- 14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
- 15. HRS GENERATOR ON LINE 669. 8 2663. 2 27827. 8
- 16. UNIT RESERVE SHUTDOWN HOURS 0.0 0. 0 381. 7
- 17. GROSS THERNAL ENERGY (NWH) 1719132 712i092 7623229'7
- 18. GROSS ELECTRICAL ENERGY (NWg) 561420 2347280 25380780 19 NET ELECTRICAL ENERGY (NWH) 537925 2255554 24423862
- 20. UNIT SERVICE FACTOR 93.2/ 92.5X 72 5X
- 21. UNIT AVAILABILITYFACTOR 93.2X 92.5/ 73.5/
22 UNIT CAPACITY FACTOR (NDC NET) 68.3X 71. 5/ 58. 1/
23 UNIT CAPACITY FACTOR (DER NET) "68. 0/ 71. 2/ 57. 8%
- 24. UNIT FORCED OUTAGE RATE 0. 0% 3.0% 9 1/
- 25. FORCED OUTAGE HOURS 0.0 83.6 2775.2 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 NONTHB (TYPEqDATE~DURATION)'ONE
- 27. IF CURRENTLY SHUTDOWN EBTINATED STARTUP DATE: 6/14/89 8905220037 890430 PDR ADOCK 05000397 R
PDC
v tvett f(I', "'I ", Jl't iL>4 CJ ~ ~ j
'I I.
Vtt IJ I" Et 1, I
~.I) 'I>>.'~7j. If-
'L Ij~ v, >>.tvvvt'l lft J ~ v <>i I I "I
'ji3>> '
,jt "~ jtt 4 I t
f 'lv ~ I[ 'l'f t, IJ"<<.
lpga jvttjl ~ j<<tk<<Ivan I j ~
h v VII vtf,'tll v tlat vC>> j tv ) "I., I,"l3 <'fl, f'"" j'0 'R tl 1>>7 I~ P ""3
~%a I
t '8 "PP3
~
I, I.,<<i<<v'>If>> 1Cj<<." '. "t~ ",it) j>>ij I If'- I'1 Jljv J v y tf Qg I I v v vvg
') '>>t<<"'.I,tt' <lgl'I
'I, t IQ<<4.
'.t C Vv
( <<
\ Il v 't QI v
( il;.' "I 'l" 0 '-3 "I' 'i .t H I$
>~" jt'jP' I>>II>> w' "2 "v i <<'~J3 t I>> I tf'<I(
4 I ',,",4PP,>> '.. "'";t v .f.)'j." >>lJ d.j";'l 'f..>~j
'I ~ >>'I
>'j.j t; I( I, '>J4'I"Gl"" I ij I'cv 11 t'I A /gy1 vt I,)'I
. ~
s I I If
'v jv v' ',tt I I . I tgvt j II
>>v 4>>
$ lil e
~I V ~ + ,t/ I' t
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
WHP-2 DATE '/1/89 COgPI ETED 8Y LB HUTCHISON TELEPHONE (509)377"2486 flONTH APRIL 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (YwE-Het) (h1wE-Het) 818 17. 817
- 2. 658 18. 813
- 3. 813 19. 807 815 20. 803
- 5. 799 21. 790
- 6. 805 22. 815
- 7. 806 23. 817
- 8. 816 24. 812
- 9. 816 25. 814
- 10. 815 26. 817 816 27. 815
- 12. 816 28. 684
- 13. 814 29
'0.
- 14. 808
- 15. 807 31.
- 16. 817 INSTRUCT IOHS On this form, list the average daily unit power level in VMe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100'5 line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
a 0
4 I
1 ~
DOCKET NO. 5O-397 UNIT NNlE DnTE 5/I/89
'NIT SIUTDONNS / REDUCTIONS 'OMPLETED DY LB HUTCHISON BEKAT PEAICD APRIL 19 89 TELEPllONE 509 377-2486 mcnth, year FE. ~m 'xi% Iiol3n~ WnhsGH ~sc'iV tatlK v i i ~llll'C 89-06 4/28/89 S 49.2 C I FUELXX PLANT SHUTDOWN AS SCHEDULED FOR REFUELING OUTAGE R-4 SUht l/NY WNP-2 OPERATED ROUTINELY IN APRIL. SHUTDOWN ON 28TH FOR SCHEDULED REFUELING OUTAGE TYPE SYSTEM Ec COMPOhCNT F-Forced A-Equip Failure F-Admin 1-thanual Exhibit F h H S-Schcd 0-Haint or Test ~ G-Oper Error 2-manual Scram Instructions for C-Ref ue ling l)-Other 3-pluto Scram Preparation D-Aegulatory Res triction 4-Continued E'ntry Sheet oi'ata E-Operator Training 5 neduced Qnad ucensee Event Report h License Examination 9-Other (LiER) File (NUAEG-Oldl)
(g