ML18093A877: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 28: Line 28:
USNRC Licensing Project Manager Mr. R. w. Borchardt USNRC Senior Resident Inspector Mr. w. T. Russell, Administrator USNRC Region I Mr. D. M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628
USNRC Licensing Project Manager Mr. R. w. Borchardt USNRC Senior Resident Inspector Mr. w. T. Russell, Administrator USNRC Region I Mr. D. M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628


                                                                                          ..,,,.
                                                                                          .
                                                                                          .-
                                                                                            ,_ -
                                                                 ~
                                                                 ~
12(14)AF21 PUMP TIE IN 12 14 AF118                                                  N SALEM UNIT 1 CONTAINMENT LEAKAGE COLLECTION UNIT 1 FHB                                      POINT 12(14)BF57 12(14)BF58
12(14)AF21 PUMP TIE IN 12 14 AF118                                                  N SALEM UNIT 1 CONTAINMENT LEAKAGE COLLECTION UNIT 1 FHB                                      POINT 12(14)BF57 12(14)BF58
                      '
                       \
                       \
                         \
                         \

Latest revision as of 07:41, 3 February 2020

Requests Relief from Requirements of ASME Section XI Re 10-yr Hydrostatic Testing of Buried Piping in Auxiliary Feedwater Sys.Relief Sought Due to Alternative Test Method Used During First 10-yr Inservice Insp Outage.Fee Paid
ML18093A877
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/06/1988
From: Miltenberger S
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NLR-N88-076, NLR-N88-76, NUDOCS 8806160156
Download: ML18093A877 (3)


Text

Public Service Electric and Gas Company Steven E. Miltenberger Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609 339-4199 Vice President -

Nuclear Operations June 6, 1988 NLR-N8807 6 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

INSERVICE INSPECTION PROGRAM RELIEF REQUEST SALEM GENERATING STATION UNIT NO. 1 DOCKET NO. 50-272 In accordance with 10CFR50.55a(g)(5), Public Service Electric and Gas Company {PSE&G) is requesting relief from the requirements of ASME Section XI regarding the 10-year hydrostatic testing of buried piping in the Salem Unit 1 Auxiliary Feedwater System. In particular, relief is being sought due to an alternative test method used during the recent Salem Unit 1 First 10-Year ISI outage. The relief request is presented in detail in the attachment to this letter and represents the final relief request for the Salem Unit 1 First 10-Year IS! interval.

In accordance with the requirements of 10CFR170.21, a check in the amount of $150.00 is enclosed.

If you have any questions with regard to this relief request, please do not hesitate to contact us.

Sincerely, Attachment

(

8806160156 880606 PDR ADOCK 05000272 P DCD

Document Control Desk 2 06-06-88 C Mr. D. C. Fische~

USNRC Licensing Project Manager Mr. R. w. Borchardt USNRC Senior Resident Inspector Mr. w. T. Russell, Administrator USNRC Region I Mr. D. M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628

~

12(14)AF21 PUMP TIE IN 12 14 AF118 N SALEM UNIT 1 CONTAINMENT LEAKAGE COLLECTION UNIT 1 FHB POINT 12(14)BF57 12(14)BF58

\

\

\. NOTES

..... 1. EACH BURIED PIPE RUN IS APPROXIMATELY 190 FT.

OUTER MECHANICAL. 2. PIPE CONFIGURATION BURIED PENETRATION IS THE SAME FOR BOTH 12 AND 14 PIPES AF LINES 12(14)AF23