ML19318C351: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:OG8 K- Q
{{#Wiki_filter:OG8 K- Q
* The Ohio State University            Engineering Experiment Station O                                                              142 Hitchcock Hall 2070 Neil Avenue Columbus, Ohio 43210 Phone 614 422-2411 June 17, 1980
* The Ohio State University            Engineering Experiment Station O                                                              142 Hitchcock Hall 2070 Neil Avenue Columbus, Ohio 43210 Phone 614 422-2411 June 17, 1980 Mr. John Kepler Director, Region III Nuclear Regulatory Commission Office of Inspection and Enforcement 799 Roosevelt Road Glenn Ellyn, Illinois    60137
                                                                  ,
Mr. John Kepler Director, Region III Nuclear Regulatory Commission Office of Inspection and Enforcement 799 Roosevelt Road Glenn Ellyn, Illinois    60137


==Dear Sir:==
==Dear Sir:==
Line 28: Line 26:
I i
I i
l        The intent of the Tech Spec is to limit the spread of contamination in I        the event of any emergency. The current situation would not allow l
l        The intent of the Tech Spec is to limit the spread of contamination in I        the event of any emergency. The current situation would not allow l
'
releases to the outside nor does it exchange air between the reactor room and the analyzer room since the system is not operated in the exhaust mode. Therefore, the intent of this Technical Specification is not violated.
releases to the outside nor does it exchange air between the reactor room and the analyzer room since the system is not operated in the exhaust mode. Therefore, the intent of this Technical Specification is not violated.
8007039 3
8007039 3
                                                              *
                                                                 &lUN - .1980 College of Engineering QUN 2 3 1980
                                                                 &lUN - .1980 College of Engineering QUN 2 3 1980


  .
   ~ * <
   ~ * <
                                                                ,
,    4 r
,    4 r
\-                                                                              ,
\-                                                                              ,
                                                                                  .
June 17, 1980 Page 2 4
June 17, 1980 Page 2 4
I However to be in strict adherence to the Tech Specs, we have initiated action-to have this air conditioner tied into the control room emergency switch. The order for a work estimate was sent 6-2-80.
I However to be in strict adherence to the Tech Specs, we have initiated action-to have this air conditioner tied into the control room emergency switch. The order for a work estimate was sent 6-2-80.
Until work is completed, the air conditioner will not be operated if the reactor is operating. If you have questions regarding this matter please contact either Mr. Hajek or Mr. Myser at the Nuclear Reactor Laboratory (614/422-6755).
Until work is completed, the air conditioner will not be operated if the reactor is operating. If you have questions regarding this matter please contact either Mr. Hajek or Mr. Myser at the Nuclear Reactor Laboratory (614/422-6755).
Sincerely,
Sincerely, pT        /        ue~< -
                                          '
pT        /        ue~< -
Robert F. Redmond Director Engineering Experiment Station RFR/BKH/jmg cc:  D. W. Miller B. K. Hajek R. D. Myser                                                          l l
Robert F. Redmond Director Engineering Experiment Station RFR/BKH/jmg cc:  D. W. Miller B. K. Hajek R. D. Myser                                                          l l
l l
l l
I l
I l
i}}
i}}

Latest revision as of 07:07, 1 February 2020

Informs That Reportable Noncompliance Item Exists Involving Tech Spec 2.1.Air Conditioner for Multichannel Analyzer Room Not Tied to Emergency Switch in Control Room.Action Initiated to Have Air Conditioner Tied to Control Room
ML19318C351
Person / Time
Site: Ohio State University
Issue date: 06/17/1980
From: Redmond R
OHIO STATE UNIV., COLUMBUS, OH
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8007010383
Download: ML19318C351 (2)


Text

OG8 K- Q

  • The Ohio State University Engineering Experiment Station O 142 Hitchcock Hall 2070 Neil Avenue Columbus, Ohio 43210 Phone 614 422-2411 June 17, 1980 Mr. John Kepler Director, Region III Nuclear Regulatory Commission Office of Inspection and Enforcement 799 Roosevelt Road Glenn Ellyn, Illinois 60137

Dear Sir:

During a recent discussion of Technical Specifications (5-28-80) between Brian Hajek, Associate Director of the NRL and Richard Myser, Manager of Reactor Operations, it was concluded there may be a reportable non-compliance item. Following discussions on 5-29-80 and 5-30-80 between Mr. Ken Ridgeway of your office and Mr. Myser of The Ohio State University Nuclear Reactor Laboratory, we decided to report under the requirements of our NRC license R-75 section D(2). While the item does not involve actual reactor operation, this still seemed the most appropriate procedure to follow.

This reportable iten involves Tech Spec 2.1(1) which states briefly that "all circulating fans and air conditioning systems shall have the capability to be shut off from a single control in the control room....". We discovered that an air conditioner for the multi-channel analyzer room (Room 109) of the Nuclear Reactor Laboratory is not tied to the emergency switch in the control room.

While this air conditioner is mounted on an interior wall which obviously eliminates any possibility of exchange of reactor building air with outside air, it may not be turned off from the control room.

I i

l The intent of the Tech Spec is to limit the spread of contamination in I the event of any emergency. The current situation would not allow l

releases to the outside nor does it exchange air between the reactor room and the analyzer room since the system is not operated in the exhaust mode. Therefore, the intent of this Technical Specification is not violated.

8007039 3

&lUN - .1980 College of Engineering QUN 2 3 1980

~ * <

, 4 r

\- ,

June 17, 1980 Page 2 4

I However to be in strict adherence to the Tech Specs, we have initiated action-to have this air conditioner tied into the control room emergency switch. The order for a work estimate was sent 6-2-80.

Until work is completed, the air conditioner will not be operated if the reactor is operating. If you have questions regarding this matter please contact either Mr. Hajek or Mr. Myser at the Nuclear Reactor Laboratory (614/422-6755).

Sincerely, pT / ue~< -

Robert F. Redmond Director Engineering Experiment Station RFR/BKH/jmg cc: D. W. Miller B. K. Hajek R. D. Myser l l