Responds to NRC Re Violations Noted in Insp Rept 50-150/84-01.Corrective Actions:Scheduling Procedures for Instrument Calibr & Control Element Tests,Requalification Exams & Reactor Operations Meetings Revised
ML20140D267
Person / Time
Site: Ohio State University
Issue date: 12/03/1984
From: Redmond R
OHIO STATE UNIV., COLUMBUS, OH
To: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20140D264 List:
References
NUDOCS 8412180402
Download: ML20140D267 (2)


Text

p

?6; Q.

- i '

The Ohio State Universky Engineering Experiment Stagen 142 Hitchcock Hall 2070 Neil Avenue Columbus, Ohio 43210 Phone 614 422-2411 December 3, 1984 C. E. Norelius, Director Division of Reactor Projects US Nuclear Regulatory Commission

' Region III 799 Roosevelt Road Glen Ellyn IL 60137

Dear Sir:

This communication is in response to your letter dated November 13, 1984 regarding the routine safety inspection conducted at The Ohio State University Nuclear Reactor Laboratory (Docket No. 50-150).

It is our understanding that we must reply to two Level V items of non-compliance and one deviation. Our response is outlined below.

Item 1:

Instrument Calibraticn and Control Element Tests Not Completed in a Timely Manner.

(Non-Compliance)

A.

Action Taken: This item has been reviewed by each senior Reactor Staff Member.

B.

Corrective Action to be Taken:

(1) More rigidly scheduled times for quarterly, semi-annual, and annual activities shall be established.

(2) The Maintenance Board shall be made larger and coded to better indicate when activities are due for completion.

C.

Full compliance shall be achieved by July 1,1985.

Item 2:

Requalification Examination Not Completed in a Timely Manner.

(Non-Compliance)

A.-

Action Taken: This item has been reviewed by each senior Reactor Staff Member.

8412180402 841212 gDRADOCK 05000150 PDR DEC 7 1984 College of Engineering

=

C. E. Norelius, Director

-December 3, 1984 Page Two B.

Corrective Action to be Taken:

(1)

Revise the Requalification Program procedure for the OSU-NRC.

(2) Assign a single individual responsibility for the annual exam preparation.

(3) Require that the requalification exam and requalification operations fall within more rigidly scheduled times.

C.

Full compliance shall be achieved by July 1,1985.

Item 3:

Reactor Operations Committee Meetings Not Held at the Proper Frequency.

(Deviation)

A.

Action Taken: This item has been reviewed by each senior staff member.

B.

Corrective Action Taken:

(1) Meetings will be set to fall within more rigidly scheduled times.

(2) The date for the next meeting shall be established at each current meeting.

(3) A secretary shall be assigned to do minutes, agendas, and meeting reminders.

C.

Full compliance shall be achieved by July 1,1985.

If you have questions on the contents of this response letter, please contact Mr. Richard Myser, Associate Director of 'the NRL at 614/422-9755.

Sincerely, Robert F. Redmond Director RFR/sh

[