Forwards Insp Rept 50-150/99-201 on 990208-12.No Violations Noted.Insp Consisted of Organization,Periodic & Special Repts,Operations & Maint,Procedures Requalification Training,Surveillance,Experiments & Physical Security
ML20204B203
Person / Time
Site: Ohio State University
Issue date: 03/04/1999
From: Weiss S
NRC (Affiliation Not Assigned)
To: Ashley D
OHIO STATE UNIV., COLUMBUS, OH
Shared Package
ML20204B207 List:
References
50-150-99-201, NUDOCS 9903220030
Download: ML20204B203 (4)


See also: IR 05000150/1999201

Text

_

,

Dr. Divid B. Ashlry, Director

11 arch 4',1999

Engineering Experim:nt Strtion

..

Ohio Stita Univ:rsity

167 Hitchcock Hall

.,

Columbus, Ohio 43210

SUBJECT:

ROUTINE SAFETY INSPECTION REPORT NO. 50-150/99-201(DRPM)

,

(

,

Dear Dr. Ashley:

I

-This refers to the inspection conducted on February 8-12,1999, at the Ohio State University

6

Research Reactor. The purpose of the inspection was to determine whether activities

authorized by the license were u.aducted safely and in accordance with NRC requirements. At

the conclusion of the inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within these areas, the

inspection consisted of selective examinations of proct,dures and representative records,

interviews with personnel, and observations of activities in progress.

Your facility operations were acceptable and materiel conditions were improved since the last

inspection. Two minor violations were identified. Corrective actions will be reviewed during the

next inspoction.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its.

enclosure will be placed in the NRC Public Document Room.

Sincerely,

Marvin M. tiendonca for:

Seymour H. Weiss, Director

Non-Power Reactors and Decommissioning

Project Directorate

Division of Regulatory Improvement Programs

Office of Nuclear Reactor Regulation

Docket No.

50-150

License No.

R-75

)

Enclosure:

Inspection Report No. 50-150/99-201

cc w/ enclosure: See next page

/

DISTRIBUTION:

HARD COPY

E-MAIL COPY

IDochet File 60350

F UBLC

AAdams

CBassett

go)

EHylton

SWeiss

PDoyle

TDragoun

~p

PDNDC

GTracy, EDO

WEresian

SHolmes

TMichaels

DMatthaws

Pisaac

MMendonca

TBurdick

BDavis (Fonn only)

/

^

PDND:P

PDND:PMg

P.

PDND:D

TBurdick '

TMichaels

tn

SWeiss

3 / 4 199

4 /g /99

3 /

/99

3 /y /99

OFFICIAL RECORD COPY

DOCUMENT N ME: G:\\SECY\\BURDICK\\992010SU.WPD

9903220030 990304

PDR

ADOCK 05000150

-

,t

0

pop

-e,

,

,:

(,,_c.

"W

. _ . . . _ -

, _ , , . .

Dr. David B. Ashisy, Dircctor

,

March 4, 1999

,

Engineenng Experimtnt Station

'

Ohio St ts Univ:rsity

  • <

167 Hitchcock Hall

Columbus, Ohio 43210

SUBJECT:

ROUTINE SAFETY INSPECTION REPORT NO. 50-150/99-201(DRPM)

l

Dear Dr. Ashley:

l

This refers to the inspection conducted on February 8-12,1999. at the Ohio State University

Research Reactor. The purpose of the inspection was to determine whether activities

autnorized by the license were conducted safely and in accordance with NRC requirements. At

the conclusion of the inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in the reg *

Within ths,ae areas, the

inspecticn consisted of selective examinations of procedures ans ;epresentative records,

interviews with personnel, and observations of activities in progress.

Your facility operations were acceptable and materiel conditions were improved since the last

inspection. Two minor violations were identified. Corrective actions will be reviewed during the

next inspection.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Sincerely,

Marvin M. !!endonca for:

{

Seymour H. Weiss, Director

Non-Power Reactors and Decommissioning

Project Directorate

Division of Regulatory Improvement Programs

Office of Nuclear Reactor Regulation

Docket No.

50-150

License No.

R-75

Enclosure:

Inspection Report No. 50-150/99-201

cc w/ enclosure: Sec next page

DISTRIBUTtON:

HARD COPY

E-MAIL COPY,

Docket File 50-150

PUBLC

AAdams

CSassett

EHylton

SWeiss

PDoyle

TDragoun

PDND r\\f

GTracy, EDO

WEresian

SHolmes

TMichaels

DMatthews

Plsaac

MMendonca

TBurdick

BDavis (Form only)

'

/t

9

PDND:PM,4,1

PQNDIA.

PDND:D

PDND:PM

j

TBuroick / p

TMichaels

$9lt n

SWeiss

J / 4 /99

i /g /99

9/

/99

3 /y /99

OFFICIAL RECORD COPY

DOCUMENT N ME: G:\\SECY\\BURDICK\\992010SU.WPD

'

\\

'

.

,

p*M%

[p

~$.

UNITED STATES

9

.

j

j

NUCLEAR REGULATORY COMMISSION

,

"

t

WASHINGTON, D.C. 20666-4001

%,*****/

Marchk,1999

Dr. David B. Ashley, Director

Engineering Experiment Station

Ohio State University

167 Hitchcock Ha'l

Columbus, Ohio 43210

SUBJECT:

ROUTINE SAFETY INSPECTION REPORT NO. 50-150/99-201(DRPM)

Dear Dr. Ashley:

T's refers to the inspection conducted on February 8-12,1999, at the Ohio State University

Research Reactor. The purpose of the inspection was to determine whether activities

authorized by the Ucense were conducte,d safely and in accordance with NRC requirements. At

the conclusion of the inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within these areas, the

inspection consisted of selective examinations of procedures and representative records,

interviews with personnel, and observations of activities in progress.

Your facility operations were acceptable and materiel conditions were improved since the last

inspection. Two minor violations were identified. Corrective actions will be reviewed dpring the

next inspection.

!

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

l

Sincerely,

w% d'~

'

'

i

Seymour H. Weiss, Director

A

Non-Power Reactors and Decommissioning

Project Directorate

i

Division of Regulatory improvement Programs

Office of Nuclear Reactor Regulation

,

Docket No.

50-150

i

License No.

R-75

Enclosure:

Inspection Report No. 50-150/99-201

)

cc w/ enclosure: See ne: pag (,

l

l

i

I

.

  • .

. Ohio State University

Docket No. 50-150

cc:

Ohio Department of Health

ATTN: Radiological Health

Program Director

j

P. O. Box 118

i

Columbus, OH 43216

Ohio Environmental Protection Agency

Division of Planning

i

Environmental Assessment Section

P. O. Box 1049

,

Columbus, OH 43216

Mr. Richard D. Myser

Reactor Operations Manager

Engineering Experiment Station

Ohio State University

142 Hitchcock Hall

Columbus, OH 43210

i

!