{{#Wiki_filter:August 31, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer
{{#Wiki_filter:August 31, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555
 
Exelon Nuclear
 
Exelon Generation Company, LLC
 
Quad Cities Nuclear Power Station  
 
4300 Winfield Road
 
Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
QUAD CITIES NUCLEAR POWER STATION  
QUAD CITIES NUCLEAR POWER STATION


==Dear Mr. Crane:==
==Dear Mr. Crane:==


On August 7, 2006, the NRC staff completed its performance review of the Quad Cities Nuclear Power Station for the first half of the calendar year 2006 assessment cycle. Our technical staff
On August 7, 2006, the NRC staff completed its performance review of the Quad Cities Nuclear Power Station for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
 
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
reviewed performance indicators (PIs) for the most recent quarter and inspection results over
Plant performance for the most recent quarter for Quad Cities Unit 1 was within the Regulatory Response column of the NRCs Action Matrix based on one inspection finding being classified as having low to moderate safety significance (White) in the mitigating systems cornerstone.
The White finding and related violation were finalized in a letter dated June 29, 2006, and related to the failure to verify that the electromatic relief valve (ERV) actuator design was suitable for operation at the increased vibration levels experienced at extended power uprate (EPU) power levels. As a result, in addition to conducting the reactor oversight process baseline inspection at Unit 1, a supplemental inspection using Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, is tentatively planned to be conducted in the first quarter of 2007, pending the completion of your planned corrective actions, described in your response letter as scheduled for the end of 2006.
Plant performance for the most recent quarter for Unit 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process baseline inspections at Unit 2.


the previous 12 months. The purpose of this lette r is to inform you of our assessment of yoursafety performance during this period and our plans for future inspections at your facility.
C. Crane                                       The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Exempt from Public Disclosure in
In addition, the resident inspectors plan to perform Temporary Inspection 2515/169, Mitigating Systems Performance Index (MSPI) Verification, before the end of calendar year 2006. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
 
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Accordance with 10 CFR 2.390" will include the physical protection review and resultant
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mark A. Ring at 630-829-9703 with any questions you may have regarding this letter or the inspection plan.
 
Sincerely,
inspection plan.
                                              /RA/
Plant performance for the most recent quarter for Quad Cities Unit 1 was within the Regulatory Response column of the NRC's Action Matrix based on one inspection finding being classified as having low to moderate safety significance (White) in the mitigating systems cornerstone.
Mark A. Satorius, Director Division of Reactor Projects Docket Nos. 50-254; 50-265; 72-053 License Nos. DPR-29; DPR-30
The White finding and related violation were finalized in a letter dated June 29, 2006, and
 
related to the failure to verify that the electromatic relief valve (ERV) actuator design was
 
suitable for operation at the increased vibration levels experienced at extended power uprate (EPU) power levels. As a result, in addition to conducting the reactor oversight process
 
baseline inspection at Unit 1, a supplement al inspection using Inspection Procedure 95001,"Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area," is
 
tentatively planned to be conducted in the first quarter of 2007, pending the completion of your
 
planned corrective actions, described in your response letter as scheduled for the end of 2006.
Plant performance for the most recent quarter for Unit 2 was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no
 
additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process
 
baseline inspections at Unit 2.
C. Crane The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution
 
of any scheduling conflicts and personnel availabilit y issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.  
 
In addition, the resident inspectors plan to perform Temporary Inspection 2515/169, "Mitigating
 
Systems Performance Index (MSPI) Verification," before the end of calendar year 2006. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public
 
Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at
 
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).If circumstances arise which cause us to c hange the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mark A. Ring at 630-829-9703 with
 
any questions you may have regarding this letter or the inspection plan.
Sincerely,/RA/Mark A. Satorius, Director Division of Reactor Projects Docket Nos. 50-254; 50-265; 72-053 License Nos. DPR-29; DPR-30


==Enclosure:==
==Enclosure:==


Quad Cities Inspection/Activity Plan DISTRIBUTION:
Quad Cities Inspection/Activity Plan DISTRIBUTION:
See next page C. Crane The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution
See next page


of any scheduling conflicts and personnel availabilit y issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.  
C. Crane                                                                  The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
 
In addition, the resident inspectors plan to perform Temporary Inspection 2515/169, Mitigating Systems Performance Index (MSPI) Verification, before the end of calendar year 2006. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In addition, the resident inspectors plan to perform Temporary Inspection 2515/169, "Mitigating
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mark A. Ring at 630-829-9703 with any questions you may have regarding this letter or the inspection plan.
Systems Performance Index (MSPI) Verification," before the end of calendar year 2006. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
Sincerely,
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public
                                                                          /RA/
 
Mark A. Satorius, Director Division of Reactor Projects Docket Nos. 50-254; 50-265; 72-053 License Nos. DPR-29; DPR-30
Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at
 
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).If circumstances arise which cause us to c hange the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mark A. Ring at 630-829-9703 with
 
any questions you may have regarding this letter or the inspection plan.
Sincerely,/RA/Mark A. Satorius, Director Division of Reactor Projects Docket Nos. 50-254; 50-265; 72-053 License Nos. DPR-29; DPR-30


==Enclosure:==
==Enclosure:==


Quad Cities Inspection/Activity Plan DISTRIBUTION:
Quad Cities Inspection/Activity Plan DISTRIBUTION:
See next pageDOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2005 to 2006\quad cities\QuadC MOC Letter 2006.wpdX Publicly Available G Non-Publicly Available G SensitiveX Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIIRIIINAMEMRing:slsMSatoriusDATE08/31/200608/31/2006 OFFICIAL RECORD COPY C. Crane-3-cc w/encl:Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station
See next page DOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2005 to 2006\quad cities\QuadC MOC Letter 2006.wpd X Publicly Available                       G Non-Publicly Available                 G Sensitive              X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE            RIII                                RIII                            RIII                              RIII NAME              MRing:sls                          MSatorius DATE              08/31/2006                          08/31/2006 OFFICIAL RECORD COPY


Regulatory Assurance Manager - Quad Cities Nuclear Power Station
C. Crane                                  cc w/encl: Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager - Quad Cities Nuclear Power Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission D. Tubbs, Manager of Nuclear MidAmerican Energy Company Chairman, Rock Island County Board Rock Island County Sheriff Coordinator, Rock Island Emergency Services and and Disaster Chairman, Whiteside County Board Whiteside County Sheriff Coordinator, Whiteside County Emergency Services Chairman, Board of Supervisors Clinton County Sheriff Coordinator, Clinton County Emergency Management Scott County Administrator Scott County Sheriff Coordinator, Scott County Emergency Management Mayor of Albany Mayor of Rapids City President, Village of Port Byron President, Village of Cordova Mayor of Camanche Mayor of Clinton Clinton City Administrator Mayor of Low Moor Mayor of LeClaire LeClaire City Administrator Mayor of Princeton Mayor of McCausland INPO


Chief Operating Officer
C. Crane                                  ADAMS Distribution:
DXC1 TEB MXB JXH11 RidsNrrDirslpab JLC1 GEG KGO RML2 SRI Quad Cities DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)


Senior Vice President - Nuclear Services
Page 1 of 2                                                                                  Quad Cities 08/30/2006    15:03:25                                                                Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit                                                                                                                        No. of Staff    Planned Dates          Inspection Number      Inspection Activity                                                    Title                                        on Site        Start    End            Type CDBI          - COMPONENT DESIGN BASES INSPECTION                                                                        6 1, 2          IP 7111121              Component Design Bases Inspection                                                                    08/14/2006 09/15/2006 Baseline Inspections 7112203        - REMP                                                                                                      1 1, 2          IP 7112203              Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P              10/09/2006 10/13/2006 Baseline Inspections 1, 2          IP 71151                Performance Indicator Verification                                                                  10/09/2006 10/13/2006 Baseline Inspections 71152B        - PROBLEM IDENTIFICATION AND RESOLUTION                                                                    4 1, 2          IP 71152B                Identification and Resolution of Problems                                                            11/27/2006 12/15/2006 Baseline Inspections BI            - HEAT SINK INSPECTION                                                                                      1 1, 2          IP 7111107B              Heat Sink Performance                                                                                12/18/2006 12/22/2006 Baseline Inspections 7112103        - INSTRUMENTATION & SCBA                                                                                    1 1, 2          IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                                        02/05/2007 02/09/2007 Baseline Inspections 1, 2          IP 71151                Performance Indicator Verification                                                                  02/05/2007 02/09/2007 Baseline Inspections EP BI          - BASELINE EP INSPECTION                                                                                    1 1, 2          IP 7111402              Alert and Notification System Testing                                                                02/12/2007 02/16/2007 Baseline Inspections 1, 2          IP 7111403              Emergency Response Organization Augmentation Testing                                                02/12/2007 02/16/2007 Baseline Inspections 1, 2          IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies                                    02/12/2007 02/16/2007 Baseline Inspections 1, 2          IP 71151-EP01            Drill/Exercise Performance                                                                          02/12/2007 02/16/2007 Baseline Inspections 1, 2          IP 71151-EP02            ERO Drill Participation                                                                              02/12/2007 02/16/2007 Baseline Inspections 1, 2          IP 71151-EP03            Alert & Notification System                                                                          02/12/2007 02/16/2007 Baseline Inspections ISI            - ISI BASELINE INSPECTION                                                                                  1 1              IP 7111108G              Inservice Inspection Activities - BWR                                                                02/12/2007 02/16/2007 Baseline Inspections 7112102        - OUTAGE: ACC CNTL & ALARA                                                                                  1 1, 2          IP 7112101              Access Control to Radiologically Significant Areas                                                  05/07/2007 05/11/2007 Baseline Inspections 1, 2          IP 7112102              ALARA Planning and Controls                                                                          05/07/2007 05/11/2007 Baseline Inspections FY 2007        - QUAD CITIES INIT PREP 05/2007                                                                            3 1                W90150                OL - INITIAL EXAM - QUAD CITIES - MAY/JUNE 2007                                                      05/14/2007 05/18/2007 Not Applicable FY 2007        - QUAD CITIES INIT EXAM 06/2007                                                                            3 1                W90150                OL - INITIAL EXAM - QUAD CITIES - MAY/JUNE 2007                                                      06/04/2007 06/15/2007 Not Applicable MOD5059        - MODIFCATION/50.59 INSPECTION                                                                              2 1, 2          IP 7111102              Evaluation of Changes, Tests, or Experiments                                                        08/20/2007 09/07/2007 Baseline Inspections 1, 2          IP 7111117B              Permanent Plant Modifications                                                                        08/20/2007 09/07/2007 Baseline Inspections 7112202        - RADWASTE & TRANSPORTATION                                                                                1 1, 2          IP 7112202              Radioactive Material Processing and Transportation                                                  08/27/2007 08/31/2007 Baseline Inspections 1, 2          IP 71151                Performance Indicator Verification                                                                  08/27/2007 08/31/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
Senior Vice President - Mid-West Regional
 
Operating Group


Vice President - Mid-West Operations Support
Page 2 of 2                                                                                  Quad Cities 08/30/2006     15:03:25                                                               Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit                                                                                                                No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                                on Site       Start    End            Type ISFSI         - ISFSI INSPECTION                                                                                 1 1, 2           IP 60855.1               Operation of an Independent Spent Fuel Storage Installation at Operating Plants             09/01/2007 10/30/2007 Other Routine MAINRULE - MAINTENANCE EFFECTIVENESS INSPECTION                                                                   1 1, 2          IP 7111112B              Maintenance Effectiveness                                                                    09/24/2007 09/28/2007 Baseline Inspections 71111.11       - LIC OPERATOR REQUAL PROGRAM EVALUATION                                                           2 1, 2          IP 7111111B              Licensed Operator Requalification Program                                                    10/29/2007 11/03/2007 Baseline Inspections 7112102       - ALARA & PI VERIFICATION                                                                           1 1, 2           IP 7112101               Access Control to Radiologically Significant Areas                                           11/26/2007 11/30/2007 Baseline Inspections 1, 2           IP 71151                 Performance Indicator Verification                                                           11/26/2007 11/30/2007 Baseline Inspections ISI           - ISI INSPECTION                                                                                   1 2          IP 7111108G              Inservice Inspection Activities - BWR                                                        03/03/2008 03/28/2008 Baseline Inspections 71121.02       - OUTAGE ALARA & ACCESS CTRL                                                                       1 1, 2           IP 7112101               Access Control to Radiologically Significant Areas                                           03/10/2008 03/14/2008 Baseline Inspections 1, 2           IP 7112102               ALARA Planning and Controls                                                                 03/10/2008 03/14/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
 
Vice President - Licensing and Regulatory Affairs
 
Director Licensing - Mid-West Regional
 
Operating Group
 
Manager Licensing - Dresden and Quad Cities
 
Senior Counsel, Nuclear, Mid-West Regional
 
Operating Group
 
Document Control Desk - Licensing
 
Vice President - Law and Regulatory Affairs
 
Mid American Energy Company
 
Assistant Attorney General
 
Illinois Emergency Management Agency
 
State Liaison Officer, State of Illinois
 
State Liaison Officer, State of Iowa
 
Chairman, Illinois Commerce Commission
 
D. Tubbs, Manager of Nuclear
 
MidAmerican Energy Company
 
Chairman, Rock Island County Board
 
Rock Island County Sheriff
 
Coordinator, Rock Island Emergency Services and
 
and Disaster
 
Chairman, Whiteside County Board
 
Whiteside County Sheriff
 
Coordinator, Whiteside County Emergency Services
 
Chairman, Board of Supervisors
 
Clinton County Sheriff
 
Coordinator, Clinton County Emergency Management
 
Scott County Administrator
 
Scott County Sheriff
 
Coordinator, Scott County Emergency Management
 
Mayor of Albany
 
Mayor of Rapids City
 
President, Village of Port Byron
 
President, Village of Cordova
 
Mayor of Camanche Mayor of Clinton
 
Clinton City Administrator
 
Mayor of Low Moor
 
Mayor of LeClaire
 
LeClaire City Administrator
 
Mayor of Princeton
 
Mayor of McCausland
 
INPO C. Crane ADAMS Distribution:
DXC1 TEB MXB JXH11 RidsNrrDirslpab
 
JLC1 GEG KGO RML2 SRI Quad Cities
 
DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)
Quad Cities Inspection / Activity Plan 09/01/2006
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 15:03:25 Report 22 6 CDBI-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 08/14/2006 09/15/2006 1, 2  7111121 IP Component Design Bases Inspection 1 7112203-REMP Baseline Inspections 10/09/2006 10/13/2006 1, 2  7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 10/09/2006 10/13/2006 1, 2  71151 IP Performance Indicator Verification 4 71152B-PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 11/27/2006 12/15/2006 1, 2  71152B IP Identification and Resolution of Problems 1 BI-HEAT SINK INSPECTION Baseline Inspections 12/18/2006 12/22/2006 1, 2  7111107B IP Heat Sink Performance 1 7112103-INSTRUMENTATION & SCBA Baseline Inspections 02/05/2007 02/09/2007 1, 2  7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 02/05/2007 02/09/2007 1, 2  71151 IP Performance Indicator Verification 1 EP BI-BASELINE EP INSPECTION Baseline Inspections 02/12/2007 02/16/2007 1, 2  7111402 IP A lert and Notification System Testing Baseline Inspections 02/12/2007 02/16/2007 1, 2  7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 02/12/2007 02/16/2007 1, 2  7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 02/12/2007 02/16/2007 1, 2  71151-EP01 IP Drill/Exercise Performance Baseline Inspections 02/12/2007 02/16/2007 1, 2  71151-EP02 IP ERO Drill Participation Baseline Inspections 02/12/2007 02/16/2007 1, 2  71151-EP03 IP A lert & Notification System 1 ISI-ISI BASELINE INSPECTION Baseline Inspections 02/12/2007 02/16/2007 1    7111108G IP Inservice Inspection Activities - BWR 1 7112102-OUTAGE: ACC CNTL & ALARA Baseline Inspections 05/07/2007 05/11/2007 1, 2  7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 05/07/2007 05/11/2007 1, 2  7112102 IP A LARA Planning and Controls 3 FY 2007-QUAD CITIES INIT PREP 05/2007 Not Applicable 05/14/2007 05/18/2007 1    W90150 OL - INITIAL EXAM - QUAD CITIES - MAY/JUNE  2007 3 FY 2007-QUAD CITIES INIT EXAM 06/2007 Not Applicable 06/04/2007 06/15/2007 1    W90150 OL - INITIAL EXAM - QUAD CITIES - MAY/JUNE  2007 2 MOD5059-MODIFCATION/50.59 INSPECTION Baseline Inspections 08/20/2007 09/07/2007 1, 2  7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 08/20/2007 09/07/2007 1, 2  7111117B IP Permanent Plant Modifications 1 7112202-RADWASTE & TRANSPORTATION Baseline Inspections 08/27/2007 08/31/2007 1, 2  7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 08/27/2007 08/31/2007 1, 2  71151 IP Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Quad Cities Inspection / Activity Plan 09/01/2006
-03/31/2008 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 15:03:25 Report 22 1 ISFSI-ISFSI INSPECTION Other Routine 09/01/2007 10/30/2007 1, 2   60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1 MAINRULE-MAINTENANCE EFFECTIVENESS INSPECTION Baseline Inspections 09/24/2007 09/28/2007 1, 2  7111112B IP Maintenance Effectiveness 2 71111.11-LIC OPERATOR REQUAL PROGRAM EVALUATION Baseline Inspections 10/29/2007 11/03/2007 1, 2  7111111B IP Licensed Operator Requalification Program 1 7112102-ALARA & PI VERIFICATION Baseline Inspections 11/26/2007 11/30/2007 1, 2   7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 11/26/2007 11/30/2007 1, 2   71151 IP Performance Indicator Verification 1 ISI-ISI INSPECTION Baseline Inspections 03/03/2008 03/28/2008 2  7111108G IP Inservice Inspection Activities - BWR 1 71121.02-OUTAGE ALARA & ACCESS CTRL Baseline Inspections 03/10/2008 03/14/2008 1, 2   7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 03/10/2008 03/14/2008 1, 2   7112102 IP A LARA Planning and Controls This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 14:31, 23 November 2019

8/31/06 Quad Cities - Mid-Cycle Performance Review and Inspection Plan
ML062430596
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 08/31/2006
From: Satorius M
Division Reactor Projects III
To: Crane C
Exelon Generation Co, Exelon Nuclear
References
Download: ML062430596 (7)


Text

August 31, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

QUAD CITIES NUCLEAR POWER STATION

Dear Mr. Crane:

On August 7, 2006, the NRC staff completed its performance review of the Quad Cities Nuclear Power Station for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter for Quad Cities Unit 1 was within the Regulatory Response column of the NRCs Action Matrix based on one inspection finding being classified as having low to moderate safety significance (White) in the mitigating systems cornerstone.

The White finding and related violation were finalized in a letter dated June 29, 2006, and related to the failure to verify that the electromatic relief valve (ERV) actuator design was suitable for operation at the increased vibration levels experienced at extended power uprate (EPU) power levels. As a result, in addition to conducting the reactor oversight process baseline inspection at Unit 1, a supplemental inspection using Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, is tentatively planned to be conducted in the first quarter of 2007, pending the completion of your planned corrective actions, described in your response letter as scheduled for the end of 2006.

Plant performance for the most recent quarter for Unit 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process baseline inspections at Unit 2.

C. Crane The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

In addition, the resident inspectors plan to perform Temporary Inspection 2515/169, Mitigating Systems Performance Index (MSPI) Verification, before the end of calendar year 2006. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mark A. Ring at 630-829-9703 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mark A. Satorius, Director Division of Reactor Projects Docket Nos. 50-254; 50-265;72-053 License Nos. DPR-29; DPR-30

Enclosure:

Quad Cities Inspection/Activity Plan DISTRIBUTION:

See next page

C. Crane The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.

In addition, the resident inspectors plan to perform Temporary Inspection 2515/169, Mitigating Systems Performance Index (MSPI) Verification, before the end of calendar year 2006. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mark A. Ring at 630-829-9703 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mark A. Satorius, Director Division of Reactor Projects Docket Nos. 50-254; 50-265;72-053 License Nos. DPR-29; DPR-30

Enclosure:

Quad Cities Inspection/Activity Plan DISTRIBUTION:

See next page DOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2005 to 2006\quad cities\QuadC MOC Letter 2006.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MRing:sls MSatorius DATE 08/31/2006 08/31/2006 OFFICIAL RECORD COPY

C. Crane cc w/encl: Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager - Quad Cities Nuclear Power Station Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission D. Tubbs, Manager of Nuclear MidAmerican Energy Company Chairman, Rock Island County Board Rock Island County Sheriff Coordinator, Rock Island Emergency Services and and Disaster Chairman, Whiteside County Board Whiteside County Sheriff Coordinator, Whiteside County Emergency Services Chairman, Board of Supervisors Clinton County Sheriff Coordinator, Clinton County Emergency Management Scott County Administrator Scott County Sheriff Coordinator, Scott County Emergency Management Mayor of Albany Mayor of Rapids City President, Village of Port Byron President, Village of Cordova Mayor of Camanche Mayor of Clinton Clinton City Administrator Mayor of Low Moor Mayor of LeClaire LeClaire City Administrator Mayor of Princeton Mayor of McCausland INPO

C. Crane ADAMS Distribution:

DXC1 TEB MXB JXH11 RidsNrrDirslpab JLC1 GEG KGO RML2 SRI Quad Cities DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

Page 1 of 2 Quad Cities 08/30/2006 15:03:25 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type CDBI - COMPONENT DESIGN BASES INSPECTION 6 1, 2 IP 7111121 Component Design Bases Inspection 08/14/2006 09/15/2006 Baseline Inspections 7112203 - REMP 1 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 10/09/2006 10/13/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/09/2006 10/13/2006 Baseline Inspections 71152B - PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 IP 71152B Identification and Resolution of Problems 11/27/2006 12/15/2006 Baseline Inspections BI - HEAT SINK INSPECTION 1 1, 2 IP 7111107B Heat Sink Performance 12/18/2006 12/22/2006 Baseline Inspections 7112103 - INSTRUMENTATION & SCBA 1 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 02/05/2007 02/09/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 02/05/2007 02/09/2007 Baseline Inspections EP BI - BASELINE EP INSPECTION 1 1, 2 IP 7111402 Alert and Notification System Testing 02/12/2007 02/16/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 02/12/2007 02/16/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/12/2007 02/16/2007 Baseline Inspections 1, 2 IP 71151-EP01 Drill/Exercise Performance 02/12/2007 02/16/2007 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 02/12/2007 02/16/2007 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 02/12/2007 02/16/2007 Baseline Inspections ISI - ISI BASELINE INSPECTION 1 1 IP 7111108G Inservice Inspection Activities - BWR 02/12/2007 02/16/2007 Baseline Inspections 7112102 - OUTAGE: ACC CNTL & ALARA 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 05/07/2007 05/11/2007 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 05/07/2007 05/11/2007 Baseline Inspections FY 2007 - QUAD CITIES INIT PREP 05/2007 3 1 W90150 OL - INITIAL EXAM - QUAD CITIES - MAY/JUNE 2007 05/14/2007 05/18/2007 Not Applicable FY 2007 - QUAD CITIES INIT EXAM 06/2007 3 1 W90150 OL - INITIAL EXAM - QUAD CITIES - MAY/JUNE 2007 06/04/2007 06/15/2007 Not Applicable MOD5059 - MODIFCATION/50.59 INSPECTION 2 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 08/20/2007 09/07/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 08/20/2007 09/07/2007 Baseline Inspections 7112202 - RADWASTE & TRANSPORTATION 1 1, 2 IP 7112202 Radioactive Material Processing and Transportation 08/27/2007 08/31/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/27/2007 08/31/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Quad Cities 08/30/2006 15:03:25 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type ISFSI - ISFSI INSPECTION 1 1, 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 09/01/2007 10/30/2007 Other Routine MAINRULE - MAINTENANCE EFFECTIVENESS INSPECTION 1 1, 2 IP 7111112B Maintenance Effectiveness 09/24/2007 09/28/2007 Baseline Inspections 71111.11 - LIC OPERATOR REQUAL PROGRAM EVALUATION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 10/29/2007 11/03/2007 Baseline Inspections 7112102 - ALARA & PI VERIFICATION 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 11/26/2007 11/30/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 11/26/2007 11/30/2007 Baseline Inspections ISI - ISI INSPECTION 1 2 IP 7111108G Inservice Inspection Activities - BWR 03/03/2008 03/28/2008 Baseline Inspections 71121.02 - OUTAGE ALARA & ACCESS CTRL 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/10/2008 03/14/2008 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/10/2008 03/14/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.