{{#Wiki_filter:April 14, 2008 | {{#Wiki_filter:April 14, 2008 LICENSEE: Detroit Edison Company FACILITY: Fermi Power Plant, Unit 2 | ||
LICENSEE: Detroit Edison Company FACILITY: Fermi Power Plant, Unit 2 | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On April 9, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners | OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On April 9, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company representatives to discuss the NRCs 2007 End-of-Cycle Assessment of the Fermi Power Plant Unit 2 safety performance. | ||
The NRC began the meeting with an overview of the NRC and the nuclear industry, the | The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600499). | ||
The licensee then provided a response to the | The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRCs assessment of Fermi Unit 2 performance in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML080990717. A list of principal meeting attendees can be found in the attached enclosure. | ||
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Several members of the public asked questions that covered evacuation plans and routes, emergency diesel generator performance, spent fuel, numerous event reports, new reactor licensing, and attendance at NRC exit meetings. | The licensee then provided a response to the NRCs assessment and briefly addressed its plan to address the newly opened substantive cross-cutting issue in human performance. In summary, the licensee concurred with the NRC assessment that Fermi Unit 2 was operated in a manner that preserved the safety of the public and the environment. | ||
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Several members of the public asked questions that covered evacuation plans and routes, emergency diesel generator performance, spent fuel, numerous event reports, new reactor licensing, and attendance at NRC exit meetings. | |||
/RA/ | |||
Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43 | |||
==Enclosure:== | |||
As stated DISTRIBUTION: | |||
See next page | |||
Letter to Detroit Edison Company from C. Lipa dated April 14, 2008 | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT cc w/encl J. Plona, Vice President, Nuclear Generation | OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT cc w/encl J. Plona, Vice President, Nuclear Generation K. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators T. Strong, Chief, State Liaison Officer, State of Michigan Wayne County Emergency Management Division Chair, Wayne County Board of Commissioners Wayne County Sheriff Director, Wayne County Emergency Management Agency Mayor of Flat Rock Mayor of Gibraltar City Administrator of Gibraltar Monroe County Board Chairman Monroe County Sheriff Director, Monroe County Emergency Management Agency Director, Monroe County Health Department Mayor of Monroe Monroe City Manager Carleton Village President Mayor of Rockwood Rockwood City Administrator Supervisor, Frenchtown Charter Township G. Mortensen, INPO | ||
LICENSEE: Detroit Edison Company FACILITY: Fermi Power Plant, Unit 2 | LICENSEE: Detroit Edison Company FACILITY: Fermi Power Plant, Unit 2 | ||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On April 9, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners | OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On April 9, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company representatives to discuss the NRCs 2007 End-of-Cycle Assessment of the Fermi Power Plant Unit 2 safety performance. | ||
The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600499). | The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600499). | ||
The NRC began the meeting with an overview of the NRC and the nuclear industry, the | The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRCs assessment of Fermi Unit 2 performance in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML080990717. A list of principal meeting attendees can be found in the attached enclosure. | ||
The licensee then provided a response to the | The licensee then provided a response to the NRCs assessment and briefly addressed its plan to address the newly opened substantive cross-cutting issue in human performance. In summary, the licensee concurred with the NRC assessment that Fermi Unit 2 was operated in a manner that preserved the safety of the public and the environment. | ||
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Several members of the public asked questions that covered evacuation plans and routes, emergency diesel generator performance, spent fuel, numerous event reports, new reactor licensing, and attendance at NRC exit meetings. | At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Several members of the public asked questions that covered evacuation plans and routes, emergency diesel generator performance, spent fuel, numerous event reports, new reactor licensing, and attendance at NRC exit meetings. | ||
Christine A. Lipa, Chief Branch 4 | Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43 | ||
==Enclosure:== | ==Enclosure:== | ||
As stated DISTRIBUTION | As stated DISTRIBUTION: | ||
See next page DOCUMENT NAME: G:\BRANCH TSS\ALL EOC\EOC CY 2007\EOC MEETING NOTICES - | |||
LETTERS\FERMI EOC Meeting Summary 04-09-08.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME AGarmoe:dtp CLipa: | |||
DATE 04/14/08 04/14/08 OFFICIAL RECORD COPY | |||
Memo to Detroit Edison Company from C. Lipa dated April 14, 2008 | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION | OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION: | ||
TEB AXM8 RidsNrrDirslpab JLC1 MAS JKH3 KGO RML2 SRI Fermi DRPIII DRSIII PLB1 TXN | |||
Nuclear Regulatory Commission G. Shear, Deputy Director, Division of Reactor Projects C. Lipa, Branch Chief, Division of Reactor Projects R. Michael Morris, Senior Resident Inspector, Fermi T. Steadham, Resident Inspector, Fermi A. Garmoe, Reactor Engineer P. Chandrathil, Public Affairs Officer Other Attendees James A. McDevitt, Frenchtown Township Supervisor Charles Slat, Monroe Evening News}} | PUBLIC MEETING PRINCIPAL ATTENDEES April 9, 2008 Detroit Edison Company K. Hlavaty, Plant Manager, Fermi M. Caragher, Nuclear Engineering Director C. Walker, Organization Effectiveness Director Nuclear Regulatory Commission G. Shear, Deputy Director, Division of Reactor Projects C. Lipa, Branch Chief, Division of Reactor Projects R. Michael Morris, Senior Resident Inspector, Fermi T. Steadham, Resident Inspector, Fermi A. Garmoe, Reactor Engineer P. Chandrathil, Public Affairs Officer Other Attendees James A. McDevitt, Frenchtown Township Supervisor Charles Slat, Monroe Evening News Enclosure}} |
Revision as of 18:47, 14 November 2019
ML081060598 | |
Person / Time | |
---|---|
Site: | Fermi ![]() |
Issue date: | 04/14/2008 |
From: | Christine Lipa Reactor Projects Region 3 Branch 4 |
To: | |
References | |
Download: ML081060598 (5) | |
Text
April 14, 2008 LICENSEE: Detroit Edison Company FACILITY: Fermi Power Plant, Unit 2
SUBJECT:
SUMMARY
OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On April 9, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company representatives to discuss the NRCs 2007 End-of-Cycle Assessment of the Fermi Power Plant Unit 2 safety performance.
The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600499).
The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRCs assessment of Fermi Unit 2 performance in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML080990717. A list of principal meeting attendees can be found in the attached enclosure.
The licensee then provided a response to the NRCs assessment and briefly addressed its plan to address the newly opened substantive cross-cutting issue in human performance. In summary, the licensee concurred with the NRC assessment that Fermi Unit 2 was operated in a manner that preserved the safety of the public and the environment.
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Several members of the public asked questions that covered evacuation plans and routes, emergency diesel generator performance, spent fuel, numerous event reports, new reactor licensing, and attendance at NRC exit meetings.
/RA/
Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43
Enclosure:
As stated DISTRIBUTION:
See next page
Letter to Detroit Edison Company from C. Lipa dated April 14, 2008
SUBJECT:
SUMMARY
OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT cc w/encl J. Plona, Vice President, Nuclear Generation K. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators T. Strong, Chief, State Liaison Officer, State of Michigan Wayne County Emergency Management Division Chair, Wayne County Board of Commissioners Wayne County Sheriff Director, Wayne County Emergency Management Agency Mayor of Flat Rock Mayor of Gibraltar City Administrator of Gibraltar Monroe County Board Chairman Monroe County Sheriff Director, Monroe County Emergency Management Agency Director, Monroe County Health Department Mayor of Monroe Monroe City Manager Carleton Village President Mayor of Rockwood Rockwood City Administrator Supervisor, Frenchtown Charter Township G. Mortensen, INPO
LICENSEE: Detroit Edison Company FACILITY: Fermi Power Plant, Unit 2
SUBJECT:
SUMMARY
OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On April 9, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company representatives to discuss the NRCs 2007 End-of-Cycle Assessment of the Fermi Power Plant Unit 2 safety performance.
The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600499).
The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRCs assessment of Fermi Unit 2 performance in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML080990717. A list of principal meeting attendees can be found in the attached enclosure.
The licensee then provided a response to the NRCs assessment and briefly addressed its plan to address the newly opened substantive cross-cutting issue in human performance. In summary, the licensee concurred with the NRC assessment that Fermi Unit 2 was operated in a manner that preserved the safety of the public and the environment.
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Several members of the public asked questions that covered evacuation plans and routes, emergency diesel generator performance, spent fuel, numerous event reports, new reactor licensing, and attendance at NRC exit meetings.
Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43
Enclosure:
As stated DISTRIBUTION:
See next page DOCUMENT NAME: G:\BRANCH TSS\ALL EOC\EOC CY 2007\EOC MEETING NOTICES -
LETTERS\FERMI EOC Meeting Summary 04-09-08.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME AGarmoe:dtp CLipa:
DATE 04/14/08 04/14/08 OFFICIAL RECORD COPY
Memo to Detroit Edison Company from C. Lipa dated April 14, 2008
SUBJECT:
SUMMARY
OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:
TEB AXM8 RidsNrrDirslpab JLC1 MAS JKH3 KGO RML2 SRI Fermi DRPIII DRSIII PLB1 TXN
PUBLIC MEETING PRINCIPAL ATTENDEES April 9, 2008 Detroit Edison Company K. Hlavaty, Plant Manager, Fermi M. Caragher, Nuclear Engineering Director C. Walker, Organization Effectiveness Director Nuclear Regulatory Commission G. Shear, Deputy Director, Division of Reactor Projects C. Lipa, Branch Chief, Division of Reactor Projects R. Michael Morris, Senior Resident Inspector, Fermi T. Steadham, Resident Inspector, Fermi A. Garmoe, Reactor Engineer P. Chandrathil, Public Affairs Officer Other Attendees James A. McDevitt, Frenchtown Township Supervisor Charles Slat, Monroe Evening News Enclosure