ML081060598: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:April 14, 2008  
{{#Wiki_filter:April 14, 2008 LICENSEE:       Detroit Edison Company FACILITY:       Fermi Power Plant, Unit 2
 
LICENSEE: Detroit Edison Company FACILITY: Fermi Power Plant, Unit 2  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On April 9, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners' Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company representatives to discuss the NRC's 2007 End-of-Cycle Assessment of the Fermi Power Plant Unit 2 safety performance. The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600499).
OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On April 9, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company representatives to discuss the NRCs 2007 End-of-Cycle Assessment of the Fermi Power Plant Unit 2 safety performance.
The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRC's Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRC's assessment of Fermi Unit 2 performance in 2007. The NRC's meeting presentation slides can be found in ADAMS at ML080990717. A list of principal meeting attendees can be found in the attached enclosure.
The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600499).
The licensee then provided a response to the NRC's assessment and briefly addressed its plan to address the newly opened substantive cross-cutting issue in human performance. In summary, the licensee concurred with the NRC assessment that Fermi Unit 2 was operated in a manner that preserved the safety of the public and the environment.
The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRCs assessment of Fermi Unit 2 performance in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML080990717. A list of principal meeting attendees can be found in the attached enclosure.
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Several members of the public asked questions that covered evacuation plans and routes, emergency diesel generator performance, spent fuel, numerous event reports, new reactor licensing, and attendance at NRC exit meetings.  
The licensee then provided a response to the NRCs assessment and briefly addressed its plan to address the newly opened substantive cross-cutting issue in human performance. In summary, the licensee concurred with the NRC assessment that Fermi Unit 2 was operated in a manner that preserved the safety of the public and the environment.
      /RA/  
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Several members of the public asked questions that covered evacuation plans and routes, emergency diesel generator performance, spent fuel, numerous event reports, new reactor licensing, and attendance at NRC exit meetings.
                                            /RA/
Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43


Christine A. Lipa, Chief      Branch 4      Division of Reactor Projects Docket No. 50-341 License No. NPF-43
==Enclosure:==
As stated DISTRIBUTION:
See next page


==Enclosure:==
Letter to Detroit Edison Company from C. Lipa dated April 14, 2008
As stated DISTRIBUTION
: See next page Letter to Detroit Edison Company from C. Lipa dated April 14, 2008  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT cc w/encl J. Plona, Vice President, Nuclear Generation   K. Hlavaty, Plant Manager   R. Gaston, Manager, Nuclear Licensing   D. Pettinari, Legal Department   Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County   Emergency Management Division Supervisor - Electric Operators T. Strong, Chief, State Liaison Officer, State of Michigan Wayne County Emergency Management Division   Chair, Wayne County Board of Commissioners Wayne County Sheriff   Director, Wayne County Emergency   Management Agency   Mayor of Flat Rock   Mayor of Gibraltar City Administrator of Gibraltar   Monroe County Board Chairman   Monroe County Sheriff   Director, Monroe County Emergency   Management Agency   Director, Monroe County Health Department   Mayor of Monroe   Monroe City Manager   Carleton Village President   Mayor of Rockwood Rockwood City Administrator   Supervisor, Frenchtown Charter Township   G. Mortensen, INPO  
OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT cc w/encl       J. Plona, Vice President, Nuclear Generation K. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators T. Strong, Chief, State Liaison Officer, State of Michigan Wayne County Emergency Management Division Chair, Wayne County Board of Commissioners Wayne County Sheriff Director, Wayne County Emergency Management Agency Mayor of Flat Rock Mayor of Gibraltar City Administrator of Gibraltar Monroe County Board Chairman Monroe County Sheriff Director, Monroe County Emergency Management Agency Director, Monroe County Health Department Mayor of Monroe Monroe City Manager Carleton Village President Mayor of Rockwood Rockwood City Administrator Supervisor, Frenchtown Charter Township G. Mortensen, INPO


LICENSEE: Detroit Edison Company FACILITY: Fermi Power Plant, Unit 2  
LICENSEE:           Detroit Edison Company FACILITY:           Fermi Power Plant, Unit 2


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On April 9, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners' Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company representatives to discuss the NRC's 2007 End-of-Cycle Assessment of the Fermi Power Plant Unit 2 safety performance.
OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On April 9, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company representatives to discuss the NRCs 2007 End-of-Cycle Assessment of the Fermi Power Plant Unit 2 safety performance.
The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600499).
The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600499).
The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRC's Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRC's assessment of Fermi Unit 2 performance in 2007. The NRC's meeting presentation slides can be found in ADAMS at ML080990717. A list of principal meeting attendees can be found in the attached enclosure.
The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRCs assessment of Fermi Unit 2 performance in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML080990717. A list of principal meeting attendees can be found in the attached enclosure.
The licensee then provided a response to the NRC's assessment and briefly addressed its plan to address the newly opened substantive cross-cutting issue in human performance. In summary, the licensee concurred with the NRC assessment that Fermi Unit 2 was operated in a manner that preserved the safety of the public and the environment.
The licensee then provided a response to the NRCs assessment and briefly addressed its plan to address the newly opened substantive cross-cutting issue in human performance. In summary, the licensee concurred with the NRC assessment that Fermi Unit 2 was operated in a manner that preserved the safety of the public and the environment.
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Several members of the public asked questions that covered evacuation plans and routes, emergency diesel generator performance, spent fuel, numerous event reports, new reactor licensing, and attendance at NRC exit meetings.
At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Several members of the public asked questions that covered evacuation plans and routes, emergency diesel generator performance, spent fuel, numerous event reports, new reactor licensing, and attendance at NRC exit meetings.
Christine A. Lipa, Chief Branch 4       Division of Reactor Projects Docket No. 50-341 License No. NPF-43  
Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43


==Enclosure:==
==Enclosure:==
As stated DISTRIBUTION
As stated DISTRIBUTION:
: See next page DOCUMENT NAME: G:\BRANCH TSS\ALL EOC\EOC CY 2007\EOC MEETING NOTICES - LETTERS\FERMI EOC Meeting Summary 04-09-08.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII   RIII            NAME AGarmoe:dtp CLipa:     DATE 04/14/08 04/14/08     OFFICIAL RECORD COPY Memo to Detroit Edison Company from C. Lipa dated April 14, 2008  
See next page DOCUMENT NAME: G:\BRANCH TSS\ALL EOC\EOC CY 2007\EOC MEETING NOTICES -
LETTERS\FERMI EOC Meeting Summary 04-09-08.doc G Publicly Available G Non-Publicly Available   G Sensitive       G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE         RIII                         RIII NAME           AGarmoe:dtp                 CLipa:
DATE           04/14/08                     04/14/08 OFFICIAL RECORD COPY
 
Memo to Detroit Edison Company from C. Lipa dated April 14, 2008


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION
OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:
: TEB AXM8 RidsNrrDirslpab JLC1 MAS JKH3 KGO RML2 SRI Fermi DRPIII DRSIII PLB1 TXN    
TEB AXM8 RidsNrrDirslpab JLC1 MAS JKH3 KGO RML2 SRI Fermi DRPIII DRSIII PLB1 TXN
 
Enclosure PUBLIC MEETING PRINCIPAL ATTENDEES April 9, 2008
 
Detroit Edison Company K. Hlavaty, Plant Manager, Fermi M. Caragher, Nuclear Engineering Director C. Walker, Organization Effectiveness Director


Nuclear Regulatory Commission G. Shear, Deputy Director, Division of Reactor Projects C. Lipa, Branch Chief, Division of Reactor Projects R. Michael Morris, Senior Resident Inspector, Fermi T. Steadham, Resident Inspector, Fermi A. Garmoe, Reactor Engineer P. Chandrathil, Public Affairs Officer Other Attendees James A. McDevitt, Frenchtown Township Supervisor Charles Slat, Monroe Evening News}}
PUBLIC MEETING PRINCIPAL ATTENDEES April 9, 2008 Detroit Edison Company K. Hlavaty, Plant Manager, Fermi M. Caragher, Nuclear Engineering Director C. Walker, Organization Effectiveness Director Nuclear Regulatory Commission G. Shear, Deputy Director, Division of Reactor Projects C. Lipa, Branch Chief, Division of Reactor Projects R. Michael Morris, Senior Resident Inspector, Fermi T. Steadham, Resident Inspector, Fermi A. Garmoe, Reactor Engineer P. Chandrathil, Public Affairs Officer Other Attendees James A. McDevitt, Frenchtown Township Supervisor Charles Slat, Monroe Evening News Enclosure}}

Revision as of 18:47, 14 November 2019

04/09/2008, Summary of Public Meeting with Detroit Edison Company to Discuss 2007 Fermi, Unit 2, End-of-Cycle Performance Assessment
ML081060598
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/14/2008
From: Christine Lipa
Reactor Projects Region 3 Branch 4
To:
References
Download: ML081060598 (5)


Text

April 14, 2008 LICENSEE: Detroit Edison Company FACILITY: Fermi Power Plant, Unit 2

SUBJECT:

SUMMARY

OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On April 9, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company representatives to discuss the NRCs 2007 End-of-Cycle Assessment of the Fermi Power Plant Unit 2 safety performance.

The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600499).

The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRCs assessment of Fermi Unit 2 performance in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML080990717. A list of principal meeting attendees can be found in the attached enclosure.

The licensee then provided a response to the NRCs assessment and briefly addressed its plan to address the newly opened substantive cross-cutting issue in human performance. In summary, the licensee concurred with the NRC assessment that Fermi Unit 2 was operated in a manner that preserved the safety of the public and the environment.

At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Several members of the public asked questions that covered evacuation plans and routes, emergency diesel generator performance, spent fuel, numerous event reports, new reactor licensing, and attendance at NRC exit meetings.

/RA/

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

As stated DISTRIBUTION:

See next page

Letter to Detroit Edison Company from C. Lipa dated April 14, 2008

SUBJECT:

SUMMARY

OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT cc w/encl J. Plona, Vice President, Nuclear Generation K. Hlavaty, Plant Manager R. Gaston, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators T. Strong, Chief, State Liaison Officer, State of Michigan Wayne County Emergency Management Division Chair, Wayne County Board of Commissioners Wayne County Sheriff Director, Wayne County Emergency Management Agency Mayor of Flat Rock Mayor of Gibraltar City Administrator of Gibraltar Monroe County Board Chairman Monroe County Sheriff Director, Monroe County Emergency Management Agency Director, Monroe County Health Department Mayor of Monroe Monroe City Manager Carleton Village President Mayor of Rockwood Rockwood City Administrator Supervisor, Frenchtown Charter Township G. Mortensen, INPO

LICENSEE: Detroit Edison Company FACILITY: Fermi Power Plant, Unit 2

SUBJECT:

SUMMARY

OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On April 9, 2008, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company representatives to discuss the NRCs 2007 End-of-Cycle Assessment of the Fermi Power Plant Unit 2 safety performance.

The results of that assessment were discussed in a letter to the licensee dated March 3, 2008 (ADAMS ML080600499).

The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP), and national ROP results. This was followed by a summary of the NRCs assessment of Fermi Unit 2 performance in 2007. The NRCs meeting presentation slides can be found in ADAMS at ML080990717. A list of principal meeting attendees can be found in the attached enclosure.

The licensee then provided a response to the NRCs assessment and briefly addressed its plan to address the newly opened substantive cross-cutting issue in human performance. In summary, the licensee concurred with the NRC assessment that Fermi Unit 2 was operated in a manner that preserved the safety of the public and the environment.

At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. Several members of the public asked questions that covered evacuation plans and routes, emergency diesel generator performance, spent fuel, numerous event reports, new reactor licensing, and attendance at NRC exit meetings.

Christine A. Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

As stated DISTRIBUTION:

See next page DOCUMENT NAME: G:\BRANCH TSS\ALL EOC\EOC CY 2007\EOC MEETING NOTICES -

LETTERS\FERMI EOC Meeting Summary 04-09-08.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME AGarmoe:dtp CLipa:

DATE 04/14/08 04/14/08 OFFICIAL RECORD COPY

Memo to Detroit Edison Company from C. Lipa dated April 14, 2008

SUBJECT:

SUMMARY

OF THE APRIL 9, 2008, PUBLIC MEETING TO DISCUSS THE 2007 FERMI UNIT 2 END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:

TEB AXM8 RidsNrrDirslpab JLC1 MAS JKH3 KGO RML2 SRI Fermi DRPIII DRSIII PLB1 TXN

PUBLIC MEETING PRINCIPAL ATTENDEES April 9, 2008 Detroit Edison Company K. Hlavaty, Plant Manager, Fermi M. Caragher, Nuclear Engineering Director C. Walker, Organization Effectiveness Director Nuclear Regulatory Commission G. Shear, Deputy Director, Division of Reactor Projects C. Lipa, Branch Chief, Division of Reactor Projects R. Michael Morris, Senior Resident Inspector, Fermi T. Steadham, Resident Inspector, Fermi A. Garmoe, Reactor Engineer P. Chandrathil, Public Affairs Officer Other Attendees James A. McDevitt, Frenchtown Township Supervisor Charles Slat, Monroe Evening News Enclosure