IR 05000261/2011402: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:ber 19, 2011
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ber 19, 2011


==SUBJECT:==
==SUBJECT:==
Line 24: Line 24:


==Dear Mr. Duncan:==
==Dear Mr. Duncan:==
On September 22, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your H.B. Robinson Steam Electric Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed report documents the inspection results which were discussed with Mr.
On September 22, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your H.B. Robinson Steam Electric Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results which were discussed with Mr.


R. Gideon and other members of your staff.
R. Gideon and other members of your staff.


This inspection examined activities conducted under your license as they relate to security and compliance with the Commission
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations, and with the conditions of your license.
=s rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


Based on the results of this inspection, no findings of significance were identified. However, one licensee-identified violation which was determined to be of very low safety significance, is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2, of the NRC Enforcement Policy because of the very low safety significance of the violation, and because it was entered into your corrective actions program. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis of your denial, to the Nuclear Regulatory Commission, Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Shearon Harris Nuclear Station.
Based on the results of this inspection, no findings of significance were identified. However, one licensee-identified violation which was determined to be of very low safety significance, is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2, of the NRC Enforcement Policy because of the very low safety significance of the violation, and because it was entered into your corrective actions program. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis of your denial, to the Nuclear Regulatory Commission, Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Shearon Harris Nuclear Station.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. Progress Energy 2 - SECURITY-RELATED INFORMATI ON ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. Progress Energy   2 ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.
=s enclosure will not be available for public inspection.


In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).


Sincerely,
Sincerely,
/RA/ J. WALLO FOR M. ERNSTES  
/RA/ J. WALLO FOR M. ERNSTES Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-261 License No.: DPR-23 Enclosure:
 
Inspection Report 05000261/2011402 w/Attachment Supplemental Information (OUO)
Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety  
cc w/encl: (See page 3) ML112930735   X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/BR4 SIGNATURE RA RA RA/ RP For JS RA RA NAME R. Patterson A. True J. Shehee M. Ernstes R. Musser DATE 10/14/2011 10/17/2011 10/17/2011 10/14/2011 10/17/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO 3 cc w/Encl:
 
Robert II Joseph W. Donahue Vice President  Vice President H.B. Robinson Steam Electric Plant, Unit 2 Nuclear Oversight Progress Energy  Progress Energy 3581 West Entrance Rd. TPP-15 Harstville, SC 29550 100 E. Davie Street Raleigh, NC 27601 William R. Gideon Director Site Operations Kelvin Henderson H. B. Robinson Steam Electric Plant, Unit 2 General Manager Progress Energy   Nuclear Fleet Operations 3581 West Entrance Rd. Progress Energy Hartsville, SC 29550 TPP-15 100 E. Davie Street Thomas Cosgrove   Raleigh, NC 27601 Plant General Manager H.B. Robinson Steam Electric Plant, Unit 2 Edward T. O'Neil Progress Energy   Director 3581 West Entrance Rd. Nuclear Protective Serv and Emergency Hartsville, SC 29550 Preparedness Progress Energy Christos Kamilaris TPP-15 Manager, Support Services 100 East Davie Street H.B. Robinson Steam Electric Plant, Unit 2 Raleigh, NC 27601 Progress Energy 3581 West Entrance Rd. Scott D. West Hartsville, SC 29550 Superintendent Security H. B. Robinson Steam Electric Plant Rich Rogalski   Progress Energy Supervisor, Licensing/Regulatory Programs 3581 West Entrance Road H. B. Robinson Steam Electric Plant Hartsville, SC 29550 3581 West Entrance Rd.
Docket No.: 50-261 License No.: DPR-23  
 
Enclosure:
Inspection Report 05000261/2011402 w/Attachment Supplemental Information (OUO)  
 
cc w/encl: (See page 3)  
 
ML112930735 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/BR4 SIGNATURE RA RA RA/ RP For JS RA RA NAME R. Patterson A. True J. Shehee M. Ernstes R. Musser DATE 10/14/2011 10/17/2011 10/17/2011 10/14/2011 10/17/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO 3 cc w/Encl: Robert II Vice President H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy 3581 West Entrance Rd.
 
Harstville, SC 29550  
 
William R. Gideon Director Site Operations H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy 3581 West Entrance Rd.
 
Hartsville, SC 29550  
 
Thomas Cosgrove Plant General Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy 3581 West Entrance Rd.
 
Hartsville, SC 29550  
 
Christos Kamilaris Manager, Support Services H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy 3581 West Entrance Rd.
 
Hartsville, SC 29550  
 
Rich Rogalski Supervisor, Licensing/Regulatory Programs H. B. Robinson Steam Electric Plant 3581 West Entrance Rd.
 
Hartsville, SC 29550
 
Joseph W. Donahue Vice President Nuclear Oversight Progress Energy TPP-15 100 E. Davie Street Raleigh, NC 27601
 
Kelvin Henderson General Manager Nuclear Fleet Operations Progress Energy TPP-15 100 E. Davie Street Raleigh, NC 27601
 
Edward T. O'Neil Director Nuclear Protective Serv and Emergency Preparedness Progress Energy TPP-15 100 East Davie Street Raleigh, NC 27601


Scott D. West Superintendent Security H. B. Robinson Steam Electric Plant Progress Energy 3581 West Entrance Road Hartsville, SC 29550
Hartsville, SC 29550
}}
}}

Latest revision as of 13:12, 12 November 2019

NRC Security Inspection Report 05000261-11-402
ML112930735
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/19/2011
From: Ernstes M
NRC/RGN-II/DRS/PSB2
To: Duncan R
Progress Energy Co
References
IR-11-402
Download: ML112930735 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 19, 2011

SUBJECT:

H.B. ROBINSON STEAM ELECTRIC PLANT UNIT 2 - NRC SECURITY INSPECTION REPORT 05000261/2011402

Dear Mr. Duncan:

On September 22, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your H.B. Robinson Steam Electric Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results which were discussed with Mr.

R. Gideon and other members of your staff.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations, and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified. However, one licensee-identified violation which was determined to be of very low safety significance, is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2, of the NRC Enforcement Policy because of the very low safety significance of the violation, and because it was entered into your corrective actions program. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis of your denial, to the Nuclear Regulatory Commission, Administrator, Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Shearon Harris Nuclear Station.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. Progress Energy 2 ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390 (b)(1).

Sincerely,

/RA/ J. WALLO FOR M. ERNSTES Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-261 License No.: DPR-23 Enclosure:

Inspection Report 05000261/2011402 w/Attachment Supplemental Information (OUO)

cc w/encl: (See page 3) ML112930735 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/BR4 SIGNATURE RA RA RA/ RP For JS RA RA NAME R. Patterson A. True J. Shehee M. Ernstes R. Musser DATE 10/14/2011 10/17/2011 10/17/2011 10/14/2011 10/17/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO 3 cc w/Encl:

Robert II Joseph W. Donahue Vice President Vice President H.B. Robinson Steam Electric Plant, Unit 2 Nuclear Oversight Progress Energy Progress Energy 3581 West Entrance Rd. TPP-15 Harstville, SC 29550 100 E. Davie Street Raleigh, NC 27601 William R. Gideon Director Site Operations Kelvin Henderson H. B. Robinson Steam Electric Plant, Unit 2 General Manager Progress Energy Nuclear Fleet Operations 3581 West Entrance Rd. Progress Energy Hartsville, SC 29550 TPP-15 100 E. Davie Street Thomas Cosgrove Raleigh, NC 27601 Plant General Manager H.B. Robinson Steam Electric Plant, Unit 2 Edward T. O'Neil Progress Energy Director 3581 West Entrance Rd. Nuclear Protective Serv and Emergency Hartsville, SC 29550 Preparedness Progress Energy Christos Kamilaris TPP-15 Manager, Support Services 100 East Davie Street H.B. Robinson Steam Electric Plant, Unit 2 Raleigh, NC 27601 Progress Energy 3581 West Entrance Rd. Scott D. West Hartsville, SC 29550 Superintendent Security H. B. Robinson Steam Electric Plant Rich Rogalski Progress Energy Supervisor, Licensing/Regulatory Programs 3581 West Entrance Road H. B. Robinson Steam Electric Plant Hartsville, SC 29550 3581 West Entrance Rd.

Hartsville, SC 29550