ML18053A568: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1
| project =
| stage = Request
}}
}}



Revision as of 21:38, 7 November 2019

Forwards Application for Amend to License DPR-20, Incorporating Containment Isolation Valve Spec to Allow Manual Operation of Penetration 33 Isolation Valves at Power for Sampling Safety Injection Tanks Into Tech Spec.Fee Paid
ML18053A568
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/15/1988
From: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18053A570 List:
References
NUDOCS 8809200072
Download: ML18053A568 (1)


Text

..,.c.

,,&.

consumers

  • Power Kenneth W Berry POWERllllli Direc"tor Nuclear Licensing 11/tlCHlliAlll"S PROlillE5S General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-1636 September 15, 1988 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

TECHNICAL SPECIFICATIONS CHANGE REQUEST - CONTAINMENT ISOLATION SYSTEM Enclosed is a change to the Palisades Technical Specifications. This change is a result of Consumers Power Company's commitment made in the revised response to Inspection Report 88-008 dated September 2, 1988. The requested Technical Specification Change incorporates a Containment Isolation Valve Specification which allows for the manual operation of the penetration 33 isolation valves at power for the purpose of sampling Safety Injection Tanks.

This requested change addresses and resolves applicable Standard Technical Specifications requirements and includes a containment isolation valve table as part of the change. In addition to the penetration 33 valves, the table includes all containment isolation valves needed to isolate upon receipt of containment high radiation (CHR) or containment high pressure (CHP) signals.

The change request has been determined to involve an unreviewed safety question, but an analysis of no significant hazards considerations has been performed and the change has been found to involve no significant hazards considerations.

Consumers Power Company recognizes that numerous Technical Specifications Change Requests, required prior to start-up of the Palisades Plant, have been recently submitted.. This change request could also fall into that category.

However, if approval of the Technical Specification Change Request can not be given due to the work load schedule, we will continue to operate as we have in the past, regarding the sampling of the Safety Injection tanks, since the opening of manual containment isolation valves of penetration 33 for the purpose of Safety Injection Tank sampling was found to involve no significant hazards considerations.

A check for $150.00 is included as required by 10CFR170.12.

'1~_V'4 Kenneth W Berry Director, Nuclear Licensing CC Administrator, Region III, NRC NRC Resident Inspector - Palisades Attachment OC0988-0129-NL02 ,- aso

.

PDR. o<

92 )072 880915 ADOCK 05000255 PDC \

~- -

p