{{#Wiki_filter:From: Ennis, Rick Sent: Tuesday, July 11, 2017 11:26 AM To: Duke, Paul R.  
{{#Wiki_filter:From:                       Ennis, Rick Sent:                       Tuesday, July 11, 2017 11:26 AM To:                         Duke, Paul R.


==Subject:==
==Subject:==
Request for Additional Information - Salem Unit 1 - Steam Generator Tube Inspection Report (CAC No. MF9094)
Request for Additional Information - Salem Unit 1 - Steam Generator Tube Inspection Report (CAC No. MF9094)
Attachments:
Attachments:                 final rai01 mf9094.doc By letter dated January 20, 2017 (Agencywide Documents Access and Management System Accession No. ML17020A111), PSEG Nuclear LLC (PSEG, the licensee) submitted a report to the U.S. Nuclear Regulatory Commission (NRC) summarizing the results of the 2016 steam generator (SG) inspections at Salem Nuclear Generating Station, Unit No. 1. These inspections were performed during refueling outage (RFO) 24. The SG tube inspection report is required to discuss the topics listed under Technical Specification 6.9.1.10, which includes information such as the scope of inspections performed, degradation mechanisms found, and the results of condition monitoring.
final rai01 mf9094.doc By letter dated January 20, 2017 (Agencywide Documents Access and Management System Accession No. ML17020A111), PSEG Nuclear LLC (PSEG, the licensee) submitted a report to  
The Nuclear Regulatory Commissions (NRC) staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific request for additional information (RAI) questions are attached. The RAI questions were provided in draft form to Mr. Paul Duke of the PSEG staff via e-mail on July 6, 2017. The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed.
 
A conference call between the NRC staff and the PSEG staff was held on July 11, 2017, to discuss the draft RAI questions. During the call, Mr. Duke stated that PSEG would provide a response to the RAI questions by August 10, 2017.
the U.S. Nuclear Regulatory Commission (NRC) summarizing the results of the 2016 steam  
If you have any questions, please contact me at (301) 415-1420.
 
Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-272
generator (SG) inspections at Salem Nuclear Generating Station, Unit No. 1. These inspections  
 
were performed during refueling outage (RFO) 24. The SG tube inspection report is required to  
 
discuss the topics listed under Technical Specification 6.9.1.10, which includes information such  
 
as the scope of inspections performed, degradation mechanisms found, and the results of  
 
condition monitoring.  
 
The Nuclear Regulatory Commission's (NRC) staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific request for  
 
additional information (RAI) questions are attached. The RAI questions were provided in draft  
 
form to Mr. Paul Duke of the PSEG staff via e-mail on July 6, 2017. The draft questions were  
 
sent to ensure that the questions were understandable, the regulatory basis for the questions  
 
was clear, and to determine if the information was previously docketed.  
 
A conference call between the NRC staff and the PSEG staff was held on July 11, 2017, to  
 
discuss the draft RAI questions. During the call, Mr. Duke stated that PSEG would provide a  
 
response to the RAI questions by August 10, 2017.  
 
If you have any questions, please contact me at (301) 415-1420.  
 
Richard B. Ennis, Senior Project Manager  
 
Plant Licensing Branch I-2  
 
Division of Operating Reactor Licensing  
 
Office of Nuclear Reactor Regulation  
 
Docket No. 50-272  
 
REQUEST FOR ADDITIONAL INFORMATION REGARDING STEAM GENERATOR TUBE INSPECTION REPORT PSEG NUCLEAR LLC EXELON GENERATION COMPANY, LLC SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 DOCKET NO. 50-272
 
By letter dated January 20, 2017 (Agencywide Documents Access and Management System Accession No. ML17020A111), PSEG Nuclear LLC (the licensee) submitted a report to the U.S.
 
Nuclear Regulatory Commission (NRC) summarizing the results of the 2016 steam generator (SG) inspections at Salem Nuclear Generating Station, Unit No. 1. These inspections were
 
performed during refueling outage (RFO) 24. The SG tube inspection report is required to
 
discuss the topics listed under Technical Specification 6.9.1.10, which includes information such
 
as the scope of inspections performed, degradation mechanisms found, and the results of
 
condition monitoring. 
 
The NRC staff is reviewing your submittal and has determined that additional information is
 
needed to complete its review. The specific information requested is addressed below. 


REQUEST FOR ADDITIONAL INFORMATION REGARDING STEAM GENERATOR TUBE INSPECTION REPORT PSEG NUCLEAR LLC EXELON GENERATION COMPANY, LLC SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 DOCKET NO. 50-272 By letter dated January 20, 2017 (Agencywide Documents Access and Management System Accession No. ML17020A111), PSEG Nuclear LLC (the licensee) submitted a report to the U.S.
Nuclear Regulatory Commission (NRC) summarizing the results of the 2016 steam generator (SG) inspections at Salem Nuclear Generating Station, Unit No. 1. These inspections were performed during refueling outage (RFO) 24. The SG tube inspection report is required to discuss the topics listed under Technical Specification 6.9.1.10, which includes information such as the scope of inspections performed, degradation mechanisms found, and the results of condition monitoring.
The NRC staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific information requested is addressed below.
Chemical, Corrosion, and Steam Generator Branch (RCCB)
Chemical, Corrosion, and Steam Generator Branch (RCCB)
Reviewer: Alan Huynh RAI-RCCB-1 Please provide the number, location, and material (if known) of all foreign objects that remain in  
Reviewer: Alan Huynh RAI-RCCB-1 Please provide the number, location, and material (if known) of all foreign objects that remain in the SGs. Please also include all foreign object wear indications that were not included in the report, if any.
 
RAI-RCCB-2 On page 4 of 6 of Attachment 1 to the letter dated January 20, 2017, the scope of the Array Probe inspections lists special interest inspections that resulted from secondary side inspections. However, further discussion of these inspections is not included in the report.
the SGs. Please also include all foreign object wear indications that were not included in the  
Please discuss the results of any secondary side inspections performed during RFO 24.
 
RAI-RCCB-3 For each operating cycle since and including RFO 18 in 2007, please provide the effective full power months of operation for the Unit 1 SGs.}}
report, if any.  
 
RAI-RCCB-2 On page 4 of 6 of Attachment 1 to the letter dated January 20, 2017, the scope of the Array  
 
Probe inspections lists special interest inspections that resulted from secondary side  
 
inspections. However, further discussion of these inspections is not included in the report.
 
Please discuss the results of any secondary side inspections performed during RFO 24.  
 
RAI-RCCB-3 For each operating cycle since and including RFO 18 in 2007, please provide the effective full  
 
power months of operation for the Unit 1 SGs.}}

Latest revision as of 02:12, 30 October 2019

Request for Additional Information - Salem Unit 1 - Steam Generator Tube Inspection Report
ML17192A167
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/11/2017
From: Richard Ennis
Plant Licensing Branch 1
To: Duke P
Public Service Enterprise Group
Ennis R, 415-1420
References
CAC MF9094
Download: ML17192A167 (2)


Text

From: Ennis, Rick Sent: Tuesday, July 11, 2017 11:26 AM To: Duke, Paul R.

Subject:

Request for Additional Information - Salem Unit 1 - Steam Generator Tube Inspection Report (CAC No. MF9094)

Attachments: final rai01 mf9094.doc By letter dated January 20, 2017 (Agencywide Documents Access and Management System Accession No. ML17020A111), PSEG Nuclear LLC (PSEG, the licensee) submitted a report to the U.S. Nuclear Regulatory Commission (NRC) summarizing the results of the 2016 steam generator (SG) inspections at Salem Nuclear Generating Station, Unit No. 1. These inspections were performed during refueling outage (RFO) 24. The SG tube inspection report is required to discuss the topics listed under Technical Specification 6.9.1.10, which includes information such as the scope of inspections performed, degradation mechanisms found, and the results of condition monitoring.

The Nuclear Regulatory Commissions (NRC) staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific request for additional information (RAI) questions are attached. The RAI questions were provided in draft form to Mr. Paul Duke of the PSEG staff via e-mail on July 6, 2017. The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed.

A conference call between the NRC staff and the PSEG staff was held on July 11, 2017, to discuss the draft RAI questions. During the call, Mr. Duke stated that PSEG would provide a response to the RAI questions by August 10, 2017.

If you have any questions, please contact me at (301) 415-1420.

Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-272

REQUEST FOR ADDITIONAL INFORMATION REGARDING STEAM GENERATOR TUBE INSPECTION REPORT PSEG NUCLEAR LLC EXELON GENERATION COMPANY, LLC SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 DOCKET NO. 50-272 By letter dated January 20, 2017 (Agencywide Documents Access and Management System Accession No. ML17020A111), PSEG Nuclear LLC (the licensee) submitted a report to the U.S.

Nuclear Regulatory Commission (NRC) summarizing the results of the 2016 steam generator (SG) inspections at Salem Nuclear Generating Station, Unit No. 1. These inspections were performed during refueling outage (RFO) 24. The SG tube inspection report is required to discuss the topics listed under Technical Specification 6.9.1.10, which includes information such as the scope of inspections performed, degradation mechanisms found, and the results of condition monitoring.

The NRC staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific information requested is addressed below.

Chemical, Corrosion, and Steam Generator Branch (RCCB)

Reviewer: Alan Huynh RAI-RCCB-1 Please provide the number, location, and material (if known) of all foreign objects that remain in the SGs. Please also include all foreign object wear indications that were not included in the report, if any.

RAI-RCCB-2 On page 4 of 6 of Attachment 1 to the letter dated January 20, 2017, the scope of the Array Probe inspections lists special interest inspections that resulted from secondary side inspections. However, further discussion of these inspections is not included in the report.

Please discuss the results of any secondary side inspections performed during RFO 24.

RAI-RCCB-3 For each operating cycle since and including RFO 18 in 2007, please provide the effective full power months of operation for the Unit 1 SGs.