ML17279A476: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:OPERATING DATA REPORT WNP-2 01-May-87 1.DOCKET)50-397 2.REPORTING PERIODR 3 UTILITY CONTACT'pr-87 OUTAGE+ON-LINE HOURS LEONARD HUTCHISON (509>377-2486 719 4 LICENSED THERMAL POWER (MNt)e 5 NAMEPLATE RATING (GROSS MWe)z 6.DESIGN ELECTRICAL RATING (NET MWe)x 7.MAXIMUM DEPENDABLE CAPACITY (GROSS MWe>: B.MAXIMUM DEPENDABLE CAPACITY (NET MWe>a 9 IF CHANGES OCCUR ABOVE SINCE LAST REPORTS GIVE REASONS'323 1200.9 1100 1140 1095 10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe)x f f REASONS FOR RESTRICTIONS IF ANY lA RRC PumP InoPerable 788.12 REPORT PERIOD HOURS 13.HOURS REACTOR CRITICAL 14.RX RESERVE SHTDWN HRS 15 HRS GENERATOR ON LINE ib.UNIT RESERVE SHUTDOWN HOURS 17 GROSS THERMAL ENERGY (MWH)18.GROSS ELECTRICAL ENERGY (MWH)19.NET ELECTRICAL ENERGY (MNH)20.UNIT SERVICE FACTOR 21.UNIT AVAILABILITY FACTOR 22.UNIT CAPACITY FACTOR (MDC NET)23.UNIT CAPACITY FACTOR (DER NET)24.UNIT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH 719 230 6 0 0 223 7 0.0 508800 169930 164018 31.1/31~1%20 BX 20.7X O.OX 0 0 YEAR CUMULATIVE 2879 20839.2 2248.1 15955.5 0.0 340.4 2198.5 15359.4 0.0 381.7 5104872 38786052 1710530 12929800 1651917 12421888 76.4X 73.7/76.4%75.5X 52.4/54.4X 52 2%54.2%7.8%7.6X 185.2 1260.5 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE~DATE INDURATION)s NONE 27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE!June 4, 1987 8708190339 870430 PDR ADOCK 05000~7 R PDR' e)v'rt r~~AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.WNP-2 5/1 F87 L.B.Hutehison TELEPHONE (509)377-2486 APRIL 1987 DAY AVH&GE DAILY POWER LEVEL (Meet)1 759 762 722 761 729 758 752?52 756 83 DAY AVERAGE DAILY POWER:(.EVEL (MWe-Net)0 18 13 14 15 PiSTRUCTIONS On this form, Bst the amma daily unit power level in MN'e~Xet for each day in the reporthg month.Compute to the nearest whole megawatt.These Ggures will be used to plot a graph for each reporting month.Note that when maximum dependable mpacity h used for the net electrical tathg of the unit, them may be occasions when.the daily avenge power!evel exceeds the.l00%Hne (or the restricted power level Hne).In such cases, the average daily unit power output sheet should be ,.'..footnoted to eq8ah the apparent anomaly.
{{#Wiki_filter:OPERATING DATA REPORT WNP-2 01-May-87
P~i AEHAT PEAICO April 19 87 m~mm, year H5.DAAE Wii'GIE 1EltKH g~lgJ 86-14P 11/10/86 F NIT SIUTKNNS/AEOUCTIONS DOCKET NO.mlT Nex WNP-2 DATE 5/1/87 COMPLETED 8Y L.B.Hutchison TELEP)QNE (509)377-2486 BICKMll TIEIBI i'd%'llZlft CB PUMP XX~limited to 72K due to incurability of lA RRC Pup 87-04 4/10/87 S 495.3 C NA Plant shut down as scheduled for refueling outage SQffAAY WNP-2 operated at reduced power level unti 1 shutdown for refueling outage.lF-Forced QScl'IQd A-Equi p Failure 0-Haint or Test~C-Aef ue ling 0-Aegulatory Restriction E-Operator Trafning h License Examination F-Admfn G-Oper Error H-Other 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Aeduced Load 9-Other SYSTEM k COMPOM.:NT Exhibit F h H Instructions for Preparation of'ata Entry Sheet Licensee Event Aepnrt (LEA)File (NUAEG-0161)
: 1. DOCKET) 50-397
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 June 5, 1987 Director Office of Resource Management U.S.Nuclear Regulatory Commission Washington, D.C.20555
: 2. REPORTING PERIODR                             OUTAGE +    ON-LINE  HOURS          719 3     UTILITY CONTACT'pr-87               LEONARD HUTCHISON (509>         377-2486 4   LICENSED THERMAL POWER (MNt) e 5   NAMEPLATE RATING (GROSS MWe) z                                                   1200.9
: 6. DESIGN ELECTRICAL RATING (NET MWe) x                                               1100
: 7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe>:                                           1140 B. MAXIMUM DEPENDABLE CAPACITY (NET MWe> a REASONS'323            1095 9   IF CHANGES OCCUR ABOVE SINCE LAST REPORTS       GIVE
: 10. POWER TO WHICH   RESTRICTED,   IF ANY (NET MWe)   x                             788.
ff    REASONS FOR RESTRICTIONS       IF ANY     lA RRC PumP   InoPerable MONTH          YEAR    CUMULATIVE 12   REPORT PERIOD HOURS                                       719        2879      20839.2
: 13. HOURS REACTOR CRITICAL                                 230 6      2248.1      15955.5
: 14. RX RESERVE SHTDWN HRS                                     0 0          0.0        340.4 15   HRS GENERATOR ON LINE                                   223 7      2198.5      15359.4 ib. UNIT RESERVE SHUTDOWN HOURS                               0.0          0.0        381.7 17   GROSS THERMAL ENERGY (MWH)                             508800      5104872    38786052
: 18. GROSS ELECTRICAL ENERGY (MWH)                         169930      1710530    12929800
: 19. NET ELECTRICAL ENERGY (MNH)                           164018      1651917    12421888
: 20. UNIT SERVICE FACTOR                                       31. 1/     76. 4X       73. 7/
: 21. UNIT AVAILABILITYFACTOR                                  31 ~ 1%      76.4%         75.5X
: 22. UNIT CAPACITY FACTOR (MDC NET)                          20 BX        52.4/         54.4X
: 23. UNIT CAPACITY FACTOR (DER NET)                                    INDURATION)s 20.7X        52 2%         54.2%
: 24. UNIT FORCED OUTAGE RATE                                    O.OX        7.8%         7.6X
: 25. FORCED OUTAGE HOURS                                        0 0      185.2       1260.5 26   SHUTDOWNS SCHEDULED OVER THE NEXT       6 MONTHS (TYPE~DATE NONE
: 27. IF   CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE!                             June 4, 1987 8708190339 870430 PDR R
ADOCK 05000~7 PDR
                                    '


==Dear Sir:==
e) v' rt r~        ~
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
WNP-2 5/1 F87 L. B. Hutehison 377-2486 TELEPHONE (509)
APRIL 1987 DAY AVH&GEDAILYPOWER LEVEL                                  DAY AVERAGE DAILYPOWER:(.EVEL (Meet)                                                    (MWe-Net) 1 759                                                      0 762 18 722 761 729 758 752
                                              ?52 756 83 13 14 15 PiSTRUCTIONS On this form, Bst the amma daily unit power level in MN'e~Xet for each day in the reporthg month. Compute to the nearest whole megawatt.
These Ggures will be used to plot a graph for each reporting month. Note that when maximum dependable mpacity h used for the net electrical tathg of the unit, them may be occasions when. the daily avenge power!evel exceeds the
              . l00% Hne (or the restricted power level Hne). In such cases, the average daily unit power output sheet should be
  ,    . '..footnoted to eq8ah the apparent anomaly.
 
P~
i
 
DOCKET NO.
mlT Nex        WNP-2 DATE    5/1/87 NIT SIUTKNNS      / AEOUCTIONS                          COMPLETED 8Y      L. B. Hutchison AEHAT PEAICO April          19 87                                                                      TELEP)QNE (509) 377-2486 m~mm,      year H5. DAAE    Wii'GIE          1EltKH g~lgJ BICKMll TIEIBI i'd%'llZlft 86-14P 11/10/86  F                                            CB      PUMP XX      ~    limited to      72K due to incurability of lA RRC Pup 87-04  4/10/87  S    495.3      C                          NA                  Plant shut      down as scheduled for refueling outage SQffAAY    WNP-2  operated at reduced power level unti 1 shutdown  for refueling outage.
SYSTEM  k COMPOM.:NT lF-Forced    A-Equi p  Failure          F-Admfn        1-Manual            Exhibit F h H QScl'IQd      0-Haint or Test    ~      G-Oper Error  2-Manual Scram        Instructions for C-Aef ue ling              H-Other        3-Auto Scram          Preparation 0-Aegulatory Restriction                    4-Continued                Entry Sheet of'ata E-Operator Trafning                        5-Aeduced Load        Licensee Event Aepnrt h  License Examination                9-Other              (LEA)  File  (NUAEG-0161)
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~  3000 George Washington Way  ~ Richland, Washington 99352 Docket No. 50-397 June 5, 1987 Director Office of  Resource Management U.S. Nuclear Regulatory Commission Washington, D. C.      20555
 
==Dear Sir:==


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for May 1987 as required by our Technical Specifications 6.9.1.6.Very truly yours, c"ri f C.M.Powers (M/D 927M)WNP-2 Plant Manager CMP/lc Enclosure cc: Mr.John B.Martin-Mr.Robert T.Dodds-Ms.Dottie Sherman-Mr.J.T.Wheelock-Mr.Phil Ross NRC, Region V NRC Site Representative ANI, Farmington CT INPO NRC, Washington D.C.
NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for May 1987 as   required by our Technical Specifications 6.9.1.6.
1 t'(I}}
Very truly yours, c"ri f C. M. Powers (M/D 927M)
WNP-2 Plant Manager CMP/lc Enclosure cc:   Mr. John B. Martin-       NRC,  Region  V Mr. Robert T. Dodds-     NRC  Site Representative Ms. Dottie Sherman-     ANI, Farmington    CT Mr. J. T. Wheelock-       INPO Mr. Phil Ross             NRC,   Washington D.C.
 
1
  '(t I}}

Revision as of 15:09, 29 October 2019

Monthly Operating Rept for Apr 1987.W/870508 Ltr
ML17279A476
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1987
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC
References
NUDOCS 8708190338
Download: ML17279A476 (6)


Text

OPERATING DATA REPORT WNP-2 01-May-87

1. DOCKET) 50-397
2. REPORTING PERIODR OUTAGE + ON-LINE HOURS 719 3 UTILITY CONTACT'pr-87 LEONARD HUTCHISON (509> 377-2486 4 LICENSED THERMAL POWER (MNt) e 5 NAMEPLATE RATING (GROSS MWe) z 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe) x 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe>: 1140 B. MAXIMUM DEPENDABLE CAPACITY (NET MWe> a REASONS'323 1095 9 IF CHANGES OCCUR ABOVE SINCE LAST REPORTS GIVE
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe) x 788.

ff REASONS FOR RESTRICTIONS IF ANY lA RRC PumP InoPerable MONTH YEAR CUMULATIVE 12 REPORT PERIOD HOURS 719 2879 20839.2

13. HOURS REACTOR CRITICAL 230 6 2248.1 15955.5
14. RX RESERVE SHTDWN HRS 0 0 0.0 340.4 15 HRS GENERATOR ON LINE 223 7 2198.5 15359.4 ib. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7 17 GROSS THERMAL ENERGY (MWH) 508800 5104872 38786052
18. GROSS ELECTRICAL ENERGY (MWH) 169930 1710530 12929800
19. NET ELECTRICAL ENERGY (MNH) 164018 1651917 12421888
20. UNIT SERVICE FACTOR 31. 1/ 76. 4X 73. 7/
21. UNIT AVAILABILITYFACTOR 31 ~ 1% 76.4% 75.5X
22. UNIT CAPACITY FACTOR (MDC NET) 20 BX 52.4/ 54.4X
23. UNIT CAPACITY FACTOR (DER NET) INDURATION)s 20.7X 52 2% 54.2%
24. UNIT FORCED OUTAGE RATE O.OX 7.8% 7.6X
25. FORCED OUTAGE HOURS 0 0 185.2 1260.5 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE~DATE NONE
27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE! June 4, 1987 8708190339 870430 PDR R

ADOCK 05000~7 PDR

'

e) v' rt r~ ~

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

WNP-2 5/1 F87 L. B. Hutehison 377-2486 TELEPHONE (509)

APRIL 1987 DAY AVH&GEDAILYPOWER LEVEL DAY AVERAGE DAILYPOWER:(.EVEL (Meet) (MWe-Net) 1 759 0 762 18 722 761 729 758 752

?52 756 83 13 14 15 PiSTRUCTIONS On this form, Bst the amma daily unit power level in MN'e~Xet for each day in the reporthg month. Compute to the nearest whole megawatt.

These Ggures will be used to plot a graph for each reporting month. Note that when maximum dependable mpacity h used for the net electrical tathg of the unit, them may be occasions when. the daily avenge power!evel exceeds the

. l00% Hne (or the restricted power level Hne). In such cases, the average daily unit power output sheet should be

, . '..footnoted to eq8ah the apparent anomaly.

P~

i

DOCKET NO.

mlT Nex WNP-2 DATE 5/1/87 NIT SIUTKNNS / AEOUCTIONS COMPLETED 8Y L. B. Hutchison AEHAT PEAICO April 19 87 TELEP)QNE (509) 377-2486 m~mm, year H5. DAAE Wii'GIE 1EltKH g~lgJ BICKMll TIEIBI i'd%'llZlft 86-14P 11/10/86 F CB PUMP XX ~ limited to 72K due to incurability of lA RRC Pup 87-04 4/10/87 S 495.3 C NA Plant shut down as scheduled for refueling outage SQffAAY WNP-2 operated at reduced power level unti 1 shutdown for refueling outage.

SYSTEM k COMPOM.:NT lF-Forced A-Equi p Failure F-Admfn 1-Manual Exhibit F h H QScl'IQd 0-Haint or Test ~ G-Oper Error 2-Manual Scram Instructions for C-Aef ue ling H-Other 3-Auto Scram Preparation 0-Aegulatory Restriction 4-Continued Entry Sheet of'ata E-Operator Trafning 5-Aeduced Load Licensee Event Aepnrt h License Examination 9-Other (LEA) File (NUAEG-0161)

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 June 5, 1987 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for May 1987 as required by our Technical Specifications 6.9.1.6.

Very truly yours, c"ri f C. M. Powers (M/D 927M)

WNP-2 Plant Manager CMP/lc Enclosure cc: Mr. John B. Martin- NRC, Region V Mr. Robert T. Dodds- NRC Site Representative Ms. Dottie Sherman- ANI, Farmington CT Mr. J. T. Wheelock- INPO Mr. Phil Ross NRC, Washington D.C.