ML17285A904: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DI UTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM'(RIDS)
{{#Wiki_filter:ACCELERATED DI                       UTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM'(RIDS)
ACCESSION NBR:8912210126 DOC.D NOTARIZED:
ACCESSION NBR:8912210126             DOC.D                 NOTARIZED: NO               DOCKET FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public               Powe   05000397 AUTH. NAME           AUTHOR AFFILIATION HUTCHISON,L.B.       Washington Public Power Supply System POWERS,C.M.         Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION                                                     R
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.
Washington Public Power Supply System POWERS,C.M.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000397 R  


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Nov 1989 for WNP-2./891206 l r.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL TITLE: Monthly Operating Report'(per Tech Specs)NOTES D RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R COPIES LTTR ENCL 3 3 1 1 RECIPIENT ID CODE/NAME PD5 PD COPIES LTTR ENCL 1 1.A D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/LPEB10 PRPB11 REG FI 01 EXTERNAL EG&G S IMPSON g F NRC PDR 10 10 l,l 1 1 1 1 1 1 1 1'1 AEOD/DOA~'1 IRM TECH ADV 2 2 NRR/DOEA/OEABll," 1 1 NUDOCS-ABSTRACT 1'RGN5 1'LPDR NSIC D D NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept           for Nov 1989 for WNP-2. /891206       l r.
A D D PLEASE HELP, US TO REDUCE WASTEl CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 29  
DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR       ENCL                               D TITLE: Monthly Operating Report '(per Tech Specs)
~(r~,~l~~s~~~~"'i 4 l i'f 1 g I'i i/~-'f~ii i g-~"~e<if'<j~l I h g pl~S WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 December, 6;1989 U.S.Nuclear, Regulatory Comission Document Control Desk Washington; D.C.20555  
NOTES RECIPIENT             COPIES            RECIPIENT          COPIES ID CODE/NAME           LTTR ENCL       ID CODE/NAME       LTTR ENCL              .A PD5 LA                      3    3    PD5 PD                 1      1 l,l SAMWORTH,R                  1     1                                                   D INTERNAL: ACRS                       10     10     AEOD/DOA       ~
                                                                        '           1             D AEOD/DSP/TPAB                            IRM TECH ADV           2       2 NRR/DLPQ/LPEB10              1    1    NRR/DOEA/OEABll,"       1 '
1 PRPB11          1    1    NUDOCS-ABSTRACT         1 REG  FI          01          1    1    RGN5                    1   '
EXTERNAL  EG&G S IMPSON g F            1    1'   LPDR NRC PDR                            1    NSIC D
A D
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP, US TO REDUCE WASTEl CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR             29   ENCL   29
 
r
                              ~
(         ~   ~~ ~
                                                          ~ ~ ,    ~   l
                                                              "'i 4   l i
    'f 1         g I
      'i i/~-'f ~ ii i g -~" ~e   < if' <
j ~
l     I h
g pl ~
S
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 December,   6; 1989 U.S. Nuclear, Regulatory Comission Document Control Desk Washington; D.C. 20555


==Dear,==
==Dear,==
Sir,:  
Sir,:


==SUBJECT:==
==SUBJECT:==
NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for, November, 1989 as required by our, Technical Specifications 6.9.1.6.Very Truly Yours, C.M.Powers (M/D 927M)WNP-2 Plant Manager, CMP/lc Enclosure cc: Mr,.Mr,.Ms.Mr,.Mr..J.B.Martin C.J.Bosted Dottie Sherman J.T.Wheelock W.H.Lovelace NRC Region V NRC Site Representative (901A)ANI;Farmington CT INPO NRC;Washington D.C.8912210126 S91130 PDR ADOCK 05000397 R PDC-  
NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for, November, 1989 as required by our, Technical Specifications 6.9.1.6.
<'~
Very Truly Yours, C. M. Powers       (M/D 927M)
AEPCAT PEAIOO November1989 month, year$>i>.t>nE~>-TU>n~~Gism>Ts&liU None LNIT SIIUTDOl'INS
WNP-2   Plant   Manager, CMP/lc Enclosure cc: Mr,. J. B. Martin        NRC Region    V Mr,. C. J. Bosted           NRC  Site Representative      (901A)
/AEOUCTIONS Yll llRST~h DOCKET NO.lNIT I'IRI 1E llNP-2 ORTE 12/1/89 COMPLETED QY Le Hutchison TELEPIIONE (509)377-2486;C IOt PAF E ACIN C~: SUhWlNY lINP-2 Operated routinely during November with no outages or significant power reductions
Ms. Dottie   Sherman         ANI; Farmington    CT Mr,. J. T. Wheelock             INPO Mr.. W. H. Lovelace             NRC;   Washington D.C.
~: F-Forced S-Scllcd R-Equip Failure 0-Maint or Test~C-Ae f ue ling O-AeOulatory Aestriction E-Operator Training I License Examination F-Rdmin G-Oper Error H-Other l-Manual 2-Manual Scrain 3-Iluto Scram 4-Continued 6 Aeduced Load 9-OI:her SYSTEM h COMPOhCNT Exhibit F h H Instructions for Preparation of'-Data Entry Sheet Licensee Event Aepnrt (LEA)File (NUAEG-0161)
8912210126 S91130 PDR   ADOCK 05000397 R                     PDC-
OPERATING DATA REPORT WNP-2 01-Dec-89 1.DOCKET: 50-397 2.REPORTING PERIOD: 3.UTILITY CONTACT: Nov-89 OUTAGE+ON-LINE HOURS LEONARD HUTCHXSON (509)377-2486 720 4.LICENSED THERMAL POWER (MWt): 5.NAMEPLATE RATING (GROSS MWe): 6.DESIGN ELECTRXCAL RATING (NET MWe): 7.MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 8.MAXIMUM DEPENDABLE CAPACITY (NET MWe): 9~I F CHANGES OCCUR ABOVE S I NCE LAST REPORT i G I VE REASONS None 3323 1200.9 1100 1140 1095 10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe): 11.REASONS FOR RESTRICTIONS, IF ANY: None 12.REPORT PERIOD HOURS 13.HOURS REACTOR CRXTICAL 14.RX RESERVE SHTDWN HRS 15.HRS GENERATOR ON LINE 16.UNIT RESERVE SHUTDOWN HOURS 17.GROSS THERMAL ENERGY (MWH)18.GROSS ELECTRICAL ENERGY (MWH)19.NET ELECTRICAL ENERGY (MWH)20.UNXT SERVXCE FACTOR 21.UNIT AVAILABILITY FACTOR 22.UNIT CAPACXTY FACTOR (MDC NET)23.UNIT CAPACITY FACTOR (DER NET)24.UNIT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH 720 720.0 0.0 720.0 0.0 2332340 780990 755603 100.0~o 100'+o 95.8>o 95.4~o 0.04 0.0 YEAR CUMULATIVE 8016 43520.2 6113.7 32331.3 0.0 340.4 5939.4 31103.9 0.0 381.7 16840250 85951455 5565030 28598530 5337830 27506138 74'~o 71 5+o 74ol~o 72'~o 60'~o 57 7~o 60'+o 57 5~o 4.9%8.8~o 304.6 2996.2 2 6~SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE i DATE i DURATION)REFUELING OUTAGE 4 13 90 for 45 DAYS 27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:  
 
~~I AGE DAILY UNIT POWER LEVEL DOCKET NO.WNP-2 DATE 12/1/89 COMPLETED BY LB.Hutchison t 10NTH NOVEMBER 1989 TELEPHONE (509)377-2486 2.3.4, 5.6.7.8.9.10.12.13.14.15.16.DAY AVERAGE DAILY POWER LEVEL (MwE-Net)1082 1086 1056 1042 1079 1023 1048 996 950 876 870 1061 1063 1075 1079 17.18.19.20.21.22.23.24.25.26.27.28.29~30.31.DAY AVERAGE DAILY POWER LEVEL (MwE-Net)1076 1079 1075 1077 1082 1079 1045 1065 1079 1083 1083 1085 INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100'ine (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.  
<'
  ~
 
                                                                                                        ~ h DOCKET NO.
lNIT I'IRI 1E   llNP-2 ORTE     12/1/89 LNIT SIIUTDOl'INS  / AEOUCTIONS                COMPLETED QY       Le Hutchison AEPCAT PEAIOO    November1989                                                                    TELEPIIONE     (509) 377-2486; month,    year
$ >i>. t>nE ~>      -TU>n~  ~Gism>    Ts&liU                  Yll        llRST                          C IOt     PAF E   ACIN C None
                                                                                                                                      ~:
SUhWlNY
                                                                                                                                      ~:
lINP-2 Operated     routinely during November   with no outages or significant power reductions SYSTEM h COMPOhCNT F-Forced     R-Equip Failure               F-Rdmin          l-Manual            Exhibit F h H S-Scllcd    0-Maint or Test     ~         G-Oper Error     2-Manual Scrain     Instructions for C-Ae fue ling                  H-Other        3-Iluto Scram       Preparation of'-
O-AeOulatory Aestriction                      4-Continued         Data Entry Sheet E-Operator Training                            6 Aeduced Load     Licensee Event Aepnrt I  License Examination                    9-OI:her             (LEA) File (NUAEG-0161)
 
OPERATING DATA REPORT WNP-2 01-Dec-89
: 1. DOCKET:   50-397
: 2. REPORTING PERIOD:           Nov-89           OUTAGE +   ON-LINE   HOURS         720
: 3. UTILITY CONTACT:                      LEONARD HUTCHXSON   (509) 377-2486
: 4. LICENSED THERMAL POWER (MWt):                                                3323
: 5. NAMEPLATE RATING (GROSS MWe):                                              1200.9
: 6. DESIGN ELECTRXCAL RATING (NET MWe):                                          1100
: 7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):                                      1140
: 8. MAXIMUM DEPENDABLE CAPACITY (NET MWe):                                       1095 9 ~   IFNoneCHANGES              I OCCUR ABOVE S NCE LAST REPORT   i I G VE REASONS
: 10. POWER TO WHICH   RESTRICTED,   IF ANY (NET MWe):
: 11. REASONS FOR RESTRICTIONS,     IF ANY:
None MONTH          YEAR    CUMULATIVE
: 12. REPORT PERIOD HOURS                                   720        8016    43520.2
: 13. HOURS REACTOR CRXTICAL                             720.0      6113.7    32331.3
: 14. RX RESERVE SHTDWN HRS                                 0.0          0.0      340.4
: 15. HRS GENERATOR ON LINE                               720.0      5939.4    31103.9
: 16. UNIT RESERVE SHUTDOWN HOURS                           0.0          0.0      381.7
: 17. GROSS THERMAL ENERGY (MWH)                       2332340    16840250    85951455
: 18. GROSS ELECTRICAL ENERGY (MWH)                     780990    5565030    28598530
: 19. NET ELECTRICAL ENERGY (MWH)                       755603    5337830    27506138
: 20. UNXT SERVXCE FACTOR                                 100.0~o       74 '~o     71 5+o
: 21. UNIT AVAILABILITYFACTOR                            100 '+o      74ol~o     72 '~o
: 22. UNIT CAPACXTY FACTOR (MDC NET)                      95. 8>o      60 '~o     57 7~o
: 23. UNIT CAPACITY FACTOR (DER NET)                      95. 4~o      60 '+o     57 5~o
: 24. UNIT FORCED OUTAGE RATE                              0.04        4.9%       8. 8~o
: 25. FORCED OUTAGE HOURS                                  0.0        304.6     2996.2 26  ~ SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS       (TYPE i DATE i DURATION)
REFUELING OUTAGE 4 13 90 for 45 DAYS
: 27. IF CURRENTLY     SHUTDOWN ESTIMATED STARTUP DATE:
 
I
  ~   ~
AGE DAILY UNIT POWER LEVEL DOCKET NO.
WNP-2 DATE 12/1/89 COMPLETED BY   LB .Hutchison TELEPHONE   (509) 377-2486 t 10NTH NOVEMBER  1989 DAY AVERAGE  DAILY POWER LEVEL                    DAY AVERAGE DAILY POWER LEVEL (MwE-Net)                                        (MwE-Net) 1082                               17.             1076
: 2.            1086                                18.             1079
: 3.            1056                              19.             1075 4,            1042                                20.
: 5.            1079                                21.             1077
: 6.            1023                                22.             1082
: 7.            1048                                23.             1079
: 8.              996                                24.             1045
: 9.              950                                25.             1065 876                                26.             1079 10.
870                                27.             1083
: 12.            1061                                28.             1083
: 13.            1063                                29 ~
: 14.            1075                                30.             1085
: 15.            1079                                31.
16.
INSTRUCTIONS On this form,   list the average   daily unit power level in MWe-Net   for   each day       in the reporting month.     Compute to the nearest whole megawatt.
These   figures will   be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the (or the restricted power level line). In such cases, the average daily 100'ine unit power output sheet should be footnoted to explain the apparent anomaly.
 
"p}}
"p}}

Revision as of 14:30, 29 October 2019

Monthly Operating Rept for Nov 1989 for WNP-2.W/891206 Ltr
ML17285A904
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/30/1989
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8912210126
Download: ML17285A904 (8)


Text

ACCELERATED DI UTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM'(RIDS)

ACCESSION NBR:8912210126 DOC.D NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System POWERS,C.M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operating rept for Nov 1989 for WNP-2. /891206 l r.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL D TITLE: Monthly Operating Report '(per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL .A PD5 LA 3 3 PD5 PD 1 1 l,l SAMWORTH,R 1 1 D INTERNAL: ACRS 10 10 AEOD/DOA ~

' 1 D AEOD/DSP/TPAB IRM TECH ADV 2 2 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEABll," 1 '

1 PRPB11 1 1 NUDOCS-ABSTRACT 1 REG FI 01 1 1 RGN5 1 '

EXTERNAL EG&G S IMPSON g F 1 1' LPDR NRC PDR 1 NSIC D

A D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP, US TO REDUCE WASTEl CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 29

r

~

( ~ ~s ~ ~

~ ~ , ~ l

"'i 4 l i

'f 1 g I

'i i/~-'f ~ ii i g -~" ~e < if' <

j ~

l I h

g pl ~

S

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 December, 6; 1989 U.S. Nuclear, Regulatory Comission Document Control Desk Washington; D.C. 20555

Dear,

Sir,:

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for, November, 1989 as required by our, Technical Specifications 6.9.1.6.

Very Truly Yours, C. M. Powers (M/D 927M)

WNP-2 Plant Manager, CMP/lc Enclosure cc: Mr,. J. B. Martin NRC Region V Mr,. C. J. Bosted NRC Site Representative (901A)

Ms. Dottie Sherman ANI; Farmington CT Mr,. J. T. Wheelock INPO Mr.. W. H. Lovelace NRC; Washington D.C.

8912210126 S91130 PDR ADOCK 05000397 R PDC-

<'

~

~ h DOCKET NO.

lNIT I'IRI 1E llNP-2 ORTE 12/1/89 LNIT SIIUTDOl'INS / AEOUCTIONS COMPLETED QY Le Hutchison AEPCAT PEAIOO November1989 TELEPIIONE (509) 377-2486; month, year

$ >i>. t>nE ~> -TU>n~ ~Gism> Ts&liU Yll llRST C IOt PAF E ACIN C None

~:

SUhWlNY

~:

lINP-2 Operated routinely during November with no outages or significant power reductions SYSTEM h COMPOhCNT F-Forced R-Equip Failure F-Rdmin l-Manual Exhibit F h H S-Scllcd 0-Maint or Test ~ G-Oper Error 2-Manual Scrain Instructions for C-Ae fue ling H-Other 3-Iluto Scram Preparation of'-

O-AeOulatory Aestriction 4-Continued Data Entry Sheet E-Operator Training 6 Aeduced Load Licensee Event Aepnrt I License Examination 9-OI:her (LEA) File (NUAEG-0161)

OPERATING DATA REPORT WNP-2 01-Dec-89

1. DOCKET: 50-397
2. REPORTING PERIOD: Nov-89 OUTAGE + ON-LINE HOURS 720
3. UTILITY CONTACT: LEONARD HUTCHXSON (509) 377-2486
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRXCAL RATING (NET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1095 9 ~ IFNoneCHANGES I OCCUR ABOVE S NCE LAST REPORT i I G VE REASONS
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
11. REASONS FOR RESTRICTIONS, IF ANY:

None MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 720 8016 43520.2
13. HOURS REACTOR CRXTICAL 720.0 6113.7 32331.3
14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
15. HRS GENERATOR ON LINE 720.0 5939.4 31103.9
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 2332340 16840250 85951455
18. GROSS ELECTRICAL ENERGY (MWH) 780990 5565030 28598530
19. NET ELECTRICAL ENERGY (MWH) 755603 5337830 27506138
20. UNXT SERVXCE FACTOR 100.0~o 74 '~o 71 5+o
21. UNIT AVAILABILITYFACTOR 100 '+o 74ol~o 72 '~o
22. UNIT CAPACXTY FACTOR (MDC NET) 95. 8>o 60 '~o 57 7~o
23. UNIT CAPACITY FACTOR (DER NET) 95. 4~o 60 '+o 57 5~o
24. UNIT FORCED OUTAGE RATE 0.04 4.9% 8. 8~o
25. FORCED OUTAGE HOURS 0.0 304.6 2996.2 26 ~ SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE i DATE i DURATION)

REFUELING OUTAGE 4 13 90 for 45 DAYS

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

I

~ ~

AGE DAILY UNIT POWER LEVEL DOCKET NO.

WNP-2 DATE 12/1/89 COMPLETED BY LB .Hutchison TELEPHONE (509) 377-2486 t 10NTH NOVEMBER 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MwE-Net) (MwE-Net) 1082 17. 1076

2. 1086 18. 1079
3. 1056 19. 1075 4, 1042 20.
5. 1079 21. 1077
6. 1023 22. 1082
7. 1048 23. 1079
8. 996 24. 1045
9. 950 25. 1065 876 26. 1079 10.

870 27. 1083

12. 1061 28. 1083
13. 1063 29 ~
14. 1075 30. 1085
15. 1079 31.

16.

INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the (or the restricted power level line). In such cases, the average daily 100'ine unit power output sheet should be footnoted to explain the apparent anomaly.

"p