ML17291B229: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY j.REGULATOR INFORMATION DISTRZBUTIONGSTEM (RIDE)ACCESSION NRR.9602210250 DOC.DATE:,96/01/31, NOTARIZED:
{{#Wiki_filter:CATEGORY j.
NO DOCKET FACIL:5G-4
REGULATOR INFORMATION DISTRZBUTIONGSTEM (RIDE)
/ŽQPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAMED AUTHOR AFFILIATION EMBREE,D.G.
ACCESSION NRR .9602210250         DOC.DATE:,96/01/31, NOTARIZED: NO                 DOCKET FACIL:5G-4 /'QPPSS Nuclear Project, Unit 2, Washington Public Powe                 05000397 AUTH.NAMED           AUTHOR AFFILIATION EMBREE,D.G.         Washington Public Power Supply System PARRISH,J.V.       Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION k
Washington Public Power Supply System PARRISH,J.V.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION k  


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Jan 1996 for WNP Unit 2.W/960209 ltr.DISTRIBUTION CODE: ZE24D COPIES RECEIVED:LTR i ENCL L SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME, PD4-2 PD INTERNAL: 8R ILE CENTER RG EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 , RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/SPD/RRAB NRR/DRPM/PECB NOAC COPIES LTTR ENCL 1 1'1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating rept     for   Jan 1996 for WNP   Unit 2.W/960209 ltr.
'4 PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL.19 ai WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 February 9, 1996 G02-96-023 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:
DISTRIBUTION CODE: ZE24D       COPIES RECEIVED:LTR       i ENCL   L   SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT         COPIES          , RECIPIENT            COPIES ID CODE/NAME,       LTTR ENCL        ID CODE/NAME        LTTR ENCL PD4-2 PD                 1    1      CLIFFORD,J               1     1' INTERNAL:    8R                    10   10       AEOD/SPD/RRAB                 1 ILE  CENTER            1    1      NRR/DRPM/PECB           1    1 RG                      1   1 EXTERNAL: LITCO BRYCE,J H            1     1     NOAC                    1     1 NRC PDR                  1     1 NOTE TO ALL "RIDS" RECIPIENTS:       '4 PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR           19   ENCL   . 19
 
ai WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 February 9, 1996 G02-96-023 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:


==Subject:==
==Subject:==
WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT JANUARY 1996 Transmitted herewith is the Monthly Operating Report for the month of January 1996 as required by Technical Specification 6.9.1.6.Sincerely, J.Parrish anaging Director (Mail Drop 1023)JVP:DGE CC: LJ Callan, NRC R IV NRC Sr.Resident Inspector (927N)INPO ANI Library Utility Data Institute BPA (399)0042 96022i0250 960i31 PDR ADGCK 050003'P7 R PDR t..t 4 A$a I  
WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JANUARY 1996 Transmitted herewith is the Monthly Operating Report for the month           of January 1996 as required by Technical Specification 6.9.1.6.
~OPERATING STATUS REPOR'1 for WNP-2 Date: February 1, 1996 2.3.4.5.6.7.8.9.3486 1199 1153 1145 1099 none Docket: 50-397 Reporting Period: JANUARY 1996 Outage+On-line Hours: 744.0 Utility Contact: David G.Embree (509)377-8448 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity-summer (Gross MW,): Maximum Dependable Capacity-summer (Net MW,): If changes occur above since last report, give reasons: 10.11.12.13.14.15.16.17.18.19.20.21.22.23.24.25.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)Gross Electrical Energy (MWH)Net Electrical Energy (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours Power to which restricted, if any (Net MW,): about 99%for January Reasons for restrictions, if any: administrative limit placed on plant operations until special feedwater flow test results were validated, which resulted in about a 1%decrease in power.Revised electrical ratings in the process of being re-calculated.
Sincerely, J   . Parrish anaging Director (Mail Drop 1023)
MONTH YEAR CUMULATIVE 744.0 744.0 97,592.2 744.0 744.0 70,379.8 0.0 0.0 744.9 744.0 744.0 67,994.5 0.0 0.0 958,8 2,416,449 2,416,449 202,873,999 827,600 827,600 68,405,080 799,679 799,679 65,557,997 100.0%100.0%69.7%100.0%100.0%70.7%97.8%97.8%61.5%93.2%93.2%60.7%0.0%0.0%10,9%0.0 0.0 8,319.7 26, Shutdowns scheduled over the next 6 months (type, date, duration):
JVP:DGE CC:     LJ Callan, NRC R IV NRC Sr. Resident Inspector (927N)
27.If currently shutdown, estimated startup date: Refueling, 4/13/96, 55 days NA Note: Cumulative Unit Capacity Factors (MDC&, DER)are calculated with weighted averages.
INPO ANI Library Utility Data Institute BPA (399) 0042 96022i0250 960i31 PDR     ADGCK   050003'P7 R                       PDR
AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD: JANUARY 1996 DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
 
50-397 WNP-2 February 1, 1996 D.G.Embree (509)377-8448 DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe)10 12 13 14 15 1159 1156 1148 1159 1159 1157 1156 1158 1157 1152 1154 1083 693 688 820 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1049 1157 1155 1132 692 687 1045 1152 1155 1160 1159 1153 1157 1152 1155 1162 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
t
5 g r, UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD: JANUARY 1996 DOCKET NO.: 50-397 UNIT NAME: WNP-2~.DATE: February 1, 1996 COMPLETED BY: D.G.Embree TELEPHONE:
        ..t 4
(509)377444$No.Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 9641 1/12/96 S 97.0 H NA ZZ ZZZZZZ Economic dispatch goal following) at the request of~the BPA.9642 1/19/96 S 68.5 H NA ZZ ZZZZZZ Economic dispatch (load following) at the request of the BPA.
A
$ a I
 
                        ~     OPERATING STATUS REPOR'1 for WNP-2 Date: February 1, 1996 Docket: 50-397
: 2. Reporting Period: JANUARY 1996                             Outage   +   On-line Hours: 744.0
: 3. Utility Contact:       David G. Embree (509) 377-8448
: 4. Licensed Thermal Power (MW, ):                                                             3486
: 5. Nameplate Rating (Gross MW, ):                                                             1199
: 6. Design Electrical Rating (Net MW,):                                                       1153
: 7. Maximum Dependable Capacity - summer (Gross MW,):                                         1145
: 8. Maximum Dependable Capacity - summer (Net MW, ):                                           1099
: 9. Ifchanges occur above since last report, give reasons:                                    none
: 10. Power to which restricted, if any (Net MW,):                           about 99% for January
: 11. Reasons for restrictions, if any:           administrative limit placed on plant operations until special feedwater flow test results were validated, which resulted in about a 1%
decrease in power. Revised electrical ratings in the process of being re-calculated.
MONTH                 YEAR           CUMULATIVE
: 12. Report Period Hours                              744.0                 744.0           97,592.2
: 13. Hours Reactor Critical                            744.0                 744.0           70,379.8
: 14. Rx Reserve Shutdown Hours                            0.0                 0.0             744.9
: 15. Hours Generator On-Line                          744.0                 744.0           67,994.5
: 16. Unit Reserve Shutdown Hours                          0.0                 0.0             958,8
: 17. Gross Thermal Energy (MWH)                  2,416,449             2,416,449         202,873,999
: 18. Gross Electrical Energy (MWH)                  827,600             827,600         68,405,080
: 19. Net Electrical Energy (MWH)                    799,679               799,679         65,557,997
: 20. Unit Service Factor                            100.0%               100.0%               69.7%
: 21. Unit Availability Factor                        100.0%               100.0%               70.7%
: 22. Unit Capacity Factor (MDC Net)                  97.8%                 97.8%               61.5%
: 23. Unit Capacity Factor (DER Net)                  93.2%                 93.2%               60.7%
: 24. Unit Forced Outage Rate                            0.0%                 0.0%               10,9%
: 25. Forced Outage Hours                                  0.0                 0.0           8,319.7 26,   Shutdowns scheduled over the next 6 months (type, date, duration):                   Refueling, 4/13/96, 55 days
: 27. Ifcurrently  shutdown, estimated startup date:                                            NA Note: Cumulative Unit Capacity Factors (MDC &, DER) are calculated with weighted averages.
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:       50-397 UNIT:    WNP-2 DATE:    February 1, 1996 COMPLETED BY:        D. G. Embree TELEPHONE:        (509) 377-8448 REPORT PERIOD:            JANUARY 1996 AVERAGE DAILYPOWER LEVEL                                      AVERAGE DAILYPOWER LEVEL DAY                    (Net MWe)                                 DAY                 (Net MWe) 1159                                   16                    1049 1156                                   17                    1157 1148                                   18                    1155 1159                                   19                    1132 1159                                   20                      692 1157                                   21                      687 1156                                   22                    1045 1158                                   23                    1152 1157                                   24                     1155 10                        1152                                   25                    1160 1154                                  26                    1159 12                        1083                                  27                    1153 13                        693                                  28                    1157 14                        688                                  29                    1152 15                        820                                  30                    1155 31                    1162 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
 
5 g r,
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:       50-397 UNIT NAME:       WNP-2                 ~.
DATE:     February 1, 1996 COMPLETED BY:         D.G. Embree TELEPHONE:       (509) 377444$
REPORT PERIOD:      JANUARY 1996 No.       Date     Type     Hours     Reason     Method   LER Number       System Component     Cause and Corrective Action To Prevent Recurrence 9641     1/12/96     S       97.0       H                       NA             ZZ   ZZZZZZ       Economic dispatch goal following) at the request the BPA.
of  ~
9642       1/19/96     S       68.5       H                       NA             ZZ   ZZZZZZ       Economic dispatch (load following) at the request of the BPA.


==SUMMARY==
==SUMMARY==
: At the beginning of the month, the plant was operating near full power.The plant was placed in economic dispatch goad~following) at the request of the BPA for a portion of the month.The plant returned to full power operation at the end of the month, TYPE F-Forced S-Scheduled REASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT NUREG4161 Exhibits F&H
:               At the beginning of the month, the plant was operating near full power. The plant was placed in economic dispatch goad                 ~
~~'}}
following) at the request of the BPA for a portion of the month. The plant returned to full power operation at the end of the month, TYPE                       REASON                                                          METHOD                  SYSTEM & COMPONENT F - Forced                 A - Equipment Failure             E - Operator Training &       1 - Manual              NUREG4161 Exhibits F & H S - Scheduled              B - Maintenance or Test                  License Examination    2 - Manual Scram C - Refueling                    F - Administration            3 - Auto Scram D - Regulatory Restriction        G - Operational Error          4 - Continued H - Other                      5 - Reduced Load 9- Other
 
~ ~
    '}}

Revision as of 13:21, 29 October 2019

Monthly Operating Rept for Jan 1996 for Wnp Unit 2.W/960209 Ltr
ML17291B229
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/31/1996
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-023, GO2-96-23, NUDOCS 9602210250
Download: ML17291B229 (8)


Text

CATEGORY j.

REGULATOR INFORMATION DISTRZBUTIONGSTEM (RIDE)

ACCESSION NRR .9602210250 DOC.DATE:,96/01/31, NOTARIZED: NO DOCKET FACIL:5G-4 /'QPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAMED AUTHOR AFFILIATION EMBREE,D.G. Washington Public Power Supply System PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION k

SUBJECT:

Monthly operating rept for Jan 1996 for WNP Unit 2.W/960209 ltr.

DISTRIBUTION CODE: ZE24D COPIES RECEIVED:LTR i ENCL L SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES , RECIPIENT COPIES ID CODE/NAME, LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 CLIFFORD,J 1 1' INTERNAL: 8R 10 10 AEOD/SPD/RRAB 1 ILE CENTER 1 1 NRR/DRPM/PECB 1 1 RG 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 NOTE TO ALL "RIDS" RECIPIENTS: '4 PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 19 ENCL . 19

ai WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 February 9, 1996 G02-96-023 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JANUARY 1996 Transmitted herewith is the Monthly Operating Report for the month of January 1996 as required by Technical Specification 6.9.1.6.

Sincerely, J . Parrish anaging Director (Mail Drop 1023)

JVP:DGE CC: LJ Callan, NRC R IV NRC Sr. Resident Inspector (927N)

INPO ANI Library Utility Data Institute BPA (399) 0042 96022i0250 960i31 PDR ADGCK 050003'P7 R PDR

t

..t 4

A

$ a I

~ OPERATING STATUS REPOR'1 for WNP-2 Date: February 1, 1996 Docket: 50-397

2. Reporting Period: JANUARY 1996 Outage + On-line Hours: 744.0
3. Utility Contact: David G. Embree (509) 377-8448
4. Licensed Thermal Power (MW, ): 3486
5. Nameplate Rating (Gross MW, ): 1199
6. Design Electrical Rating (Net MW,): 1153
7. Maximum Dependable Capacity - summer (Gross MW,): 1145
8. Maximum Dependable Capacity - summer (Net MW, ): 1099
9. Ifchanges occur above since last report, give reasons: none
10. Power to which restricted, if any (Net MW,): about 99% for January
11. Reasons for restrictions, if any: administrative limit placed on plant operations until special feedwater flow test results were validated, which resulted in about a 1%

decrease in power. Revised electrical ratings in the process of being re-calculated.

MONTH YEAR CUMULATIVE

12. Report Period Hours 744.0 744.0 97,592.2
13. Hours Reactor Critical 744.0 744.0 70,379.8
14. Rx Reserve Shutdown Hours 0.0 0.0 744.9
15. Hours Generator On-Line 744.0 744.0 67,994.5
16. Unit Reserve Shutdown Hours 0.0 0.0 958,8
17. Gross Thermal Energy (MWH) 2,416,449 2,416,449 202,873,999
18. Gross Electrical Energy (MWH) 827,600 827,600 68,405,080
19. Net Electrical Energy (MWH) 799,679 799,679 65,557,997
20. Unit Service Factor 100.0% 100.0% 69.7%
21. Unit Availability Factor 100.0% 100.0% 70.7%
22. Unit Capacity Factor (MDC Net) 97.8% 97.8% 61.5%
23. Unit Capacity Factor (DER Net) 93.2% 93.2% 60.7%
24. Unit Forced Outage Rate 0.0% 0.0% 10,9%
25. Forced Outage Hours 0.0 0.0 8,319.7 26, Shutdowns scheduled over the next 6 months (type, date, duration): Refueling, 4/13/96, 55 days
27. Ifcurrently shutdown, estimated startup date: NA Note: Cumulative Unit Capacity Factors (MDC &, DER) are calculated with weighted averages.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: February 1, 1996 COMPLETED BY: D. G. Embree TELEPHONE: (509) 377-8448 REPORT PERIOD: JANUARY 1996 AVERAGE DAILYPOWER LEVEL AVERAGE DAILYPOWER LEVEL DAY (Net MWe) DAY (Net MWe) 1159 16 1049 1156 17 1157 1148 18 1155 1159 19 1132 1159 20 692 1157 21 687 1156 22 1045 1158 23 1152 1157 24 1155 10 1152 25 1160 1154 26 1159 12 1083 27 1153 13 693 28 1157 14 688 29 1152 15 820 30 1155 31 1162 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net) for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

5 g r,

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-397 UNIT NAME: WNP-2 ~.

DATE: February 1, 1996 COMPLETED BY: D.G. Embree TELEPHONE: (509) 377444$

REPORT PERIOD: JANUARY 1996 No. Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 9641 1/12/96 S 97.0 H NA ZZ ZZZZZZ Economic dispatch goal following) at the request the BPA.

of ~

9642 1/19/96 S 68.5 H NA ZZ ZZZZZZ Economic dispatch (load following) at the request of the BPA.

SUMMARY

At the beginning of the month, the plant was operating near full power. The plant was placed in economic dispatch goad ~

following) at the request of the BPA for a portion of the month. The plant returned to full power operation at the end of the month, TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure E - Operator Training & 1 - Manual NUREG4161 Exhibits F & H S - Scheduled B - Maintenance or Test License Examination 2 - Manual Scram C - Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction G - Operational Error 4 - Continued H - Other 5 - Reduced Load 9- Other

~ ~

'