{{#Wiki_filter:ACCELERATED DIS UTION DEMONSTRATION SYSTEM~~-e REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)Q4'4 g" ACCESSION NBR:9205150222 DOC.DATE: 92/04/30 NOTARIZED:
{{#Wiki_filter:ACCELERATED DIS                         UTION DEMONSTRATION SYSTEM
NO'OCKET FACIL:STN-50-528.Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CHAVET,K.A.
      ~ ~ -e REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Arizona Public Service Co.(formerly Arizona Nuclear Power LEVINE,J.M.
Q4'4 g" ACCESSION NBR:9205150222               DOC.DATE: 92/04/30     NOTARIZED: NO FACIL:STN-50-528.Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528
Arizona Public Service Co.(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION RECIPIENT ID CODE/NAME PD5 LA TRAMMELL,C COPIES LTTR ENCL 3 3 1 1 RECIPIENT ID CODE/NAME PD5 PD THOMPSON,M COPIES LTTR ENCL 1 1 1 1
                                                                                      'OCKET STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME             AUTHOR AFFILIATION CHAVET,K.A.             Arizona Public Service Co. (formerly Arizona Nuclear Power LEVINE,J.M.             Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME             RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Apr 1992 for PVNGS,Units 1,2 6 3.W/920514 ltr.k DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:STANDARDIZED PLANT Standardized plant.Standardized plant.D 05000528 A 05000I'5'29
Monthly operating repts           for Apr 1992   for PVNGS,Units 1,2       6 D
>05000530 D D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN5 EXTERNAL: EGGG BRYCE,J.H NSIC 10 10 1 1 1 1 1 1 1 1 1 1 AEOD/DOA NRR/DLPQ/LPEB1(0 G=-F-IEE~~
3.W/920514     ltr.                     k DISTRIBUTION CODE: IE24D             COPIES RECEIVED:LTR         ENCL     SIZE:
0 1 NRC PDR 1 1 1 1 1 1 1 D NOTE TO ALL"RIDS" RECIPIENTS:
TITLE: Monthly Operating Report (per Tech Specs)
D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25 V k lP>.
NOTES:STANDARDIZED PLANT                                                                   05000528    A Standardized plant.                                                                 05000I'5'29 Standardized plant.                                                                >05000530   D D
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O.BOX 52034~PHOENIX, ARIZONA 85072-2034 JAMES M, LEVINE VICE PAESIDENT NUCLEAR PAODUCTION 254-02045-JML/KAC May 14, 1992 U.S.Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555  
RECIPIENT              COPIES            RECIPIENT        COPIES ID CODE/NAME            LTTR ENCL        ID CODE/NAME      LTTR ENCL PD5 LA                      3    3      PD5 PD                1         1 TRAMMELL,C                  1     1     THOMPSON,M            1         1 INTERNAL: ACRS                          10    10    AEOD/DOA                1         1 AEOD/DSP/TPAB                1     1     NRR/DLPQ/LPEB1(0       1          1 NRR/DOEA/OEAB                1    1        G=-F-IEE~~ 0 1                 1 RGN5                        1     1 EXTERNAL: EGGG BRYCE,J.H                  1     1     NRC PDR                1         1 NSIC                        1    1 D
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 25   ENCL   25
 
V k
lP> .
 
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA 85072-2034 JAMES M, LEVINE VICE PAESIDENT NUCLEAR PAODUCTION                                                                     254-02045-JML/KAC May 14, 1992 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555


==Dear Sirs:==
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528/529/530 Monthly Operating Reports for April 1992 File: 92-024-404'2-056-026'nclosed are the Monthly Operating Reports for April 1992, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.,By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region V.If you have any questions, please contact Kent A.Chavet at (602)340-4718.Sincerely, JMUKAC/kac Enclosures cc: J.B.Martin D.H.Coe A.C.Gehr A.H.Gutterman INPO Records Center Utility Data Institute (all w/enclosures) 9205150222 920430 g 8$,', PDR ADOCK 05000528'R PDR  
Palo Verde Nuclear Generating Station (PVNGS)
,lp*t~~  
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for April 1992 File: 92-024-404'2-056-026'nclosed are the Monthly Operating Reports for April 1992, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.,By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region V.
~~0 0 NRC MONTHLY, OPERATING REPORT DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K A Chavet OPERATING STATUS 1.2.3.4, 5.6.7.8.9.10.Unit Name: Palo Verde Nuclear Generatin Station Unit 1 Reporting Period:~A ril 1992 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe):~12 0 Maximum Dependable Capacity (Gross'MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N A ,':.":,".:.'.:,':;:!",a.';:::ji
If you have any questions, please                                 contact Kent A. Chavet at (602) 340-4718.
.-,,'.;UNIT,.:''.:;:1',':,::GeoENerE<R<<ATXHG'i:SToATee I SWIGS::<$'';-':,''",N:,",:,,::,::;:::",:!,'Be ureSer:i;Xl.
Sincerely, JMUKAC/kac Enclosures cc:   J. B. Martin                                               (all w/enclosures)
'Repereting::,",PeviC,d':::":::::.::::.':.:::,.;2!.,:.;;:,'y."N." 8'ie<': 720 2,904: dgpg'pp)25'>
D. H. Coe A. C. Gehr A. H. Gutterman INPO Records Center Utility Data Institute 9205150222 920430 PDR    ADOCK 05000528 g8$   ,',
<(<<2:<:~;~"i":
            'R                                               PDR
i::: 8'<e:p d2:9<4'"'d<:.'">~8:R.I:2.:opk<.":8:<:.'oeo.', 54,840 12 13 14 15 16 17 18 19 20 21 22 23;,, facto.';:,::,,UQ3;:t:::!R'e'86're::::i Shu.';-:;::::,,,C'ro"..'s':.'.",':81e~~~ie'al,"'.",::Ne't;.:',..:;.E1'ecii''i'ca1:'-
 
Rnei'j j'~<qgnR@m:
    ,lp
S et'vxce;.;Pac toXgi(4)'.";"'4:"~jg>,'8'i(<+:"',Pi,".";~!NONE<':ld
* t
';;:;"i''i'.,tgi,;;':,.'AVakil'ae
          ~
':i',-',!U$
        ~
iC':l8,Ca'P""akim:Cy',,',;.:",8,:~'e::totr''<.',(UP',:i;:n
 
.:'j::: V're:t.;"jC'ap5a'i'i't j,.:;-:-:Fpc't 4<.";-UA3!
    ~ ~
t:.::<POXCed,".'.'OUt8gbi<ARA:te98':(:.S)ii."':q'""S>S'~W-.'':d<o,'.::.8
0   NRC MONTHLY,OPERATING REPORT 0
<l'4!'<gI 0.0 0.0 0.0 0.0 0 0 0 0.0s 0.0s 0.0s 0.0a 0.0a 831.0 0.0 810.3 0.0 2,679,785 924,200 857,484 27.9a 27.9a 24.2a 23.3%25.1%29,890.1 0.0 29,132.4 0.0 106,544,041 36,972,900 34,682,276 53.1%53.1s 51.8S 49.8s 20.4%24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refuelin outa e be an Februar 15 1992 70 da s 25.If Shutdown At End of Report Period, Estimated Date of Start-up: Ma 18 199 INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast~05 85 06 85 11 85 Achieved 05/525 85 06 10 85 01 28 86 1
DOCKET NO.                               50-528 UNIT           NAME                     PVNGS-1 DATE COMPLETED BY K A Chavet OPERATING STATUS
~~
: 1.         Unit                   Name:                   Palo Verde Nuclear Generatin Station Unit 1
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.A, Chavet MONTH: April 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 18 19 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 15 16 2 i!II I I f I REFUELING INFORMATION DOCKET NO.50-528 UNIT NAME PVNGS-I DATE COMPLETED BY K.A.Chavet Scheduled date for next refueling shutdown.The Unit 1 third refueling outage began on 02/15/92.Scheduled date for restart following refueling.
: 2.        Reporting Period: ~A                                               ril           1992
05/18/92 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment2 Yes.Figures 3.2-2 and 3.2-2A of the Technical Specifications have been revised to reflect different DNBR margin limits.Scheduled date for submitting proposed licensing action and supporting information.
: 3.        Licensed Thermal Power (MWt): 3800 4,        Nameplate Rating (Gross MWe):                                                             1403
Information to support the revision to Figures 3.2-2 and 3.2-2A was submitted on 12/24/91.The figures were revised in Technical'Specification Amendment No.61 on 04/03/92.Important Licensing considerations associated with refueling, e.g., new or different fuel.design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
: 5.        Design Electrical Rating (Net MWe): ~12 0
The Unit 1, Cycle 4, nuclear design was performed using the DIT, ROCS, and MC computer codes described in Topical Report CENPD-266-P-A with the improvements in anisotropic scattering, higher order interface currents, nodal expansion method, and assembly discontinuity factors.Biases and uncertainties used in the Unit 1 Cycle 4 analysis were established by comparing results obtained from analytical calculation with measured data to insure that 95/95 confidence limits are maintained in the safety analysis.The number of fuel assemblies.
: 6.        Maximum Dependable Capacity (Gross 'MWe): 1303
a)In the core.241 b)In the spent fuel storage pool.267 Licensed spent fuel storage capacity.1329 Intended change in spent fuel storage capacity.None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2004 (18 Month reloads and full core discharge capability).
: 7.        Maximum Dependable Capacity (Net MWe):                                                                                         1221
3 0 I  
: 8.        If             Changes Occur In Capacity Ratings                                                         (Item                         Numbers 3 Through 7)
Since                       Last         Report,               Give             Reasons:   N   A
: 9.        Power Level to Which Restricted,                                                           If   Any (Net MWe): None
: 10.        Reasons                             For       Restrictions,                       If Any:     N A
: dgpg'pp)25'> <(<<2:<:~;~"i":i::: 8'<e:pd2:9<4'"'d<:.'">~8:R.I:2.:opk<.":8:<:.'oeo.',
ISWIGS::<$
                                                                                                                              ':
        ,':.":,".:.'.:,':;:!",a.';:::ji .-,,'.;UNIT,.:''.:;:1',':,::GeoENerE<R<<ATXHG'i:SToATee                '';-':,''",N:,",:,,::,::;:::",:!,
        'Be ureSer:i;Xl. 'Repereting::,",PeviC,d':::":::::.::::.':.:::,.;2!.,:.;;:,'y."N." 8'ie<                                                                          720                                      2,904                        54,840 12                                                                                                                                                                       0.0                                      831.0                      29,890.1 13          ;,, facto.                                                                                                                                                 0.0                                            0.0                        0.0 14                                                                                                                                                                      0.0                                      810.3                      29,132.4 15      ';:,::,,UQ3;:t:::!R'e'86're::::i                         Shu                                                                                                   0.0                                            0.0                          0.0 16                                                                                                                                                                              0                    2,679,785                            106,544,041 17      .';
:;::::,,,C'ro"..'s':.'.",':81e~~~ie'al,                                                                                                                             0                          924,200                        36,972,900 18      "'.",::Ne't;.:',..:;.E1'ecii''i'ca1:'-                         Rnei'j                                                                                                   0                          857,484                        34,682,276 19                                      S et'vxce;.;Pac toXgi(4)'.";"'4:"~jg>,'8'i(<+:"',Pi,".";~!NONE<':ld j'~<qgnR@m:
0.0s                                        27.9a                        53.1%
20      ';;:;"i''i'.,tgi,;;':,.'AVakil'ae                                                                                                                                 0.0s                                        27.9a                        53.1s 21      ':i',-',!U$iC':l8,Ca'P""akim:Cy',,',;.:",8,:~'e::totr''<.',(UP',:i;:n                                                                                             0.0s                                        24.2a                        51.8S 22      .:'j::: V're:t.;"jC'ap5a'i'i't j,.:;-:-:Fpc't                                                                                                                   0.0a                                        23.3%                        49.8s 23      4<.";-UA3!t:.::<POXCed,".'.'OUt8gbi<ARA:te98':(:.S)ii."':q'""S>S'~W-.'':d<o,'.::.8 <l'4!'<gI                                                                     0.0a                                        25.1%                        20.4%
: 24.         Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration                                                                                                                                        of      Each): Refuelin outa e be an Februar 15 1992 70 da s
: 25.         If Shutdown                                  At        End    of Report Period, Estimated                                                      Date        of Start-up:                              Ma          18      199 Forecast                                                Achieved INITIAL CRITICALITY                                                                                                    ~05 85                                                    05/525 85 INITIAL ELECTRICITY                                                                                                      06 85                                                  06 10 85 COMMERCIAL OPERATION                                                                                                      11 85                                                  01 28 86 1
 
~ ~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-528 UNIT NAME    PVNGS-1 DATE COMPLETED BY K.A, Chavet MONTH: April 1992 DAY    AVERAGE DAILY POWER LEVEL                        DAY  AVERAGE DAILY POWER LEVEL 18 19 20 21 22 23 24 25 10                                                    26 27 12                                                    28 13                                                    29 14                                                    30 15 16 2
 
i
!
II I
I f
I
 
REFUELING INFORMATION DOCKET NO. 50-528 UNIT  NAME    PVNGS-I DATE COMPLETED BY K.A. Chavet Scheduled date    for next refueling  shutdown.
The  Unit  1  third refueling outage began on 02/15/92.
Scheduled    date for restart following refueling.
05/18/92 Will refueling or resumption of operation thereafter require        a  Technical Specification change  or other license    amendment2 Yes. Figures 3.2-2 and 3.2-2A of the Technical Specifications have been revised to reflect different DNBR margin limits.
Scheduled date    for submitting  proposed licensing action and supporting information.
Information to support the revision to Figures 3.2-2 and 3.2-2A    was submitted on 12/24/91.
The  figures were revised in Technical 'Specification Amendment      No. 61 on 04/03/92.
Important Licensing considerations associated with refueling, e.g., new or different fuel.
design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
The Unit 1, Cycle 4, nuclear design was performed using the DIT, ROCS, and MC computer codes described in Topical Report CENPD-266-P-A with the improvements in anisotropic scattering, higher order interface currents, nodal expansion method, and assembly discontinuity factors. Biases and uncertainties used in the Unit 1 Cycle 4 analysis were established by comparing results obtained from analytical calculation with measured data to insure that 95/95 confidence limits are maintained in the safety analysis.
The number    of fuel assemblies.
a)  In the core.         241 b)  In the spent fuel storage pool.            267 Licensed spent    fuel storage capacity.         1329 Intended change in spent fuel storage capacity.           None Projected date of last refueling that can be discharged          to spent fuel storage pool assuming present capacity.
2004 (18 Month    reloads and  full core  discharge capability).
3
 
0 I


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K A Chavet~Anil 1992 04/01 04/15 04/28 04/30 0000 0242 0140 2400 Unit began the month with the RX defueled.Unit entered Mode 6.Unit entered Mode 5.Ended the month in Mode 5.4 SHUTDOWNS AND POWER REDUCTIONS April 1992 DOCKET NO 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.A.Chavet No.Outage Method of Duration Shutting System Date Type Hours Reason Down Reactor LER No.Code Component Code~Cause and Corrective Action to Prevent Recurrence 92-02 02/15/92 S 720.0 N/A N/A N/A t Continuation of the third refueling outage.~F-Forced S-Scheduled
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-528 UNIT NAME   PVNGS-1 DATE COMPLETED BY K A Chavet
~Reason: A-Equipment Failure(Explain)
~Anil 1992 04/01     0000   Unit began the month with the RX defueled.
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error H-Other (Explain)~Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)~Exhibit H-Same Source 5 4~\  
04/15      0242  Unit entered Mode 6.
04/28      0140  Unit entered Mode 5.
04/30      2400  Ended the month in Mode 5.
4
 
SHUTDOWNS AND POWER REDUCTIONS April 1992 DOCKET NO     50-528 UNIT NAME     PVNGS-1 DATE COMPLETED BY K.A. Chavet Outage               Method of                                         Cause and  Corrective Duration             Shutting                 System       Component        Action to No.        Date Type     Hours   Reason     Down Reactor       LER No. Code           Code~     Prevent Recurrence 92-02     02/15/92   S     720.0                                 N/A       N/A         N/A refueling outage.
t Continuation of the third
  ~F-Forced       ~Reason:                        ~Method:                4Exhibit F-Instructions S-Scheduled     A-Equipment Failure(Explain)   1-Manual                  for Preparation of the Data B-Maintenance or Test           2-Manual Scram            Entry Sheets for Licensee C-Refueling                     3-Automatic Scram        Event Report (LER)  File D-Regulatory Restriction       4-Continuation from      (NUREG 0161)
E-Operator Training & License     Previous Month Examination                  5-Reduction of 20% or F-Administrative                  Greater in the Past   ~Exhibit H-Same Source G-Operational Error              24 Hours H-Other (Explain)               9-Other-(Explain) 5
 
4
~   \


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.A.Chavet MONTH: April 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1247 17 1240 1246 18 1241 1210 19 1243 1241 20 1231 1242 21 1242 1241 22 1240 1243 23 1241 1247 24 1239 1252 25 1232 10 1245 1224 26 27 1232 1230 1241 28 1230 13 1242 29 1229 14 1239 30 1235 15 1239 16 1240 7  
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-529 UNIT NAME   PVNGS-2 DATE COMPLETED BY K.A. Chavet MONTH: April 1992 DAY   AVERAGE DAILY POWER LEVEL                       DAY   AVERAGE DAILY POWER LEVEL 1247                                   17             1240 1246                                   18             1241 1210                                   19             1243 1241                                   20             1231 1242                                   21             1242 1241                                   22             1240 1243                                   23             1241 1247                                   24             1239 1252                                   25             1232 10           1245                                   26            1232 1224                                   27             1230 1241                                   28             1230 13           1242                                   29             1229 14           1239                                   30             1235 15           1239 16           1240 7


REFUELING INFORMATION DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.A.Chavet Scheduled date for next refueling shutdown.03/15/93, 4th refueling Scheduled date for restart following refueling.
REFUELING INFORMATION DOCKET NO. 50-529 UNIT NAME     PVNGS-2 DATE COMPLETED BY K.A. Chavet Scheduled date   for next refueling           shutdown.
05/24/93 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
03/15/93, 4th refueling Scheduled date   for restart following refueling.
Yes.A change to the moderator temperature coefficient curve in the Technical Specification is anticipated as a result of the next refueling.
05/24/93 Will refueling or resumption of operation thereafter require               a Technical Specification change or other license           amendment?
Scheduled date for submitting proposed licensing action and supporting information.
Yes. A change   to the moderator             temperature coefficient curve in the Technical Specification is anticipated             as a result of the next refueling.
Scheduled date   for submitting           proposed licensing action and supporting information.
1/1/93 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
1/1/93 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
The Unit 2, Cycle 5, reload should be typical of previous PVNGS cycles.The number of fuel assemblies')
The Unit 2, Cycle 5, reload should             be typical of previous PVNGS cycles.
In the core.241 b)In the spent fuel storage pool.288 Licensed spent fuel storage capacity.1329 Intended change in spent fuel storage capacity.None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2004 (18 Month reloads and full core discharge capability).
The number   of fuel assemblies')
8  
In the core.                 241 b)   In the spent fuel storage pool.                     288 Licensed spent   fuel storage capacity.                   1329 Intended change in spent fuel storage capacity.                   None Projected date of last refueling that can be discharged                   to spent fuel storage pool assuming present capacity.
\W 1!
2004 (18 Month   reloads and           full core   discharge capability).
t t  
8
 
  \
W 1
!
 
t                               t


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K A Chavet A~ail 1992 04/01 04/30 0000 2400 Unit began the month in Mode 1;100%RX power.Ended the month in Mode 1;100%RX power.9 I l 1 1 t SHUTDOWNS AND POWER REDUCTIONS April 1992 DOCKET NO 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.A.Chavet No.Outage Method of Duration Shutting System Date Type Hours Reason Down Reactor LER No.Code Cause and Corrective Component Action to Codes Prevent Recurrence No reactor shutdowns or significant power reductions occurred during the month.~F-Forced S-Scheduled
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-529 UNIT NAME   PVNGS-2 DATE COMPLETED BY K A Chavet A~ail 1992 04/01     0000   Unit began the month in Mode 1; 100% RX power.
~Reason: A-Equipment Failure(Explain)
04/30      2400  Ended the month in Mode 1; 100% RX power.
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error H-Other (Explain)~Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)~Exhibit H-Same Source 10-I.  
9
 
I l
1 1
t
 
SHUTDOWNS AND POWER REDUCTIONS April 1992 DOCKET NO   50-529 UNIT NAME   PVNGS-2 DATE COMPLETED BY K.A. Chavet Outage               Method of                                           Cause and Corrective Duration               Shutting                 System       Component        Action to No.          Date Type     Hours   Reason     Down Reactor     LER No. Code           Codes     Prevent Recurrence No reactor shutdowns or significant power reductions occurred during the month.
  ~F- Forced     ~Reason:                        ~Method:                4Exhibit F-Instructions S-Scheduled     A-Equipment Failure(Explain)   1-Manual                  for Preparation of the Data B-Maintenance or Test           2-Manual Scram            Entry Sheets for Licensee C-Refueling                     3-Automatic Scram        Event Report (LER)    File D-Regulatory Restriction       4-Continuation from      (NUREG  0161)
E-Operator Training & License     Previous Month Examination                  5-Reduction of 20% or F-Administrative                  Greater in the Past   ~Exhibit  H-Same Source G-Operational Error              24 Hours H-Other (Explain)               9-Other-(Explain) 10-
 
I.


AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.A, Chavee MONTH: April 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1257 17 1255 1257 1255 1257 19 125 1254 20 1258 1254 1258 1255 22 1254 1254 23 1255 1254 24 1259 1254 25 1259 10 1253 26 1258 1253 27 1257 12 1253 28 1255 13 1254 29 1255 14 1253 30 1257 1253 16 1254 12  
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-530 UNIT NAME   PVNGS-3 DATE COMPLETED BY K.A, Chavee MONTH: April 1992 DAY   AVERAGE DAILY POWER LEVEL                       DAY   AVERAGE DAILY POWER LEVEL 1257                                 17             1255 1257                                                 1255 1257                                 19             125 1254                                 20             1258 1254                                                 1258 1255                                 22             1254 1254                                 23             1255 1254                                 24             1259 1254                                 25             1259 10             1253                                 26             1258 1253                                 27             1257 12             1253                                 28             1255 13             1254                                 29             1255 14             1253                                 30             1257 1253 16             1254 12


REFUELING INFORMATION DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K A Chavet Scheduled date for next: refueling shutdown.09/19/92, 3rd refueling Scheduled date for restart following refueling.
REFUELING INFORMATION DOCKET NO. 50-530 UNIT NAME   PVNGS-3 DATE COMPLETED BY K A Chavet Scheduled date   for next: refueling shutdown.
11/28/92 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
09/19/92, 3rd refueling Scheduled date   for restart following refueling.
There are no Technical Specification changes associated with this reload.Scheduled date for submitting proposed licensing action and supporting information.
11/28/92 Will refueling or resumption of operation thereafter require           a Technical Specification change or other license   amendment?
There are no Technical     Specification   changes   associated with this reload.
Scheduled date   for submitting   proposed licensing action     and supporting information.
N/A Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
N/A Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
S A Technical Specification change request was submitted to the NRC on December 20, 1991, to allow the use of advanced zircaloy-based cladding alloys instead of Zircaloy-4 on up to 80 fuel rods in two fuel assemblies.
S A Technical Specification change request was submitted to the NRC on December 20, 1991, to allow the use of advanced zircaloy-based cladding alloys instead of Zircaloy-4 on up to 80 fuel rods in two fuel assemblies.
The number of fuel assemblies.
The number of fuel assemblies.
a)In the core.241 b)In the spent fuel storage pool.192 Licensed spent fuel storage capacity.1329 Intended change in spent fuel storage capacity.None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.2005 (18 Month reloads and full core discharge capability).
a)   In the core.         241 b)   In the spent fuel storage pool.             192 Licensed spent   fuel storage capacity.           1329 Intended change in spent fuel storage capacity.             None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
13  
2005 (18 Month   reloads and   full core   discharge capability).
13


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.A.Chavet April 1992 04/01 04/30 0000 2400 Unit began the month in Mode 1;100%RX power.Ended the month in Mode 1;100%RX power.14 lq SHUTDOWNS AND POWER REDUCTIONS April 1992 DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.A.Chavet No.Outage Method of Duration Shutting System Date Type Hours Reason Down Reactor LER No.Code Component Code~Cause and Corrective Action to Prevent Recurrence No reactor shutdowns or significant power reductions occurred during the month.~F-Forced S-Scheduled
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-530 UNIT NAME   PVNGS-3 DATE COMPLETED BY K.A. Chavet April 1992 04/01     0000   Unit began the month in Mode 1; 100% RX power.
~Reason: A-Equipment Failure(Explain)
04/30      2400  Ended the month in Mode 1; 100% RX power.
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 6 License Examination F-Administrative G-Operational Error H-Other (Explain)~Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20%or Greater in the Past 24 Hours 9-Other-(Explain)
14
'Exhibit F-Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER)File (NUREG 0161)~Exhibit H-Same Source 15}}
 
lq SHUTDOWNS AND POWER REDUCTIONS April 1992 DOCKET NO     50-530 UNIT NAME     PVNGS-3 DATE COMPLETED BY K.A. Chavet Outage               Method of                                           Cause and  Corrective Duration               Shutting                 System       Component        Action to No.          Date Type     Hours   Reason     Down Reactor       LER No. Code           Code~     Prevent Recurrence No reactor shutdowns or significant power reductions occurred during the month.
  ~F- Forced     ~Reason:                        ~Method:                'Exhibit F-Instructions S-Scheduled     A-Equipment Failure(Explain)   1-Manual                  for Preparation of the Data B-Maintenance or Test           2-Manual Scram            Entry Sheets for Licensee C-Refueling                     3-Automatic Scram        Event Report (LER) File D-Regulatory Restriction       4-Continuation from      (NUREG  0161)
E-Operator Training 6 License     Previous Month Examination                  5-Reduction of 20% or F-Administrative                  Greater in the Past   ~Exhibit  H-Same  Source G-Operational Error              24 Hours H-Other (Explain)               9-Other-(Explain) 15}}

Revision as of 10:09, 29 October 2019

Monthly Operating Repts for Apr 1992 for Pvngs,Units 1,2 & 3.W/920514 Ltr
ML17306A724
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/30/1992
From: Chavet K, James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
254-02045-JML-K, 254-2045-JML-K, NUDOCS 9205150222
Download: ML17306A724 (32)


Text

ACCELERATED DIS UTION DEMONSTRATION SYSTEM

~ ~ -e REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

Q4'4 g" ACCESSION NBR:9205150222 DOC.DATE: 92/04/30 NOTARIZED: NO FACIL:STN-50-528.Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528

'OCKET STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION CHAVET,K.A. Arizona Public Service Co. (formerly Arizona Nuclear Power LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Apr 1992 for PVNGS,Units 1,2 6 D

3.W/920514 ltr. k DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:STANDARDIZED PLANT 05000528 A Standardized plant. 05000I'5'29 Standardized plant. >05000530 D D

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 TRAMMELL,C 1 1 THOMPSON,M 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/DLPQ/LPEB1(0 1 1 NRR/DOEA/OEAB 1 1 G=-F-IEE~~ 0 1 1 RGN5 1 1 EXTERNAL: EGGG BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25

V k

lP> .

Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA 85072-2034 JAMES M, LEVINE VICE PAESIDENT NUCLEAR PAODUCTION 254-02045-JML/KAC May 14, 1992 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for April 1992 File: 92-024-404'2-056-026'nclosed are the Monthly Operating Reports for April 1992, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.,By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region V.

If you have any questions, please contact Kent A. Chavet at (602) 340-4718.

Sincerely, JMUKAC/kac Enclosures cc: J. B. Martin (all w/enclosures)

D. H. Coe A. C. Gehr A. H. Gutterman INPO Records Center Utility Data Institute 9205150222 920430 PDR ADOCK 05000528 g8$ ,',

'R PDR

,lp

  • t

~

~

~ ~

0 NRC MONTHLY,OPERATING REPORT 0

DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K A Chavet OPERATING STATUS

1. Unit Name: Palo Verde Nuclear Generatin Station Unit 1
2. Reporting Period: ~A ril 1992
3. Licensed Thermal Power (MWt): 3800 4, Nameplate Rating (Gross MWe): 1403
5. Design Electrical Rating (Net MWe): ~12 0
6. Maximum Dependable Capacity (Gross 'MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): None
10. Reasons For Restrictions, If Any: N A
dgpg'pp)25'> <(<<2:<:~;~"i":i::: 8'<e:pd2:9<4'"'d<:.'">~8:R.I:2.:opk<.":8:<:.'oeo.',

ISWIGS::<$

':

,':.":,".:.'.:,':;:!",a.';:::ji .-,,'.;UNIT,.:.:;:1',':,::GeoENerE<R<<ATXHG'i:SToATee ;-':,",N:,",:,,::,::;:::",:!,

'Be ureSer:i;Xl. 'Repereting::,",PeviC,d':::":::::.::::.':.:::,.;2!.,:.;;:,'y."N." 8'ie< 720 2,904 54,840 12 0.0 831.0 29,890.1 13  ;,, facto. 0.0 0.0 0.0 14 0.0 810.3 29,132.4 15 ';:,::,,UQ3;:t:::!R'e'86're::::i Shu 0.0 0.0 0.0 16 0 2,679,785 106,544,041 17 .';

,,,C'ro"..'s'
.'.",':81e~~~ie'al, 0 924,200 36,972,900 18 "'.",::Ne't;.:',..:;.E1'eciii'ca1:'- Rnei'j 0 857,484 34,682,276 19 S et'vxce;.;Pac toXgi(4)'.";"'4:"~jg>,'8'i(<+:"',Pi,".";~!NONE<':ld j'~<qgnR@m:

0.0s 27.9a 53.1%

20 ';;:;"ii'.,tgi,;;':,.'AVakil'ae 0.0s 27.9a 53.1s 21 ':i',-',!U$iC':l8,Ca'P""akim:Cy',,',;.:",8,:~'e::totr<.',(UP',:i;:n 0.0s 24.2a 51.8S 22 .:'j::: V're:t.;"jC'ap5a'i'i't j,.:;-:-:Fpc't 0.0a 23.3% 49.8s 23 4<.";-UA3!t:.::<POXCed,".'.'OUt8gbi<ARA:te98':(:.S)ii."':q'""S>S'~W-.:d<o,'.::.8 <l'4!'<gI 0.0a 25.1% 20.4%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): Refuelin outa e be an Februar 15 1992 70 da s
25. If Shutdown At End of Report Period, Estimated Date of Start-up: Ma 18 199 Forecast Achieved INITIAL CRITICALITY ~05 85 05/525 85 INITIAL ELECTRICITY 06 85 06 10 85 COMMERCIAL OPERATION 11 85 01 28 86 1

~ ~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.A, Chavet MONTH: April 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 18 19 20 21 22 23 24 25 10 26 27 12 28 13 29 14 30 15 16 2

i

!

II I

I f

I

REFUELING INFORMATION DOCKET NO. 50-528 UNIT NAME PVNGS-I DATE COMPLETED BY K.A. Chavet Scheduled date for next refueling shutdown.

The Unit 1 third refueling outage began on 02/15/92.

Scheduled date for restart following refueling.

05/18/92 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment2 Yes. Figures 3.2-2 and 3.2-2A of the Technical Specifications have been revised to reflect different DNBR margin limits.

Scheduled date for submitting proposed licensing action and supporting information.

Information to support the revision to Figures 3.2-2 and 3.2-2A was submitted on 12/24/91.

The figures were revised in Technical 'Specification Amendment No. 61 on 04/03/92.

Important Licensing considerations associated with refueling, e.g., new or different fuel.

design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

The Unit 1, Cycle 4, nuclear design was performed using the DIT, ROCS, and MC computer codes described in Topical Report CENPD-266-P-A with the improvements in anisotropic scattering, higher order interface currents, nodal expansion method, and assembly discontinuity factors. Biases and uncertainties used in the Unit 1 Cycle 4 analysis were established by comparing results obtained from analytical calculation with measured data to insure that 95/95 confidence limits are maintained in the safety analysis.

The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool. 267 Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

3

0 I

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K A Chavet

~Anil 1992 04/01 0000 Unit began the month with the RX defueled.

04/15 0242 Unit entered Mode 6.

04/28 0140 Unit entered Mode 5.

04/30 2400 Ended the month in Mode 5.

4

SHUTDOWNS AND POWER REDUCTIONS April 1992 DOCKET NO 50-528 UNIT NAME PVNGS-1 DATE COMPLETED BY K.A. Chavet Outage Method of Cause and Corrective Duration Shutting System Component Action to No. Date Type Hours Reason Down Reactor LER No. Code Code~ Prevent Recurrence 92-02 02/15/92 S 720.0 N/A N/A N/A refueling outage.

t Continuation of the third

~F-Forced ~Reason: ~Method: 4Exhibit F-Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training & License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past ~Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain) 5

4

~ \

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.A. Chavet MONTH: April 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1247 17 1240 1246 18 1241 1210 19 1243 1241 20 1231 1242 21 1242 1241 22 1240 1243 23 1241 1247 24 1239 1252 25 1232 10 1245 26 1232 1224 27 1230 1241 28 1230 13 1242 29 1229 14 1239 30 1235 15 1239 16 1240 7

REFUELING INFORMATION DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.A. Chavet Scheduled date for next refueling shutdown.

03/15/93, 4th refueling Scheduled date for restart following refueling.

05/24/93 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Yes. A change to the moderator temperature coefficient curve in the Technical Specification is anticipated as a result of the next refueling.

Scheduled date for submitting proposed licensing action and supporting information.

1/1/93 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

The Unit 2, Cycle 5, reload should be typical of previous PVNGS cycles.

The number of fuel assemblies')

In the core. 241 b) In the spent fuel storage pool. 288 Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2004 (18 Month reloads and full core discharge capability).

8

\

W 1

!

t t

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K A Chavet A~ail 1992 04/01 0000 Unit began the month in Mode 1; 100% RX power.

04/30 2400 Ended the month in Mode 1; 100% RX power.

9

I l

1 1

t

SHUTDOWNS AND POWER REDUCTIONS April 1992 DOCKET NO 50-529 UNIT NAME PVNGS-2 DATE COMPLETED BY K.A. Chavet Outage Method of Cause and Corrective Duration Shutting System Component Action to No. Date Type Hours Reason Down Reactor LER No. Code Codes Prevent Recurrence No reactor shutdowns or significant power reductions occurred during the month.

~F- Forced ~Reason: ~Method: 4Exhibit F-Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training & License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past ~Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain) 10-

I.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.A, Chavee MONTH: April 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1257 17 1255 1257 1255 1257 19 125 1254 20 1258 1254 1258 1255 22 1254 1254 23 1255 1254 24 1259 1254 25 1259 10 1253 26 1258 1253 27 1257 12 1253 28 1255 13 1254 29 1255 14 1253 30 1257 1253 16 1254 12

REFUELING INFORMATION DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K A Chavet Scheduled date for next: refueling shutdown.

09/19/92, 3rd refueling Scheduled date for restart following refueling.

11/28/92 Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

There are no Technical Specification changes associated with this reload.

Scheduled date for submitting proposed licensing action and supporting information.

N/A Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.

S A Technical Specification change request was submitted to the NRC on December 20, 1991, to allow the use of advanced zircaloy-based cladding alloys instead of Zircaloy-4 on up to 80 fuel rods in two fuel assemblies.

The number of fuel assemblies.

a) In the core. 241 b) In the spent fuel storage pool. 192 Licensed spent fuel storage capacity. 1329 Intended change in spent fuel storage capacity. None Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2005 (18 Month reloads and full core discharge capability).

13

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.A. Chavet April 1992 04/01 0000 Unit began the month in Mode 1; 100% RX power.

04/30 2400 Ended the month in Mode 1; 100% RX power.

14

lq SHUTDOWNS AND POWER REDUCTIONS April 1992 DOCKET NO 50-530 UNIT NAME PVNGS-3 DATE COMPLETED BY K.A. Chavet Outage Method of Cause and Corrective Duration Shutting System Component Action to No. Date Type Hours Reason Down Reactor LER No. Code Code~ Prevent Recurrence No reactor shutdowns or significant power reductions occurred during the month.

~F- Forced ~Reason: ~Method: 'Exhibit F-Instructions S-Scheduled A-Equipment Failure(Explain) 1-Manual for Preparation of the Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation from (NUREG 0161)

E-Operator Training 6 License Previous Month Examination 5-Reduction of 20% or F-Administrative Greater in the Past ~Exhibit H-Same Source G-Operational Error 24 Hours H-Other (Explain) 9-Other-(Explain) 15