{{#Wiki_filter: | {{#Wiki_filter:June 13, 2019 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2-INFORMATION REQUEST TO SUPPORT UPCOMING TEMPORARY INSTRUCTION 2515/194 INSPECTION; INSPECTION REPORT 05000373/2019013; 05000374/2019013 Dear Mr. Hanson | ||
: This letter is to request information to support our inspection of the Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (U.S. Nuclear Regulatory Commission (NRC) Bulletin 2012-01) beginning September 3 , 2 019, at your LaSalle County Statio This inspection will be performed in accordance with the NRC Temporary Instruction 2515/19 In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents requested for the inspectio Please provide this information prior to August 9, 201 It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection Insofar as possible, this information should be provided electronically to the lead inspecto The lead inspector for this inspection is Mr. Ijaz Hafee We understand that our licensing contact for this inspection is Mr. Dan Mearhoff of your organizatio If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9843 or via e-mail at Ijaz.Hafeez@nrc.go This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-001 The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Numbe B. Hanson -2- This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, "Public Inspections, Exemptions, Requests for Withholding." | |||
Sincerely, | |||
/RA/ Ijaz Hafeez , Reactor Engineer Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Enclosure: | |||
Document Request for Temporary Instruction 2515/194 Inspection cc: Distribution via LISTSERV | |||
}} | }} |
Revision as of 01:18, 31 July 2019
ML19164A296 | |
Person / Time | |
---|---|
Site: | LaSalle |
Issue date: | 06/13/2019 |
From: | Ijaz Hafeez Division of Reactor Safety III |
To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
References | |
IR 2019013 | |
Download: ML19164A296 (5) | |
Text
June 13, 2019 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2-INFORMATION REQUEST TO SUPPORT UPCOMING TEMPORARY INSTRUCTION 2515/194 INSPECTION; INSPECTION REPORT 05000373/2019013; 05000374/2019013 Dear Mr. Hanson
- This letter is to request information to support our inspection of the Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (U.S. Nuclear Regulatory Commission (NRC)Bulletin 2012-01) beginning September 3 , 2 019, at your LaSalle County Statio This inspection will be performed in accordance with the NRC Temporary Instruction 2515/19 In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents requested for the inspectio Please provide this information prior to August 9, 201 It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection Insofar as possible, this information should be provided electronically to the lead inspecto The lead inspector for this inspection is Mr. Ijaz Hafee We understand that our licensing contact for this inspection is Mr. Dan Mearhoff of your organizatio If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9843 or via e-mail at Ijaz.Hafeez@nrc.go This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-001 The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Numbe B. Hanson -2- This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Sincerely,
/RA/ Ijaz Hafeez , Reactor Engineer Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Enclosure:
Document Request for Temporary Instruction 2515/194 Inspection cc: Distribution via LISTSERV