NRC Biennial Problem Identification and Resolution Inspection Report 05000373/2019010 and 05000374/2019010
ML19143A272
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 05/22/2019
From: Kenneth Riemer
NRC/RGN-III/DRP/B1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2019010
Download: ML19143A272 (16)


Text

May 22, 2019

SUBJECT:

LASALLE COUNTY STATION, UNITS 1 AND 2NRC BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000373/2019010 AND 05000374/2019010

Dear Mr. Hanson:

On April 26, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed a problem identification and resolution inspection at your LaSalle County Station, Units 1 and 2 and discussed the results of this inspection with Mr. W. Trafton and other members of your staff.

The results of this inspection are documented in the enclosed report.

The NRC inspection team reviewed the stations corrective action program and the stations implementation of the program to evaluate its effectiveness in identifying, prioritizing, evaluating, and correcting problems, and to confirm that the station was complying with NRC regulations and licensee standards for corrective action programs. Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.

The team also evaluated the stations processes for use of industry and NRC operating experience information and the effectiveness of the stations audits and self-assessments.

Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.

Finally the team reviewed the stations programs to establish and maintain a safety-conscious work environment, and interviewed station personnel to evaluate the effectiveness of these programs. Based on the teams observations and the results of these interviews the team found no evidence of challenges to your organizations safety-conscious work environment. Your employees appeared willing to raise nuclear safety concerns through at least one of the several means available. The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Kenneth Riemer, Chief Branch 1 Division of Reactor Projects

Docket Nos.: 05000373; 05000374 License Nos.: NPF-11; NPF-18

Enclosure:

IR 05000373/2019010; 05000374/2019010

Inspection Report

Docket Numbers:

05000373 and 05000374

License Numbers:

NPF-11 and NPF-18

Report Numbers:

05000373/2019010 and 05000374/2019010

Enterprise Identifier: I-2019-010-0043

Licensee:

Exelon Generation Company, LLC

Facility:

LaSalle County Station, Units 1 and 2

Location:

Marseilles, IL

Inspection Dates:

April 08, 2019 to April 26, 2019

Inspectors:

J. Havertape, Resident Inspector

M. Learn, Reactor Engineer

V. Meghani, Reactor Inspector

N. Shah, Project Engineer

Approved By:

Kenneth Riemer, Chief

Branch 1

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a problem identification and resolution inspection at LaSalle County Station, Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Findings and violations being considered in the NRCs assessment are summarized in the table below.

List of Findings and Violations

No findings were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES - BASELINE

71152B - Problem Identification and Resolution Biennial Team Inspection (IP Section 02.04)

The inspectors performed a biennial assessment of the licensees corrective action program, use of operating experience, self-assessments and audits, and safety conscious work environment.

  • Corrective Action Program Effectiveness: The inspectors assessed the corrective action programs effectiveness in identifying, prioritizing, evaluating, and correcting problems.
  • Operating Experience, Self-Assessments and Audits: The inspectors assessed the effectiveness of the stations processes for use of operating experience, audits and self-assessments.
  • Safety Conscious Work Environment: The inspectors assessed the effectiveness of the stations programs to establish and maintain a safety-conscious work environment.

INSPECTION RESULTS

Assessment 71152B Corrective Action Program: Based on the samples reviewed, the inspectors determined that staffs performance in each of these areas adequately supported nuclear safety.

Effectiveness of Problem Identification: Overall, the licensee was effective at identifying issues at a low threshold and was properly entering them into the Corrective Action Program (CAP) as required by procedures. The inspectors determined that the station was generally effective at identifying negative trends that could potentially impact nuclear safety. The inspectors did several plant walkdowns; for the areas reviewed, the inspectors did not identify any concerns in the area of problem identification.

Effectiveness of Prioritization and Evaluation of Issues: In depth reviews of a risk-informed sampling of Action Requests (ARs), work orders (WOs), and cause evaluations were completed, including a 5 year review of issues associated with the Switchgear Heat Removal (VX) system. The inspectors identified that the licensee generally, appropriately prioritized and evaluated issues for resolution.

The inspectors identified several examples where the issue documentation was insufficient to clearly understand the actions taken to evaluate and resolve the issues. One of the expectations in the licensees CAP program procedure was that each CAP item be sufficiently documented to function as a stand alone product. Specifically, that an independent reader could clearly understand the issue and how it was evaluated and corrected. This expectation was supposed to be reinforced by the Station Oversight (SOC) and Management Review (MRC) Committees, who were responsible for screening each CAP issue. A similar observation had also been identified in the most recent and previous Nuclear Oversight (NOS)audits of the program. Although the inspectors were able to verify that the associated issues were properly addressed, this appeared to be an ongoing issue warranting further licensee attention. The licensee documented this observation in the CAP.

Effectiveness of Corrective Actions: The inspectors concluded that the licensee was generally effective in developing Corrective Actions that were appropriately focused to correct the identified problem and correct conditions adverse to quality. For issues considered significant conditions adverse to quality, the licensee took action to address the root and contributing causes and to preclude repetition. Corrective actions were generally completed in a timely manner and in accordance with procedural requirements commensurate with the safety significance of the issue.

The inspectors reviewed a root cause to address fuel channel distortion issues documented in AR 4169154. This issue was considered a Condition Adverse to Quality. The corrective action for this concern was to transition to advanced channel materials, that were less susceptible to this distortion, by 2023. As interim actions, the licensee had initiated rechanneling of fuel bundles, equipment inspections, revising the channel friction model and updating the channel distortion monitoring plan. As stated in the root cause, these interim actions were designed to mitigate the risk of fuel channel distortion until the final actions were completed. However, the inspectors noted that these items were coded as action tracking items (ACITs), instead of corrective actions in the CAP. The ACITs were considered a lower classification than a corrective action, meaning that they could be cancelled, rescheduled or modified without station management review. Another example was AR 1136071, documenting a potential non-conservative Technical Specification applicable to LaSalle station, which was also considered a Condition Adverse to Quality. One of the interim actions, was to track the NRC review of an industry document which recommended actions to address this concern. Upon competition of the NRC review, the licensee planned to implement these recommendations as the final corrective action. However, this interim action was tracked as an ACIT rather than as a corrective action. As a result, even though the NRC review was completed in 2017, the ACIT did not show up as overdue, given its lower priority status, until the inspectors brought it to the attention of the licensee. Based on interviews, the inspectors determined that the practice of using ACITs was in part due to a misconception among licensee staff, that since the interim actions were not the final corrective actions, they did not warrant such coding. However, since these interim actions were designed to mitigate the risk until the final actions were implemented, the inspectors determined that they should be treated as corrective actions. By coding them as ACITS, the inspectors concluded that this may result in some Conditions Adverse to Quality not being adequately addressed. The licensee documented this observation in the CAP.

The inspectors also identified examples where risk assessments were not being performed in accordance with the CAP procedures. Each of these examples were classified as Conditions Adverse to Quality. This was in part due to unclear guidance regarding what constituted an appropriate risk assessment and the lack of reinforcement of this expectation during CAP product screenings. For example, the root cause evaluation for AR 4193000, concluded that inadequate oversight by mid-level management was a primary contributor in several equipment failures occurring at the site. Under the CAP procedure, each root cause was required to have either a Corrective Action to Prevent Recurrence (CAPR) or a risk assessment, if a CAPR was not assigned. For this issue, there was no documented CAPR or risk assessment. Similarly, the licensee CAP procedures required that for Corrective Action Program Evaluations (CAPEs; formally referred to as Apparent Cause Evaluations), if a cause was not identified, then the most probable cause should be documented and a risk assessment performed. The inspectors identified two CAPEs (ARs 4110933; 4117722) for which no cause was identified, but there was no stated probable cause or risk assessment documented. Based on interviews with those licensee staff involved in the above evaluations, the inspectors determined that the risk had been considered, even though the licensee procedural requirements were not strictly followed. Also, in all of the examples, the licensee had implemented interim actions which the inspectors reviewed and concluded were sufficient to address the concern and mitigate the risk; however, these actions were documented as ACITs and not corrective actions. Since the intent of the procedure, if not necessarily the strict requirements were met, this was not considered a violation, however, the inspectors concluded that this was a failure to reinforce CAP expectations and requirements. This licensee documented this issue in the CAP.

No corrective action program issues were identified during the review of the VX system.

As stated, the observations identified by the inspectors were documented in the licensee CAP.

The specific ARs are listed in the attached List of Documents Reviewed for this inspection.

Assessment 71152B Operating Experience and Self-Assessment and Audits: Based on the samples reviewed, team determined that the licensees performance in each of these areas adequately supported nuclear safety.

The team noted that Operating Experience identified by external organizations, such as industry groups and the NRC, were appropriately addressed by station procedures.

Specifically, there was prescriptive guidance regarding how these items were to be tracked, documented and processed in the CAP. However, the inspectors noted that similar guidance was not prescribed for Operating Experience identified through internal corporate oversight.

For example, the licensees corporate organization had identified a potential fleet trend involving configuration control events. This trend was captured as a corporate CAP and several actions were identified to be taken by each of the individual plants in the fleet.

However, there was no documentation or evidence of any tracking items ensuring that the actions were taken at each site (including LaSalle) nor was there any assessment of their effectiveness in addressing the trend. As a result, these types of issues were not processed similarly to those originating from the industry. The licensee documented this observation in the CAP. The specific CAP item is documented in the List of Documents Reviewed that is attached to this report.

Assessment 71152B Safety Conscious Work Environment (SCWE): The inspectors found no significant challenges to the licensees organizations safety conscious work environment. Through interviews and field observations, the inspectors determined that workers were willing to identify issues through any of the available means and had generally positive feedback on the program effectiveness. The overall health of the Employee Concerns Program was good and no adverse, discernible trend was noted during the review of issues.

One area of focus was the stations use of the OR7 code to classify issues having potential safety culture concerns. Individuals whose issues were assigned this code, were to be contacted by supervision to discuss the issue and assess the impact. During interviews, most individuals had only a general awareness of this code with some expressing concerns that it was potentially detrimental--i.e., the code could be used to identify complainers; however, none of the individuals expressed any reluctance to raise issues. The inspectors noted that the station had identified a similar concern and had initiated a CAP item (AR 4237390) to address this issue.

Overall the licensee was maintaining an appropriate safety conscious and work environment.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 26, 2019, the inspector presented the problem identification and resolution inspection results to Mr. W. Trafton and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152B

Corrective Action

Documents

AR 4144044

CCP Drawing Discrepancies Identified - 22078 and VPF-3411-

6/4/2018

AR 02453200

Outage Delay due H4 Shroud Weld

2/16/2015

AR 02478819

Perform Root Cause on the 2B33-F067A/B from L2R15

4/2/2015

AR 02704946

Generate EACE Actions for 1VX05C Breaker Trip Alarm

8/16/2016

AR 02705960

Electrical Overheating Indications on Failed Contactors

8/18/2016

AR 02714273

Division 2 Battery Room Fan Tripped

9/10/2016

AR 02718493

1VX03C Contactor has Elevated Coil Temperature

9/21/2016

AR 03972830

Compensatory Measures for Plant Barrier Impairments not Met

2/6/2017

AR 03984867

High Pressure Core Spray Maintenance Rule Reliability

Criteria

3/14/2017

AR 04004367

NRC Scaffold Built Close to Safety Related Equipment

4/29/2017

AR 04004367

NRC Scaffold Built Close to Safety Related Equipment

4/29/2017

AR 04022566

NOS ID: Scaffold Not Erected IAW Procedure Requirements

6/16/2017

AR 04028406

Maintenance Trend: Lapses Documented in Scaffolding

7/3/2017

AR 04028406

Maintenance Trend: Lapses Documented in Scaffolding

7/3/2017

AR 04037236

2VX01C Division 1 Switchgear Room Supply Fan Breaker Trip

7/31/2017

AR 04051196

NRC Identified Violation for Hardened Containment Vent

System Top Hat

9/12/2017

AR 04056931

NRC Question on Division 3 Protected Pathways

9/27/2017

AR 04062821

2017 Mid Cycle Gap to Excellence (GTE) in Work

Management (WM.1-1)

10/13/2017

AR 04069173

Lapses in Maintenance Fundamentals Deliberate and

Conservative

10/31/2017

AR 04069173

Lapses in Maintenance Fundamental Deliberate and

Conservative

10/31/2017

AR 04074546

Maintenance Trend: Line of Fire

11/14/2017

AR 04077095

Daughtering of Parent Nuclides Not Included in LOCA Dose

Calculation

11/15/2017

AR 04091820

Non-Technical Specification Flow Switch Broke, Causing

Reactor Core Isolation Cooling Isolation

1/9/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 04105645

Low Flow During LOS-RH-R1

2/19/2018

AR 04110933

1B21-F013U Fails Set-Pressure Test

3/3/2018

AR 04115533

Generate CAP Product for Unit 1 Division 1 Battery

3/16/2018

AR 04121071

Maintenance Trend IR - Valve Team Performance

3/30/2018

AR 04127238

FME Prevention Enhancements

4/16/2018

AR 04127878

NRC Identified Potential Finding on 1E12-F050A Post

Maintenance Test

4/17/2018

AR 04134599

Potential Green Non-Cited Violation for not Meeting OM Code

Requirements

5/4/2018

AR 04136375

New Eaton Contactor Found Bound in the Energized State

5/10/2018

AR 04148965

Trend in Maintenance Safety Behaviors

6/30/2018

AR 04174611

NRC Identified Scaffold Question Division 2 CSCS Room

9/18/2018

AR 04182624

Hi Pressure Steam Leak Off B TDRFP Drain Valve 2TE126B

10/11/2018

AR 04185035

NRC Identified Potential Scaffold Issue in U2 CSCS Pump

Room

10/18/2018

AR 04185256

NRC Identified: Potential Scaffold Issue in U2 B/C RHR Room

10/19/2018

AR 04189380

Additional Data Points to be Added to CAPE 04185035

10/30/2018

AR 04192778

2018 WANO AFI ER.2

11/7/2018

AR 04200198

1A Emergency Diesel Generator Soak Back Pump Did Not

Stop When Control Switch Taken to Off

2/4/2018

AR 04202638

CCP - 1VX19YA Not Responding to IMD Testing

2/13/2018

AR 04202744

2VX02C Failed to Stop when C/S Taken to Stop

2/13/2018

AR 04204165

ER 2A Diesel Generator Day Tank Level Indicator Gauge,

Poor 1998 Work Order Issues With Parts Too

2/18/2018

AR 04221825

APS as Found: FME within 2A RR Pump Air Cooler Inspection

Panel

2/20/2019

AR 04228310

L2R17 OPA Lessons Learned

3/10/2019

AR 2389133

U2 Leak Detection System LD-14 Function MR Criteria

Exceeded

10/1/2014

AR 2639566

LOS-RD-SR7 Friction Settle Test Times

3/13/2016

AR 2641420

1B RR PumpTripped During Upshift

3/16/2016

AR 2642954

1B Pump Seal Cavity #2 Increased to 1000 PSIG

3/21/2016

AR 2742254

U1 RCIC Trip on Low Suction Pressure

11/17/2016

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 3965622

Check-In NRC Pre-Dry Cask Campaign Readiness

Assessment

1/19/2017

AR 3975576

1FW005 Feed Reg Valve Positioner Arm Broken

2/18/2017

AR 3982397

RM-U2 Rod 06-35 Position 8 Settles at XX

3/7/2017

AR 3984936

2017 Biennial Operating Experience Program Assessment

7/19/2017

AR 3999427

2017 Mid Cycle Organizational Effectiveness Self-Assessment

2/20/2017

AR 4001039

Performance Monitoring of OOT HCU Pressure Switches

4/21/2017

AR 4002295

CFR Part 21 Interim--Control Rod Drive Mechanism

Contaminated With Chlorides

4/25/2017

AR 4005230

Level 3 OPEX Review Requested #408052 Comanche Peak

5/1/2017

AR 4013979

Level Three OPEX Review Prairie Island Unit 2 408134

5/23/2017

AR 4019235

Trending IR on 2A RWCU Regen HX Tube

Outlet Temperature

6/7/2017

AR 4021408

CFR Part 21 Interim--Potential Defect in Greyboot Socket

6/13/2017

AR 4022270

Level 3 OPEX Review Requested #414434 Monticello Unit 1

6/15/2017

AR 4024815

0DG01P Tripped After Attempting to Shut Down Pump

6/27/2017

AR 4038696

1TE111 Vacuum Breaker Requires Fill More Often

8/3/2017

AR 4048867

1A IN Compressor Loss of Power

9/4/2017

AR 4049063

OPEX Eval: IN 2017-05 Square-D CKT BKR Binding

9/5/2017

AR 4050373

2A IN Compressor not Loading

9/9/2017

AR 4051128

RM-U2 CR 30-31 Slow Trace and High Stall Flow

9/12/2017

AR 4091551

RCIC Isolation Alarm Received

1/8/2018

AR 4094528

CAPE Requested for ER Critical Component Failures

1/17/2018

AR 4103166

CFR Part 21 Interim--Deviation in SOR Qualification Testing 2/12/2018

AR 4105375

RM-Multiple Rods Slow to Settle L1R17 SD

2/19/2018

AR 4105400

Additional Slow to Settle Rod L1R17

2/19/2018

AR 4108860

OPEX: IN 2018-02 Target Rock SRV Degradation

2/27/2018

AR 4110933

1B21-F013U Fails Set-Pressure Test

2/27/2018

AR 4111658

OPEX Review for Industry Event 431025

3/6/2018

AR 4111767

Refuel Bridge Trend

3/6/2018

AR 4117722

RM-1A Reactor Recirculation Pump Failed to Downshift and

Tripped to 0 Speed

3/22/2018

AR 4117757

RM - 1B33-F067B Vent Line Leak

3/22/2018

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 4121081

Main. Trend IR - Valve Team Performance

3/30/2018

AR 4136655

2018 Employee Concerns Program Performance and

Effectiveness Review

1/23/2019

AR 4149479

NRC ID: Potential NCV for Non-Conformance With OM Code

6/22/2018

AR 4149537

NRC ID: UHS Inspection - ER-AA-340-1002 HX Inspection

Procedure

6/22/2018

AR 4162014

Unprofessional ERO Qualification Coercion

8/3/2018

AR 4162942

NRC ID: Potential Finding IST Valve Position Verification

8/9/2018

AR 4163020

Numerous Equipment Deficiency Tags Not Addressed for

Years

8/9/2018

AR 4169321

RM-U2 Rod 54-15 Failed to Settle and Friction Tested

9/1/2018

AR 4174521

EC 617710 Cancelled U2 Main Steam Differential Pressure

Switch to Rosemounts/ALARA and Manpower

9/17/2018

AR 4174521

EC 617710 Cancelled U2 Main Steam Differential Pressure

Switch to Rosemounts/ALARA and Manpower

9/17/2018

AR 4180633

Incorrect Station Vent Stack Wide Range Gas Monitor Base

Provided

10/1/2018

AR 4180633

Incorrect Station Vent Stack Wide Range Gas Monitor Data

Base Provided

10/1/2018

AR 4191219

RM-U2 Rod 26-31 Friction Tested and Failed to Settle

11/3/2018

AR 4192776

2018 WANO MA.1 Supplemental Valve Team Performance

11-6-2019

AR 4193000

2018 World Institute of Nuclear Operators AFI.ER.1

11/8/2018

AR 4193001

2018 World Institute of Nuclear Operators AFI.EN.1

11/8/2018

AR 4199673

CFR Part 21--Emergency Diesel Generator EMD Soakback

Pump

2/03/2018

AR 4204165

ER 2A DG Day Tank Level Instrumentation Gauge, Poor 1998

Work Order Issues With Parts Too

2/18/2018

AR 4219430

Unprepared to Perform RP-LA-706 to Complete LIS-PC-106B

2/6/2019

AR 4219430

Unprepared to Perform RP-LA-706 to Complete LIS-PC-106B

2/6/2019

AR 4223111

Scope Delete Removal of Bonnet Vent Valves on 2B33-

F067A/B

2/24/2019

AR 4223314

Unit 2 Cable Spreading Room Sprinkler Trouble Alarm

2/25/2019

AR 4223737

NRC IDD: WO not Coded as a CA

2/26/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 4228310

L2R17 OPA Lessons Learned

3/10/2019

AR 4228557

TRM 3.3P / 3.7K 14 Day Time Clock Expiration (U2 CSR)

3/11/2019

AR 4228653

Untimely Completion of Corrective Action Report

3/11/2019

AR 4236826

Fuel Pool Cooling 1A Pump Trip

4/5/2019

AR 4236934

LOS-AA-S101 A Channel Narrow Range Level Channel Check

Unsat

4/6/2019

AR 4236985

LOS-AP-W1 Complete W/ Portions Unsat

4/6/2019

AR 4237302

1WR001A - A WR PMP DSCH CK VLV Making Loud

Knocking Noise

4/8/2019

AR 4237375

RM-U2 HCU 26-27 Accumulator Trouble Alarm

4/8/19

AR 4237390

Trend IR: Lack of OR7 Communication to Originators

4/8/2019

AR 4237390

Trend IR: Lack of OR7 Communication to Originators

4/8/2019

AR 4237434

Trend: Little to No Notice for Non-Emergent Activities-Eng

4/8/2019

AR 4237528

2A RHR Seal Cooler <15 GPM During LOS-RH-SR1

4/8/19

AR 4237723

1VY01A Area Cooler Flow/DP Results

4/8/2019

AR 4242432

PI&R NRC ID: Corrective Actions Not Generated in Timely

Manner

4/22/2019

kAR 04090775

NRC Identified Potential Finding on 0 Diesel Generator Braze

Repair

1/5/2018

Corrective Action

Documents

Resulting from

Inspection

AR 4223737

NRC IDD: Work Order Not Coded As a Corrective Action

3/22/2018

AR 4238596

NRC Identified: WANO ER.1 Area for Improvement

Effectiveness

4/11/2019

AR 4238622

NRC PI&R Review of Root Cause Report 4193001

4/11/2019

AR 4242432

PI&R NRC ID: CAS Not Generated In Timely Matter

4/22/2019

AR 4243078

NRC Identified: WO#1840264 Not Completed for PS

Calibration

4/24/2019

AR 4243128

2019 PI&R--Risk Assessment Procedure Clarity

4/24/2019

AR 4243135

PI&R NRC ID: ER-AA-340-1002 Procedure Writers Guide

Deviation

4/24/2019

AR 4243141

2019 LaSalle PI&R--Observation on Corporate Documentation

4/24/2019

AR 4243257

PI&R NRC ID: WO Referenced in IR Not

Completed/Cancelled

4/25/2019

AR 4243301

NRC PI&R Review of Root Cause 4169154

4/24/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 4243354

2019 PI&R Classification of IR 4136375 Not Changed to SL3

4/25/2019

AR 4243473

2019 PI&R SA 4037526 SYSMON - Benchmarking Not

Completed

4/25/2019

AR 4243649

Enhancement Needed for Extent of Condition for CAPE

4185035

4/26/2019

Engineering

Changes

397773

Unit 1 2015 Online Replacement of Klockner-Moeller Cubicles

Revision 1

EC 622475

Bypass 1VP01CA Chiller Bearing Module

EC 623895

TMOD to Defeat High Level Alarm on the Upper and Lower

Motor Bearing Oil Reservoir of the 1B Reactor Recirculation

Pump Motor

Engineering

Evaluations

1480441

Unit 2 18-31 High Friction Found During Shutdown Not Part of

Test Population (Only Test 10% of Population)

2/11/2013

2640121

Investigation of L1C16 EOC No-Settle Control Rods

2/14/2016

4169154

Control Rod 30-12 Did Not Fully Insert During the U2 Manual Scram on 8/31/2018

8/31/2018

455968

Unit 1 SAE, Channel Friction Not Detected by Testing Criteria

3/20/2006

667185

Repeat Reactor Core Channel Distortion Issues on LaSalle

Units 1 and 2

9/2/2007

27361

Unit 1 Channel Distortion Root Cause Report

1/26/2008

Miscellaneous

DIERS

Daily Industry Events Reports

4/9-13/2018

OP-AA-102-103-

1001, Att 3

Key Function Review Justification

1/4/2019

OP-AA-102-103-

1001, Att. 1

Quarterly Operator Burden Degraded Equipment Aggregate

Assessments - Unit Common, Unit 1 and Unit 2

1/4/2019

PIIM 2017-0401

Lapses in Documented Scaffolding

7/12/2017

PIIM 2017-0593

Opportunities for Improvements in Maintenance Fundamentals

10/31/2017

Operability

Evaluations18-001

Eaton Contactor binding

2/13/2018

Procedures

EI-AA-101

Employee Concerns Program

EI-AA-101-1001

Employee Concerns Program Process

ER-AA-340-1002

Service Water Heat Exchanger Inspection Guide

7, 8

NF-AB-1102210

Core Loading Pattern Development

Revision 18

NF-AB-135-1420

Establishing Rechanneling and Channel Distortion Monitoring

Populations

Revision 15

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

OP-AA-102-103-

1001

Operator Burden and Plant Significant Decisions Impact

Assessment Program

Revision 8

PA-AA-125

Corrective Action Program Procedure

Revision 6

PI-AA-1012

Safety Culture Monitoring

Revision 2

PI-AA-1012

Safety Culture Monitoring

PI-AA-115

Operating Experience Program

PI-AA-115-1001

Processing of Level 1 OPEX Evaluations

PI-AA-115-1002

Processing of Level 2 OPEX Evaluations

PI-AA-115-1003

Processing of Level 3 OPEX Evaluations

PI-AA-120

Issue Identification and Screening Process

Revision 8

PI-AA-125-1003

Corrective Action Program Evaluation Manual

Revision 4

Self-Assessments

AR 4037526

Self-Assessment SYSMON Plans

9/28/17

AR 3964622

LaSalle Pre-NRC Inspection / 2017 Spent Fuel Loading

Campaign Readiness Assessment

3/22/2017

AR 3983403

Self Assessment - Triennial 50.59 (NRC-IP 71111.17T)

3/9/2017

NOSA-LAS-17-05

Engineering Design Control Audit Report

6/28/2017

NOSA-LAS-17-09

Fire Protection Audit Report

9/20/2017

NOSA-LAS-18-01

Maintenance Functional Area Audit Report

2/7/2018