|
|
Line 3: |
Line 3: |
| | issue date = 03/28/2017 | | | issue date = 03/28/2017 |
| | title = Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 (CAC Nos. MF9289 and MF9290) | | | title = Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 (CAC Nos. MF9289 and MF9290) |
| | author name = Ennis R B | | | author name = Ennis R |
| | author affiliation = NRC/NRR/DORL/LPLI | | | author affiliation = NRC/NRR/DORL/LPLI |
| | addressee name = Hanson B C | | | addressee name = Hanson B |
| | addressee affiliation = Exelon Nuclear | | | addressee affiliation = Exelon Nuclear |
| | docket = 05000277, 05000278 | | | docket = 05000277, 05000278 |
Line 24: |
Line 24: |
|
| |
|
| ==Dear Mr. Hanson:== | | ==Dear Mr. Hanson:== |
| By letter dated February 17, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17048A444), Exelon Generation Company, LLC (Exelon) submitted two affidavits both dated February 13, 2017 (contained in Attachment 9 to Exelon's letter), executed by Mr. Ernest M. Hauser of Cameron Holding Corporation (Cameron). | | By letter dated February 17, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17048A444), Exelon Generation Company, LLC (Exelon) submitted two affidavits both dated February 13, 2017 (contained in Attachment 9 to Exelon's letter), executed by Mr. Ernest M. Hauser of Cameron Holding Corporation (Cameron). |
| Exelon requested that the information contained in Attachment 8 to its letter be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 2.390. Specifically, Exelon requested that the following documents be withheld: | | Exelon requested that the information contained in Attachment 8 to its letter be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 2.390. Specifically, Exelon requested that the following documents be withheld: |
| Engineering Report: ER-464 Revision 4, "Uncertainty Analysis for Thermal Power Determination at Peach Bottom Unit 2 Using the LEFMV" + System" Engineering Report: ER-463 Revision 4, "Uncertainty Analysis for Thermal Power Determination at Peach Bottom Unit 3 Using the LEFMV" + System" Exelon's letter requested that the information in Attachment 8 be withheld in its entirety (i.e., a non-proprietary version of the information was not provided in the application). | | Engineering Report: ER-464 Revision 4, "Uncertainty Analysis for Thermal Power Determination at Peach Bottom Unit 2 Using the LEFMV" + System" Engineering Report: ER-463 Revision 4, "Uncertainty Analysis for Thermal Power Determination at Peach Bottom Unit 3 Using the LEFMV" + System" Exelon's letter requested that the information in Attachment 8 be withheld in its entirety (i.e., a non-proprietary version of the information was not provided in the application). |
| However, the U.S. Nuclear Regulatory Commission (NRC) staff's review of the application and material, in accordance with the requirements of 10 CFR 2.390, determined that some of the information sought to be withheld is available in public sources. Following discussion of this issue with the NRC staff on March 7, 2017, Exelon agreed to submit a non-proprietary version of the subject reports. In its letter dated March 20, 2017 (ADAMS Accession No. ML 17080A067), Exelon submitted (1) a revised proprietary version of Engineering Reports ER-463 and ER-464 (Revision 5 of each report), marked to specifically identify the portions considered to be proprietary (Attachment 1 to Exelon's letter), (2) a non-proprietary version of Engineering Reports ER-463 and ER-464 (Attachment 2 to Exelon's letter), and (3) two affidavits both dated March 13, 2017 (Attachment 3 to Exelon's letter), executed by Mr. Ernest M. Hauser of Cameron. The non-proprietary copy of Engineering Reports ER-463 and ER-464 has been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room. | | However, the U.S. Nuclear Regulatory Commission (NRC) staff's review of the application and material, in accordance with the requirements of 10 CFR 2.390, determined that some of the information sought to be withheld is available in public sources. Following discussion of this issue with the NRC staff on March 7, 2017, Exelon agreed to submit a non-proprietary version of the subject reports. In its letter dated March 20, 2017 (ADAMS Accession No. ML17080A067), Exelon submitted (1) a revised proprietary version of Engineering Reports ER-463 and ER-464 (Revision 5 of each report), marked to specifically identify the portions considered to be proprietary (Attachment 1 to Exelon's letter), (2) a non-proprietary version of Engineering Reports ER-463 and ER-464 (Attachment 2 to Exelon's letter), and (3) two affidavits both dated March 13, 2017 (Attachment 3 to Exelon's letter), executed by Mr. Ernest M. Hauser of Cameron. The non-proprietary copy of Engineering Reports ER-463 and ER-464 has been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room. |
| B. Hanson The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: 5.(ii)(a) 5.(ii)(b) 5.(ii)(c) | | B. Hanson The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: 5.(ii)(a) 5.(ii)(b) 5.(ii)(c) |
| The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Cameron's competitors without license from Cameron constitutes a competitive economic advantage over other companies. | | The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Cameron's competitors without license from Cameron constitutes a competitive economic advantage over other companies. |
Line 41: |
Line 41: |
| ==SUBJECT:== | | ==SUBJECT:== |
| REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (CAC NOS. MF9289 AND MF9290) DATED MARCH 28, 2017 DISTRIBUTION: | | REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (CAC NOS. MF9289 AND MF9290) DATED MARCH 28, 2017 DISTRIBUTION: |
| Public LPL 1 R/F RidsNrrDorlLpl1 Resource RidsNrrLALRonewicz Resource RidsRgn1 MailCenter Resource RidsACRS_MailCTR Resource RidsNrrPMPeachBottom Resource ADAMS Accession No.: ML 17067A082 OFFICE DORL/LPL 1 /PM DORL/LPL 1 /LA DORL/LPL 1 /BC DORL/LPL 1 /PM NAME REnnis LRonewicz JDanna REnnis DATE 03/33/2017 03/23/2017 03/27/2017 03/28/2017 OFFICIAL RECORD COPY}} | | Public LPL 1 R/F RidsNrrDorlLpl1 Resource RidsNrrLALRonewicz Resource RidsRgn1 MailCenter Resource RidsACRS_MailCTR Resource RidsNrrPMPeachBottom Resource ADAMS Accession No.: ML17067A082 OFFICE DORL/LPL 1 /PM DORL/LPL 1 /LA DORL/LPL 1 /BC DORL/LPL 1 /PM NAME REnnis LRonewicz JDanna REnnis DATE 03/33/2017 03/23/2017 03/27/2017 03/28/2017 OFFICIAL RECORD COPY}} |
Letter Sequence Withholding Request Acceptance |
---|
CAC:MF9289, Clarify Application of Setpoint Methodology for LSSS Functions, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (Approved, Closed) CAC:MF9290, Clarify Application of Setpoint Methodology for LSSS Functions, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control (Approved, Closed) |
|
MONTHYEARML17048A4442017-02-17017 February 2017 Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Request ML17066A0642017-03-17017 March 2017 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Withholding Request Acceptance ML17065A2982017-03-17017 March 2017 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Withholding Request Acceptance ML17073A0652017-03-20020 March 2017 Acceptance of Requested Licensing Action - License Amendment Request Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Acceptance Review ML17080A0672017-03-20020 March 2017 Request for License Amendment Regarding Measurement Uncertainty Recapture Power Uprate - Supplement 1 - Request for Non-Proprietary Version of Cameron Corporation Proprietary Documents Project stage: Supplement ML17067A0822017-03-28028 March 2017 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 Project stage: Withholding Request Acceptance ML17177A2482017-06-26026 June 2017 Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML17191A3492017-07-10010 July 2017 Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML17240A0062017-08-24024 August 2017 Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML17243A0112017-08-30030 August 2017 Measurement Uncertainty Recapture License Amendment Request - Supplement 4 Response to Request for Additional Information Project stage: Supplement ML17258A1792017-09-15015 September 2017 Submittal of Measurement Uncertainty Recapture Power Uprate License Amendment Request - Supplement 5, Supplemental Reload Licensing Report Project stage: Supplement ML17289A3242017-10-30030 October 2017 Transmittal of Draft Safety Evaluation for Proposed Measurement Uncertainty Recapture Power Uprate Amendment (CAC Nos. MF9289 and MF9290; EPID L-2017-LLS-0001) Project stage: Draft Approval ML17286A0132017-11-15015 November 2017 Issuance of Amendments Measurement Uncertainty Recapture Power Uprate (CAC Nos. MF9289 and MF9290; EPID L-2017-LLS-0001) Project stage: Approval 2017-03-28
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection 2024-09-06
[Table view] Category:Proprietary Information Review
MONTHYEARML22186A1772022-07-0707 July 2022 Request for Withholding Information from Public Disclosure Peach Bottom Atomic Power Station, Unit 2 ML21279A0062021-10-13013 October 2021 Request for Withholding Information from Public Disclosure ML21084A1352021-04-0505 April 2021 Request for Withholding Information from Public Disclosure ML20317A1342020-11-12012 November 2020 Request for Withholding Information from Public Disclosure; Guarantees of Payment of Deferred Premiums ML20111A1702020-04-20020 April 2020 Emergency Preparedness Biennial Exercise Scenario Request to Withhold Previously Submitted Exercise Scenario from Public Release ML19336A0192019-12-0303 December 2019 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML17320A1452017-11-20020 November 2017 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML17067A0822017-03-28028 March 2017 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 ML17065A2982017-03-17017 March 2017 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 ML17066A0642017-03-17017 March 2017 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 ML16337A2762016-12-0909 December 2016 Calvert; Clinton; Dresden; LaSalle; Limerick; Nine Mile Point; Oyster Creek; Peach Bottom; Quad Cities; R.E. Ginna; Three Mile Island - Request for Withholding Information Regarding; Guarantees of Payment of Deferred Premiums ML16098A3222016-04-27027 April 2016 Request to Withhold Emergency Preparedness Documents from Public Disclosure (CAC Nos. MF7504-MF7525) ML16050A1742016-02-29029 February 2016 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 3 ML15278A0462016-02-0505 February 2016 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 ML15278A0552015-10-13013 October 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit 3 ML15251A5792015-09-14014 September 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML15246A1612015-09-0808 September 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit 3 ML15195A2902015-07-27027 July 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 ML15124A2242015-07-14014 July 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML15124A2952015-05-20020 May 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 2 ML15110A0852015-05-12012 May 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 2 ML15084A3422015-04-0606 April 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 2 ML15042A5302015-03-23023 March 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML15040A7202015-03-12012 March 2015 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 2 ML14345A9882014-12-23023 December 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Station, Unit No. 2 ML14133A1172014-06-0303 June 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 (Tac ME9631 and ME9632) ML14111A3552014-05-0505 May 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units Nos. 2 and 3 ML14111A3412014-05-0505 May 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 (Tac Nos. ME9631 and ME9632) ML14077A4612014-04-16016 April 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML14064A3012014-03-20020 March 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML14034A3572014-02-0909 February 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML14023A8092014-02-0909 February 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit 2 and 3 ML13345B3102014-01-0808 January 2014 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13322B2302013-12-11011 December 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13308C4412013-12-11011 December 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13302B8952013-11-21021 November 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit No. 3 ML13291A1222013-11-0606 November 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13247A7692013-09-18018 September 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13232A2902013-08-26026 August 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13232A2772013-08-26026 August 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13162A6192013-06-26026 June 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Units 2 and 3 ML13161A3972013-06-26026 June 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13112A8572013-05-0202 May 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13052A8532013-03-11011 March 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13052A8562013-03-11011 March 2013 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML13016A5002013-01-30030 January 2013 Request for Withholding Information from Public Disclosure for Braidwood Station, Units 1 & 2; Byron Station, Units 1 & 2; Clinton Power Station, Unit 1; Dresden Nuclear Power Station, Units 2 & 3; LaSalle County Station, Units 1 & 2 ML12300A0112012-11-13013 November 2012 Request for Withholding Information from Public Disclosure ML12279A2902012-10-22022 October 2012 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit 2 Nos. 2 and 3 ML12279A2852012-10-22022 October 2012 Request for Withholding Information from Public Disclosure for Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 ML12250A8552012-09-17017 September 2012 Request for Withholding Information from Public Disclosure 2022-07-07
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 March 28, 2017
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (CAC NOS. MF9289 AND MF9290)
Dear Mr. Hanson:
By letter dated February 17, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17048A444), Exelon Generation Company, LLC (Exelon) submitted two affidavits both dated February 13, 2017 (contained in Attachment 9 to Exelon's letter), executed by Mr. Ernest M. Hauser of Cameron Holding Corporation (Cameron).
Exelon requested that the information contained in Attachment 8 to its letter be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 2.390. Specifically, Exelon requested that the following documents be withheld:
Engineering Report: ER-464 Revision 4, "Uncertainty Analysis for Thermal Power Determination at Peach Bottom Unit 2 Using the LEFMV" + System" Engineering Report: ER-463 Revision 4, "Uncertainty Analysis for Thermal Power Determination at Peach Bottom Unit 3 Using the LEFMV" + System" Exelon's letter requested that the information in Attachment 8 be withheld in its entirety (i.e., a non-proprietary version of the information was not provided in the application).
However, the U.S. Nuclear Regulatory Commission (NRC) staff's review of the application and material, in accordance with the requirements of 10 CFR 2.390, determined that some of the information sought to be withheld is available in public sources. Following discussion of this issue with the NRC staff on March 7, 2017, Exelon agreed to submit a non-proprietary version of the subject reports. In its letter dated March 20, 2017 (ADAMS Accession No. ML17080A067), Exelon submitted (1) a revised proprietary version of Engineering Reports ER-463 and ER-464 (Revision 5 of each report), marked to specifically identify the portions considered to be proprietary (Attachment 1 to Exelon's letter), (2) a non-proprietary version of Engineering Reports ER-463 and ER-464 (Attachment 2 to Exelon's letter), and (3) two affidavits both dated March 13, 2017 (Attachment 3 to Exelon's letter), executed by Mr. Ernest M. Hauser of Cameron. The non-proprietary copy of Engineering Reports ER-463 and ER-464 has been placed in the NRC's Public Document Room and added to the ADAMS Public Electronic Reading Room.
B. Hanson The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: 5.(ii)(a) 5.(ii)(b) 5.(ii)(c)
The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Cameron's competitors without license from Cameron constitutes a competitive economic advantage over other companies.
It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, and assurance of quality, or licensing a similar product. We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavits, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
B. Hanson If you have any questions regarding this matter, I may be reached at 301-415-1420 or Rick.Ennis@nrc.gov.
Docket Nos. 50-277 and 50-278 cc: Mr. Ernest M. Hauser Director of Business Development Nuclear and Defense Markets Cameron Holding Corporation Sincerely, Richard B. Ennis, Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Caldon Ultrasonics Technology Center 1000 McClaren Woods Drive Coraopolis, PA 15108 Additional Distribution via Listserv B. Hanson
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (CAC NOS. MF9289 AND MF9290) DATED MARCH 28, 2017 DISTRIBUTION:
Public LPL 1 R/F RidsNrrDorlLpl1 Resource RidsNrrLALRonewicz Resource RidsRgn1 MailCenter Resource RidsACRS_MailCTR Resource RidsNrrPMPeachBottom Resource ADAMS Accession No.: ML17067A082 OFFICE DORL/LPL 1 /PM DORL/LPL 1 /LA DORL/LPL 1 /BC DORL/LPL 1 /PM NAME REnnis LRonewicz JDanna REnnis DATE 03/33/2017 03/23/2017 03/27/2017 03/28/2017 OFFICIAL RECORD COPY