Line 3: Line 3:
| issue date = 03/31/1995
| issue date = 03/31/1995
| title = Monthly Operating Rept for Mar 1995 for Wa Nuclear Project 2.W/950407 Ltr
| title = Monthly Operating Rept for Mar 1995 for Wa Nuclear Project 2.W/950407 Ltr
| author name = EMBREE D G, SCHWARZ C J
| author name = Embree D, Schwarz C
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  

Revision as of 23:20, 18 June 2019

Monthly Operating Rept for Mar 1995 for Wa Nuclear Project 2.W/950407 Ltr
ML17291A720
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/31/1995
From: Embree D, Schwarz C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-95-067, GO2-95-67, NUDOCS 9504120340
Download: ML17291A720 (9)


Text

PR.XC38.1 EY'CCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9504120340 DOC.DATE: 95/03/31 NOTARIZED:

NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.

Washington Public Power Supply System SCHWARZ,C.J.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar 1995 for WA Nuclear Project.2.W/950407 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR

!ENCL J SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS C NXER DOPS7OECB EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/SPD/RRAB NRR/DIS P/PI PB RGN4 NOAC COPIES LTTR ENCL 1 1 1 1 1.1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.504-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Bax'968~3000 George%'ashtngton Way~Rtchland, 1Pashtngton 993524968~(509)372-5000 April 7, 1995 G02-95-067 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555

Dear Sirs:

Subject:

WASHINGTON NUCLEAR PROJECT NO.2 MONTHLY OPERATING REPORT MARCH 1995 Transmitted herewith is the Monthly Operating Report for the month of March, 1995 as required by our Technical Specifications 6.9.1.6.Sincerely,.J.Schwarz Operations Manager (MD 9270)CJS:DGE CC: NRC, Administrator, Region IV NRC, Resident Inspector (927N)INPO ANI Library Utility Data Institute BPA (399)."'.'-..'C G t.'.6 9S04120MO 950331 PDR ADOCK 05000397 R , PDR

t t AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD: MARCH 1995 DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:

50-397 WNP-2 April 1, 1995 D.G.Embree (509)377-S44S DAY AVERAGE DAILY POWER LEVEL (Net MWe)AVERAGE DAILY POWER LEVEL DAY (Net MWe)6 10 12 13 14 15 487 1100 1068 1116 1117 1117 1103 1099 1042 1108 1107 1103 1108 16 17 18 19 20 21 22 23 25 26 27 28 29 30 31 1112 1108 1103 1109 1097 1110 1113 1061 1116 1112 1109 1112 1106 INSTRUCTIONS On this form, list the average daily unit power level'in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

I ll li J J OPERATING STATUS REPORT for WNP-2 Date: April 1, 1995 2.3.4, 5.6.7.8.9.3323 1200.9 1120 1132 1086 N/A Docket: 50-397 Reporting Period: MARCH 1995 Outage+On-Line Hours: 744.0 Utility Contact: David G.Embree (509)377-8448 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity (Gross MW,): Maximum Dependable Capacity (Net MW,): If changes occur above since last report, give reasons: 10.Power to which restricted, if any (Net MW,): 11.Reasons for restrictions, if any: None 12., Report Period Hours 13.Hours Reactor Critical 14.Rx Reserve Shutdown Hours 15.Hours Generator On-Line 16.Unit Reserve Shutdown Hours 17.Gross Thermal Energy (MWH)18.Gross Electrical Energy (MwH)19.Net Electrical Energy (MWH)20.Unit Service Factor 21.Unit Availability Factor'2.Unit Capacity Factor (MDC Net)23.Unit Capacity Factor (DER Net)24.Unit Forced Outage Rate 25.Forced Outage Hours MONTH 744.0 739.6 0.0 722.2 0.0 2,342,830 809,850 779,555"97.1%97.1%96.5%93.6%2.9%21.8 YEAR 2,160.0 2,011.4 0.0 1,963.8 0.0 6,317,832 2,185,780 2,101,632 90.9%90.9%89.6%86.9%9.1%196.2 CUMULATIVE 90,248.2 64,712.0 340.4 62,531.4 381.7 185,580,672 62,539,280 59,926,766 69.3%69.7%60.8%60.2%11.6%8,167.3 26.Shutdowns scheduled over the next 6 months (type, date, duration):

Refueling, April 15, 1995, 42 days.27.If currently shutdown, estimated startup date: Note: Cumulative Unit Capacity Factors (MDC 8r, DER)are calculated with weighted averages.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD: MARCH 1995 DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: April 1, 1995 COMPLETED BY: D.G.Embree TELEPHONE:

(509)3774448 No.Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 95-03 2/26/95 F 21.8 95404 INSTRU gttutpment malfunction causing turbine governor'valves to ramp closed-DEH electronic control card was replaced.

SUMMARY

At the beginning of the month the plant was in the process of starting up following an automatic scram as the result of a DEB control panel problem.The plant completed the month with normal operation.

TYPE F-Forced S-Scheduled REASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-ŽOther METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT NUREG4161 Exhibits F&H t>