ML17304A701: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 09/30/1988
| issue date = 09/30/1988
| title = Revised Monthly Operating Rept for Sept 1988 for Palo Verde Nuclear Generating Station,Unit 1
| title = Revised Monthly Operating Rept for Sept 1988 for Palo Verde Nuclear Generating Station,Unit 1
| author name = BLOOM T J
| author name = Bloom T
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name =  
| addressee name =  

Revision as of 20:43, 18 June 2019

Revised Monthly Operating Rept for Sept 1988 for Palo Verde Nuclear Generating Station,Unit 1
ML17304A701
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 09/30/1988
From: Bloom T
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17304A702 List:
References
NUDOCS 8811080135
Download: ML17304A701 (2)


Text

NRC MONTHLY OPERATING REPORT DOCKET NO.50-528 UNIT NAME PVNGS-1 DATE 10 24 88 COMPLETED BY T J Bloom TELEPHONE 602 371-418 OPERATING STATUS l.2.3.4~5.6.7.8.9.10 Unit Name: Palo Verde Nuclear Generatin Station Unit 1 Reporting Period: Se tember 1988 Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): 1403 Design Electrical Rating (Net MWe): 1270 Maximum Dependable Capacity (Gross MWe): 1303 Maximum Dependable Capacity (Net MWe): 1221 If Changes Occur In Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: N A Power Level to Which Restricted, If Any (Net MWe): None Reasons For Restrictions, If Any: N A ,'This Month Yr.-to-Date Cumulative ll 12 13 14.15.16 17 18 19.20.21.22 23 24 20 0 6 5 6 0 23 448.0 13 532 1 3 554 9 0 0 0.0 13 096 9 3 3 9 8 0.0 0.0 47 208 584.0 12 175 4 0 4 236 500 0 16 379 800.0 15 295 346.0 3 967 421.0 51.4S 55.9S 55.9a 53.4%96 4 51.4a 30.6%on of Each): Hours in Reporting Period Number of Hours Reactor, Was Critical 720 0 Reactor Reserve Shutdown Hours 0 0 Unit Reserve Shutdown Hours 0 0 Gross Thermal Energy Generated (MWH)Gross Electrical Energy Generated (MWH)894 600.0 Net Electrical Energy Generated (MWH)847 552.0 Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)Unit Capacity Factor (Using DER Net)92 7S Unit Forced Outage Rate 0 Oa 44 3s Shutdowns Scheduled Over Next 6 Months (Type, Date, and Durati Refuelin Outa e-03 21 89-70 Da s 25.If Shutdown At End of Report Period, Estimated Date of Startup: N A INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION.SS12OSS>>S SS'I 0409A/2264A PDR~DO~'PNU Q R Forecast~05 85 06 85 ll 85 Achieved~05 25 85//'V 06/610 85~01 28 86~j 0 L'~i ll J 1