IR 05000397/2019301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML19050A485
| number = ML19113A294
| issue date = 02/19/2019
| issue date = 04/23/2019
| title = NRC Initial Operator Licensing Examination Approval 05000397/2019301
| title = NRC Examination Report 05000397/2019301
| author name = Werner G E
| author name = Werner G E
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
Line 8: Line 8:
| addressee affiliation = Energy Northwest
| addressee affiliation = Energy Northwest
| docket = 05000397
| docket = 05000397
| license number = NPF-021
| license number =  
| contact person =  
| contact person =  
| case reference number = 50-397/19-01
| case reference number = EPID L-2019-OLL-0003
| document report number = 50-397/OL-19
| document report number = 50-397/19-301
| document type = Letter, License-Operator License Exam, Draft
| document type = Letter, License-Operator Examination Report
| page count = 3
| page count = 9
}}
}}


Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:
[[Issue date::February 19, 2019]]
Mr. Brad Sawatzke , Chief Executive Officer Energy Northwest MD 1023 P.O. Box 968 Richland, WA 99352
SUBJECT: COLUMBIA GENERATING STATION
- NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000 397/2019 301
==Dear Mr. Sawatzke:==
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Columbia Generating Station. The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Dave Crawford, Exam Writer. Note that any examination waivers and applicatio n denials have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examination in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11 , on March 7 , 2019. The NRC staff will administer the operating tests during the week of February 25, 2 0 19. This examination has undergone extensive review by NRC staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG
-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 817-200-1159. Please contact your chief examiner , Mahdi Hayes
, at 817-200-1508, if you have any questions or identify any errors or changes in the license level (reactor operator or senior reactor operator) or type of examination (partial or complete written examination and/or operating test) specified for each applicant approved to take the examination
.
Sincerely,/RA/ Gregory E. Werner, Chief Operations Branch Division of Reactor Safety Docket No. 55-397 License No. NPF-21 cc: Electronic Distribution for Columbia Generating Station
ML19050A485 x SUNSI Review:
ADAMS: Non-Publicly Available x Non-Sensitive Keyword: By: MOH x Yes No x Publicly Available Sensitive OFFICE OB:OE OB:BC NAME MHayes GWerner SIGNATURE /RA/ /RA/ DATE 02/16/2019 02/19/2019
}}
}}

Revision as of 23:42, 2 May 2019

NRC Examination Report 05000397/2019301
ML19113A294
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/23/2019
From: Werner G E
Operations Branch IV
To: Sawatzke B J
Energy Northwest
References
EPID L-2019-OLL-0003 50-397/19-301
Download: ML19113A294 (9)


Text