December 20, 2019

SUBJECT:

COLUMBIA GENERATING STATION - TEMPORARY INSTRUCTION 2515/194 (INSPECTION REPORT 05000397/2019013)

Dear Mr. Sawatzke:

On November 21, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Columbia Generating Station and discussed the results of this inspection with Mr. G. Hettel, Chief Nuclear Officer, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Nicholas H. Taylor, Chief Engineering Branch 2 Division of Reactor Safety

Docket No. 05000397 License No. NPF-21

Enclosure:

As stated

Inspection Report

Docket Number:

05000397

License Number:

NPF-21

Report Number:

05000397/2019013

Enterprise Identifier: I-2019-013-0021

Licensee:

Energy Northwest

Facility:

Columbia Generating Station

Location:

Richland, WA

Inspection Dates:

November 18, 2019, to November 21, 2019

Inspector:

N. Okonkwo, Reactor Inspector

Approved By:

Nicholas H. Taylor, Chief

Engineering Branch 2

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Temporary Instruction 2515/194 at Columbia Generating Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the Temporary Instruction (TI)in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

Temporary Instruction 2515/194 - Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01)

This inspection was conducted using Temporary Instruction 2515/194 (ADAMS Accession No. ML17137A416) effective November 1, 2017, to verify that licensees have appropriately implemented the Nuclear Energy Institute Voluntary Industry Initiative (ADAMS Accession No. ML15075A454) dated March 16, 2015, including updating their licensing basis to reflect the need to protect against open phase conditions. The inspector reviewed the licensees implementation of Nuclear Energy Institutes voluntary industry initiative in compliance with Commission guidance. The inspector reviewed and discussed the licensees open phase condition system design, installation, testing and maintenance plans with plant staff, and performed system walkdowns to verify that the installed equipment was supported by the design documentation.

Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01) (1 Sample)

Temporary Instruction 2515/194-03.01 - Voluntary Industry Initiative (Part 1)

Energy Northwest Inc. selected the Open Phase Detection System (OPDS), designed by Columbia Generating Station, assisted by Bonneville Power Administration - Transmission Business Line (BPA-TBL) as the protection system design vendor. The design utilizes digital relays SEL-451 and SEL-735, developed and manufactured by Schweitzer Engineering Laboratories, Inc. (SEL).

During normal operations, auxiliary power for plant electrical loading is supplied by the units main generator through the normal unit auxiliary transformer (E-TR-N1).

Columbia Generating Station has two credited independent offsite power sources, which provide power to the 4KV safety buses, SM-7 and SM-8, through 230KV Ashe Substation connected to Startup Auxiliary Transformer E-TR-S, and the Backup offsite power from 115KV Benton substation connected to the backup startup Auxiliary Transformer E-TR-B.

E-TR-S is a 70MVA 4-winding transformer with a solidly-grounded Y connected winding on the 230KV primary, two secondary high resistance grounded Y connected windings to a 4.16KV and 6.9KV, and a third delta connected buried tertiary winding.

E-TR-B is a 14MVA 3-phase, 3-winding power transformer with grounded wye 115KV primary, embedded intermediate delta, and resistance grounded wye (4.16KV) secondary.

Columbia Generating Station installed OPDS to monitor the 230KV interconnection to E-TR-S and 115KV interconnection to E-TR-B, which are the credited offsite power sources. Two OPD relay sets were installed to provide monitoring, alarm and trip functions for each transformer. The SEL-451 relay processes alarm and trip functions while supervising the SEL-735 relay which monitors standby transformer loading. If an open phase condition is detected with transformer in standby, SEL-735 will provide output signal to SEL-451 which will initiate a main control room alarm. The design also includes local relays and annunciation in the station switchyard relay house.

At the time of the inspection, the system was installed and operating in a monitoring and alarming mode with the trip switches bypassed. The licensee enabled the trip function on December 13,

INSPECTION RESULTS

Observation: Temporary Instruction 2515/194-03.01 - Voluntary Initiative (Part 1)2515/194 Based on discussions with licensee staff, review of design, installation, testing and preventive maintenance documentation, corrective action reports and walkdowns of installed equipment, the inspector had reasonable assurance the licensee has appropriately implemented the voluntary industry initiative.

The inspector determined by design document review, walkdowns, staff discussions, system demonstrations and observations that:

For Detection, Alarms, and General Criteria

(1) Open phase conditions will be detected and alarmed in the control rooms.
(2) Detection circuits are sensitive enough to identify an open phase condition for all credited loading conditions.
(3) The SEL OPDS is designed to minimize mis-operation or spurious action in the range of voltage unbalance normally expected in the transmission system that could cause separation from an operable offsite power source. The licensee had demonstrated that the actuation circuit design did not result in lower overall plant operation reliability.
(4) No new non-Class-1E circuits were replaced with Class 1E circuits in the design.
(5) The licensee had updated the Final Safety Analysis Report to discuss the design features and analyses related to the effects of, and protection for, any open phase condition vulnerabilities.

Protective Actions Criteria

(1) The primary offsite interconnects to startup auxiliary transformer E-TR-S, and backup startup auxiliary transformer E-TR-B were identified as susceptible to an open phase condition and the licensee had implemented design changes to mitigate the effects.
(2) With an open phase condition present and no accident condition signal present, the SEL OPDS would not adversely affect the function of important-to-safety systems, structures, or components.
(3) With an open phase condition present and accident condition signal present, the SEL OPD system would automatically detect Open Phase Condition (OPC) and actuate a transfer of the loads required to mitigate postulated accidents to an alternate source and ensure that safety-related functions are preserved, as required by the current licensing bases.

If an OPC is detected when the onsite 4.16KV AC power is connected to the offsite power, the OPDS relay will provide alarm and trip the associated E-TR-S or E-TR-B lockout relay. In turn, the transformer lockout relay will initiate a trip of the breaker of the source that has the OPC.

Sensing the subsequent undervoltage condition at the 4.16KV ESF bus, a transfer to the next available source of power in the transfer sequence will be initiated depending upon initial conditions and bus transfer design.

In summary, the 4.16KV engineered safeguards buses (SM-4, SM-7, and SM-8) are normally energized from the main generator through the normal unit auxiliary transformer (E-TR-N) and the non-engineered safeguards busses. Upon loss of the normal power source, the engineered safeguards load (SM-7 and SM-8) are automatically transferred to the selected (backup)

Startup Transformer. Isolation of the Startup Transformer due to an open phase condition results in the engineered safeguards loads being automatically transferred and energized from the respective emergency diesel generator in the same manner as required by the current licensing bases.

Protective Actions Criteria Exception

At the time of this inspection, the licensee is still identifying and enhancing periodic tests, calibrations, surveillances, and inspection procedures for open phase protection system equipment. The licensee had performed a pre-inspection self-assessment and documented actions in Condition Report AR 261654261654 These actions included the licensees plans to determine the open phase detection components needed to be included in the maintenance rule program, turn on the trip function, and analyze open phase condition during the 500KV back feed operation mode during refueling and maintenance.

EXIT MEETINGS AND DEBRIEFS

The inspector confirmed that proprietary information was controlled to protect from public disclosure.

  • On November 21, 2019, the inspector presented the Temporary Instruction 2515/194 inspection results to Mr. G. Hettel, Chief Nuclear Officer, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2515/194

Calculations

E/I-02-16-04

Open Phase Analysis

E/I-02-16-05

Open Phase Detection Scheme Settings

Corrective Action

Documents

Action Requests

AR-00401466, AR-00334543, AR-00318878, AR-00387320,

AR-00366372, AR-00367013, AR-00368519, AR-00369054,

AR-00370908, AR-00372256, AR-00376698, AR-00377987,

AR-00377993, AR-00378638, AR-00382361, AR-00386440,

AR-00389837, AR-00392539, AR-00396616, AR-00400385,

AR-00400535, AR-00400503, AR-00310273, AR-00401326

Corrective Action

Documents

Resulting from

Inspection

Action Requests

AR-00392300, AR-00401524, AR-00401525, AR-00401526

AR-00401527401527Drawings

2496

Current Schematic Diagram 115KV OPDS Bank TRB Relay

Set 1 & Set 2

2497

Potential Schematic Diagram 115KV OPDS Bank TRB Relay

Set 1 & Set 2

2501

Communication BLK Diagram 115KV OPDS Bank TRB

Relay Set 1 & 2

2510

One Line Diagram 115KV OPDS Bank TRB Open Phase

Detection Scheme

2511

Current Schematic Diagram 230KV OPDS Bank TRS Relay

Set 1 & Set 2

2512

Potential Schematic Diagram 230KV OPDS Bank TRS Relay

Set 1 & Set 2

2525

One Line Diagram 230KV OPDS Bank TRS Open Phase

Detection Scheme

23725

Schematic Diagram Comm. RM 525, RK 3, PWR & Alarms

230KV Open Phase Detection

23726

Schematic Diagram Comm. RM 525, RK 3, PWR & Alarms

115KV Open Phase Detection

E502-1

Main One Line Diagram,

E502-2

Main One Line Diagram

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2515/194

Drawings

E502-2

Main One Line Diagram

E503-2A

Auxiliary One Line Diagram, E-MC-1B, E-MC-2D, E-MC-2P

& E-MC-3C

E503-6

Auxiliary One Line Diagram

114

E503-9

Auxiliary One Line Diagram

E507-2

Main Three Line Diagram

E507-3

Main Three Line Diagram

E507-4

Main Three Line Diagram, E-SM-4 HPCS Bus

E512-1

Protective Relaying & Control Elementary Drawings

E513-3

One Line Diagram 230 KV Line Protection, Relay Circuits

E513-3A

Open Phase Detection System 230 KV Line Protection TR-S,

Relay Circuits

E513-4A

Open Phase Detection System 115KV Line Protection TR-B,

Relay Circuits

E514-11

Switchgear Under Voltage Relay Settings List

E539-10A

Connection Diagram 4160 V Switchgear E-SM-4 Unit 101

Breaker E-CB-4/2 Cubicle

E539-10C

Connection Diagram 4160 V Switchgear E-SM-4 Unit 102

Auxiliary Cubicle

EWD-46E-044A

Electrical Wiring Diagram AC Electrical Distribution System,

E-TR-B, Open Phase Detection System

EWD-46E-060

Electrical Wiring Diagram Main Control Room, BOP

Annunciator Engraving ANN-ANN-C/C1, -C/C2 & -C/C3

EWD-46E-308

Electrical Wiring Diagram AC Electrical Distribution System,

OPDS-BLDG-B, Power Panel OPDS-PP-B

EWD-46E-308

Electrical Wiring Diagram AC Electrical Distribution System,

OPDS-BLDG-B, Power Panel OPDS-PP-B

EWD-46E-309

Electrical Wiring Diagram AC Electrical Distribution System,

OPDS-BLDG-S, Power Panel OPDS-PP-S

EWD-50E-003

Electrical Wiring Diagram DC Electrical Distribution System,

Distribution Panel E-DP-S1/1C

EWD-50E-004

Electrical Wiring Diagram DC Electrical Distribution System,

Distribution Panel E-DP-S1/1C1

EWD-50E-009

Electrical Wiring Diagram DC Electrical Distribution System,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2515/194

Drawings

Distribution Panel E-DP-S1/2B

EWD-50E-010

Electrical Wiring Diagram DC Electrical Distribution System,

Distribution Panel E-DP-S1/2C

EWD-50E-011

Electrical Wiring Diagram DC Electrical Distribution System,

Distribution Panel E-DP-S1/2C1

EWD-50E-019

Electrical Wiring Diagram DC Electrical Distribution System,

Distribution Panel E-DP-S1/1C3

EWD-50E-029

Electrical Wiring Diagram DC Electrical Distribution System,

Distribution Panel E-DP-S1/7

Engineering

Changes

0000011331

Critical 4.16 KV Switchgear SM-4 Undervoltage Relay

Enhancement

0000013851

Engineering Change (EC) Open Phase Design Vulnerability

(OPDV) Vulnerability (OPDV) Project Installation Design For

E-TR-S

0000013901

Engineering Change (EC) Open Phase Design Vulnerability

(OPDV) Project Installation Design for E-TR-B

Miscellaneous

25772

EPRI Report for Analysis of Station Auxiliary Transformer

Response to Open Phase Condition

6/2012

15314

Specification for Switch yard Relay Buildings and Relay

Equipment for Open Phase Detection System (OPDS) TRS

& TRB

5/26/2016

15315

Specification for OPDS HV Instrument Transformers

GO2-12-152

Columbia Generating Station Docket No. 50-397 Response

to NRC Bulletin 2012-01, Design Vulnerability in Electric

Power System

10/25/2012

LDCN-16-016

Implementation Open Phase Detection System

Presentation

Open Phase Detection System (OPDS) at Columbia

Presentation

n/a

Procedures

10.25.119

Testing and Setting Schweitzer SEL Relays

10.25.179

Flexible and Rigid Link Removal, Inspection, and Installation

4-OPDS.TR-B

TR-B Open Phase Detection System (OPDS) Annunciator

Panel Alarms

4-OPDS.TRS

TR-S Open Phase Detection System (OPDS) Annunciator

Panel Alarms

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2515/194

Procedures

4.800.C3

800.C3 Annunciator Panel Alarms

ABN-ELEC-DG4-

Crosstie/MC-8A

DG4 Crosstie to MC-8A

ABN-ELEC-GRID

Degraded Offsite Power Grid

OSP-ELEC-W101 Offsite Station Power Alignment Check

SOP-ELEC-

115KV-LU

TR-B Valve, Breaker and Control Switch Lineup

SOP-ELEC-

230KV-LU

TR-S Valve, Breaker and Control Switch Lineup

SOP-ELEC-

OPDS-TRB

TR-B Open Phase Detection System (OPDS) Operation

SOP-ELEC-

OPDS-TRS

TR-S Open Phase Detection System (OPDS) Operation

SOP-

HVAC/OPDS-

START

OPDS Relay Building Ventilation System Start

Work Orders

2094215 70

OPDS - EC-13901 Electrical Installation

4/19/2017