December 20, 2019
SUBJECT:
COLUMBIA GENERATING STATION - TEMPORARY INSTRUCTION 2515/194 (INSPECTION REPORT 05000397/2019013)
Dear Mr. Sawatzke:
On November 21, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Columbia Generating Station and discussed the results of this inspection with Mr. G. Hettel, Chief Nuclear Officer, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Nicholas H. Taylor, Chief Engineering Branch 2 Division of Reactor Safety
Docket No. 05000397 License No. NPF-21
Enclosure:
As stated
Inspection Report
Docket Number:
05000397
License Number:
Report Number:
Enterprise Identifier: I-2019-013-0021
Licensee:
Energy Northwest
Facility:
Columbia Generating Station
Location:
Richland, WA
Inspection Dates:
November 18, 2019, to November 21, 2019
Inspector:
N. Okonkwo, Reactor Inspector
Approved By:
Nicholas H. Taylor, Chief
Engineering Branch 2
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Temporary Instruction 2515/194 at Columbia Generating Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the Temporary Instruction (TI)in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
Temporary Instruction 2515/194 - Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01)
This inspection was conducted using Temporary Instruction 2515/194 (ADAMS Accession No. ML17137A416) effective November 1, 2017, to verify that licensees have appropriately implemented the Nuclear Energy Institute Voluntary Industry Initiative (ADAMS Accession No. ML15075A454) dated March 16, 2015, including updating their licensing basis to reflect the need to protect against open phase conditions. The inspector reviewed the licensees implementation of Nuclear Energy Institutes voluntary industry initiative in compliance with Commission guidance. The inspector reviewed and discussed the licensees open phase condition system design, installation, testing and maintenance plans with plant staff, and performed system walkdowns to verify that the installed equipment was supported by the design documentation.
Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01) (1 Sample)
Temporary Instruction 2515/194-03.01 - Voluntary Industry Initiative (Part 1)
Energy Northwest Inc. selected the Open Phase Detection System (OPDS), designed by Columbia Generating Station, assisted by Bonneville Power Administration - Transmission Business Line (BPA-TBL) as the protection system design vendor. The design utilizes digital relays SEL-451 and SEL-735, developed and manufactured by Schweitzer Engineering Laboratories, Inc. (SEL).
During normal operations, auxiliary power for plant electrical loading is supplied by the units main generator through the normal unit auxiliary transformer (E-TR-N1).
Columbia Generating Station has two credited independent offsite power sources, which provide power to the 4KV safety buses, SM-7 and SM-8, through 230KV Ashe Substation connected to Startup Auxiliary Transformer E-TR-S, and the Backup offsite power from 115KV Benton substation connected to the backup startup Auxiliary Transformer E-TR-B.
E-TR-S is a 70MVA 4-winding transformer with a solidly-grounded Y connected winding on the 230KV primary, two secondary high resistance grounded Y connected windings to a 4.16KV and 6.9KV, and a third delta connected buried tertiary winding.
E-TR-B is a 14MVA 3-phase, 3-winding power transformer with grounded wye 115KV primary, embedded intermediate delta, and resistance grounded wye (4.16KV) secondary.
Columbia Generating Station installed OPDS to monitor the 230KV interconnection to E-TR-S and 115KV interconnection to E-TR-B, which are the credited offsite power sources. Two OPD relay sets were installed to provide monitoring, alarm and trip functions for each transformer. The SEL-451 relay processes alarm and trip functions while supervising the SEL-735 relay which monitors standby transformer loading. If an open phase condition is detected with transformer in standby, SEL-735 will provide output signal to SEL-451 which will initiate a main control room alarm. The design also includes local relays and annunciation in the station switchyard relay house.
At the time of the inspection, the system was installed and operating in a monitoring and alarming mode with the trip switches bypassed. The licensee enabled the trip function on December 13,
INSPECTION RESULTS
Observation: Temporary Instruction 2515/194-03.01 - Voluntary Initiative (Part 1)2515/194 Based on discussions with licensee staff, review of design, installation, testing and preventive maintenance documentation, corrective action reports and walkdowns of installed equipment, the inspector had reasonable assurance the licensee has appropriately implemented the voluntary industry initiative.
The inspector determined by design document review, walkdowns, staff discussions, system demonstrations and observations that:
For Detection, Alarms, and General Criteria
- (1) Open phase conditions will be detected and alarmed in the control rooms.
- (2) Detection circuits are sensitive enough to identify an open phase condition for all credited loading conditions.
- (3) The SEL OPDS is designed to minimize mis-operation or spurious action in the range of voltage unbalance normally expected in the transmission system that could cause separation from an operable offsite power source. The licensee had demonstrated that the actuation circuit design did not result in lower overall plant operation reliability.
- (4) No new non-Class-1E circuits were replaced with Class 1E circuits in the design.
- (5) The licensee had updated the Final Safety Analysis Report to discuss the design features and analyses related to the effects of, and protection for, any open phase condition vulnerabilities.
Protective Actions Criteria
- (1) The primary offsite interconnects to startup auxiliary transformer E-TR-S, and backup startup auxiliary transformer E-TR-B were identified as susceptible to an open phase condition and the licensee had implemented design changes to mitigate the effects.
- (2) With an open phase condition present and no accident condition signal present, the SEL OPDS would not adversely affect the function of important-to-safety systems, structures, or components.
- (3) With an open phase condition present and accident condition signal present, the SEL OPD system would automatically detect Open Phase Condition (OPC) and actuate a transfer of the loads required to mitigate postulated accidents to an alternate source and ensure that safety-related functions are preserved, as required by the current licensing bases.
If an OPC is detected when the onsite 4.16KV AC power is connected to the offsite power, the OPDS relay will provide alarm and trip the associated E-TR-S or E-TR-B lockout relay. In turn, the transformer lockout relay will initiate a trip of the breaker of the source that has the OPC.
Sensing the subsequent undervoltage condition at the 4.16KV ESF bus, a transfer to the next available source of power in the transfer sequence will be initiated depending upon initial conditions and bus transfer design.
In summary, the 4.16KV engineered safeguards buses (SM-4, SM-7, and SM-8) are normally energized from the main generator through the normal unit auxiliary transformer (E-TR-N) and the non-engineered safeguards busses. Upon loss of the normal power source, the engineered safeguards load (SM-7 and SM-8) are automatically transferred to the selected (backup)
Startup Transformer. Isolation of the Startup Transformer due to an open phase condition results in the engineered safeguards loads being automatically transferred and energized from the respective emergency diesel generator in the same manner as required by the current licensing bases.
Protective Actions Criteria Exception
At the time of this inspection, the licensee is still identifying and enhancing periodic tests, calibrations, surveillances, and inspection procedures for open phase protection system equipment. The licensee had performed a pre-inspection self-assessment and documented actions in Condition Report AR 261654261654 These actions included the licensees plans to determine the open phase detection components needed to be included in the maintenance rule program, turn on the trip function, and analyze open phase condition during the 500KV back feed operation mode during refueling and maintenance.
EXIT MEETINGS AND DEBRIEFS
The inspector confirmed that proprietary information was controlled to protect from public disclosure.
- On November 21, 2019, the inspector presented the Temporary Instruction 2515/194 inspection results to Mr. G. Hettel, Chief Nuclear Officer, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2515/194
Calculations
E/I-02-16-04
Open Phase Analysis
E/I-02-16-05
Open Phase Detection Scheme Settings
Corrective Action
Documents
Action Requests
AR-00401466, AR-00334543, AR-00318878, AR-00387320,
AR-00366372, AR-00367013, AR-00368519, AR-00369054,
AR-00370908, AR-00372256, AR-00376698, AR-00377987,
AR-00377993, AR-00378638, AR-00382361, AR-00386440,
AR-00389837, AR-00392539, AR-00396616, AR-00400385,
AR-00400535, AR-00400503, AR-00310273, AR-00401326
Corrective Action
Documents
Resulting from
Inspection
Action Requests
AR-00392300, AR-00401524, AR-00401525, AR-00401526
AR-00401527401527Drawings
2496
Current Schematic Diagram 115KV OPDS Bank TRB Relay
Set 1 & Set 2
2497
Potential Schematic Diagram 115KV OPDS Bank TRB Relay
Set 1 & Set 2
2501
Communication BLK Diagram 115KV OPDS Bank TRB
Relay Set 1 & 2
2510
One Line Diagram 115KV OPDS Bank TRB Open Phase
Detection Scheme
2511
Current Schematic Diagram 230KV OPDS Bank TRS Relay
Set 1 & Set 2
2512
Potential Schematic Diagram 230KV OPDS Bank TRS Relay
Set 1 & Set 2
2525
One Line Diagram 230KV OPDS Bank TRS Open Phase
Detection Scheme
23725
Schematic Diagram Comm. RM 525, RK 3, PWR & Alarms
230KV Open Phase Detection
23726
Schematic Diagram Comm. RM 525, RK 3, PWR & Alarms
115KV Open Phase Detection
E502-1
Main One Line Diagram,
E502-2
Main One Line Diagram
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2515/194
Drawings
E502-2
Main One Line Diagram
E503-2A
Auxiliary One Line Diagram, E-MC-1B, E-MC-2D, E-MC-2P
& E-MC-3C
E503-6
Auxiliary One Line Diagram
114
E503-9
Auxiliary One Line Diagram
E507-2
Main Three Line Diagram
E507-3
Main Three Line Diagram
E507-4
Main Three Line Diagram, E-SM-4 HPCS Bus
E512-1
Protective Relaying & Control Elementary Drawings
E513-3
One Line Diagram 230 KV Line Protection, Relay Circuits
E513-3A
Open Phase Detection System 230 KV Line Protection TR-S,
Relay Circuits
E513-4A
Open Phase Detection System 115KV Line Protection TR-B,
Relay Circuits
E514-11
Switchgear Under Voltage Relay Settings List
E539-10A
Connection Diagram 4160 V Switchgear E-SM-4 Unit 101
Breaker E-CB-4/2 Cubicle
E539-10C
Connection Diagram 4160 V Switchgear E-SM-4 Unit 102
Auxiliary Cubicle
EWD-46E-044A
Electrical Wiring Diagram AC Electrical Distribution System,
E-TR-B, Open Phase Detection System
EWD-46E-060
Electrical Wiring Diagram Main Control Room, BOP
Annunciator Engraving ANN-ANN-C/C1, -C/C2 & -C/C3
EWD-46E-308
Electrical Wiring Diagram AC Electrical Distribution System,
OPDS-BLDG-B, Power Panel OPDS-PP-B
EWD-46E-308
Electrical Wiring Diagram AC Electrical Distribution System,
OPDS-BLDG-B, Power Panel OPDS-PP-B
EWD-46E-309
Electrical Wiring Diagram AC Electrical Distribution System,
OPDS-BLDG-S, Power Panel OPDS-PP-S
EWD-50E-003
Electrical Wiring Diagram DC Electrical Distribution System,
Distribution Panel E-DP-S1/1C
EWD-50E-004
Electrical Wiring Diagram DC Electrical Distribution System,
Distribution Panel E-DP-S1/1C1
EWD-50E-009
Electrical Wiring Diagram DC Electrical Distribution System,
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2515/194
Drawings
Distribution Panel E-DP-S1/2B
EWD-50E-010
Electrical Wiring Diagram DC Electrical Distribution System,
Distribution Panel E-DP-S1/2C
EWD-50E-011
Electrical Wiring Diagram DC Electrical Distribution System,
Distribution Panel E-DP-S1/2C1
EWD-50E-019
Electrical Wiring Diagram DC Electrical Distribution System,
Distribution Panel E-DP-S1/1C3
EWD-50E-029
Electrical Wiring Diagram DC Electrical Distribution System,
Distribution Panel E-DP-S1/7
Engineering
Changes
0000011331
Critical 4.16 KV Switchgear SM-4 Undervoltage Relay
Enhancement
0000013851
Engineering Change (EC) Open Phase Design Vulnerability
(OPDV) Vulnerability (OPDV) Project Installation Design For
E-TR-S
0000013901
Engineering Change (EC) Open Phase Design Vulnerability
(OPDV) Project Installation Design for E-TR-B
Miscellaneous
25772
EPRI Report for Analysis of Station Auxiliary Transformer
Response to Open Phase Condition
6/2012
15314
Specification for Switch yard Relay Buildings and Relay
Equipment for Open Phase Detection System (OPDS) TRS
& TRB
5/26/2016
15315
Specification for OPDS HV Instrument Transformers
Columbia Generating Station Docket No. 50-397 Response
to NRC Bulletin 2012-01, Design Vulnerability in Electric
Power System
10/25/2012
LDCN-16-016
Implementation Open Phase Detection System
Presentation
Open Phase Detection System (OPDS) at Columbia
Presentation
n/a
Procedures
10.25.119
Testing and Setting Schweitzer SEL Relays
10.25.179
Flexible and Rigid Link Removal, Inspection, and Installation
4-OPDS.TR-B
TR-B Open Phase Detection System (OPDS) Annunciator
Panel Alarms
4-OPDS.TRS
TR-S Open Phase Detection System (OPDS) Annunciator
Panel Alarms
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2515/194
Procedures
4.800.C3
800.C3 Annunciator Panel Alarms
ABN-ELEC-DG4-
Crosstie/MC-8A
DG4 Crosstie to MC-8A
ABN-ELEC-GRID
Degraded Offsite Power Grid
OSP-ELEC-W101 Offsite Station Power Alignment Check
SOP-ELEC-
TR-B Valve, Breaker and Control Switch Lineup
SOP-ELEC-
TR-S Valve, Breaker and Control Switch Lineup
SOP-ELEC-
OPDS-TRB
TR-B Open Phase Detection System (OPDS) Operation
SOP-ELEC-
OPDS-TRS
TR-S Open Phase Detection System (OPDS) Operation
SOP-
HVAC/OPDS-
START
OPDS Relay Building Ventilation System Start
Work Orders
2094215 70
OPDS - EC-13901 Electrical Installation
4/19/2017