06/13/2007 Summary of Category 1 Working-Level Meeting with PPL Susquehanna, LLC (PPL) to Discuss the Licensee'S Proposed License Amendment Request Regarding Electrical Distribution Systems Dated March 2, 2007
ML071710019
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/21/2007
From: Guzman R V
NRC/NRR/ADRO/DORL/LPLI-1
To:
Guzman R V, NRR/DORL, 415-1030
References
Download: ML071710019 (6)


Text

June 21, 2007LICENSEE:PPL Susquehanna, LLC (PPL)FACILITY:Susquehanna Steam Electric Station, Unit 1 and 2 (SSES 1 and 2)

SUBJECT:

SUMMARY

OF JUNE 13, 2007, CATEGORY 1 WORKING-LEVELMEETING WITH PPL TO DISCUSS THE LICENSEE'S PROPOSED LICENSE AMENDMENT REQUEST REGARDING ELECTRICAL DISTRIBUTION SYSTEMS DATED MARCH 2, 2007 (AGENCYWIDE DOCUMENTS ACCESS AND MANAGEMENT SYSTEM (ADAMS)

ACCESSION NO. ML070720545)On June 13, 2007, a public meeting was held between the U.S. Nuclear RegulatoryCommission (NRC), and representatives of PPL at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss PPL's March 2, 2007, amendment request to revise the SSES 2 Technical Specifications (TSs).PPL provided an overview of their proposed amendment request to revise TS 3.8.1, "AC(alternating current) Sources Operating," in order to support the 4.16 kilo-volt (kV) bus maintenance during the SSES 1 refueling outage scheduled for spring 2008. PPL presented various configurations of the SSES 1 and 2 electrical distribution system with respect to the proposed note to the SSES 2 TSs. It also discussed the interrelation of SSES 1 and 2 common loads and how maintenance on one unit affects the operation of the other. PPL indicated that the existing SSES 2 TS 3.8.1 requires that when a Unit 1 4.16 kV bus is de-energized for routine maintenance, limiting condition for operation (LCO) 3.8.1 Conditions A, B, and D are entered. Specifically, an offsite circuit (Condition A) and a diesel generator (Condition B) are declared inoperable, and TS 3.8.1 Condition D requires a 12-hour completion time to perform all the maintenance work on the bus. The time required to perform the planned maintenance is between 50 and 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br />. PPL presented its proposed resolution to add a note to SSES 2 TS

3.8.1 which

would effectively remove the requirement for entry into TS 3.8.1, but would retain entry into LCO 3.8.7 Condition C during the planned maintenance.PPL concluded that (1) since LCO 3.8.7 Condition C is the only affected TS LCO condition afterapplication of the proposed note to LCO 3.8.1, the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time is applicable, and sufficient time is provided to perform the necessary 4.16 kV bus maintenance, and (2) adding the proposed note to SSES 2 TS 3.8.1 precludes the need to enter any LCO 3.8.1 conditions for the planned SSES 1 4.16 kV bus configuration.The Pennsylvania state contact, Brad Fuller, was in attendance. No Public Meeting Feedbackforms were received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a copy of the licensee's slides presented at the meeting (ML071710427).

PPL Susquehanna, LLC-2-Please direct any inquiries to me at 301-415-1030, or rvg@nrc.gov./RA/Richard V. Guzman, Senior Project ManagerPlant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-387 and 50-388

Enclosures:

1. List of Attendees
2. Licensee's Handouts/Slidescc w/encls: See next page

ML071710019OFFICELPLI-1/PMLPLI-1/LALPLI-1/BCNAMERGuzmanSLittleMKowalDATE6/21/076/21/076/21/07 LIST OF ATTENDEESNUCLEAR REGULATORY COMMISSION (NRC)NUCLEAR REACTOR REGULATION (NRR) CATEGORY 1 MEETINGWITH PPL SUSQUEHANNA, LLC (PPL)LICENSE AMENDMENT APPLICATION FORTECHNICAL SPECIFICATION 3.8.1, "AC SOURCES OPERATING,"SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 AND 2JUNE 13, 2007NAME ORGANIZATION1. Richard GuzmanNRC/NRR/Plant Licensing Branch I-12. Sheila RayNRC/NRR/Division of Engineering

3. Yoira DiazNRC/NRR/Division of License Renewal
4. Drew StuyvenbergNRC/NRR/Division of License Renewal
5. Patrick BoughanNRC/NRR/Division of Engiineering
6. Duane FilchnerPPL
7. Todd CreasyPPL
8. Philip BradyPPL
9. Brad FullerPennsylvania Bureau of Radiation ProtectionEnclosure 1 MEETING SLIDESEnclosure 2 Susquehanna Steam Electric Station, Units 1 and 2 cc:

Britt T. McKinneySr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467Robert A. SacconeGeneral Manager - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467Terry L. HarpsterGeneral Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467Rocco R. SgarroManager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Supervisor - Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467Michael H. CrowthersSupervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Steven M. CookManager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467Luis A. RamosCommunity Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467Bryan A. Snapp, EsqAssoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA 18101-1179Supervisor - Document Control ServicesPPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Richard W. OsborneAllegheny Electric Cooperative, Inc.

212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266Director - Bureau of Radiation ProtectionPennsylvania Department of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105-8469Senior Resident InspectorU.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4Berwick, PA 18603-0035Regional Administrator, Region 1U.S. Nuclear Regulatory Commission

475 Allendale Road King of Prussia, PA 19406Board of SupervisorsSalem Township P.O. Box 405 Berwick, PA 18603-0035Dr. Judith JohnsrudNational Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803