ML16111A889: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 9: Line 9:
| docket = 05000293
| docket = 05000293
| license number =  
| license number =  
| contact person = Burritt A L
| contact person = Burritt A
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| page count = 13
| page count = 13

Revision as of 06:01, 20 June 2019

4/13/2016 - Pilgrim Nuclear Power Station Annual Assessment Meeting - NRC Presentation Slides
ML16111A889
Person / Time
Site: Pilgrim
Issue date: 04/13/2016
From:
NRC/RGN-I/DRP/PB5
To:
Burritt A
References
Download: ML16111A889 (13)


Text

Reviewof2015 Performance atPilgrim Nuclear Power StationAnnual AssessmentMeeting April13,2016 ML16111A889 Agenda*Introduction *Discussion of NRC Oversight Results

  • Entergy Response and Remarks
  • NRC Closing Remarks
  • Break
  • Public Q&A Robust NRC Oversight*Licensee performance, characterized by a weak corrective action program, placed

plant in Column 4 of the Action Matrix*Ongoing NRC oversight to ensure safety margins maintained*Current regulatory actions are adequate

  • Degraded Cornerstone Column (since 4 th Quarter 2013)*Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications*Two White Parallel Findings:

oInadequate corrective actions for the two White PIs oDid not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters Pilgrim Performance Problems

failure*White Finding combined with performance within the Degraded Cornerstone for more than

five quarters

  • Led to Pilgrim performance transition to Column 4 Pilgrim Performance Problems NRC Oversight Actions Are Comprehensive*Ensure adequate safety margins maintained*Completed Inspection Procedure (IP) 95003 Phases A & B to ensure:

osignificant issues in corrective action program (CAP) appropriately addressed ointerim licensee actions arresting CAP performance declines*Increased Problem Identification and Resolution samples on previously identified performance

issues NRC Oversight Actions Are Comprehensive*Additional Resident Inspector was assigned to site*Quarterly Assessments -increased management oversight*Current regulatory actions are adequate 9/01: MC letter/final White11/12: 3Q report issued 12/01: security report issued12/21: FP triennial report issued 2/11: 4Q15 report issued2/29: Phase A issued3/4: annual assessment letters issued 4/4-4/8: Phase B inspection4/13: annual assessment meeting 5/2-5/20: Mods TeamApril 4-8, 2016 Phase BSix-month review of the corrective action program to determine improvement progress TBD Phase CIP 95003 items not already covered in Phases A and BSafety culture assessmentJanuary 11-15, 2016 Phase A COMPLETEReport Issue 2/29Snapshot of corrective action program performance TBDIP 92723Four SL IV violations (impeding regulatory

process)4Q2015 CPI&R Samples COMPLETEReport Issue 12/11 Three operations-focused (complete)Adverse weather preps (resident inspectors)PI&R Sample 1Q2016Security baseline follow-upMay 2-20, 2016Mods Team Baseline triennial modification team

inspection April 2016 Public Meeting 95003 updateAnnual assessment meeting Key Inspections & Milestones Future Action to Monitor Pilgrim*Supplemental IP 95003 Phase C o Most significant Phase of 95003 oPrimary Focus -CAP and Safety Culture oConducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)*CAL Follow-up inspection Licensee Response and RemarksMr. John Dent Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Annual Assessment Meeting NRC Closing Remarks Contacting the NRC*Report a safety concern -(800) 695-7403 -Allegation@nrc.gov*General information or questions-www.nrc.gov

-Select "What We Do" for Public Affairs Reference Sources*Reactor Oversight Process

-www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tmlPilgrim Special Oversight Website:

-www.nrc.gov/info-finder/reactors/pilg/special-oversight.html

  • Public Electronic Reading Room

-www.nrc.gov/reading-rm.html

  • Public Document Room-800-397-4209 Reviewof2015 Performance atPilgrim Nuclear Power StationAnnual AssessmentMeeting April13,2016 ML16111A889 Agenda*Introduction *Discussion of NRC Oversight Results
  • Entergy Response and Remarks
  • NRC Closing Remarks
  • Break
  • Public Q&A Robust NRC Oversight*Licensee performance, characterized by a weak corrective action program, placed

plant in Column 4 of the Action Matrix*Ongoing NRC oversight to ensure safety margins maintained*Current regulatory actions are adequate

  • Degraded Cornerstone Column (since 4 th Quarter 2013)*Two White Performance Indicators (PIs): Unplanned Scrams, Unplanned Scrams with Complications*Two White Parallel Findings:

oInadequate corrective actions for the two White PIs oDid not meet Inspection Procedure 95002 Objectives o Remained in the Degraded Cornerstone column for more than five quarters Pilgrim Performance Problems

failure*White Finding combined with performance within the Degraded Cornerstone for more than

five quarters

  • Led to Pilgrim performance transition to Column 4 Pilgrim Performance Problems NRC Oversight Actions Are Comprehensive*Ensure adequate safety margins maintained*Completed Inspection Procedure (IP) 95003 Phases A & B to ensure:

osignificant issues in corrective action program (CAP) appropriately addressed ointerim licensee actions arresting CAP performance declines*Increased Problem Identification and Resolution samples on previously identified performance

issues NRC Oversight Actions Are Comprehensive*Additional Resident Inspector was assigned to site*Quarterly Assessments -increased management oversight*Current regulatory actions are adequate 9/01: MC letter/final White11/12: 3Q report issued 12/01: security report issued12/21: FP triennial report issued 2/11: 4Q15 report issued2/29: Phase A issued3/4: annual assessment letters issued 4/4-4/8: Phase B inspection4/13: annual assessment meeting 5/2-5/20: Mods TeamApril 4-8, 2016 Phase BSix-month review of the corrective action program to determine improvement progress TBD Phase CIP 95003 items not already covered in Phases A and BSafety culture assessmentJanuary 11-15, 2016 Phase A COMPLETEReport Issue 2/29Snapshot of corrective action program performance TBDIP 92723Four SL IV violations (impeding regulatory

process)4Q2015 CPI&R Samples COMPLETEReport Issue 12/11 Three operations-focused (complete)Adverse weather preps (resident inspectors)PI&R Sample 1Q2016Security baseline follow-upMay 2-20, 2016Mods Team Baseline triennial modification team

inspection April 2016 Public Meeting 95003 updateAnnual assessment meeting Key Inspections & Milestones Future Action to Monitor Pilgrim*Supplemental IP 95003 Phase C o Most significant Phase of 95003 oPrimary Focus -CAP and Safety Culture oConducted after licensee declares readiness o Ensures causes understood & plan to address o Confirmatory Action Letter (CAL)*CAL Follow-up inspection Licensee Response and RemarksMr. John Dent Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Annual Assessment Meeting NRC Closing Remarks Contacting the NRC*Report a safety concern -(800) 695-7403 -Allegation@nrc.gov*General information or questions-www.nrc.gov

-Select "What We Do" for Public Affairs Reference Sources*Reactor Oversight Process

-www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.h tmlPilgrim Special Oversight Website:

-www.nrc.gov/info-finder/reactors/pilg/special-oversight.html

  • Public Electronic Reading Room

-www.nrc.gov/reading-rm.html

  • Public Document Room-800-397-4209