{{#Wiki_filter:,".~~'Rot,P~7~P.O.BOX529100MIAMI,FL33152+iAriMr.J.P.O'Reilly,
{{#Wiki_filter:,".~~'Rot,P~7~P.O.BOX 529100 MIAMI, FL 33152+i AriMr.J.P.O'Reilly, Director, Region II Office of Inspection
Director,
5 Enforcement
RegionIIOfficeofInspection
U.S.Nuclear Regulatory
5Enforcement
U.S.NuclearRegulatory
Commission
Commission
101MariettaStreet,Suite3100Atlanta,Georgia30303DearMr.O'Reilly:
101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Dear Mr.O'Reilly: RE: RII:JJL Docket No.50-389 79-18~g/4lP li 7 p/g.FLORIDA POWER 5 LIGHT COMPANY koch 4, 1980 L-80-73 As requested, we are providing the.following clarifications
RE:RII:JJLDocketNo.50-38979-18~g/4lPli7p/g.FLORIDAPOWER5LIGHTCOMPANYkoch4,1980L-80-73Asrequested,
weareproviding
the.following
clarifications
concerning
concerning
thephysicalinspection
the physical inspection
ofprotective
of protective
coatingmaterialbyReceiving
coating material by Receiving guality Control for container data and marking and the preparation
gualityControlforcontainer
of Nonconformance
dataandmarkingandthepreparation
Report 869R.l.Item lA on Florida Power 8 Light Receipt Inspection
ofNonconformance
Report Form 4307-1.1, (Revision 12/76)entitled"Container
Report869R.l.ItemlAonFloridaPower8LightReceiptInspection
Data and Markings" documents the physical in-spection performed by Receiving gC to verify lot or batch numbers of delivered pro-tective coating materials against documentation
ReportForm4307-1.1,
provided by the supplier.For the material in question, lot numbers for both the resin and cure containers
(Revision
were the same, 690 7161.This portion of the physical inspection
12/76)entitled"Container
was performed on October ll, 1979 and the material was determined
DataandMarkings"
to be acceptable.
documents
A Nonconformance
thephysicalin-spectionperformed
Report was not required.2.However, Nonconformance
byReceiving
Report 869R was prepared on October 12, 1979 fol-lowing the exit interview of the subject inspection.
gCtoverifylotorbatchnumbersofdelivered
The primary punpose of this NCR was to assure through written controls that future deliveries
pro-tectivecoatingmaterials
of protective
againstdocumentation
coating materials would be handled in the same manner as other safety-related
providedbythesupplier.
material and not delivered directly to the paint storage facility.Surveillances
Forthematerialinquestion,
performed by guality Assurance have verified that deliveries
lotnumbersforboththeresinandcurecontainers
of protective
werethesame,6907161.Thisportionofthephysicalinspection
coat-ing matierals are segregated
wasperformed
until receipt inspection
onOctoberll,1979andthematerialwasdetermined
approval, at which time the material is released via a R'equisition
tobeacceptable.
on Stores to the paint storage facility.Very truly yours, Robert E.Uhrig Vice President Advanced Systems 8 Technology
ANonconformance
Reportwasnotrequired.
2.However,Nonconformance
Report869RwaspreparedonOctober12,1979fol-lowingtheexitinterview
ofthesubjectinspection.
TheprimarypunposeofthisNCRwastoassurethroughwrittencontrolsthatfuturedeliveries
ofprotective
coatingmaterials
wouldbehandledinthesamemannerasothersafety-related
materialandnotdelivered
directlytothepaintstoragefacility.
Surveillances
performed
bygualityAssurance
haveverifiedthatdeliveries
ofprotective
coat-ingmatierals
aresegregated
untilreceiptinspection
approval,
atwhichtimethematerialisreleasedviaaR'equisition
onStorestothepaintstoragefacility.
Verytrulyyours,RobertE.UhrigVicePresident
AdvancedSystems8Technology
REU:GDW/tg
REU:GDW/tg
Attachment
Attachment
CC-AC'.Lenahan..
CC-AC'.Lenahan..R.Bra'dl ey"'"'" Harold F.Reis, Esq.-8604o~0(73 PEOPLE...SERVING
R.Bra'dley"'"'"HaroldF.Reis,Esq.-8604o~0(73PEOPLE...SERVING
PEOPLE
PEOPLE
}}
}}

Revision as of 19:27, 7 July 2018

Responds to NRC 791105 Ltr Re Violations Noted in IE Insp Rept 50-389/79-18.Corrective Actions:Lot Numbers for Resin & Cure Containers Verified as Same.Surveillance Verified Delivery & Segregation of Matls
ML17208A413
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/04/1980
From: UHRIG R E
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17208A412 List:
References
L-80-73, NUDOCS 8004040173
Download: ML17208A413 (1)


See also: IR 05000389/1979018

Text

,".~~'Rot,P~7~P.O.BOX 529100 MIAMI, FL 33152+i AriMr.J.P.O'Reilly, Director, Region II Office of Inspection

5 Enforcement

U.S.Nuclear Regulatory

Commission

101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Dear Mr.O'Reilly: RE: RII:JJL Docket No.50-389 79-18~g/4lP li 7 p/g.FLORIDA POWER 5 LIGHT COMPANY koch 4, 1980 L-80-73 As requested, we are providing the.following clarifications

concerning

the physical inspection

of protective

coating material by Receiving guality Control for container data and marking and the preparation

of Nonconformance

Report 869R.l.Item lA on Florida Power 8 Light Receipt Inspection

Report Form 4307-1.1, (Revision 12/76)entitled"Container

Data and Markings" documents the physical in-spection performed by Receiving gC to verify lot or batch numbers of delivered pro-tective coating materials against documentation

provided by the supplier.For the material in question, lot numbers for both the resin and cure containers

were the same, 690 7161.This portion of the physical inspection

was performed on October ll, 1979 and the material was determined

to be acceptable.

A Nonconformance

Report was not required.2.However, Nonconformance

Report 869R was prepared on October 12, 1979 fol-lowing the exit interview of the subject inspection.

The primary punpose of this NCR was to assure through written controls that future deliveries

of protective

coating materials would be handled in the same manner as other safety-related

material and not delivered directly to the paint storage facility.Surveillances

performed by guality Assurance have verified that deliveries

of protective

coat-ing matierals are segregated

until receipt inspection

approval, at which time the material is released via a R'equisition

on Stores to the paint storage facility.Very truly yours, Robert E.Uhrig Vice President Advanced Systems 8 Technology

REU:GDW/tg

Attachment

CC-AC'.Lenahan..R.Bra'dl ey"'"'" Harold F.Reis, Esq.-8604o~0(73 PEOPLE...SERVING