ML111010491: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML111010491
| number = ML111010491
| issue date = 04/11/2011
| issue date = 04/11/2011
| title = Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Acceptance Review E-mail, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources Operating and Tstf 163, Revision 2, Minimum Vs. Steady State Voltage and Frequency.
| title = Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Acceptance Review E-mail, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources Operating and TSTF 163, Revision 2, Minimum Vs. Steady State Voltage and Frequency.
| author name = Wang A B
| author name = Wang A B
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV

Revision as of 14:16, 13 April 2018

Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Acceptance Review E-mail, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources Operating and TSTF 163, Revision 2, Minimum Vs. Steady State Voltage and Frequency.
ML111010491
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/11/2011
From: Wang A B
Plant Licensing Branch IV
To: Baldwin T, Soenen P R
Pacific Gas & Electric Co
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC ME5939, TAC ME5940
Download: ML111010491 (2)


Text