ML083400282

From kanterella
Jump to navigation Jump to search

Acceptance Review E-mail
ML083400282
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/04/2008
From: Wang A
Plant Licensing Branch IV
To: Ketelsen S, Parker L
Pacific Gas & Electric Co
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC ME0200
Download: ML083400282 (1)


Text

From: Alan Wang Sent: Thursday, December 04, 2008 2:35 PM To: Larry Parker; Stan Ketelsen Cc: Susan Lent; Glenna Lappert

Subject:

Accpetance of Diablo Canyon Stan:

By letter dated December 4, 2008, Pacific Gas and Electric Company (PG&E) submitted a relief request for Diablo Canyon Power Plant, Unit No. 1. The proposed relief request is needed for Unit 1's January 2009 refueling outage and requests for approval of an alternative to the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, Code Case N-729-1 as conditioned by 10 CFR 50.55a(g)(6)(ii)(D)(3) for demonstrated volumetric or surface leak path assessment through all J-groove welds.. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1445.

Alan Wang Project Manager (Diablo Canyon)

Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445 Fax: (301) 415-1222 E-mail Properties

Mail Envelope Properties (419623E8C7444444BF132DA3AE69EDA213FD3E4B28)

Subject:

Accpetance of Diablo Canyon Sent Date: 12/4/2008 2:34:34 PM Received Date: 12/4/2008 2:34:34 PM From: Alan Wang Created By: Alan.Wang@nrc.gov Recipients:

LMP1@pge.com (Larry Parker)

Tracking Status: None SCK3@pge.com (Stan Ketelsen)

Tracking Status: None Susan.Lent@nrc.gov (Susan Lent)

Tracking Status: None Glenna.Lappert@nrc.gov (Glenna Lappert)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 9434 12/4/2008 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: