Acceptance Review of LAR Regarding Revision to Technical Specification 3.8.1
ML14122A362
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/02/2014
From: Peter Bamford
Plant Licensing Branch IV
To: Soenen P
Pacific Gas & Electric Co
Bamford P
References
TAC MF3826, TAC MF3827
Download: ML14122A362 (1)


Text

From: Bamford, Peter To: Soenen, Philippe R (PNS3@pge.com)

Cc: Burkhardt, Janet

Subject:

Acceptance Review of LAR Regarding Revision to Technical Specification 3.8.1 (TAC Nos. MF3826 and MF3827 Date: Friday, May 02, 2014 3:10:00 PM Attachments: image002.png By letter dated March 27, 2014 (ADAMS Accession No. ML14086A426), Pacific Gas and Electric Company submitted a license amendment request (LAR) for Diablo Canyon Power Plant, Units 1 and 2, proposing to modify various sections of Technical Specification 3.8.1 to address certain non-conservative technical specifications in accordance with U.S.

Nuclear Regulatory Commission (NRC) Administrative Letter 98-10 Dispositioning of Technical Specifications That are Insufficient to Assure Plant Safety.

The purpose of this email is to provide the results of the NRC staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application, and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed license amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

Peter Bamford NRR/DORL/LPL4-1 Diablo Canyon and ANO Project Manager 301-415-2833