ML24250A050
| ML24250A050 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 09/06/2024 |
| From: | Samson Lee NRC/NRR/DORL/LPL4 |
| To: | Richardson M Pacific Gas & Electric Co |
| References | |
| L-2024-LLA-0106 | |
| Download: ML24250A050 (3) | |
Text
From:
Samson Lee Sent:
Friday, September 6, 2024 8:46 AM To:
'Richardson, Michael'
Subject:
Acceptance Review: Diablo Canyon revision to Technical Specification 5.5.16 for permanent extension of Type A and Type C leak rate test frequencies (EPID: L-2024-LLA-0106)
By letter dated July 31, 2024 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24213A331), Pacific Gas and Electric Company (the licensee) submitted a request for Diablo Canyon Power Plant, Units 1 and 2, to revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, by replacing the reference to Regulatory Guide (RG) 1.163, Performance-Based Containment Leak-Test Program with Revision 1 of RG 1.163. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed the licensees application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, the licensee will be advised by separate correspondence.
Based on the information provided in the licensees submittal, the NRC staff has estimated that this licensing request will take approximately 800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> to complete. The NRC staff expects to complete this review by September 6, 2025. If there are emergent complexities or challenges in the NRC staffs review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application, and they could change, due to several factors including complexity and uniqueness of the review, requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact me.
Samson Lee Diablo Canyon Project Manager Plant Licensing Branch 4 Division of Operating Reactor Licensing
Office of Nuclear Reactor Regulation 301-415-3168 Docket Nos. 50-275 and 50-323
Hearing Identifier:
NRR_DRMA Email Number:
2597 Mail Envelope Properties (SA1PR09MB8653FC3607E3057FB1AB31D49A9E2)
Subject:
Acceptance Review Diablo Canyon revision to Technical Specification 5.5.16 for permanent extension of Type A and Type C leak rate test frequencies (EPID L-2024-LLA-0106)
Sent Date:
9/6/2024 8:46:16 AM Received Date:
9/6/2024 8:46:00 AM From:
Samson Lee Created By:
Samson.Lee@nrc.gov Recipients:
"'Richardson, Michael'" <MJRm@pge.com>
Tracking Status: None Post Office:
SA1PR09MB8653.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3085 9/6/2024 8:46:00 AM Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date: